CONSTITUENCY-WISE ALLOTMENT (CWA)<br />
The constituency-wise allocation was conceptualized to place Rs.10.00<br />
lakh to each constituency, so that critical road projects can be taken up in rural<br />
areas in consultation with the local representatives (MLAs) to address the<br />
urgent needs of the locality. It was decided to supplement, another Rs.10.00<br />
lakh per constituency in shape of food grains.<br />
1. Physical and Financial Achievement, <strong>2003</strong>-04<br />
A target was fixed to improve 1938.76 km of roads by utilizing said<br />
amount and food grains, out of which 1695.79 km of road work has been<br />
completed by incurring expenditure of Rs.989.64 lakh during the year. The<br />
target could not achieve for want of LC.<br />
2. Programme for <strong>2004</strong>-05<br />
During the year <strong>2004</strong>-05, there is a provision for Rs.14.50 crore under<br />
CWA. This fund will be utilized for improvement of roads /CD works in 145<br />
constituencies, as per the suggestions of the MLAs concerned.