Pre Fabrication Piping - Imimg
Pre Fabrication Piping - Imimg
Pre Fabrication Piping - Imimg
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
DDEL<br />
Layout Engineering<br />
<strong>Piping</strong> General Arrangement Drawings (Plan & Sections)<br />
<strong>Piping</strong> Isometrics<br />
Capabilities ( Contd… )<br />
Pipe Shop <strong>Fabrication</strong> Spools drawings<br />
Equipment Nozzle Orientation Plan<br />
Review of piping GAD’s with respect to P&IDs<br />
Review of Vendor Drawings/ Documents<br />
Stress Analysis<br />
Capable to carry out stress analysis using Caeser-II<br />
latest software package and suggest required changes<br />
in the layout drawings and select proper and optimal<br />
supports to bring the system with in permissible limits<br />
of stresses and forces and moments at the terminals<br />
Material Engineering<br />
<strong>Piping</strong> Items Procurement Specifications.<br />
Insulation Items Procurement Specifications.<br />
Painting Specifications,<br />
<strong>Piping</strong> Bill of Materials<br />
<strong>Pre</strong>liminary BOM Issue (Based on P&ID and Plot Plan)<br />
Intermediate (Based on <strong>Piping</strong> Layout)<br />
Final (Based on <strong>Piping</strong> Isometrics).<br />
- Pipe Supports Bill of Materials.<br />
- Technical Bid Evaluation for procurement<br />
Pipe Support Engineering<br />
Pipe Support Layouts, Pipe Support Detail<br />
Drawings<br />
Spring Hanger Data Sheets, specifications<br />
Inserts & Loading Drawings (Input to Civil)<br />
43