CONSTITUENCY-WISE ALLOTMENT (CWA)<br />

The constituency-wise allocation was conceptualized to place Rs.10.00<br />

lakh to each constituency, so that critical road projects can be taken up in rural<br />

areas in consultation with the local representatives (MLAs) to address the<br />

urgent needs of the locality. It was decided to supplement, another Rs.10.00<br />

lakh per constituency in shape of food grains.<br />

1. Physical and Financial Achievement, <strong>2003</strong>-04<br />

A target was fixed to improve 1938.76 km of roads by utilizing said<br />

amount and food grains, out of which 1695.79 km of road work has been<br />

completed by incurring expenditure of Rs.989.64 lakh during the year. The<br />

target could not achieve for want of LC.<br />

2. Programme for <strong>2004</strong>-05<br />

During the year <strong>2004</strong>-05, there is a provision for Rs.14.50 crore under<br />

CWA. This fund will be utilized for improvement of roads /CD works in 145<br />

constituencies, as per the suggestions of the MLAs concerned.