27.06.2013 Views

Pre Fabrication Piping - Imimg

Pre Fabrication Piping - Imimg

Pre Fabrication Piping - Imimg

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

DDEL<br />

Layout Engineering<br />

<strong>Piping</strong> General Arrangement Drawings (Plan & Sections)<br />

<strong>Piping</strong> Isometrics<br />

Capabilities ( Contd… )<br />

Pipe Shop <strong>Fabrication</strong> Spools drawings<br />

Equipment Nozzle Orientation Plan<br />

Review of piping GAD’s with respect to P&IDs<br />

Review of Vendor Drawings/ Documents<br />

Stress Analysis<br />

Capable to carry out stress analysis using Caeser-II<br />

latest software package and suggest required changes<br />

in the layout drawings and select proper and optimal<br />

supports to bring the system with in permissible limits<br />

of stresses and forces and moments at the terminals<br />

Material Engineering<br />

<strong>Piping</strong> Items Procurement Specifications.<br />

Insulation Items Procurement Specifications.<br />

Painting Specifications,<br />

<strong>Piping</strong> Bill of Materials<br />

<strong>Pre</strong>liminary BOM Issue (Based on P&ID and Plot Plan)<br />

Intermediate (Based on <strong>Piping</strong> Layout)<br />

Final (Based on <strong>Piping</strong> Isometrics).<br />

- Pipe Supports Bill of Materials.<br />

- Technical Bid Evaluation for procurement<br />

Pipe Support Engineering<br />

Pipe Support Layouts, Pipe Support Detail<br />

Drawings<br />

Spring Hanger Data Sheets, specifications<br />

Inserts & Loading Drawings (Input to Civil)<br />

43

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!