27.06.2013 Views

Aerocapture Technology - 123SeminarsOnly

Aerocapture Technology - 123SeminarsOnly

Aerocapture Technology - 123SeminarsOnly

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Neptune Orbiter <strong>Aerocapture</strong> System Concept<br />

Mass margin provides opportunity for<br />

• Third probe<br />

• Increased aeroshell size for possible reduction in<br />

aeroheating rates/loads, TPS thickness<br />

requirements, surface recession<br />

Propulsive mission is too massive for Delta IV-H<br />

<strong>Aerocapture</strong> is ENABLING<br />

Orbiter<br />

2.88 m Length<br />

Flattened Ellipsled<br />

Aeroshell<br />

2 Probes<br />

Orbiter<br />

Reference: “Systems Analysis for a Neptune <strong>Aerocapture</strong> Mission”, NASA TM 2006-214300, May 2006<br />

35% Dry<br />

Margin at<br />

Orbiter and<br />

SEP Level<br />

5m Fairing<br />

Solar<br />

arrays<br />

SEP Prop<br />

Module<br />

14

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!