DDEL<br />
Process Flow Chart<br />
START JOB<br />
BEND PIPES AS<br />
PER DRAWING<br />
FITUP AS PER<br />
DRAWING<br />
DIMENSION &<br />
ORIENTATION<br />
INSPECTION<br />
WELDING<br />
OK<br />
RECEIPT OF<br />
BOMS &<br />
SPOOLWISE<br />
DRAWINGS<br />
EDGE<br />
PREPARATION<br />
NOT OK<br />
<strong>Pre</strong> <strong>Fabrication</strong> Pipe spools<br />
Each process is followed by a Quality check<br />
REWORK<br />
NDT<br />
PROCESS<br />
REPAIR<br />
NOT OK<br />
CUT PIPES /<br />
SECTIONS AS<br />
PER MARKING<br />
PRODUCTION<br />
PLANNING<br />
VISUAL &<br />
DIMENSION<br />
INSPECTION<br />
OK<br />
JOB<br />
COMPLETION<br />
DIMENSION<br />
INSPECTION<br />
CS<br />
RECEIPT OF RAW<br />
MATERIAL (PIPES,<br />
FITTINGS &<br />
STRUCTURAL)<br />
SHOT BLASTING<br />
SPOOL<br />
SS<br />
SPOOL<br />
NOT OK<br />
SOLVENT CLEANING<br />
DISPATCH<br />
MARK PIPE /<br />
STRUCTURAL<br />
FOR CUTTING &<br />
BENDING<br />
VISUAL<br />
(SURFACE)<br />
INSPECTION<br />
VISUAL<br />
(SURFACE)<br />
INSPECTION<br />
PACKING<br />
INCOMING<br />
INSPECTION<br />
OK<br />
INTERNAL<br />
STORAGE<br />
PAINTING<br />
NOT OK<br />
REJECTED<br />
VISUAL / DFT<br />
INSPECTION<br />
FINAL<br />
INSPECTION<br />
24