A Note from the TSI<br />
Preparation of the Comprehensive District Annual Plan was attempted under the<br />
facilitation of Technical Support Institutions (TSI) during 2008-09, and PRIA was<br />
appointed as the TSI for <strong>Angul</strong> district for the said year. We are happy to see that our<br />
effort has been widely appreciated and the Government of Orissa has been pleased to<br />
reappoint us as the TSI for <strong>Angul</strong> district for the year <strong>2009</strong>-10. However, this year we<br />
have faced some new challenges and had to work under new limitations. Collection of<br />
GP-level <strong>plan</strong>s, as per an innovative format designed by PRIA keeping in view the<br />
requirements of PlanPlus software, was one of these challenges and added to that was the<br />
difficulty of collecting data on resource envelope. Deadlines set by the district<br />
administration for submission of these documents failed many times. The current Plan has<br />
been prepared under several such limitations and constraints. It has however been our<br />
sincere effort to make the Plan dynamic and innovative, and accordingly a special chapter<br />
on gender sub-<strong>plan</strong> has been incorporated.<br />
Despite our efforts errors are not unlikely. We apologize for any such unintentional<br />
errors; and hope that in the next attempts such errors would be avoided.<br />
Projections based on GP-level <strong>plan</strong>ning need feasibility assessment which was not<br />
possible on our part partly because it was beyond of purview of our assignment, and<br />
partly because it needs lot of time and resource.<br />
The chapterization and the sections have largely followed the guidelines of the Planning<br />
& Coordination Department. Attempt has thus been made to make the main Plan<br />
document consise and precise, so as to make to readable and reviewable easily. We hope<br />
that the present Plan would be useful despite its limitations.<br />
We look forward to the consideration of this draft <strong>annual</strong> <strong>plan</strong> at the end of the District<br />
Planning Committee, <strong>Angul</strong>.<br />
PRIA is an International Centre for learning and promotion of participation and democratic governance<br />
1<br />
PRIA-Orissa<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com
Acknowledgement<br />
During the financial year <strong>2009</strong>-10, PRIA has been involved in the district <strong>plan</strong> preparation<br />
process in two districts of Orissa, viz. <strong>Angul</strong> and Nayagarh. Each district has its own<br />
challenges and opportunities; so it’s not just a mere repetition of the process everywhere.<br />
Rather, each such case has been a new learning for us enriching our understanding of the<br />
process and enhancing our capability.<br />
In the district of <strong>Angul</strong>, the district administration has repeatedly tried to ensure that the TSI<br />
gets the required information. The Collector, <strong>Angul</strong> has taken some special initiatives in<br />
order to make the district <strong>plan</strong>ning process meaningful; and thanks to his endeavour, the<br />
corporate sector has expressed its interest to contribute to the development of the district.<br />
The Project Director, DRDA, <strong>Angul</strong>; and the District Planning Officer, <strong>Angul</strong>; Sarpanchs and<br />
Samiti Members; Block Development Officers; Executive Officers of Urban Local Bodies;<br />
and other departmental authorities have also tried to follow the suggestions made by us<br />
through the district administration. We take this opportunity to thank all of them.<br />
Sri Khageswar Behera, Hon’ble MLA, Chhendipada and Sri Rajanikant Singh, Hon’ble<br />
MLA, <strong>Angul</strong> have extended a special cooperation in our endeavour. Sri Santosh Kumar<br />
Nayak, President, Zilla Parishad and Sri Bhakta Das, representative of Sri Tathagata<br />
Satapathy, Hon’ble MP, Dhenkanal have been quite constructive in our endeavour. We have<br />
also received support from other representatives of the people at various levels. PRIA is<br />
grateful to all of them for this support.<br />
Sri Suchit Singh and his team, Ms. Jnananjali Parida & her team, Sri Mahendra Tripathy and<br />
his team, and Sri Rudra Prasanna Nayak have rendered us professional services as consultants<br />
for facilitating/conducting Block-level consultations and <strong>plan</strong>ning and/or in consolidation of<br />
GP-<strong>plan</strong>s. Further, Sri Bidyadhar Moharana, a senior agricultural expert, has helped us in the<br />
preparation of the CDAP as during 2008-09. We are very much thankful to these consultants.<br />
We are happy that the Planning & Coordination Department, Government of Orissa has<br />
trusted PRIA to prepare the <strong>annual</strong> <strong>plan</strong> for <strong>Angul</strong> district for the second time. We hope that<br />
this trust has been duly honoured through our work.<br />
PRIA is an International Centre for learning and promotion of participation and democratic governance<br />
2<br />
PRIA-Orissa<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com
PRIA is an International Centre for learning and promotion of participation and democratic governance<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
3
CONTENTS<br />
Subject<br />
Chapter<br />
Page<br />
Chapter-I Executive Summary, Methodology and District Profile<br />
SWOT analysis<br />
5<br />
Chapter-II<br />
District Vision and brief perspective <strong>plan</strong><br />
15<br />
Chapter-III<br />
23<br />
Chapter-IV<br />
Chapter-V<br />
Chapter-VI<br />
Chapter-VII<br />
Chapter-VIII<br />
Chapter-IX<br />
Chapter-X<br />
Resource envelope for district 24<br />
Resource envelope for Blocks and GPs 26<br />
Annual Credit Plan 29<br />
Sectoral District Plan<br />
AGRICULTURE & ALLIED ACTIVITIES: 31<br />
RURAL DEVELOPMENT 52<br />
SPECIAL AREAS PROGRAMMES: 58<br />
IRRIGATION & FLOOD CONTROL 66<br />
ENERGY 80<br />
INDUSTRY & MINERALS 86<br />
TRANSPORT 94<br />
SCIENCE, TECHNOLOGY & ENVIRONMENT 101<br />
GENERAL ECONOMIC SERVICES 110<br />
SOCIAL SERVICES 117<br />
GENERAL SERVICES 142<br />
Tribal Sub-Plan 147<br />
Scheduled Caste Sub-Plan 150<br />
Gender Sub_Plan 152<br />
ANNEXURES<br />
PRIA is an International Centre for learning and promotion of participation and democratic governance<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
4
Chapter I<br />
-----------------------------------------------------------------<br />
EXECUTIVE SUMMARY OF DISTRICT PLAN FOR <strong>2009</strong>-10<br />
The proposed outlay for <strong>Angul</strong> district for the year <strong>2009</strong>-10 is Rs.519.73 crores excluding the<br />
NREGS budget of Rs. 486.07 crores. As the following chart would show, largest single<br />
share(22%) is that of ‘other roads’, i.e. roads to be constructed by R&B Division and Rural<br />
Works Division which develop the internal road network of the district. National Highways<br />
share another 10%. Development of water supply and sanitation by PHED and RWSS share<br />
13% of the total outlay. Irrigation has a share of 10%. Although sectors like agriculture &<br />
allied, education, and health appear to have a lower share, that does not necessarily mean a<br />
lower priority to these areas; rather the reason for this gap is differential project costs.<br />
Estimation for NREGS by Blocks and line departments often imply to a shelf of projects that<br />
might take 3 or more years to complete. Hence, the NREGS outlay does not actually imply to<br />
the outlay for <strong>2009</strong>-10 only though being submitted during the said year it has been<br />
considered under the outlay for the same year.<br />
Sector Proposed outlay for <strong>2009</strong>-10<br />
Agriculture and allied 1704.339<br />
DRDA(excluding NREGS & IWDP) 3759.46<br />
Special Areas Programme 685.67<br />
Irrigation 5093.31<br />
Power 786.08<br />
DIC,textiles,sericulture 20<strong>7.</strong>155<br />
National Highways 517<strong>7.</strong>88<br />
Other roads 11212.72<br />
E-governance 11<br />
Forestry 2469.968<br />
Education 4862.11<br />
Sports 16.778<br />
Health 1183.87<br />
Water supply 6826.06<br />
NAC/Municipality 834<br />
District Welfare 1615.59<br />
Labour Welfare 103.5<br />
Social Welfare 4693.622<br />
Buildings(R&B and RW) 730.097<br />
Total 51973.21<br />
NREGS(core) 46581.5<br />
NREGS(line departments) 2025.73<br />
PRIA is an International Centre for learning and promotion of participation and democratic governance<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
5
NAC/Municipality<br />
2%<br />
Sports<br />
(less than 1%)<br />
Labour Welfare<br />
(less than 1%)<br />
Water supply<br />
13%<br />
Health<br />
2%<br />
Sectoral share in proposed district outlay for<br />
<strong>2009</strong>-10:<strong>Angul</strong> District<br />
District Welfare<br />
3%<br />
Education<br />
9%<br />
Social Welfare<br />
9%<br />
Forestry<br />
5%<br />
Buildings(R&B and<br />
RW)<br />
1%<br />
Agriculture and allied<br />
3%<br />
E-governance<br />
(less than 1%)<br />
Other roads<br />
22%<br />
DRDA(excluding<br />
NREGS & IWDP)<br />
7%<br />
Special Areas<br />
Programme<br />
1%<br />
Irrigation<br />
10%<br />
Power<br />
2%<br />
DIC,textiles,<br />
sericulture<br />
(less than 1%)<br />
National Highways<br />
10%<br />
The RKVY <strong>plan</strong> for the district has been carefully developed so as to be feasible and<br />
complying to the norms. Total outlay under RKVY has thus been Rs.5.66 crores for the<br />
current year. Major share in this budget is that of the Soil Conservation Department followed<br />
by Animal Resource Development and Agriculture.<br />
Most of the projections have been based on actual allocation or assured allocation, hence the<br />
resource gap is not supposed to be much. The original proposals have been modified in some<br />
cases, and a number of proposals under <strong>2009</strong>-10 have been shifted to the Plan for <strong>2010</strong>-11 so<br />
that the scope the same being sanctioned may increase substantially. Total outlay for <strong>2010</strong>-11<br />
has been proposed to be Rs. 586.68 crores(excluding NREGS) details of which are available<br />
in annexure-2.<br />
GP-level wish list has been generated during the participatory <strong>plan</strong>ning process of <strong>2009</strong>-10,<br />
but due want of feasibility assessment these have not been incorporated in the proposed<br />
outlay. Details of the wish-list are available in annexure-8 which can, after feasibility<br />
assessment, be incorporated in the <strong>annual</strong> <strong>plan</strong> <strong>2010</strong>-11.<br />
________<br />
PRIA is an International Centre for learning and promotion of participation and democratic governance<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
6
INTRODUCTION<br />
To achieve desired targets of economic growth and balanced regional development the efforts<br />
for decentralized <strong>plan</strong>ning commenced with the first Five Year Plan. The <strong>plan</strong> recognized the<br />
need to break up <strong>plan</strong>ning exercise into National, State, District and Local Government level.<br />
But it failed to spell out the process for the same. In the second Five Year Plan, two new<br />
elements, namely, establishment of District Development Council and drawing up of village<br />
<strong>plan</strong>s were introduced. But again the attempt went futile due to lack of proper enabling<br />
framework. On the recommendations of Balwant Rai Mehta Committee in 1957, village,<br />
block and district level Panchayat Institutions were established in many states. But, they were<br />
not assigned with any meaningful role or resources. Administrative Reforms Commission<br />
(1967) highlighted in its Report that district <strong>plan</strong>ning needed to be focused in those areas<br />
where local variations in the pattern and process of development were likely to yield quick<br />
results in terms of growth. In 1969, the Planning Commission communicated guidelines to<br />
the states for formulating district <strong>plan</strong>s detailing the concept and methodology of drawing up<br />
such <strong>plan</strong>s. It gave some fruitful results but limited to few states. A Central Scheme was also<br />
operational from Fourth to Ninth Five Year Plan to assist states for strengthening their<br />
<strong>plan</strong>ning. This scheme was extended to district level in 1982-83. A Working Group headed<br />
by Prof. M. L. Dantwala (1978) identified remoteness of <strong>plan</strong>ning agencies at district level<br />
from actual scene of action as the cause for mismatch of financial allocations with location<br />
specific needs. The Group recommended Block as the appropriate sub-state <strong>plan</strong>ning unit.<br />
Planning Commission also issued guidelines on formulation of Block level <strong>plan</strong>s in tune to<br />
these recommendations. The Ashok Mehta Committee (1978) in its report recommended that<br />
Panchayats ought to be strengthened for undertaking local <strong>plan</strong>ning. The Hanumantha Rao<br />
Committee (1984) brought out the fact that <strong>plan</strong>ning from below was undermined by<br />
different streams of funding the district <strong>plan</strong>. The Group recommends decentralization of<br />
function, powers and finances, setting up of district <strong>plan</strong>ning bodies and district <strong>plan</strong>ning<br />
cells. The G. V. K. Rao Committee (1985) reviewed the administrative arrangements for rural<br />
development and recommended district Panchayat to manage all development programmes.<br />
The Sarkaria Commission also highlighted the need for people’s participation in the <strong>plan</strong>ning<br />
and administrative machinery at local level. During Sixth and Seventh Plan role of<br />
Panchayats in rural development was also enlarged. In 1992-93, the 73 rd and 74 th<br />
Amendments gave Constitutional status to local self- governments and provided a new and<br />
universalized platform for decentralized <strong>plan</strong>ning. In recent initiatives taken by MoPR<br />
regarding decentralized <strong>plan</strong>ning it is recommended that under Article 243ZD of the<br />
Constitution District Planning Committee (DPC) shall be constituted at the district level in<br />
every state to consolidate the <strong>plan</strong>s prepared by the Panchayats and the Municipalities in the<br />
district and to prepare a draft development <strong>plan</strong> for the district. The object of district <strong>plan</strong>ning<br />
is to arrive at an integrated, participatory coordinated idea of development of a local area.<br />
The comprehensive district <strong>plan</strong> will integrate multiple programmes that are in operation in<br />
the district concerned and therefore address backwardness through a combination of<br />
resources that flow to the district.<br />
The process was made concrete through the help of Technical Support Institutions(TSI) since<br />
2008-09 though under several limitations in respect of methodology and achievements.<br />
During <strong>2009</strong>-10, new elements have been added to the process with a slightly modified<br />
approach, though bottlenecks of the previous year still persist.<br />
PRIA is an International Centre for learning and promotion of participation and democratic governance<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
7
METHODOLOGY<br />
PRIA, as the TSI for <strong>Angul</strong> district, adopted the following methodology for preparation of<br />
district <strong>plan</strong>:<br />
Stakeholder consultation and orientation at GP-, Block-, ULB-, and district level<br />
Liasiaoning with district officials, PRI members and ULB functionaries<br />
Designing of special 3-step format for <strong>plan</strong> preparation and distribution of the same<br />
Publication of special booklet on CDP in Odia and distribution of the same as a guide<br />
book for <strong>plan</strong> preparation<br />
Distribution of necessary formats as per Manual of Integrated District<br />
Planning(MIDP) to various line departments and Blocks<br />
Focussed facilitation of GP level and Block level <strong>plan</strong>ning<br />
Personal guidance to various <strong>plan</strong>ning authorities for their respective <strong>plan</strong> preparation<br />
Engagement of an agriculture consultant<br />
Engagement of a district point person<br />
Consultation with MPs/MLAs(annexure-6)<br />
Consultation with corporate sector(annexure-7)<br />
Data entry, processing and consultation.<br />
GP-level wish lists that have been generated during the participatory <strong>plan</strong>ning process of<br />
<strong>2009</strong>-10 and available in annexure-8 can be considered for incorporation in the <strong>annual</strong> <strong>plan</strong><br />
<strong>2010</strong>-11 after feasibility assessment,<br />
PRIA is an International Centre for learning and promotion of participation and democratic governance<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
8
DISTRICT BACKGROUND AND PROFILE<br />
Location and history<br />
<strong>Angul</strong> was a feudal state that was later annexed by the British who developed it as a<br />
separate administrative unit. Forest administration is one of the leading features of that<br />
period. However, <strong>Angul</strong> became a part of Dhenkanal district after independence till 1 st<br />
April 1993 when it was carved out as a separate district. <strong>Angul</strong> lies between 20° 31 N &<br />
21° 40 N latitude and 84° 15 E & 85° 23 E longitude. The total geographical area of<br />
<strong>Angul</strong> is 6232 sq.kms, thus it is the 11 th largest district among 30 districts of Orissa.<br />
<strong>Angul</strong> shares its borders with Sundargarh in the north, Deogarh, Sambalpur & Sonepur in<br />
the west, Boudh & Nayagarh districts in the south, Dhenkanal & Cuttack in the south-east<br />
and Keonjhar in the east.<br />
More details of district profile are available in annexure-1. Following is an abstract of the<br />
development indicators of the district:<br />
PRIA is an International Centre for learning and promotion of participation and democratic governance<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
9
1. GENERAL FEATURES<br />
Total Geografical Area (Sq.km) 6375<br />
No. of Sub Divisions 4<br />
No. of Blocks 8<br />
No. of Villages inhabited 1661<br />
No. of Village electrified 1356<br />
No.of Villages with Pucca Roads<br />
Villages with Potable Drinking Water 1602<br />
All Weather Road (km) 9978<br />
Rail Network[km] 6375<br />
No. of Sub Divisions 102<br />
2 SOIL & CLIMATE<br />
Agro climate Zone Eastern Plateau<br />
Climate Dry sub-humid<br />
Soil type Medium to deep black, red and yellow<br />
Normal rainfall [mm] 1421<br />
Actual rainfall[mm] Last year Year before Last 2 Years before Last<br />
Year<br />
year<br />
1400 1691<br />
3. DEMOGRAFIC PROFILE<br />
Total population [in ‘000] 1140 Total Literacy [%] 69<br />
Male population [in ‘000] 587 Literate Males[%] 81<br />
Female population [in ‘000] 553 Literate Females[%] 55<br />
Rural population [in ‘000] 982 SC population [in “000] 196<br />
Urban population [in ‘000] 158 ST population {in “000} 133<br />
Total Households[Nos] 230711 BPL Households [in Nos,] 120608<br />
Rural Households[Nos] BPL population [in “000]<br />
4. WORKERS PROFILE [in “000]<br />
Cultivators 138<br />
Of the above, small/Marginal Farmers 44<br />
Agricultural Labourers 127<br />
Artisans/People engaged in cottage Inds 39<br />
Those engaged in Allied Agro-activities 5<br />
Others 162<br />
5.IRRIGATION COVERAGE[HA]<br />
Canals/Channels 25582<br />
Wells/Tubewells 5636<br />
Tanks<br />
PRIA is an International Centre for learning and promotion of participation and democratic governance<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
10
Other Sources 15951<br />
Net Irrigated Area 47169<br />
Gross Irrigated Area<br />
Cropping Intensity 143<br />
6. LAND UTILISATION<br />
Total Area 623000 Area Not Suitable for<br />
Cultivation<br />
67000<br />
Net sown Area 195000 Pasture land 11000<br />
Forest Land 272000 Other Land 39000<br />
Fallow Land 39000 Area Under HYV<br />
Seeds<br />
<strong>7.</strong> DISTRIBUTION OF LAND HOLDING<br />
Classification of<br />
Holdings Area<br />
Holding Nos. % to Total Ha. % to Total<br />
1 to 2 Ha 20184 14.8 70632 43.3<br />
Total 136613 100 163196 100<br />
8. AGRIINPUTS<br />
Total N/P/K Consumption[MT] 7035<br />
No. of agriculture Tractors [Nos.] 320<br />
Agriculture Pump sets Nos.] 4031<br />
Agro-engines/threshers/Cutters[Nos.] 260<br />
9. ANIMAL POPULATION<br />
Plough Animals 250 Sheep 43<br />
Cow 175 Goat 146<br />
Buffaloes 14 Poultry 638<br />
10.MILK, FISH,EGG PRODUCTION<br />
Fish Production [MT] 5370<br />
Egg production [Lakh Nos] 152<br />
Milk production [“000MT] 17<br />
PRIA is an International Centre for learning and promotion of participation and democratic governance<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
11
11. AREA , PRODUCTION & AVERAGE YIELD OF MAJOR CROPS<br />
Crop 2003-04 2004-05<br />
Avg. Yield<br />
Rice Area (Ha.) Prod.(MT) Area (Ha.) Prod.(MT) [kg/Ha]<br />
Onion 109000 248000 117000 149000 1406<br />
Sugarcane 2200 23570 2245 24017 10703<br />
Groundnut 321 17173 148 8047 52148<br />
Patato 3235 2858 4120 3895 796<br />
Garlic 554 4955 576 5317 9386<br />
Mesta 1090 3450 1233 3910 3170<br />
Crop 990 4460 1092 5575 4624<br />
Production of cotton (lint) Jute, Mesta & Sanhemp are in bales (17<strong>7.</strong>8 kg per bale in India<br />
)<br />
12. INFRASTRUCTURE RELATED TO AGRICULTURE & ALLIED<br />
ACTIVITIES<br />
No. of Wholesale Markets<br />
No. of Rural/Urban Mandis<br />
No. of Godowns<br />
Total godown Capacity [MT]<br />
No. of Cold storages nil<br />
Total Cold Storage capacity [MT] nil<br />
No. of Milk Chilling Plants<br />
Total Chilling Capacity [LPD]<br />
No. of Veterinary Hospitals/Dispensaries 40<br />
No. of Artificial Insemination Centres 79<br />
No. of Fertiliser/Seeds/Pestiside outlets 67/103/23<br />
No. of Plantation /Horticulture-Nurseries 3<br />
No. of Fish seed farms/hatcheries<br />
No. of Polutary hatcheries<br />
No. of Krishi Vigyan Kendras 1<br />
No. of Farmers”Clubs 51<br />
PRIA is an International Centre for learning and promotion of participation and democratic governance<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
12
INFRASTRUCTURE INDICATORS<br />
The main indicators in term of which the development of a district<br />
can be judged compared to the state are given below.<br />
Sl.NO Infrastructure component <strong>Angul</strong><br />
District<br />
State Category<br />
1 Electricity<br />
a Percentage of villages electrified<br />
(as per pre 2003-04 defination)<br />
80.3 76% A+<br />
b Percentage of villages electrified<br />
(as per 2003-04 defination)<br />
81.5 81% A+<br />
c Percentage of rural consumers to<br />
total consumers<br />
40 71.61 C<br />
2 Transportation<br />
a Road density per 100 sq km 1,549 1,518 A+<br />
b No. of transport vehicles<br />
(registerd vehicles of all types<br />
)per 1000 sq km<br />
8627 12103 b<br />
c Villages connected by pucca<br />
roads<br />
30% 40% B<br />
3 Irrigation<br />
a Irrigated area to net cropped area 32.31% 48.25% C<br />
b Percentage of area irrigated<br />
through ground water<br />
19 21.36 A<br />
c Percentage of area irrigated<br />
through surfacewater<br />
16 78.64 D<br />
d No. of tube wells per 100 ha<br />
cropped area<br />
0.5 0.86 C<br />
4 Communication<br />
a No. of telephone lines per 100<br />
Population<br />
2.72 4.5 C<br />
b Population served per post office 4,810 4,509 A<br />
c Average area served per post<br />
office (sq. km)<br />
26.9 19 C<br />
5 Education<br />
a Literacy rate 68.79 63.08 A+<br />
b Literacy rate-Male 81.43 75.35 A+<br />
c Literacy rate-Female 55.37 50.51 A+<br />
d No. of schools (elementary<br />
education upto standard VIII per<br />
1 lakh population)<br />
118.85 172 C<br />
e No. of secondary and senior<br />
secondary schools per 1 lakh<br />
population<br />
19.47 20 A<br />
f No. of degree and professional<br />
colleges per 1 lakh population<br />
2.19 6 D<br />
PRIA is an International Centre for learning and promotion of participation and democratic governance<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
13
g Teachers pupil ratio upto class V<br />
class V to VIIi<br />
1:42 1:37 1:39 1:21 AC<br />
6 Health<br />
a Birth rate (per 1000 persons) 18.86 21.9 A+<br />
b Death rate(per 1000 persons) 6 9.3 A+<br />
c Maternal mortality rate<br />
(MMR)per 1 lakh live births<br />
89.85 301 A+<br />
d Infant Mortality rate (IMR) per 1<br />
lakh live births<br />
78 73 A<br />
e Life expectancy at birth 65 61 A+<br />
f Sub centres/primary Health<br />
centres/community Health<br />
CentresPer 1 lakh population.<br />
(Allopathic only)<br />
3.15 22 D<br />
g No. of dispensary and hospitals<br />
per 1 lakh population. (Allopathic<br />
only)<br />
0.438 4 D<br />
h No. of beds in hospitals per 1<br />
lakh population (Allopathic only)<br />
28.77 38.5 B<br />
i Doctors (Modern i.e. allopathic<br />
system) per 1 lakh population<br />
8.15 14 C<br />
7 Water supply<br />
a Percentages of villages having<br />
drinking water supply(Fully or<br />
Partly)<br />
83.87 92 A<br />
8 Agriculture Markets<br />
a No. of agriculture market per 100 sq.<br />
km<br />
0.62 0.33 A+<br />
9 Poverty<br />
a Percentage of rural people below<br />
poverty line<br />
52 39.90 B<br />
10 Agriculture Marketing<br />
a No. of regulated markets per 100 sq.<br />
km<br />
0.03 0.27 D<br />
11 Productivity of major agriculture<br />
crops in kg/ha<br />
a Paddy 1406 1,534 A<br />
b Ragi 409 663 C<br />
c Gram 539 651 B<br />
d Mung 539 243 A+<br />
e Biri 347 291 A+<br />
f Sugarcane 61000 63417 A<br />
g Mustard 271 170 A+<br />
h Potato 9386 9701 A<br />
i Ground Nut 1325 1,111 A+<br />
(Source: NABARD: <strong>2009</strong>, Potential Linked Credit Plan <strong>2009</strong>-10, <strong>Angul</strong> District)<br />
PRIA is an International Centre for learning and promotion of participation and democratic governance<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
14
Chapter II<br />
--------------------------------------------------------------<br />
SWOT ANALYSIS<br />
In the present chapter sector wise SWOT analysis of district <strong>Angul</strong> is carried out. The<br />
present analysis will provide inputs towards the formulation of the elements of district<br />
vision.<br />
Agriculture/Horticulture<br />
Strengths<br />
• Fertile agricultural land<br />
• Suitable climate for the production of variety of agricultural and horticultural<br />
products<br />
• Availability of labour force<br />
Weaknesses<br />
• Poor and inadequate irrigation facilities<br />
• Rainfed agriculture<br />
• Pest infestation<br />
• Poor marketing and inadequate storage facilities<br />
• Lift and minor irrigation schemes are not working properly<br />
• Depletion of ground water level<br />
Opportunities<br />
• Irrigation potential ranges from 25 to 40 percent in different blocks<br />
• Agricultural productivity can be enhanced through farm mechanization<br />
• Establishment of village level mandis will provide better price of produce to the<br />
farmers<br />
• Strengthening of Agricultural Department<br />
• Better storage facilities (like cold storage) stop distress sale and farmers will get<br />
better prices for their produce<br />
• New gardens of mango, litchi and other suitable fruit crops can be established.<br />
Threats<br />
• High dependency on rainfed agriculture and chemical farming<br />
• Expansion of industries and mining activity will have multiple effects in the form<br />
of land availability of agriculture, pollution and labour shortage<br />
• Declining interest of people in the in agricultural and allied activities<br />
• Diversion of the labour force to other sectors of employment<br />
PRIA is an International Centre for learning and promotion of participation and democratic governance<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
15
Animal Husbandry & Fisheries<br />
Strengths<br />
• Ensured scope in goatery<br />
• Sufficient availability of ponds and reservoirs for aquaculture<br />
Weaknesses<br />
• Poor facilities for the marketing of milk discourages people to adopt dairy<br />
farming<br />
• Depletion of grazing lands<br />
• Outsourcing of fingerlings leads to poor quality of fingerlings<br />
• Only 2<strong>7.</strong>5 percent of the cattle population is breedable<br />
Opportunities<br />
• Goatery can be promoted with the present natural resource availability<br />
• Replacement of indigenous cattle population with the crossbred cattle leads to<br />
increase in milk production<br />
• Farm ponds can be created under NREGS, and irrigation reservoirs can be utilized<br />
for fingerling production.<br />
Threats<br />
• Growing industrial and mining activity further deplete natural grazing land<br />
• Lack of interest of people in animal rearing and fisheries<br />
• In some areas all tanks get dry from January to monsoon period<br />
Forestry<br />
Strengths<br />
• Vast availability of natural and forest resources<br />
Weaknesses<br />
• Poor basic facilities for people residing in forest and sanctuary area<br />
• No legal rights are given to dwellers for the collection of NTFP and MFP<br />
• Insufficient tenurial rights in community forestry<br />
• Compensatory forest <strong>plan</strong>tation has not been adequately taken up<br />
Opportunities<br />
• Optimal and need based use of NTFP to raise economic status of tribals and other<br />
forest dwellers<br />
• Promotion of eco- tourism<br />
Threats<br />
PRIA is an International Centre for learning and promotion of participation and democratic governance<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
16
• Existing practices of forestry did not promote the production of species suitable<br />
for fuel purposes leading to further pressure on forests<br />
• People alienated from forests are joining extremist/ Maoist groups<br />
Rural Development & Panchayati Raj<br />
Strengths<br />
• Politically active and strong PRIs<br />
• Active DRDA<br />
• Financial support from various sources<br />
• Various developmental schemes<br />
Weaknesses<br />
• Lack of adequate staff<br />
• Lack of efficient coordination<br />
• Delayed receipt of grants<br />
• NREGS-norms are not suitable for certain areas or sections of people, causing<br />
low demand.<br />
• Road development and water supply are still major issues in some areas.<br />
Opportunities<br />
• NREGS<br />
• Coordinated effort for development by the PRIs<br />
Threats<br />
• Political interference<br />
• Corruption<br />
Roads & Transportation<br />
Strengths<br />
• Widespread road network<br />
• Four national highways<br />
• Sambalpur-Khurdha railway line<br />
Weaknesses<br />
• Most of the intra district or link roads in the villages cut off during the rainy<br />
season<br />
• NH-23 is in poor condition adversely affecting transportation to Rourkela<br />
Opportunities<br />
• All weather road network in the district will promote agricultural activities and<br />
well being of the people<br />
• Bimlagarh-Talcher railway line is expected.<br />
PRIA is an International Centre for learning and promotion of participation and democratic governance<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
17
Threats<br />
Health & Family Welfare<br />
Strengths<br />
Heavy traffic on national highways leads to accidents particularly<br />
near residential areas<br />
• Basic infrastructure is available<br />
• Corporate hospitals of NALCO and Coal India working in the district<br />
• Health Index of <strong>Angul</strong> is higher than the state average, as per Orissa Human<br />
Development Report(2004)<br />
Weaknesses<br />
• Inadequate infrastructural, equipments and service facilities<br />
• Lack of Superspecility services at district headquarter hospital<br />
• Most of the blocks in the district are malaria prone<br />
• Considerable IMR & MMR<br />
• Non-availability of doctors<br />
• Lack of reliable health care services in remote areas<br />
• Lack of awareness among people regarding health and family welfare<br />
Opportunities<br />
• Possibility of creating adequate infrastructure with the help of industrial houses.<br />
Coal India has also proposed a Medial College in the district<br />
• Implementation of Yoshoda Yojana<br />
Threats<br />
• Increase in the number of lung and skin diseases, TB etc.<br />
• Biological and other waste material from Hospitals may create pollution<br />
Education<br />
Strength<br />
• Literacy level is higher in case of male and females as compared to state average<br />
• Most of the villages have schools<br />
• Sarva Siksha Abhiyan<br />
• Madhyamik Siksha Abhiyan<br />
Weaknesses<br />
• Most of the schools buildings do not have proper infrastructure and boundary<br />
walls<br />
PRIA is an International Centre for learning and promotion of participation and democratic governance<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
18
• Scarcity of teachers and other staff in the schools. Untrained teachers are<br />
appointed<br />
• Most of the tribals, SCs and poor children do not have access to the basic<br />
education<br />
• Poor coordination between teachers, PRI members and parents<br />
• Non- accountability of teachers towards performance of the students<br />
• SSA is facing the problem in getting immediate & continuous technical support as<br />
per need in conduct of innovation activity in pedagogy i.e. developing module,<br />
hearing materials, support materials and research activity.<br />
• SSA has the difficulty in conduct of quality training programme for new recruiters<br />
like SSS & Education volunteers, which would have been possible in the<br />
availability of a DIET, where the trainees could have directly trained to strength<br />
their skill.<br />
• SSA is lacking resource support in ensuring monitoring & follow up activities<br />
which could have been extended by DIET to attain classroom situation<br />
improvement & learning improvement of children.<br />
Opportunities<br />
• Possibility of creating adequate infrastructure with the help of industrial houses<br />
• Residential facilities for teachers and staff in remote areas<br />
Threats<br />
• Preference of people for private schools. Poor children may get discriminated due<br />
to this.<br />
Industrialization & Mining<br />
Strengths<br />
• Six major PSUs and other SMEs operating in the district provide direct and<br />
indirect employment to the people<br />
• Coal reserves<br />
• Some social initiatives are also taken by these industrial units<br />
• District is getting good revenue from these industrial and mining units<br />
Weaknesses<br />
• Pollution in different forms, contamination of water bodies, displacement and<br />
deterioration of agriculture and forest in the district<br />
• Displacement of people<br />
• Poor status of handloom and cottage industries<br />
Opportunities<br />
• Revenue generated from these units can be used for the infrastructural<br />
development in the district<br />
• Development of micro enterprises and promotion of allied micro enterprises<br />
• Waste material from steel and power <strong>plan</strong>ts can be used for the manufacturing of<br />
other products<br />
PRIA is an International Centre for learning and promotion of participation and democratic governance<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
19
Threats<br />
• Extension in coal fields and/or industrialization leads into further degradation of<br />
natural resources<br />
• Contamination of water is increasing rapidly leads to livelihood and health related<br />
problems<br />
• More displacement of people<br />
Water & Sanitation<br />
Strengths<br />
• Ground water development structures in most areas for drinking water purpose<br />
• Presence of rivers and reservoirs in the district<br />
• RWSS & PHED<br />
Weaknesses<br />
• Lack of awareness among people regarding sanitation especially in rural areas<br />
• Scarcity of drinking water due to defunct tubewells and ground water depletion<br />
• Contamination of water and severity of water borne diseases<br />
• Insufficient funds<br />
Opportunities<br />
• Supply of safe drinking water through pipelines<br />
• Repairing and maintenance of defunct tube wells<br />
Threats<br />
• Expansion of coal fields further deteriorate the quality and availability of drinking<br />
water<br />
• Improper sanitation facilities further leads to spread of diseases<br />
• Fluoride pollution<br />
Livelihood & Social Issues<br />
Strengths<br />
• Community based Institutions are formed and strengthened the traditional village<br />
committees, youth clubs, women SHGs<br />
Weaknesses<br />
• Involvement of illiterates in particular and other people in general in govt.<br />
programmes is very low<br />
• Percentage of population BPL is very high<br />
• Non- availability of work for labourers in the village<br />
• Easy availability of liquor results into household violence and antisocial activities<br />
PRIA is an International Centre for learning and promotion of participation and democratic governance<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
20
Opportunities<br />
• Optimum utilization of natural resources<br />
• Optimum utilization of the scope of NREGS to stop migration of labour<br />
Threats<br />
• Unemployment and poverty may lead to social disorders<br />
• Unsustainability in livelihood through increasing dependency on government and<br />
private services<br />
Women Issues<br />
Strengths<br />
• Higher women literacy rate as compared to state and India’s avaerage<br />
• Significant share in the total workforce<br />
• Increasing participation in PRIs<br />
Weaknesses<br />
• Out of 154 anganwadi centres only 34 centres have building<br />
• Inadequate remuneration against significant contribution in workforce,<br />
particularly in NTFP collection and agricultural activities<br />
• Social stigma<br />
• Dowry-related torture and deaths<br />
• Post-rehabilitation issues<br />
Opportunities<br />
• More focus on the capacity building of women SHGs<br />
• Strengthening the Anganwadi system<br />
• Social motivation and mobilization to minimize social pressure on women<br />
Threats<br />
• Instability in traditional family systems<br />
• Risk of increasing violence against women because of their growing exposure in<br />
traditionally male dominant activities/ occupations<br />
Power sector<br />
Strengths<br />
• High demand in the domestic and industrial sector<br />
• Power production units<br />
• Surplus power production<br />
• Most of the villages are electrified.<br />
Weaknesses<br />
• Inadequate infrastructure and human resource<br />
• Theft of transmission wire<br />
PRIA is an International Centre for learning and promotion of participation and democratic governance<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
21
• Transmission loss<br />
Opportunities<br />
• Rajeev Gandhi Grameen Vidyut Karan Yojna<br />
• Biju Gram Jyoti Yojna<br />
• Scope for new thermal power <strong>plan</strong>s<br />
• Solar power<br />
Threats<br />
• Disruption in power supply<br />
• Risk of accidents<br />
PRIA is an International Centre for learning and promotion of participation and democratic governance<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
22
Chapter III<br />
--------------------------------------------------------------<br />
District Vision 2020<br />
<strong>Angul</strong> is a model district for the country where integrated natural resource management is<br />
the key to rural livelihood. Holistic development of agriculture and industrial sector with<br />
the focus on the socio- economic and intellectual well being of the citizens lead the<br />
district towards a sustainable growth with encouraging impacts in the neighboring<br />
districts.<br />
Perspective Plan 2008-13<br />
The five year perspective <strong>plan</strong> that was prepared during 2008 projected a total<br />
outlay(excluding NREGS) of Rs. 299588.95 lakhs agisnt which Rs. 228715.2 lakhs was<br />
estimated to be available, thereby suggesting a resource gap of Rs. 66873.655 lakh<br />
rupees.<br />
PRIA is an International Centre for learning and promotion of participation and democratic governance<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
23
Chapter IV<br />
_____________________________________<br />
RESOURCE ENVELOPE FOR <strong>2009</strong>-10<br />
Introduction:<br />
Resource envelope is basically created by grants from the government except in cases<br />
like periphery development programmes of industries/mines. The 5-year <strong>plan</strong> for 2007-12<br />
has estimated <strong>annual</strong> as well as 5-year outlays for each and every sector. And the funds<br />
are supposed to be released accordingly.<br />
The release of funds may be one-time, or in installments. Sometimes additional funds<br />
may be released under specific circumstances.<br />
The resource envelope excluded from the estimated cost of programmes suggests the<br />
resource gap. This gap implies that additional funds are to be ensured either from<br />
government sources or from other sources.<br />
Due to want of adequate information from the concerned departments, it has been quite<br />
difficult for the TSI to estimate the respurce envelope and resource gap at present.<br />
However, it is understood that most of the proposals made during the year <strong>2009</strong>-10 are<br />
likely to receive financial sanction as these have been based on the actual allocations or<br />
availability of funds or assured funds.<br />
Major areas of resource gap:<br />
Major gaps are in the following sectors:<br />
Sector/Department<br />
Approx. gap<br />
amount in lakh<br />
rupees<br />
Agriculture(as proposed under RKVY) 8<strong>7.</strong>12<br />
Soil Conservation (as proposed under RKVY) 195.75<br />
Animal Husbandry(as proposed under RKVY) 149.1<br />
Fishery (as proposed under RKVY) 44.8<br />
Krushi Vigyan Kendra (as proposed under RKVY) 13.00<br />
Cooperation(for construction/renovation of godowns) 58.00<br />
PBDA, Pallahara(for infrastructure development in PBDA area) 610.00<br />
E-governance 11.00<br />
DFO, <strong>Angul</strong> KL(for innovative activities only) 3.8<br />
Ayurveda 6.00<br />
Homaeopathy 2.00<br />
<strong>Angul</strong> Municipality 550.00<br />
PRIA is an International Centre for learning and promotion of participation and democratic governance<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
24
Athmallik NAC 112.00<br />
District Welfare (Civil works for educational institutions) 399.5<br />
Social Welfare(civil works for own building, and AWC) 135.00<br />
Total estimated resource gap comes to approx. Rs. 237<strong>7.</strong>07 lakhs.<br />
Periphery grants:<br />
Periphery development grants are sanctioned by NTPC, NALCO, and MCL. The TSI has<br />
been informed that no such grant has been finalized for <strong>2009</strong>-10. However, the Plan<br />
submitted by Special Land Acquisition Officer, MCL suggests that there is a proposal for<br />
construction of road at Hensamula and Kalamchuin, construction of anganwadi centre at<br />
Solada, and construction of health sub-centres at Danara, Jarada and Padmabatipur, the<br />
total cost being estimated at Rs.12.50 lakhs out of whch people can contribute Rs.5000/-<br />
and the rest is to be paid by MCL.<br />
The corporate sector in <strong>Angul</strong> district has expressed interest to contribute to the<br />
development of the district under CSR programme, and has asked for necessary statistics,<br />
proposals and guidance for this purpose.<br />
_____________<br />
PRIA is an International Centre for learning and promotion of participation and democratic governance<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
25
Chapter V<br />
_____________________________________<br />
RESOURCE ENVELOPE<br />
FOR BLOCKS AND GRAM PANCHAYATS<br />
Introduction:<br />
Blocks and Gram Panchayats often receive funds from district headquarters so as to<br />
implement Panchayat Samiti(Block)-level or GP-level programmes. However, in few<br />
cases some of the grants are shared only with the PRIs at all the three stages, or with the<br />
GPs only.<br />
These grants have their specific norms that may change over time. Some of these have an<br />
uncertainty too pertaining to their allocation, and these may either be pending for one or<br />
more years, or else may be stopped. Receipt in installments is also in vogue in some<br />
cases.<br />
Revenue sources of PRI institutions:<br />
The Zilla parishads, Panchyat samitis, and Gram panchyats are supposed to have a<br />
number of sources of revenue that may be broadly categorized as internal- & external, or<br />
tax- & non-tax revenue. In actual practice however some of these sources may hardly<br />
have any significance. For instance, revenue collection from license fees on bicycles is<br />
hardly in practice at GP level.<br />
Presently, following sources of revenue are important for the PRI institutions:<br />
• Kendu leaf grant<br />
• Cess grant<br />
• NREGS funds<br />
• SGSY funds<br />
• IAY funds<br />
• GGY funds<br />
• GP ghar fund<br />
• TFC grant<br />
• MPLAD<br />
• MLA-LAD<br />
• WODC<br />
• Special Problem Fund<br />
Periphery development grants from local industries/mines are also received sometimes,<br />
but the distribution thereof may be quite erratic and/or uncertain.<br />
PRIA is an International Centre for learning and promotion of participation and democratic governance<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
26
Kendu leaf grant:<br />
50% of the net revenue realized from kendu leaf business by the Kendu Leaf wing of the<br />
Forest Department is distributed as KL grant. Of this, 90% is allocated to Zilla Parishad,<br />
Panchayat Samitis, and Gram panchayats at the ratio of 8:10:72 respectively; and the<br />
rest(10%) may be retained by the government for distribution of socially relevant<br />
purposes and activities.<br />
<strong>Angul</strong> district is a KL growing area, and the KL grant received is shared with the KL<br />
growing sub-divisions on the basis of KL production. Blocks in each sub-division then<br />
receive equal share from the sub-divisional share.<br />
80% of the KL grant received by the PRIs is meant for infrastructure developments, 10%<br />
is for providing services to public in respect of education, drinking water, etc.; and rest<br />
10% is meant for production activities (promoting agricultural production or handicraft<br />
production, etc.).<br />
Cess grant:<br />
This grant is related to land cess. Population is the key factor in deciding the share of<br />
GPs, in this grant. In <strong>Angul</strong> district, the PRIs have received Cess grant during 2008-09<br />
for the purpose of creating permanent assets basically useful for administrative purpose.<br />
The Zilla parishad is to use this fund for socially relevant purposes and activities.<br />
TFC grant:<br />
The Twelfth Finance Commission (TFC) has proposed grants of Rs 56,855 crore for<br />
bridging non-Plan revenue deficits of States, Rs 25,000 crore for local bodies and Rs<br />
15,000 crore for roads and bridges. In addition, seven States would receive a total grant<br />
of Rs 5,887 crore for healthcare, while eight States would get Rs 10,171 crore for<br />
education. Another head would be calamity relief, where TFC has called for a<br />
provisioning of Rs 16,000 crore for all States. http://news.indiamart.com/newsanalysis/tfc-recommendations--8829.html).<br />
The period of TFC is 2005-<strong>2010</strong>. In <strong>Angul</strong> district, the PRIs have received TFC grant<br />
during 2008-09 for the purpose of water supply and/or sanitation programme.<br />
GP ghar:<br />
This fund is intended basically for construction/addition/alteration of GP buildings.<br />
Other sources like NREGS, etc. have been discussed in the chapters on Rural<br />
Development and General Economic Services.<br />
Current position:<br />
PRIA is an International Centre for learning and promotion of participation and democratic governance<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
27
The following table reflects the current availability of funds(as submitted to the TSI), in<br />
rupees, to the PRIs under KL grant, Cess grant, GP ghar fund, and TFC during <strong>2009</strong>-10:<br />
Source ZP share PS share GP share Total<br />
KL grant<br />
TFC<br />
Cess grant<br />
GP ghar<br />
Sairat<br />
Surcharge<br />
Total<br />
(Source: DRDA)<br />
616073.00 0.00 2772329.00 3388402.00<br />
6592000.00 12439500.00 23034000.00 42065500.00<br />
1820944.00 1820944.00 273141<strong>7.</strong>00 6373305.00<br />
0.00 0.00 3000000.00 3000000.00<br />
0.00 0.00 103248.00 103248.00<br />
0.00 0.00 1548<strong>7.</strong>00 1548<strong>7.</strong>00<br />
902901<strong>7.</strong>00 14260444.00 31656481.00 54945942.00<br />
As the above table shows, total receipt of the PRIs under KL grant, Cess grant, GP ghar<br />
fund, TFC and other sources like sairat is Rs.549.459 lakhs.<br />
Proposals under LAD scheme of MPs and MLAs are yet to be finalized with minor<br />
exceptions.<br />
___________<br />
PRIA is an International Centre for learning and promotion of participation and democratic governance<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
28
Chapter VI<br />
_____________________________________<br />
ANNUAL CREDIT PLAN <strong>2009</strong>-10:<br />
ANGUL DISTRICT<br />
SECTOR<br />
<strong>2009</strong>-<strong>2010</strong><br />
Amount<br />
A CROP LOAN 2229435<br />
B<br />
Minor Irrigation 33416<br />
Land development 11250<br />
Farm mechanization 109483<br />
Plantation & Horticulture 56861<br />
Other Agriculture 68233<br />
AGRIL.TERM LOAN 279243<br />
C<br />
Diary development 32412<br />
Poultry Farming 25394<br />
Sheep/Goat/Pig 89834<br />
Fishery 15333<br />
Forestry<br />
Storage & Market yard 22000<br />
AGRIL. SECTOR ALLIED 184973<br />
D= (A+B+C) TOTAL AGRICULTURE 2693651<br />
E NFS/SME 207852<br />
F O.P.S 1390997<br />
G=(D+E+F) TOTAL PRIORITY SECT. 4292500<br />
H N.P.S 707500<br />
I=(G+H) GRAND TOTAL 5000000<br />
K Of Which govt.. prog. 218669<br />
(Source: Lead Bank, <strong>Angul</strong>)<br />
PRIA is an International Centre for learning and promotion of participation and democratic governance<br />
29<br />
Amount in Rs .”000<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com
Chapter VII<br />
_____________________________________<br />
SECTORAL DISTRICT PLANS & SCHEMES<br />
There are various schemes being implemented in the district of <strong>Angul</strong>. Some of these are<br />
central sector schemes like Rajiv Gandhi Grameen Vidyutikaran Yojna, some are<br />
centrally sponsored ones, and some are state <strong>plan</strong> schemes like GGY. However, the<br />
district <strong>plan</strong> is and can not be limited to these schemes only for there are several<br />
requirements that are not covered under these schemes. The following abstract would<br />
reflect the proposed outlays under district <strong>plan</strong> for <strong>2009</strong>-10 and <strong>2010</strong>-11.<br />
Proposed outlay for Proposed outlay for<br />
Sectors/departments <strong>2009</strong>-10<br />
<strong>2010</strong>-11<br />
Agriculture and allied<br />
DRDA(excluding NREGS &<br />
1704.339 1610.935<br />
IWDP) 3759.46 3869.56<br />
Special Areas Programme 685.67 83.237<br />
Irrigation 5093.31 7193.273<br />
Power 786.08 2275.02<br />
DIC,textiles,sericulture 20<strong>7.</strong>155 17<strong>7.</strong>349<br />
National Highways 517<strong>7.</strong>88 5711.168<br />
Other roads 11212.72 10302.22<br />
E-governance 11 12.1<br />
Forestry 2469.968 2606.67<br />
Education 4862.11 4838.34<br />
Sports 16.778 18.4558<br />
Health 1183.87 137<strong>7.</strong>257<br />
Water supply 6826.06 6548.671<br />
NAC/Municipality 834 5760<br />
District Welfare 1615.59 1699.199<br />
Labour Welfare 103.5 20.66<br />
Social Welfare 4693.622 3852.504<br />
Buildings(R&B and RW) 730.097 711.917<br />
Total 51973.209 58668.5358<br />
(Note: The above projection excludes kendu leaf operations funded by Orissa Forest<br />
Development Corporation, and takes into consideration 10% increment of the outlay of<br />
<strong>2009</strong>-10 in cases where the departments have not proposed outlay for <strong>2010</strong>-11. However,<br />
few exceptions are there, like in case of civil works for PBDA area, no incremental<br />
assessment has been taken into consideration. Also, NREGS is excluded in case of <strong>2010</strong>-<br />
11. )<br />
PRIA is an International Centre for learning and promotion of participation and democratic governance<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
30
AGRICULTURE & ALLIED ACTIVITIES<br />
Introduction:<br />
Agriculture is the backbone of rural economy. In <strong>Angul</strong> district, the gross cropped area is<br />
3,37,000 ha with cropping intensity of 175 percent. The topography of the district is both<br />
flat and undulating. The important soil groups of the district are alluvial, black, redlaterite<br />
and lateritic .The soils are mostly acidic in reaction. The available nitrogen in the<br />
soils is low while availability of phosphorus and potassium is in medium range.<br />
Out of the total 1,35,468 operational holdings nearly 86 percent belongs to marginal and<br />
small farmers while remaining 14 percent belongs to medium and large farmers. On the<br />
other hand, marginal and small farmers are in possession of 58 percent land as<br />
operational holdings while the medium and large farmers have 42 percent land. Total<br />
workforce in the district accounts for 39.79 percent of the total population. Cultivators<br />
and agricultural labourers together accounts for 58.34 percent of the total work force in<br />
the district who are directly depend on agriculture for their livelihoods.<br />
The average rainfall in the district is about 1400 mm, but due to want of adequate water<br />
harvesting structures and irrigation a large part of the area practices rainfed agriculture.<br />
The agro-climatic conditions in Blocks like Athmallik, Kishorenagar, and Chhendipada<br />
are suitable for vegetable cultivation, fruit crops, and floriculture; and thanks to the<br />
entrepreneurship of the local people the district is a leading producer and supplier of<br />
some vegetables and fruits.<br />
Details of the developments in the agriculture and allied sectors in this district have been<br />
briefly discussed in the Comprehensive District Agriculture Plan(CDAP) as follows in a<br />
concise version.<br />
Agriculture<br />
Agriculture is a lead sector in the district which provides livelihoods to nearly two-thirds<br />
of total workforce in the district. There is inter- Block disparity in agriculture<br />
development in the district mainly due to climatic variation, extent of irrigation and<br />
poverty. It is imperative to focus on better management of soil, water and other natural<br />
resources, enhance application of inputs and crop management through transfer of<br />
technology, risk management, commercialization of agriculture, creation of irrigation<br />
facilities, crop diversification, integrated farming, farm mechanization, post-harvest<br />
management, sustainable crop production practices like integrated nutrient, pest and<br />
water management, and development of rain-fed agriculture through watershed<br />
development approach.<br />
It is understood by the TSI that the district office(s) of the Agriculture Department feels<br />
that at present it lacks adequate human- and financial resources to collect required field-<br />
PRIA is an International Centre for learning and promotion of participation and democratic governance<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
31
level information so as to identify this disparity in detail. On the other hand, it was also<br />
observed that when GP-level <strong>plan</strong>s were prepared by the respective local stakeholders<br />
natural resource management, and agriculture development in particular hardly received<br />
importance in those Plans though this decentralized <strong>plan</strong>ning process did provide a good<br />
opportunity for the local stakeholders to reflect the local needs on agriculture and allied<br />
sectors.<br />
Among major ongoing schemes of DAC, the largest is the Macro Management Scheme<br />
(MMA) which was initiated in 2000–01 so as to provide flexibility to the States to<br />
develop and pursue a mix of activities on the basis of their regional priorities. The<br />
approved pattern of assistance is in the ratio of 90:10 for the Centre and the States,<br />
respectively. The Technology Mission on Oilseeds, Maize, Oil palm, and Pulses is being<br />
implemented under a new scheme ISOPOM. National Food Security Mission as a Central<br />
sector scheme in mission-mode has already been launched. It aims at increasing food<br />
grains production by at least 20 million tonnes by the end of Eleventh Plan at country<br />
level. This programme covers rice, wheat and pulses and concentrates particularly on<br />
increasing seed replacement and the replacement of older varieties by newer ones<br />
including transfer of technology. NFSM (Rice) is being implemented in the district.<br />
MMA- Work <strong>plan</strong>, ISOPOM and NFSM-pulses are three major CSPs along with Mini<br />
Mission II that are being implemented in the district. All these interventions will target at:<br />
1 Soil treatment for management of degraded soils<br />
2 Increasing seed replacement rate<br />
3 Water management in irrigated and rain fed lands<br />
4 Crop diversification from u<strong>plan</strong>d paddy to non-paddy crops and horticultural<br />
crops<br />
5 Farm mechanization<br />
6 Promotion of INM and IPM<br />
7 Promotion of organic farming<br />
8 Streamlining agricultural extension through ATMA<br />
9 Adoption of dry land crop production technology<br />
10 Post harvest management and marketing<br />
11 Risk management<br />
The schemes that are implemented for agricultural development in the district are<br />
indicated below.<br />
Name of scheme CSP/CP/SP Brief Description<br />
Agriculture Policy 2008 State Plan Incentives to farmers on inputs<br />
Jala Nidhi State Plan Subsidy for shallow tube wells/bore<br />
wells under RIDF<br />
Management of acid State Plan Subsidy on soil amendments<br />
soil<br />
RKVY Central Sector Incentives to states on projects under<br />
stream I and II<br />
MMA-Work Plan CSP Incentives for rice, sugarcane<br />
development and farm mechanization<br />
PRIA is an International Centre for learning and promotion of participation and democratic governance<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
32
ISOPOM CSP Incentives for promotion of oilseeds,<br />
pulses, maize and oil palm<br />
NFSM-Rice Central Sector Incentives for promotion of pulse crops<br />
Support to State CSP For extension reform through ATMA<br />
Extension (ATMA)<br />
Mini Mission II CSP For promotion of Jute/Mesta<br />
Following is the <strong>annual</strong> <strong>plan</strong> for the District Agriculture Office for <strong>Angul</strong> district:<br />
Schme-wise Outlay for <strong>2009</strong>-10<br />
Outlay for <strong>2010</strong>-11<br />
proposal<br />
in lakh rupees<br />
in lakh rupees<br />
Work Plan (Rice) 5.9 5.9<br />
WP(Sugar Cane) 0.8 0.8<br />
ISOPOM(P) <strong>7.</strong>53 8<br />
ISOPOM(O) 5.58 6.34<br />
ISOPOM(M) 3.11 3.21<br />
Farm Mech. 68.32 80.29<br />
Mini Mission II 4.28 4.68<br />
Jalanidhi 58.3 64.7<br />
CM package 1.5 1.6<br />
RKVY 8<strong>7.</strong>12 90.94<br />
ATMA 20.22 22.55<br />
NFSM (R) 121.28 133.13<br />
Total 383.94 422.14<br />
(Note: The original <strong>plan</strong> has been modified by the TSI according to the suggestion of the<br />
Collector & D.M, <strong>Angul</strong> to double the target for SRI demonstration, and also because of<br />
the fact that the proposal for ‘capacity building of extension personnel’ under RKVY,<br />
being non-specific in nature, has been replaced by the proposal for construction of FIAC<br />
building.)<br />
Details of the agriculture <strong>plan</strong> are given in annexure-3.<br />
Horticulture<br />
Horticultural crops like vegetables, fruits and spices are potential crops of the district. In<br />
the area of horticulture, a major beginning has been made with the National Horticulture<br />
Mission. The most important constraints to establish the required linkages are in the area<br />
of agricultural marketing and processing. Since high-value agriculture is based on<br />
perishable commodities, large investments are required in modern methods of grading,<br />
post-harvest management (PHM), and development of cold chains. Such investment in<br />
turn requires that new players, including large corporate players, be able to enter existing<br />
markets and set up new marketing channels. The NHM therefore incentivizes the ongoing<br />
PRIA is an International Centre for learning and promotion of participation and democratic governance<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
33
marketing reforms based on amending existing Agricultural Product Marketing<br />
Committee (APMC) Acts to allow this. This process has started with amendment of<br />
APMC Act. The major thrust for horticultural development in the district would be:<br />
1 Commercial cultivation of fruits, floriculture and mushrooms<br />
2 Production and supply of quality <strong>plan</strong>ting materials<br />
3 Hybrid and off-season vegetable cultivation<br />
4 Increasing water use efficiency through micro-irrigation<br />
5 Organic farming<br />
6 Post harvest management of fruits and vegetables<br />
The schemes that are being implemented in the district are indicated below.<br />
Name of scheme Sector Brief description<br />
NHM CSP (85:15) For production enhancement of fruits<br />
through supply of quality <strong>plan</strong>ting<br />
materials and subsidy on inputs ,<br />
demonstration etc<br />
Micro irrigation programme CSP (40:10) Subsidy on drip and sprinkler<br />
irrigation<br />
The district of <strong>Angul</strong> provides a huge scope for development of horticulture because of<br />
its climatic conditions as well as entrepreneurship of the people in Blocks like Athmallik,<br />
Kishorenagar, Chhendipada, and Pallahara, etc.. The following action <strong>plan</strong> as submitted<br />
by the office of the Deputy Director, Horticulture reflects the same:<br />
Scheme<br />
NHM<br />
Activity proposed<br />
Target(activities proposed<br />
scheme wise)<br />
Production of <strong>plan</strong>ting<br />
material<br />
Model Nursery in Public<br />
Sector (No)<br />
Small Nursery in Public<br />
Sector (No)<br />
Model Nursery in Private<br />
Sector(No)<br />
Small Nursery in Private<br />
Sector(No)<br />
Seed Infrastructure<br />
<strong>2009</strong>-10 <strong>2010</strong>-11<br />
Physical<br />
Target<br />
- -<br />
2 6<br />
Financial<br />
target<br />
In lakh<br />
Rs.<br />
Physical<br />
Target<br />
1 9 1 9<br />
3 4.5<br />
PRIA is an International Centre for learning and promotion of participation and democratic governance<br />
2<br />
34<br />
Financial<br />
target<br />
In lakh<br />
Rs.<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
3
Vegetable seed<br />
Production(Ha<br />
Establishment of New<br />
Garden<br />
5 2.25<br />
Mango(Ha) 850 95.62 850 95.62<br />
K.Lime (Ha) 20 2.25 20 2.25<br />
Litchi (Ha.) 20 2.25 20 2.25<br />
Banana T.C. 13 1.95 13 1.95<br />
Banana sucker 220 23.1 220 23.1<br />
Floriculture<br />
Rose-Small & Marginal<br />
Farmer(Ha)<br />
PRIA is an International Centre for learning and promotion of participation and democratic governance<br />
5<br />
2.5<br />
100 3.5 100 3.5<br />
Rose – Other Farmer(Units) 100 2.31 100 2.31<br />
Tuberose – Small &<br />
Marginal Farmer(Ha)<br />
Tuberose<br />
Farmer(Ha)<br />
– Other<br />
Gladioli – Small &<br />
Marginal Farmer(Ha)<br />
Gladioli – Other<br />
Farmer(Ha)<br />
100 4.5 100 4.5<br />
100 2.97 100 2.97<br />
200 9 200 9<br />
200 5.94 200 5.94<br />
Marigold(Ha) 750 5.94 750 5.94<br />
Plantation crops including<br />
Coastal Horticulture<br />
Cashew(Ha) 145 8.15 150 8.43<br />
Protected Cultivation<br />
Green House (SF & MF)in<br />
No<br />
Green House (Other<br />
Farmer)in No<br />
20 2.23 20 2.23<br />
10 0.35 10 0.35<br />
Shade net hose(No) 20 0.7 20 0.7<br />
Promotion of INM/IPM<br />
Promotion of IPM/INM in<br />
Mango/Cashew/Banana(Ha)<br />
Organic Farming<br />
20 0.2<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
35
Innovative<br />
Programme<br />
Vermi Compost – Big(No) 27 8.1<br />
Vermi Compost – Small<br />
(No)<br />
Human Resource<br />
Development<br />
70 5.25<br />
30 9<br />
PRIA is an International Centre for learning and promotion of participation and democratic governance<br />
70<br />
5.25<br />
Exposure visit Inside the 550 8.25<br />
9<br />
State on IPM/INM ,<br />
Plantation, PHM<br />
600<br />
Exposure visit Outside in 150 3.75<br />
3.75<br />
the State<br />
150<br />
Training of Supervisor 4 1.08 4 1.08<br />
Training of Gardeners 10 2.7 10 2.7<br />
Training of Entrepreneur 4 0.72 4 0.72<br />
Sub-total 3714 222.56 3749 21<strong>7.</strong>04<br />
Pack house 4 2.5 4 2.5<br />
District level show 1 0.5 1 0.5<br />
Refrigerated van 1 6 1 6<br />
Mobility 80<br />
Sub-total 6 89 6 9<br />
1st year maint. of mango<br />
<strong>plan</strong>tation<br />
895 40.27 850 38.35<br />
1st year maint. of Banana<br />
<strong>plan</strong>tation<br />
1st year maint. of K.Lime<br />
<strong>plan</strong>tation<br />
1st year maint. of cashew<br />
<strong>plan</strong>tation<br />
1 st year maint. of Litchi<br />
<strong>plan</strong>tation<br />
2nd year maint. of mango<br />
<strong>plan</strong>tation<br />
180 5.4<br />
30 1.34 27 0.81<br />
108 2.43 145 3.26<br />
20 0.9<br />
36<br />
895 60.41<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com
RKVY<br />
Microirrigation<br />
Medicinal<br />
Plant<br />
QPM<br />
2nd year maint. of K.Lime<br />
<strong>plan</strong>tation<br />
2nd year maint. of Litchi<br />
<strong>plan</strong>tation<br />
2nd year maint. of Cashew<br />
<strong>plan</strong>tation<br />
Sub-total 1233 50.34<br />
Vermicompost unit 200 14.7<br />
Sub-total 200 14.7<br />
PRIA is an International Centre for learning and promotion of participation and democratic governance<br />
37<br />
31 20.96<br />
20 1.35<br />
108 3.64<br />
128.78<br />
2076<br />
Microirrigation drip & 145 19<br />
sprinkler<br />
150 20<br />
Sub-total 145 19 150 20<br />
Nursery<br />
Small nursery in public<br />
sector<br />
Small nursery in private<br />
sector<br />
1 4 1 4<br />
2 4 2 4<br />
Cultivation<br />
Aonla 30 1.95 30 1.95<br />
Sarpagandha cultivation 10 2.19 10 2.19<br />
Aswagandha cultivation 5 0.25 5 0.25<br />
Cultivation of Ghritkumari 5 0.21 5 0.21<br />
Cultivation of Beal 5 0.5 5 0.5<br />
Mission management<br />
Exposure visit inside the<br />
state<br />
20 0.3 20 0.3<br />
Exposure visit outside the<br />
state<br />
5 0.15 5 0.15<br />
Sub-total 83 13.55 83 13.55<br />
Mango 4.25 4.5<br />
Litchi 0.55 0.55<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com
Coconut 0.1 0.1<br />
K.Lime 0.15 0.15<br />
Guava 0.05 0.05<br />
Sub-total 5.1 5.35<br />
Grand total 409.15 388.37<br />
NRM & Watershed Development<br />
To sustain people’s participation, it is necessary to have longer treatment and inclusion of<br />
a farming systems component in watershed development programme. There is a need to<br />
utilize resources available from the RKVY for watershed development. Orissa Watershed<br />
Development Mission has already prepared a perspective <strong>plan</strong> to rehabilitate all<br />
watersheds of the states by the end of 13 th Plan. The schemes that are being implemented<br />
in the district are indicated below:<br />
Name of scheme Sector Brief description<br />
NWDPRA CSP (90:10) Sustainable natural<br />
resource management<br />
IWDP CSP(11:1) Watershed rehabilitation<br />
Watershed activities, with added focus on livelihood, create vast scope for local<br />
development. Unfortunately, the integrated approach is often not practiced by the<br />
beneficiaries as well as the officials due to lack of awareness and/or other<br />
compulsions/limitations like lack of proper coordination among concerned departments,<br />
and inadequate human resource in Pallahara ASCO office, etc..<br />
The Block-wise soil conservation programme drawn up by the ASCO, <strong>Angul</strong> and<br />
ASCO, Pallahara is presented below:<br />
PRIA is an International Centre for learning and promotion of participation and democratic governance<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
38
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
Block<br />
Annual Plan <strong>2009</strong>-10 Annual Plan <strong>2010</strong>-11<br />
NWDPRA IWDP RKVY NREGS NWDPRA IWDP RKVY NREGS<br />
Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy<br />
<strong>Angul</strong> 235 25.73<br />
375( 35.6 56 farm<br />
115 12.48<br />
375 89.06<br />
w.s. 25 ponds &<br />
w.s.<br />
d.) 45 hect.<br />
Planta-<br />
d.<br />
Nil Nil O.A. 30.6 tion 41.79<br />
Nil Nil O.A. 12.4 Nil Nil<br />
Banarpal 235 25.73<br />
5 6.3 27 farm<br />
115 12.48<br />
5 6.5<br />
Nil Nil<br />
ponds 10.05<br />
Nil Nil<br />
Nil Nil<br />
Chendi- 235 25.73<br />
375 35.6 78 farm<br />
115 12.48 375 89.06<br />
pada<br />
w.s. 25 ponds &<br />
w.s.<br />
d.<br />
100 hect.<br />
Planta-<br />
d.<br />
Nil Nil O.A. 16.6 tion 75.15<br />
O.A. 10.8 Nil Nil<br />
Atha- 235 25.73 1500 90 50 40.5 135 farm 82.34 115 12.48 750 45 50 29.2<br />
mallik<br />
(O. ponds &<br />
(O.<br />
A.) 68.76<br />
hect.<br />
Planta-<br />
A.)<br />
tion<br />
Nil Nil<br />
Kishor- 235 25.73 1500 90 50 30.5 198 farm 120.25 115 12.48 750 45 50 29.2<br />
nagar<br />
O.A. ponds &<br />
7<strong>7.</strong>13<br />
hect.<br />
Planta-<br />
O.A.<br />
tion<br />
Nil Nil<br />
PRIA is an International Centre for learning and promotion of participation and democratic governance<br />
39
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
Talcher 1 3.87<br />
Kaniha 1 3.87<br />
Pallahara 1 3.87 8 13.2<br />
TOTAL 140.26 193.2 195.<br />
75<br />
2 farm<br />
ponds 1<br />
8 farm<br />
ponds<br />
and 94<br />
hect.<br />
Plantation 2<strong>7.</strong>5<br />
1(cont.<br />
from<br />
<strong>2009</strong>-<br />
10)<br />
1(cont.<br />
from<br />
<strong>2009</strong>-<br />
10)<br />
1(cont.<br />
from<br />
<strong>2009</strong>-<br />
10)<br />
PRIA is an International Centre for learning and promotion of participation and democratic governance<br />
12.51<br />
12.51<br />
12.51 8(co<br />
nt.<br />
from<br />
<strong>2009</strong><br />
-10)<br />
68<br />
40<br />
Nil Nil<br />
30<br />
hect.<br />
Plan-<br />
tation<br />
Maint<br />
of<br />
existing<strong>plan</strong>tations<br />
and<br />
60<br />
hect.<br />
new<br />
<strong>plan</strong>tation<br />
358.08 99.93 158 266.<br />
22 28.37<br />
(Note: The original proposals particularly under RKVY have been modified by the TSI and target for watershed development (w.s.d.)<br />
has been reduced. O.A. means ‘ Other activities’ that include field bunding, gully control measures, water harvesting structure,<br />
construction and repairing work, etc..).<br />
Grand total for Soil Conservation: Rs. 88<strong>7.</strong>29 lakhs for <strong>2009</strong>-10 and Rs. 552.52 lakhs for <strong>2010</strong>-11.
Livestock Promotion and Animal Resource Development<br />
Livestock plays an important role in Indian economy and is an important sub-sector of Indian<br />
agriculture. The contribution of livestock to the GDP is about 4.5% and the sector employs about<br />
5.5% of the workforce. Major part of the livestock population is concentrated in the marginal and<br />
small size of holdings. Growth during the Tenth Plan has been at the rate of 3.6%. The National<br />
Project on Cattle and Buffalo Breeding is the flagship scheme initiated in October 2000 for a<br />
period of 10 years. This envisages genetic up-gradation of indigenous cattle and buffaloes,<br />
development and conservation of important indigenous breeds, and to evolve sustainable<br />
breeding policy. The allocation for dairy development by the Central and State Governments has<br />
also diminished over the last two <strong>plan</strong>s. Consequently, in the first four years of the Tenth Five<br />
Year Plan, the growth rate of milk has been less than 3% per annum.<br />
The goals for the Eleventh Five Year Plan for the livestock sector would be (i) to achieve an<br />
overall growth between 6% and 7% per annum for the sector as a whole with milk group<br />
achieving a growth of 5.0% per annum and meat and poultry group achieving a growth of 10%<br />
per annum; (ii) the benefit of growth should be equitable, benefiting mainly the small and<br />
marginal farmers and landless labourers and should benefit poorly endowed areas like draught<br />
prone, arid, and semi-arid areas; (iii) to provide adequate animal health services for effective<br />
disease control; (iv) the sector should generate additional employment opportunity to people in<br />
the rural areas especially to the female population; (v) livestock should provide major source of<br />
income in the selected areas having potential for growth in the sector should result in the<br />
improvement of environment, specially in the rural areas.<br />
The trust activities of ARD Department in the district are:<br />
1 Monitoring livestock disease control programme<br />
2 Transfer of knowledge and technology on improved AH & Dairying practices<br />
3 Establishment of LACs<br />
4 Up-gradation of skill of farmers/ un-employed educated youth for self-employment<br />
5 Fodder development for dairying<br />
6 Breed up-gradation through AI and natural crossing<br />
The major schemes that are being implemented in the district for achieving the above objectives<br />
are:<br />
Scheme Sector Brief description<br />
Up-gradation of skill in self State <strong>plan</strong> Organising training camps<br />
employment under ARD sector<br />
Training and demonstration in State Plan On-farm demonstration and<br />
fodder cultivation<br />
training<br />
Assistance to states for control of CSP(75:25) Vaccination and diagnosis of<br />
animal diseases(ASCAD)<br />
diseases<br />
Fodder seed distribution CSP(75:25) To encourage fodder<br />
cultivation by multiplication<br />
and<br />
seeds<br />
distribution of fodder<br />
PRIA is an International Centre for learning and promotion of participation and democratic governance<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
41
<strong>Angul</strong> district has better prospects for goatery, whereas the two distinguished features, i.e. the<br />
State Poultry Breeding and Research Farm that was established in 1942 at <strong>Angul</strong> and produces<br />
banaraj chicks, and the big fodder farm at Panchmahala, need proper management and<br />
development. The office of CDVO needs to be strengthened in respect of human resource and<br />
infrastructure. The Collector & D.M. <strong>Angul</strong> has suggested for genetic upgradation of all the<br />
breadable population in the district in the next few years, and also for increasing the production<br />
of eggs. The following <strong>annual</strong> <strong>plan</strong> reflects the proposed activities of the ARD in <strong>Angul</strong> district:<br />
Proposed outlay in<br />
lakh rupees for<br />
<strong>2009</strong>-10<br />
Proposed outlay in<br />
lakh rupees for<br />
<strong>2010</strong>-11<br />
Scheme-wise proposed<br />
activities for <strong>2009</strong>-10<br />
Strengthening the Livestock<br />
service infrastructure &<br />
modernization of offices(<br />
Urban)<br />
Rural Infrastructure<br />
3 3.3<br />
Development Fund for ARD<br />
Opening of new Livestock Aid<br />
80.3 88.33<br />
Centres<br />
Training & demonstration in<br />
fodder cultivation and pasture<br />
14.95 16.445<br />
management 0.5 0.55<br />
Sub-total<br />
RKVY<br />
98.75 108.625<br />
Farmers' training 6.6 6.6<br />
Training of Gomitra<br />
Purchase of instruments and<br />
2 2<br />
cryocans<br />
Construction of livestock aid<br />
5 5<br />
centres @Rs.4.5 lakhs/unit 40.5(9 units) 40.5(9 units)<br />
Development of fodder farm 90<br />
Research work on country fowl 5 5<br />
Sub-total<br />
Other schemes<br />
149.1 59.1<br />
NPCBB 2 3<br />
ADCAD 1 1.1<br />
SADP 0.2 0.25<br />
SPCA 0.15 0.2<br />
SMILE 1 1.2<br />
Sub-total 4.35 5.75<br />
Grand total 252.2 173.475<br />
(Note: The outlay for <strong>2009</strong>-10 is based on the <strong>plan</strong> documents provided by the Office of the<br />
CDVO, <strong>Angul</strong> . RKVY <strong>plan</strong> has been prepared as per the norms. ‘Other schemes’ have been<br />
added by the TSI on the basis of the financial support available during 2008-09.)<br />
PRIA is an International Centre for learning and promotion of participation and democratic governance<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
42
During 2008-09, the office of the CDVO, <strong>Angul</strong> <strong>plan</strong>ned for a training hostel with a project cost<br />
of Rs.30 lakhs. The DPC had approved this <strong>plan</strong> on the condition that this will serve as a<br />
common facility centre for other allied departments. However, the government is yet to sanction<br />
the same. Since the allied departments also express a need for training centre and/or hostel, it<br />
has been suggested that a common facility centre for this may be developed on PPP mode. The<br />
Corporate sector may contribute for this purpose under its CSR programme.<br />
Fishery<br />
Presently, fisheries and aquaculture contribute 1.04% to the national GDP of the country and<br />
5.34% to agriculture and allied activities. The fisheries sector has been providing employment to<br />
fishermen whose occupation is highly prone to natural calamities. Sustainable fisheries can only<br />
be achieved through improvement of the quality, technical skills, and management of human<br />
resource managing fisheries in the country, in consonance with the rapidly changing needs.<br />
The priority areas in fishery sector in the district are:<br />
1 To promote sustainable development of inland fishery<br />
2 To produce and stock fingerlings/yearlings for enhancement of fish production<br />
3 To enhance contribution of fishery sector to food and livelihoods security of the people<br />
engaged in fishery<br />
4 To develop human resource through capacity building<br />
The major schemes that are being implemented in the district are:<br />
Scheme Sector Brief description<br />
Upgradation of skills for self- State Plan To impart training to unemployment<br />
in fisheries<br />
employed youth<br />
Inland capture fishery CSP(75:25) Training<br />
Development fishery and CSP (75:25) Excavation and renovation of<br />
aquaculture through FFDA<br />
pisciculture tanks<br />
Welfare programme for fishermen CSP (50:50) Insurance and low cost<br />
housing for fishermen<br />
Infrastructure is insufficient for the production of fingerlings as per requirement in the district.<br />
Hence, major emphasis has been given to the development of the existing fish farms. Fingerling<br />
production in the irrigation dams & reservoirs of the district has been suggested to this<br />
Department but they express certain limitations of the same. However, one remarkable<br />
achievement of the Department has been promotion of pisciculture in village ponds through<br />
women’s SHGs.<br />
Following is the <strong>annual</strong> <strong>plan</strong> for this Department:<br />
PRIA is an International Centre for learning and promotion of participation and democratic governance<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
43
Scheme-wise proposed activities<br />
Proposed outlay in<br />
lakh rupees for<br />
<strong>2009</strong>-10<br />
Proposed outlay in<br />
lakh rupees for<br />
<strong>2010</strong>-11<br />
Development of fresh water aquaculture<br />
under FFDA(Rural+ Urban) 38.59 42.449<br />
Integrated development of inland<br />
capture resources 2.9 3.19<br />
Development of water-logged area<br />
through FFDA 2 2.2<br />
NWFF low cost housing 4<br />
Training of farmers 12<br />
Aquashop 6<br />
Construction of nursery tank with<br />
borewell 2<br />
Sub-total 43.49 71.839<br />
RKVY Not specified<br />
Dev. of <strong>Angul</strong> fish farm 20<br />
Dev. of Bantala fish farm 5<br />
Dev. of Khamar Fish farm 6<br />
Dev. of Boinda fish farm 4<br />
Dev. of Athmallik fish farm <strong>7.</strong>5<br />
Extension programme(computer, printer,<br />
laboratory kits, LCD projector, chart &<br />
board) 2.3<br />
Sub-total 44.8<br />
Grand total 88.29 71.839<br />
(Note: The outlay for <strong>2009</strong>-10 is based on the <strong>plan</strong> documents provided by the Department of<br />
Fishery. On the other hand, that for <strong>2010</strong>-11 is based on the 5-year perspective <strong>plan</strong> prepared<br />
during 2008-09 as the concerned Department has not submitted projections for <strong>2010</strong>-11 this<br />
year. RKVY <strong>plan</strong> has been modified as per the instruction of the Collector and D.M, <strong>Angul</strong>.)<br />
Agricultural Research & Education:<br />
Orissa University of Agriculture & Technology has a Krushi Vigyan Kendra(KVK) at <strong>Angul</strong><br />
which is the premier agency for research & training in agriculture and allied sectors. The zonal<br />
research station of OUAT for the mid-central table land agroclimatic zone is at Mahishapat,<br />
Dhenkanal; and the research findings are disseminated in <strong>Angul</strong> district through KVK, <strong>Angul</strong>.<br />
The KVK has 5 adopted villages for intensive programme and about 15 villages of extensive<br />
programme. It undertakes demonstration activities, and provides literatures for this purpose.<br />
Some of its interventions include distribution of tissue culture <strong>plan</strong>ting materials for banana, and<br />
low-cost onion storage structure.(Source: Programe Coordinator, KVK, <strong>Angul</strong>). The institution is<br />
PRIA is an International Centre for learning and promotion of participation and democratic governance<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
44
also working on preparing a calendar of activities for the agriculture & allied sector in the<br />
district.<br />
For <strong>2009</strong>-10, KVK, <strong>Angul</strong> has proposed the following <strong>annual</strong> <strong>plan</strong>(modified by the TSI):<br />
Proposed activity Cost in lakh rupees<br />
Rain water harvesting structure 4.00<br />
Development of mixed orchard with<br />
micro-irrigation system<br />
2.00<br />
Demonstration units 5.00<br />
Construction of shade house 2.00<br />
Total 13.00<br />
[Note: The original <strong>plan</strong> submitted by KVK, <strong>Angul</strong> contained few more proposals like<br />
construction of fully furnished conference hall(cost Rs.30 lakhs), boundary wall(Rs.15 lakhs),<br />
spillway/head regulator/bridge (Rs.10 lakhs), borewell(Rs. 1 lakh), and land development<br />
activity(Rs.2 lakhs). All these, including the above listed, were to be proposed under RKVY; and<br />
the <strong>revised</strong> <strong>plan</strong> as produced here has been prepared keeping the RKVY norms in view, and also<br />
the suggestion of the Collector & D.M., <strong>Angul</strong> to discard the proposal for conference hall as<br />
instead of having individual conference hall or training hall facilities for the agriculture & allied<br />
departments, there should be a common facility centre for all.]<br />
Agricultural Financial Institutions:<br />
Credit<br />
Credit is an essential requirement for revitalizing agriculture .The findings of the National<br />
Sample Survey Organization (NSSO) 59th Round (2003) revealed that only 27% of the total<br />
number of cultivator households received credit from formal sources while 22% received credit<br />
from informal sources. The remaining households, comprising mainly small and marginal<br />
farmers, had no credit out-standing. It is unlikely that the situation has changed much since 2003.<br />
The <strong>annual</strong> credit <strong>plan</strong> for different Blocks as prepared by the Lead Bank Officer is given below:<br />
Block<br />
Annual Credit Plan<br />
Credit <strong>plan</strong> in Lakh Rs during <strong>2009</strong>-10<br />
Crop loan FM/Hort/Irrigation Allied Total<br />
<strong>Angul</strong> 3960.00 55<strong>7.</strong>71 552.98 5070.69<br />
Banarpal 4540.14 324.68 249.38 5114.20<br />
Chendipada 3908.59 534.16 256.61 4699.36<br />
Athamallik 2164.09 440.78 206.32 2811.19<br />
Kishornagar 1548.92 276.08 165.00 1990.00<br />
Talcher 1671.65 268.34 136.23 2076.22<br />
Kaniha 2491.95 225.35 179.11 2896.41<br />
Pallahara 2048.90 165.33 104.10 2318.33<br />
Total 22334.24 2792.43 1849.73 26976.40<br />
PRIA is an International Centre for learning and promotion of participation and democratic governance<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
45
NABARD has already prepared a potential credit linked programme for the district as indicated<br />
in the following Table.<br />
Potential Linked Credit Plan <strong>2009</strong>-10 (NABARD)<br />
Block<br />
PL Credit requirement during <strong>2009</strong>-10 in Lakh Rs<br />
Crop<br />
loan<br />
MI LD FM Hort First Dairy Poultry Shhep/<br />
goat<br />
<strong>Angul</strong> 5100 63.74 35.93 182.75 91.34 14.39 56.08 15.45 95.85 24.52 212.50 50.29 5942.84<br />
Banarpal 2244 28.69 16.13 71.06 29.46 6.77 26.21 6.60 42.57 11.48 10.00 20.73 2513.7<br />
Chendipada 1836 23.85 14.37 74.29 34.24 5.60 23.44 6.60 36.27 11.25 19<strong>7.</strong>50 18.25 2281.66<br />
Athamallik 1632 21.16 12.61 71.23 26.75 5.24 22.51 6.60 30.69 <strong>7.</strong>45 19<strong>7.</strong>50 16.00 2049.74<br />
1020 13.72 8.98 45.90 1<strong>7.</strong>40 3.81 15.20 4.35 19.17 4.95 5.00 10.25 1168.73<br />
Kishornagar<br />
Talcher 4480 56.84 31.62 178.67 70.19 11.93 51.54 13.20 85.77 21.35 195.00 43.52 5239.63<br />
Kaniha 2040 26.00 15.18 70.55 29.56 6.13 24.82 6.60 38.34 9.00 2.50 20.48 2289.16<br />
Pallahara 2040 26.00 15.18 70.55 31.06 6.13 21.20 6.60 38.34 9.00 2.50 20.48 228<strong>7.</strong>04<br />
Total 20400 260.00 150.00 765.00 330.00 60.00 241.00 66.00 38<strong>7.</strong>00 99.00 825.00 200.00 23783.00<br />
PRIA is an International Centre for learning and promotion of participation and democratic governance<br />
Fish<br />
ry<br />
Sora<br />
ge<br />
Other<br />
Allied<br />
The potential linked credit <strong>plan</strong> prepared by NABARD for Rs 402 crore for the year <strong>2009</strong>-10<br />
is detailed below:<br />
S.No Broad sectors PLP Projection for<br />
<strong>2009</strong>-10 ( In lakh Rs)<br />
1 Crop production 20400<br />
2 Term Investment for Agriculture& Allied Sector 3383<br />
3 Agro&Food processing sector 300<br />
4 Non-farm sector 2180<br />
5 Other priority sector 13937<br />
Total 40200<br />
The credit <strong>plan</strong> indicates that 50.7% of investment has been proposed for crop production in the<br />
district during <strong>2009</strong>-10.<br />
Cooperatives<br />
The credit disbursal by commercial banks covers only 11.7% of operational holdings in the<br />
country. The most potent means for widening and deepening access to institutional credit to the<br />
innumerable small and marginal farmers are the co-operative credit societies that are autonomous<br />
and democratic. The revitalization of the co-operative credit structure in order to transform them<br />
into vibrant and viable democratic financial institutions is therefore vital.<br />
The thrust areas of cooperation department are share capital assistance to short-term credit<br />
cooperative societies, crop insurance, distribution of agro-inputs and agricultural marketing. The<br />
credit <strong>plan</strong> for crop loan, as prepared by ARCS, <strong>Angul</strong> is indicated below:<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
46<br />
Total
Cooperation (Year-wise credit <strong>plan</strong>) Rs in lakhs<br />
Block <strong>2009</strong>-10 <strong>2010</strong>-11<br />
<strong>Angul</strong> 3037 3341<br />
Banarpal 3478 3826<br />
Chendipada 3026 3329<br />
Athamallik 1545 1700<br />
Kishornagar 1176 1294<br />
Talcher 1176 1294<br />
Kaniha 1680 1848<br />
Pallahara 1680 1848<br />
Total 16798 18480<br />
PACSs in <strong>Angul</strong> Circle now have 102926 members as against 101779 members in 2008-09. On<br />
the other hand, those in Talcher Circle achieved a membership of 46160 during 2008-09 which is<br />
slightly less than the target of 46500 for that year.<br />
Overall details of the cooperatives in the Talcher Circle and <strong>Angul</strong> Circle of the district are<br />
reflected in the following <strong>annual</strong> <strong>plan</strong> of the respective ARCSs:<br />
Proposed activities<br />
Issue of Kissan Credit<br />
Cards(nos.)<br />
Enrolment of<br />
membership(nos.)<br />
Rabi loan in lakh<br />
rupees<br />
Khariff loan in lakh<br />
rupees<br />
Deposit mobilization in<br />
lakh rupees<br />
Sale of consumer<br />
goods(lakh rupees)<br />
Supply of inputs to<br />
farmers(MT)<br />
<strong>Angul</strong> Circle<br />
Talcher Circle<br />
<strong>2009</strong>-10 <strong>2010</strong>-11 <strong>2009</strong>-10 <strong>2010</strong>-11<br />
86121 87251 34125 34350<br />
103824 104870 46500 47000<br />
5762 6340 1550 1650<br />
6500 7150 1600 1750<br />
3395 3774 5195 5429<br />
35.48 40.80 205.6 215.5<br />
330 370 210.65 231.72<br />
One of the major targets this time is a substantial increase in the proposed procurement of paddy.<br />
For instance, against a target of 2462 MT for the same during 2008-09, ARCS, <strong>Angul</strong> Circle<br />
proposes for a target of 8000 MT and 8500 MT respectively for <strong>2009</strong>-10 and <strong>2010</strong>-11.<br />
Proposal under RKVY for cooperation sector:<br />
Adequate storage infrastructure is necessary for the Primary Agriculture Cooperatives. Given the<br />
fact the target for procurement of paddy has substantially increased this year, the present storage<br />
PRIA is an International Centre for learning and promotion of participation and democratic governance<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
47
facilities need to be upgraded and enhanced. In <strong>Angul</strong> Circle, out of total 74 PACSs, 20 have<br />
godowns in good condition, 48 have in partially damaged condition, one at<br />
Kruttibaspur(Athmallik Block) has a totally damaged godown, and 5 do not have any godowns.<br />
Similarly, in the Talcher Circle of ARCS, there are 29 PACSs having 22 godowns which need<br />
complete renovation. The following proposal has accordingly made by the TSI under RKVY:<br />
Year <strong>2009</strong>-10 <strong>2010</strong>-11<br />
Construction of new godowns for<br />
PACSs @Rs.7 lakhs/unit<br />
Renovation of godowns @Rs.2<br />
lakhs/unit<br />
28.00 (2 in <strong>Angul</strong><br />
Circle and 2 in Talcher<br />
Circle)<br />
30.00(10 in <strong>Angul</strong><br />
Circle and 5 in Talcher<br />
Circle)<br />
Total 58.00 58.00<br />
Marketing<br />
28.00 (2 in <strong>Angul</strong> Circle<br />
and 2 in Talcher Circle)<br />
30.00(10 in <strong>Angul</strong> Circle<br />
and 5 in Talcher Circle<br />
Marketing is a driving force for agricultural development. Currently agricultural markets are<br />
regulated under APMC Act. Besides, there are other regulations, viz. Essential Commodities Act<br />
and various Control Orders issued there under. All these have created restrictive and<br />
monopolistic marketing structures, which have resulted in inefficient operation and high degree<br />
of marketing costs. They have also had an adverse impact upon agricultural production and<br />
system, inefficient flow of commodities, and lack of competitiveness. When the APMCs were<br />
first initiated there was significant gain in market infrastructure development. However, this<br />
infrastructure is now out of date, especially given the needs of a diversified agriculture. The<br />
Krushak Bazars created for marketing have to be strengthened and made operational.<br />
During <strong>2009</strong>, following the bumper production of groundnut in some parts of the district the<br />
concerned farmers allegedly faced the constraint of selling the same at a price lower than the<br />
deserving one. This suggests that unless the promotional activities for agricultural/horticultural<br />
production are correlated with the ensured marketing mechanism, farmers may be discouraged to<br />
take up high production activities.<br />
Forestry and Wild Life<br />
Forests provide livelihoods to the rural poor living around and create opportunities for wage<br />
employment. They maintain a natural balance in the ecosystem and reduce the impact of natural<br />
calamities. The strategies for forest sector development are:<br />
1 Conservation of dense forest growth<br />
2 Regeneration of forest cover<br />
3 Afforestation<br />
4 Capacity building of the community for participatory forest management<br />
5 Promotion of eco-tourism and eco-development<br />
6 Implementation of forest policy<br />
PRIA is an International Centre for learning and promotion of participation and democratic governance<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
48
More details of the proposals under this sector have been discussed separately. It is however<br />
important to mention here that the <strong>Angul</strong> Kendu Leaf Division has taken up some innovative<br />
programme activities like vermicomposting with kendu leaves, recycling of waste kendu leaves,<br />
and drying yard development. It requires financial support for such activities, and hence these<br />
have been prposed under RKVY.<br />
Sericulture:<br />
Sericulture development has a good scope in the district which has been discussed separately.<br />
There is however no proposal under RKVY for this sector.<br />
RASTRIYA KRUSHI VIKASH YOJANA (RKVY)<br />
RKVY is a major agricultural scheme launched during the Eleventh Plan with the following<br />
objectives.<br />
• To incentivise the states so as to increase public investment in Agriculture and allied<br />
sectors.<br />
• To provide flexibility and autonomy to states in the process of <strong>plan</strong>ning<br />
• To ensure the preparation of agriculture <strong>plan</strong>s based on agro-climatic conditions,<br />
availability of technology and natural resources.<br />
• To ensure that the local needs/crops/priorities are better reflected in the<br />
agricultural <strong>plan</strong>s of the states<br />
• To achieve the goal of reducing the yield gaps in important crops, through focused<br />
interventions.<br />
• To maximize returns to the farmers in Agriculture and allied sectors.<br />
• To bring about quantifiable changes in the production and productivity<br />
The scheme has already been implemented in the district during 2008-09. The proposals<br />
submitted by the line departments for implementation of the scheme during <strong>2009</strong>-10 and <strong>2010</strong>-<br />
11 are given below:<br />
RKVY PROPOSAL FOR <strong>2009</strong>-10 & <strong>2010</strong>-11 (Financial in Lakh Rupees)<br />
Name of Name of Proposal <strong>2009</strong>-10 <strong>2010</strong>-11<br />
Department<br />
Phy Fin Phy Fin<br />
Agriculture SRI<br />
Demonstration<br />
100 12.50 120 15.00<br />
Acid soil treatment 130 t 1.30 140 t 1.40<br />
Vermicompost 120 3.60 130 3.90<br />
Vermi hatchery 5 2.47 6 2.97<br />
SRI Village 1 3.30 1 3.30<br />
Use of 3800 3.95 4200 4.37<br />
PRIA is an International Centre for learning and promotion of participation and democratic governance<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
49
Biofertiliser ha ha<br />
Construction<br />
FIAC<br />
of<br />
1 Building<br />
3 60.00 3 60.00<br />
Sub-Total 8<strong>7.</strong>12 90.94<br />
Horticulture Vermi<br />
unit<br />
compost 200 14.70 200 14.70<br />
Sub-total 14.70 14.70<br />
ARD Farmers’ training 6.60 6.60<br />
Training<br />
Gomitra<br />
of 2.00 2.00<br />
Purchase of 5.00 5.00<br />
Instruments<br />
Cryocans<br />
and<br />
Development<br />
fodder farm<br />
of 90.00<br />
Research work on<br />
country fowl<br />
5.00 5.00<br />
Construction<br />
LAC<br />
of 9 40.5 9 40.5<br />
Sub-Total 149.1 59.1<br />
Fisheries Development<br />
20.00<br />
Of<br />
farm<br />
<strong>Angul</strong> Fish<br />
Bantala fish farm 5.00<br />
Khamar Fish farm 6.00<br />
Boinda Fish farm 4.00<br />
Athamalik<br />
farm<br />
fish <strong>7.</strong>50<br />
Extension support<br />
(AV aids)<br />
2.3<br />
Sub-total 44.8<br />
KVK, <strong>Angul</strong> Rain<br />
harvesting<br />
structure<br />
water 4.00<br />
Development<br />
mixed orchard<br />
of 2.00<br />
Demonstration<br />
units<br />
5.00<br />
Construction<br />
shade house<br />
of 2.00<br />
Sub-Total 13.00<br />
Soil<br />
Conservation<br />
Field Bunding 125 ha <strong>7.</strong>50 95 ha 8.10<br />
1 Farmer’s Information and Advisory Centre<br />
PRIA is an International Centre for learning and promotion of participation and democratic governance<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
50
Cooperation<br />
<strong>Angul</strong><br />
Kendu<br />
Leaves<br />
Division<br />
WHS 13 65.00 13 65.00<br />
Gully control 20 8.00 30 6.00<br />
Boundary wall 50 m 2.00 100 m 4.00<br />
Training Hall 3 40.00<br />
Repair of BCK 1 2.00<br />
Watershed Dev 750 ha 71.25 750 ha 178.12<br />
Nursery 2.ha 5.00<br />
Sub-total 195.75 266.22<br />
Construction of 4 28.00 4 28.00<br />
new godowns for<br />
PACSs<br />
Renovation of 15 30.00 15 30.00<br />
damaged godowns<br />
Sub-total 58.00 58.00<br />
Vermicomposting 10 2.5<br />
Recycling<br />
kendu leaves<br />
of 10 0.6<br />
Drying<br />
development<br />
yard 10 0.7<br />
Sub-total 3.8<br />
Grand total 566.27 488.96<br />
The sectoral district <strong>plan</strong> for <strong>2009</strong>-10 and <strong>2010</strong>-11 is indicated ion the following Table.<br />
Annual Plan including RKVY( In Lakh Rupees):<br />
Sub-sector Requirement for <strong>2009</strong>-10 Requirement for <strong>2010</strong>-11<br />
Agriculture 383.94 422.14<br />
Horticulture 409.15 388.37<br />
ARD 252.2 173.475<br />
Fishery 74.84 56.55<br />
Soil Conservation 88<strong>7.</strong>29 552.52<br />
Cooperation 58.00 58.00<br />
Sericulture 63.60 69.69<br />
KVK 13.00<br />
Forestry 2 3860.866 660.79<br />
Total 6002.886 2381.535<br />
2 Only the financial target of Forest Divisions (territorial), and the Satkoshia WL Division have been taken into<br />
account as the Kendu Leaves Division is basically funded by Orissa Forest Development Corporation. However,<br />
only the RKVY proposal part of <strong>Angul</strong> KL Division has been added to this estimation because no other source is<br />
likely to fund the same.<br />
PRIA is an International Centre for learning and promotion of participation and democratic governance<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
51
RURAL DEVELOPMENT<br />
The District Rural Development Authority (DRDA), headed by its Project Director has been<br />
implementing various programmes for rural development. The interventions are mainly of three<br />
categories, as under:<br />
Special programme for rural development:<br />
These include Drought Prone Area Programme (DPAP), Desert Development Programme<br />
(DDP), and Integrated Wasterland Development Projects(IWDP) Scheme,(etc.). DPAP and DDP<br />
are not implemented in <strong>Angul</strong> district whereas IWDP is being implemented through the soil<br />
conservation department. Details of IWDP are therefore available in the respective section on<br />
soil conservation.<br />
Gopabandhu Gramin Yojna(GGY) is a special programme for rural development launched by the<br />
Govt of Orissa in the non-BRGF districts. Each district(non-BRGF) is to get Rs. 15.00 crore<br />
from the state every year (during the 11 th <strong>plan</strong> period) under this scheme the principal objective<br />
of which is to provide additional funds to the targeted districts to provide infrastructure<br />
consisting primarily of bijli(electricity), sadak(road) and pani (water) to every revenue village in<br />
a phased manner. The amount received under GGY is equally reallocated among the blocks to<br />
take up projects. Village wise allocation of funds is based on the population.<br />
Rural employment:<br />
Various programmes/schemes like the Swaranjyanti Gram Swarozgar Yojana (SGSY),<br />
Sampoorna Gram Rozgar Yojana (SGRY), National Food for Work Programme and/or National<br />
Employment Guarantee Programme, and National Rural Employment Guarantee Scheme<br />
(NREGS) have been implemented to provide employment to the poor people at rural level. Of<br />
these, only SGSY and NREGS are presently being implemented in the district.<br />
<strong>Angul</strong> district experiences massive poverty in the midst of the existence of large industrial<br />
houses like NALCO, NTPC and MCL. Out of the total 203152 rural families 120608 are living<br />
below poverty line. Since 59.36% of the total rural families are living below poverty line, it<br />
creates a challenge before the <strong>plan</strong>ners to hammer the vicious circle of poverty. However, the<br />
Ministry of Rural Development has launched numerous schemes to reduce the pressure of<br />
poverty from the countryside. State Plan also supplements in developing the rural infrastructures.<br />
Panchayati Raj Development has been implementing three important types of schemes viz-self<br />
employment, and wage employment.<br />
A) Self Employment : -<br />
Creation of Self Employment otherwise means addition to the existing nation output. Presently<br />
Swaranjayanti Gram Swarozgar Yojana has been implemented through Panchayati Raj<br />
PRIA is an International Centre for learning and promotion of participation and democratic governance<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
52
Institutions since 1999. The basic objective of the scheme is to create self employment<br />
opportunities among the rural BPL families. It is a credit cum subsidy scheme.<br />
Objective of the Scheme<br />
1. To bring about the BPL families to above the poverty line.<br />
2. To establish micro enterprises in the rural areas.<br />
3. To Reduce the degree of regional imbalance through upliftment of the rural economy.<br />
4. To ensure social justice through emphasizing the SC/ST and Women beneficiaries.<br />
5. To achieve Women Empowerment through finance WSHGs.<br />
6. To reduce the pressure of work force on Agriculture through diversification of<br />
occupation.<br />
Thrust Areas of the Scheme<br />
1. Women literacy rate is to be raised so as to enable women swarozgaries to manage<br />
their own economic activities.<br />
2. Banking sector has to play a pro-active role in SGSY finance.<br />
3. Man Power Planning of the Pancahyati Raj Department should be as per the practical<br />
situations of the blocks.<br />
B) Wage Employment<br />
Creation of Wage Employment otherwise means addition to the existing national<br />
employment. Presently National Rural Employment Guarantee Scheme has been<br />
implemented through Panchayati Raj Institutions. The basic objective of the scheme is to<br />
assure 100 days wage employment opportunities to all rural families in a year.<br />
Objective of the Scheme<br />
1. To provide minimum 100 days unskilled wage employment to all rural families in a year<br />
on demand.<br />
2. To provide wage employment to the rural job seekers in their respective localities.<br />
3. To create durable assets in the rural areas.<br />
4. To ensure justice through emphasizing the SC/ST, women workers in the scheme.<br />
5. To reduce the pressure of work force on Agriculture through diversification of<br />
occupation.<br />
6. To reduce the rate of migration for employment to distant places.<br />
Thrust areas of the Scheme<br />
1. Since the Action Plan has to be finalized by the respective Local Bodies like GP, PS and<br />
ZP the projects should be need based and completed with in the same financial year.<br />
2. The job seekers should be enthusiastic for the works opened in their localities.<br />
MAHATMA GANDHI RURAL EMPLOYMENT GUARANTEE SCHEME:<br />
The Govt. of India passed the National Rural Employment Guarantee Act on September-2005<br />
and launched new centrally sponsored National Rural Employment Guarantee Scheme<br />
(NREGS). Centrally Sponsored Scheme NFFWP has been merged into NREGA. This is<br />
PRIA is an International Centre for learning and promotion of participation and democratic governance<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
53
essentially a demand-driven programme which offers jobs to deserving rural people for<br />
minimum 100 days in a year, per household. The current wage rate is Rs.90/worker/day.<br />
NREGS has been renamed as Mahatma Gandhi Rural Employment Guarantee Scheme on 2 nd<br />
October <strong>2009</strong>. It takes up specific projects for creating rural employment, and also creates assets<br />
for villages. Construction of roads, and farm ponds etc. are included in the list of projects<br />
sanctioned under the scheme.<br />
Persons desiring jobs under NREGS need to apply for job cards.Norms specify the maximum<br />
duration of payment of wages, the ratio of wage & material cost; etc..The progress is monitored<br />
online.<br />
NREGA 2008-09<br />
During 2008-09, Rs.2282.00 lakhs and Rs.253.55 lakhs have been received as Central Share and<br />
State share under NREGA.Total funds received is Rs.2535.55 lakhs.<br />
3. Other rural development programmes:<br />
Among other rural development projects, Indira Awas Yojna(IAY) is the major one. This is a<br />
housing scheme which DRDA is implementing for the deserving BPL families. More details of<br />
the programme are available under ‘Housing’.<br />
12 th Finance Commission (TFC) Award is also being received for rural development activities.<br />
Following are the achievements under TFC grant. The State Finance Commission has also<br />
provided some grants as under:<br />
Although several sources of funding area vailable for rural development, the policy decisions<br />
particularly regarding the implementation strategy are sometimes questionable sometimes. For<br />
instance, in some cases the village with highest population becomes the starting point which may<br />
delay the process of extending the facility to other deserving villages.<br />
Watershed Mission Programme :<br />
The Watershed Programme is operating in <strong>Angul</strong> District since 1998-99. There are two nos<br />
of I.W.D.P. projects taken up in 2 Blocks i.e. I.W.D.P.:-I in Chhendipada Block and<br />
I.W.D.P.:-II in Pallahara Block. The I.W.D.P.:-I is covering 9 nos of Micro Watersheds and<br />
the name of the project is Kumbhira Nallah and the Micro Watersheds are Salakhaman,<br />
Chhotatentuli, Nanguli, Nuapada , Chhendipada, Mamuria, Chhendipada jungle, Handiguda,<br />
Dhaurakhaman. The I.W.D.P.:-II is covering 8 nos of Micro Watersheds and the names of the<br />
project are Talabahali, Jhalakamajha, Jharbeda, Saliamunda, Sukha, Mundajora, Belajhara,<br />
Kainanda Nallahs.<br />
Further in the year 2005-06 another two projects I.W.D.P.:-III Athamallik and I.W.D.P.:-IV<br />
Kishorenagar have been taken up in the district. Both the projects are having 10 microprojects<br />
each.<br />
PRIA is an International Centre for learning and promotion of participation and democratic governance<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
54
Funds for IWDP projects are channelised through the DRDA though the Soil Conservation<br />
Department is the implementing agency for the same utilizing this fund.<br />
Various details as regards achievements under SGSY, NREGS, GGY, IAY, and IWDP have<br />
been furnished in annexure-4.<br />
DRDA Annual <strong>plan</strong>:<br />
Following is the <strong>annual</strong> <strong>plan</strong> of District Rural Development Agency, <strong>Angul</strong>:<br />
Financial<br />
Year<br />
<strong>2009</strong>-10<br />
<strong>2010</strong>-11<br />
Annual <strong>plan</strong> for non-NREGS activities:<br />
Physical Target (Scheme wise) Financial Target (Est. Cost) in lakh rupees<br />
SGSY(3306 swarojgaris)<br />
IAY(4457 houses)<br />
IWDP<br />
GGY<br />
DRDA Admn.<br />
MO KUDIA<br />
440.92<br />
1571.44<br />
126.00<br />
1500.00<br />
140.00<br />
10<strong>7.</strong>10<br />
Sub-total 3885.46<br />
SGSY<br />
IAY<br />
IWDP<br />
GGY<br />
DRDA Admn.<br />
485.00<br />
1728.56<br />
126.00<br />
1500.00<br />
156.00<br />
Sub-total 3995.56<br />
Annual <strong>plan</strong> for NREGS activities:<br />
NREGS programme to be implemented in the Blocks & GPs through the BDOs directly may be<br />
regarded as the core NREGS. On the other hand, NREGS implemented through different<br />
departments may be regarded as Departmental NREGS.<br />
Presently the Blocks are preparing only <strong>annual</strong> <strong>plan</strong>s for NREGS, based on latest palli sabha<br />
resolutions. Fresh resolutions are seeked each year, and projects pending from the previous year<br />
are ignored if fresh resolutions no more enlist them. It is thus not possible for the TSI at present<br />
to prepare a perspective <strong>plan</strong> completely on this basis particularly when palli sabha resolutions<br />
may alter the <strong>plan</strong>s next year.<br />
The following <strong>plan</strong> that has been approved for Core NREGS programme for the year <strong>2009</strong>-10 is<br />
likely to have spill over the coming four years or more, given the low rate of achievements so<br />
far.<br />
PRIA is an International Centre for learning and promotion of participation and democratic governance<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
55
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
Block Core NREGS Plan(Blocks/GPs): No. of projects sanctioned<br />
All<br />
weather<br />
road<br />
CC<br />
road<br />
Water<br />
conservation<br />
and water<br />
harvesting<br />
projects<br />
Irrigation<br />
canals<br />
including<br />
micro-<br />
and minor<br />
projects<br />
Renovation<br />
of<br />
traditional<br />
water body,<br />
and<br />
desilting<br />
Flood<br />
control &<br />
protection<br />
PRIA is an International Centre for learning and promotion of participation and democratic governance<br />
Firm<br />
pond<br />
Afforestation<br />
and <strong>plan</strong>tation<br />
Total cost in<br />
lakh rupees<br />
<strong>Angul</strong> 532 464 277 276 441 140 576 258 7276.00<br />
Banarpal 273 425 96 82 251 52 189 129 3900.15<br />
Chhendipa<br />
da<br />
420 288 195 43 115 64 466 134 3036.00<br />
Athmallik 920 ----- 379 350 392 225 1689 365 870<strong>7.</strong>00<br />
Kishore- 350 287 198 181 171 174 811 57 4778.85<br />
nagar<br />
Pallahara 518 470 341 307 177 171 249 2633 7090.55<br />
Kaniha 391 351 245 222 322 187 867 240 5426.45<br />
Talcher 598 1120 209 192 277 110 365 250 6366.50<br />
Grand<br />
total<br />
46581.5<br />
(based on the proceedings of the Zilla Parishad, <strong>Angul</strong> on 21 January <strong>2009</strong> and 23 June <strong>2009</strong>)<br />
56
On the other hand, NREGS programmes of Line Departments have differential prospects. For<br />
instance, the Horticulture Department does not see much need of NREGS activities for its<br />
purpose and funding under National Horticulture Mission gives enough scope to this<br />
Department for it activities. On the other hand, some irrigation departments seem to have a<br />
higher prospect because of their regular maintenance activities.<br />
Department<br />
Financial target for<br />
<strong>2009</strong>-10 in lakh rupees<br />
DFO, <strong>Angul</strong> 320.00<br />
DFO, Athmallik 74<strong>7.</strong>9481<br />
DFO, Deogarh 166.42<br />
DFO, Satkoshia WL 164.00<br />
Minor Irrigation<br />
<strong>Angul</strong> irrigation division<br />
Sericulture<br />
Soil Conservation<br />
Total(Departmental)<br />
52.71<br />
200.68<br />
15.891<br />
358.08<br />
2025.73<br />
The above Plan does not include activities expected to be covered under NREGS by the<br />
<strong>Angul</strong> KL Division as the Panchayati Raj Department does not see the same conforming to<br />
NREGS norms. Further, proposal for jatropha <strong>plan</strong>tation under EPBP, that has been estimated<br />
to have an investment of Rs.50 lakhs, has recently been decided to be covered under NREGS;<br />
but it has not been added to the above list pending official confirmation.<br />
PRIA is an International Centre for learning and promotion of participation and democratic governance<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
57
SPECIAL AREAS PROGRAMME<br />
III.1 Introduction:<br />
Special Areas Programme of the Government of India focuses on the development of specific<br />
areas having distinguished geographical, socio-economic, and/or anthropological<br />
characteristics. In the district of <strong>Angul</strong>, the Hill Areas Development Programme, and Border<br />
Area Development Programme, etc. are not implemented. It is also not a BRGF district.<br />
III.2 Development in tribal areas:<br />
The Ministry of Tribal Affairs have been providing Special Central Assistance as an<br />
additionally to the Tribal Sub-Plan for carrying out programmes to assist tribal households<br />
with income generation schemes and for creation of infrastructure in the Tribal Sub-Plan<br />
areas to support economic activities. A portion of the SCA is allocated to OSFDC for<br />
implementation of Dispersed Tribal Development Programme (DTDP). A part of the SCA is<br />
being utilized for supporting the educational infrastructure created specially for the tribal<br />
children in TSP areas. Leaving these aside, the SCA funds are passed on to the ITDAs, Micro<br />
Projects and the MADA/Cluster Blocks for implementation of Income Generation Scheme<br />
(IGS) and Infrastructure Development Schemes (IDS) in the ratio of 70:30. (Source:<br />
http://orissagov.nic.in/stsc/ActivitiesReport2004-05.htm )<br />
Orissa is implementing 17 micro-projects for the development of primitive tribal groups in<br />
the state, and the Paudi Bhuyan Development Agency in the Pallahara Block of <strong>Angul</strong> district<br />
is one of them.<br />
III.2.1 The Paudi Bhuyan Development Agency(PBDA):<br />
The Paudi Bhuyan Development Agency(PBDA) was established during the year 1978 by the<br />
Govt. for socio-economic and educational development of the Primitive Tribal Group named<br />
Paudi Bhuyans. The Head Quarter of this Agency is situated at Jamardihi with a distance of<br />
15 kms from Pallahara. It covers the Nagira hill ranges and some parts of plain land<br />
consisting of 25 villages in 5 GPs. with a population of 5633 covering 1236 households.<br />
There is a Special Officer supervising PBDA. For the year <strong>2009</strong>-10, he has submitted the<br />
following <strong>annual</strong> <strong>plan</strong>:<br />
Proposed activity Budget in lakh rupees<br />
Road development 500.00<br />
Development of educational facility 100.00<br />
Construction of health-subcentre at Shibida 10.00<br />
Total 610.00<br />
However, during the year 2008-09, his predecessor, the then District Welfare Officer, who<br />
was also in charge of the Special Officer, PBDA had submitted a more comprehensive <strong>plan</strong><br />
for the development of the area that received approval of the DPC. Select portions of that<br />
Plan is being reproduced here for review by the DPC:<br />
PRIA is an International Centre for learning and promotion of participation and democratic governance<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
58
Being a hilly area, communication facility is required in all the villages. Though<br />
communication facility is available to some villages but few villages still have no all<br />
weather communication. So it requires all weather communication to all the villages<br />
under this Agency.<br />
Though drinking water supply have been provided to all the villages through tube<br />
wells, sanitary wells and open wells but the water is not suitable for drinking due to<br />
objectionable levels of iron in it. So it is proposed to supply pipe water to all the<br />
villages of this Agency.<br />
Regarding electricity, only 2 nos of villages have been electrified since inception, and<br />
the remaining 23 villages are in dark. So it is proposed to electrify all the remaining<br />
villages during coming five year <strong>plan</strong>.<br />
As regards irrigation, there are some projects constructed since long for this purpose,<br />
but are now defunct due to lack of regular maintenance. Hence for growth of<br />
agriculture and horticulture in the area, it is proposed to improve 6 nos of existing<br />
minor irrigation to Ac. 400.00 of land.<br />
The Bhuyans are remaining in the thatched roof houses which are not so suitable. So<br />
it is required to construct fireproof houses systematically with sufficient facilities to<br />
500 nos of families. Most of the Bhuyan children are not continuing their studies due<br />
to poverty. So it is proposed to establish an Educational Complex for boys at Nagira<br />
.GP.1ike Educational Complex at Sibida for girl students, to improve the education of<br />
the tribal students.<br />
The following <strong>annual</strong> <strong>plan</strong> has been prepared by the District Welfare Officer-cum-<br />
Special Officer, PBDA, for development of PBDA area as under:<br />
PRIA is an International Centre for learning and promotion of participation and democratic governance<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
59
Financial<br />
Year<br />
Proposed activity and target<br />
2008-09 Communication<br />
I. construction of bridge from<br />
Seebida to Kadambinipur<br />
2. Improvement of road (C.C.Road)<br />
with Ghat cutting from Badibahal to<br />
Nagira.<br />
Drinking Water Supply<br />
Financial target<br />
(amount in Lakh)<br />
25.00<br />
20.00<br />
Jamardihi, Dudipani & Timi village 50.00<br />
Electricity<br />
Bhuyan Bastis of Itee, Siaria,<br />
Patamund, Timi & Rugudihi<br />
Irrigation<br />
15.00<br />
I. Construction<br />
Kadambinipur<br />
of channel at<br />
10.00<br />
2.Constructyion of MIP at Barundihi 15.00<br />
Fire proof Houses<br />
123 House holds 2.025<br />
Education<br />
1.Educational Complex in Nagira<br />
G.P. for ST boys<br />
2.Training Hall with equipments for<br />
ST youths<br />
100.00<br />
10.00<br />
PRIA is an International Centre for learning and promotion of participation and democratic governance<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
60
Financial<br />
Year<br />
<strong>2009</strong>-10<br />
Financial<br />
Year<br />
<strong>2010</strong>-11<br />
Proposed activity<br />
Communication<br />
1. Construction of road from Seebida to Badibahal 15.00<br />
2.Costruction road ferom Tanugula to Khadaka 25.00<br />
Drinking Water Supply<br />
Pipe water supply in villages -Duipani, 50.00<br />
Ashanpani, Jamudiha, Kadamdiha & Rugudidihi<br />
Electricity<br />
Nagira G.P. 100.00<br />
Irrigation<br />
.Renovation & extension of Channel at Seebida 10.00<br />
Fire proof Houses<br />
40 house holds 10.00<br />
Financial target<br />
(Estimated cost)<br />
Proposed activity and target Financial target<br />
(Estimated cost)<br />
Communication<br />
Improvement of road from Kadambinipur to Salei with<br />
construction of bridge<br />
Drinking Water Supply<br />
30.00<br />
Pipe water supply in. Nagira a.p. 100.00<br />
Irrigations<br />
Renovation & extension of Channel at Baradihi <strong>7.</strong>00<br />
Fire proof Houses<br />
77 house holds 19.50<br />
(reproduced from <strong>Angul</strong> District Perspective Plan: 2008-13)<br />
PRIA is an International Centre for learning and promotion of participation and democratic governance<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
61
III.3 Grants under Article 275(1) of the ‘Constitution of India’:<br />
Grants under Article 275(1) of the ‘Constitution of India’ guarantees grants from the<br />
Consolidated Fund of India each year for promoting the welfare of Scheduled Tribes and in<br />
pursuance to this constitutional obligation, the Ministry of Tribal Affairs provides fund through a<br />
Central Sector Scheme "Grants under Article 275(1) of the Constitution".<br />
OBJECTIVE:<br />
1. The objective of the Scheme is promotion of welfare of Scheduled Tribes and<br />
administration of Scheduled Areas.<br />
COVERAGE:<br />
2. The Scheme covers all Tribal Sub Plan and 4 tribal majority States of the country.<br />
FUNDING PATTERN:<br />
3. This is a Central Sector Scheme and 100% Grants are provided by the Ministry to meet<br />
the cost of each project for tribal development as may be undertaken by the State<br />
Government for raising the level of administration of Scheduled Areas therein and for<br />
welfare of the tribal people to bring them at par with the rest of the State.<br />
SALIENT FEATURES:<br />
4. The Grants are provided on the basis of ST population percentage in the State.<br />
• The Ministry, which used to release the funds without identifying the projects in earlier<br />
years, has now decided to release fund to the State Governments against specific<br />
infrastructure development and welfare projects from the year 2000-2001.<br />
The grants under the Scheme are available for any project on welfare of Scheduled Tribes and<br />
strengthening of administration of tribal areas. , With a view to provide ST students to the<br />
accessibility to quality education it was decided to establish 100 Residential Schools from the<br />
grants available under the Scheme, during Ninth Plan Period on the pattern of Navodaya<br />
Schools. Each school is provided with a non-recurring grant of Rs.2.5 Crores. (Source:<br />
http://www.tribal.nic.in/chapter6.html )<br />
PRIA is an International Centre for learning and promotion of participation and democratic governance<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
62
In the district of <strong>Angul</strong>, the provision under article 275(1) is implemented in three areas, as<br />
under:<br />
• <strong>Angul</strong> Cluster(mostly concentrated in and around Tikarpada area)<br />
• Pallahara Block<br />
• Athmallik Block<br />
The grant is basically used for infrastructure development that can include irrigation facilities.<br />
IIII.4 Special Central Assistance (SCA) to TSP:<br />
The Special Central Assistance (SCA) is provided by the Ministry of Tribal Affairs (MOTA) to<br />
the State Government as an additive to the State Tribal Sub- Plan (TSP), where state <strong>plan</strong><br />
provisions are not normally forthcoming to bring about a more rapid economic development of<br />
Tribals. From the Tenth Five Year Plan period, the objective and scope of SCA to TSP, which<br />
was originally meant for filling up of the critical gaps in the family based income generation<br />
activities of the TSP, has been expanded to cover the employment-cum-income generation<br />
activities and the infrastructure incidental thereto not only family based, but also run by the Self<br />
Help Groups (SHGs) Community. Thus, SCA is primarily meant for family oriented income<br />
generating schemes in sectors of agriculture, horticulture, sericulture, animal husbandry and<br />
cooperation and a part of SCA (not more than 30%) is permitted to be used for development of<br />
infrastructure incidental to such income generating schemes. Ministry of Tribal Affairs,<br />
Government of India releases Special Central Assistance in the shape of grant-in-aid to the State<br />
Government keeping in view the tribal population percentage of the state. Further, Information,<br />
Education and Communication (I.E.C) related programmes in tribal areas have been<br />
implemented under the funding of S.C.A. to T.S.P. The Ministry of Tribal Affairs have been<br />
providing Special Central Assistance as an additionality to the Tribal Sub-Plan for carrying out<br />
programmes to assist tribal households with income generation schemes and for creation of<br />
infrastructure in the Tribal Sub<strong>plan</strong> areas to support economic activities. A portion of the SCA is<br />
allocated to OSFDC for implementation of Dispersed Tribal Development Programme (DTDP).<br />
A small portion of the SCA is being utilized for supporting the educational infrastructure created<br />
specially for the tribal children in areas covered under TSP. Leaving these aside, the SCA funds<br />
are passed on to the I.T.D.As, Micro Projects and the MADA/Cluster Blocks for implementation<br />
of Income Generation Schemes (IGS) and Infrastructure Development Schemes (IDS) in the<br />
ratio of 70:30. During the Xth Plan Period (2002-03 to 2006-07),a total amount of Rs.346.05<br />
crore has been received as under SCA to TSP. (GoO, SC & ST Development Department,<br />
Annual Report 2007-08, p.14)<br />
SCA is released for the economic development of the following:-<br />
*Integrated Tribal Development Project (ITDP) area contiguous large area in which ST<br />
population is 50% or more out of a total population.<br />
*Modified Area Development Approach (MADA) pockets: identification of pockets containing<br />
50% or more of ST population out of a total population of 10000 and above.<br />
PRIA is an International Centre for learning and promotion of participation and democratic governance<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
63
*Clusters-identified pockets containing 50% or more ST Population out of a total population of<br />
5000. (Source: http://www.tribal.nic.in/index1.html)<br />
IBO(Individual Benefit Oriented) and CBO(Community Benefit Oriented) schemes are the two<br />
components of the proposals under SCA to TSP.<br />
The following <strong>annual</strong> <strong>plan</strong>s for <strong>2009</strong>-10 have accordingly been prepared by the District Welfare<br />
Office:<br />
Scheme-wise activities<br />
Cluster <strong>Angul</strong><br />
ANGUL BLOCK<br />
Financial target in<br />
lakh rupees<br />
Goatery for 4 women's SHGs 4.2<br />
CC road in Pabala village 1.72<br />
Sub-total 5.92<br />
Article 275(1)<br />
Construction of boundary at Chotkel 2.5<br />
Construction of additional class roomsat Katarang 0.25<br />
Sub-total 2.75<br />
Scheme-wise activities<br />
PAL-LAHRA BLOCK<br />
Financial target in<br />
lakh rupees<br />
MADA Pallahara<br />
Hibrid goatery for 10 WSHGs 10<br />
Compl. Of field channel Patna cross bandha at Tauban 2<br />
Construction of irrigation field channel at Phapanda 4<br />
Construction of irrigation field channel at Namagen 2<br />
Construction of irrigation field channel at Timi 2<br />
Construction of irrigation field channel at Keloposhi 2<br />
C.D. work at Kantanali road 5<br />
Sub-total 2<strong>7.</strong>00<br />
Article 275(1)<br />
Completion of addition class room at Malyagiri H.S. 1<br />
Completion of Malyagiri College building 4<br />
Completion of Bandhabhuin K/S hostel building 1<br />
Repair of WEO quarters 2<br />
PRIA is an International Centre for learning and promotion of participation and democratic governance<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
64
Completion of boundary wall at Bandhabhuin ----- 1<br />
Sanitary system including generator at Malyagiri H.S. 3<br />
Repair of school building at bandhabhuin Kanyashram 1<br />
Sub-total 13.00<br />
Scheme-wise activities<br />
MADA Athmallik<br />
ATHMALLIK BLOCK<br />
Financial target in<br />
lakh rupees<br />
Goatery for 3 WSHGs 3<br />
Improvement of Badadhar diversion wire 2<br />
Improvement of Kutulisinga project 2<br />
Improvement of Tantanali diversion wire 2<br />
Improvement of Katarangdaranala, Paikasahi 2<br />
Improvement of Mamurijharan diversion wire 2<br />
Improvement of Sisukata diversion wire 2<br />
Improvement of Kenchunali diversion wire 2<br />
6 Nos. of additional classrooms at Amsarmunda, Rainali,<br />
Mamuria,etc. 7<br />
Sub-total 24.00<br />
Article 275(Athmallik)<br />
Completion of addition class room at Sapaphana GP H.S. 0.3<br />
Construction of culvert on Damodarpur Nala 2<br />
Construction of vented cause way on Paikasahi-Jagadalpur road 0.7<br />
Sub-total 3.00<br />
PRIA is an International Centre for learning and promotion of participation and democratic governance<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
65
IRRIGATION AND FLOOD CONTROL<br />
Introduction:<br />
The district of <strong>Angul</strong> has a number of irrigation projects and adequate potential as well as<br />
demand for irrigation development, but the actual development of irrigation potential is not very<br />
satisfactory. Irrigation potential has been created to irrigate about 50000 ha of cultivated land<br />
which accounts for about 36% of net sown area(135206 ha, vide NABARD 2008, p.18) in the<br />
district, but the actual irrigated area is reportedly only 24% of the net sown area(NABARD PLP-<br />
<strong>2009</strong>-10, <strong>Angul</strong> District, p.18). The projects include major irrigation projects with a capacity of<br />
more than 10000 ha, medium projects with a capacity of 2000-10000 ha, and minor irrigation<br />
projects(less than 2000 ha capacity). Minor irrigation projects may use surface water or ground<br />
water, and lift irrigation projects are a type of minor irrigation project that use electricity/pumps<br />
for lifting water(thus, LI projects are usually separately <strong>plan</strong>ned).<br />
Despite a goof rainfall, precipitation in the district is usually confined to July-September, thus<br />
rendering agriculture dependent on irrigation during the rest of the period. Lack of irrigation is<br />
one of the major obstacles in agriculture development in many parts of the district. Given the<br />
limitations of creating more major/medium projects, new minor/lift irrigation projects are the<br />
major hope at present.<br />
Following is a brif account of various irrigation projects alongwith their <strong>annual</strong> <strong>plan</strong>s:<br />
A. Major Irrigation:<br />
A. 1 Rengali Dam Project:<br />
Rengali Dam has been constructed basically for flood control & power generation, but with a<br />
potential to facilitate irrigation. The main component of the project is a masonry gravity dam of<br />
1040 m length, with a maximum height of 75 m across river Brahmani near village Rengali in<br />
<strong>Angul</strong> District.<br />
The construction of the dam being already over, presently it requires funds for its maintenance.<br />
However, the proposed Durgapur Canal which is expected to irrigate 1749 hectares of land in the<br />
Bajrakot area would be a construction project.<br />
Rengali Dam maintenance project does not have any NREGS component at present. The <strong>annual</strong><br />
<strong>plan</strong> for this project is as under:<br />
PRIA is an International Centre for learning and promotion of participation and democratic governance<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
66
Financial<br />
Year<br />
Proposed activity<br />
Physical Target<br />
<strong>2009</strong>-10 Maintenance of Rengali Dam<br />
1. State Non-Plan<br />
2. Critical Lump-Non-Plan<br />
3. TFCG<br />
Financial Target in lakh<br />
rupees<br />
138.60<br />
122.50<br />
10.00<br />
Total 271.10<br />
(Source: Executive Engineer, Rengali Dam Project)<br />
Plan for <strong>2010</strong>-11 has not been received from the concerned authority.<br />
A.2 Samal Barrage Project:<br />
In stage-II construction of Rengali multi purpose project a barrage has been constructed at<br />
Samal. The water released from the Rengali power house is picked up in the Barrage at about<br />
35 km down stream of the dam to provide industrial water use and extend irrigation facilities<br />
on either bank of the river in an area of 3, 36,400 ha lying in <strong>Angul</strong>, Dhenkanal, Cuttack,<br />
Jajpur & Keonjhar districts.<br />
Irrigation is the prime objective of the Samal barrage. However, being incomplete, it requires<br />
funds under various construction heads, and not for maintenance at present. The budget<br />
includes relief & rehabilitation (R.R.) activities for the displaced people. Following is the<br />
<strong>annual</strong> <strong>plan</strong> for Samal barrage project:<br />
Financial Year Proposed activity<br />
<strong>2009</strong>-10 1.Electrical & civil maintenance<br />
<strong>2010</strong>-11 1. Critical lump<br />
2. State Non-<strong>plan</strong>(for canal repairing , etc.)<br />
PRIA is an International Centre for learning and promotion of participation and democratic governance<br />
67<br />
Financial Target in lakh<br />
rupees<br />
200.00<br />
98.50<br />
Sub-total 298.50<br />
2. State non-<strong>plan</strong><br />
3. Centrally sponsored scheme<br />
40.00<br />
125.00<br />
2500.00<br />
Sub-total 2665.00<br />
(Source: Executive Engineer, Head Works Division, Samal)<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com
The proposal for <strong>2010</strong>-11 is likely to cover also the displacement issue of Katarapada village.<br />
B. Medium Irrigation:<br />
B.1 <strong>Angul</strong> Irrigation Division:<br />
There are two Medium Irrigation Projects namely Derjang Irrigation project and Aunli Irrigation<br />
Project in <strong>Angul</strong> District, which are under the control of <strong>Angul</strong> Irrigation Division, <strong>Angul</strong>.<br />
The <strong>annual</strong> <strong>plan</strong> for <strong>Angul</strong> irrigation division is as under:<br />
Financial<br />
Year<br />
<strong>2009</strong>-10<br />
Scheme Proposed activity Financial Target in lakh<br />
rupees<br />
Critical Works Canal embankment 69.00<br />
Critical Works River embankment 15.00<br />
12 th Finance<br />
Commission<br />
Construction of road along<br />
dam and canal<br />
NREGS Improvement to canals<br />
through pani panchayats<br />
NREGS Improvement to canals<br />
through department<br />
10.00<br />
75.68<br />
125.00<br />
Total 294.68<br />
PRIA is an International Centre for learning and promotion of participation and democratic governance<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
68
Financial<br />
Year<br />
<strong>2010</strong>-11<br />
Scheme Financial Target in lakh rupees<br />
Critical Works<br />
12 th Finance<br />
Commission<br />
70.00<br />
15.00<br />
NREGS 63.00<br />
Total 148.00<br />
B.2 Manjore Irrigation Division:<br />
Manjore project is a medium irrigation project taken up in a drought prone and tribal dominated<br />
area of <strong>Angul</strong> District, across river Manjore under Mahanadi Basin. The project was cleared by<br />
Central Water Commission (CWC), Govt. of India on 26.03.1993 and Department of Forest and<br />
Environment cleared the project during August 199<strong>7.</strong> The project work was taken up since 1996.<br />
Due to paucity of funds the work was taken up on phased manner. The 1st phase work was<br />
completed during 2004 and irrigation potential was created for 2300 ha of lands. By<br />
now(October <strong>2009</strong>), a lot of progress has taken place and it is expected that after the installation<br />
of the gate, land acquisition for rest of the canal system will proceed and the project will be<br />
completed by 2011.(Source: Executive Engineer, Manjore Irrigation Project)<br />
On completion of the project the economy of the locality will be highly improved due to<br />
irrigation facility in Rabi & Khariff. The water scarcity in summer, the drinking water facility<br />
through out the year can very well be assured by the project in this drought prone area of<br />
Athmallik Sub-Division. The pisciculture, in the reservoir shall change economy of the people<br />
and standard of food. Huge reservoir along with the beautiful dam, spillway in the midist of<br />
dense green forest will certainly attract the tourists from all over the country, which has already<br />
been experienced since construction of the dam.<br />
PRIA is an International Centre for learning and promotion of participation and democratic governance<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
69
The presence of crocodiles and the migrating birds have already attracted the local tourists,<br />
which in future can be very good tourist spot, if a co-ordinate action <strong>plan</strong> shall be taken up with<br />
tourism department.<br />
Following is the <strong>annual</strong> <strong>plan</strong> of Manjore Division for <strong>2009</strong>-10:<br />
PRIA is an International Centre for learning and promotion of participation and democratic governance<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
70
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
Sl.No. Sub Heads<br />
Outlay/expenditure in lakh rupees<br />
2008-09 <strong>2009</strong>-10<br />
Allotment Expenditure Allotment Expenditure<br />
(Ending 7/09)<br />
PRIA is an International Centre for learning and promotion of participation and democratic governance<br />
Proposed<br />
outlay in 1st<br />
Revised<br />
Estimate for<br />
<strong>2009</strong>-10<br />
Proposed<br />
outlay for<br />
<strong>2010</strong>-11<br />
1 2 3 4 5 6 7 8<br />
1 Dam & Appt.Major works 15 15.44 24.25 4.33 50 0<br />
2 Canal & Branches Major<br />
works<br />
281 281.04 260 79.99 1000 3000<br />
3 Spillway Major works 156 158.37 78.52 1.24 150 0<br />
4 L.A. Compensation 750 750 250 .. 500 100<br />
5 L.A.C.charged 110 110 200 .. 200 0<br />
6 R & R Assistance 1195.05 1189.89 20 0.82 500 100<br />
7 Workcharged 16 14.92 11.5 4.29 18.63 20<br />
8 Normal Mastor Role 1.27 1.25 1.25 0.42 1.5 5<br />
9 Misc.Work Account 3 3.12 3 0.63 3 4<br />
10 Suspense 0 0.04 1 -0.09 1 1<br />
11 Tools & Plants 0 .. .. .. 3 0<br />
12 Total 252<strong>7.</strong>32 2524.07 849.52 91.63 242<strong>7.</strong>13 3230<br />
13 Establishment 65.48 59.99 151.48 22.78 100 70<br />
Grand Total 2592.8 2584.06 1001 114.41 252<strong>7.</strong>13 3300<br />
71
DHAURARGH MEDIUM IRRIGATION PROJECT<br />
Another feather can be added to cap of District of <strong>Angul</strong> within 2020 on completion of<br />
Dhauragarh Medium Irrigation project, contemplated to be taken up over Barabankianalla<br />
near village Dhauragoth under Athamallik Block with irrigation potential of 2230 ha.<br />
The Dhauragarh project, with an estimated cost of Rs.6<strong>7.</strong>63 crores can be completed within<br />
3-4 years if sanctioned with secure & regular fund flow. This project also comes under the<br />
jurisdiction of Manjore Irrigation Division.<br />
However, due to lack of sanction of funds no activities are proposed for this project during<br />
<strong>2009</strong>-10.<br />
C. Minor Irrigation:<br />
An irrigation project facilities irrigation potential for 40 ha. above and up to 2000 ha. is<br />
coming under classification of Minor Irrigation project, which is maintained by Minor<br />
Irrigation (wing) under Water Resource Department. The MI Division, Dhenkanal has<br />
jurisdiction over the MI projects in the district of <strong>Angul</strong> that has 153 no. M.I. projects<br />
including the category of M.I. Tank, Reservoir, Diversion weir inundation channel<br />
(Integrated), etc. are providing 27556 ha (Designed Ayacut) under M.I. sector, out of total<br />
74268 ha land under irrigation sector against the total cultivable land of 2,16,403 ha in this<br />
district. Out of 153 no. of M.I.Ps, 54 nos. are completed, 19 partly derelict, 75 completely<br />
derelict & 5 nos. are on going projects which are presently providing 15626 ha against<br />
designed Ayacut of 27556 ha.<br />
The cropping pattern that is basically prevailing & fed by M.I. project includes high yield<br />
paddy in Khariff, pulses, groundnut other vegetables and other vegetables, and other light<br />
duty crop. Sugarcane and other heavy duty crops are not supported by M.I. water.<br />
Due to paucity of funds under non <strong>plan</strong> scheme the project have not been maintained<br />
properly for which the targeted irrigation potentiality has not been achieved. A ray of hope<br />
has been developed to bring the projects to functional position through OCTMP and NREGS<br />
schemes.<br />
As per decision of the government the maintenance and repair works of projects will be<br />
transferred to Panipachayats in phased manner. The election of panipanchayat functionaries,<br />
their formation and process of handing over has already been started.<br />
PRIA is an International Centre for learning and promotion of participation and democratic governance<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
72
MI projects receive funding under the following schemes/projects:<br />
• RIDF:<br />
NABARD has provided financial assistance for minor irrigation projects under the Rural<br />
Infrastructure Development Fund(RIDF) scheme. RIDF-I was launched in 1995-96 with an<br />
initial corpus of Rs.2000 crore through contributions both from public and private sector, and<br />
RIDF XIV is effective since 2008-09.<br />
• OCTMP:<br />
Government of Orissa has initiated a community-based tanks rehabilitation project under<br />
World Bank support. There are many tanks fit for irrigation, but mainly due to deficient<br />
maintenance, most of them are performing at well below capacity with the percentage of<br />
actual area irrigated to potential created varying between 40-60% depending on rainfall. The<br />
project of community-based tank management <strong>plan</strong>s to rehabilitate such tanks.<br />
The project development objective is to improve tank based livelihoods and strengthen<br />
community management of selected tank systems.<br />
Following is the <strong>annual</strong> <strong>plan</strong> of the MI Division for <strong>Angul</strong> district for the year <strong>2009</strong>-10:<br />
Name of the project Scheme Estimated cost in rupees<br />
Badakerajanga Minor Irrigation<br />
project RIDF-VII 64 lakh<br />
Kushakila M.I project RIDF-VIII 100 lakh<br />
Chilanti M.I project RIDF-X 70 lakh<br />
Kanighai M.I project RIDF-XIII 100 lakh<br />
Kanga M.I project RIDF-XIII 70 lakh<br />
Janara ( Jamarkela) M.I project RIDF-XIII 38 lakh<br />
Sahar Gurujang M.I project RIDF-XIII 20 lakh<br />
Ghurudia M.I project RIDF-XIV 60 lakh<br />
Sureswari -ii M.I project RIDF-XV 30 lakh<br />
Bandhiani M.I project RIDF-XV 10 lakh<br />
Karadabahal M.I project RIDF-XV 10 lakh<br />
Tangianisa M.I project RIDF-XV 27 lakh<br />
Angapada M.I project RIDF-XV 50 lakh<br />
Parang M.I project RIDF-XV 30 lakh<br />
Krutibaspur M.I project RIDF-XV 30 lakh<br />
Aida M.I project Critical 17 lakh<br />
Saragipalli M.I project Critical 04 lakh<br />
Tebudu (Tube) M.I project Critical 12 lakh<br />
Katada M.I project Critical 10 lakh<br />
Hatasmili M.I project Critical 17 lakh<br />
Saliamunda Ghagara M.I project Critical 03 lakh<br />
Mankada M.I project Critical 04 lakh<br />
Kaansabaansa M.I project Critical 03 lakh<br />
Mankadakenda M.I project Critical 12 lakh<br />
Sureswari M.I project Critical 03 lakh<br />
PRIA is an International Centre for learning and promotion of participation and democratic governance<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
73
Dalakjharan M.I project Critical 23 lakh<br />
Khuntaposi M.I project NREGS 3 lakh<br />
Andhari-1 M.I project NREGS 3 lakh<br />
Andhari-2 M.I project NREGS 3 lakh<br />
Kaansabaansa M.I project NREGS 3 lakh<br />
Kukurapeta M.I project NREGS 3 lakh<br />
Guranga M.I project NREGS 3 lakh<br />
Kuio M.I project NREGS 3 lakh<br />
Takua M.I project NREGS 3 lakh<br />
Mankadakenda M.I project NREGS 1.49 lakh<br />
Beleikhai M.I project NREGS 2.29 lakh<br />
Rajabandha M.I project NREGS 2.96 lakh<br />
Ashrubahal M.I project NREGS 2.97 lakh<br />
Sureswari M.I project NREGS 2.95 lakh<br />
Kishorenagar M.I project NREGS 1.72 lakh<br />
Jaygarh M.I project NREGS 2.71 lakh<br />
Jhilimunda M.I project NREGS 2.62 lakh<br />
Valugadia M.I project NREGS 3 lakh<br />
Kishoresagar M.I project NREGS 3 lakh<br />
Balijodi M.I projecet NREGS 3 lakh<br />
Badakerajanga Mini Irrigation<br />
project RIDF-VII 63 lakh<br />
Kushakila M.I project RIDF-VIII 158 lakh<br />
Chilanti M.I project RIDF-X 100 lakh<br />
Kanighai M.I project RIDF-XIII 100 lakh<br />
Kanga M.I project RIDF-XIII 30 lakh<br />
Janara ( Jamarkela) M.I project RIDF-XIII 10 lakh<br />
Sahar Gurujang M.I project RIDF-XIII 08 lakh<br />
Ghurudia M.I project RIDF-XIV 10 lakh<br />
Sureswari -ii M.I project RIDF-XV 80 lakh<br />
Bandhiani M.I project RIDF-XV 80 lakh<br />
Karadabahal M.I project RIDF-XV 80 lakh<br />
Tangianisa M.I project RIDF-XV 60 lakh<br />
Angapada M.I project RIDF-XV 100 lakh<br />
Parang M.I project RIDF-XV 10 lakh<br />
Krutibaspur M.I project RIDF-XV 60 lakh<br />
Dholadimiri M.I project RIDF-XV 10 lakh<br />
Rukunanala M.I project RIDF-XV 10 lakh<br />
Total Rs.1838.71 lakh<br />
(Source: Executive Engineer, MI Division, Dhenkanal)<br />
For the year <strong>2010</strong>-11, the following Plan has been proposed:<br />
Name of the project Scheme Estimated cost<br />
Gopalpur M.I. project NREGS 8 lakh<br />
Kothabhuin M.I project NREGS 8 lakh<br />
Matelia M.I project NREGS 10 lakh<br />
Takua M.I project NREGS 7 lakh<br />
Jagannathpur M.I project NREGS 10 lakh<br />
PRIA is an International Centre for learning and promotion of participation and democratic governance<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
74
Bhimadhar M.I project NREGS 8 lakh<br />
Chotakoi M.I project NREGS 5 lakh<br />
Sabalavanga M.I project NREGS 5 lakh<br />
Bauli M.I project NREGS 10 lakh<br />
Guranga M.I project NREGS 3 lakh<br />
Dalaki M.I project NREGS 3 lakh<br />
Chalama bar M.I project NREGS 4 lakh<br />
Dandasinga M.I project NREGS 4 lakh<br />
Talapada M.I project NREGS 4 lakh<br />
Nuapada M.I project NREGS 4 lakh<br />
Chanaghai M.I project NREGS 3 lakh<br />
Dheladimiri M.I Project NREGS 3 lakh<br />
Rukunanala M.I project NREGS 3 lakh<br />
Kuio M.I project NREGS 5 lakh<br />
Santarpur M.I project NREGS 3 lakh<br />
Balibandha Badajor M.I project NREGS 3 lakh<br />
Gauduni Nala M.I project NREGS 4 lakh<br />
Jameijharana M.I project NREGS 4 lakh<br />
Raijharan M.I project NREGS 5 lakh<br />
Chendipada forest M.I project NREGS 4 lakh<br />
Bakala M.I project NREGS 3 lakh<br />
Similisahi M.I project NREGS 4 lakh<br />
Tube M.I project NREGS 3 lakh<br />
Patrapada M.I project NREGS 20 lakh<br />
Kumbhira M.I project NREGS 10 lakh<br />
Jhantipal M.I project NREGS 10 lakh<br />
Kaansabaansa M.I project NREGS 15 lakh<br />
Kukurapeta M.I project NREGS 3 lakh<br />
Katada M.I project NREGS 8 lakh<br />
Durgapur M.I project NREGS 3 lakh<br />
Mankada M.I project NREGS 20 lakh<br />
Khunataposi M.I project NREGS 5 lakh<br />
Saliamunda M.I project NREGS 10 lakh<br />
Dalo M.I project NREGS 8 lakh<br />
Andhari M.I project NREGS 7 lakh<br />
Aaunli M.I project NREGS 5 lakh<br />
Gandijora M.I project NREGS 8 lakh<br />
Jamarakela M.I project NREGS 5 lakh<br />
Rajamunda M.I project NREGS 4 lakh<br />
Sankhamur M. I project NREGS 4 lakh<br />
Naupada M.I project NREGS 3 lakh<br />
Elisuan M.I project NREGS 3 lakh<br />
Siaria M.I project NREGS 4 lakh<br />
Khandimunda M.I project NREGS 3 lakh<br />
Jogi Munda M.I project NREGS 3 lakh<br />
Valugadia M.I project NREGS 10 lakh<br />
Fulmukha M.I project NREGS 10 lakh<br />
Kampur M.I project NREGS 8 lakh<br />
Simajodi M.I project NREGS 8 lakh<br />
Ghasiaposi M.I project NREGS 10 lakh<br />
PRIA is an International Centre for learning and promotion of participation and democratic governance<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
75
Balijodi M.I project NREGS 8 lakh<br />
Deojoda M.I project NREGS 7 lakh<br />
Laxmisagar M.I project NREGS 3 lakh<br />
Kishoresagar M.I project NREGS 3 lakh<br />
Patharamunda M.I project NREGS 3 lakh<br />
Sabighata M.I project NREGS 3 lakh<br />
Telposi M.I project NREGS 4 lakh<br />
Mangalpur M.I project NREGS 7 lakh<br />
Laupal M.I Project NREGS 9 lakh<br />
Mandarbahal M.I project NREGS 7 lakh<br />
Patrapada M.I project NREGS 10 lakh<br />
Kadapada M.I project NREGS 7 lakh<br />
Sankhamala M.I project NREGS 5 lakh<br />
JogiMunda M.I project NREGS 5 lakh<br />
Podapathar M.I project NREGS 7 lakh<br />
Gangapani M.I project NREGS 7 lakh<br />
Aida M.I project NREGS 5 lakh<br />
Beleikhai M.I project NREGS 3 lakh<br />
Jhilimunda M.I project NREGS 3 lakh<br />
Kalamati M.I project NREGS 4 lakh<br />
Kaliadar M.I project NREGS 4 lakh<br />
Khajurijoda M.I project NREGS 4 lakh<br />
Dhuliapada M.I project NREGS 4 lakh<br />
Kishoresagar M.I project NREGS 3 lakh<br />
Lunahandisagar M.I project NREGS 4 lakh<br />
Rajabandha M.I project NREGS 3 lakh<br />
Vuasuninala M.I project NREGS 4 lakh<br />
Dahimala M.I project NREGS 4 lakh<br />
Kenchuanali M.I project NREGS 3 lakh<br />
Khameswarpalli M.I project NREGS 3 lakh<br />
Mangalpur M.I project NREGS 4 lakh<br />
Ranibandha M.I project NREGS 5 lakh<br />
Mankadakenda M.I project NREGS 3 lakh<br />
Lehedi M.I project NREGS 3 lakh<br />
Pataka-1 M.I project NREGS 3 lakh<br />
Dalimura M.I project NREGS 7 lakh<br />
Jaygad M.I project NREGS 10 lakh<br />
Sureswari M.I project NREGS 10 lakh<br />
Ashrubahal M.I project NREGS 7 lakh<br />
Padiabandhu M.I project NREGS 10 lakh<br />
Goratopa M.I project NREGS 5 lakh<br />
Saragipalli M.I project NREGS 5 lakh<br />
Susab M.I project NREGS 5 lakh<br />
Thelkanali M.I project NREGS 4 lakh<br />
Gumukhenda M.I project NREGS 3 lakh<br />
Purunapani M.I project NREGS 4 lakh<br />
Garud M.I project NREGS 3 lakh<br />
Ashrubahal M.I project OCTMP 9.02 lakhs<br />
Dalimura M.I project OCTMP 61.60 lakhs<br />
PRIA is an International Centre for learning and promotion of participation and democratic governance<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
76
Garud M.I project OCTMP 8.815 lakhs<br />
Jaygad M.I project OCTMP 72.00 lakhs<br />
Andhari M.I project OCTMP 102.35 lakhs<br />
Gandijora M.I project OCTMP 149.25 lakhs<br />
Khunataposi M.I project OCTMP 38.88 lakhs<br />
Saliamunda M.I project OCTMP 63.18 lakhs<br />
Sankhamar M.I project OCTMP 15.738 lakhs<br />
Total Rs.1096.833 lakh<br />
(Source: Executive Engineer, MI Division, Dhenkanal)<br />
D. Lift Irrigation:<br />
Lift Irrigation Division, Dhenkanal covers its jurisdiction over 8(eight) nos. of Blocks in<br />
<strong>Angul</strong> District. 3(three) nos. of Lift Irrigation Sub-Divisions are existing including 8(eight)<br />
nos. of Lift Irrigation Sections.<br />
As compared to the status as on 31-7-2008, the current status(as reported to the TSI on 26-<br />
10-<strong>2009</strong>) of LI projects in the district of <strong>Angul</strong> is as under:<br />
Particulars Status as on 31-7-08 Status as on 26-10-09<br />
Total no of L.I.Projects 451 503<br />
Irrigation potential of energised<br />
L.I.Ps<br />
12466 13662<br />
No .of defunct L.I.Ps 211 234<br />
No of operable L.I.Ps 240 269<br />
Irrigation potential of operable<br />
L.I.Ps(Ha)<br />
6056 7192<br />
There are total 349 Pani Panchayats in the district out of which 263 are currently active.<br />
Biju Krushak Vikash Yojna(BKVY), a Govt of Orissa initiative is presently the chief source<br />
of funding of LI projects. Following is the <strong>annual</strong> <strong>plan</strong> of the LI Division for <strong>Angul</strong> district<br />
for <strong>2009</strong>-10:<br />
Name of the LI projects under Ayacut area in Cost in lakh<br />
Block BKVY<br />
hactare<br />
rupees<br />
<strong>Angul</strong> Dhukuta No.3 24 8.00<br />
Chakuriapal 24 8.785<br />
Mahidharpur 24 8.434<br />
Banarpal Tentoloi 24 8.923<br />
Athmallik Mundapada 20 <strong>7.</strong>44<br />
Total 116 41.582<br />
For the year <strong>2010</strong>-11, the following has been <strong>plan</strong>ned:<br />
PRIA is an International Centre for learning and promotion of participation and democratic governance<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
77
1. Under BKVY:<br />
Block<br />
Kaniha<br />
Name of the LI projects<br />
under BKVY<br />
Ayacut area in<br />
hactare<br />
PRIA is an International Centre for learning and promotion of participation and democratic governance<br />
78<br />
Cost in lakh rupees<br />
Gahama-IV 80 40<br />
Nilataila 20 9.98<br />
Kamarei-II 20 9.94<br />
Kansamunda 40 19.98<br />
Bol-III 20 9.96<br />
Pitirima-IV 20 9.9<br />
Ranjana-II 20 9.73<br />
Rengali-II 40 19.96<br />
Rengali-III 40 19.98<br />
Durgapur-VII 40 19.84<br />
Olanda 20 9.97<br />
Pallahara Aluri-III 20 10<br />
Aluri-IV 20 10<br />
Odanga-II 20 9.99<br />
Biranmunda 20 9.99<br />
Burbura-I 20 10<br />
Burbura-II 20 10<br />
Kalanda-III 20 10<br />
Parachhat-III 20 9.99<br />
Parachhat-IV 20 9.99<br />
Paunshia-II 20 9.99<br />
Talcher Dharampur-III 20 10<br />
Kankili-VII 20 10<br />
Nuagaon 40 14<br />
Chhendipada Tukuda 40 19.25<br />
Total 25 projects 680 332.44<br />
2. Under Rengali Right Canal Project:<br />
Block<br />
Name of the LI<br />
projects under<br />
BKVY<br />
Ayacut area<br />
in hactare<br />
Cost in lakh rupees<br />
Talcher Kukudola 35 13.47<br />
Banarpal Tentulihata 100 3<strong>7.</strong>18<br />
Budhapanka-I 120 59.29<br />
Gothamara 100 44.4<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com
Apartipur 120 64.73<br />
Budhapanka-II 160 89.47<br />
Solagadia-II 90 42.61<br />
Srikantapur 110 72.95<br />
Total 8 projects 835 424.1<br />
(as reported to the TSI by the Estimator, LI Divisional Office, Dhenkanal on 26-10-09)<br />
PRIA is an International Centre for learning and promotion of participation and democratic governance<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
79
ENERGY<br />
Introduction:<br />
<strong>Angul</strong> happens to be one of the focal areas of power production in the power map of India.<br />
Whereas the Rengali hydroelectric project has been efficiently producing hydropower,<br />
thermal power <strong>plan</strong>ts have become the major source of electricity generation in the district.<br />
These thermal power <strong>plan</strong>ts derive their chief raw material from the coal mines of <strong>Angul</strong>, and<br />
new power <strong>plan</strong>ts are in the pipe line to use these coal resources.<br />
The irony however is that in this power-surplus district, the local distribution system for<br />
consumers is not so satisfactory. For instance, around the NTPC power <strong>plan</strong>t in Kaniha<br />
power supply to the villages is reportedly irregular or erratic. The reason behind this<br />
contradiction is that GRIDCO, a Govt of Orissa undertaking, is the transmission agency that<br />
purchases power from the power <strong>plan</strong>ts, and then private distribution agencies manage the<br />
local distribution of this power from GRIDCO. The Orissa Electricity Regulatory<br />
Commission is the decision making authority in selection of the distribution agencies for<br />
different regions of the state. The Central Electricity Supply Utility Company (CESU) is the<br />
distribution agency authorized for <strong>Angul</strong> district, and is presently under the management of<br />
the government due to want of private ownership. The distribution system depends on<br />
outdated transmission and distribution arrangements (viz, wire, transformers, etc.), and theft<br />
of wire, heavy demand from industries, and irregular payment by domestic consumers are<br />
some of the issues. Hence, the power-surplus district remains in dark in many of its areas.<br />
Rajiv Gandhi Grameen Vidyutikaran Yojna(RGGVY):<br />
RGGVY is a central government programme that is implemented through National Thermal<br />
Power Corporation (NTPC), but CESU is the local agency to provide monitoring support for<br />
this programme. (RGGVY) was launched in April-05 by merging all ongoing schemes.<br />
The RGGVY aims at:<br />
Electrifying all villages and habitations as per new definition<br />
Providing access to electricity to all rural households<br />
Providing electricity Connection to Below Poverty Line (BPL) families free of<br />
charge<br />
Infrastructure under RGGVY:<br />
o Rural Electricity Distribution Backbone (REDB) with 33/11 KV (or 66/11 KV) substation<br />
of adequate capacity in blocks where these do not exist.<br />
o Village Electrification Infrastructure (VEI) with provision of distribution<br />
transformer of appropriate capacity in villages/habitations.<br />
o Decentralized Distributed Generation (DDG) Systems based on conventional & non<br />
conventional energy sources where grid supply is not feasible or cost-effective.<br />
As per the new definition, a village would be declared as electrified, if :<br />
PRIA is an International Centre for learning and promotion of participation and democratic governance<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
80
1) Basic infrastructure such as Distribution Transformer and Distribution<br />
lines are provided in the inhabited locality as well as the Dalit Basti/<br />
hamlet where it exists.<br />
2) Electricity is provided to public places like Schools, Panchayat Office,<br />
Health Centers, Dispensaries, Community centers etc.<br />
3) The number of households electrified should be at least 10% of the total<br />
number of households in the village.<br />
Following statistics reveal the status of RGGVY in <strong>Angul</strong> district(as on 26-10-<strong>2009</strong>):<br />
Number of Villages Targeted for Electrification / Intensive Electrification under<br />
RGGVY<br />
S. No. Block<br />
No. of Villages<br />
Un-<br />
Electrified<br />
De-<br />
Electrified<br />
Electrified Total<br />
1 Palalahada 59 78 135 272<br />
2 Kaniha 44 19 123 186<br />
3 Talcher 22 14 101 137<br />
4 Chhendipada 27 40 106 173<br />
5 Kishorenagar 35 34 159 228<br />
6 Athmallik 77 50 170 297<br />
7 Anugul 52 49 119 220<br />
8 Banarpal 3 22 110 135<br />
TOTAL OF ALL BLOCK 319 306 1023 1648<br />
S<br />
No.<br />
Block<br />
Villages Completed Under RGGVY<br />
No. of Villages<br />
Electrified Un-Electrified(*) Total<br />
1 Palalahada 48 106 154<br />
2 Kaniha 58 60 118<br />
3 Talcher 33 20 53<br />
4 Chhendipada 24 60 84<br />
5 Kishorenagar 76 61 137<br />
6 Athmallik 26 118 144<br />
7 Anugul 10 70 80<br />
8 Banarpal 12 16 28<br />
TOTAL OF ALL<br />
BLOCK<br />
287 511 798<br />
(Source: http://rggvy.gov.in/rggvy/rggvyportal/index.html )<br />
However, the TSI has been reported that owing to certain administrative problems<br />
contractors are not encouraged to take up RGGVY work resulting in unnecessary delay in the<br />
PRIA is an International Centre for learning and promotion of participation and democratic governance<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
81
progress. And, the office of CESU, <strong>Angul</strong> has provided the following status of RGGVY in<br />
the district as on 13-10-<strong>2009</strong>:<br />
Total No. of No. of villages with work in Villages<br />
Block villages selected progress<br />
charged<br />
<strong>Angul</strong> 187 160 11<br />
Athmallik 292 268 43<br />
Banarpal 128 107 18<br />
Chhendipada 168 161 40<br />
Kaniha 184 177 95<br />
Kishorenagar 223 203 105<br />
Pallahara 244 224 70<br />
Talcher 118 99 39<br />
Total 1544 516 421<br />
94614 BPL connections were to be provided under the programme, and as on 13-10-09 work<br />
was in progress for 79740 connections out of the same.<br />
Biju Gram Jyoti Yojna (BGJY):<br />
BGJY is a Government of Orissa programme augmenting RGGVY in areas where RGGVY<br />
is not implemented. Under this programme, each Block will share Rs.50 lakhs out of total<br />
Rs.4 crores.<br />
Biju Gram Jyoti Yojana aims to ensure supply of electricity to thousands of small villages<br />
and habitations in the State.Implemented with funds to be made available by the State<br />
Government from its own resources, this programme has the District Collector as the<br />
implementing authority for the scheme. CESU acts in the capacity of the supervising agency,<br />
as in case of RGGVY; but unlike in case of the latter, in BGJY CESU gets paid for its<br />
service.<br />
The villages that would not be covered under the Rajiv Gandhi Gram Vidyutirakan Yojana of<br />
the Centre will be given priority under the Biju Gram Jyoti Yojana.<br />
In <strong>Angul</strong> district, 250 BPL connections were proposed in each Block during 2007-08 out of<br />
which 1157 have been energized. Out of 120 villages/hamlets taken, 106 have been<br />
completed and rest 14 was left out due to higher scope and/or village disputes. These 14 are<br />
to be substituted against the left out villages. During that year, 39 beneficiaries deposited<br />
30% share for energisation of private pumps under BGJY, and out of 100 feasible projects<br />
taken 21 have been completed and 4 are under progress. It may be mentioned here that<br />
project cost for the private pump energisation is Rs.<strong>7.</strong>5 lakhs/Block. During 2008-09, out of<br />
the proposed BPL connection of 2000 the number of connections given/energized is 531.<br />
The Block-wise status in the progress of BGJY as regards 2008-09 is as follows:<br />
Block<br />
No. of villages/hamlets<br />
taken No. of villages/hamlets completed<br />
<strong>Angul</strong> 13 5 (rest under progress)<br />
Athmallik 15 Nil (completed under RGGVY)<br />
Chhendipada 11 6 (rest under progress)<br />
PRIA is an International Centre for learning and promotion of participation and democratic governance<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
82
Banarpal 11 9 (dispute arised in 2 villages)<br />
Kishorenagar 11 Nil ((completed under RGGVY)<br />
Pallahara 11 5 (rest under progress)<br />
Kaniha 14 12( 2 villages completed under RGGVY )<br />
Talcher 11 7(rest under progress)<br />
Total 97 44<br />
(Source: CESU, <strong>Angul</strong>)<br />
Where conventional supply of electricity is not found viable (like in remote areas), renewable<br />
energy is the hope. The Renewable Energy Cell of OREDA works in the district for this<br />
purpose<br />
Development of Power sector:<br />
CESU has two electricical divisions in the district, viz, the <strong>Angul</strong> Division and the Talcher<br />
Division. The <strong>Angul</strong> Electrical Division(AED) depends on the <strong>Angul</strong> grid whereas the<br />
Talcher Electrical Division(TED) depends on the Chainpal grid. Following is the Annual<br />
<strong>plan</strong> for efficient power distribution in the district:<br />
Financial<br />
Year<br />
<strong>2009</strong>-10<br />
<strong>2010</strong>-11<br />
AED, <strong>Angul</strong>:<br />
Activity proposed Financial target in lakh rupees<br />
RGGVY 274.05(as per the district sector allocation)<br />
BGJY 400.00<br />
Sub-total 674.05<br />
RGGVY 301.4 (with 10% increment on the allocation of 2008-<br />
09)<br />
BGJY 400.00<br />
Upgradation of 11<br />
KV, 33 KV and L.T.<br />
line<br />
Upgradation of<br />
power transformers<br />
and VCB<br />
1438.00<br />
90.00<br />
Upgradation<br />
distribution<br />
transformers<br />
of 30.00<br />
Sub-total 1958<br />
PRIA is an International Centre for learning and promotion of participation and democratic governance<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
83
TED, Chainpal:<br />
Financial Year Activity proposed Financial target in lakh rupees<br />
<strong>2010</strong>-11<br />
Renewable Energy:<br />
Upgradation of 11<br />
KV, 33 KV and L.T.<br />
line<br />
Upgradation of<br />
power transformers<br />
and VCB<br />
60.00<br />
55.00<br />
Upgradation<br />
distribution<br />
transformers<br />
of 20.00<br />
Sub-total 135.00<br />
The District Renewable Energy Cell basically works for promotion of different nonconventional<br />
sources of energy as per provision of different schemes & programme heads<br />
being allotted/sanctioned by the Govt. time to time.<br />
Out of different scheme head only NBMMP (National Biogas & Manure Management<br />
Programme and SPV (Solar Photovoltaic) are the two programmes being monitored on<br />
continual basis. Though the potential in the district is much higher in comparison to the<br />
achievement, the progress is restricted mainly due to two major reasons, i.e. high cost<br />
involvement for one common beneficiary and secondly limitation in allocation of physical<br />
target to avail the subsidy. The programme could be more successful if some additional<br />
financial assistance can be provided under the programme.<br />
Under RVEP (Remote Village Electrification Programme) two villages namely ‘Udala’ &<br />
‘Tentulikhol’ of Kishorenagar block have successfully been electrified during 2008-09<br />
through non-conventional energy. In <strong>2009</strong>-10, the programme has been extended further to 3<br />
villages(Asanbahal, Sitkoili, and Bhurkundi) in <strong>Angul</strong> Block and 3(Balabhadrapur,<br />
Chakradharpur, and Ganeswarpur) in Pallahara Block. About 19 more villages are in the<br />
pipeline.<br />
Under EPBP (Energy Plantation & Bio-Diesel Production) introduced at the end of the<br />
financial year 2007-08, the IEC & training activities have been completed in 5 blocks and<br />
district headquarter also. Very positive response & proposals are coming up from different<br />
patches of the district which are under process.<br />
<strong>Angul</strong> is a priority district among the 8 districts of Orissa where OREDA has <strong>plan</strong>ned to<br />
create ‘energy parks’ in waste- and otherwise unutilized lands through <strong>plan</strong>tation of jatropha,<br />
a source of raw material for bio-diesel. According to the <strong>plan</strong>, <strong>plan</strong>tation of ‘energy<br />
crops’(like, jatropha) in about six lakh hectares of the district would help generate<br />
employment of 100 million person days <strong>annual</strong>ly(The Samaj, 12-3-08, p.9).However, as<br />
understood by the TSI, the <strong>plan</strong> seems to ignore the far reaching negative impacts of large<br />
scale of <strong>plan</strong>tation of controversial crops like jatropha. The fraud of jatropha programme has<br />
been exposed, and the malafide intention of the biodiesel <strong>plan</strong>tation/promotion(<strong>plan</strong>ting<br />
material suppliers) companies is also coming to limelight. Under such circumstances, the<br />
PRIA is an International Centre for learning and promotion of participation and democratic governance<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
84
district administration should carefully examine the strategies of the proposed programme in<br />
the interest of the people. Recently, it has been decided that this <strong>plan</strong>tation would be<br />
promoted through NREGS; but the TSI would suggest that instead of jatropha, other<br />
indigenous species like karanj may be preferred under this programme.<br />
Major source of funding for the RE programme is the Central Government grant. Following<br />
is the <strong>annual</strong> <strong>plan</strong> for this programme in the <strong>Angul</strong> district, and the target villages can be<br />
selected in consultation with the people’s representatives:<br />
Proposed activity Scheme Budget for <strong>2009</strong>-10 Budget for <strong>2010</strong>-11<br />
Installation of biogas <strong>plan</strong>ts<br />
Repair & maintenance of biogas<br />
NBMMP 26.25 lakh (250 nos.) 36.00 lakh (300 nos)<br />
<strong>plan</strong>ts NBMMP 2.63 lakh(75 nos.) 3.15 lakh (90 nos.)<br />
Remote village Electrification RVEP 55.75 lakh (380 nos.) 83.63 lakh (570 nos.)<br />
100.00 lakh (800<br />
Jatropha cultivation EPBP 50 lakh (400 acres) acres)<br />
Solar light promotion SPV 04.35 lakh (40 nos.) 0<strong>7.</strong>74 lakh(50 nos.)<br />
22.50 lakh (1 unit of 5 50.00 lakh((2 units of<br />
Solar power <strong>plan</strong>t installation SPV KW <strong>plan</strong>t)<br />
5 KW <strong>plan</strong>t)<br />
01.25 lakh (5 units of 01.50 lakh(5 units of<br />
Promotion of solar water heater ST 100 LPD each) 100 LPD each)<br />
(Source: Asst. Director, RE Cell, DRDA, <strong>Angul</strong>)<br />
Total investment for <strong>2009</strong>-10 and <strong>2010</strong>-11 is proposed to be Rs.112.03 lakhs and Rs.182.02<br />
lakhs respectively as no subsidy is given for promotion of solar heater, and jatropha<br />
cultivation is to be financed either under NREGS or by private farmers.<br />
The Central Workshop of Mahandi Coal Fields Limited is going to be an important centre for<br />
renewable energy as one solar power <strong>plan</strong>t is to be installed there alongwith a solar power<br />
heater and solar lights. Banarpal PHC is also likely to have a solar power heater.<br />
__________<br />
PRIA is an International Centre for learning and promotion of participation and democratic governance<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
85
INDUSTRIES & MINERALS<br />
Introduction<br />
The district of <strong>Angul</strong> is enriched with abundant resources like forest, mines, rivers etc. It has<br />
also got its identity with respect to the adequacy of power production. In addition to this, a<br />
number of educational institutions have been opened to suffice the knowledge of youths of<br />
every corner in various aspects. The major Central Public Sector Undertakings such as<br />
NALCO, NTPC, MCL, Heavy Water Project etc are functioning in the district having<br />
contribution to promotion of Down Stream and Ancillary industries resulting in self<br />
employment generation. Besides, a number of Large & Medium Industries are coming up in<br />
private sector which will promote self employment opportunity in the district.<br />
On the other hand there are traditional and non-traditional cottage industries that produce<br />
handicrafts, textiles, and other consumable products. In the following sections we would have<br />
a brief profile of these industries in the district. Further, the status of sericulture and minerals<br />
would also be discussed.<br />
All the basic infrastructures are available in the district on the basis of which industrial<br />
development can be achieved. The physical infratrsuctures include Sambalpur-<strong>Angul</strong>-<br />
Bhubaneswar railway line, national highways, a number of power generation <strong>plan</strong>ts, and 2<br />
Industrial Estates in the district located at <strong>Angul</strong> & Talcher.<br />
There are 4 Nos. of PSUs functioning under Mineral & Mining Sector sector in the district as<br />
detailed below:<br />
1) Mahandi Coal Fields Ltd ( MCL), At: Talcher<br />
2) NALCO ( S.P. & CPP ) , At: <strong>Angul</strong><br />
3) Natianal Thermal Power Station ( NTPC ) , At: TTPS , Talcher<br />
4) Super Thermal Power Station , NTPC , At: Kaniha<br />
In addition, there are several operational and upcoming medium & large scale industries in<br />
the private sector some of which are owned by renowned corporate groups like TATA, and<br />
Jindal. Also operational are several small scale industries.<br />
District Industries Centre (DIC) and the ongoing schemes:<br />
The District Industries Centre, <strong>Angul</strong> is functioning in this district since the year 2000-01. It<br />
is the pivotal agency through which the major income generating schemes are being<br />
implemented. The list of the schemes is as follows.<br />
a) Micro Small & Medium Enterprises ( MSME)<br />
b) Development of MSME cluster<br />
PRIA is an International Centre for learning and promotion of participation and democratic governance<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
86
c) Prime Minister’s Employment Generation Programme ( PMEGP )<br />
d) Development of handicraft clusters<br />
e) Rehabilitation of Handicraft Artisans( RHA )<br />
A) MICRO , SMALL & MEDIUM ENTERPRISES ( MSME )<br />
Micro, Small & Medium Enterprises play an important role in generating the employment.<br />
Following is the Plan under this programme:<br />
Particulars <strong>2009</strong>-10<br />
Nos. of enterprises to be<br />
set up<br />
Investment(in lakhs) by the<br />
industries<br />
Employment(in Nos.) to be<br />
generated<br />
185<br />
1110<br />
925<br />
B) DEVELOPMENT OF MSME CLUSTERS:<br />
Particulars <strong>2009</strong>-10 <strong>2010</strong>-11<br />
No. of clusters to be<br />
promoted<br />
1 engineering cluster 1 aluminium cluster<br />
Nos. of Units to be covered 40 (existing and new) 30 (existing and new)<br />
No. of employment to be<br />
generated<br />
60 50<br />
C) PRIME MINISTER’S EMPLOYMENT GENERATION PROGRAMME(PMEGP )<br />
Particulars<br />
DIC Sector:<br />
Rural Area<br />
Urban Area<br />
Nos Margin<br />
money<br />
in lakh<br />
Rs.<br />
15<br />
14<br />
18.00<br />
16.82<br />
<strong>2009</strong>-10 <strong>2010</strong>-11<br />
Emplpyment<br />
in Nos.<br />
Nos Margin<br />
money in<br />
lakh Rs.<br />
PRIA is an International Centre for learning and promotion of participation and democratic governance<br />
150<br />
140<br />
15<br />
14<br />
18.00<br />
16.82<br />
KVIB Sector 23 2<strong>7.</strong>62 230 23 2<strong>7.</strong>62 230<br />
KVIC Sector(only rural) 23 2<strong>7.</strong>59 230 23 2<strong>7.</strong>59 230<br />
87<br />
Emplpyment<br />
in Nos.<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
150<br />
140
D) DEVELOPMENT OF HANDICRAFT CLUSTERS<br />
Particulars <strong>2009</strong>-10 <strong>2010</strong>-11<br />
No. of clusters to be promoted 2 2<br />
Nos. of SHGs to be involved 8 8<br />
No. of artisans to be covered 120 120<br />
Investment in lakhs to develop<br />
the clusters<br />
10 10<br />
E) REHABILITATION OF HANDICRAFT ARTISANS (RHA)<br />
This is a scheme implemented through the Directorate of Handicraft & Cottage Industries,<br />
Orissa, Bhubaneswar for Handicraft artisans. There is provision of providing margin money<br />
grant of 25% limiting to Rs 5,000/- for each artisan.<br />
Particulars <strong>2009</strong>-10 <strong>2010</strong>-11<br />
No. of artisans to be rehabilitatated 15 15<br />
Investment of margin money in lakhs 0.75 0.75<br />
No. of employment to be generated 30 30<br />
Development of handicrafts:<br />
DIC is the nodal centre for promotion of handicraft industries in the district; hence the <strong>annual</strong><br />
<strong>plan</strong> of DIC includes interventions for this sector. This Centre has already developed a<br />
handicraft cluster at Chheliapada(<strong>Angul</strong> Block) where 60 terracotta artisans received skill<br />
upgradation training. To ensure regular income for these artisans, the DIC made a tie-up<br />
arrangement with the Jagannath temple at <strong>Angul</strong> for supply of kudua, and this has<br />
substantially benefited both the temple as well as the artisans. Training programme is<br />
continuing presently(as reported to the TSI on 27-10-09) in two other areas, viz. at<br />
Poktunga(<strong>Angul</strong> Block) which is a cluster of bamboo-craft artisans, and at Tubey which is a<br />
cluster of brass metal and bell metal artisans. This is as per the <strong>plan</strong> of 2008-09. During that<br />
year, the achievement under RHA was: 25 artisans rehabilitated with a magin money<br />
investment of Rs.1.25 lakhs.<br />
For <strong>2009</strong>-10, two clusters, viz. one at Jarapada(Chhendipada Block) for terracotta and the<br />
other at Barakaunia & Bandanaposhi(<strong>Angul</strong> Block) for cane & bamboo have been identified<br />
for development.<br />
Total investment <strong>plan</strong> of DIC:<br />
The DIC <strong>plan</strong>s to invest Rs. 10.75 lakhs for development of handicrafts, and Rs. 90.03 lakhs<br />
under PMEGP. Total investment is thus Rs. 100.78 lakhs for <strong>2009</strong>-10.<br />
PRIA is an International Centre for learning and promotion of participation and democratic governance<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
88
HANDLOOM & TEXTILES:<br />
In the district of <strong>Angul</strong>, 1802 numbers of handloom weavers having 725 nos. of looms are<br />
working at present with a production worth Rs.70.00 lakhs/annum. The skill of weavers is<br />
coarse ordinary/coarse special to medium ordinary, and their earning level is average<br />
Rs.700/- to Rs.900/- per month whereas earning level of weavers of Athamallik Block is<br />
Rs.1600/- to Rs. 2000/-. There are also sizable number of weavers who have temporarily<br />
discontinued from their profession due to inadequate level of income.<br />
There are 13 handloom weaver’s societies of which 3 are in Athmallik Block, 3 in <strong>Angul</strong><br />
Block, 4 in Banarpal Block, 2 in Chhendipada Block and 1 in Kishorenagar Block.<br />
The handloom sector is facing great problems in marketing due to want of social<br />
reorganization and acceptance. Besides, comparatively cheaper and similar looking<br />
powerloom products are another major challenge for the sustenance of handloom products in<br />
the market. The weavers usually procure average- or low grade raw materials from local<br />
traders, and the dyeing quality is also not upto the mark, limiting the scope of marketing at<br />
the production level itself.<br />
Hence, the strategy for development of this sector should include the following:<br />
• Modernizing the weaving mechanism<br />
• Modernizing the working environment<br />
• Skill upgradation to meet market demand<br />
• Organization of handloom exhibitions<br />
• Cluster development<br />
The Handloom and Textile Department is having the following schemes and programmes:<br />
Particulars Budget in lakh Rs. for <strong>2009</strong>-10<br />
Promotion of Handloom<br />
Industries<br />
Integrated Handloom<br />
Development Scheme –<br />
Cluster Approach<br />
Integrated Handloom<br />
Development Scheme –<br />
Marketing Incentive.<br />
Promotion of Sericulture<br />
Industries:<br />
8.50<br />
22.40<br />
3.36<br />
0.76<br />
The Asst. Director, Texites, Dhenkanal has however proposed the following <strong>annual</strong> <strong>plan</strong> for<br />
<strong>Angul</strong> district (rupees in lakhs):<br />
PRIA is an International Centre for learning and promotion of participation and democratic governance<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
89
Sl. Name of the Activity <strong>2009</strong>-10 <strong>2010</strong>-11<br />
No.<br />
Phy. Financia<br />
l<br />
Phy. Financial<br />
1. Skill up-gradation training<br />
under ISDP<br />
--- 5.70<br />
2 Self-employment<br />
programme<br />
40 <strong>7.</strong>02 <strong>7.</strong>02<br />
3 SGSY infrastructure for ---- 12.00<br />
4<br />
Mahima WCS at Nuasahi,<br />
Banarpal Block<br />
Workshed 30 11.10 30 11.10<br />
5 Repair and renovation of ---- 1.61<br />
office at<br />
6<br />
Jayarat(Kishorenagar Block)<br />
Repair and renovation of ---- 1.50<br />
godown at<br />
7<br />
Beladola(Athmallik Block))<br />
Marketing incentive ---- 3.60 4.00<br />
8 Cluster approach 1 cluster 18.35<br />
covering<br />
Athmallick,<br />
Kishorenagar,<br />
and Banarpal<br />
9 Group approach<br />
Blocks<br />
1 group <strong>7.</strong>78<br />
10 District level exhibition ---- 2.00 2.00<br />
Total 70.66 24.12<br />
Note: Projections under Mahatma Gandhi Bunakar Bima Yojna and Health insurance scheme have not been<br />
specfified, but the resource envelope is supposed to be ‘unlimited’.<br />
It is heartening to know that the district administration decided to utilize the SGSY fund for<br />
infrastructure development for Mahima WCS while considering shortage of funds from other<br />
sources for the same.<br />
Under ‘Promotion of handloom industry’ programme(State Plan), Rs.23 lakhs have been<br />
utilized by providing margin money for 200 weavers in the Athmallik area, construction of<br />
common facility centre at Belladola, and exposre visits. No new activity has been proposed<br />
under this scheme for <strong>2009</strong>-10. (Source: Office of the Asst. Director of Textiles, Dhenkanal).<br />
SERICULTURE:<br />
Sericulture is an agro based cottage industry and is a source of income to large rural<br />
population in the state. Out of four verities of silk, the Sericulture Department is developing<br />
two varieties i.e. Tasar & Eri in <strong>Angul</strong> district, considering favorable agro-climatic condition<br />
of the area. Due to denudation of forest, they are unable to provide tasar feed<br />
<strong>plan</strong>ts(Asan/Arjun) to the needy tasar rearer for tasar sills worm rearing. It is decided by the<br />
Textiles & Handloom Department, Govt.of Orissa, to grow economic tasar host <strong>plan</strong>ts in<br />
traditional tasar rearing areas for easy tasar silk worm rearing by the farmers.<br />
PRIA is an International Centre for learning and promotion of participation and democratic governance<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
90
Considering viable production of tasar cocoons Tasar Rearers Co-operative Societies<br />
(T.R.C.S.) are organized by the Department for marketing of Tasar cocoons. During 2008-09,<br />
there were 2065 registered members in 4 TRCSs of the district. There is no support price<br />
system to silk cocoons, unlike other agricultural crops. Hence marketing is the biggest<br />
challenge in Sericulture Industry as cocoons are perishable commodity and cocoon<br />
production exhibit large seasonal fluctuations.<br />
Besides the Department has developed castor <strong>plan</strong>tation for Eri silk worm rearing at<br />
Pallahara. Athmallik and Handapa areas.In forest areas the Department has developed<br />
“Adapahi”(tasar <strong>plan</strong>tation area) for rearing, which are insufficient as per their need. For their<br />
economic gain minimum one hector of tasar host <strong>plan</strong>tation is required for each family.<br />
There are potential forest areas for economic tasar host <strong>plan</strong>tation by which each family can<br />
earn about Rs. 20,000/- to 25,000/- per year by means of rearing, which is the subsidiary<br />
income of a farmer.<br />
Strategy for sericulture development:<br />
The Sericulture Department should negotiate with the Forest Department for promotion of<br />
tassar <strong>plan</strong>tations in the khesra and revenue forests where the latter does not have restrictions<br />
in the sericultural operations on trees. Market linkages should be better developed, and new<br />
arenas should be explored for marketing. Quality control should be effectively ensured<br />
through adequate and skilled staff employment and supply of quality seeds.<br />
Annual <strong>plan</strong>:<br />
The Sericulture Department has proposed the following <strong>plan</strong> during <strong>2009</strong>-10:<br />
Budget for <strong>2009</strong>-10 Budget for <strong>2010</strong>-11<br />
Proposed activity<br />
In lakh rupees In lakh rupees<br />
Maintenance of tassar host <strong>plan</strong>tation 4.2168 <strong>7.</strong>3794<br />
New tassar host <strong>plan</strong>tation 11.6742 19.9435<br />
Castor <strong>plan</strong>tation with startup tools 1.575 1.575<br />
Construction Eri rearing house<br />
Assistance for construction of cocoon<br />
30 30<br />
storage house in Tassar sector 2.5<br />
Support to primary TRCS for marketing<br />
activities for providing safety net to<br />
seariculture rearers<br />
1<br />
Publicity propaganda 1 1<br />
Study tour, research & training for staff<br />
& beneficiaries 0.5 0.5<br />
Maintenance of infrastructure of<br />
primary TRCS and/or government units<br />
Implementation of cluster development<br />
9.64<br />
programme in tropical tassar<br />
3.796<br />
Total 63.606 69.6939<br />
PRIA is an International Centre for learning and promotion of participation and democratic governance<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
5<br />
2<br />
91
MINING:<br />
Geological Investigation by GSI and Department of Steel & Mines has proved mineral potential<br />
area in <strong>Angul</strong> district. Mineable deposits of major minerals like Coal, Quartz & Graphite and<br />
minor minerals like decorative stone & other building stones have been identified in the district.<br />
The Deputy Director, Mines(DDM) based at Talcher is the district authority for supervision of<br />
mining operations.<br />
At present 7 Nos. of Open Cast Coal Mines & 4 Nos. of Underground Mines are in operation in a<br />
very vast patch of land. Mining and extraction of Coal involves a lot of mechanism which leads<br />
to destruction of land topo and vegetation over it. The DDM claimed during 2008-09 that large<br />
scale measures were being taken to restore the abandoned mines, and thick vegetations over the<br />
abandoned dumps were on programme. According to him, phased programmes are being<br />
executed by M/S. Mahanadi Coalfields Ltd. Under the guidance of this Department & other line<br />
Departments like Pollution Control Board & Forest Department. However, the TSI understands<br />
that things are practically not so reliable or satisfactory in the field.<br />
Several Up-coming projects in Chhendipada Block are in the pipe line. Things are moving fast<br />
under the active supervision of the District Administration for acquiring land, addressing local<br />
problems, providing the shelter through R & R polices of State Government.<br />
On completion of the formalities & procedures, when the Mines will be operative in<br />
Chhendipada Block covering a total area of 5243.380 hectares of land, a huge mechanism shall<br />
be in process to handle such a large quantity of Coal that would be raised, transported &<br />
consumed in the coming years.<br />
The working area being vast the checking of pilferage and smuggling of coal is the biggest task<br />
of this circle. Given the recent exposure of big mining scam in the state and the government’s<br />
initiatives to check further such violations, the responsibility of the DDM has substantially<br />
increased whereas the present infrastructure and staff is very much insufficient. The DDM,<br />
Talcher has therefore been suggesting for required infrastructure development as well as<br />
recruitment of staff. He estimates that rupees one crore would be useful in meeting the<br />
expenses against this, and his office would be able to have 60 additional staff and one new<br />
vehicle through this sanction(if any). The TSI strongly recommends that the district<br />
administration should take necessary action so that the capacity development of the DDM office<br />
at Talcher can take place adequately and timely, particularly when this office collects <strong>annual</strong><br />
revenue of Rs.450 crores or more. In this context, the following proposals of the DDM are<br />
reproduced from the Annual Plan for 2008-09:<br />
PRIA is an International Centre for learning and promotion of participation and democratic governance<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
92
Financial<br />
year<br />
Physical target Financial<br />
target<br />
Available<br />
fund (with<br />
source), if<br />
any<br />
Deficit<br />
amount<br />
Suggested<br />
sources of<br />
funding to<br />
mobilize to<br />
mobilize<br />
the deficit<br />
amount<br />
1 2 4 5 6 7<br />
2008-09 Collection of mining<br />
revenue<br />
450 crores - - -<br />
Setting of 5 nos. 5 lakhs with - - Out<br />
checkgates salary of 15<br />
sourcing<br />
checkgate<br />
from the<br />
clerks & 15<br />
user<br />
checkgate<br />
peons<br />
Agencies<br />
Deployment of 1 crore per - - -<br />
Govt. staff in private<br />
weigh bridges of all<br />
private<br />
steel/sponge/alloys<br />
<strong>plan</strong>t<br />
annum<br />
However, the TSI does not support the DDM’s proposal to get his requiremenrs financed by the<br />
user agencies because those who can be a party to the violation should not have any stake in the<br />
monitoring system.<br />
______<br />
PRIA is an International Centre for learning and promotion of participation and democratic governance<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
93
TRANSPORT<br />
Introduction:<br />
<strong>Angul</strong> district is comparatively well-developed so far road development is considered. Further,<br />
there is ample scope of developing the river routes for transportation purpose. The scope for<br />
commercial civil aviation is increasing too given the intensified industrial and mining activities.<br />
Improved transportation system not only bring all round development but also saves fuel,<br />
maintenance cost of the road, were-tear cost of vehicle, and the most important factor is that its<br />
saves much valuable time of the road users. As a result there is a great save of national property.<br />
Minor ports:<br />
At present there are no minor ports in the district. The opening of proposed Inland Waterway<br />
No.-5 is supposed to create scope for the establishment of minor ports.<br />
A number of ferry ghats are there wherefrom commodities and public are transported through<br />
conventional means of water transport.<br />
Civil aviation:<br />
Though the district does not have any airport at present, the Jindal company is reported to be<br />
establishing its private airstrip near Subarnapur in the <strong>Angul</strong> Block. However, helipads are there.<br />
Roads & bridges:<br />
There are four categories of roads in the district, as under:<br />
• National Highways<br />
• State Highways<br />
• Major District Roads(MDR)<br />
• Other District Roads(ODR)<br />
Developments in each of the above categories are described below:<br />
1. National Highways:<br />
There are four National Highways in the district total length of which is supposed to be about<br />
250 kilometers. These are as under:<br />
Name Route Authority<br />
NH-42 Chowdwar-Sambalpur NH Division,<br />
Dhenkanal<br />
PRIA is an International Centre for learning and promotion of participation and democratic governance<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
94
NH-23 Ranchi-Banarpal NH Division,<br />
Pallahara<br />
NH-6 Howrah-Mumbai NH Division,<br />
Pallahara<br />
NH-200 Raipur-Chandikhole NH Division,<br />
Deogarh<br />
Of these, NH-42 is the most important one followed by NH-23 both in terms of the length and<br />
traffic.<br />
• Jurisdiction of N.H. Division, Dhenkanal<br />
NH-42 is the lifeline of <strong>Angul</strong> district. The industries receive their procurements and supply their<br />
products using this route. Also, a large number of buses operate in this route day and night. The<br />
highway is so heavily utilized(26000 CVD) that it has even caused a threat to the <strong>Angul</strong> town<br />
and other adjoining areas because of the accidents. Hence, while widening (4-laning) and<br />
strengthening of this NH is required for the traffic, a by-pass is required in the interest of the<br />
public. The following <strong>annual</strong> <strong>plan</strong> has been prepared for the year <strong>2009</strong>-10:<br />
Sl.<br />
No.<br />
Name of the scheme/work Cost in lakh rupees<br />
1 Strengthening of existing road from 99/0(Kulada)<br />
99/0 km to 107/0(<strong>Angul</strong>) of NH 42<br />
1086.03<br />
2 Improvement to riding quality to 116/0(Derenga<br />
sahi) to 132/0(Jarapada) of NH.42<br />
654.24<br />
3 Temporary repair of NH 42 at 154/0,156/0, 158/0,<br />
160/0, 183/0 and 184/0<br />
204.48<br />
4 Improvement to riding quality to 178/0 to 183/0 25<strong>7.</strong>83<br />
5 Temporary repair of NH 42 at 144/0, 147/0, 148/0<br />
to 154/0, 156/0, 158/0<br />
220.30<br />
Total 2422.88<br />
(Source: Executive Engineer, NH Division, Dhenkanal)<br />
No <strong>plan</strong> has been submitted for the year <strong>2010</strong>-11 by this office, but work for improvement to<br />
riding quality to 116/0(Derenga sahi) to 132/0(Jarapada) of NH.42 is likely to continue upto<br />
<strong>2010</strong>-11.<br />
• Jurisdiction of N.H. Division, Pallahara<br />
N.H.-23= 83.980 k.m<br />
N.H.-6= 11.542 k.m<br />
PRIA is an International Centre for learning and promotion of participation and democratic governance<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
95
N.H -23<br />
N.H-23 starts from Banarpal junction point with N.H.-42 & ends at Pallahara, junction<br />
point with N.H.-6 with a stretch of 83.980 k.m.. Out of this 12.00 is in single/ intermediate lane.<br />
N.H -6<br />
11.542 k.m. of N.H.-6, which comes on Vijayawadea- Ranchi ( V-R) Highway project, is<br />
of double lane standard.<br />
Traffic<br />
The present traffic on the N.H.-23 comes to 1700.00 C.V.D. (commercial vehicle per<br />
day) and on N.H.-6, it comes to 4200 CVD. The projected traffic on the year 2020 comes to 4137<br />
CVD & 9320 CVD respectively.<br />
To accommodate such heavy traffic the existing N.H.s needs to be improved to 4.0 lane standard.<br />
Also required is a Railway overbridge, and Elephant corridor at three places where the elephants<br />
pass the N.H.23, i.e. at 36 th , 48 th & 68 th k.m. Following is the <strong>annual</strong> <strong>plan</strong> of NH Division,<br />
Pallahara for <strong>Angul</strong> district:<br />
Financial Proposed activity Budget in lakh<br />
year<br />
rupees<br />
<strong>2009</strong>-10 1 RQP to NH 23 from 363/900 to 366/900 and<br />
400/116 to 405/450 (Satyabandha and Kulei)<br />
438.00<br />
Strengthening of road from 378 to 385.00<br />
383(Katumunda)<br />
Strengthening of road from 337 to 347(Batisuan<br />
to Pallahara)<br />
622.00<br />
Widening & strengthening to NH 23 from 54/0<br />
to 63/0<br />
780.00<br />
Construction of road over-bridge at Chainpal 400.00<br />
Sub-total 2625<br />
<strong>2010</strong>-11 Widening & strengthening to NH 23 from 347<br />
to 353(Batisuan to Barkotia)<br />
1400.00<br />
Construction of road over-bridge at Chainpal 1000.00<br />
Sub-total 2400.00<br />
• Jurisdiction of N.H. Division, Deogarh:<br />
NH-200 has a stretch of 62.893 km in the district having a CVD of 290 at present. It runs from<br />
Khindo(near Rengali) to Balhar chhak(near Talcher). Although the present load of traffic is not<br />
significant, still the authority <strong>plan</strong>s to widen and strengthen the road in view of the increasing<br />
mining activities in the Chhendipada area which is supposed to almost double the CVD.<br />
Accordingly, the following activity has been <strong>plan</strong>ned:<br />
PRIA is an International Centre for learning and promotion of participation and democratic governance<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
96
Activity proposed Budget for <strong>2009</strong>-10 Budget for <strong>2010</strong>-11<br />
Widening & strengthening of road from<br />
295/0(Talabeda) to 301.893(Balhar chhak)<br />
(Source: Executive Engineer, Deogarh NH Division)<br />
It has been also learnt by the TSI that estimate for widening to 2-lane standard of the NH from<br />
239/0(Khindo) to 273/0(Kaniha), and also for 288/77(Godibandha chhak) to 295(Talabeda) is<br />
under preparation.<br />
2. State Highways, MDR & ODR:<br />
The Works Department, otherwise known as the Road & Buildings Division, has jurisdiction<br />
over the State Highways(SH), ODR, and MDR. Following table reflects the status of this<br />
connection(as reported during 2008):<br />
1 Name of the Division <strong>Angul</strong> (R&B) Division<br />
2 Total no of (R&B) Sub-division 3 Nos. <strong>Angul</strong><br />
3 Total no. of (R&B) Section 10 Nos.<br />
130.00 646.00<br />
Talcher<br />
Pallahara<br />
4 Total no. of road 31 Nos. S.H. - 1No.<br />
M.D.R. - 3 Nos.<br />
O.D.R. - 27 Nos.<br />
5 Total length of roads 555.23 km. S.H. - 48,000 km<br />
M.D.R. – 134.00 km<br />
O.D.R. – 373.23 km<br />
6 Surface status of roads B.T. - 46<strong>7.</strong>311 km<br />
C.C. - 5.256 km<br />
M.T. - 62.152 km<br />
Other - 20.511 km<br />
PRIA is an International Centre for learning and promotion of participation and democratic governance<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
97
Following is the <strong>annual</strong> <strong>plan</strong> of this Department for development of SH, MDR and ODR:<br />
Financial<br />
Year<br />
<strong>2009</strong>-10<br />
<strong>2010</strong>-11<br />
Activity proposed Financial target in lakh<br />
rupees<br />
A. State <strong>plan</strong>:<br />
Roads<br />
RIDF<br />
RDP<br />
Deposit Works<br />
TFC<br />
Non-<strong>plan</strong><br />
B. Centrally sponsored <strong>plan</strong>:<br />
Roads<br />
Central Road Funds<br />
1600.00<br />
800.00<br />
1800.00<br />
215.00<br />
850.00<br />
500.00<br />
Total 5765.00<br />
A. State <strong>plan</strong>:<br />
Roads<br />
RIDF<br />
RDP<br />
Deposit Works<br />
TFC<br />
Non-<strong>plan</strong><br />
B. Centrally sponsored <strong>plan</strong>:<br />
Roads<br />
Central Road Funds<br />
2000.00<br />
500.00<br />
----<br />
412.00<br />
950.00<br />
500.00<br />
Total 4362.00<br />
(Source: Executive Engineer, <strong>Angul</strong> R&B Division)<br />
PRIA is an International Centre for learning and promotion of participation and democratic governance<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
98
3. Rural roads under Rural Works Division:<br />
The Rural Work Division, <strong>Angul</strong> covers the whole territorial jurisdiction of <strong>Angul</strong> district.Major<br />
activities of this Division are construction of PMGSY Road, Repair and Maintenance of Rural<br />
Roads and Buildings. As per 2008 data, it has 68 Nos. of roads with total length of 688.858 KM<br />
out of which 368.484 KM is BT, 153.810 KM metalled, 5.283 KM moorum Sub-base, 143.054<br />
KM is Eastern, 18,217 KM is C.C Road with 690 Nos. Minor CD works and 45 Nos Major CD<br />
works.<br />
The Departments has proposed the following <strong>annual</strong> <strong>plan</strong>:<br />
Financial Activity Target Financial target in<br />
Year<br />
lakh rupees<br />
<strong>2009</strong>-10 Construction of PMGSY road 9<strong>7.</strong>97 2524.250<br />
Construction of R.D. road 38.862 541.382<br />
Repair of road 104.819 1048.190<br />
Repair of CD works 157 109.900<br />
Construction of Bridge:R.D. Road 4 669.00<br />
Construction of Bridge: PMGSY<br />
road<br />
5 555.00<br />
Total 544<strong>7.</strong>72<br />
<strong>2010</strong>-11 Construction of PMGSY road<br />
(Source: Executive Engineer, Rural Works Division, <strong>Angul</strong>)<br />
9<strong>7.</strong>97 2584.250<br />
Construction of R.D. road 61.476 962.992<br />
Repair of road 74.648 746.480<br />
Repair of CD works 175 122.500<br />
Construction of Bridge:R.D. Road 5 744.00<br />
Construction of Bridge: PMGSY<br />
road<br />
5 780.00<br />
Total 5940.222<br />
PRIA is an International Centre for learning and promotion of participation and democratic governance<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
99
4. Other roads:<br />
Other roads include Panchayat Samiti & GP roads constructed by the District Rural<br />
Development Agency, and roads under the management of Forest Department and Irrigation<br />
Department.<br />
_____________<br />
PRIA is an International Centre for learning and promotion of participation and democratic governance<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
100
SCIENCE & TECHNOLOGY<br />
E-GOVERNANCE:<br />
The TSI has not received any proposals for e-governence in the district, but that doesn’t<br />
necessarily suggest that there is no requirement for development of e-governance sector in the<br />
district. For instance, the District Planning Office lacks adequate data management system and<br />
internet connection. Many departments have computers but without adequate anti-virus<br />
protection. On the other hand, some of the computers require upgradation and high-speed<br />
internet connection. Accordingly, the following investment proposal has been reproduced from<br />
the 5-year perspective <strong>plan</strong> 2008-13 of <strong>Angul</strong> district prepared during 2008-09:<br />
Year Sector/Agency Tentative budget in lakh rupees<br />
<strong>2009</strong>-10<br />
<strong>2010</strong>-11<br />
FOREST & ENVIRONENT<br />
DRDA 6.60<br />
Others 4.40<br />
DRDA <strong>7.</strong>26<br />
Others 4.84<br />
Forestry reflects clean and green civilization. The production aspect of ancient forestry has<br />
shifted its momentum to diversified aspects with the participation of people in management and<br />
protection of forest. This paradigm shift of the management with the principle of sustained yield<br />
can face the burgeoning needs of the growing civilization.<br />
Bio-geographically <strong>Angul</strong> district covers the forests Athamallik Division, <strong>Angul</strong> Division,<br />
Pallahara sub division which is a part of Deogarh Division, Satkosia Wild Life Division and<br />
Kendu Leaf Divisions of Athamallik and <strong>Angul</strong>. A Working Plan Division set up at <strong>Angul</strong> is<br />
engaged in preparing work <strong>plan</strong> of Territorial forest Division assigned for a period of 10- years<br />
on approval of Govt. of India.<br />
Sustainable development of Forestry:<br />
In order to ensure sustainable forestry it is essential to protect the existing forestry from fire,<br />
illicit feeling, poaching and encroachment.<br />
• To build up growing stock and improve stand structure by suitable silvicultural operation.<br />
• To expand the non-forest area under forestry.<br />
• To reclaim the unsuitable forest area and covered under AR<br />
PRIA is an International Centre for learning and promotion of participation and democratic governance<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
101
• To rehabilitate the degraded forest by artificial interference & improve site condition<br />
• To maintain and improve biodiversity.<br />
• To improve the habitat of Wild animals, density, condition and composition of forest<br />
cover<br />
• To establish natural regeneration of indigenous species.<br />
Socio economic aspects of forestry :<br />
Forest collection, particularly of NTFPs has been assuming a key role in the livelihood of forest<br />
dwellers. To regulate their dependency, and to involve them in the forest management<br />
programme, the Forest Department expects that all the forest fringe villages in <strong>Angul</strong> district<br />
shall be covered under joint forest management by 2020. All those villages not covered under<br />
any forestry development project till now shall be covered, and the socio-economic aspects of<br />
those village inhabiting villagers shall be emphasized.<br />
Compensatory afforestation:<br />
Given the fact that vast stretches of good forest areas, some of which have been even protected<br />
by local communities, have been engulfed by expansion of mining and industrial activities,<br />
compensatory afforestation has a special significance for <strong>Angul</strong> district. The Forest Department<br />
utilizes the money deposited for this purpose by the deforesting agencies, and it is the<br />
responsibility of the Department to ensure that the afforestation takes place at a suitable place<br />
and in a ideal manner so that the ecological and other kinds of losses can also be compensated to<br />
some extent.<br />
Division-wise <strong>annual</strong> <strong>plan</strong>s of the Forest Department are being given below:<br />
A.1 DFO, <strong>Angul</strong>(territorial):<br />
Proposed activity for <strong>2009</strong>-10 Budget in lakh rupees<br />
Industrial Plantation:210 hecare(Ranipank, 32.5<br />
Talcher)<br />
Compensatory afforestation:4<strong>7.</strong>17<br />
2.63<br />
hectare(Talcher)<br />
Bamboo <strong>plan</strong>tation:10 hectares 0.45<br />
Electrical fencing: 5 km(Santarabandh-Jalatap) 5.00<br />
Teak <strong>plan</strong>tation:230 hectare 30.23<br />
Afforestation 611<br />
Repair of buildings 5.6<br />
Repair of forest roads 2.3<br />
PRIA is an International Centre for learning and promotion of participation and democratic governance<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
102
NREGS 320.00<br />
Sub-total 1009.71<br />
Proposed activity for <strong>2010</strong>-11 Budget in lakh rupees<br />
Industrial Plantation:215 hecare(Ranipank,<br />
Talcher)<br />
26.62<br />
Teak <strong>plan</strong>tation:770 hectare(Balang-Antulia) 131.00<br />
Afforestation in <strong>Angul</strong> VSS area 369.00<br />
Afforestation and internal development 100.00<br />
Sub-total 626.62<br />
A.2 DFO, Athmallik (territorial ):<br />
The vision of this Division is quite in tune with that of the overall forest vision of the district, as<br />
under:<br />
1. Existing 50.3% of forest cover and density of forests will improve with preservation<br />
of rich biodiversity of these forests<br />
2. Successful protection and conservation of forest is ensured through community forest<br />
management.<br />
3. Silvicultural and <strong>plan</strong>tation activities to satisfy local needs and fuel and small timber.<br />
4. Compensatory <strong>plan</strong>tation projects are rationality implemented.<br />
5. Substantial supply of cultivated Bamboo and chancing economic of rural public.<br />
6. Forest right Act. 2005 will be implemented successfully and tribals will get involved<br />
in the forestry activities and protection of forest.<br />
<strong>7.</strong> NTFP market links are to be established and strengthened.<br />
8. Environmental Laws will be implemented actively for maintaining healthy<br />
environment.<br />
It is highly imperative that both the State government and the Central government take all<br />
necessary measures to conserve and protect the existing forest richness and biodiversity of this<br />
Division.<br />
Nature has bestowed upon this area with such a richness of forests that <strong>plan</strong>tations and major<br />
developmental activities are hardly required. Rehabilitation of degraded forests(RDF), <strong>plan</strong>tation<br />
under National Bamboo Mission project, and <strong>plan</strong>tations under Forest Development<br />
Authority(FDA) scheme are some of the projects that have been proposed in the <strong>annual</strong> <strong>plan</strong> of<br />
this Division, as under:<br />
PRIA is an International Centre for learning and promotion of participation and democratic governance<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
103
Financial year Physical target Financial target in lakh Rs.<br />
<strong>2009</strong>-10<br />
(a) Construction of 1 F.G. Qtr 3.00<br />
(b) Bamboo mission(20 hec) 1.11<br />
(c)3rd year maintenance of RDF<br />
over 150 Hec<br />
1.26<br />
(d) Assisted Natural Regeneration<br />
without graft <strong>plan</strong>tation (100 hect.)<br />
2.10<br />
(e) NREGS 740.47810<br />
Sub-total 74<strong>7.</strong>9481<br />
<strong>2010</strong>-11 (a) Construction of 2 nos. Forester<br />
Qtrs @Rs.400000/-<br />
PRIA is an International Centre for learning and promotion of participation and democratic governance<br />
8.00<br />
(b)Bamboo mission(20 hec) 1.61<br />
(c) RDF-200 Hec. @60MD<br />
(200X63X70)<br />
(d)Maintenance of FDA<br />
<strong>plan</strong>tation(1250 hect)<br />
8.81<br />
15.75<br />
Sub-total 34.17<br />
A.3: DFO, Pallahara Sub-Division(territorial )::<br />
This Forest Division comprises entire Deogarh District and Pallahara Sub- Division of <strong>Angul</strong><br />
District. There are five Ranges out of which Deogarh, Barkote, and Reamal come under Deogarh<br />
district, and Pallahara and Khamar Ranges come under Pallahara Sub- Division.<br />
The DFO, Deogarh has submitted the following <strong>annual</strong> <strong>plan</strong>:<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
104
Proposed Work Estimated Cost<br />
in lakh rupees<br />
Sensitization of alternate use of timber and firewood among VSS, 2.00<br />
Fire efficiency Chullas<br />
Encouragement of growing fast growing Tree Outside Forest (TOF)<br />
to quench the gap of demand and supply.<br />
PRIA is an International Centre for learning and promotion of participation and democratic governance<br />
<strong>7.</strong>13<br />
Strengthening the anti smuggling staff to combat trading. 1.00<br />
Creation and maintenance of fresh and old fire line before the onset<br />
of the dry period<br />
Engagement of fire fighting crew in all strategic point those are<br />
sensitives to fire hazards<br />
Mass sensitization programme among the villagers in general and<br />
VSS, school children in specific on ill effects of Forest Fire.<br />
Creation of pasture land in the interface of forest and village<br />
ecosystems (ecotone)<br />
4.00<br />
0.30<br />
10.00<br />
Erection of solar power Fence to keep the pachyderm at bay. 20.00<br />
Sensitization among the sufferers to cultivate elephant repellent crop<br />
like chillies in the sensitive areas.<br />
Special training to be imparted among the target group to learn the<br />
scientific of harvesting techniques.<br />
1.00<br />
0.50<br />
Watershed Project 116.525<br />
Afforestation Programme 13.50<br />
To restore the degraded forest & upliftment of the backward classes 175.00<br />
Const. of Check Dam, Renovation of water bodies, Elephant proof<br />
Trench, Affn. Activities etc.<br />
166.42<br />
Total 51<strong>7.</strong>375<br />
In addition, the DFO has suggested the following activities to be taken up by the veterinary<br />
department:<br />
Effective sensitisation of the villagers to break the stigma to shift to productive cattle<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
105
Encourage the creation of individual as well as the community village land for stall<br />
feeding.<br />
A.3 DFO, Satkoshia Wildlife Division:<br />
Satkoshia located in the heartland of Orissa is a biological refuge and is considered as an<br />
important biogeographic stepping stone in the link between forest species of central India and<br />
south India. Spreading over four districts viz., <strong>Angul</strong>, Cuttack, Boudh and Nayagarh, Satkoshia<br />
has the significant genetic and ecological importance as it is the wet portion of the Decan zone. It<br />
is famous for its unique gorge eco-system and serves as major water shed for the entire sanctuary<br />
and its periphery.<br />
Following is the <strong>annual</strong> <strong>plan</strong> of the Satkoshia WL Division for the year <strong>2009</strong>-10(as modified by<br />
the TSI in consultation with the concerned office):<br />
Scheme-wise activities proposed Budget in lakh rupees<br />
Centrally Sponsored Scheme: Project Tiger 914.085<br />
Special Central Assistance: development of forest village 2<strong>7.</strong>00<br />
Ecotourism: renovation of forest rest houses at<br />
Tikarpada, Labangi, and Pampasar<br />
35.05<br />
NREGS: Development of forest road 164.00<br />
Orissa Forestry Sector Development Project 68.598<br />
Compensatory afforestation under CAMPA 373.30<br />
Total 1582.033<br />
Note: Under the proposal for Project Tiger, the project cost for the part of Satkoshia WL<br />
Sanctuary in Cuttack district has been excluded with a suggested assumption of approx. 10% of<br />
the total cost. Under ecotourism development, project cost of Rs.4.95 lakh for Jilinda in<br />
Narsinghpur Block of Cuttack district have also been excluded.<br />
A.4. ANGUL (K.L) DIVISION<br />
<strong>Angul</strong> Kendu Leaves Division comprises of the areas of 3 districts, namely part of <strong>Angul</strong>,<br />
Dhenkanal and Cuttack. In <strong>Angul</strong> district alone there are 9 Ranges in 2 sub-divisions namely<br />
<strong>Angul</strong> and Talcher. Following is the <strong>annual</strong> <strong>plan</strong> of this Division:<br />
PRIA is an International Centre for learning and promotion of participation and democratic governance<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
106
Activities proposed for<br />
<strong>2009</strong>-10<br />
PRIA is an International Centre for learning and promotion of participation and democratic governance<br />
107<br />
Physical target Financial Target in<br />
lakh rupees<br />
1. Production of Kendu<br />
leaves (All normal works)<br />
14225.0 qtls. 502.14<br />
2. Conversion of brush wood 20 Nos. 20.00<br />
phadies to semipermanent<br />
phadi houses<br />
3. Vermicompost farming 10 Nos. 2.50 (No funding<br />
4. Recycling of waste Kendu 10 units<br />
available; proposed<br />
under RKVY<br />
1.00(funding<br />
leaves<br />
available : Rs.06<br />
lakhs; rest proposed<br />
under RKVY)<br />
5. Drying yard Development 10 unit 1.00( funding<br />
available : Rs.03<br />
lakhs; rest proposed<br />
under RKVY)<br />
Activities proposed for<br />
<strong>2010</strong>-11<br />
Physical target Financial Target in<br />
lakh rupees<br />
1. Production of Kendu<br />
leaves (All normal works)<br />
14225.0 qtls. 602.57<br />
2. Conversion of brush wood 20 Nos. 20.00<br />
phadies to semipermanent<br />
phadi houses<br />
3. Vermicompost farming 10 Nos. 2.50<br />
4. Recycling of waste Kendu<br />
leaves<br />
10 units 1.00<br />
5. Drying yard Development 10 unit 1.00<br />
Total 62<strong>7.</strong>07<br />
It is estimated that the sale value obtained will be approx. 86<strong>7.</strong>0 lakhs at the rate of an average<br />
sale value of Rs.6,100/- per quintal and thus, bringing a net profit of 365.0 lakhs.<br />
Besides the above, for the benefit of the pluckers and binding labourers the Kendu Leaves<br />
Pluckers and Binding Labourers Welfare Trust is functioning in this Division. The members<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com
contribute Rs.10/- per annum and get themselves enrolled into the Trust. During <strong>2009</strong>-10 about<br />
10000 pluckers and 300 binding labourers are to be enrolled into the Trust.<br />
The Kendu Leaves operation are taken up under the non-<strong>plan</strong> scheme of State Trading in Kendu<br />
Leaves, out of the funds provided by OFDC Ltd. Orissa; and hence does not cover State<br />
budgetary <strong>plan</strong>.<br />
A.5 ATHMALIK (KL) DIVISION:<br />
The jurisdiction of Athmalik K.L Division extends over the entire Athamalik revenue Sub-<br />
Division of <strong>Angul</strong> District and part of Rairakhol Revenue Sub-Division of Sambalpur District.<br />
Athamalik region is mostly dominated by the poor pluckers, tribal and Scheduled cast people<br />
who depend on forest and forest resources for their livelihood. Particularly K.L collection and<br />
selling is the main source of their earnings. More than 3 to 4 crores of rupees are being paid in<br />
cash directly to pluckers during the month from April to early part of June. No other Department<br />
except K.L provides direct benefits to the people within a span of two months time.<br />
At the same time, reinforcing the present procurement and marketing system is necessary.<br />
Athmalik KL Division produces good quality leaves, and is one of the two distinguished KL<br />
Divisions of the state where praja patra or grower’s leaf(GL) is procured/produced. GL is<br />
produced in private lands.<br />
The Division envisages that there will be increases in bush cutting command area by 2020, and<br />
disappearance of high forests. Dearth of Kendu Leaf pluckers will be a threat to the trade.<br />
Scarcity of semi – skilled labourer for bush cutting will be replaced by mechanized method.<br />
Whatever, unless beneficial and welfare measures are taken for the poor tribal pluckers they will<br />
remain always as pluckers and live from hand to mouth only for sustainance.<br />
During 2008-09, this Division made an achievement of 18435.6 quintals and 5239.8 quintals<br />
against targets of 18750 quintals and 5500 quintals of plucker’s leaf(PL) and grower’s leaf(GL)<br />
respectively. During <strong>2009</strong>, the achievement was 19513.2 quintals and 5855.4 quintals achieved<br />
against targets of 20000 quintals and 5500 quintals of plucker’s leaf(PL) and grower’s leaf(GL)<br />
PRIA is an International Centre for learning and promotion of participation and democratic governance<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
108
espectively. Same targets have been reported to the TSI for the coming crop year without any<br />
financial target.<br />
STATE POLLUTION CONTROL BOARD:<br />
There is a regional office of the State Pollution Control Board at <strong>Angul</strong>. During the year 2008-<br />
09, an important suggestion emerged during the consultative <strong>plan</strong>ning process that this office<br />
should also be involved in the <strong>plan</strong>ning process given the gradually worsening state of<br />
environmental degreadation in the district. Accordingly, the TSI made an attempt to involve the<br />
SPCB, but whereas it was found that the report/data submitted by the Board significantly lacked<br />
updation and details, thereby being inadequate and insufficient, the representatives of the Board<br />
emphacised on two facts as under:<br />
Being a statutary body, it is not involved in the <strong>plan</strong>ning process; so it can’t involve<br />
itself directly.<br />
The regional office of the Board spends only on sample collection and analysis<br />
activities, and there are no other developmental <strong>plan</strong>s particulary due to lack of funds.<br />
However, when convinced of their important role in the process, they finally agreed that if the<br />
DPC asks them to be involved in an advisory capacity, then they can share their information with<br />
the DPC regarding the status of environmental degradation, and also can suggest remedial<br />
measures. The TSI accordingly suggests that the DPC should take special initiatives in this<br />
regard.<br />
____________<br />
PRIA is an International Centre for learning and promotion of participation and democratic governance<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
109
GENERAL ECONOMIC SERVICES<br />
IX.1 Introduction:<br />
General economic services include services provided by the departments of Tourism, Civil<br />
Supplies, and Weights & Measures, etc.. Following is a brief account of these services:<br />
IX.2 Tourism:<br />
The district of <strong>Angul</strong> has a number of places of tourist attraction. The already identified tourist<br />
spots are as under:<br />
• Bhimkand/Deepsikha: Sleeping Vishnu<br />
• Binikei(Athmallik Block): Religious centre(Temple of goddess Binikei)<br />
• Tikarpada/Satkoshia(<strong>Angul</strong> Block): scenic spot and wildlife<br />
• Deulajhari(Athmallik Block): Religious centre and hot spring<br />
• Handapa-Patrapada: scenic spot<br />
• Hingula pitha(Talcher Block): Religious centre(Temple of goddess Hingula)<br />
• Khuludi(Pallahara Block): waterfall<br />
• Rengali: scenic spot<br />
• Bulajhara: scenic spot<br />
In addition to these, there are other places of interest like Maa Maheswari temple; but places of<br />
global tourist interest include the Satkoshia WL sanctuary and the image of sleeping Vishnu at<br />
Bhimkand. However, the state of tourism development, particularly in view of national and<br />
international tourists, seems to be poor. The departmental activities are controlled from<br />
Dhenkanal, and <strong>plan</strong>ning process is centralized at the Director’s level at Bhubaneswar.<br />
Whereas no official communication has been received from the Directorate of Tourism regarding<br />
the developmental <strong>plan</strong> for <strong>2009</strong>-10 and <strong>2010</strong>-11 in the district, the TSI has been informally<br />
informed by the District Tourism Officer, <strong>Angul</strong> and the Executive Engineer, OTDC,<br />
Bhubaneswar that the project activities under development of rural tourism at<br />
Deulajhari(Athmallik Block) are continuing, and among the three new proposals, construction of<br />
way-side amenity centre may be delayed due to want of allocation of funds and finalization of<br />
the spot; periphery development of Jagannath temple is likely to be started; and construction of<br />
ecotourism cell at <strong>Angul</strong> is also to be started once the proposed spot is finalized.<br />
PRIA is an International Centre for learning and promotion of participation and democratic governance<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
110
During 2008-09, the Tourism Department had submitted the following <strong>plan</strong>s and proposals to<br />
the District Planning Office for information and further action, without providing the estimated<br />
costs:<br />
• Eco-tourism Cell-cum- Conference Hall at <strong>Angul</strong><br />
• Project proposal for development of Baidasagar pond(Chandan Pokhari) near Jagannath<br />
temple in <strong>Angul</strong> town<br />
• Destination tourism development of Derjang project<br />
• Identification and development of Mandaragiri as a tourist centre in the district<br />
• Development of Satkoshia as a destination development scheme<br />
• Rural tourism at Deulajhari<br />
Of these, the Deulajhari project, eco-tourism centre, and development of Baidyasagar pond under<br />
periphery development programme of Jagannath temple are either continuing or are in the pipe<br />
line. Focus is now required on the rest of the proposed activities.<br />
However, the TSI recommends that a colourful brochure be published containing information of<br />
various places of tourist interest in the district. This brochure should clearly identify spots of<br />
international/national/local interest, and facilities available, etc.. It should also be placed on the<br />
district website.<br />
It is learnt that Tikarpada being under the Forest Department, the Tourism Department can’t<br />
implement its <strong>plan</strong> there directly. Further, the Forest Department has its logics and limitations to<br />
modify the design of developing Satkoshia as a place of international tourist attraction. However,<br />
there is still scope for better strategies which need to be focused.<br />
IX.3 Census, survey & statistics:<br />
No developmental <strong>plan</strong> has been received by the TSI from this Department.<br />
IX.4 Civil supplies:<br />
No developmental <strong>plan</strong> has been received by the TSI from this Department.<br />
IX.5 Weight & Measures:<br />
No developmental <strong>plan</strong> has been received by the TSI from this Department.<br />
IX.6 District Planning Office:<br />
The District Planning Office, <strong>Angul</strong> is the district unit of Planning & Co-Ordination department,<br />
Govt. of Orissa, that came into force in October 1993 after re-organisation of the district by<br />
bifurcating Dhenkanal district. Presently, the office is functioning in the ground floor of the<br />
DRDA building. The District Planning Officer is the head of the office and also the drawing &<br />
disbursing officer. Under the Planning Officer., there are sanctioned strength of two numbers of<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
111
Senior Economic Investigator, One Senior Clerk, One Junior Clerk and two peons. Presently,<br />
there is only one Senior Economic Investigator posted in this office.<br />
The main function of the Dist. Planning Office is to provide secretarial assistance to District<br />
Planning Committee(DPC). The formation of the DPC is made by this office by means of<br />
election by adopting the system proportional representation by means of single transferable vote.<br />
Fourteen members from Zilla Parisad & two from ULBs are elected to the office of the DPC.<br />
Two expert members and one Chairperson are nominated by Govt.. The Collector is the membersecretary<br />
of the DPC. The work of integration and consolidation of <strong>annual</strong> <strong>plan</strong> and five years<br />
<strong>plan</strong> prepared by the panchayats and ULBs are rest with this office. The consolidated <strong>plan</strong> is<br />
placed before the DPC for approval. After getting the approval from the DPC, then the <strong>plan</strong> is<br />
sent to the Govt. for final approval. Besides, inter blocks disparities and inter GPs disparities are<br />
being examined and transmitted to the Regional Imbalance Enquiry committee for their<br />
necessary action.<br />
The following different schemes are dealt in this office. The tabular statistics that were provided<br />
by the DPO, <strong>Angul</strong> to the TSI on 31-10-<strong>2009</strong> suggest that projects under all schemes are yet to<br />
be finalized.<br />
MPLAD SCHEME<br />
MPLAD is a <strong>plan</strong> scheme of Govt. of India implemented in the States/ Union Territories of India<br />
since 1993. It is 100% Grant-in –Aid provided by the Govt. of India without any matching share<br />
from the State govt. and is used for creating durable community infrastructure assets for the<br />
State. The MPs are entitled to recommend work up to 200 lakhs per annum for developmental<br />
work in their respective constituencies(LAD means local area development). <strong>Angul</strong> district is a<br />
part of Sambalpur and Dhenkanal Parliamentary Constituencies receiving funds up to 150 lakhs<br />
per annum approximately. Besides, Rajya Sabha MPs also recommend works for this district.<br />
The MPLAD fund is used mainly for execution of works of developmental nature based on<br />
locally felts needs. Although <strong>Angul</strong> district is industrially rich, the inter block disparities are still<br />
present in the availability of basic infrastructures. Over the years MPALD funds has been<br />
utilized to mitigate this gap to some extent. The local people have benefited directly or indirectly<br />
by the operation of the Scheme.<br />
The TSI has been reported that only 1 project has so far been proposed under MLALAD scheme<br />
in the Banarpal Block for <strong>2009</strong>-10. Rs.2 lakhs has been sanctioned agisnt the same.<br />
However, the following proposals have been received from Sri R.N. Pani, Hon’ble MP:<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
112
Proposed work Executing officer<br />
Construction of classroom of<br />
Aurobindo Siskya Kendra, First<br />
Gate, Talcher<br />
Construction of classroom of<br />
Vivekananda Vidya mandir, Ward<br />
No.4, Talcher town<br />
Ex. Officer, Talcher<br />
Municipality 2.00<br />
Ex. Officer, Talcher<br />
Municipality 3.00<br />
Construction of CC near Kulabir<br />
Chandrasekhar temple BDO, Kaniha 1.00<br />
Construction of CC near<br />
Brahmandei Ashram BDO, Kaniha 1.00<br />
Construction of CC near Sivananda<br />
Ashram, Gaham BDO, Kaniha 0.5<br />
Construction of CC near<br />
Radhakrishna Ashram, Samkoi<br />
Bridge, Gaham BDO, Kaniha 0.5<br />
Construction of CC near Parabil<br />
Radhakrishna mandir BDO, Kaniha 0.5<br />
Construction of CC near Susuba<br />
Paika Akhada BDO, Kaniha 0.25<br />
Construction of Rengali Girls High<br />
School BDO, Kaniha 1.00<br />
Comp. of Hatiadanda Laxmi<br />
Mandap BDO, Kaniha 0.1<br />
Comp. of Rengali OHPC Electrical<br />
Colony CC BDO, Kaniha 0.1<br />
Comp. of CC near Rengali Trinath<br />
Mandir BDO, Kaniha 0.2<br />
Amount<br />
proposed<br />
in lakh rupees<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
113
Construction of Rengali dam<br />
Hadisahi Mandap BDO, Kaniha 0.1<br />
Construction of Rengali dam Gandhi<br />
Chhaka mandap BDO, Kaniha 0.1<br />
Construction of CC at Khalpal BDO, Kaniha 0.5<br />
Construction of CC at Denali BDO, Kaniha 0.5<br />
Construction of CC near Sitaram<br />
Ashram Samakoi Bridge, Gaham BDO, Kaniha 0.5<br />
Construction of Panihara UP school<br />
compound wall, Pallahara BDO, Pallahara 0.5<br />
Construction of boundary wall of CC<br />
near Iti Radhakrishna Mandir,<br />
Pallahara BDO, Pallahara 0.5<br />
Construction of Kochibeda<br />
Community Centre, Pallahara BDO, Pallahara 0.5<br />
Construction of community centre<br />
near Tarini Mandir Karadapal<br />
Netanala, Pallahara BDO, Pallahara 0.5<br />
Construction of CC near Khamar<br />
Sulia Hingula Mandir, Pallahara BDO, Pallahara 0.5<br />
Total 14.35<br />
MLALAD SCHEME:<br />
The MLALAD Scheme is a <strong>plan</strong> scheme of Govt. of Orissa for better improvement /<br />
development of all Assembly Constituencies. It has been implemented since 1997-98 according<br />
to the guidelines intended to be utilized for small but essential projects /works based on the felt<br />
needs of the local public The <strong>Angul</strong> district is coming under five Assembly Constituencies. The<br />
Govt. are placing the funds to the Collector; & the Project Director, DRDA, is drawing the funds<br />
& keping in Bank account separately for each MLAs. The Collector is the sanctioning authority,<br />
and all the relevant files/records are being dealt in District Planning Office. The fund is<br />
sanctioned basing on the proposal/recommendation/request of concerned MLAs.<br />
The TSI has not been reported of any project or fund proposed under MLALAD scheme in the<br />
district for <strong>2009</strong>-10.<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
114
WODC SCHEME:<br />
The Western Orissa Development Council Scheme is a <strong>plan</strong> Scheme of Govt. of Orissa for better<br />
improvement of Western Orissa people. The Athmallik Sub-division of this district is only<br />
included in this Scheme vide Govt. Notification No.11091/P. dt. 24.6.03. The Council has been<br />
sanctioned the projects/funds by received of proposal from concerned MLA for lift irrigation<br />
points, Infrastructure grant to schools & colleges, renovation of Bandha & Katas, rural<br />
electrification,drain ,community center & Kothaghar through the Collector as well as WODC<br />
Monitoring cell. The Council has also been sanctioning funds to lines departments directly for<br />
sinking of tube wells, and costruction of .Road & Bridges etc.; and it is too difficult to monitor<br />
the works of lines departments.<br />
The TSI has not been reported of any project or fund proposed under WODC scheme in the<br />
district for <strong>2009</strong>-10.<br />
SPECIAL PROBLEM FUND<br />
The Scheme Special Problem Fund is received as Grant-in-Aid of State from the <strong>plan</strong> budget. It<br />
is operational since 1997-98. The main objective of the scheme is to provide funds to small but<br />
essential projects which are left incomplete and require completion for providing immediate<br />
benefit to the public. In <strong>Angul</strong> district this fund has been utilized mainly for renovation of canal,<br />
MIPs, tanks for water, improvement of connecting roads of remote villages which are otherwise<br />
unused in rainy seasons, construction of culverts in important small bridges and renovation of<br />
schools and colleges. Some important works undertaken in the scheme relating to <strong>Angul</strong> district<br />
are , Soubhagya Sagar tank at Talcher, Balijodi MIP at Kaniha, Kalianala D/W in Chhendipada,<br />
Gayanallah bridge at Kaniha, Jarpada village road, Kankarei village road in Chhendipada block,<br />
Gadamandal School building in Chhendipada block, Madhapur and Aida High School building<br />
in Athamallik block, Library building in Kishore Nagar College of Kishore Nagar block of the<br />
district.<br />
The TSI has not been reported of any project or fund proposed under Special Problem Fund<br />
scheme in the district for <strong>2009</strong>-10.<br />
Zilla Parishad:<br />
Zilla Parishad is the district–level apex body in the Panchayati Raj System. As per norms, the<br />
sources of income of a Parishad shall consist of—<br />
(i) the Central or State Government funds allotted to the Parishad;<br />
(ii) grants from All-India Bodies and Institutions for the development of cottage, village and<br />
small scale industries and the like;<br />
(iii) such share of the land cess or any other cess or State taxes allotted under any law or.<br />
fees as may be prescribed;<br />
(iv) income from endowments, trusts or other institutions administered by the<br />
Parishad;<br />
(v) donations and contributions from the Samitis or from the public in any form.<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
115
The expenses of the Parishad shall include the salaries and allowances of its employees,<br />
honorarium payable to the President and Vice-President, the traveling expenses incurred by the<br />
members of the Parishad for attending the meetings of the Parishad and any item of expenditure<br />
directed by the government for carrying out the provisions of this Act.<br />
(Source: www.orissapanchayat.gov.in/English/download/Zilla_Parishad_Act.pdf )<br />
During <strong>2009</strong>-10, the ZP, <strong>Angul</strong> has reportedly received Rs.3.86459 lakhs as cess grant, Rs.<br />
14.32956 lakhs towards the salary of teachers of its cadre, and Rs. 5.07583 towards honorarium,<br />
etc.. Part of this receipt, particular from the cess grant, has been decided to be spent for<br />
construction work of ZP guest house and for purchase of water purified-cum-cooler.<br />
____________<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
116
SOCIAL SERVICES<br />
X.1 Introduction:<br />
Social services include diverse and sometimes complex assignments that have short-term and/or<br />
long term impacts. These include sectors like education, health & sanitation, and social welfare,<br />
etc.. Various schemes are operational to effect the development of various sections of the society<br />
particularly addressing their disadvantageous status, and their intervention strategies vary as<br />
under:<br />
• Direct financial benefit to the individual/group<br />
• Indirect financial benefit to the individual/group through assistance in<br />
kind(equipment/material)<br />
• Infrastructure development<br />
• Securing better health & sanitation<br />
• Securing better environment<br />
We shall discuss below various such social development strategies for the district of <strong>Angul</strong>.<br />
X.2 General Education:<br />
X.2.1 Elementary Education<br />
Universalisation of Elementary Education have been envisaged as the national priorities in the<br />
educational development of our country since independence, which is supposed to be achieved<br />
through the instrument of Sarva Shikshya Abhiyan(SSA), an ambitions, judicious country wide<br />
programme. Recently, the programme of SSA has been extended upto class VIII.<br />
The district project office of SSA also prepaes the bidget for the following programmes:<br />
NATIONAL PROGRAMME FOR EDUCATION OF GIRLS AT ELEMENTARY<br />
LEVEL (NPEGEL):<br />
The National Programme for Education of Girls at Elementary level is a sub-<strong>plan</strong> of SSA, which<br />
has been formulated for education of under privileged and disadvantaged girls as a separate and<br />
distinct gender component <strong>plan</strong>,. to achieve UEE for girls.<br />
The NPEGEL programme is now functioning in 2 educationally backward block of <strong>Angul</strong><br />
district namely Pallahara and Kishorenagar & 1 urban slum of Talcher MPL as per approval of<br />
PAV for the year 2004-05.<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
117
Under this scheme, 37 model luster schools are functioning at Pallahara & Kishorenagar blocks<br />
and one at Talcher MPL. Remedial teaching, tailoring and subject teachers are being provided in<br />
36 model cluster schools of Kishorenagar & Pallahara blocks.<br />
KASTURBA GANDHI BALIKA VIDYALAYA (KGBV):<br />
Kasturba Gandhi Balika Vidyalaya is a premier scheme, which envisages being enrolled dropout<br />
girls of educationally backward blocks in residential schools. KGBV is functioning in two<br />
backward blocks namely Kishorenagar & Pallahara in existing upper primary schools (Model<br />
III). A total nos. of 78 dropout girls has been enrolled in 2005-06.<br />
Two Kasturba Gandhi Balika Vidyalayas have been opened at Dhaurapalli UPS in Kishorenagar<br />
Block and Govt. Nodal UPS, Khamar in Pallahara Block .<br />
SSA ANNUAL PLAN:<br />
The <strong>annual</strong> <strong>plan</strong> for development of elementary education in <strong>Angul</strong> district has been prepared for<br />
<strong>2009</strong>-10 as under:<br />
Sl.<br />
No Activity Proposed Budget in lakh rupees<br />
<strong>2009</strong>-10 <strong>2010</strong>-11<br />
1 Teachers Salary<br />
2 Teachers Salary(Recurring) (excluded by the TSI)<br />
3 Teachers Grant 2<strong>7.</strong>6115 31.75323<br />
4 BRCC 12.32 12.32<br />
5 CRCC 12.04 12.04<br />
6 Teachers Training 118.68 136.482<br />
7 Out of School Children 68.935 58.59475<br />
8 Free Text Books 186.277 214.2186<br />
9 IED(Inclusive Education for Disabled) 36.04 30.634<br />
10 Civil 740.788 60<strong>7.</strong>4462<br />
11 TLE(Teaching Leraning Equipment) 50.577 58.16355<br />
12 Maintenance Grant 158.355 182.1083<br />
13 School Grant 119.3815 13<strong>7.</strong>2887<br />
14 Research and Evaluation 24.25 25.25<br />
15 Management and Quality 14<strong>7.</strong>775 169.9413<br />
16 Innovative Activity 95 95<br />
17 Community Training 5.82 5.82<br />
Total SSA Budget 1803.85 177<strong>7.</strong>06<br />
18 NPEGEL 30.32 30.32<br />
19 KGBV 32.15 32.15<br />
Grant Total 1866.32 1839.53<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
118
X.2.2 Secondary Education:<br />
The Dhenkal Educational Circle, Dhenkal comprises of two Revenue Districts,. i.e. <strong>Angul</strong> and<br />
Dhenkanal. The Inspector of Schools stationed at Dhenkanal is in the overall charge of Secondary<br />
Education of the <strong>Angul</strong> district. The vital function of Inspector of Schools is to inspect/supervise the<br />
High Schools for ensuing qualitative improvement in the area of co-curricular activates of the schools,<br />
and to assess the infrastructural need of institutions specifically in the area of laboratory, library<br />
facilities and other related necessity of the school to go-ahead into nurturing quality education.<br />
The Government of India has launched in March <strong>2009</strong> the secondary education counterpart of<br />
SSA which will hopefully help reduce the resource gap, and give a boost to secondary education.<br />
This new programme is known as Rastriya Madhyamik Siksha Abhiyan(RMSA). Currently, the<br />
action <strong>plan</strong> under RMSA has actually been prepared at the end of SSA, <strong>Angul</strong> as under:<br />
Major activities proposed Budget for <strong>2009</strong>-10 Budget for <strong>2010</strong>-11<br />
in lakh rupees in lakh rupees<br />
Civil Works 2166.75 2166.25<br />
Quality improvement 123.84 126.32<br />
Intervention for out of school children 22.00 10.00<br />
Intervention<br />
group<br />
for disadvantageious 31.10 31.10<br />
Research and evaluation 1.97 2.00<br />
Project Management 175.22 178.72<br />
Community mobilization 2.71 2.77<br />
Different incentives 472.20 481.65<br />
Total 2995.79 2998.81<br />
X.3 Sports & Youth Services:<br />
Panchayat Yuva Krida Aur Khel Ahiyan (PYKKA), which is the sports sector equivalent of<br />
programmes like NRHM and SSA, is a recently introduced central scheme that aims at providing<br />
basic sports infrastructure and equipment at the panchayat level and encouraging sports and games in<br />
rural areas through <strong>annual</strong> competitions at the Block and district levels. PYKKA will help States in<br />
promoting sport at the grassroots level, which they have not been able to achieve on their own so far<br />
due to severe resource constraints. It will also deepen and widen the seedbed of sporting talent,<br />
leading to better performances by our sportspersons in national and international events.<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
119
This central sector scheme has now created new hope & scope for development of sports in the<br />
district. The following activity <strong>plan</strong> for <strong>2009</strong>-10(prepared on the basis of funds allocated) of the<br />
Department of Sports & Youth Services reflects the major share of this scheme:<br />
Components Funds allocated for <strong>2009</strong>-10 in lakh rupees<br />
PYKKA scheme: Rural sports(GP &<br />
Block) 14.15<br />
PYKKA scheme:Rural sports(district<br />
sector) 1.8<br />
Interschool 0.75<br />
Women' sports 0.078<br />
Youth festival Nil<br />
Play field development Nil<br />
Sports equipment Nil<br />
Youth camps Nil<br />
Total 16.778<br />
X.4 Medical & Public Health:<br />
ALLOPATHY SERVICES:<br />
The Chief District Medical Officer, based at <strong>Angul</strong> is in overall charge of family welfare and<br />
health services in the district. The National Rural Health Mission(NRHM) works under the<br />
supervision of CDMO, and is presently the chief source of funding for health care development<br />
services.<br />
NRHM Plan:<br />
National Rural Health Mission (NRHM) was launched on 12th April 2005 in India and on 17 th<br />
June 2005 in Orissa. It is one of the biggest – ever integrated health initiatives in the health<br />
sector during the last 50 years. NRHM is not a project but an over arching umbrella integrating<br />
on going vertical programmes and addressing issues related to the determinants of health like<br />
sanitation, nutrition, hygiene and safe drinking water.<br />
The Mission seeks to adopt a sector wide approach and aims at systematic reforms to enable<br />
efficiency in health services delivery. NRHM subsumes key national programmes namely the<br />
RCH- II, Immunization, National Disease Control Programmes (NDCP) and the Integrated<br />
Disease Surveillance Project (IDSP). NRHM will also enable the mainstreaming of Ayurvedic,<br />
Yoga, Unani, Siddha and Homeopathy system of medicine (AYUSH). Its core strategy includes<br />
decentralized health <strong>plan</strong>ning and management, engagement of Accredited Social Helath<br />
Activists (ASHA) to facilitate access to health services and strengthening the public health<br />
service delivery infrastructure at the primary and secondary level. Multi sectoral convergence,<br />
promoting healthy behaviour, increasing social participation and empowerment are also<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
120
emphasized. (Source:<br />
www.orissahealth.org/Filefetch.aspx?FileName=2NDdraft%20PIP%20Balasore.doc)<br />
Following is the summary of <strong>plan</strong>ned activities under NRHM for the district of <strong>Angul</strong>:<br />
SUMMARY BUDGET OF NRHM PIP (<strong>2009</strong>-10) OF ANGUL DISTRICT<br />
<strong>2009</strong>-10<br />
Budget head<br />
Total<br />
Qtr I Qtr II Qtr III Qtr IV<br />
Rs. lakhs %<br />
1 Maternal Health<br />
2 Child Health<br />
3 Family Planning<br />
4 Adolescent Reproductive<br />
and Sexual Health<br />
3.81<br />
19.01<br />
2.18<br />
0.75<br />
5 Urban RCH -<br />
3.57<br />
1.20<br />
1.67<br />
0.52<br />
5.00<br />
<strong>7.</strong>96<br />
1.20<br />
1.99<br />
0.98<br />
1.75<br />
<strong>7.</strong>46<br />
1.20<br />
2.49<br />
0.48<br />
1.75<br />
22.80<br />
22.61<br />
6 Tribal RCH - - - - -<br />
7 Vulnerable groups<br />
8 Innovations / PPP / NGO<br />
9 Infrastructure and Human<br />
Resources<br />
10 Institutional<br />
strengthening<br />
11 Training<br />
12 BCC/ IEC<br />
0.10<br />
15.00<br />
25.17<br />
1.00<br />
0.56<br />
0.87<br />
3.00<br />
8.77<br />
0.11<br />
2.54<br />
0.90<br />
- -<br />
- - -<br />
18.22<br />
1.00<br />
1.59<br />
0.62<br />
8.77<br />
0.05<br />
5.35<br />
0.52<br />
8.33<br />
2.73<br />
8.50<br />
3.10<br />
15.00<br />
60.94<br />
2.15<br />
10.05<br />
13 Procurement - - - - -<br />
14 Programme<br />
management<br />
Sub Total RCH Flexible<br />
Pool<br />
15. JSY<br />
16. Compensation for<br />
3.87<br />
72.32<br />
64.53<br />
3.77<br />
31.04<br />
98.05<br />
3.77<br />
3.77<br />
39.08 31.84<br />
64.53 96.45<br />
16.95<br />
2.89<br />
15.19<br />
174.28<br />
323.55<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
121<br />
13.08<br />
12.97<br />
4.78<br />
1.57<br />
4.88<br />
-<br />
1.78<br />
8.61<br />
34.97<br />
1.23<br />
5.76<br />
1.66<br />
-<br />
8.71<br />
100.00<br />
8<strong>7.</strong>28
Sterilisation 6.35 6.35 12.71 42.36 11.43<br />
1<strong>7.</strong> NSV Acceptance<br />
Sub Total<br />
Total RCH<br />
B. Immunisation<br />
0.72<br />
71.60<br />
143.92<br />
9.52<br />
0.72<br />
105.11<br />
136.16<br />
4.87<br />
1.43<br />
1.92<br />
78.67 115.31<br />
11<strong>7.</strong>75 14<strong>7.</strong>15<br />
4.87<br />
4.87<br />
4.78<br />
370.69<br />
544.98<br />
24.14<br />
C. IPPI - - - - -<br />
D. Mission Flexible Pool<br />
Grand Total<br />
AYURVEDA HOSPITALS:<br />
182.91<br />
336.36<br />
116.19<br />
25<strong>7.</strong>22<br />
234.17 73.48<br />
356.80 225.50<br />
606.76<br />
1,175.87<br />
1.29<br />
122<br />
100.00<br />
46.35<br />
2.05<br />
-<br />
51.60<br />
100.00<br />
The Inspector of Ayurveda, Dhenkanal Circle, Dhenkanal has the juridction over government<br />
ayurvedic helath care services in the <strong>Angul</strong> district. Presently there are 16 ayurvedic dispensaries<br />
in the district<br />
The TSI has not received any <strong>plan</strong> from the Inspector of Ayurveda in <strong>2009</strong>-10. However, the<br />
following Plan is based on the perspective Plan submitted by him in 2008-09 with the<br />
modification that the unimplemented <strong>plan</strong> for 2008-09 has been projected this time as that for<br />
<strong>2009</strong>-10, and <strong>plan</strong> for <strong>2009</strong>-11 has been projected as <strong>plan</strong> for <strong>2010</strong>-11:<br />
Financial<br />
Year<br />
Physical<br />
target(Activity<br />
proposed),<br />
schemewise(wherever<br />
applicable)<br />
<strong>2009</strong>-10 Rural:<br />
Health camps at<br />
Kantapal,Nuagaon,<br />
<strong>2010</strong>-11<br />
and Munderibeda<br />
Rural :<br />
Construction of<br />
buildings at<br />
Burukuma,<br />
Nuagaon,<br />
Munderibeda,<br />
Jharbeda, Santiri,<br />
Etti, and Balipata<br />
Financial<br />
target(Estimated<br />
cost)<br />
Rs.2 lakhs each<br />
x 3= Rs.6 lakhs<br />
Rs.10 lakhs<br />
each x 7= Rs.70<br />
lakhs<br />
Available<br />
fund(with<br />
source), if<br />
any<br />
Deficit<br />
amount<br />
Nil NA Nil<br />
Nil NA Nil<br />
Suggested<br />
sources of<br />
funding to<br />
mobilize<br />
the deficit<br />
amount<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com
Rural :<br />
Installation of<br />
tubewell at<br />
Ghantianali,<br />
Santiri, Burukuma,<br />
Nuagaon,<br />
Munderibeda,<br />
Jharbeda, Etti, and<br />
Balipata<br />
HOMAEOPATHY HOSPITALS:<br />
Rs.25,000 each<br />
x 8 = Rs.2 lakhs<br />
Nil NA Nil<br />
There are 19 Homaeo dispensaries in <strong>Angul</strong> district which are in remote areas only. The status of<br />
the dispensaries is very poor. Lack of own building, and staff quarters with provision of water<br />
supply, electricity and lavatory etc. are some of the major grievances of the departmental staff.<br />
The TSI has not received any <strong>plan</strong> from the Inspector of Homaeopathy in <strong>2009</strong>-10. However, the<br />
following Plan is based on the perspective Plan submitted by him in 2008-09 with the<br />
modification that the unimplemented <strong>plan</strong> for 2008-09 has been projected this time as that for<br />
<strong>2009</strong>-10, and <strong>plan</strong> for <strong>2009</strong>-11 has been projected as <strong>plan</strong> for <strong>2010</strong>-11:<br />
Financial<br />
Year<br />
Physical<br />
target(Activity<br />
proposed), schemewise(wherever<br />
applicable)<br />
<strong>2009</strong>-10 Rural:<br />
Health camps at<br />
Bagadia(Chhendipada<br />
block), Jamudoli<br />
(Athmallik block),<br />
Sanjumura<br />
(Kishorenagar block),<br />
and Basala(<strong>Angul</strong><br />
<strong>2010</strong>-11<br />
block)<br />
Rural : Construction<br />
of dispensary<br />
buildings at<br />
Sanjumura, Jamudoli,<br />
Gobra, Nisha, and<br />
Padmabatipur<br />
Rural :<br />
Installation of<br />
tubewell at<br />
Sanjumura, Jamudoli,<br />
Financial<br />
target(Estimated<br />
cost)<br />
Rs.50,000 each<br />
x 4= Rs.2 lakhs<br />
Rs.2 lakhs each<br />
x 5= Rs.10<br />
lakhs<br />
Rs.20,000 each<br />
x 9 = Rs.1.8<br />
lakhs<br />
Available<br />
fund(with<br />
source), if<br />
any<br />
Deficit<br />
amount<br />
Nil NA Nil<br />
Nil NA Nil<br />
Nil NA Nil<br />
Suggested<br />
sources of<br />
funding to<br />
mobilize<br />
the deficit<br />
amount<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
123
Gobra, Nisha,<br />
Pabitranagar, Bagdia,<br />
Talamul, Basala and<br />
Padmabatipur<br />
X.5 Water supply & sanitation:<br />
X.5.1 Urban Water supply & sanitation:<br />
The water supply and santitation in urban areas are maintained by the Public Health Engineering<br />
Department (PHED). The PHED Division-II at Cuttack has jurisdiction over <strong>Angul</strong> district<br />
having a sub-divisional head(Asst. Engineer) at <strong>Angul</strong>. In private townships like NALCO, the<br />
respective owners provide these services. Moreover, in municipal areas the local<br />
municipality/NAC also takes some initiatives in this regard. Still, it is the PHED which is chiefly<br />
responsible for this.<br />
W/S SYSTEM UNDER DIFFERENT SCHEMES IMPLEMENTED BY PHED:<br />
There are two nos. of chargeable head for which the augmentation works on water system is<br />
being proposed in in <strong>Angul</strong> and Talcher Municipality:<br />
a. STATE PLAN<br />
b. UIDSSMT (Urban Infrastructural Development Scheme for Small and Midium<br />
Towns)<br />
But the case of Athamallik NAC, only the State <strong>plan</strong> grant is applicable at present.<br />
All the ULBs have water supply schemes, but it is quite inadequate. The PHED Plan as under<br />
reflects an initiative to meet the local requirement to some extent:<br />
Sl.<br />
No<br />
Name of work Allocation for the year<br />
<strong>2009</strong>-10<br />
1. Improvement of Water Supply to <strong>Angul</strong> Municipality<br />
under State Plan.<br />
2. Improvement of Water Supply in uncovered areas of<br />
Talcher Municipality.<br />
554.94 Lakhs<br />
533.50 Lakhs<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
124
3. Improvement of W/S to Athamallick(including water<br />
suppy to uncovered areas)<br />
1<strong>7.</strong>37 Lakhs<br />
Total 1105.81 lakhs<br />
X.5.2 Rural water supply and sanitation:<br />
The Rural Water Supply and Sanitation agency, having its district headquarters at Talcher, has<br />
the responsibility of safe water supply to rural areas. In addition, it also has to execute the total<br />
sanitation programme.<br />
Following is the Plan of RWSS:<br />
Proposed activities Budget for <strong>2009</strong>-10 Budget for <strong>2010</strong>-11<br />
Sinking borewells in rural area 162.00(target: 300) 225.00(target: 450)<br />
Piped water supply scheme 2336.00(target: 61) 4000.00(target: 80)<br />
Piped water supply to 19 villages in Talcher<br />
Block, from MLC fund<br />
Total sanitation<br />
2100.00<br />
IHL 1056.00(target:<br />
48000)<br />
School toilets 49.00(target: 245)<br />
AWC toilets 1<strong>7.</strong>25(target: 345)<br />
110<strong>7.</strong>28(target:<br />
50331)<br />
Grand total 5720.25 5332.28<br />
X.6 State Housing Board:<br />
The Orissa State Housing Board had proposed a commercial residential complex in <strong>Angul</strong><br />
district at Kukuda firm area, <strong>Angul</strong> town. The 6.5 acre Complex with an estimated cost of Rs.64<br />
crores has however failed to attract applicants because of its cost. Hence, the project work could<br />
not proceed.<br />
At Pallahara, the houses built by the Board several years back had to be handed over to the<br />
government due to want of purchasers. The Vikrampur project near Talcher however has some<br />
positive achievement.<br />
X.7 Police Housing:<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
125
Orissa State Police Housing and Welfare Corporation Limited was incorporated in May 1980 as<br />
a wholly owned State Government Company with the main objective of:<br />
• Formulating and executing housing schemes for both residential and non-residential<br />
purposes for the Police, Vigilance and Fire Service Departments of Government of Orissa<br />
(GoO) as well as Government of India (GoI);<br />
• Taking up construction, repair, maintenance, modification and renovation of roads,<br />
buildings and other civil structures through competitive tender or on the basis of direct<br />
placement of works.<br />
In pursuance of the objectives, the Company had undertaken allotted works of the GoO since<br />
inception and deposit works of State Universities and other bodies since 1989.<br />
Presently, the Company is taking up construction activities for Police, Fire, Court, Jail, and<br />
Health departments. Details of the work take up by the Corporation in <strong>Angul</strong> district have been<br />
furrnished in annexure-5.<br />
X.8 Rural housing:<br />
Indira Awas Yojana (IAY) is the main housing scheme implemented through the PR Dept. for<br />
providing houses to the disadvantageous people belonging to the BPL category. This scheme is<br />
an integral part of the Bharat Nirman Yojana of the Union Govt.<br />
IAY (NORMAL & ECONOMIC STIMULUS PACKAGE) <strong>2009</strong>-10:<br />
For <strong>2009</strong>-10, physical target of 4489 ( 326 E.S.P. + 4163 ) houses has been received from Govt.<br />
in P.R.Deptt. Excluding 516 nos of last year E.S.P.,3973 nos houses have been distributed<br />
among the blocks for the year <strong>2009</strong>-10. Rs.546.445 lakhs have been received as 1 st installment of<br />
Central share for <strong>2009</strong>-10.<br />
MO KUDIA:<br />
This is a state <strong>plan</strong> project, and the target fixed for <strong>Angul</strong> district for <strong>2009</strong>-10 is 306 as reported<br />
to the TSI by APD(MIS), DRDA on 5 th November <strong>2009</strong>. Project cost for each house is<br />
Rs.35,000.<br />
For 2008-09 , Rs. 204.40 lakhs have been received from State Govt against the physical target of<br />
584 nos..<br />
More details of IAY and MO KUDIA are available in annexure-4.<br />
X.9 URBAN DEVELOPMENT<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
126
X.9.1 Introduction:<br />
While industrialization and increasing mining activities have accelerated the process of<br />
urbanization in the district of <strong>Angul</strong>, few areas like Pallahara town are rapidly improving their<br />
scope of coming under a municipal body. The number of satellite townships like TTPS township<br />
are also increasing. It has thus been imperative to invest more for urban development so as to<br />
meet the needs of changing times.<br />
X.9.2 Urban areas in the district:<br />
There are three ULB towns in the district, viz. <strong>Angul</strong>, Talcher, and Athmallik. In addition to that,<br />
there are satellite townships and emerging towns, as listed below:<br />
1. Dera coliary(Talcher)<br />
2. FCI town(Talcher)<br />
3. TTPS township(Talcher)<br />
4. NALCO township(<strong>Angul</strong>)<br />
5. Ghantapada town(Talcher)<br />
6. Rengali dam project<br />
Of these, all except Rengali Dam Township are census towns.<br />
X.9.3 Population:<br />
Total urban population of the district, as per 2001 census, was 159000 which was but 13.90% of<br />
the total population of the district. Of this, the population of <strong>Angul</strong> municipality, Talcher NAC,<br />
and Athmallik NAC was 84,392(53.07%).This suggests that almost equal population is shared by<br />
the satellite towns or small/emerging towns.<br />
X.9.4 Urban development programme:<br />
The urban counterpart of DRDA is District Urban Development Agency (DUDA) which is<br />
headed by the its Project Director-cum-Additional District Magistrate (ADM).This agency is<br />
responsible for the overall coordination of urban development programmes in the district.<br />
A special agency TADA(Talcher-<strong>Angul</strong> Development Authority) has been created to focus on<br />
the development of Talcher-<strong>Angul</strong> region. Later the area of its jurisdiction has been extended to<br />
Meramundali in the Dhenkanal district, and the agency is now as TAMDA.<br />
The urban local bodies are responsible for the basic developmental activities in their respective<br />
areas. Some satellite townships are under the control of corporate bodies (NALCO, TTPS, etc.)<br />
that usually have their own departments of water supply and sanitation, etc., independent of the<br />
ULBs.<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
127
X.9.4.1 TAMDA:<br />
With establishment of industries like FCI, NALCO & NTPC and expansion of local mining<br />
activities, the Govt. of Orissa felt the need for development of Talcher – <strong>Angul</strong> area in a <strong>plan</strong>ned<br />
manner. Hence the provision of the Orissa Town Planning & Improved Trust Act, 1956 was<br />
enforced over 231 revenue villages of <strong>Angul</strong>, Talcher and Motonga Police station in Nov’1982.<br />
Talcher <strong>Angul</strong> Meramandali Regional Improvement Trust (TAMRIT) was constituted having the<br />
jurisdiction over the area w.e.f. 1 st July’1983. The area of operation is spread over 451 sq km.<br />
Initially the headquarters of the Trust was located at Dhenkanal. Subsequently the office was<br />
shifted to <strong>Angul</strong> on 01.01.1986.<br />
The responsibility of the Trust was to prepare a comprehensive Master Plan of the area, prevent<br />
unauthorized constructions and take up various developmental activities such as housing scheme<br />
TAMRIT developed a housing colony with 238 houses at <strong>Angul</strong> in the year 1993. TAMRIT was<br />
renamed as Talcher <strong>Angul</strong> Development Authority (TADA) w.e.f. 01.091995. TADA envisages<br />
<strong>plan</strong>s for development of sites, land utilization and provision of basic services to community.<br />
(Source: District Gazeteer <strong>Angul</strong>, pp.238-9)<br />
The Talcher-<strong>Angul</strong>-Meramundali Development Authority is yet to be fully functional due to<br />
want of financial and other resources. However, it has assigned the task of preparing a<br />
master<strong>plan</strong> for the area, to the IIT, Kharagpur so that the City Development Plan can be<br />
developed.<br />
The projects taken up by TAMDA include the following:<br />
(i) Kalinga Market Complex at <strong>Angul</strong> - 172 shops<br />
(ii) Market Complex at Banarpal - 72 shops<br />
(ii) Market Complex at Talcher-58<br />
shops<br />
(iv) Kiosks at different places within <strong>Angul</strong> NAC area -45<br />
shops<br />
(v) Auto-Repair & Service Centre At:- Panchmahala, <strong>Angul</strong> -38 nos<br />
of<br />
(vi) Housing Accomodation scheme( TAMRIT Colony) <strong>Angul</strong> -238<br />
nos<br />
(vii) Kalyan Mandap at <strong>Angul</strong><br />
(viii) Site & services scheme at PTC(115 beneficiaries)<br />
(ix) Site & services scheme at Working Women’s Hostel(90 beneficaries)<br />
(x) Plantation work and other developmental activities at TAMRIT Colony<br />
The <strong>annual</strong> <strong>plan</strong> of TAMDA for <strong>2009</strong>-10 and <strong>2010</strong>-11 has however not been received by the<br />
TSI.<br />
X.9.5 <strong>Angul</strong> Municipality:<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
128
The <strong>Angul</strong> N.A.C. was first constituted as a Notified Area Committee in 1932 as per the<br />
provision of Bihar Orissa Municipal Act 1892. After enforcement of Orissa Municipal Act 1950<br />
it was converted to Notified Area Council with effect from.1955. In the year 1972 it was<br />
extended to villages Hulurisingha, Baniabahal and part of village Ranigodda jungle & Turanga<br />
jungle. Subsequently it has been converted into Municipality in the year 2008. The total area of<br />
this municipality is 19.24 sq. kms., and it covers the following :<br />
North - Kumanda Jungle Boundary<br />
South - 1) Susuda village boundary<br />
2) Khalari village boundary<br />
3) Lingarajodi village boundary<br />
East- 1) Turanga village boundary<br />
2) Turanga Jungle village boundary<br />
3) Susuda village boundary<br />
West - 1) Karadgadia village boundary<br />
2) Kumanda village boundary to Matisasahi boundary<br />
This municipality is presently divided into 23 Nos. of wards. Unlike other ULBs in the district,<br />
this Municipality has prepared a ward-wise Plan that has been consolidated by the TSI as under:<br />
Proposed activity Budget for <strong>2009</strong>-10 Budget for <strong>2010</strong>-11<br />
Construction of community centre in all<br />
wards<br />
230.00<br />
Construction of market complex in all<br />
wards except ward numbers 4,5,7,8,9<br />
300.00<br />
Development and repairing of drainage<br />
system(all wards)<br />
9<strong>7.</strong>00<br />
Plantation to combat environemental<br />
22.00<br />
pollution(all wards)<br />
Construction<br />
wards)<br />
of household latrine(all<br />
715.00<br />
Construction and repairing of road 25<strong>7.</strong>00<br />
Purchase of two town buses 20.00<br />
Total 550 1091<br />
X.9.6 Talcher Municipality:<br />
Talcher Municipality started functioning since the Darbar period. It was again reconstituted and<br />
validated in Govt. Ordinance NO.1. of 1976 vide Law Department Notification dt.26.1 0.1976.<br />
The total area of Municipality is 25.5 sq.km. It has 21 wards with a population of the 34998 as<br />
per 2001 census.<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
129
Mining development is the main barrier against the future grants for development of this urban<br />
area. Heavy vehicles, transporting of coal, have created a lot of damage to the town besides<br />
pollution.<br />
The Plan that was originally submitted by the Talcher Municipality has been edited, modified 3<br />
and consolidated by the TSI as under:<br />
Proposed activity Budget for <strong>2009</strong>-10 Budget for <strong>2010</strong>-11<br />
Stone packing on Brahmani river side 500<br />
Afforestation/<strong>plan</strong>tation 10<br />
Construction and repairing of road 33 367<br />
Construction of Bypass road from Dera chowk<br />
through Lingaraj area(5 km)<br />
1000<br />
Construction of Truck Terminal at Kothaghar<br />
road<br />
12 18<br />
Construction and repairing of<br />
sewarage/drainage<br />
Construction of houses under Slum<br />
120 200<br />
Development programme<br />
2000<br />
Electrification 7 73<br />
Renovation of pond 300<br />
Total 172 4468<br />
X.9.7 Athmallik Municipal Council:<br />
Athamallik N.A.C. is surrounded by 2 districts, i.e. Boudh and Sambalpur. The NAC . is<br />
functioning since 11.01.1996 with a population of 11383(2001 census), and covering an area of<br />
29.79 sqkms. The number of wards is 11.<br />
Communication is poor for this town. Many of the development works that are <strong>plan</strong>ned at<br />
district- or state level for this area face a difficulty in their execution as the big contractors hardly<br />
prefer to come to this area(as happened in case of PEHD tender). In order to strengthen the town<br />
infrastructures, cash economy and human resources, it is badly required a bridge on river<br />
Mahanadi from Puleswar to Dhalpur which will connect to other districts like Boudh, Phulbani,<br />
Ganjam and Nayagarh. So also urban <strong>plan</strong>ning could be successful if special attention will be<br />
thrust upon housing sector of local inhabitants.<br />
The Plan that was originally submitted by the Athmallik Municipality has been edited, modified 4<br />
and consolidated by the TSI as under:<br />
3 Like, budget for drinking water supply has been excluded as part os it is already covered under PHED Plan.<br />
Repeatation of <strong>plan</strong>tation <strong>plan</strong> has also been avoided.<br />
4 Like, activities appearing to have greater priority have been proposed under <strong>2010</strong>-11.<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
130
Proposed activities<br />
Road Construction and Electrification From<br />
Budget for <strong>2009</strong>-10 Budget for <strong>2010</strong>-11<br />
Baragaon to Siddhapur<br />
Road Construction and Electrification From<br />
50.00<br />
Liptinga to Manikapathar<br />
Road Construction from Athamallik to<br />
20.00<br />
Madhapur and Jirad<br />
Renovation of all ponds managed by the<br />
4.00<br />
Council<br />
Road Construction and Electrification of<br />
110.00<br />
Padia Hindak village<br />
Construction of Community Hall at Dama<br />
3.00<br />
Sahi<br />
Road Construction From Baragaon to<br />
2.00<br />
Mahanadi river<br />
Road Construction From Purunagad to<br />
9.00<br />
Mahanadi<br />
Road Construction from Purunagardh to<br />
10.00<br />
Bhagabati temple 5.00<br />
Renovation/repairing of Kainphulia Nala<br />
Construction of Surface Causeway(pichhala)<br />
10.00<br />
on Tangianisa-Badi Sahi road<br />
Surface Causeway on Baragaon - Mahanadi<br />
4.00<br />
Road 3.00<br />
Construction of Baratikira Patra Phadi Road<br />
Construction of embankment on Malipadar<br />
3.00<br />
Nala - Dimiribeda 80.00<br />
Total 112 201<br />
X.10 Information & Publicity:<br />
The Information & Publicity Department is in charge of a Information & Public Relations<br />
Officer(DIPRO). This Departmement seems to have been cornered in the main line of<br />
developmental activities because its actual potential is underutilized. It is a fact that lack of<br />
awareness among the people about various schemes and programmes of the government has<br />
been one of the important factors responsible for low rate of success of these programmes.<br />
Whereas the Information & Publicity Department can be well utilized to solve this issue, this has<br />
hardly been done.<br />
The DIPRO has submitted a ‘nil’ <strong>plan</strong> estimate for his department, but has stressed on<br />
infrastructure development (like, internet facility and audio-visual equipments) and funding for<br />
better and efficient functioning.<br />
X.11 Development of SCs, STs & OBCs:<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
131
The District Welfare Department, headed by the District Welfare Officer, coordinates the<br />
developmental work for scheduled caste, scheduled tribe, and other backward caste communities.<br />
Several Central- as well as State schemes are implemented for this purpose. Some of these<br />
schemes like CSA to tribal sub-<strong>plan</strong> and grants under article 275(1) have been discussed in<br />
chapter III. This section shall brief about rest of the programmes:<br />
The District Welfare Department basically intervenes through development of educational<br />
facilities for the SC/ST people. Following scholls and hostels are being managed for this<br />
purpose:<br />
• Residential High Schools(HS): 4<br />
These include Phulamba Boys HS, Kishore Nagar Block; Derang Boys HS, Kaniha Block;<br />
Malyagiri Boys HS, and Bandhabhuin Girls HS, Palahara Block. Excepting Bandhabhuin<br />
Girls HS which has classes from I to X (being an upgraded school), other have classers from<br />
VIII to X.<br />
• Ashram Schools(AS): 3<br />
These are at Jamardihi(Pallahara Block), Palasbahali & Kaliadama(Kaniha Block); and<br />
provide education upto class VII. Each AS has a girl’s hostel attached to it.<br />
• Residential Sevashram School(SS): 1<br />
This is at Naikanipali(Pallahara Block) where education is provided from class I to V.<br />
• ST hostels(girls): 17<br />
These are at Kamparkela, Jamardihi, Naikanipali, Bandhabhuin, Karadapal, Alori &<br />
Debahali in Pallahara Block; Kandhabereni(Talcher Block); Palasbahali, Kaliadama &<br />
Derang(Kaniha Block); Tentuloi & Banarpal(Banarpal Block); Baghamunda(<strong>Angul</strong> Block);<br />
Amsarmunda & Rainali(Athmallik Block); and Kusuni(Kishore Nagar Block).<br />
Total number of residential and non-residential institutions under the management of Welfare<br />
Department for education is 45 in the district. The non-residential institutions are distributed in<br />
different Blocks.<br />
However, the Department feels that the present state of development is not satisfactory, and that<br />
a residential school is essential for each G.P.. Further, the existing residential schools in this<br />
district are in wrenched condition. These require construction of hostel building, additional<br />
classrooms, boundary wall, bath & latrin, pipe water supply and teachers’ quarter. The following<br />
<strong>annual</strong> <strong>plan</strong> has accordingly been prepared:<br />
Financial<br />
year<br />
Proposed activities Estimated cost in<br />
lakh rupees<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
132
<strong>2009</strong>-10<br />
Financial<br />
year<br />
<strong>2010</strong>-11<br />
Opening of 4 nos. of Ashram school 100.00<br />
Construction of hostel building for one 30.00<br />
residential high school(100 bedded) at<br />
Malyagiri H.S.<br />
Construction of boundary wall for Derang high<br />
school<br />
0<strong>7.</strong>00<br />
Construction of latrine and bathroom(10 nos.<br />
each) for Bandhbhuin High School<br />
05.00<br />
Construction of hostel building for Kaliadama<br />
Ashram school(100 bedded)<br />
30.00<br />
Construction of boundary wall for Palasabahali<br />
Ashram school<br />
10.00<br />
Construction of latrine and bathroom(10 nos.<br />
each) for Jamardihi Ashram School<br />
05.00<br />
Construction of additional class rooms in 5 nos<br />
of Sevashram school<br />
10.00<br />
Construction of 80-seated hostel building for 4<br />
nos of Sevashram school<br />
100.00<br />
Construction of latrine and bathroom for 2 nos<br />
ST hostel<br />
10.00<br />
Internal electrification of Phulamba H.S.,<br />
Palasbahali A.S., and 3 nos of Sevashram<br />
school<br />
<strong>7.</strong>50<br />
Construction of 16 nos of teacher’s quarters 80.00<br />
Pipe water supply to the H.S., A.S., and ST<br />
hostel<br />
5.00<br />
Sub-total 399.5<br />
Proposed activities Estimated cost in<br />
lakh rupees<br />
Opening of 4 nos. of Ashram school 95.00<br />
Construction of hostel building for one 30.00<br />
residential<br />
Phulamba<br />
high school(100 bedded) at<br />
Construction of boundary wall for Malyagiri<br />
high school<br />
10.00<br />
Construction of latrine and bathroom(10 nos.<br />
each) for Derang High School<br />
05.00<br />
Construction of hostel building for Jamardihi<br />
Ashram school(100 bedded)<br />
30.00<br />
Construction of boundary wall for Kaliadama<br />
Ashram school<br />
08.00<br />
Construction of latrine and bathroom(10 nos.<br />
each) for Palasabahali High School<br />
05.00<br />
Construction of additional class rooms in 8 nos<br />
of Sevashram school<br />
16.00<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
133
Construction of 80-bedded hostel building for 2 50.00<br />
nos of Sevashram school<br />
Construction of latrine and bathroom for 4 nos 20.00<br />
ST hostel<br />
Internal electrification of Malyagiri H.S., <strong>7.</strong>50<br />
Jamardihi A.S., and 3 nos of Sevashram school<br />
Construction of 16 nos of teacher’s quarters 80.00<br />
Pipe water supply to the H.S., A.S., and ST 5.00<br />
hostel<br />
Sub-total 361.5<br />
NON-EDUCATIONAL INTERVENTIONS:<br />
• OSFDC targets for <strong>2009</strong>-10:<br />
The Orissa Scheduled Castes & Scheduled Tribes Development Finance Corporation (OSFDC)<br />
has been financing SCs, STs, Safai Karmacharis(scavengers) to take up small enterprises . The<br />
following targets have been fixed for <strong>Angul</strong> district for the year <strong>2009</strong>-10 :<br />
Block/Municipal Rehabilitation of groups(SHGs) Rehabilitation of scavengers<br />
area SC ST<br />
<strong>Angul</strong> 7 6 Nil<br />
Athmallik 8 9 Nil<br />
Banarpal 6 4 Nil<br />
Chhendipada 6 4 Nil<br />
Kishore nagar 9 9 Nil<br />
Kaniha 9 6 Nil<br />
Pallahara 10 9 Nil<br />
Talcher 6 5 Nil<br />
<strong>Angul</strong><br />
Municipality<br />
2 --- Nil<br />
Talcher NAC 2 --- Nil<br />
Athmallik NAC 2 2 Nil<br />
Total 67 54 Nil<br />
Total subsidy Rs.67,00,000 Rs.52,00,000 Nil<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
134
Note: Women’s SHGs are preferred, and in case SHGs have not been formed, individuals are also allowed to avail<br />
the facility.<br />
• Scholarship:<br />
The scholarships include expenditure on supply of free school dresses. Following estimate<br />
reflects the details of requirement for <strong>Angul</strong> district for the year <strong>2009</strong>-10:<br />
Name of the school<br />
Scholarship amount for ST students<br />
Amount in lakh<br />
rupees No. of students<br />
Scholarship amount for<br />
SC students<br />
Amount in<br />
lakh rupees<br />
No. of<br />
students<br />
3 Ashram Schools and<br />
1 Residential<br />
Sevashram 45.2 913 2.65 65<br />
100-seated ST girls<br />
hostel 1045.69 1963 3.551 77<br />
Total 1090.89 2876 6.201 142<br />
• Development of OBC:<br />
The State-owned O.B.C.F.D.C. has been channelising credit extended by the National Backward<br />
Classes Finance Development Corporation for providing loans to O.B.C. beneficiaries for taking<br />
up high unit cost income generating activities and enterprises, but after 2001-02 this has been<br />
stopped as the recovery rate was reportedly not satisfactory.<br />
X.11 Labour & Employment<br />
The human resources of any country needs proper management and utilization for effective<br />
advancement in work culture to help the national development in all respects. These<br />
responsibilities have been entrusted to Labour & Employment Department of Government of<br />
India/Odisha,but we have yet to achieve a lot. There are about 80% of the total population<br />
working in different sectors including industrial & agricultural sectors which needs to be taken<br />
care of for proper management and to protect the legal interest of such people for good moral to<br />
develop a healthy working situation without any unrest and a labour environment of work<br />
culture. The result will definitely contribute to better growth in national development.<br />
ANNUAL PLAN FOR LABOUR WELFARE<br />
The District Labour Office at <strong>Angul</strong> has been functioning right from 1959 under the Labour &<br />
Employment Department, Government of Odisha to look after maintenance of industrial peace<br />
& harmony, better industrial relations, protect the interest of all working class people in<br />
organized sector, enforcement of 23 labour enactments including the Minimum Wages Act, the<br />
Child Labour (P & R) Act, etc. Though the Government has been pleased to upgrade this office<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
135
to that of Zonal Labour Office,<strong>Angul</strong> and the sub divisional Labour office at Talcher to District<br />
Labour Office, but many things are yet to be done to meet the entrusted requirements of 10 lakh<br />
working class people.<br />
As per 2001 census, 70% of the total population of <strong>Angul</strong> district are working class people and<br />
by the year 2008 this is supposed to have increased to 80% (approximately) because of<br />
industrialization. Following is a sector-wise population of labour in the district:<br />
Sectors Approx.No. of working class people<br />
1. Agriculture : 4,10,000<br />
2. Industries & Mines : 90,000<br />
3. Kendu leaf Collection : 55,000<br />
4. Beedi manufacturing : 45,000<br />
5. Collection Mahula, Sala seed etc. 20,000<br />
6. Govt. contingencies<br />
including engagement under various scheme 60,000<br />
<strong>7.</strong> Construction 60,000<br />
8. Motor Transport, shops &<br />
Commercial establishments, Stone crushers, and other<br />
miscellaneous activities 30,000<br />
Total 8,00,000<br />
The Labour Office at <strong>Angul</strong> is entrusted with following responsibilities.<br />
Enforcement of 23 labour Acts.<br />
Maintenance of industrial peace & harmony in industries of the district.<br />
Disposal of complaint cases.<br />
Conciliating upon industrial disputes<br />
Implementation of Awards of Labour Courts, Industrial Tribunals.<br />
R.I.H. Scheme for Beedi workers<br />
Collection of Non-tax revenue under labours Acts.<br />
Asst. Labour Commissioner, <strong>Angul</strong> is having judicial functions as Commissioner for<br />
Workmen’s Compensation, Authority under the M.W.Act & the P.G.Act.<br />
The District Labour Officer, <strong>Angul</strong> is Project Director of National Child Labour<br />
project, <strong>Angul</strong>.<br />
The ALC, DLOs, ALOs are having quasi judiciary functioning under the Industrial<br />
Dispute Act 1947 as Conciliations Officers.<br />
The major lacunae are lack of required human resource and infrastructure.<br />
Need assessment for next five years:<br />
In the current situation of rapid growth of industrialization in <strong>Angul</strong> the following needs are felt<br />
for fulfillment:<br />
• Up gradation of this Zonal Labour Office to Divisional Labour Office.<br />
• Filling up of vacancies.<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
136
137<br />
1. ALO:-01<br />
2. RLI:-002<br />
3. Senior Clerk:-01<br />
4. Junior Clerk:-02<br />
5. Driver:-01<br />
6. Class –IV employees:-02<br />
• Creations of posts<br />
1. Deputy Labour Commissioner:-01<br />
2. Asst. Labour Officer(Athamalik) :-01<br />
3. Asst. Labour Officer (Pallalhara):-01<br />
4. Asst. Labour Officer (O/o DLO, Talcher) :-01<br />
5. Rural Labour Inspector (K.Nagar, Athamalik, Chhandipada, Kaniha,<br />
Pallalhara, Banarpal):-06<br />
6. Head Clerk -01<br />
<strong>7.</strong> Senior Clerk-03<br />
8. Junior Clerk-06<br />
9. Stenographer-01<br />
10. Class IV employees -08<br />
11. Computer Operaters-04<br />
• Constriction of quarters for DLC, <strong>Angul</strong>, ALC, <strong>Angul</strong>, 02 quarters for ALO & RLI,<br />
06 quarters for class-III staff.<br />
• Construction of Court hall (02) nos<br />
• Conference-cum- Training hall<br />
• Workers rest rooms with sanitary facilities.<br />
• Construction of building for office of the ALO Pallalhara & Athamalik with<br />
quarters.<br />
• Additional building for office of DLC<br />
• Constriction of office building for DLC, Talcher with quarters.<br />
• Installation of 04comkputers for DLC, ALC & two DLOs.<br />
• Car for deputy labour Commissioner, two jeeps for two DLOs. And Motor cycles<br />
for ALOs.<br />
The activities that were originally proposed by the DLO, have been <strong>revised</strong> 5 and modified by the<br />
TSI as under:<br />
Year Proposed activities Estimated cost<br />
<strong>2009</strong>-10 Construction of quarters for ALC<br />
& 04 quartes for staff<br />
Rs.32 lakhs.<br />
Accessories for Office of the<br />
ALOs<br />
Rs. 04 lakhs<br />
Quarter for ALOs-02 nos Rs. 12 lakhs<br />
Management of rehabitation centers Rs. 40 lakhs (Recurring )<br />
5 For instance, estimate of Rs.2 lakhs for 3 computers have been reduced to Rs.1 lakh.<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com
<strong>2010</strong>-11<br />
X.12 Employment:<br />
( 50 Children each in 8 blocks)<br />
Accessories for Office of the Rs. 04 lakhs<br />
ALOs<br />
Construction of quarters fro ALOs Rs. 11.5 lakhs<br />
& RLIs<br />
Sub-total 103.5 lakhs<br />
Extension of present office Rs.8.5 lakhs.<br />
building including restructuring<br />
Construction of Court hall Rs.08 lakhs.<br />
Construction of workers rest room<br />
Rs.08 lakhs.<br />
Computer installation -03nos Rs.1 lakh<br />
Jeep-02 nos.for DLOs. Rs.11 lakhs<br />
Sub-total Rs.20.66 lakhs<br />
The District Employment Exchange constitutes the basic unit for implementation and coordinating<br />
all programmes of employment assistance, carrier advice, employment marketing<br />
information and surveys and studies in the District.<br />
The District Employment Exchange comprises of the area of eight Blocks and its operational<br />
jurisdiction is among the unemployed youths of these above Blocks. There is also a Special<br />
Employment Exchange at Talcher that is functioning since 1964 and it is meant for<br />
implementing and co-ordinating all programme of Employment Service i.e. Registration,<br />
Renewal of candidates, sponsoring the name of candidates, career advices, Vocational Guidance<br />
and Employment Market Information and Survey and studies in operation jurisdiction as well as<br />
look into rehabilitation of land oustees in Mines and Industries.<br />
However, none of these offices have submitted their Plans for <strong>2009</strong>-10 and <strong>2010</strong>-11, as reported<br />
to the TSI by the District Planning Office.<br />
X.13 Social security, social welfare, women empowerment and child welfare:<br />
The District Department of Social Welfare, headed by a District Social Welfare Officer based at<br />
<strong>Angul</strong> looks after the implementation of various Central- and State government schemes meant<br />
for the social welfare, women empowerment, and child welfare. Integrated Child Development<br />
Services(ICDS) is one of the major programmes implemented through this Department.<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
138
SCHEMES IMLEMENTED:<br />
• ICDS(Integrated Child Development Sevices)<br />
• MADHU BABU PENSION YOJANA (MBPY)<br />
• NATIONAL OLD AGE PENSION (NOAP)<br />
NATIONAL FAMILY BENEFIT SCHEME (NFBS)<br />
• PH SCHOLARSHIP<br />
• SUPPLEMENTARY NUTRITION PROGRAMME (SNP )<br />
• Mid–Day–Meal ( MDM )<br />
• MISSION SHAKTI<br />
This Department is also looking after orphanages, short-stay home, and SWADHAR, etc.. Given<br />
its wider responsibilities and direct impact on the people of the district, it should have necessary<br />
staff, infrastructure and capacity which is lacking at present. Accordingly, the Plan received from<br />
this office in <strong>2009</strong>-10 has been partially modified by the TSI on the basis of the 5-year<br />
perspective <strong>plan</strong> submitted during 2008-09 :<br />
Name of the scheme Physical Target Financial Target<br />
in lakh rupees<br />
Available fund<br />
/Allotment received<br />
till 31-10-<strong>2009</strong><br />
(in lakh rupees)<br />
MBPY(SOAP+ODP) 37943(B) 910.63200 60<strong>7.</strong>08800<br />
NOAP 11850(B) 284.40 13<strong>7.</strong>90<br />
NFBS 179(B) 1<strong>7.</strong>90 1<strong>7.</strong>90<br />
Orphanage(for 2 existing<br />
ones)<br />
-- <strong>7.</strong>50 3.69<br />
Handicapped<br />
Scholarship(Banishree)<br />
148(B) 2.80970 1.66250<br />
SNP 132473 (B) 1235.664 564.86300<br />
MDM Primary 1,22,190<br />
(B)<br />
601.4<strong>2010</strong> 248.56673<br />
Upper Primary 61861 431.10970 143.57480<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
139
(B)<br />
Construction of<br />
kitchenshed - Primary<br />
75 nos 45.00 Nil<br />
Upper<br />
Primary<br />
220 nos 132.00 Nil<br />
ICDS Functioning of<br />
1614 AWC and<br />
implementation<br />
of all other allied<br />
schemes<br />
695.80 Nil<br />
AWC building 40 nos 120.00 Nil<br />
Maintenance of<br />
AWC building<br />
Mission Shakti<br />
Group formation<br />
Micro credit<br />
support<br />
Strengthing of WSHG and<br />
Federation<br />
Training-cum-production<br />
centre for SHG<br />
Construction of Sale<br />
Centre for WSHG products<br />
in Block headquarters<br />
Total<br />
32 nos 8.00 8.00<br />
1167<br />
3000<br />
For <strong>2010</strong>-11, the following proposals may be considered:<br />
1.16700<br />
150.00<br />
Nil<br />
Nil<br />
- 14.21980 <strong>7.</strong>00<br />
03 nos 30.00 Nil<br />
02 nos 6.00 Nil<br />
4693.622 1740.245<br />
Scheme/activities Physical Target Financial target in<br />
lakh rupees<br />
Madhu Babu Pension<br />
Jojana (MBPY) SOAP +<br />
ODP<br />
32714 785.13600<br />
NOAP 10369 248.85600<br />
NFBS 265 26.50000<br />
SNP 1,32,267 793.18200<br />
MDM<br />
Primary 1,34,962 689.11597<br />
Upper Primary 58957 371.54701<br />
Orphanage 3 Nos. 9.00<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
140
MISSION SHAKTI<br />
Group Formation 1167 1.16700<br />
Micro Credit Support 2000 100.00<br />
Training to SHG &<br />
Federation member<br />
Construction of Sale<br />
Centre for WSHG products<br />
in Block headquarters<br />
As per targeted beneficiaries 2.00<br />
3 Nos. 9.00<br />
ICDS Functioning of 1582 AWC and<br />
implementation of all other allied<br />
schemes<br />
682.00<br />
AWC building 40 120.00<br />
DSWO Office building in<br />
Dist. Headquarter<br />
1 No. 15.00<br />
Total 3852.504<br />
__________________<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
141
GENERAL SERVICES<br />
XI.1 Introduction:<br />
In this chapter we shall discuss the <strong>plan</strong> and prospects relating to the Police Department, Jails,<br />
and Public Works. Printing & Stationeries also comes under the purview of this chapter, but is<br />
not applicable in district <strong>plan</strong>ning as there is no separate district department for this and also the<br />
expenditure accrued under this head is comparatively insignificant.<br />
XI.2 Police Department:<br />
The police department in <strong>Angul</strong> district basically depends on a centralized <strong>plan</strong>ning process<br />
controlled by the state police headquarters at Cuttack. It is understood that so far the availability<br />
of vehicles, and supply of computers (etc.) are concerned, things have already been <strong>plan</strong>ned for<br />
the district police. There are issues like insufficient space for malkhana, but that seems to be<br />
manageable. The major grievance/requisition is the lack of staff quarters and/or thana buildings.<br />
The office of the Superintendent of Police submitted during 2008-09 a detail list of the number<br />
of quarters/buildings required to be constructed/repaired, and it is further understood that these<br />
requirements were submitted to the R&B Department, the Rural Works Department (as the case<br />
may be), or Police Housing Corporation Ltd.. However, the total number of required<br />
buildings/quarters (613 residential and 21 non-residential) indicated that the district<br />
administration should focus on resolving this issue so as to raise the morale of the police staff.<br />
Although no Plan has been submitted by this office during <strong>2009</strong>-10 for incorporation in the<br />
district <strong>plan</strong>, the TSI suggests that the district administration should review the existing<br />
limitations and prospects of the police department in the district, and make necessary<br />
recommendations to the concerned authorities at state level.<br />
The lessons learnt in maoist confrontations and riots in other parts of the state should be utilized<br />
for better organization of the Department. On the other hand, the Department should <strong>plan</strong> for<br />
womens’ police stations, and examine the feasibility of opening an industrial police station at<br />
Talcher.<br />
X.3 Jail:<br />
<strong>Angul</strong> district has the following jails at present:<br />
• Juvenile Jail-cum-District Jail, <strong>Angul</strong><br />
• Probation Centre, <strong>Angul</strong><br />
• Athmalik sub-jail<br />
• Pallahara sub-jail<br />
• Talcher special sub-jail<br />
These jails are being renovated/developed for some of the basic services like water & sanitation,<br />
but effective criminal control is still at stake. On one hand, the district jail is accommodating<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
142
prisoners about three times of its actual capacity, and on other hand use of mobile phones by<br />
prisoners is a major threat. In the sub-jails accommodation is not a major issue, but boundary<br />
wall and jammer(for mobile phones) are very much required.<br />
The Directorate of Prisons & Correctional Services(DPCS), Bhubaneswar is the <strong>plan</strong>ning<br />
authority for the jails. The <strong>plan</strong>s are made for the state, and not district-wise though sometimes<br />
sub-division (jail) wise projects are mentioned. Whereas the available information in 2008-09<br />
suggested that provision of cell phone jammer or video conferencing system etc. had not been<br />
<strong>plan</strong>ned upto <strong>2009</strong>-10 by DPCS; and none of the Jails/sub-Jails is known to have submitted any<br />
<strong>annual</strong> Plan to the District Planning Office during <strong>2009</strong>-10, it is worth reviewing the following<br />
proposals originally submitted during 2008-09:<br />
Juvenile Jail, <strong>Angul</strong><br />
Year Activity<br />
2008-09 Construction of watch towers<br />
Installation of hi-max light<br />
<strong>2009</strong>-10 Construction of 20-bedded hospital<br />
Facility for video conferencing<br />
Installation of close-circuit camara at jail-gate and in the wards<br />
Illumination of outside perimeter wall<br />
Installation of jammer<br />
<strong>2010</strong>-11 Provision of vehicle, especially for shifting sick prisoners<br />
Construction of compound wall<br />
Construction of reading room cum library<br />
Construction of staff quarters<br />
Drainage system outside the perimeter wall<br />
Of these, only few high-luminosity lights have been provided around the Jail, as reported to the<br />
TSI by the Superintendent.<br />
So far other sub-jails are concerned, whereas the Superintendent, Talcher Jail has added two new<br />
requirements to the previous Plan(that has not been implemented), in Athmallik sub-jail some<br />
renovation of female ward and toilets is reportedly being done, and the unimplemented proposals<br />
have adequately been placed below by the TSI. However, the situation as regards Pallahara sub-<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
143
jail reflects the lackadaisical attitude for remote areas because the proposals submitted by the<br />
Superientendent of this sub-jail, later on forwarded by the higher authority for estimation at the<br />
end of Police Housing Corporation is reportedly pending at the end of the latter, which is<br />
unfortunate. It may be remembered that sometimes noted /dreaded criminals are sent to jails in<br />
remote areas, and Pallahara sub-jail can also serve this purpose provided adequate facilities are<br />
developed.<br />
The TSI has prepared the following Plan for these sub-jails based on updated inputs:<br />
Sub-Jails<br />
Sub-jail <strong>2009</strong>-10 <strong>2010</strong>-11<br />
Talcher 1.Construction of boundary<br />
wall<br />
1.Construction of warder barrack<br />
2.Construction of E-type staff<br />
2.Installation of Jammer quarters(8)<br />
Athmallik 1.Construction of boundary<br />
wall<br />
1.Construction of dining hall<br />
2.Renovation of kitchen<br />
Pallahara 1.Construction of boundary<br />
wall<br />
2.Installation of jammer<br />
3.Complete repair &<br />
renovation of administrative<br />
building roof and prison’s<br />
ward roof<br />
4.Construction of kitchen<br />
and provision of gas<br />
cylinder<br />
5.Renovation of existing<br />
toilets and construction of 6<br />
new toilets<br />
6.Construction of watch<br />
tower<br />
<strong>7.</strong>Construction of new<br />
toilets in the administrative<br />
building<br />
144<br />
1.Renovation of perimeter wall with<br />
raising of 3 feet height<br />
2.Construction of computer-cum-<br />
CCTV monitoring room<br />
3.Provision of land phone at<br />
superintendent’s residence<br />
4.Provision of marble flooring for<br />
superintendent office, subordinate<br />
office, kitchen, dining hall, and prison<br />
wards<br />
5.Construction of 5-bedded indoor<br />
hospital<br />
6.Library facility<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com
XI.4 Public Works:<br />
Public Works include construction activities for roads and buildings under the ownership of<br />
government. The R&B Division, Rural Works Division, and NH Division are the implementing<br />
agencies for such projects. As the road development part has already been discussed in chapter<br />
VII, we shall discuss here only the <strong>plan</strong>s pertaining to the construction of government buildings.<br />
XI.4.1 R&B Division:<br />
<strong>2009</strong>-10<br />
<strong>2010</strong>-11<br />
A. State <strong>plan</strong>:<br />
Buildings<br />
State <strong>plan</strong><br />
TFC<br />
Deposit works<br />
Non-<strong>plan</strong><br />
B. Centrally sponsored <strong>plan</strong>:<br />
Buildings<br />
Central <strong>plan</strong><br />
Budget in lakh rupees<br />
90.00<br />
65.12<br />
150.00<br />
80.00<br />
79.38<br />
Total 464.5<br />
A. State <strong>plan</strong>:<br />
Buildings<br />
State <strong>plan</strong><br />
TFC<br />
Deposit works<br />
Non-<strong>plan</strong><br />
Total<br />
B. Centrally sponsored <strong>plan</strong>:<br />
Buildings<br />
Central Plan<br />
90.00<br />
80.00<br />
90.00<br />
120.00<br />
50.00<br />
430.00<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
145
XI.4.2 Rural Works Division:<br />
Financial<br />
Year<br />
Activity Target Financial<br />
target(Estimated<br />
cost) in lakh rupees<br />
<strong>2009</strong>-10 Construction of new buildings 10 120.000<br />
Repair to residential buildings 53 14.119<br />
Repair to non-residential building 98 131.478<br />
Total 265.597<br />
<strong>2010</strong>-11 Construction of new buildings 10 135.000<br />
Repair to residential buildings 63 16.783<br />
Repair to non-residential building 97 130.134<br />
Total 281.917<br />
______________<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
146
147<br />
Chapter VIII<br />
______________________________________<br />
TRIBAL SUB-PLAN<br />
Some of the line departments/agencies have special budgetary provisions for scheduled<br />
tribes which is known as the TSP(Tribal Sub-Plan) component. The major<br />
agencies/departments having this component in their <strong>annual</strong> <strong>plan</strong> and budget are DRDA,<br />
District Welfare, Energy, etc.. Following is an abstract of the provisions under TSP for<br />
<strong>Angul</strong> district for <strong>2009</strong>-10 as per the statistics available with the TSI: 6<br />
Department<br />
Total<br />
budget in<br />
lakh<br />
rupees<br />
TSP<br />
share in<br />
lakh<br />
rupees<br />
Energy(RGGVY) 275.05 31.20<br />
DRDA(SGSY) 440.92 92.59<br />
Textiles & Handloom(various components) 35.02 <strong>7.</strong>71<br />
Animal Resource Development 98.75 24.32<br />
Agriculture & food processing 290.08 15.35<br />
Horticulture 62.2 13.33<br />
Soil conservation 60.75 2<strong>7.</strong>34<br />
Watershed mission 180 66.6<br />
(Note: Except for <strong>Angul</strong> Forest Division and DRDA, statistics for other components have<br />
been collected from District Sector Outlays for Rural & Urban sectors as provided to the<br />
P&C Department, Govt of Orissa by various Departments; and hence these may not<br />
match with the proposed outlay in the district agencies which often require more funds<br />
for additional activities.)<br />
Needless to mention, the already discussed proposals for Paudi Bhuyan Development<br />
Agency, MADA clusters, artcle 275(1), developmental activities for educational<br />
institutions under District Welfare Department, are fully or mostly devoted to the<br />
development of tribals.<br />
Details of the TSP component in the <strong>annual</strong> <strong>plan</strong> of the District Agriculture Department is<br />
furnished below:<br />
6 The abstract is incomplete due to non-submission of relevant data by several<br />
departments.<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
Sl No Major Head/<br />
Sub head /<br />
schemes<br />
District Agriculture Plan: Physical targets and achievements under TSP<br />
Unit Eleventh<br />
Plan<br />
(2007-12)<br />
Target<br />
Annual Plan<br />
2007-08<br />
Actual<br />
Achievement<br />
Annual Plan<br />
2008-09 Actual<br />
achievement<br />
Annual Plan<br />
<strong>2009</strong>-10 Target<br />
Annual Plan<br />
<strong>2010</strong>-11 Target<br />
1<br />
ISOPOM<br />
OILSEEDS<br />
Block<br />
Demonstration<br />
HA 5 5 5<br />
2 Gypsum HA 113 60 70<br />
3 PP<br />
Equipments<br />
No 17 6 7<br />
4 Micro<br />
Nutrient HA 40 40 50<br />
5 Sprinkler No 1 1 1<br />
Total 17 159 112 133<br />
148
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
Sl No Major Head /<br />
sub-head /<br />
schemes<br />
ISOPOM<br />
Oilseeds<br />
District Agriculture Plan: Financial targets & achievements under TSP<br />
(in lakh rupees)<br />
Eleventh Plan ( 2007-<br />
12) Projected Outlays<br />
( at 2006-07 prices )<br />
Total<br />
outlay<br />
Of which<br />
flow to<br />
TSP<br />
Annual Plan:<br />
2007-08<br />
Actual<br />
expenditure<br />
under TSP<br />
Annual Plan:<br />
2008-09<br />
Actual<br />
expenditure under<br />
TSP<br />
Annual Plan: <strong>2009</strong>-10 Proposed<br />
Outlay<br />
Total outlay Of<br />
which<br />
flow to<br />
TSP<br />
1 Block<br />
Demonstration<br />
0.125 0.25 0.125<br />
2 Gypsum 0.37 2.6 0.16<br />
3 PP Equipment<br />
0.1 0.4 0.05<br />
4 Micro nutrient<br />
0.03 0.13 0.025<br />
5 Sprinkler 0.075 0.3 0.075<br />
Total 0.1 0.6 3.68 0.435<br />
________________<br />
149
Chapter IX<br />
______________________________________<br />
SCHEDULED CASTE SUB-PLAN<br />
150<br />
Some of the line departments/agencies have special budgetary provisions for scheduled<br />
caste people which is known as the SCSP(Scheduled Caste Sub-Plan) component. The<br />
agencies/departments having this component in their <strong>annual</strong> <strong>plan</strong> and budget are DRDA,<br />
District Welfare, Forest, Energy, etc.. Following is an abstract of the provisions under<br />
SCSP for <strong>Angul</strong> district for <strong>2009</strong>-10 as per the statistics available with the TSI: 7<br />
.<br />
Department<br />
Total<br />
budget in<br />
lakh<br />
rupees<br />
SCSP<br />
share in<br />
lakh<br />
rupees<br />
Energy 275.05 51.45<br />
DRDA(SGSY) 440.92 12<strong>7.</strong>86<br />
<strong>Angul</strong> Forest Division(social/farm forestry & construction<br />
of building) 12.00 8.00<br />
Textiles & Handloom(various components) 35.02 <strong>7.</strong>07<br />
Animal Resource Development 98.75 19.19<br />
Agriculture & food processing 290.08 22.48<br />
Fishery: Dev. of fresh water aquaculture under FFDA 28.8 13.2<br />
Horticulture 62.2 10.11<br />
Soil conservation 60.75 10.02<br />
Watershed mission 180 30.6<br />
Satkoshia Wildlife(Bamboo <strong>plan</strong>tation:20 Hect.) 0.4664<br />
(Note: Except for <strong>Angul</strong> Forest Division, Satkoshia WL Division, and DRDA, statistics<br />
for other components have been collected from District Sector Outlays for Rural & Urban<br />
sectors as provided to the P&C Department, Govt of Orissa by various Departments; and<br />
hence these may not match with the proposed outlay in the district agencies which often<br />
require more funds for additional activities.)<br />
The District Welfare Department provides financial and other kinds of support for SC<br />
students. The Forest Department sometimes takes initiatives for livelihood support of the<br />
forest-dependent SC people like bamboo artisans. Details of the SCSP component in the<br />
<strong>annual</strong> <strong>plan</strong> of the District Agriculture Department is furnished below:<br />
7 The abstract is incomplete due to non-submission of relevant data by several<br />
departments.<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com
Scheme<br />
Annual Plan: <strong>2009</strong>-10<br />
Proposed outlay in<br />
Total<br />
outlay<br />
lakh rupees<br />
Of which<br />
flow to<br />
SCSP<br />
Annual Plan: <strong>2010</strong>-11<br />
Proposed outlay in lakh<br />
Total<br />
outlay<br />
rupees<br />
Of which<br />
flow to SCSP<br />
WorkPlan(rice<br />
demonstration: Krushak<br />
Sampark Mela) 2.4 0.6 2.4 0.6<br />
WorkPlan(intercropping<br />
demonstration and ratoon<br />
management under sugar<br />
cane development ) 0.4 0.2 0.4 0.2<br />
Mini Mission (PP<br />
Equipment, Farmers<br />
training, Retailing<br />
technology<br />
demonstration, Kacha<br />
refiling tank, FFS,<br />
Essential nutrient<br />
3.38 1.3 3.63 1.36<br />
ISOPOM(excluding few<br />
componets) 13.76 4.19 15.01 4.78<br />
Farm mechanization 68.32 8.15 80.29 10.25<br />
Jalanidhi 58.3 11.9 64.7 12.9<br />
ATMA(excluding few<br />
componets) 1<strong>7.</strong>07 2.96 19.35 3.35<br />
National Food Security<br />
Mission 121.28 20.38 133.13 21.94<br />
RKVY(excluding few<br />
componets) 1<strong>7.</strong>99 2.66 20.56 3.03<br />
Total 302.9 52.34 339.47 58.41<br />
_____________<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
151
Chapter X<br />
______________________________________<br />
GENDER SUB-PLAN<br />
152<br />
As per 2001 census, <strong>Angul</strong> district had a sex ratio little lower than that of the state<br />
average (941 against 972). Of the total workers of 453570, the number of women was<br />
147361; but the women assumed major role as marginal workers. Population of females<br />
was a little lower than that of males, but in respect of literacy rate they significantly<br />
lagged behind males(55.37% against 81.43%). As regards health problems, social<br />
security, and economic security women are still a vulnerable group; and as such require<br />
specific interventions so as to be placed at par with the male population for a secure life<br />
& livelihood.<br />
Gender budgeting and gender sub<strong>plan</strong> are the concepts which focus on specific<br />
developmental <strong>plan</strong>s and activities for the development of women. NRHM has specific<br />
programmes for this purpose like Janani Suraksya Yojana and Maternal Health. The<br />
District Social Welfare Department also has various programmes under Mission Shakti<br />
and ICDS, etc.. The District Welfare Department provides financial and other kinds of<br />
support for the education of girls of SC and ST communities. In MADA areas, women’s<br />
SHGs receive special financial support through this Department. Even the SJSRY<br />
programme implemented in urban areas provide support to women. DRDA provides<br />
Indira Awas house to deserving widows. The Sports Department promotes women’s<br />
sports activities, and most of the pluckers working for the Kendu Leaf wing of Forest<br />
Department are women who deserve specific welfare activities like cretch for their<br />
children.<br />
These women-centric developmental activities are now being reflected in what is known<br />
as the WC (women component) of the budget. During <strong>2009</strong>-10, the TSI has received only<br />
one such <strong>plan</strong> in the <strong>Angul</strong> district, and that is from the Agriculture Department, as<br />
reproduced below:<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
Sl<br />
No<br />
Major Head/ Sub<br />
head / schemes<br />
JALANIDHI<br />
DRAFT ANNUAL PLAN -<strong>2009</strong>-10: PHYSICAL TARGETS AND ACHIEVEMENTS:<br />
PROPOSALS FOR WC(AGRICULTURE)<br />
Unit Eleventh<br />
Plan<br />
(2007-<br />
12)<br />
Target<br />
Annual Plan<br />
2007-08<br />
Actual<br />
Achievement<br />
Annual Plan<br />
2008-09<br />
Actual<br />
achievement<br />
Annual Plan <strong>2009</strong>-<br />
10 Target<br />
Annual Plan <strong>2010</strong>-11<br />
Target<br />
i Bore well No 18 11 13 14<br />
ii Dug well No 3 6 7 7<br />
iii River lift Project<br />
No 1<br />
FARM<br />
MECHANISATION<br />
i Tractor No 10 15 18<br />
ii Power Tiller<br />
No 5 6 7<br />
iii Hydrolic Trailer<br />
No 1 3 4 5<br />
iv Axialflow Tresher<br />
No 3 4 5 6<br />
v Multicrop tresher<br />
No 5 5 6<br />
153
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
Sl<br />
No<br />
DRAFT ANNUAL PLAN- <strong>2009</strong>-10: FINANCIAL OUTLAYS: PROPOSALS FOR WC (Rs. In Lakh)<br />
Major Head / subhead<br />
/ schemes<br />
JALANIDHI<br />
Eleventh Plan<br />
( 2007-12)<br />
Projected<br />
Outlays ( at<br />
2006-07<br />
Total<br />
outlay<br />
prices )<br />
Of<br />
which<br />
flow<br />
to<br />
WC<br />
Annual<br />
Plan:<br />
2007-08<br />
Actual<br />
expenditure<br />
under WC<br />
Annual<br />
Plan:<br />
2008-09<br />
Actual<br />
expenditure<br />
under WC<br />
Annual Plan: <strong>2009</strong>-<br />
10 Proposed<br />
Outlay<br />
Total<br />
outlay<br />
Of which<br />
flow to<br />
WC<br />
Total<br />
outlay<br />
Annual Plan: <strong>2010</strong>-11<br />
Proposed outlay<br />
154<br />
Of which flow to WC<br />
i Borewell 9 5.5 3<strong>7.</strong>5 6.5 41.5 7<br />
ii Dug well 0.9 3 20 3.5 22 3.5<br />
iii River lift 1.2 0.4<br />
FARM<br />
MECHANISATION<br />
i Tractor 9 45 13.5 54 16.2<br />
ii Power tiller<br />
3 13.2 3.6 15 4.2<br />
iii Hydrolic trailer<br />
0.2 0.75 3.25 1 3.75 1.25<br />
iv Azial flow thresher<br />
0.3 1 4.5 1.25 5 1.5<br />
v Multicrop thresher<br />
0.44 1.57 0.44 1.74 0.52
Observations NABARD:<br />
In its PLP for <strong>Angul</strong> district, NABARD observes that the female population shares a negligible<br />
benefit of various schemes implemented by the government. This section of the population is<br />
also deprived of full benefits of the credit due to lack of entrepreneurship,illiteracy, and lack of<br />
knowledge/exposure, male dominance and several other social problems. However a silver line<br />
now a days is seen in the entire society is that the women have come out of the cell to form Self<br />
Help Group in a massive scale.<br />
Socio-cultural issues related to women:<br />
The district has more than 8500 Self Help Groups out of which more than 5800 have already<br />
been credit linked. Most of these groups are women SHGs .A major chunk of the women SHGs<br />
have gone for some economic activity or other providing a sort of supplementary income to their<br />
families. Apart from the economic activities, many of the women SHGs have come up as a<br />
pressure group for deriving the benefits available from government and other agencies due to<br />
them and their villages. They are also now instrumental in solving various special problems,<br />
which could have led to exploitation in the society.<br />
Issues of women entrepreneurs:<br />
More than 80% of the women SHGs have, by now availed loans from banks and utilized the<br />
same for petty business and have repaid the loans in time. The per capita loan has doubled by<br />
now over last 3 years. It is observed that the SHGs movement under Mission Shakti has<br />
empowered the women socio-economically as is evidenced by their presence in huge number in<br />
different bank branches, shouldering responsibility for mid day meal scheme of schools, gas<br />
dealership, PDS, running market outlets for SHG products, attending federation meets and<br />
BLCC/BLBC meets, closing down arrack shops in the villages , getting represented in local<br />
bodies, taking up contracts for latrine constructions etc. Their loan observation capacity has gone<br />
up as evidenced from their borrowings from RGVN, MFIs in addition to bank borrowing.<br />
Capacity building needs:<br />
The women face problem in marketing their products. For the purpose effort should be made for<br />
capacity building of the women to develop their marketing skill and ability. Since now almost all<br />
SHGs have been federated at local level , market complex for SHG products may be opened in<br />
each panchayat and handed over to Federation for management.<br />
Potential activities for women:<br />
While the women can go for all the activities men can do, some activities are easier for them to<br />
take up. Production of article of day to day consumption like badi, papad, mixture, spices,<br />
turmeric powders etc. are the most favourite for them. Other economic activities like agrohorticulture,<br />
Diary, Poultry, Goatery, Pisiculture, mushrum cultivation etc are also the potential<br />
items for the women to go for. Under NFS, they can be trained for taking up tailoring, garment<br />
making, phenyle, chalk, soaps, agarbathi, handicraft, soft toys ,and embroidery etc activities.<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
155
Assessment for credit requirement:<br />
From the past experience it may be assessed that the credit requirement for the women for the<br />
above activities would be around Rs 1500 lakh during the year, which this PLP has projected.<br />
Organisations working with women :<br />
Several organizations are working in the district for the betterment of women, dealing with their<br />
social problems. A few of them are PIUS , Bikalpa Vikash, and Biswa Yuba Kendra etc. Some<br />
of these organizations are also taking up the human rights problem of the women.<br />
Credit delivery to women:<br />
Of late, the bankers are getting the pressure from women SHGs for more and more bank finance.<br />
To cope up with the increasing load on banks, it has been decided by Govt of Orissa to observe<br />
every working Tuesday as exclusive SHG day by all banks in all districts. Though break-up of<br />
activity wise disbursements to women beneficiaries is not available , it is observed that the<br />
women are gradually availing credit for all the common activities being financed in the district.<br />
Extension of micro credit to women SHGs and inclusion of women SHGs under SGSY<br />
Programme are the main causes for steady rise in the credit off take for women.<br />
With the empowerment of women, it is felt that they can be covered in all sectors of financing .<br />
But financing under NFS activities may be convenient for them to undertake since they can<br />
easily do the extra job in addition to their day-to-day household activities.<br />
______________<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
156
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
157
Physiography<br />
ANNEXURE-1<br />
MORE DETAILS ON DISTRICT PROFILE<br />
The physiography of the district is marked by three major regions. The South and Western part<br />
comprises ranges of the Eastern Ghat Super group & the Older Metamorphic Group. The Central<br />
portion is represented by sediments deposited in the Satpura- Mahanadi graven defined by<br />
pronounced NW-SE trending lineaments on a Precambrian plat form, almost separating the<br />
Eastern ghat Mobile Belt and Orissa craton. The northern boundaries of Talcher Basin are<br />
faulted. On a regional scale, Talcher basin takes the shape of a north westerly plunging syncline<br />
with closure in the east & the younger horizon outcropping progressively towards west. On the<br />
other hand, the beds dip northerly & number of coal seams increases in that direction indicating a<br />
possible homoclinal structure. Three sets of intrabasinal faults trending E-W-NE-SW-WNW-<br />
ESE have been recognized. The North & North East part is occupied by hill ranges of Iron Ore<br />
Super group. The elevation varies from 76 m. to 1186 m. The highest peak of the district is<br />
Malyagiri of Pallahara Sub-division which is 1186 meter above MSL. Banamadali peak in<br />
<strong>Angul</strong> Sub-division is 790 meter in height. In Athamallik Sub-division the main peaks are<br />
Panchadhara and Hingamandal hills.<br />
River System<br />
The river Mahanandi marks the southern boundary of this district. River Brahmani enters the<br />
district through Rengali reservoir and passes through Talcher sub- division. Both these great<br />
rivers have innumerable tributaries large and small. Pallahara & Talcher Sub-Divisions, a major<br />
portion of <strong>Angul</strong> Sub-division form a part of Brahmani basin. The basin of Mahanadi is spread<br />
over Athamallik Sub-division & part of <strong>Angul</strong> Sub-division. Mahanadi and the Brahmani are<br />
perennial rivers. A multi purpose dam has been constructed over the Brahmani at Rengali. 250<br />
MW of electricity is generated at Rengali hydropower station. A barrage has been constructed 35<br />
Kms. down stream at a place called Samal. This irrigation project is poised to irrigate 3,36,400<br />
Ha. of land in <strong>Angul</strong>, Dhenkanal, Cuttack , Jajpur & Keonjhar districts. Other rivers of <strong>Angul</strong><br />
are mountain streams, which are torrents in the rains and in the summer contain little or no water.<br />
Their banks in the most part are high. Their beds are rocky and they cannot be used for the<br />
purpose of navigation.<br />
Climate<br />
The climatic condition of <strong>Angul</strong> is much varied. It has mainly 4 seasons. The summer season is<br />
from March to Mid June, the period from Mid June to September is the Rainy season, October<br />
and November constitute the post monsoon season and winter is from December to February.<br />
The best time to visit this district is during winter. The average <strong>annual</strong> rainfall of the district is<br />
1421 mm. However there is a great variation of rainfall from year to year. The rainfall in the<br />
district during the last 10 years varied between 896 mm & 1744 mm. There are 70 rainy days<br />
on an average in a year, but it varies from 66 at Athamallik to 80 at Pallahara. The distribution of<br />
rainfall is also quite erratic causing wide spread drought year after year.<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
158
The hot season commences by beginning of March. May is the hottest month with a mean daily<br />
maximum temperature at 44 degree Celsius. With the onset of monsoon, early in June day<br />
temperature drops appreciably. After outset of monsoon by the 1 st week of October both day and<br />
night temperature began to fall steadily. December is usually coldest month of a year with a<br />
mean daily minimum temperature of 12° degree Celsius. In association with the passage of<br />
western disturbances across north India during winter months short spells of cold occur and the<br />
minimum temperature drops down to 10° Celsius. The highest maximum temperature recorded at<br />
<strong>Angul</strong> was 46.90° Celsius on 30 th May 1998 whereas the lowest minimum temperature was 6°<br />
Celsius on 16 th January 2003. The summer temperature has shown as increasing trend in recent<br />
past. The humidity of the air is generally high, especially during the South West monsoon and<br />
post monsoon months. In other months, the afternoons are comparatively drier. In the summer<br />
afternoons the relative humidity varies between 25 and 40 percent.<br />
Special Weather Phenomena: The district is affected by hailstorm and depressions in the<br />
monsoon season and in October, when winds increase in force and widespread heavy rain occurs.<br />
Thunder storms, occurs mostly in the afternoon in the summer months and in October. The<br />
hailstorm, which occurred on 12 th April 2002, caused heavy damage in the <strong>Angul</strong> town and<br />
nearby villages. Occasional fog occurs in the cold seasons.<br />
Administrative Divisions<br />
There are 4 subdivisions with 8 blocks and 3 urban local bodies. Total number of Gram<br />
Panchayats is 209.<br />
Demographic profile<br />
Demographic profile of the district is presented in Table 1. <strong>Angul</strong> has a total population of<br />
11,40,003 consisting of 51.51 percent male population and 48.49 percent female population<br />
(2001 census) and sex ratio is 941 which is slightly less than the state average of 972. The<br />
population of <strong>Angul</strong> constitutes 3.10 percent of the Orissa’s total population. The population<br />
density is 179 persons per Km 2 against the state average of 236. The decade 1991 to 2001<br />
witnessed population growth of 18.55 percent against the state average of 15.94 percent. Literacy<br />
rate of the district is higher i.e. 68.8 percent as compared to 63 percent in a state as a whole. But<br />
the literacy rate of female population is only 55 percent, but it is higher than the state and<br />
national average. The literacy rate of SC and ST population is better in <strong>Angul</strong> district than the<br />
state average. Among the scheduled tribes the Paudi Bhuyans, who are dependent on shifting<br />
cultivation have received special attention under the Paudi Bhuyan Development Agency so as to<br />
reduce their vulnerability of livelihood.<br />
There are 1910 villages in the district out of which 1661 are inhabited and 249 are uninhabited,<br />
as per the 2001 census 8 . The rural population of the district constitutes 86.10 percent while urban<br />
population constitutes 13.90 percent of the total population. Out of the total population of the<br />
<strong>Angul</strong>, 11.6 percent belongs to schedules tribes whose concentration is largest in the Pallahara<br />
8 However, The District Gazetteer of <strong>Angul</strong>(pg.28) mentions the total number of villages, inhabited villages and<br />
uninhabited villages to be 1922,1635 and 287 respectively.<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
159
lock. The Paudi Bhuyans, the Juangs, and several other tribals groups are also found in this<br />
district. The population of scheduled castes is 1<strong>7.</strong>19 percent of the total population. The<br />
important castes inhabited in this district are Chasa, Khandayat, Karana, Brahmin, Gouda, Paika,<br />
and Kumbhara. Among these, Chasas constitute the major community in the district and they are<br />
mainly cultivators whereas Gaudas are the chief pastoral caste of Orissa. Religion of the district<br />
<strong>Angul</strong> can broadly be classified into Hinduism, Islam, Christianity, Sikhism, Jainism, Buddhism,<br />
Mahima Dharma and Nath cult.<br />
Table 1: Demographic profile of district <strong>Angul</strong><br />
Demographic Indicators Unit <strong>Angul</strong> District Orissa<br />
Total Population No. 1140003 36804660<br />
Male 587234 18660570<br />
Female 552769 18144090<br />
Rural Population % 86.10 85.01<br />
Urban Population % 13.89 14.99<br />
SC population % 1<strong>7.</strong>19 16.52<br />
ST population % 11.66 22.13<br />
Households No. 230711 7738065<br />
Population density Persons/Km 2 179 236<br />
Sex Ratio 941 972<br />
Literacy rate %<br />
Persons 68.79 63.08<br />
Male 81.43 75.35<br />
Female 55.37 50.51<br />
ST 45.35 3<strong>7.</strong>37<br />
Male 60.25 51.48<br />
Female 30.05 23.37<br />
SC 56.99 55.53<br />
Male 71.71 70.47<br />
Female 41.77 40.33<br />
Source: Statistical Abstract of Orissa: 2008<br />
Occupational Structure<br />
The majority of the population of <strong>Angul</strong> district depends on agriculture. The occupational<br />
structure of district <strong>Angul</strong> is presented in Table 2. The proportion of main workers to the total<br />
workers is 65.9 percent, which is less than the state average of 6<strong>7.</strong>2 percent. On the other hand,<br />
work participation rate is 39.8 percent and is slightly higher than the state average. Proportion of<br />
cultivators to the total workers is 30.3 percent in the district. Agricultural laborers constitute 28<br />
percent of the total workers in the district. The entrepreneurship of the people in<br />
agriculture/horticulture, particularly in Blocks like Chhendipada, is remarkable; and the work<br />
participation rate is higher than the state average. Mining & industrialization in few parts of the<br />
district have significantly influenced the traditional occupation of the local population partly<br />
because of direct or indirect employment opportunities in these projects and partly because of the<br />
loss of agricultural land through land acquisition by the government.<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
160
Table 2: Occupational Structure of district <strong>Angul</strong><br />
Indicators <strong>Angul</strong> District<br />
(Percent)<br />
Orissa<br />
Proportion of Main-workers to total workers 65.93 6<strong>7.</strong>2<br />
Proportion of Marginal workers to total workers 34.1 32.8<br />
Work participation rate 39.8 38.8<br />
Proportion of cultivators to total workers 30.32 29.75<br />
Proportion of agricultural labourers to total<br />
workers<br />
28.02<br />
35.02<br />
Proportion of workers in household industries to<br />
total workers<br />
5.90<br />
4.91<br />
Proportion of other workers to total workers 35.8 30.3<br />
Source: Census of India 200; Orissa, Series 22, Vol.1, statements 8-13<br />
Human Development & Gender Equity<br />
The Human Development Index (HDI) of <strong>Angul</strong> is 0.663 which is higher than the state average<br />
of 0.579. Similarly, the income index is also significantly higher 0.748 for <strong>Angul</strong> as against the<br />
state average of 0.545. In case of Reproductive Health Index, <strong>Angul</strong> had 35.76 percent of women<br />
married below 18 years as against the state average of 40 percent. Sex ratio is lower than the<br />
state average, but literacy rate is comparatively high for women in the district (HDR, Orissa,<br />
2004).<br />
Crime statistics indicates that number of deaths due to dowry was higher i.e. 41 as compared to<br />
state average of 33.2 and the number of registered abduction and rape cases was 18 which are<br />
slightly lower than the state average of 19 during the year 2006 (Statistical Abstract of Orissa,<br />
2008).<br />
The participation rate of women in the total workforce of the district is slightly higher 32.48<br />
percent than the state average 31.54 percent. Role of the women in agricultural activities and<br />
NTFP is also very significant.<br />
The overall position thus seems to be quite optimistic as building public awareness, social<br />
motivation, special schemes and provisions for women and girl child would help women to be in<br />
a more favourable position by 2020.<br />
Agriculture and Allied sectors<br />
Land Use Pattern<br />
Agriculture occupies a vital place in the economy of <strong>Angul</strong> district. It provides direct and<br />
indirect employment to around 70 percent of the total work force of the district (2001 Census).<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
161
The total cultivable area of this district is 2,16,403 ha constituting 32.7 percent of the total<br />
geographical area of the district.<br />
% of total geographical area<br />
50<br />
45<br />
40<br />
35<br />
30<br />
25<br />
20<br />
15<br />
10<br />
5<br />
0<br />
Forest<br />
Misc.tree &<br />
groves<br />
Permanent<br />
pasture<br />
Land use(in %):2005-06<br />
Culturable<br />
waste<br />
Land put to<br />
nonagricultural<br />
use<br />
Category of use<br />
Barren &<br />
unculturable<br />
land<br />
Orissa average <strong>Angul</strong> district<br />
Figure 1: Land use pattern of district <strong>Angul</strong> vis-à-vis Orissa<br />
The above Figure shows that land use has a more or less similar pattern in the district <strong>Angul</strong> as<br />
compared to the state. However, the total forest area (legal boundary) is higher than the state<br />
average. Within district, the forest area is maximum in the Pallahara block followed by Kaniha<br />
and Athamallik blocks.<br />
The 2003 statistics suggests that net area sown is maximum in the Chhendipada block followed<br />
by Athamallik, <strong>Angul</strong> and Pallahra. Area under current fallow is maximum in Chhendipada<br />
block followed by Athamallik and Kishorenagar. Whereas, area under the culturable waste is<br />
maximum in the Kishorenagar block followed by Kaniha, Chhendipada, and <strong>Angul</strong> blocks. This<br />
indicates that the scope of extension of agriculture is highest in Kishorenagar block.<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
Current<br />
fallow<br />
Other fallow<br />
Net area<br />
sown<br />
162
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
Table 3: Land use pattern of of different blocks of district <strong>Angul</strong> during 2003-04<br />
(Area in hectares)<br />
Particulars<br />
Total Geographical Area<br />
<strong>Angul</strong> Banarapal Chhendipada<br />
Blocks<br />
Athmallik Kishorenagar Talcher Kaniha Pallahara<br />
Total<br />
<strong>Angul</strong><br />
Forests 10715 2080 10739 20146 16355 2538 22341 41682 126596<br />
Misc. tree crops & Groves not<br />
included in net area sown<br />
882 216 2301 646 979 659 708 262 6653<br />
Barren & Uncultivable land 338 472 91 3804 8819 34 1272 175 15005<br />
Land put to non- agricultural<br />
use<br />
3153 6424 4204 8477 2346 6664 3919 5383 40570<br />
Culturable waste 2839 1153 2840 1821 3476 662 2967 1086 16844<br />
Permanent pastures and other<br />
grazing land<br />
2664 2157 3100 2302 2243 520 2042 1546 16574<br />
Current Fallows 2893 4321 7824 6852 5514 3852 2509 3430 37195<br />
Other Fallows 7312 3128 6891 2374 4784 1210 3392 1400 30491<br />
Net area sown 17300 13566 21938 21501 15530 6525 15493 16354 128207<br />
Source: District Statistical Handbook (2005), <strong>Angul</strong>, Dept. of Economic and Statistics, Orissa<br />
163
Cropping pattern<br />
Most of the cultivated area of the district is covered with double crops like kulthi<br />
(kolath), bengalgram(harad), coriander, field pea; and vegetables are taken after harvest<br />
of ground nut and early kharif paddy.<br />
164<br />
The kharif crops include paddy, maize, ragi, small millets, arhar, biri, mung, gound nut,<br />
til, castor, cotton, turmeric, ginger and vegetables like brinjal, tomato, and early<br />
cauliflower. On the other hand, rabi crops include paddy, wheat, maize, field pea, mung,<br />
biri, mustard, sunflower, safflower, niger, potato, onion, garlic, coriander, vegetables,<br />
tobacco, sugar cane etc.<br />
The crop rotation practice followed by the farmers in the district are:<br />
a) In U<strong>plan</strong>d region: Kulthi and vegetables are taken after harvest of short<br />
duration paddy, gram, coriander and groundnut crop.<br />
b) In Mid land region: Wheat, onion, garlic, mung, biri, vegetables and groundnut<br />
are taken after harvesting of kharif season paddy.<br />
c) In Low land region: Paddy and pulses are taken after harvest of rabi season<br />
paddy crop. In assured irrigation farmlands, three crops like paddy-vegetablepulses,<br />
paddy-potato-til and paddy-pulses-groundnut are taken.<br />
Table 4 reveals that the average cropping intensity in the district is around 175 percent.<br />
The highest cropping intensity is found in Pallahara block followed by Banarpal block,<br />
whereas, in Talcher block the cropping intensity is almost half as compared to other<br />
blocks. This is mainly due to the inadequate irrigation facilities in the block.<br />
Table 4: Agricultural land utilization in different blocks during 2004-05<br />
Block<br />
Total cultivated<br />
area in ‘000 hect.<br />
Gross cropped<br />
area‘000 hect.<br />
Net area<br />
sown‘000 hect.<br />
Cropping<br />
intensity (%)<br />
<strong>Angul</strong> 32 54 30 180<br />
Athamallik 32 50 30 167<br />
Banarpal 24 43 22 195<br />
Chhendipada 32 56 30 187<br />
Kaniha 24 41 22 186<br />
Kishorenagar 23 40 21 190<br />
Pallahara 19 36 17 212<br />
Talcher 33 21 23 91<br />
Source: A Profile on Agriculture in Orissa, 2006, p. 49<br />
The Table 5 presents the production and productivity of food grains in the district and it<br />
has often been substantially lower than the state average.<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com
Table 5: Area, production and productivity of food grains<br />
Year<br />
Area in ‘000 hect. Yield in Kg/hect Production in ‘000 MT<br />
State average <strong>Angul</strong> State average <strong>Angul</strong> State average <strong>Angul</strong><br />
2001-<br />
02<br />
222.76 19<strong>7.</strong>32 1232.00 1048.00 274.41 206.84<br />
2002-<br />
03<br />
199.73 178.45 675.00 335.00 134.83 59.71<br />
2003-<br />
04<br />
218.93 208.43 1178.00 923.00 25<strong>7.</strong>88 192.47<br />
2004-<br />
05<br />
219.21 215.37 1154.00 834.00 252.94 179.59<br />
Source: A Profile of Agriculture in Orissa, 2006, p. 99<br />
The district has a comparatively better position in case of some vegetable crops like<br />
onion and potato.<br />
165<br />
About 90 percent of the paddy area is said to have been brought under high yielding<br />
varieties (NABARD, PLP 2008-09). In other crops also, high yield and hybrid varieties<br />
are being increasingly used.<br />
Irrigation<br />
The total irrigation potential of the district is 23 percent with the net irrigated area 38867<br />
hectares kharif and 24120 hectares rabi. Lack of irrigation facilities is the major<br />
constraint in the development of agriculture in many parts of the district. Athamallik,<br />
Pallahra, Kaniha, Kishorenagar, and Talcher blocks do not have any major or medium<br />
irrigation scheme (2004-05) whereas, minor irrigation schemes have maximum coverage<br />
in Chhendipada and Kaniha blocks. Lift irrigation from bore wells is a failure in mining<br />
areas due to depletion of ground water level and as such in these areas rain water<br />
harvesting structures have been suggested.<br />
Table 6: Source wise area irrigated<br />
By channels By wells By LIPs<br />
(Hectares)<br />
By miscellaneous sources<br />
17544 5636 3644 12043<br />
Source: NABARD, Potential Linked Credit Plan 2008-09, <strong>Angul</strong><br />
Fertilizer consumption<br />
The farmers use cow-dung (FYM), oil cakes, and silt of tanks as manure. But,<br />
insufficiency of bio-fertilizer, need for intensification of productivity, and popularization<br />
strategy of various agencies for chemical fertilizers has substantially increased the<br />
dependency on the latter over the years. However, short supply of chemical fertilizers<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com
and/or financial limitations may be some of the factors responsible for low consumption<br />
of chemical fertilizers in some regions of the district.<br />
Table 7: Consumption of Fertilizers in <strong>Angul</strong> district<br />
166<br />
Year<br />
N<br />
Consumption of fertilizer in 000’ MT<br />
P K Total<br />
Consumption<br />
in Kg/hectare<br />
2001-02 4.66 1.46 1.04 <strong>7.</strong>16 25<br />
2002-03 3.80 1.35 0.61 5.76 22<br />
2003-04 4.79 1.33 0.91 <strong>7.</strong>03 23<br />
2004-05 5.23 1.48 0.73 <strong>7.</strong>44 23<br />
Source: A Profile of Agriculture in Orissa, 2006, pp.84-85<br />
Animal husbandry<br />
The livestock population in district <strong>Angul</strong> is presented in Table 8. On analyzing the<br />
information it is found that major part of the livestock population constitutes indigenous<br />
cattle. Whereas, crossbred cattle constitutes only a small part of this population. Majority<br />
of the present cattle population needs replacement as crossbred cattle to enhance milk<br />
production.<br />
Table 8: Livestock population in district <strong>Angul</strong> (2003)<br />
Sl.<br />
No.<br />
Subdivision<br />
Crossbred<br />
cattle<br />
Indigenous<br />
cattle<br />
Buffalo<br />
Total breedable<br />
cattle(including<br />
buffalo)<br />
(Number)<br />
Sheep Goat Poultry<br />
1 <strong>Angul</strong> 18646 195180 14123 60707 20310 92758 121530<br />
2 Athamallik 2990 121137 14995 38857 27385 35169 44005<br />
3 Pallahara 671 62188 4163 18410 4499 57696 82727<br />
4 Talcher 7751 104827 2557 33342 1945 40611 49986<br />
Total 30058 483332 35837 151316 54139 226234 298048<br />
Source: Chief District Veterinary Officer, <strong>Angul</strong><br />
The livestock position of the district is comparatively better than the state average as<br />
evident from the following figure (based on Statistical Abstract of Orissa: 2008, table<br />
<strong>7.</strong>01).<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com
Numbers<br />
1200000<br />
1000000<br />
800000<br />
600000<br />
400000<br />
200000<br />
0<br />
Total cattle<br />
Buffalo<br />
Livestock position:2003<br />
Goat<br />
Livestock<br />
Sheep<br />
Poultry(fowl)<br />
<strong>Angul</strong> district<br />
Orissa average<br />
167<br />
The Table 9 indicates that in district <strong>Angul</strong> production of goat meat is higher than the<br />
state average whereas, in case of production of milk and eggs it is lagging behind.<br />
Decreasing pasture lands, lack of will power, low profitability, increasing cost of<br />
production and shift of attention towards other enterprises and occupations are some of<br />
the factors responsible for less scope of increase in cattle population whereas in case of<br />
goatery the future seems bright.<br />
Table 9: Production of different livestock products in district <strong>Angul</strong> (2005-06)<br />
Region<br />
Cow milk<br />
production (‘000<br />
MT)<br />
Total egg production<br />
(Lakh)<br />
Goat meat production<br />
(MT)<br />
State average 3<strong>7.</strong>69 426.23 1270.6<br />
District <strong>Angul</strong> 30.6 133.24 1631.64<br />
Source: based on Statistical Abstract of Orissa, 2008, table-<strong>7.</strong>04<br />
Fisheries<br />
The fish production of the district, which is only from fresh water bodies, has been<br />
provisionally estimated to be around 6684.35 MT (2005-06) which is higher than the<br />
state average of fresh water fish production 5991.33 MT. Dams and reservoirs like<br />
Rengali, and Manjore hold significant potential for pisciculture, and optimum utilization<br />
of village ponds can further increase fish production. There are fishermen’s primary<br />
cooperatives, and some infrastructural support have been provided to them; however, the<br />
Fishery Department has some limitations like, production of hatchlings from government<br />
farm ponds is about 40-50 lakhs whereas the demand is between 200 to 250 lakhs<br />
<strong>annual</strong>ly. So there is a huge gap between the demand and supply.<br />
Forestry<br />
<strong>Angul</strong> district has rich sal forests in addition to mixed forests as well as pure bamboo<br />
crops. It was from <strong>Angul</strong> that the scientific management of forests was started formally<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com
168<br />
by the British who had established a forest division here. Bio geographically <strong>Angul</strong><br />
District covers the forests of Athamallik Forest Division, <strong>Angul</strong> Forest Division,<br />
Pallahara sub division which is a part of Deogarh Forest Division, and Satkosia Wild Life<br />
Division. Kendu leaf Divisions of Athamallik and <strong>Angul</strong> specifically focus on kendu leaf.<br />
A working <strong>plan</strong> division has also been set up at <strong>Angul</strong> engaged in preparing work <strong>plan</strong> of<br />
Territorial Forest Division.<br />
Table 10 reveals that legal protection to conservation of forests is better in <strong>Angul</strong> district<br />
as compared to the state so far the area under reserve forests is concerned. The Satkoshia<br />
wildlife sanctuary has further strengthened this protection measure.<br />
Table 10: Forest area by legal status in district <strong>Angul</strong> and Orissa<br />
Region<br />
<strong>Angul</strong><br />
Total<br />
government<br />
forest area by<br />
legal status<br />
2716.82<br />
Reserve<br />
forest<br />
1760.76<br />
(64.8)<br />
Demarcated<br />
Protected<br />
Forest<br />
273.21<br />
(10.0)<br />
Un demarcated<br />
Protected<br />
Forest<br />
11.99<br />
(0.4)<br />
Un<br />
classed<br />
forest<br />
(Sq. Kms)<br />
1.15<br />
(0.04)<br />
Orissa 58136.90 26329.12<br />
(45.3)<br />
1168<strong>7.</strong>11<br />
(20.1)<br />
3838.78<br />
(6.6)<br />
20.55<br />
(0.03)<br />
Source: Statistical Abstract of Orissa, 2008 Figures in parenthesis are percentages<br />
However, the satellite data analysis indicates that the district has 2657 sq. km. of forest of<br />
which 1716 sq. km (64.58 percent) is moderately dense. There is no highly dense forest<br />
in the district as per this analysis (Forest Survey of India, State of Forest, 2005).<br />
Sal seed, kendu leaf, and several other non-timber forest products (NTFP) hold the<br />
potential to support the livelihood of the forest dwellers, particularly tribals and other<br />
disadvantaged classes. However, ban on NTFP collection from the sanctuary area,<br />
insecure markets, weak implementation of MFP policy and destruction of forests area are<br />
some of the factors because of which this potential is not utilized properly. The bamboo<br />
cutters and kendu leaf collectors of Satkoshia area have been badly affected by the ban on<br />
commercial exploitation of bamboo and kendu leaf respectively, whereas poor quality of<br />
kendu leaves in the <strong>Angul</strong> KL Division is a matter of great concern.<br />
Government forests have been attempted to be managed under participatory mode<br />
through joint forest management committees (JFMC) or Van Samrakshan Samiti (VSS).<br />
However, lack of sufficient tenurial rights is a major weak point of this system.<br />
There is ample opportunity of ecotourism activities in the district. Tikarpara is a major<br />
tourist attraction. Sahargurjang, called second Chilika, is <strong>plan</strong>ned to be developed for this<br />
purpose.<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
Other forest<br />
under control<br />
of Revenue<br />
Department<br />
669.71<br />
(24.6)<br />
16261.34<br />
(28.0)
Mining and Industrial Activity<br />
Mining<br />
169<br />
Coal is the major mining product in the district. Talcher area has extensive coal mines<br />
whereas the Chhendipada area is being developed in that direction with a proposal of<br />
increasing the current number of coal mines from 1 to more than 30 in near future. In<br />
fact, <strong>Angul</strong> is the leading district in the production of coal in Orissa.<br />
Other minerals/ores include fire clay and sand, but in terms of area, output and value<br />
these are very less as compared to coal.<br />
In 2005-06, the value of all minerals in <strong>Angul</strong> district was Rs.395728 lakhs which was<br />
highest in the state, and was 39.05% of the total output value of all minerals in Orissa.<br />
That year the number of working mines in the district were 14 employing 9115 persons,<br />
which was second largest employment in the mining sector in the state (Statistical<br />
Abstract of Orissa, 2008, table 8.06).<br />
Industry<br />
Industrial sector is playing a leading role for the all-round development of <strong>Angul</strong> district.<br />
Till 2008, six PSUs as enlisted below have the major share in every <strong>plan</strong> and programme<br />
of the <strong>Angul</strong> district. Out of these six, 3(NALCO, NTPC, and MCL) are large scale<br />
enterprises have also started their production.<br />
After exploration of substantial natural resources at Talcher and Chhendipada, more<br />
number of investors are coming up to set up the industries in Steel and Power sectors.<br />
Eight units have signed MOUs with the government (teamorrisa.org). Many more are in<br />
pipeline for setting up projects in Steel and Power <strong>plan</strong>ts in <strong>Angul</strong> district.<br />
Due to the establishment of large industries, some environmental issues have been<br />
created. There is no <strong>plan</strong> for the utilization of Fly Ash generated as a waste material from<br />
the power and other <strong>plan</strong>ts. No permanent solution has been found for the utilization of<br />
clinker generated in Steel Plants. Water and air are getting polluted day by day.<br />
Agriculture sector is threatened with the waste products.<br />
Micro and small enterprises are functioning in different areas in an unsystematic way.<br />
Some of these are in residential campuses or very nearer to villages, educational<br />
institutions, hospitals and temples. The two existing industrial estates have been<br />
saturated, and given the demand for many ancillary industries for the upcoming large and<br />
mega projects, more industrial estates are required.<br />
Tourism, Art & Culture<br />
A number of places bestowed with natural beauty, historical importance, and of cultural<br />
and religious importance are major tourist destinations in the district. These include<br />
Satkoshia gorge with its crocodiles and other wildlife, sleeping image of Lord Vishnu at<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com
170<br />
Bhimkand, the temple of goddess Hingula at Gopalprasad, pre-historic sites at Kaliakata,<br />
etc. Besides this, Ravanchhaya, the traditional puppetry of Palalahara is unique in the<br />
district as well as in Orissa.<br />
Power<br />
<strong>Angul</strong> is a major power producing district in the state with the thermal power <strong>plan</strong>t at<br />
Kaniha. More thermal power <strong>plan</strong>ts are also in the pipeline. However, a number of<br />
villages still lack electrification. Even the progress of Rajiv Gandhi Grameen<br />
Vidyutikaran Yojna is not satisfactory.<br />
In case of village electrification (2005-06), the position of the district is marginally higher<br />
with 81 percent inhabited villages are electrified as compared to the state average of 80<br />
percent villages. Moreover, the state’s first solar rural electrification system has been<br />
inaugurated recently (July 2008) at Tentulikhol and Udal villages of the Kishorenagar<br />
block of <strong>Angul</strong> district.<br />
Transport & Communications<br />
The figure reflects that the district is in an advantageous position in railway and national<br />
highways network. NH-6, NH-42, NH-23, and NH-200 pass through the district. Of<br />
these, the condition of NH 23 is poor and requires immediate attention so that bus<br />
services to Rourkela via Samal can be resumed. On the other hand, the Bimlagarh-<br />
Talcher railway line has been pending since many decades which also needs immediate<br />
action.<br />
coverage in kms.<br />
1800<br />
1600<br />
1400<br />
1200<br />
1000<br />
800<br />
600<br />
400<br />
200<br />
0<br />
Railway and road communications<br />
Railway NH SH MDR ODR Rural road<br />
Railway & road<br />
Orissa average <strong>Angul</strong> district<br />
Source: Statistical Abstract of Orissa: 2008, tables-11.01, 11.02<br />
Recently, inland water transport has been proposed from Talcher to Dhamra in river<br />
Brahmani. This project basically aims at transportation of cargo.<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com
Telecom service is provided by Bharat Sanchar Nigam Limited. Cellular tele-services<br />
(mobile) are provided by a number of companies like BSNL, Reliance, Tata Indicom and<br />
Airtel etc.<br />
Education<br />
171<br />
The literacy rate of the district is presented in Table 11. The table reveals that overall as<br />
well literacy rate of male and female population of district <strong>Angul</strong> is more than Orissa and<br />
India. Whereas, on analyzing the literacy rates of different blocks of district <strong>Angul</strong>, it is<br />
found that overall literacy rate in angul, athmallik, chhendipada and pallahara blocks is<br />
even less than the district average. On the other hand, literacy rate in urban local bodies is<br />
quite higher than the district average.<br />
Table 11: Literacy status of district <strong>Angul</strong> (2001 census)<br />
(Percent)<br />
Region Total Male Female<br />
India 64.83 75.62 53.67<br />
Orissa 63.08 75.35 50.51<br />
<strong>Angul</strong> district 68.79 81.43 55.37<br />
Source: Statistical Abstract of Orissa: 2008, table-1.05<br />
Literacy rate in % of population<br />
90<br />
80<br />
70<br />
60<br />
50<br />
40<br />
30<br />
20<br />
10<br />
0<br />
62.42<br />
<strong>Angul</strong><br />
64.84<br />
Athmallik<br />
Literacy rate in different blocks:2001<br />
71.43<br />
Banarpal<br />
63.22<br />
Chhendipada<br />
Blocks<br />
69.96 69.31<br />
Kaniha<br />
Kishorenagar<br />
5<strong>7.</strong>34<br />
Pallahada<br />
78.31<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
Talcher
Literacy rate in % of population<br />
90<br />
85<br />
80<br />
75<br />
70<br />
65<br />
Literacy rate in urban local bodies<br />
88.26<br />
73.68<br />
81.54<br />
<strong>Angul</strong> Athamallik Talcher<br />
ULB<br />
Source: District Statistical hand Book 2005: <strong>Angul</strong>, table-12.05<br />
172<br />
The status of educational facilities is presented in Table 12. The table reveals that the<br />
district is in a better position with respect to the number of teachers per school as<br />
compared to state average.<br />
Table 12: Status of educational institutions in district <strong>Angul</strong> (2005-06)<br />
Region<br />
Primary school (No.<br />
of teachers/school)<br />
Middle school(No. of<br />
teachers/school)<br />
Secondary school(No.<br />
of teachers/school)<br />
Orissa 30<br />
11.12<br />
4.72<br />
(2.44)<br />
(2.24)<br />
(8.41)<br />
<strong>Angul</strong> district 22.21<br />
8.56<br />
3.59<br />
(5.04)<br />
(4.69)<br />
(8.07)<br />
Source: Statistical Abstract of Orissa:2008, table-12.01<br />
On the other hand, the figure below indicates that the availability of teachers per school<br />
in different blocks of the district is uneven and in Athamallik and Kishorenagar blocks it<br />
is in a disadvantaged position as compared to district average. Accessibility of<br />
educational facilities (per 100 sq.km) indicates that the district is lagging behind vis-à-vis<br />
the state average.<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com
No. of teachers per school<br />
12<br />
10<br />
8<br />
6<br />
4<br />
2<br />
0<br />
<strong>Angul</strong><br />
Availability of teachers in different blocks<br />
Athmallik<br />
Banarpal<br />
Chhendipada<br />
Blocks<br />
No. of teachers per primary school No. of teachers per secondary school<br />
Source: District Statistical Hand Book 2005: <strong>Angul</strong>, table-12.01<br />
Recent estimates indicates that the number of children belonging to different age groups<br />
not going to school are 13614 in the district out of these 10333 are drop-outs.<br />
Kaniha<br />
Kishorenagar<br />
Pallahada<br />
Talcher<br />
173<br />
The Indira Gandhi College of Engineering at Sarang is close to the district. In addition to<br />
this, there is one private engineering school at Chhendipada, and about 20 Nos. of<br />
Industrial Training Institutes established in the district have the catalytic role for human<br />
resource development.<br />
Coal India Ltd. has recently announced to open a medical college at Talcher. Still,<br />
accessibility and affordability of technical education, particularly engineering & medical<br />
education is a distant dream.<br />
Health & Family Welfare<br />
The health facilities in the district are not satisfactory. Hospitals lack adequate staff and<br />
infrastructure. Superspecility services in government hospitals is a distant dream.<br />
As per the 2006 statistics, there are 43 allopathic, 19 homoeopathic, and 16 ayurvedic<br />
government medical units in the district. Of these, the status of the latter two is very poor<br />
as compared to allopathic units.<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com
No. of doctors per 10000<br />
population, and No. of<br />
PHCs per 100 sq.km.<br />
1.4<br />
1.2<br />
1<br />
0.8<br />
0.6<br />
0.4<br />
0.2<br />
0<br />
Highly uneven services of allopathic medical<br />
care(govt.)in different blocks:2004-05<br />
<strong>Angul</strong><br />
Athmallik<br />
Banarpal<br />
Chhendipada<br />
Blocks<br />
Allopathic doctors/10000 population PHCs per 100 sq. km<br />
Source: District Statistical Hand Book <strong>Angul</strong>, 2005, Table 13.01<br />
Kaniha<br />
Kishorenagar<br />
Pallahada<br />
Talcher<br />
174<br />
Non-availability of doctors and trained paramedical staff is the major grievance<br />
particularly in rural areas. Modern medical care facilities are hardly accessible in many of<br />
the remote areas of the district.<br />
Trade & Commerce<br />
Coal and alumina are the major items of trade among minerals and metallurgical<br />
products. Of these, alumina is exported whereas coal is supplied to other districts and<br />
states.<br />
Among agro-products, some vegetables like onion are supplied to other districts. Kendu<br />
leaf, sal seed, mahua, etc. are among the forest products of trade.<br />
Cooperatives, Banking & Finance<br />
The Primary Agricultural Credit Societies (PACS) are the major institutional rural credit<br />
institutions in the district providing short-term loans. In 2004-05, there were total 103<br />
such societies in the district with a total membership of 139000 pesons. Chhendipada is<br />
the leading block in this context.<br />
The number of non-agricultural credit cooperative societies are 28 in 2004-05 with a total<br />
membership of 8000 persons. Besides, there is one RCMS (Regional Cooperative<br />
marketing Society), one WCCS (Wholesale Consumer Cooperative Store) and 9 Primary<br />
Consumer Cooperative Stores.<br />
<strong>Angul</strong> United Central Cooperative Bank (AUCCB) is the central cooperative bank of the<br />
district. It has 11 branches in the district. Besides, there are 2 Cooperative Agricultural &<br />
Rural Development Bank (CARD) branches operational at sub-divisional level providing<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com
credit to agricultural and allied activities. The Orissa State Cooperative Bank also has a<br />
branch at <strong>Angul</strong>.<br />
175<br />
There are total 23 financial institutions in the district having 103 branches of which 66<br />
are based in rural areas. UCO Bank is the lead bank, and there are 14 other nationalized<br />
banks. The number of public sector banks are three (Axis Bank, ICICI Bank, and HDFC<br />
Bank) and one private sector bank Neelachal Gramya Bank. In addition to this there are<br />
29 Regional Rural Banks operating in the district. The Orissa State Financial Corporation<br />
has a branch at <strong>Angul</strong>.<br />
Law & order<br />
The incidence of crime is increasing in the district as is evident from Table 13.<br />
Table 13: Crime in <strong>Angul</strong> district<br />
(No. of cases registered)<br />
Year Murder Dacoity Robbery Theft Kidnapping Rioting<br />
2002 40 7 27 127 15 105<br />
2004 51 12 19 222 10 94<br />
2006 39 19 47 316 16 144<br />
Source: District Statistical Hand Book <strong>Angul</strong>, 2005, table 16.03<br />
Statistical Abstract of Orissa: 2008, table 19.05<br />
In 2006, <strong>Angul</strong> had the highest incidence of rioting in the state.<br />
There are 20 police stations, but mahila thanas are yet to be established in the district.<br />
Resettlement & rehabilitation<br />
Resettlement and rehabilitation of the displaced people (or, to be displaced in near future)<br />
in region of coal mining, industrialization, and irrigations projects etc. have been among<br />
the major local issues of the district. The displacement has in many cases badly weakened<br />
the moral, socio-economic and other strengths of the people because of lack of proper<br />
compensation or lack of integrated rehabilitation project management. This has been<br />
alleged by the destitute of Samal and Derjang dam projects and also of colliery projects<br />
in Talcher.<br />
The new R&R Policy of the Govt of Orissa has promised better facilities/provisions for<br />
the displaced persons and according the cost of rehabilitation has increased for new<br />
projects. However, corruptions and inadequate/insincere implementation are likely to<br />
deprive the beneficiaries of their deserving rights to some extent.<br />
Innovative measures are urgently required to address the post-rehabilitation issues of<br />
families, particularly of the female members and next generations.<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com
ANNEXURE-2<br />
ABSTRACT OF ANGUL DISTRICT PLAN BUDGET:<strong>2009</strong>-10 and <strong>2010</strong>-11<br />
Agriculture & allied<br />
sector Agriculture 383.94 422.14<br />
Rural Development<br />
Horticulture 409.15 388.37<br />
Soil Conservation 529.21 524.15<br />
Animal Husbandry 252.2 173.475<br />
Fishery 71.839 44.8<br />
Cooperation 58 58<br />
SGSY, GGY, IAY, DRDA<br />
Admn<br />
3759.46<br />
Special Areas<br />
Programme PBDA, Pallahara 610<br />
Irrigation & Flood<br />
Control Rengali Dam<br />
3869.56<br />
Grant under article 275(1) 39.75 43.725<br />
SCA to TSP 35.92 39.512<br />
271 298<br />
Samal Barrage 298.5 2665<br />
<strong>Angul</strong> Irrigation Divn. 94.68 85<br />
Manjore Divn. 252<strong>7.</strong>13 3300<br />
Minor Irrigation 1786 512.833<br />
Lift Irrigation 116 332.44<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
176
Energy <strong>Angul</strong> & Talcher Electrical<br />
Divn.<br />
674.05 2093<br />
Renewable Energy 112.03 182.02<br />
Mining & Industries DIC 100.78 110.858<br />
Textiles 58.66 24.12<br />
Sericulture 4<strong>7.</strong>715 42.371<br />
Transport NH-42 2422.88 2665.168<br />
NH-6 & 23 2625 2400<br />
NH-200 130 646<br />
R&B(roads) 5765 4362<br />
Rural Works Division(roads) 544<strong>7.</strong>72 5940.22<br />
Science &<br />
Technology E-governance 11 12.1<br />
General Economic<br />
Services Tourism<br />
DFO, <strong>Angul</strong> 689.71 626.62<br />
DFO, Athmallik <strong>7.</strong>47 34.17<br />
DFO, Deogarh 350.955 386.05<br />
DFO, Satkoshia WL 1418.033 1559.83<br />
DFO, <strong>Angul</strong> KL 3.8<br />
DFO, Athmallik KL<br />
Social Services Elementary Education(SSA) 1866.32 1839.53<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
177
General Services Jail<br />
Secondary education 2995.79 2998.81<br />
Sports 16.778 18.4558<br />
NRHM, etc 1175.87 1293.457<br />
Ayurveda 6 72<br />
Homaeopathy 2 11.8<br />
PHED 1105.81 1216.391<br />
RWSS 5720.25 5332.28<br />
TAMDA<br />
<strong>Angul</strong> Municipality 550 1091<br />
Talcher Municipality 172 4468<br />
Athmallik NAC 112 201<br />
District Welfare<br />
Civil works for educational<br />
institutions 399.5 361.5<br />
OSFDC targets 119 130.9<br />
Scholarship 109<strong>7.</strong>09 1206.799<br />
Labour 103.5 20.66<br />
Employment<br />
Social Welfare 4693.622 3852.504<br />
R&B (Building) 464.5 430<br />
Rural Works(Building) 265.597 281.917<br />
Total: 51973.21 58668.54<br />
PS/GP roads<br />
NREGS(Block/GP) 46581.5<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
178
NREGS Plan(Line<br />
Departments) 2025.73<br />
4860<strong>7.</strong>23<br />
179<br />
Note: The budget abstract does not include kendu leaves<br />
operation and other such activities that are funded by Orissa<br />
Forest Development Corporation.<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
WORK PLAN (RICE DEVELOPMENT )<br />
DRAFT ANNUAL PLAN- <strong>2009</strong>-10: PROPOSED<br />
OUTLAYS (SCHEME-WISE ) Rs. In<br />
Major Head/<br />
Minor heads<br />
of<br />
Development (<br />
Scheme-wise)<br />
Implementing<br />
Agency<br />
State<br />
Government/<br />
Public sector/<br />
Local bodies<br />
Lakh<br />
Eleventh Plan (2007-12)<br />
Projected Outlay ( at 2006-07<br />
prices)<br />
Total Continuing<br />
Schemes<br />
ANNEXURE-3<br />
Agricultural Plan Proposed Outlay<br />
New<br />
Schemes<br />
Annual Plan: <strong>2009</strong>-10 Proposed<br />
Outlay<br />
Total Continuing<br />
Schemes<br />
New<br />
Schemes<br />
Annual Plan: <strong>2010</strong>-11 Proposed<br />
Outlay<br />
Total Continuing<br />
Schemes<br />
1 2 3 4 5 12 13 14 15 16 17<br />
FFS 3.1 3.1<br />
Krushak<br />
Sampark Mela<br />
SRI<br />
Demonstration<br />
2.4 2.4<br />
New<br />
Schemes<br />
0.12 0.12<br />
Incentive for<br />
SRI<br />
Demonstration<br />
Hybrid Rice<br />
0.2 0.2<br />
Demonstration 0.08 0.08<br />
Total 0 5.9 0 0 5.9 0<br />
180
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
WORK PLAN (SUGAR CANE DEVELOPMENT )<br />
DRAFT ANNUAL PLAN- <strong>2009</strong>-10: PROPOSED<br />
OUTLAYS (SCHEME-WISE ) Rs. In<br />
Major Head/<br />
Minor heads<br />
of<br />
Development (<br />
Scheme-wise)<br />
Implementing<br />
Agency<br />
State<br />
Government/<br />
Public sector/<br />
Local bodies<br />
Lakh<br />
Eleventh Plan (2007-12)<br />
Projected Outlay ( at 2006-07<br />
prices)<br />
Total Continuing<br />
Schemes<br />
New<br />
Schemes<br />
Annual Plan: <strong>2009</strong>-10 Proposed<br />
Outlay<br />
Total Continuing<br />
Schemes<br />
New<br />
Schemes<br />
Annual Plan: <strong>2010</strong>-11 Proposed<br />
Outlay<br />
Total Continuing<br />
Schemes<br />
New<br />
Schemes<br />
1 2 3 4 5 12 13 14 15 16 17<br />
FFS 0.15 0.15<br />
Ratoon<br />
Management<br />
Inter croping<br />
Exposure visit<br />
0.35 0.35<br />
0.05 0.05<br />
0.25 0.25<br />
Total 0 0.8 0 0 0.8 0<br />
181
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
ISOPOM ( PULSE )<br />
DRAFT ANNUAL PLAN- <strong>2009</strong>-10: PROPOSED<br />
OUTLAYS (SCHEME-WISE ) Rs. In<br />
Major Head/<br />
Minor heads<br />
of<br />
Development (<br />
Scheme-wise)<br />
Implementing<br />
Agency<br />
State<br />
Government/<br />
Public sector/<br />
Local bodies<br />
Lakh<br />
Eleventh Plan (2007-12)<br />
Projected Outlay ( at 2006-07<br />
prices)<br />
Total Continuing<br />
Schemes<br />
New<br />
Schemes<br />
Annual Plan: <strong>2009</strong>-10 Proposed<br />
Outlay<br />
Total Continuing<br />
Schemes<br />
New<br />
Schemes<br />
Annual Plan: <strong>2010</strong>-11 Proposed<br />
Outlay<br />
Total Continuing<br />
Schemes<br />
New<br />
Schemes<br />
1 2 3 4 5 12 13 14 15 16 17<br />
Block<br />
Demonstration<br />
IPM<br />
Demonstration<br />
0.4 0.4<br />
2.27 2.27<br />
R.Culture &<br />
PSB<br />
Farmers<br />
0.22 0.24<br />
Training<br />
PP<br />
1.2 1.2<br />
Equipments 2.8 3.2<br />
Sprinkler<br />
Vermi<br />
0.22 0.23<br />
Compost<br />
Micro Nutrient<br />
0.14 0.16<br />
0.28 0.3<br />
Total 0 <strong>7.</strong>53 0 0 8 0<br />
182
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
ISOPOM OILSEEDS<br />
DRAFT ANNUAL PLAN- <strong>2009</strong>-10: PROPOSED<br />
OUTLAYS (SCHEME-WISE ) Rs. In<br />
Major Head/<br />
Minor heads<br />
of<br />
Development (<br />
Scheme-wise)<br />
Implementing<br />
Agency<br />
State<br />
Government/<br />
Public sector/<br />
Local bodies<br />
Lakh<br />
Eleventh Plan (2007-12)<br />
Projected Outlay ( at 2006-07<br />
prices)<br />
Total Continuing<br />
Schemes<br />
New<br />
Schemes<br />
Annual Plan: <strong>2009</strong>-10 Proposed<br />
Outlay<br />
Total Continuing<br />
Schemes<br />
New<br />
Schemes<br />
Annual Plan: <strong>2010</strong>-11 Proposed<br />
Outlay<br />
Total Continuing<br />
Schemes<br />
New<br />
Schemes<br />
1 2 3 4 5 12 13 14 15 16 17<br />
Block<br />
Demonstration 0.25 0.38<br />
R.Culture &<br />
PSB<br />
0.2 0.25<br />
Gypsum 2.6 3<br />
Farmers<br />
Training 1.2 1.2<br />
PP<br />
Equipments 0.4 0.48<br />
Sprinkler 0.3 0.38<br />
Vermi<br />
Compost 0.5 0.5<br />
Micro Nutrient<br />
0.13 0.15<br />
Total 0 5.58 0 0 6.34 0<br />
183
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
ISOPOM MAIZE<br />
DRAFT ANNUAL PLAN- <strong>2009</strong>-10: PROPOSED<br />
OUTLAYS (SCHEME-WISE ) Rs. In<br />
Major Head/<br />
Minor heads<br />
of<br />
Development (<br />
Scheme-wise)<br />
Implementing<br />
Agency<br />
State<br />
Government/<br />
Public sector/<br />
Local bodies<br />
Lakh<br />
Eleventh Plan (2007-12)<br />
Projected Outlay ( at 2006-07<br />
prices)<br />
Total Continuing<br />
Schemes<br />
New<br />
Schemes<br />
Annual Plan: <strong>2009</strong>-10 Proposed<br />
Outlay<br />
Total Continuing<br />
Schemes<br />
New<br />
Schemes<br />
Annual Plan: <strong>2010</strong>-11 Proposed<br />
Outlay<br />
Total Continuing<br />
Schemes<br />
New<br />
Schemes<br />
1 2 3 4 5 12 13 14 15 16 17<br />
Block<br />
Demonstration<br />
IPM<br />
Demonstration<br />
0.2 0.2<br />
0.91 0.91<br />
Farmers<br />
Training<br />
PP<br />
Equipments<br />
0.6 0.6<br />
HDPE Pipe<br />
0.95 1.05<br />
0.45 0.45<br />
Total 0 3.11 0 0 3.21 0<br />
184
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
FARM MECHANISATION<br />
DRAFT ANNUAL PLAN- <strong>2009</strong>-10: PROPOSED<br />
OUTLAYS (SCHEME-WISE ) Rs. In<br />
Major Head/<br />
Minor heads<br />
of<br />
Development (<br />
Scheme-wise)<br />
Implementing<br />
Agency<br />
State<br />
Government/<br />
Public sector/<br />
Local bodies<br />
Lakh<br />
Eleventh Plan (2007-12)<br />
Projected Outlay ( at 2006-07<br />
prices)<br />
Total Continuing<br />
Schemes<br />
New<br />
Schemes<br />
Annual Plan: <strong>2009</strong>-10 Proposed<br />
Outlay<br />
Total Continuing<br />
Schemes<br />
New<br />
Schemes<br />
Annual Plan: <strong>2010</strong>-11 Proposed<br />
Outlay<br />
Total Continuing<br />
Schemes<br />
New<br />
Schemes<br />
1 2 3 4 5 12 13 14 15 16 17<br />
Tractor 45 54<br />
Power Tiller<br />
13.2 15<br />
Hydrolic<br />
Trailer 3.25 3.75<br />
Axialflow<br />
Tresher 4.5 5<br />
Multicrop<br />
tresher 1.57 1.74<br />
Reaper 0.8 0.8<br />
Total 0 68.32 0 0 80.29 0<br />
185
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
MINI MISSION-II<br />
DRAFT ANNUAL PLAN- <strong>2009</strong>-10: PROPOSED<br />
OUTLAYS (SCHEME-WISE ) Rs. In<br />
Major Head/<br />
Minor heads<br />
of<br />
Development (<br />
Scheme-wise)<br />
Implementing<br />
Agency<br />
State<br />
Government/<br />
Public sector/<br />
Local bodies<br />
Lakh<br />
Eleventh Plan (2007-12)<br />
Projected Outlay ( at 2006-07<br />
prices)<br />
Total Continuing<br />
Schemes<br />
New<br />
Schemes<br />
Annual Plan: <strong>2009</strong>-10 Proposed<br />
Outlay<br />
Total Continuing<br />
Schemes<br />
New<br />
Schemes<br />
Annual Plan: <strong>2010</strong>-11 Proposed<br />
Outlay<br />
Total Continuing<br />
Schemes<br />
1 2 3 4 5 12 13 14 15 16 17<br />
Retailing<br />
Technology<br />
Demonstration 0.2 0.2<br />
Production<br />
Technology<br />
0.75 0.9<br />
Kacharating<br />
Tank 0.6 0.75<br />
PP<br />
Equipments<br />
0.84 0.91<br />
Farmers<br />
Training 0.15 0.15<br />
FFS 1.25 1.25<br />
Essential<br />
Nutrient 0.34 0.37<br />
Exposure visit<br />
0.15 0.15<br />
Total 0 4.28 0 0 4.68 0<br />
New<br />
Schemes<br />
186
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
JALANIDHI<br />
DRAFT ANNUAL PLAN- <strong>2009</strong>-10: PROPOSED<br />
OUTLAYS (SCHEME-WISE ) Rs. In<br />
Major Head/<br />
Minor heads<br />
of<br />
Development (<br />
Scheme-wise)<br />
Implementing<br />
Agency<br />
State<br />
Government/<br />
Public sector/<br />
Local bodies<br />
Lakh<br />
Eleventh Plan (2007-12)<br />
Projected Outlay ( at 2006-07<br />
prices)<br />
Total Continuing<br />
Schemes<br />
New<br />
Schemes<br />
Annual Plan: <strong>2009</strong>-10 Proposed<br />
Outlay<br />
Total Continuing<br />
Schemes<br />
New<br />
Schemes<br />
Annual Plan: <strong>2010</strong>-11 Proposed<br />
Outlay<br />
Total Continuing<br />
Schemes<br />
New<br />
Schemes<br />
1 2 3 4 5 12 13 14 15 16 17<br />
Borewell 3<strong>7.</strong>5 41.5<br />
Dugwell 20 22<br />
River Lift 0.8 1.2<br />
Total 0 58.3 0 0 64.7<br />
187
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
STATE PLAN CM PACKAGE<br />
DRAFT ANNUAL PLAN- <strong>2009</strong>-10: PROPOSED<br />
OUTLAYS (SCHEME-WISE ) Rs. In<br />
Major Head/<br />
Minor heads<br />
of<br />
Development (<br />
Scheme-wise)<br />
Implementing<br />
Agency<br />
State<br />
Government/<br />
Public sector/<br />
Local bodies<br />
Lakh<br />
Eleventh Plan (2007-12)<br />
Projected Outlay ( at 2006-07<br />
prices)<br />
Total Continuing<br />
Schemes<br />
New<br />
Schemes<br />
Annual Plan: <strong>2009</strong>-10 Proposed<br />
Outlay<br />
Total Continuing<br />
Schemes<br />
New<br />
Schemes<br />
Annual Plan: <strong>2010</strong>-11 Proposed<br />
Outlay<br />
Total Continuing<br />
Schemes<br />
New<br />
Schemes<br />
1 2 3 4 5 12 13 14 15 16 17<br />
Development<br />
&<br />
strengthening<br />
instrastucture<br />
facility for<br />
production<br />
and<br />
distribution of<br />
quality seeds<br />
1.5 1.6<br />
188
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
R.K.V.Y<br />
DRAFT ANNUAL PLAN- <strong>2009</strong>-10: PROPOSED<br />
OUTLAYS (SCHEME-WISE ) Rs. In<br />
Major Head/<br />
Minor heads<br />
of<br />
Development (<br />
Scheme-wise)<br />
Implementing<br />
Agency<br />
State<br />
Government/<br />
Public sector/<br />
Local bodies<br />
Lakh<br />
Eleventh Plan (2007-12)<br />
Projected Outlay ( at 2006-07<br />
prices)<br />
Total Continuing<br />
Schemes<br />
New<br />
Schemes<br />
Annual Plan: <strong>2009</strong>-10 Proposed<br />
Outlay<br />
Total Continuing<br />
Schemes<br />
New<br />
Schemes<br />
Annual Plan: <strong>2010</strong>-11 Proposed<br />
Outlay<br />
Total Continuing<br />
Schemes<br />
New<br />
Schemes<br />
1 2 3 4 5 12 13 14 15 16 17<br />
SRI<br />
Demonstration<br />
12.5 12.5 15 15<br />
Bio Fertiliser<br />
3.95 3.95 4.37 4.37<br />
Papermill<br />
sludge<br />
Construction<br />
of FIAC<br />
1.3 1.3 1.4 1.4<br />
building<br />
Vermi<br />
60 60 60 60<br />
compost<br />
Vermi<br />
3.6 3.6 3.9 3.9<br />
hatchery<br />
SRI Village<br />
2.47 2.47 2.97 2.97<br />
3.3 3.3 3.3 3.3<br />
Total 8<strong>7.</strong>12 8<strong>7.</strong>12 0 90.94 90.94 0<br />
189
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
ATMA<br />
DRAFT ANNUAL PLAN- <strong>2009</strong>-10: PROPOSED<br />
OUTLAYS (SCHEME-WISE ) Rs. In<br />
Major Head/<br />
Minor heads<br />
of<br />
Development (<br />
Scheme-wise)<br />
Implementing<br />
Agency<br />
State<br />
Government/<br />
Public sector/<br />
Local bodies<br />
Lakh<br />
Eleventh Plan (2007-12)<br />
Projected Outlay ( at 2006-07<br />
prices)<br />
Total Continuing<br />
Schemes<br />
New<br />
Schemes<br />
Annual Plan: <strong>2009</strong>-10 Proposed<br />
Outlay<br />
Total Continuing<br />
Schemes<br />
New<br />
Schemes<br />
Annual Plan: <strong>2010</strong>-11 Proposed<br />
Outlay<br />
Total Continuing<br />
Schemes<br />
New<br />
Schemes<br />
1 2 3 4 5 12 13 14 15 16 17<br />
Farm School 2 2.5<br />
Operational<br />
expenses 3 3<br />
Akshyaya<br />
Trutiya 0.2 0.2<br />
Farmers<br />
training (SRI)<br />
0.72 0.72<br />
Demonstration<br />
(SRI)<br />
4 4.8<br />
GKM<br />
Villagelevel<br />
training 6.2 6.82<br />
Demonstration<br />
(line deppt) 3.5 3.91<br />
Exposure visit<br />
0.6 0.6<br />
Total 0 20.22 0 0 22.55 0<br />
190
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
N F S M<br />
DRAFT ANNUAL PLAN- <strong>2009</strong>-10: PROPOSED<br />
OUTLAYS (SCHEME-WISE ) Rs. In<br />
Major Head/<br />
Minor heads<br />
of<br />
Development (<br />
Scheme-wise)<br />
Implementing<br />
Agency<br />
State<br />
Government/<br />
Public sector/<br />
Local bodies<br />
Lakh<br />
Eleventh Plan (2007-12)<br />
Projected Outlay ( at 2006-07<br />
prices)<br />
Total Continuing<br />
Schemes<br />
New<br />
Schemes<br />
Annual Plan: <strong>2009</strong>-10 Proposed<br />
Outlay<br />
Total Continuing<br />
Schemes<br />
New<br />
Schemes<br />
Annual Plan: <strong>2010</strong>-11 Proposed<br />
Outlay<br />
Total Continuing<br />
Schemes<br />
1 2 3 4 5 12 13 14 15 16 17<br />
Conoweeder 2.16 2.38<br />
Marker 0.27 0.3<br />
PP<br />
Equipments<br />
8.25 9<br />
Pumpset 10.5 12<br />
FFS 3.07 3.07<br />
Incentive on<br />
PP chemical<br />
5.9 6.4<br />
Incentive on<br />
micro nutrient<br />
8.83 9.58<br />
IPP <strong>7.</strong>5 8.25<br />
SRI 9.9 11.1<br />
Hybrid<br />
demonstration<br />
0.9 1.05<br />
PMS 40 44<br />
Seed subsidy<br />
24 26<br />
Total 0 121.28 0 0 133.13<br />
New<br />
Schemes<br />
191
ANNEXURE-4<br />
Information on SGSY, NREGS, GGY, IAY, MO KUDIA, TFC, SFC<br />
GGY 2008-09<br />
An amount of Rs.1000.00 lakh has been received from State Govt. for the year 2008-09.<br />
BLOCKWISE PHYSICAL & FINANCIAL ACHIVEMENT UNDER GGY<br />
FOR 2008-09 ( UPTO MARCH’ <strong>2009</strong>) ( Rs. in lakhs)<br />
Name of the Total Expenditure Balance Physical completed Under<br />
Block Funds<br />
Target<br />
progress<br />
<strong>Angul</strong> 185.30 159.80 25.50 96 75 21<br />
Banarpal 150.50 128.80 21.70 66 53 13<br />
Chhendipada 133.50 121.50 12.00 78 71 7<br />
Athamallik 151.50 133.50 18.00 95 82 13<br />
Kishorenagar 153.00 142.30 10.70 75 68 7<br />
Pallahara 155.00 138.00 1<strong>7.</strong>00 72 61 11<br />
Kaniha 140.00 12<strong>7.</strong>00 13.00 76 69 7<br />
Talcher 154.00 129.90 24.10 63 53 10<br />
TOTAL 1222.80 1080.80 142.00 621 532 89<br />
192<br />
GGY <strong>2009</strong>-10<br />
An amount of Rs.1500.00 lakhs has been allotted to <strong>Angul</strong> dist. by State Govt. for the<br />
year <strong>2009</strong>-10. Rs. 700.00 lakhs has been received from Govt. in P.R.Deptt.<br />
BLOCKWISE PHYSICAL & FINANCIAL ACHIVEMENT UNDER GGY<br />
FOR <strong>2009</strong>-10 ( UPTO SEPTEMBER’ <strong>2009</strong>)<br />
Name of Total Expenditure Physical Completed Under<br />
the Block Funds ( Rs. in lakhs) Target<br />
progress<br />
<strong>Angul</strong> 25.50 12.30 21 9 12<br />
Banarpal 21.70 19.00 13 11 2<br />
Chhendipad<br />
a<br />
12.00 12.00 7 7 0<br />
Athamallik 18.00 13.00 13 10 3<br />
Kishorenaga<br />
r<br />
10.70 10.20 7 4 3<br />
Pallahara 1<strong>7.</strong>00 11.50 11 3 8<br />
Kaniha 13.00 8.00 7 2 5<br />
Talcher 24.10 21.00 10 8 2<br />
TOTAL 142.00 10<strong>7.</strong>00 89 54 35<br />
(Source: DRDA, <strong>Angul</strong>)<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com
• Out of 89 projects taken up 3 nos Bijili, 48 Pani and 38 Sadak.<br />
• 34 nos Sadak & 20 nos Pani projects have been completed.<br />
• Rs. 8<strong>7.</strong>00 lakhs & Rs. 20.00 lakhs have been spent towards Sadak and<br />
pani respectively.<br />
SGSY 2008-09<br />
Amount of Rs. 322.40 lakhs have been received as Central shares and Rs.10<strong>7.</strong>46 lakh<br />
as the state matching share for the year 2008-09. Total receipt is Rs.429.86 lakhs.<br />
BLOCKWISE PHYSICAL & FINANCIAL ACHIVEMENT UNDER SGSY<br />
FOR 2008-09 ( UPTO MARCH’ <strong>2009</strong>)<br />
Name of the<br />
Block<br />
Annual<br />
Physical<br />
Target<br />
Sponsor Sanction Disburse<br />
ment<br />
193<br />
( Rs. in lakhs)<br />
Subsidy Credit<br />
<strong>Angul</strong> 467 565 487 472 45.20 108.24<br />
Banarpal 427 607 484 450 43.08 116.87<br />
Chhendipada 409 583 410 400 38.82 116.11<br />
Athamallik 336 464 376 363 34.82 106.40<br />
Kishorenagar 336 444 340 318 30.10 102.83<br />
Pallahara 419 455 423 423 40.46 106.60<br />
Kaniha 304 374 361 348 32.85 99.95<br />
Talcher 144 203 149 149 13.94 69.80<br />
TOTAL 2842 3695 3030 2923 279.27 826.80<br />
Rs.1.60 lakhs, Rs. 13.17 lakhs, Rs. 18.94 lakhs, Rs.93.50 Lakhs, Rs.1.60 Lakhs, Rs.<br />
42.90 Lakhs & Rs.279.27 lakhs have been utilized towards NGOs/ facilitators, Basic<br />
orientation Training to S.H.G./Swarozgaris, Skill development training Programme,<br />
Infrastructure development, Marketing Development , Revolving funds & subsidy<br />
respectively.<br />
SGSY <strong>2009</strong>-10<br />
For <strong>2009</strong>-10, the physical target of 3306 has been received. Target has been distributed<br />
among the blocks of the district. Rs.165.33 lakh & Rs.39.094 lakh have been received as<br />
the 1 st installment of the Central Share & State Share respectively for <strong>2009</strong>-10..<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com
BLOCKWISE PHYSICAL & FINANCIAL ACHIVEMENT UNDER SGSY FOR<br />
<strong>2009</strong>-10 ( UPTO SEPTEMBER’ <strong>2009</strong>)<br />
Name of the Annual Physical Sponsor Sanction Disbursement<br />
Block Target<br />
<strong>Angul</strong> 41/411+118=529 39/454+88=542 20/216+4 8/85<br />
Banarpal 39/390+106=496 32/375+41=416 12/128+2 5/56<br />
Chhendipada 37/370+106=476 32/343+81=424 13/143+3 6/65<br />
Athamallik 31/310+80=390 26/298+33=331 10/120+2 4/48<br />
Kishorenagar 31/310+80=390 31/337+24=<br />
361<br />
21/228+2 6/68<br />
Pallahara 38/380+108=488<br />
35/403+61=464<br />
10/107+3 3/36<br />
Kaniha 28/280+74=354 30/331+55=386 9/102+3 3/32<br />
Talcher 14/140+43=183<br />
14/152+37=189<br />
9/98+1 7/78<br />
TOTAL 259/2591+715 239/2693+420 104/1142+ 42/468<br />
=3306<br />
=3113 20<br />
194<br />
Rs. 2.34 lakhs, Rs. 3.18 lakhs, Rs. 5.00 Lakhs, Rs.2.71 Lakhs , Rs. 42.99 Lakhs &<br />
Rs.23.80 lakhs have been utilized towards Basic Orientation Training to<br />
S.H.G./Swarozgaris, Skill development training Programme, Infrastructure development,<br />
Marketing Development , Revolving funds & subsidy respectively.<br />
Sl<br />
No<br />
BLOCKWISE REGISTRATION OF HOUSE HOLDS AND ISSUE OF<br />
JOBCARDS UNDER NREGA FOR 2008-09<br />
Name Of The<br />
Block<br />
No of BPL<br />
House Hold<br />
(As Per 1997<br />
Census)<br />
No of House<br />
Holds<br />
(As Per 1997<br />
Census)<br />
House<br />
Hold<br />
Registered<br />
Till Date<br />
No<br />
Regisered<br />
On Line<br />
No Job Card<br />
Issued<br />
1 <strong>Angul</strong> 19748 33870 25399 25399 25399<br />
2 Banrapal 18141 34311 19969 19969 19952<br />
3 Chhendipada 17380 33846 26110 26110 26100<br />
4 Athamallik 14205 23639 18563 18563 18551<br />
5 Kishorenaga 14301 22638 18913 18913 18913<br />
r<br />
6 Pallahara 17813 27328 21698 21698 21698<br />
7 Kaniha 12911 27524 22372 22372 22372<br />
8 Talcher 6109 20904 12030 12030 12030<br />
TOTAL 120608 224060 165054 165054 165015<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com
Sl<br />
No<br />
BLOCK WISE EMPLOY MENT DEMANDED, OFFERED & PROVIDED<br />
UNDER NREGA FOR 2008-09<br />
Name of the<br />
Block<br />
Households<br />
applied for<br />
employment<br />
Households<br />
offered<br />
employment<br />
Households provided<br />
employment<br />
1 <strong>Angul</strong> 4426 4426 4426<br />
2 Banrapal 2634 2634 2623<br />
3 Chhendipada 4430 4430 4429<br />
4 Athamallik 4036 4036 4028<br />
5 Kishorenagar 4383 4383 4367<br />
6 Pallahara 5723 5723 5626<br />
7 Kaniha 4612 4612 4522<br />
8 Talcher 1719 1719 1719<br />
TOTAL 31963 31963 31740<br />
BLOCKWISE PHYSICAL & FINANCIAL ACHIEVEMENT UNDER<br />
NREGA FOR 2008-09<br />
Name Of<br />
The Block<br />
Project<br />
Taken Up<br />
Projects<br />
Completed<br />
Funds<br />
Available (Rs. Expenditure<br />
In Lakhs )<br />
(Rs. In Lakhs )<br />
<strong>Angul</strong> 313 28 242.95 15<strong>7.</strong>62<br />
Banarpal 209 34 206.30 151.80<br />
Chhendipada 282 89 273.22 211.31<br />
Athamallik 196 26 239.19 152.51<br />
Kishorenagar 399 12 209.04 17<strong>7.</strong>12<br />
Pallahara 415 46 295.83 242.70<br />
Kaniha 304 120 231.72 18<strong>7.</strong>87<br />
Talcher 150 11 12<strong>7.</strong>26 100.67<br />
TOTAL 2268 366 1825.51 1381.60<br />
N.B: Administrative Expenditure by DPC Rs. 24.06 Lakhs for 2008-09.<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
195
NREGA <strong>2009</strong>-10<br />
During <strong>2009</strong>-10 no funds have been received from Govt.<br />
Sl<br />
No<br />
BLOCKWISE REGISTRATION OF HOUSE HOLDS AND ISSUE OF<br />
JOBCARDS UNDER NREGA <strong>2009</strong>-10 (UPTO SEPTEMBER’ <strong>2009</strong>)<br />
Name of The<br />
Block<br />
No of BPL<br />
House Hold<br />
(As Per 1997<br />
Census)<br />
No of House<br />
Holds<br />
(As Per 1997<br />
Census)<br />
House<br />
Hold<br />
Registered<br />
Till Date<br />
No<br />
Regisered<br />
On Line<br />
196<br />
No Job<br />
Card<br />
Issued<br />
1 <strong>Angul</strong> 19748 33870 25925 25925 25908<br />
2 Banrapal 18141 34311 20071 20071 20067<br />
3 Chhendipada 17380 33846 26414 26414 26414<br />
4 Athamallik 14205 23639 18598 18598 18595<br />
5 Kishorenaga 14301 22638 18985 18985 18974<br />
r<br />
6 Pallahara 17813 27328 21852 21852 21851<br />
7 Kaniha 12911 27524 22660 22660 22580<br />
8 Talcher 6109 20904 12048 12048 12048<br />
Total 120608 224060 166553 166553 166437<br />
Sl<br />
No<br />
BLOCK WISE EMPLOY MENT DEMANDED, OFFERED & PROVIDED<br />
UNDER NREGA <strong>2009</strong>-10 (UPTO SEPTEMBER’ <strong>2009</strong>)<br />
Name of the<br />
Block<br />
Households<br />
Applied For<br />
Employment<br />
Households<br />
Offered<br />
Employment<br />
Households Provided<br />
Employment<br />
1 <strong>Angul</strong> 2162 2162 2162<br />
2 Banrapal 1233 1233 1230<br />
3 Chhendipada 3338 3338 3338<br />
4 Athamallik 1991 1991 1991<br />
5 Kishorenagar 2244 2244 2244<br />
6 Pallahara 2818 2818 2743<br />
7 Kaniha 2828 2825 2763<br />
8 Talcher 851 851 851<br />
Total 17465 17462 17322<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com
BLOCKWISE PHYSICAL & FINANCIAL ACHIEVEMENT UNDER NREGA<br />
Name of<br />
The Block<br />
FOR<strong>2009</strong>-10 (UPTO SEPTEMBER’ <strong>2009</strong>)<br />
Project<br />
Taken Up<br />
Projects<br />
Completed<br />
Funds Available<br />
(Rs. in Lakhs )<br />
Expenditure<br />
197<br />
(Rs. in Lakhs )<br />
<strong>Angul</strong> 355 61 128.40 44.59<br />
Banarpal 239 41 79.92 44.82<br />
Chhendipada 403 132 176.19 104.56<br />
Athamallik 231 28 161.41 52.21<br />
Kishorenagar 472 102 133.56 54.36<br />
Pallahara 502 92 194.58 103.66<br />
Kaniha 360 202 200.21 92.65<br />
Talcher 176 17 50.34 25.31<br />
TOTAL 2738 675 1124.61 522.16<br />
Administrative Expenditure by DPC Rs. 3.41 Lakhs for <strong>2009</strong>-10.<br />
N.B. Line deptt has completed 31 farm ponds. ( ASCO, <strong>Angul</strong>)<br />
Name of the<br />
Projects<br />
OB as<br />
on<br />
1.4.09<br />
TFC 2008-09(UP TO SEPTEMBER ’<strong>2009</strong>)<br />
Funds<br />
Allotted<br />
( in<br />
Lakhs)<br />
Expenditure<br />
( in Lakhs)<br />
Project in number<br />
Taken<br />
up<br />
Completed Under<br />
progress<br />
Units Physical<br />
Achievement<br />
O & M cost<br />
of supply<br />
-- 248.79 200.78 25 25 0 No 25<br />
Sanitation -- 230.34 230.00 209 195 14 No 195<br />
Improvement<br />
of<br />
PS/GP/BT<br />
road<br />
Restoration<br />
of Block<br />
Office<br />
Building<br />
-- 281.73 140.00 13 4 9 Km 4.50<br />
k.m.<br />
-- 10.00 10.00 1 1 0 No 1<br />
Data base<br />
& account<br />
maintenance<br />
-- 6.16 6.16 0 0 0 - 0<br />
TOTAL -- 77<strong>7.</strong>02 586.94 248 225 23<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com
Sl<br />
No<br />
Name of the<br />
Projects<br />
TFC <strong>2009</strong>-10 (UP TO SEPTEMBER ’<strong>2009</strong>)<br />
OB as<br />
on<br />
1.4.09<br />
Funds<br />
Allotted<br />
( in<br />
Lakhs)<br />
Expenditure<br />
( in Lakhs)<br />
Project in number<br />
Taken<br />
up<br />
Completed Under<br />
progress<br />
O & M cost<br />
of supply<br />
-- 124.40 -- -- -- -- No<br />
Improvement<br />
of PS/GP/BT<br />
road<br />
-- 65.92 -- -- -- -- Km<br />
TOTAL 190.32 -- -- -- --<br />
Name of the<br />
Projects<br />
G.P. Ghar<br />
Building (2008-<br />
09)<br />
State finance Commission Award (up to September <strong>2009</strong>)<br />
Funds<br />
allotted<br />
(Rs. in<br />
Lakhs)<br />
Expenditure<br />
(Rs. in Lakhs)<br />
Projects<br />
Taken<br />
up<br />
Projects<br />
completed<br />
198<br />
Units Physical<br />
Achievement<br />
Projects<br />
under<br />
progress<br />
65.50 20.00 29 3 26<br />
G.P. Ghar<br />
Building (<strong>2009</strong>-<br />
10)<br />
30.00 0 -- -- -<br />
Linked<br />
incentives G.P.<br />
31.20 0 24 -- --<br />
Repair of Block<br />
staff Qtr.<br />
3.00 -- -- -- --<br />
G.P. Road 15.50 6 -- --<br />
GENERAL INFORMATION ON WATERSHED PROGRAMME<br />
UP TO SEPTEMBER, <strong>2009</strong><br />
Particulars IWDP-I,<br />
Chhendipada<br />
Block<br />
(Amount in lakhs. & Area in Hecters)<br />
IWDP-II,<br />
Pallahara<br />
Block<br />
99-2000 to<br />
IWDP-III,<br />
Athamallik<br />
Block<br />
05-06 to 09-<br />
IWDP-IV, Total<br />
Kishorenagar<br />
Block<br />
05-06 to 09-10 --<br />
1. Project Period 98-99 to<br />
2001-02 02-03 10<br />
2. Total<br />
6475.70 7472.58 6296.62 659<strong>7.</strong>62 26842.5<br />
Geographical<br />
Area<br />
2<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com
3. Total<br />
Treatable<br />
Area<br />
4. No of Microwatersheds<br />
5. Village<br />
Covered<br />
6. Total<br />
allocation/<br />
<strong>7.</strong><br />
8.<br />
Project cost<br />
Amount<br />
released by<br />
Govt. of<br />
India.<br />
Amount<br />
released by<br />
G.O.O.<br />
9. Total Amount<br />
released by<br />
GOI & GOO<br />
10. Amount<br />
released to<br />
P.I.A<br />
11. Amount<br />
released to<br />
W.Cs<br />
Total amount<br />
12. released to<br />
PIA & W.Cs<br />
13. Utilisation by<br />
P.I.A<br />
14. Utilisation by<br />
W.Cs<br />
15. Total<br />
utilization by<br />
PIA & W.Cs<br />
& DRDA<br />
16. U.C<br />
submitted to<br />
Govt.<br />
1<strong>7.</strong> Balance Fund<br />
at the end of<br />
the month<br />
18.<br />
Name of the<br />
P.I.A<br />
603<strong>7.</strong>50 7104.27 5000.00 5000.00<br />
9 nos 8 nos 10 nos 10 nos<br />
199<br />
23141.7<br />
7<br />
19 Nos 31 Nos 22 Nos 18 Nos 90<br />
241.50 284.17 300.00 300.00 1125.67<br />
240.16 222.28 206.25 206.25 874.94<br />
- - 18.75 11.25 30.00<br />
240.16 222.28 225.00 21<strong>7.</strong>50 904.94<br />
58.30 64.93 36.00 28.50 18<strong>7.</strong>73<br />
178.99 151.67 189.00 189.00 708.66<br />
23<strong>7.</strong>29 216.60 225.00 21<strong>7.</strong>50 896.39<br />
49.51 51.29 18.04 15.76 134.60<br />
189.55 149.03 121.94 94.39 554.90<br />
239.06 200.32<br />
37<br />
139.98 110.15 689.51<br />
226.61 201.40 11<strong>7.</strong>96 96.81 642.78<br />
1.10 21.96<br />
ASCO-cum-<br />
PIA,Chhendip<br />
ASCO-cum-<br />
PIA,Pallahara<br />
85.02 10<strong>7.</strong>35 215.43<br />
ASCO-cum-<br />
PIA,Athama<br />
JSCO-cum-<br />
PIA,Kishorenga<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com
ada llik r<br />
19. No of S.H.G<br />
formed<br />
63 77 138 129<br />
20. Members<br />
enrolled<br />
884 909 1474 1454<br />
21. Savings by<br />
SHG<br />
8.03 6.34 1<strong>7.</strong>84 15.81<br />
22. No of User<br />
Groups<br />
132 128 161 127<br />
23. User group<br />
Members<br />
3126 2200 1733 1682<br />
24. Area Treated 5985.39 5008.00 2332.90 1845.10<br />
25. WDF<br />
contribution<br />
26. SHG Linked<br />
with Bank<br />
2<strong>7.</strong> Installment<br />
received from<br />
GOI<br />
13.82 5.64 9.76 2.54<br />
38 58 110 124<br />
7 Nos 5 Nos 3 No 3 No<br />
IAY (NORMAL) 2008-09<br />
During 2008-09 , Rs.726.21 laks & Rs.242.01 lakhs have been received as Central &<br />
State share respectively against the physical target of 276<strong>7.</strong><br />
BLOCKWISE PHYSICAL & FINANCIAL ACHIEVEMENT UNDER IAY<br />
(NORMAL) FOR 2008-09 ( March’<strong>2009</strong> )<br />
Name of the Target Achievement Funds available<br />
Block<br />
(Rs. In Lakhs ) Expenditure<br />
(Rs. In Lakhs )<br />
<strong>Angul</strong> 433 187 159.55 143.45<br />
Banarpal 359 241 131.00 116.50<br />
Chhendipada 414 228 153.23 139.43<br />
Athamallik 365 236 136.83 11<strong>7.</strong>23<br />
Kishorenagar 298 108 106.58 9<strong>7.</strong>78<br />
Pallahara 396 209 144.71 129.91<br />
Kaniha 303 95 111.60 66.65<br />
Talacher 199 107 73.22 65.92<br />
TOTAL 2767 1411 1016.72 876.87<br />
ADDL.IAY (NORMAL) 2008-09<br />
Rs. 6<strong>7.</strong>77 lakhs has been received from Central Govt against the physical target of 516.<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
200<br />
407<br />
4721<br />
48.02<br />
548<br />
8741<br />
15171.3<br />
9<br />
31.76<br />
330<br />
18
BLOCKWISE PHYSICAL & FINANCIAL ACHIEVEMENT UNDER<br />
ADDL.IAY (NORMAL) FOR 2008-09 ( March’<strong>2009</strong> )<br />
Name of the Block<br />
Funds available<br />
Target Achievement (Rs. in Lakhs ) Expenditure<br />
(Rs. in Lakhs )<br />
<strong>Angul</strong> 5 0 0.72 0<br />
Banarpal 120 35 1<strong>7.</strong>38 16.20<br />
Chhendipada 18 2 2.61 2.50<br />
Athamallik 119 0 15.49 0<br />
Kishorenagar 160 23 23.17 21.65<br />
Pallahara 41 0 5.94 5.83<br />
Kaniha 48 0 1.74 0<br />
Talcher 5 0 0.72 0.72<br />
TOTAL 516 60 6<strong>7.</strong>77 46.90<br />
BLOCKWISE PHYSICAL & FINANCIAL ACHIEVEMENT UNDER IAY<br />
(NORMAL & E.S.P ) FOR <strong>2009</strong>-10 (SEPTEMBER ’<strong>2009</strong> )<br />
Name of the<br />
Block<br />
Physical target <strong>2009</strong>-10<br />
Work<br />
orders<br />
issued<br />
09-10<br />
Houses<br />
completed<br />
Funds<br />
Available (Rs.<br />
in Lakhs )<br />
201<br />
Expenditure<br />
(Rs. in Lakhs)<br />
spill Target Target<br />
over <strong>2009</strong>-10 Total<br />
<strong>Angul</strong> 286 597 883 414 46 100.722 2<strong>7.</strong>20<br />
Banarpal 170 502 672 370 58 73.650 34.05<br />
Chhendipada 228 579 807 375 43 82.023 32.30<br />
Athamallik 200 505 705 302 18 79.103 28.15<br />
Kishorenagar 212 421 633 352 42 58.406 31.75<br />
Pallahara 236 609 845 397 42 86.558 30.55<br />
Kaniha 244 444 688 302 17 9<strong>7.</strong>266 33.70<br />
Talcher 104 316 420 229 30 4<strong>7.</strong>522 25.30<br />
TOTAL 1680 3973 5653 2741 296 625.250 243.00<br />
ADDL.IAY (NORMAL) <strong>2009</strong>-10<br />
BLOCKWISE PHYSICAL & FINANCIAL ACHIEVEMENT UNDER<br />
ADDITIONAL IAY FOR <strong>2009</strong>-10 (SEPTEMBER’<strong>2009</strong>)<br />
Name of the<br />
Block<br />
Target Achievement Funds available<br />
(Rs. in Lakhs )<br />
Expenditure<br />
(Rs. in Lakhs)<br />
<strong>Angul</strong> 5 0 0.72 0.25<br />
Banarpal 85 14 1.18 1.30<br />
Chhendipada 16 14 0.11 11.60<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com
202<br />
Athamallik 119 16 15.49 11.20<br />
Kishorenagar 137 13 1.52 <strong>7.</strong>60<br />
Pallahara 41 9 0.14 2.00<br />
Kaniha 48 12 1.74 1.75<br />
Talacher 5 0 -0.03 0.40<br />
TOTAL 456 78 20.87 36.10<br />
(Source: DRDA, <strong>Angul</strong>)<br />
Name of the<br />
Block<br />
BLOCKWISE PHYSICAL & FINANCIAL ACHIEVEMENT UNDER<br />
MO KUDIA FOR 2008-09 ( March’<strong>2009</strong> )<br />
Target Achievement<br />
Funds available Expenditure<br />
(Rs. in Lakhs ) (Rs. in Lakhs)<br />
<strong>Angul</strong> 91 3 2<strong>7.</strong>5 11<br />
Banarpal 72 20 1<strong>7.</strong>4 <strong>7.</strong>5<br />
Chhendipada 87 12 2<strong>7.</strong>05 8.25<br />
Athamallik 77 10 26.2 6.1<br />
Kishorenagar 63 10 18.9 5.55<br />
Pallahara 84 1 25.85 10.45<br />
Kaniha 64 5 22.4 6.45<br />
Talacher 42 6 9.85 <strong>7.</strong>1<br />
TOTAL 580 67 175.2 62.4<br />
BLOCKWISE PHYSICAL & FINANCIAL ACHIEVEMENT UNDER<br />
MO KUDIA FOR 2008-09 (SEPTEMBER’<strong>2009</strong> )<br />
Name of the Target Achievement Funds available<br />
Block<br />
(Rs. in Lakhs ) Expenditure<br />
(Rs. in Lakhs)<br />
<strong>Angul</strong> 91 3 2<strong>7.</strong>50 11.00<br />
Banarpal 72 20 1<strong>7.</strong>40 <strong>7.</strong>50<br />
Chhendipada 87 12 2<strong>7.</strong>05 8.25<br />
Athamallik 77 10 26.20 6.10<br />
Kishorenagar 63 10 18.90 5.55<br />
Pallahara 84 1 25.85 10.45<br />
Kaniha 64 5 22.40 6.45<br />
Talacher 42 6 9.85 <strong>7.</strong>10<br />
TOTAL 580 67 175.15 62.40<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com
(Source: DRDA, <strong>Angul</strong>)<br />
ANNEXURE-5<br />
Progress of construction work by Police Housing Corporation in <strong>Angul</strong> District<br />
(as on 1-10-<strong>2009</strong>)<br />
Project<br />
Police Works<br />
Status<br />
<strong>Angul</strong> Reserve Office Completed<br />
DPO, <strong>Angul</strong> Completed<br />
Construction and fortification of D/A & accommodation for<br />
Special Security battalion, <strong>Angul</strong> Cancelled<br />
Work in<br />
4 E-types quarters at <strong>Angul</strong><br />
progress<br />
Work in<br />
Range Office at NCR talcher<br />
progress<br />
Painting work<br />
Boundary wall at PTC, <strong>Angul</strong><br />
in progress<br />
Construction of fortification, Chhendipada PS Layout given<br />
Foundation<br />
work<br />
Construction of fortification Handapa PS<br />
started<br />
Work not<br />
Construction of fortification Purunakot PS<br />
started<br />
Work not<br />
Construction of fortification Jarapada PS<br />
started<br />
roof casting<br />
Construction of fortification <strong>Angul</strong> PS<br />
completed<br />
Work in<br />
Construction of fortification Athmallik PS<br />
progress<br />
Work to be<br />
Construction of fortification Thakurgarh PS<br />
started soon<br />
Completed<br />
Construction of fortification KishorenagarPS<br />
upto lintel level<br />
Fire Service<br />
Chhendipada F.S. and 13 quarters<br />
Two unit F.S. at Kaniha<br />
4 E talcher F.S.<br />
8 F talcher F.S.<br />
Incomplete F.S. <strong>Angul</strong><br />
Project<br />
diverted to<br />
Tangi<br />
Work in<br />
progress<br />
Work in<br />
progress<br />
Work in<br />
progress<br />
Work in<br />
progress<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
203
7 quarters at Kaniha F.S.<br />
Prison Works<br />
Work order<br />
issued<br />
B/W upto lintel<br />
80 capacity additional ward for Special sub-jail, Talcher<br />
10 nos. septic latrine & sewerge tank at Special sub-jail,<br />
level<br />
Talcher Completed<br />
Extension of perimeter wall, Juvenile Jail, <strong>Angul</strong> Completed<br />
Improvement of sanitation & water supply, Special Sub-jail, Work in<br />
Talcher<br />
progress<br />
Finishing work<br />
in<br />
S/R to existing staf quarters at sub-jail, Pallahara<br />
progress<br />
Work in<br />
Repair and maintenance of jail building at sub-jail, Pallahara progress<br />
S/R to jail building, ward, kitchen & hospital, sub-jail, Talcher Completed<br />
Fortification & construction of watch tower, special sub-jail, Work in<br />
Talcher<br />
progress<br />
Sinking of one deep bore well with pumpset with pipe line from<br />
PH department of <strong>Angul</strong> jail<br />
Installation of one tube well inside the jail and provision of<br />
glaze<br />
tile to existing 11 nos of latrine with water supply for sub-jail,<br />
Pallahara<br />
Construction of 2 nos. of septic latrine, 5 nos. of urinal for male<br />
block, 2 nos. of urinal for female block, lavatory in<br />
administrative<br />
block with provision of glaze tile sanitary fittings to existing<br />
10 nos. of day latrine and 5 nos. night latrine of sub-jail,<br />
Athmallik<br />
(Source: Police Housing Corporation, Bhubaneswar)<br />
Work not<br />
started<br />
Work not<br />
started<br />
Work in<br />
progress<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
204
ANNEXURE-6<br />
Proceedings of the Consultation Meeting with Hon’ble MPs and MLAs<br />
on CDP <strong>2009</strong>-11<br />
Date: 14-9-09<br />
Venue: DRDA Building, <strong>Angul</strong><br />
205<br />
An exclusive consultation meeting with the hon’ble members of Parliament as well as of<br />
the state Legislative Assembly was organized so as to apprise them of the district<br />
<strong>plan</strong>ning process in <strong>Angul</strong> and also to seek their suggestions. The meeting was attended<br />
by Sri Khageswar Behera, Hon’ble MLA, Chhendipada; Sri Rajanikanta Singh, Hon’ble<br />
MLA, <strong>Angul</strong> and Sri Bhakta Dash, nominee of Sri Tathagata Satapathy, Hon’ble MP,<br />
Dhenkanal; Sri Biswabhushan Panda, PD, DRDA; and Sri Bikash Rath, TSI<br />
representative.<br />
The TSI representative apprised the House of the district <strong>plan</strong>ning process that was<br />
adopted in 2008-09 and shared copies of the resource envelope & gap identified for the<br />
<strong>Angul</strong> district through this process. He said that whereas the previous year’s <strong>plan</strong> was a<br />
consolidation of departmental <strong>plan</strong>s, this year attempt has been made for <strong>plan</strong>ning at GP-,<br />
Block-, and ZP level so that people’s <strong>plan</strong> can be incorporated. He shared the formats and<br />
booklet distributed for this purpose to various <strong>plan</strong>ning units.<br />
Sri Rath stressed on the important role of the Hon’ble MPs and MLAs in the district<br />
<strong>plan</strong>ning process, and said that whereas LSG(Local Self Government)-level <strong>plan</strong>ning<br />
units(GPs, Blocks, ZP, NAC/Municipality) are usually confined to <strong>plan</strong>ning at their<br />
respective rural or urban levels, the constituencies of MPs and MLAs comprise of both<br />
rural and urban areas, and also much larger in area that that of most of the LSGs. Further,<br />
he said, the Hon’ble MPs and MLAs can influence governments more effectively and<br />
directly, can effect policy changes, and can also help channelize more funding for the<br />
district development.<br />
Referring to the <strong>plan</strong>ning format adopted this year by the TSI, Sri Rath explained that the<br />
data expected through such formats could also suggest projects to be funded under<br />
MPLAD and/or MLALAD scheme.<br />
The Hon’ble MLAs expressed their concern over the fact that the Plan thus prepared is<br />
hardly implemented or funded by the government. They suggested that a stocktaking of<br />
the previous year’s Plan should be made so as to identify which of the unimplemented<br />
activities are to be continued this year. Sri Rath said that this has already been attempted<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com
and some of the departments have submitted their stocktaking reports whereas others are<br />
yet to submit the report.<br />
206<br />
As of the <strong>plan</strong>ning units, the Hon’ble MLAs raised the issue of development activities<br />
undertaken by the NGOs of the district and wanted to know if the NGO coordination<br />
meeting was being organized by the district administration. They expressed<br />
dissatisfaction over the lack of progress in this regard.<br />
The Hon’ble MLA, Chhendipada and Sri Bhakta Dash expressed concerns over the<br />
devastating impact of mining as seen in the Talcher area. The TSI representative<br />
explained them how the agricultural self-reliance and entrepreneurship of the district,<br />
particularly in the Chhendipada Block, is threatened by the proposed coal mining<br />
activities. The Hon’ble MLA, Chhendipada assured that he would see to it that mining is<br />
confined to otherwise unutilized and non-agricultural land.<br />
The Hon’ble MLA, <strong>Angul</strong> shared some of the problems faced in his constituency (like,<br />
the issue of Banaraj chicks supplied by the veterinary department). He also shared that an<br />
estimate of Rs.1.67 crores has been made under GGY scheme based on the requirement<br />
of the <strong>Angul</strong> Block.<br />
The TSI representatives thanked the Hon’ble MLAs as well as the nominee of the<br />
Hon’ble MP, Dhenkanal for taking part in such a dynamic discussion. He also requested<br />
them for necessary cooperation in the decentralized <strong>plan</strong>ning process, particularly in<br />
ensuring the implementation of the Plan approved by the DPC.<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com
ANNEXURE-7<br />
Proceedings of the Consultation Meeting with the Corporate Sector<br />
On<br />
District Planning: <strong>2009</strong>-11<br />
Date: 24-9-<strong>2009</strong><br />
Venue: Chamber of the Collector, <strong>Angul</strong><br />
207<br />
A consultation meeting on district <strong>plan</strong> in <strong>Angul</strong> for the year <strong>2009</strong>-11 was organized with<br />
the Corporate Sector at <strong>Angul</strong> on 24 th September <strong>2009</strong> at 6.30 p.m.. The meeting was<br />
chaired by the Collector & District Magistrate of <strong>Angul</strong> Sri Swami, IAS. Sri Biswa<br />
Bhushan Panda, PD, DRDA and Smt. Kanaklata Dei, District Planning Officer were<br />
present in this meeting. Representatives of various industrial and mining companies like<br />
TTPS, Talcher; NTPC, Talcher; Monnet Steel; Tata Sponge; Essar Steel; Jindal Steel &<br />
Power; Bhushan Steels; Jindal India Thermal Power Ltd; and Mahanadi Iorn Ltd.<br />
attended this consultation and Sri Bikash Rath represented the TSI for <strong>Angul</strong> district.<br />
Sri Rath welcomed the participants and explained the objective of this meeting. He said<br />
that whereas the industry and the mining sector seems to be the lead sector for <strong>Angul</strong><br />
district working as the growth engine for development, the question of sustainable<br />
development however makes this apparent status questionable as after 50 years or 100<br />
years, when the district’s raw materials are exhausted, this industrial growth would be<br />
stopped. Hence, we must think of a long-term sustainable development that would not<br />
leave the district in a helpless situation after a century or so, he said. He further<br />
elaborated that the cost at which the present industrial development is being achieved is a<br />
matter of concern since valuable agricultural land and forests are being consumed for this<br />
purpose, threatening the agricultural self-reliance and environment of the district. He<br />
therefore urged the corporate sector to contribute towards a sustainable development of<br />
the district with minimum damage to the environment, and also to participate in the<br />
district <strong>plan</strong>ning process by sharing some responsibilities particularly where resource<br />
gaps are significant.<br />
In response, Sri D.P.Singh, AVP and Ms.Harmeet, CSR Head, from Monnet Ispat &<br />
Energy Ltd informed the House that their company was keen and committed towards<br />
CSR, and hence a ‘lot of work’ had been done in that direction. However, Ms. Harmeet<br />
said, they need proper guidance, technical support, and adequate data(regarding areaspecific<br />
requirement) so that their interventions can be more widespread and beneficial<br />
for the district.<br />
Sri Pratyush Panda, AGM(CSR), Jindal India Thermal Power Ltd. expressed his interest<br />
in matter with a critical remark that so far the corporate sector has been asked to<br />
contribute for the development of infrastructure, etc., but not for natural resource<br />
management or development. Representatives from NTPC also supported this by saying<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com
208<br />
that whereas activities to be taken up under CSR are decided in the RPDAC meeting, the<br />
PSUs have never been urged in the RPDAC meeting for investment on agriculture<br />
development or improvement of livestock. They wanted that clear-cut actionable points<br />
should come up for CSR, and said that whereas about 70% of the activities suggested<br />
under CSR are for infrastructure development, what also needs to be focused is skill<br />
development and entrepreneurship development, etc..<br />
The representative of Jindal Steel and Power Limited(JSPL) wanted to clarify that<br />
whereas CSR is not mandatory particularly for upcoming/new industries, JSPL has tried<br />
to make adequate interventions under CSR. Responding to the statement made by the TSI<br />
representative that prime agricultural and/or forest land is being consumed by<br />
industrialization and mining, he said that most of the land acquired by his company was<br />
barren land. He further said that while the corporate sector was ready to contribute under<br />
CSR, there should also be an effective monitoring & evaluation system for this.<br />
The representative of Tata Sponge Iron Ltd. submitted to the House that since sustainable<br />
livelihood of the displaced people is a matter of concern, given the fact that they usually<br />
tend to exhaust the compensation money after some years without making any<br />
arrangement for a sustainable income, the compensation package should from the<br />
beginning focus on this and a part of the money meant for compensation should rather be<br />
spent by the company to ensure that the affected person gets a sustainable source of<br />
livelihood. Sri Bikash Rath welcomed this suggestion very much, and showing how the<br />
format currently in use by the TSI would help identify areas where the corporate sector<br />
can contribute better, he suggested the district administration to make necessary follow<br />
up so that the interest of the corporate sector to be a development partner for this district<br />
can be well-utilized.<br />
The Collector, <strong>Angul</strong> remarked that as per the 74 th amendment, the District Planning<br />
Committee approves a district <strong>plan</strong> that prioritizes the needs. He said that the corporate<br />
sector can be very useful in the following ways:<br />
1. Gap filling through financial resources<br />
2. Gap filling through skilled/technical human resource<br />
3. Innovative schemes<br />
He further said that environment is very important, and the corporate sector should be<br />
committed towards conservation of environment. Giving examples of where CSR<br />
activities may be taken up, he mentioned watershed projects where there is a shortage of<br />
funds for maintenance, training, and ward & watch activities; and CSR investment may<br />
help in this context. He also stressed on periphery development in interior and backward<br />
areas so that people can’t be motivated by the insurgents. Moreover, he assured that the<br />
district administration would soon organize special workshops for the corporate sector so<br />
as to get them acquainted of various development schemes and the possible areas of CSR<br />
investments.<br />
The meeting ended with a vote of thanks.<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com
ANNEXURE-8<br />
GP-level wish-list generated through participatory <strong>plan</strong>ning process:<strong>2009</strong>-10<br />
BUILDINGS<br />
Block GP Proposed work Estimated cost<br />
in rupees<br />
Kishore Nagar Ambapal Community hall 5 lakh<br />
Kishore Nagar Jharabereni Community hall 5 lakh<br />
Kishore Nagar Raniakata Community hall construction 15 lakh<br />
209<br />
Kishore Nagar Raniakata G.P stadium 10 lakh<br />
Kishore Nagar Oskapali Community centre 0.5 lakh<br />
Kishore Nagar Joyrat Karamlakata common room 0.25 lakh<br />
Kishore Nagar Joyrat Gunduridadal common room 0.25 lakh<br />
Kishore Nagar Joyrat Joyrat balisahi common room 0.5 lakh<br />
Kishore Nagar Joyrat Joyrat meeting hall 0.5 lakh<br />
Kishore Nagar Urukula Community hall 10 lakh<br />
Kishore Nagar Dhadarpal Kendranali hat pada shop house construction 20 lakh<br />
Kishore Nagar Dhadarpal Dhadarpal Kalyan Mandap/ Marriage,<br />
Brataghar<br />
50 lakh<br />
Kishore Nagar Bileinali VAW house 2 lakh<br />
Kishore Nagar Bileinali Common Room ( Bhejigoth,Garuda,<br />
Bileinali, Rangamatia sahi)<br />
12 lakh<br />
Kishore Nagar Gaon Bainda Solanda club house 5 Lakh<br />
Kishore Nagar Nunukapasi Cultivation house construction 20 lakh<br />
Kishore Nagar Nunukapasi Bus stand Market complex/ market 50 lakh<br />
Kishore Nagar Nunukapasi Community hall 50 lakh<br />
Kishore Nagar Sanjamura GP boundary wall 5 lakh<br />
Kaniha Burukuna GP Building 6 lakh<br />
Kaniha Arakil VLW centre 2 lakh<br />
Kaniha Balipashi G.P. House 6 lakh<br />
Kaniha Kaniha G.P. building & drinking water 10 lakh<br />
Kaniha Samal Market complex 5 lakh<br />
Kaniha Gandamala VLW centre 3 lakh<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com
Kaniha Parabila Silan Tala sahi Community hall 2 lakh<br />
Kaniha Hariharpur Market complex 10 lakh<br />
Talcher Tentulei G.P.Building development 20 lakh<br />
Talcher Dharampur Canal to school road 5 lakh<br />
Chhendipada Ogi Matha construction 50 lakh<br />
Chhendipada Patakumunda G.P. office building construction 10 lakh<br />
Chhendipada Katada G.P.Office building construction 2 lakh<br />
Chhendipada Raijharan Raijharan market construction 10 lakh<br />
Chhendipada Barapada G.P.office building 5 lakh<br />
Chhendipada Koshala G.P.office construction 10 lakh<br />
Chhendipada Kukurpetta GP office requirement<br />
Chhendipada Tangiri G.P.office building 6 lakh<br />
<strong>Angul</strong> Talagarh G.P.office 20 lakh<br />
<strong>Angul</strong> Bantala G.P. office 50 lakh<br />
<strong>Angul</strong> Balanga Market (Haata) 5 crore<br />
<strong>Angul</strong> Balanga Market complex 50 lakh<br />
<strong>Angul</strong> Tainsi GP Office building construction 5 lakh<br />
<strong>Angul</strong> Antulia GP Office construction 7 lakh<br />
<strong>Angul</strong> Gadataras G.P. development 50 lakh<br />
<strong>Angul</strong> Angarbandha Market complex 20 lakh<br />
<strong>Angul</strong> Balasinha G.P. office developemnt 50 lakh<br />
<strong>Angul</strong> Kangulabentapur GP development 60 lakh<br />
<strong>Angul</strong> Khinda GP. Office developemnt 50 lakh<br />
210<br />
Baanrapal Kanjara Indira Abash Building 50 Lakh<br />
Baanrapal Gotamara Indira Abash Building 30 Lakh<br />
Banarpal Budhapanka Boundary of Budhapanka UP School & GP 50 lakh<br />
Baanrapal Bauligada Market complex 1 Crore<br />
Athamallik Luhasinga Luhasinga market complex building 3 Lakh<br />
(complete 5nos)<br />
Athamallik Krutibaspur Jamabahala block devlopment centre 4 Lakh<br />
Athamallik Krutibaspur Jarapada Cattli market complex 20 Lakh<br />
Athamallik Purunamanahi Panchayat building 5 Lakh<br />
Pallahara Khemla Construction of fence(protection from<br />
elephant)<br />
40 lakh<br />
Pallahara Rajdang Construction of fence(protection from 30 Lakh<br />
elephant)<br />
Pallahara Munduribeda Construiction of house at Munduribeda<br />
nuasahi<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
500,000.00
211<br />
Pallahara Munduribeda Colonysahi Khulamunda 50,000.00<br />
Pallahara Injidi GP Office construction 5 lakh<br />
Pallahara Badasada Trench & stone wall construction 1 Crore<br />
Pallahara Sankhamur Trench & stone wall construction 1 Crore<br />
ROADS<br />
Block GP Proposed work Estimated<br />
cost in<br />
rupees<br />
Kishorenagar Jamunali Road construction for 9 revenue village 50 lakh<br />
Kishore<br />
Nagar<br />
Kishore<br />
Nagar<br />
Kishore<br />
Nagar<br />
Kishore<br />
Nagar<br />
Kishore<br />
Nagar<br />
Kishore<br />
Nagar<br />
Kishore<br />
Nagar<br />
Kishore<br />
Nagar<br />
Kishore<br />
Nagar<br />
Kishore<br />
Nagar<br />
Kishore<br />
Nagar<br />
Kishore<br />
Nagar<br />
Kishore<br />
Nagar<br />
Kishore<br />
Nagar<br />
Kishore<br />
Nagar<br />
Kishore<br />
Nagar<br />
Ambapal Susab road development 3 lakh<br />
Ambapal Champapur road development 3 lakh<br />
Ambapal Brundabanpur road 10 lakh<br />
Jharabereni Road development 10 lakh<br />
Jharabereni Road development 5 lakh<br />
Raniakata Road & communication 2 crore<br />
Angapada Jientanali to Katada road construction 15 lakh<br />
Kanteikulia Banibahal to forest road 50 lakh<br />
Kanteikulia Anlaberuni to Charikhaman 50 lakh<br />
Kanteikulia Baliamba to Anlaberuni 50 lakh<br />
Kanteikulia Baliamba to Rajanpal 50 lakh<br />
Oskapali PMGSY road 1 crore<br />
Oskapali PMGSY road 5 crore<br />
Oskapali Karakamalkata to Talpadar via Kukudabahal 5 crore<br />
Joyrat Brahmanipali Kudasahi road 5 lakh<br />
Bileinali Bileinali to Gadeimunda road via Badabahal<br />
Satkeredia<br />
1.5 crore<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com
Kishore<br />
Nagar<br />
Kishore<br />
Nagar<br />
Kishore<br />
Nagar<br />
Kishore<br />
Nagar<br />
Kishore<br />
Nagar<br />
Kishore<br />
Nagar<br />
Kishore<br />
Nagar<br />
Kishore<br />
Nagar<br />
Kishore<br />
Nagar<br />
Kishore<br />
Nagar<br />
Kishore<br />
Nagar<br />
Kishore<br />
Nagar<br />
Kishore<br />
Nagar<br />
Kishore<br />
Nagar<br />
Kishore<br />
Nagar<br />
Kishore<br />
Nagar<br />
Kishore<br />
Nagar<br />
Kishore<br />
Nagar<br />
Kishore<br />
Nagar<br />
Kishore<br />
Nagar<br />
Kishore<br />
Nagar<br />
Kishore<br />
Nagar<br />
Kishore<br />
Nagar<br />
Kishore<br />
Nagar<br />
Bileinali Bileinali to Jamujhari road via Badgovindpur 2 crore<br />
Bileinali Badgovindpur to Mandirbahal road 1 crore<br />
Bileinali Bileinali to Papasara road via Bhejigoth 1 crore<br />
Bileinali Bhejigoth to Deberapali highway 5 crore<br />
Bileinali Garuda to Jarapada 5 crore<br />
Bileinali Dhauragoth to Damadarpur road 1 crore<br />
Gaon Bainda Solanda to Gaon Bainda road 10 lakh<br />
Gaon Bainda Gaon Bainda to Badahula Shiv mandir road 8 lakh<br />
Gaon Bainda Dhundibatakhol to Badahula Shiv Mandir 6 lakh<br />
Gaon Bainda Badahula to Talabahali Mati rasta 7 lakh<br />
Nunukapasi Road 1 crore<br />
Handapa Banganali to Papanara via Arjundhara 1 crore<br />
Handapa Handapa to Kholaregada via Jogipathar 1 crore<br />
Handapa Handapa to Bidisingi via Lohamunda 50 lakh<br />
Handapa Gundurimunda to Baninali Kisan sahi via<br />
Baninali<br />
50 lakh<br />
Himitira Road & communicaiton 10 lakh<br />
Himitira communicaiton 10 lakh<br />
Himitira Road & communicaiton 30 lakh<br />
Himitira Ghosar to Sandhapal road via Sugamal sahi 10 lakh<br />
Himitira Himitira to Sandhapal concretre road 10 lakh<br />
Kataranga Krushnapur to Pagabandha road 1 crore<br />
Kadalimunda New road construction 50 lakh<br />
Bamur Road & communication 10 lakh<br />
Sanjamura Sanjamura to Himitia road 10 lakh<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
212
Kishore<br />
Nagar<br />
Sanjamura Sanjamura to Gambarimulia road 10 lakh<br />
Kishore<br />
Nagar<br />
Sanjamura Bankapalasha to Himitira road 10 lakh<br />
Kaniha Hanumanpur Road construction 30 Lakh<br />
Kaniha Hanumanpur Road construction 20 lakh<br />
Kaniha Hanumanpur Road construction 50 lakh<br />
Kaniha Hanumanpur Road construction 10 lakh<br />
Kaniha Hanumanpur Road construction 20 lakh<br />
Kaniha Hanumanpur Road construction 15 lakh<br />
Kaniha Badagunduri Concrete roal to all village 5 crore<br />
Kaniha Badagunduri Main road & bridge 4 crore<br />
Kaniha Shusuba Podagarh Gengutia Road 1 crore<br />
Kaniha Shusuba Susuba Kundapasi Road 20 lakh<br />
Kaniha Shusuba Valiabeda Kusumpal Road 8 lakh<br />
Kaniha Shusuba Gengutia Duarabandh Road 10 lakh<br />
Kaniha Shusuba Potagarh Concrete Road 5 lakh<br />
Kaniha Talapada Road 80 lakh<br />
Kaniha Talapada Road 80 lakh<br />
Kaniha Talapada Road 80 lakh<br />
Kaniha Talapada Road 80 lakh<br />
Kaniha Jarada Gundurinali Road 8 lakh<br />
Kaniha Jarada Road from Jarada to Telisinga 10 lakh<br />
Kaniha Jarada Road from Jarada to Jamania 10 lakh<br />
Kaniha Kuluma Olala to Rameswar temple road 2 km 25 lakh<br />
Kaniha Kuluma Kuluma to Nila field road 3 km 25 lakh<br />
Kaniha Kuluma Khindo concrete road 1.5 km 25 lakh<br />
Kaniha Karnapal Kodasahi morum road 10 lakh<br />
Kaniha Karnapal Shipur to Sharadhapur morum road 10 lakh<br />
Kaniha Karnapal NH-23 to Karnapal pichu road 10 lakh<br />
Kaniha Karnapal Kusumpal RD to high school morum road 10 lakh<br />
Kaniha Karnapal NH-23 to Kodasahi morum road 10 lakh<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
213
Kaniha Parabila Parabil Jharianali road 10 lakh<br />
Kaniha Rengali Road & communication 2 crore<br />
Kaniha Bajrakot Road & communication 3 crore<br />
Kaniha Kamarei Road & communication 3 crore<br />
Talcher Ghantapada Road & communication 5 crore<br />
Talcher Gobara Road development 50 lakh<br />
Talcher Tentulei Road & communicaiton 5 crore<br />
Talcher Bantol Concrete road construction 25 lakh<br />
Talcher Brajnathpur Arakhapal to kanteikolia road construction 50 lakh<br />
Talcher Gopal prasad Gopalprasad Salbani to Bhalugadia road<br />
Talcher Gopal prasad Gopalprasad to Kusumpal road<br />
Talcher Gopal prasad Road from Gopalprasad Batikapur via<br />
Banbaspur<br />
Talcher Danara Danara to Kandhabereni Road 90 lakh<br />
Talcher Kalamchhuin Solda to Kalabereni 1 crore<br />
Talcher Kalamchhuin Road construction. 25 lakh<br />
Talcher Kankili Kankil Baunsagadia Danda road construction 10 lakh<br />
Talcher Kankili Nuasahi munda road construction 10 lakh<br />
Talcher Dharampur Khaithapal to Gopalsahi road 4 lakh<br />
Talcher Dharampur 5 lakh<br />
Talcher Dharampur Ramchandrapur to Pramodprasad 5 lakh<br />
Talcher Dharampur Skatlandpur to Harijansahi road 4 lakh<br />
Talcher Dera Dera to Hensamal Road construction 1 crore<br />
Talcher Santhapara Santhapada village road development 10 lakh<br />
Talcher Santhapara Nuapada temple road 5 lakh<br />
Talcher Santhapara Tulukumuni Road 5 lakh<br />
Talcher Santhapara Basanali to Brahamni Road 6 lakh<br />
Chhendipada Chhendipada Road & communication 29.97<br />
crore<br />
Chhendipada Bagadia Road & communication 75 lakh<br />
Chhendipada Jarapada Road & Communication 30 lakh<br />
Chhendipada Paranga Road 3 crore<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
214
Chhendipada Balipata Road & communicaiton 80 Lakh<br />
Chhendipada Jeranga Dehuri<br />
sahi<br />
Road construction 50 lakh<br />
Chhendipada Kankarei Road & communication 15 lakh<br />
Chhendipada Dhukuda Road & communication 50 lakh<br />
Chhendipada Ogi Road connection 1 crore<br />
Chhendipada Patakumunda PMGSY Road 20 lakh<br />
Chhendipada Natada Road 50 lakh<br />
Chhendipada Natada Road 65 lakh<br />
Chhendipada Nisha Concrete road from Balichandrapur to PWD<br />
Road<br />
8 lakh<br />
Chhendipada Nisha Concrete road from Puriabahal to PWD Road 5 lakh<br />
Chhendipada Korada Communication 20 lakh<br />
Chhendipada Kampasala Road 3 crore<br />
Chhendipada Para Para to Ogi road / bridge construction 1 crore<br />
Chhendipada Brahmanabil Road 50 lakh<br />
Chhendipada Brahmanabil Road 50 lakh<br />
Chhendipada Katada Road 3 lakh<br />
Chhendipada Machhakuta Communication 10 lakh<br />
Chhendipada Chhendipada Communicaiton 15 lakh<br />
Chhendipada Raijharan Raijharan village concrete road 20 lakh<br />
Chhendipada Raijharan Podasahi concrete road 20 lakh<br />
Chhendipada Raijharan Raijharan to dhobania road 70 lakh<br />
Chhendipada Raijharan Raijharan to Kamarsahi 20 lakh<br />
Chhendipada Tentulai<br />
Kodasahi<br />
Road (CC Road) 25 lakh<br />
Chhendipada Kushakila Dhubanali to Kushakial road 10 lakh<br />
Chhendipada Kushakila Kushanila to Naipadar road 1 crore<br />
Chhendipada Kushakila San Kushakila to Kushakila 3 lakh<br />
Chhendipada Patrapada Patrapada village concrete road 20 lakh<br />
Chhendipada Patrapada Pipalbahal village concrete road 20 lakh<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
215
Chhendipada Patrapada Gadamandal to Khairbereni road 1 crore<br />
Chhendipada Patrapada Pipalbahal to Patrapada road 2 crore<br />
Chhendipada Barapada Gopinathpur to Nandi chhod Road 1 crore<br />
Chhendipada Barapada Barapada to kushakila road 10 lakh<br />
Chhendipada Barapada Barapada to chakundapal 50 lakh<br />
Chhendipada Koshala 5 lakh<br />
Chhendipada Koshala 5 lakh<br />
Chhendipada Koshala 5 lakh<br />
Chhendipada Koshala 5 lakh<br />
Chhendipada Kukurpetta Concrete road between basti<br />
Chhendipada Barasahi Barasahi to Raipal road 50 lakh<br />
Chhendipada Barasahi Dasarasahi to Baramaliha road 1 crore<br />
Chhendipada Barasahi Khamar to Bamanali road 15 lakh<br />
Chhendipada Durgapur communicaiton 75 lakh<br />
<strong>Angul</strong> Talagarh Road & communicaiton 7 Crore<br />
<strong>Angul</strong> Bantala Road & communication 1 crore<br />
<strong>Angul</strong> Balanga communicaiton 2 crore<br />
<strong>Angul</strong> Balanga road. 25 lakh<br />
<strong>Angul</strong> Balanga road. 15 lakh<br />
<strong>Angul</strong> Balanga road. 1 crore<br />
<strong>Angul</strong> Badakera Baradabandi to Champatimunda 5 lakh<br />
<strong>Angul</strong> Badakera Deulagath Tuguni 15 lakh<br />
<strong>Angul</strong> Badakera Badakera GP road for all villages 1 crore<br />
<strong>Angul</strong> Tainsi Village road dvelopment 3 no 15 lakh<br />
<strong>Angul</strong> Badakantakul Nuanola vill to GP Office 5 lakh<br />
<strong>Angul</strong> Badakantakul Badakantakul to jkl 2 lakh<br />
<strong>Angul</strong> Badakantakul Badakantakul to Batasara 10 lakh<br />
<strong>Angul</strong> Badakantakul Jaguliabandh Talasarak 2 lakh<br />
<strong>Angul</strong> Badakantakul Talakerana to kantanila road 3 lakh<br />
<strong>Angul</strong> Antulia Village road 5 nos 20 lakh<br />
<strong>Angul</strong> Shankhapur Road construction 10lakh<br />
<strong>Angul</strong> Baluakata Road, 70 lakh<br />
<strong>Angul</strong> kumurisinga Communication 30 lakh<br />
<strong>Angul</strong> Khalari Communication 50 lakh<br />
<strong>Angul</strong> Sharadhapur Pathargarh, balijor, sharadhapur to<br />
Purunagarh Road<br />
3.5 Crore<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
216
<strong>Angul</strong> Sharadhapur Sharadhapur, Manikjodi via Gadeimukta 10 lakh<br />
<strong>Angul</strong> Gadataras Road/ communication 5 crore<br />
<strong>Angul</strong> Purunakote Purunakote road 1 lakh<br />
<strong>Angul</strong> Purunakote P.Kore to Salar 0.5 lakh<br />
<strong>Angul</strong> Dhokata Dhokata to Govindpur road 5 lakh<br />
<strong>Angul</strong> Tikarpada Tikarpada to Kataraga 15 lakh<br />
<strong>Angul</strong> Tikarpada Majhipal road 15 lakh<br />
<strong>Angul</strong> Tikarpada Hatiberi road 20 lakh<br />
<strong>Angul</strong> Jagannathpur Communication 50 lakh<br />
<strong>Angul</strong> Angarbandha road 1 crore<br />
<strong>Angul</strong> Angarbandha road 15 lakh<br />
<strong>Angul</strong> Angarbandha road 10 lakh<br />
<strong>Angul</strong> Angarbandha road 5 lakh<br />
<strong>Angul</strong> Pokatunga Dhipsahi tal area road 5 lakh<br />
<strong>Angul</strong> Pokatunga Dhipsahi uper area road 5 lakh<br />
<strong>Angul</strong> Chheliapada Chheliapada hadisahi to chheliapada village<br />
road, (Temple road)<br />
5 lakh<br />
<strong>Angul</strong> Chheliapada Chheliapada Temple to Nuagaon Parapasi 5 lakh<br />
road<br />
<strong>Angul</strong> Chheliapada Village road construction 5 lakh<br />
<strong>Angul</strong> Inkarabandh concrete road construction 5 lakh<br />
<strong>Angul</strong> Balasinha Road & communication 4 crore<br />
<strong>Angul</strong> Kangulabentapur Road & communication 10 crore<br />
<strong>Angul</strong> Kothabhuin Kothabhuin via Dalasihan Kumuri road 15 lakh<br />
<strong>Angul</strong> Khinda Road & acommunication 5 Crore<br />
<strong>Angul</strong> Bedasasan Bedasasan to chatiagaji 20 lakh<br />
<strong>Angul</strong> Bedasasan Hamamira to Kantagala 20 lakh<br />
<strong>Angul</strong> Bedasasan Hamabara to Kansara 15 lakh<br />
<strong>Angul</strong> Bedasasan Hamamira village road 10 lakh<br />
<strong>Angul</strong> Bedasasan Bedasasan village road 10 lakh<br />
<strong>Angul</strong> Bedasasan Govindpur village road 5 lakh<br />
<strong>Angul</strong> Bedasasan Chatiagaji village road 5 lakh<br />
<strong>Angul</strong> Bedasasan Gohirapasi village road 5 lakh<br />
<strong>Angul</strong> Basala PWD Road to Pandapirasa adia ghai 25 lakh<br />
<strong>Angul</strong> Basala Basala GP office to PWD road, mundadhip 20 lakh<br />
<strong>Angul</strong> Basala Basala to Kusakana 30 lakh<br />
<strong>Angul</strong> Basala Mundadhip to Panabhaia jharana nali 15 lakh<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
217
<strong>Angul</strong> Basala Asandhi to Inkarbandh in Basala 20 lakh<br />
<strong>Angul</strong> Kumanda road construction 50 lakh<br />
<strong>Angul</strong> Sanatarapur Road Construction 20 lakh<br />
Banarpal Mahidharpur communication 90 lakh<br />
Banarpal Kukudanga Communication 86 lakh<br />
Banarpal Banda Road/ communication 30 lakh<br />
Banarpal Tube Road & communication 30 lakh<br />
Banarpal Talamul communicaiton 2.75 lakh<br />
Banarpal Karadagadia Communication 1.75 lakh<br />
Banarpal Jarasingha Road cosntruction 50 lakh<br />
Banarpal Gadasantri Road & communication 2 crore<br />
Banarpal Tulasipal Road construction 25 lakh<br />
Banarpal Bhogabereni Road construction 20 lakh<br />
Banarpal Badakerajang Communication 30 lakh<br />
Banarpal San Kerajang Road construction 30 lakh<br />
Baanrapal Sakosingha Construction of road 1 Crore<br />
Baanrapal Nuahata Transportation & communication 50 Lakh<br />
Baanrapal Kanjara N.R.E.G.S (Orissa) 50 Lakh<br />
Baanrapal Gotamara N.R.E.G.S (Orissa) 50 Lakh<br />
Baanrapal Bauligada Road construction & repairing 3 Crore<br />
Baanrapal Bauligada Road construction & repairing 80 Lakh<br />
Baanrapal Fulagada Transportation & Communication 3 Crore<br />
Baanrapal Fulagada Transportation 80 Lakh<br />
Banarapal Balaram Prasad Communication 50 lakh<br />
Banarpal Budhapanka Road construction 1 crore<br />
Banarapal Kurudol Communication 50 lakh<br />
Athamallik<br />
Athamallik<br />
Athamallik<br />
Athamallik<br />
Kiakata Construction of road 1 Crore<br />
Kampala Construction of road from G.P office to<br />
Belapungi Mattha<br />
Kampala Devlopment of road work from Lunihandi<br />
village U.P School to Kampala G.P<br />
Kampala Devlopment of connection road from<br />
Kampala village to Duduma<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
218
Kampala Road from Ranjana village to Madhapur<br />
Athamallik<br />
PMGSY road<br />
From Basudevpur to Mundapada Mental &<br />
Athamallik Basudevpur Moram road<br />
From Santipur to Bhagabanpur Mental &<br />
10 Lakh<br />
Athamallik Basudevpur Moram road 8 Lakh<br />
Athamallik Communication<br />
Athamallik Thakurgad From Alekhpur to Amasama road 5 Lakh<br />
Athamallik Thakurgad Cherakhandi road Construction 5 Lakh<br />
Athamallik Luhasinga Luhasinga - Mahanadi ghat road devlopment<br />
Devlopment of Tentulipadar Dolamundi<br />
10 Lakh<br />
Athamallik Luhasinga river ghat road<br />
Devlopment of Kusuma Kuhuri to<br />
5 Lakh<br />
Athamallik Luhasinga Ranipakhala road<br />
Devlopment of pataka Ranamunda road<br />
5 Lakh<br />
Athamallik Luhasinga<br />
10 Lakh<br />
Athamallik Luhasinga Pataka Mahanadi ghat road 5 Lakh<br />
Athamallik Sanahulla From Mindola tini chhaka Dakunda road<br />
Pacca road from Mandarbahala High School<br />
10 Lakh<br />
Athamallik Kurumtap square till Beleinali<br />
PMGSY to Gundurikhali through Similia to<br />
2 Crore<br />
Athamallik Kurumtap the conection of P.W.D road<br />
From Gundurikhali via-Barapada through<br />
50 Lakh<br />
Athamallik Kurumtap PMGSY road<br />
From Mandar Bahal to Sanahulla P.W.D<br />
1 Crore<br />
Athamallik Kurumtap road via Dasodar 2 Crore<br />
Athamallik Kurumtap From Kurumtap to Sanahulla via-Balipata 1 Crore<br />
Athamallik Lunahandi Conection of road 35 Lakh<br />
Athamallik Aida P.M.G.S.Y 5 Crore<br />
Athamallik Kantapada Costruction of constant pacca road 12 Lakh<br />
Athamallik Paikasahi Communication 1 Crore<br />
Road connection 20 lakh<br />
Athamallik Maimura<br />
N.R.E.G.A.S 40% Through labour & 60%<br />
/year<br />
Athamallik Maimura material 25 lakh<br />
Athamallik Sapaghara Communication<br />
Road from Khuapada to Bhandarimunda<br />
1 Crore<br />
Athamallik Tusar<br />
square<br />
Athamallik Tusar From Tarata to Tushar<br />
Athamallik Tusar From Bela Taila to Tasharabeda<br />
Athamallik Tusar Vedadiha to Bajpur square<br />
Athamallik Tusar From Bijamaliha to Bajpur square<br />
Athamallik Tusar From Vandarimunda to Jhadangamala<br />
Athamallik Tusar Tipamunda to Orada<br />
Athamallik Tusar From Bhojpur to Sidheswarpur main road<br />
Athamallik Tusar Through Banapura,Kishorepur Orada road<br />
Athamallik Tusar Bahalabeda to Bhagabanpur road<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
219
Athamallik Tusar Belataila to main road<br />
Athamallik Jamudoli Concrete road construction for each village 12 Lakh<br />
Athamallik Kudagaon Communication 10 Lakh<br />
Athamallik Pedipathara Road from Jharabainda toJhillimunda 20 lakh<br />
Athamallik Pedipathara Road from Jharabainda to Jangahari 20 lakh<br />
Athamallik Pedipathara PMGSY road - Badadadar to Nuhurapada 60 lakh<br />
Athamallik Pedipathara Road from Barahma to Jerengia 60 lakh<br />
Pallahara Chasagurujang Road connected to all wards<br />
Pallahara Seegarh Chin to Kulipal 9.95 lakh<br />
Pallahara Seegarh Seegarh river road 6 lakh<br />
Pallahara Seegarh kulipal road 1.6 lakh<br />
Pallahara Iswarnagar Road connected to all wards<br />
Pallahara Parachhat Road construction<br />
Pallahara Bandhabhuin Road construction 3 crore<br />
Pallahara Jharabeda Road 50 lakh<br />
Pallahara Pechamundi Road 2 crores<br />
Pallahara Nagira Road 10 Crores<br />
Pallahara Nagira Road 10 lakhs<br />
Pallahara Khemala Road from Rohila to Khantapasi 10 lakh<br />
Pallahara Khemala Road from Barakotia to Gopinathpur 20 lakh<br />
Pallahara Khemala NH 23 to sukhdevpur 10 lakh<br />
Pallahara Khemala Rengalamunda to Bandhakali 10 lakh<br />
Pallahara Allori Construction of Road 1 Crore<br />
Pallahara Allori Village road construction 50 lakh<br />
Pallahara Khamar Bhagarathipur Road construction 10 lakh<br />
Pallahara Khamar Construction of Road 10 lakh<br />
Pallahara Khamar Construction of Concrete road 7 lakh<br />
Pallahara Khamar Construction of road 7 lakh<br />
Pallahara Rajdang Rajadanga to Padanga road 50 lakh<br />
Pallahara Rajdang Radanga to Belachata road 60 lakh<br />
Pallahara Munduribeda Munduribeda chakk road 3 Crore<br />
Pallahara Munduribeda Munduribeda Nuasahi road 2 crore<br />
Pallahara Munduribeda Dandaroad to Finghamundi 2 crore<br />
Pallahara Munduribeda Nuasahi Road 3 crore<br />
10<br />
Pallahara Munduribeda Kolaha Road<br />
thousand<br />
Pallahara Munduribeda Harijanasahi Road<br />
10<br />
thousand<br />
Pallahara Munduribeda Kumbhargadi to Road 500000<br />
Pallahara Munduribeda Kalamatia Krushihata 20000000<br />
Pallahara Injidi All weather road to every village of GP 50 lakh<br />
Pallahara Balipasi Construction of road 10 lakh<br />
Pallahara Balipasi Construction of road 10 lakh<br />
Pallahara Balipasi Construction of road 8 Lakh<br />
Pallahara Badasada Construction of road 50 lakh<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
220
Pallahara Nijigada Construction of road 20 lakh<br />
Pallahara Karadapal Construction of road 2 crore<br />
BRIDGES<br />
Block GP Proposed work Estimated cost<br />
in rupees<br />
Kishore Nagar Gaon Bainda One bridge on<br />
Bankadar nal<br />
10 lakh<br />
Kishore Nagar Gaon Bainda One bridge on Ajidhara<br />
nal<br />
10 lakh<br />
Kishore Nagar Gaon Bainda One bridge on<br />
Karadabami to<br />
Bantarikhol<br />
10 lakh<br />
Kishore Nagar Gaon Bainda One bridge on<br />
Badahulabandh<br />
5 lakh<br />
Kishore Nagar Gaon Bainda One bridge on<br />
Dhundinal<br />
10 lakh<br />
Kishore Nagar Gaon Bainda One bridge on Dhundi<br />
to Pahadtal sahi rasta<br />
10 lakh<br />
Kishore Nagar Gaon Bainda Solada Arabandara road 5 lakh<br />
Kishore Nagar Gaon Bainda Karadabami sahi road 3 lakh<br />
Kishore Nagar Gaon Bainda Badahula Dadar sahi to<br />
Bahalsahi road<br />
3 lakh<br />
Kishore Nagar Gaon Bainda Dhundi sishu kosh sahi<br />
road<br />
3 lakh<br />
Kaniha Burukuna Jagadala Bridge 30 lakh<br />
Kaniha Balipashi Bridge at Chilanti 50 lakh<br />
Kaniha Parabila Silan - bridge 10 lakh<br />
Chhendipada KUSHAKILA Singad Nala bridge 50 lakh<br />
Chhendipada KUSHAKILA Tentuli nal Bridge 10 lakh<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
221
Chhendipada Barapada Sinkadanali bridge 1 croe<br />
<strong>Angul</strong> Balanga Bridge 5 crore<br />
<strong>Angul</strong> Angarbandha bridge construction 5 crore<br />
Athamallik Nagaon Construction of bridge 50 Lakh<br />
Athamallik Krutibaspur Taleswar bridge 8 Lakh<br />
Athamallik Krutibaspur Bhagirathipur bridge<br />
construction<br />
5 Lakh<br />
Athamallik Kekanal bridge D.R.D.A<br />
Athamallik Madhapur Bridge construction 50 lakh<br />
Pallahara Rohila Construction of bridge 30 lakh<br />
Pallahara Rohila Construction of bridge 5 lakh<br />
Pallahara Rohila Construction of bridge 10 lakh<br />
Pallahara Rohila Construction of bridge 50 lakh<br />
Pallahara Rohila Construction of bridge 30 lakh<br />
WATER & SANITATION<br />
Block GP Proposed work Estimated<br />
cost in rupees<br />
Kishorenagar Jamunali Establishment of latrin 6 Lakh<br />
Kishore Nagar Ambapal Drinking water supply 25 lakh<br />
Kishore Nagar Jharabereni Drinking water supply 25lakh<br />
Kishore Nagar Raniakata Drinking water 1 crore<br />
Kishore Nagar Angapada Phulajhari,<br />
Jientanali,Jharabandhali<br />
Drinking water supply<br />
30 lakh<br />
Kishore Nagar Oskapali Drinking water supply at<br />
Balijereng & Sahalbahal<br />
50 lakh<br />
Kishore Nagar Urukula Drinking water supply,<br />
Urukula<br />
15 lakh<br />
Kishore Nagar Urukula Piped drinking water<br />
supply, Parsumal<br />
20 lakh<br />
Kishore Nagar Dhadarpal Dhadarpal field, Haridapasi,<br />
Kendranali water supply by<br />
pipe<br />
50 lakh<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
222
Kishore Nagar Bileinali Drinking water to all village 40 lakh<br />
Kishore Nagar Bileinali Latrine for all APL family<br />
from Govt.<br />
15 lakh<br />
Kishore Nagar Gaon Bainda water supply 15 lakh( 3<br />
supply)<br />
Kishore Nagar Nunukapasi Sanitation 10 lakh<br />
Kishore Nagar Nunukapasi Tube well 50 lakh<br />
Kishore Nagar Kadalimunda Drinking water 20 lakh<br />
Kishore Nagar Bamur Drinking water supply 10 lakh<br />
Kishore Nagar Bamur Sanitation 2 lakh<br />
Kaniha Hanumanpur Drinking water 15 lakh<br />
Kaniha Hanumanpur Drinking water 10 lakh<br />
Kaniha Hanumanpur Drinking water 15 lakh<br />
Kaniha Badatribida Drinking Water 1 crore<br />
Kaniha Sana Tribida Drinking Water 1 crore<br />
Kaniha Dalak Drinking Water 50 lakh<br />
Kaniha Talapada drinking water 40 lakh<br />
Kaniha Samal Drinking water supply 40 lakh<br />
Kaniha Kulei Drinking water supply 10 lakh<br />
Kaniha Kulei Water Sanitation 50 lakh<br />
Kaniha Karnapatta Water sanitation (G.P -latrin<br />
e)<br />
Kaniha Biru Drinking Water 10 lakh<br />
Kaniha Bijigola Drinking water supply 50 lakh<br />
Kaniha Parabila Drinking Water supply,<br />
Gaham<br />
10 lakh<br />
Kaniha Parabila Gaunghasa drinking water<br />
supply<br />
10 lakh<br />
Kaniha Rengali Drinking water 1 crore<br />
Kaniha Bajrakot Drinking water 75 lakh<br />
Kaniha Kamarei Drinking water 2 crore<br />
Kaniha Hariharpur Drinking water 10 lakh<br />
Talcher Ghantapada Drinking water 1 crore<br />
Talcher Ghantapada Sanitation 50 lakh<br />
Talcher Gobara Drinking water 50 lakh<br />
Talcher Gobara Drain 10 lakh<br />
Talcher Tentulei Drinking water 1 crore<br />
Talcher Tentulei Sanitation 50 lakh<br />
Talcher Bantol Drinking water supply 30 lakh<br />
Talcher Brajnathpur Drinking water through pipe 75 lakh<br />
Talcher Jagannathpur Drinking water supply<br />
through pipe<br />
10 lakh<br />
Talcher Gopal prasad Drinking water<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
223
Talcher Danara Drinking water supply<br />
through pipe<br />
75 lakh<br />
Talcher Kalamchhuin Drinking water supply<br />
through pipe<br />
1 crore<br />
Talcher Dera Drinking water supply<br />
through pipe<br />
65 lakh<br />
Talcher Kandhal Drinking water through pipe 80 lakh<br />
Chhendipada Jeranga Dehuri sahi drinking water supply 20 lakh<br />
Chhendipada Jeranga Dehuri sahi Sanitation work 10 lakh<br />
Chhendipada Patakumunda Tube well 5lakh<br />
Chhendipada Nisha Drinking water supply in<br />
school<br />
5 lakh<br />
Chhendipada Katada Drinking water supply<br />
project<br />
20 thousand<br />
Chhendipada Basanta pur Sanitaiton 5 lakh<br />
Chhendipada Chhendipada Drinking water 25 lakh<br />
Chhendipada Raijharan drinking water supply to<br />
primary school<br />
20 lakh<br />
Chhendipada Koshala water supply 10 lakh<br />
Chhendipada Patrapada Drinking water 50 lakh<br />
Chhendipada Similipal Sanitation 5 LAKH<br />
<strong>Angul</strong> Talagarh Drinking water 2 crore<br />
<strong>Angul</strong> Bantala Drinking water 1 crore<br />
<strong>Angul</strong> Bantala Souchalay 10 lakh<br />
<strong>Angul</strong> Baragaunia Drinking water 30 lakh<br />
<strong>Angul</strong> kumurisinga Drinking water 6 lakh<br />
<strong>Angul</strong> Khalari Drinking water 50 lakh<br />
<strong>Angul</strong> Gadataras drinking water ( Sanitation) 1 crore<br />
<strong>Angul</strong> Purunakote Water supply 1 lakh<br />
<strong>Angul</strong> Dhokata G.P. boundary & drinking<br />
water<br />
5 lakh<br />
<strong>Angul</strong> Tikarpada Water supply 30 lakh<br />
<strong>Angul</strong> Jagannathpur Drinking water 50 lakh<br />
<strong>Angul</strong> Balasinha Drinking water 1 core<br />
<strong>Angul</strong> Kangulabentapur Drinking water/sanitation 87 LAKH<br />
<strong>Angul</strong> Kothabhuin Kothabhuin drinking water<br />
supply<br />
15 lakh<br />
<strong>Angul</strong> Khinda Drinking water (sanitation) 1 crore<br />
<strong>Angul</strong> Basala Drinking water 20 lakh<br />
Banarpal Mahidharpur Drinking water 50 lakh<br />
Banarpal Kukudanga Drinking water 2 crore<br />
Banarpal Kukudanga Sanitation 34 lakh<br />
Banarpal Tube Drinking water supply 20 lakh<br />
Banarpal Talamul Drinking water 3 crore<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
224
Banarpal Talamul sanitation 1.25 lakh<br />
Banarpal Karadagadia Drinking water 1.25 lakh<br />
Banarpal Jarasingha Drinking water supply 15 lakh<br />
Banarpal Gadasantri Drinking water 5 Crore<br />
Banarpal Tulasipal Drinking water supply 10 lakh<br />
Banarpal Kulad drinking water supply 20 lakh<br />
Banarpal Bhogabereni Drinking water supply 10 lakh<br />
Banarpal Badakerajang Drinking water supply 12 lakh<br />
Banarpal San Kerajang Drinking water<br />
supply/tubewll, LI point<br />
12 lakh<br />
Baanrapal Sakosingha Supply of drinking water 50 lakh<br />
Baanrapal Nuahata Supply of drinking water 20 Lakh<br />
Baanrapal Kanjara Water supply 10 Lakh<br />
Baanrapal Gotamara Supply of drinking water 10 Lakh<br />
Baanrapal Bauligada Supply of drinking water 1 Crore<br />
Baanrapal Fulagada Supply of drinking water 1 Lakh<br />
Banarapal Balaram Prasad Sanitation 10 lakh<br />
Baanrapal Balaram Prasad Supply of drinking water 20 lakh<br />
Banarapal Kurudol Drinking water 10 lakh<br />
Banarapal Kurudol Sanitation 5 lakh<br />
Banarpal Budhapanka Drinking water supply 50 lakh<br />
Banarpal Budhapanka Health & Sanitation 50 lakh<br />
Athamallik Sanahulla Ghodabandhuni pipe water 1.5 lakh<br />
Athamallik Sanahulla Sanahulla pipe water supply 1.5 lakh<br />
Athamallik Lunahandi Drinking water supply 5 Lakh<br />
Athamallik Kantapada Drinking water supply 15 Lakh<br />
through pipe<br />
Athamallik Kantapada Sanitation system 15 Lakh<br />
Athamallik Paikasahi Drinking water 50 Lakh<br />
Athamallik Maipura Drinking water supply 5 lakh /year<br />
Athamallik Sapaghara Drinking water 20 Lakh<br />
Athamallik Krutibaspur Taleswar drinking water<br />
supply<br />
6 Lakh<br />
Athamallik Krutibaspur Banamalipur drinking water<br />
supply<br />
8 Lakh<br />
Athamallik Krutibaspur Tentulipathar drinking<br />
water supply<br />
5 Lakh<br />
Athamallik Jamudholi Construction of tube well /<br />
Pipe water supply<br />
15 Lakh<br />
Athamallik Kudgaon Drinking water supply 15 Lakh<br />
throug pipe<br />
Athamallik Kudgaon Sanitation 2 Lakh<br />
Pallahara Seegarh Latrine 15 lakh<br />
Pallahara Iswarnagar Drinking water project 2.5crore<br />
Pallahara Jharabeda Drinking water 50 lakh<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
225
Pallahara Jharabeda Parimala 50 lakh<br />
Pallahara Pechamundi Drinking water 20 lakh<br />
Pallahara Nagira Drinking water 50 lakh<br />
Pallahara Khamar Drinking water 5 lakh<br />
Pallahara Badasada Construction of Latrine 40 lakh<br />
Pallahara Sankhamur Construction of Latrine 35 lakh<br />
Pallahara Nijigada Construction of drainage 50 lakh<br />
EDUCATION<br />
Block GP Proposed work Estimated cost in<br />
rupees<br />
Kishorenagar Jamunali 4 nos Primary school building 16 lakh<br />
Kishorenagar Jamunali Construction of High School building 3 lakh<br />
Kishorenagar Jamunali U.P School building 3 lakh<br />
Kishorenagar Raniakata School building construction & boundary 1 crore<br />
Kishore Nagar Angapada Turuda & Angapada Primary school building<br />
construction<br />
Kishore Nagar Angapada Opening of +3 course at Angapada Regional college<br />
226<br />
20 lakh<br />
Kishore Nagar<br />
Kishore Nagar<br />
Oskapali School building & teacher appointment 20 lakh<br />
Joyrat Teacher appointment 3.6 lakh<br />
Kishore Nagar Urukula Urukula Primary school class room 10 lakh<br />
Kishore Nagar Urukula Parsumal Primary school class room 10 lakh<br />
Kishore Nagar Dhadarpal Natada high school new building construction 20 lakh<br />
Kishore Nagar Dhadarpal Dhadarpal Kheti, Kendranali new school house<br />
30 lakh<br />
construction<br />
Kishore Nagar Bileinali Bhejigoth school boundary 3 lakh<br />
Kishore Nagar Bileinali Garuda school boundary/ class room/ teacher 7 lakh<br />
Kishore Nagar Nunukapasi School house construction 20 lakh<br />
Kishore Nagar Handapa High school house 25 lakh<br />
Kishore Nagar Kataranga Satyasai Sevashram High school 20 lakh<br />
Kishore Nagar Kadalimunda education 10 lakh<br />
Kishore Nagar Kadalimunda Primary school<br />
Kishore Nagar Bamur Primary school 10 lakh<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com
Kishore Nagar Bamur Teacher problem<br />
Kishore Nagar Badatribida Education 5 lakh<br />
Kaniha Sana Tribida Education 5 lakh<br />
Kaniha Badagunduri High School building, boundary wall , 50 lakh<br />
Kaniha Badagunduri Primary School Boundary wall 10 lakh<br />
Kaniha Badagunduri 2 UP School building & boundary wall 15 lakh<br />
Kaniha Dalak Class room construction 5 Lakh<br />
Kaniha Shusuba Potagarh ME School 4 lakh<br />
Kaniha Shusuba Potagarh Project UP School 5 lakh<br />
Kaniha Talapada School 5 lakh<br />
Kaniha Arakil Beherabhuin school building construction 5 Lakh<br />
Kaniha Arakil Arakil High school Building construction, 4 lakh<br />
Kaniha Arakil Arakil High school cycle stand construction, 2 lakh<br />
Kaniha Arakil Duarbandh school 4 lakh<br />
Kaniha Arakil Paramapasi school 4 lakh<br />
Kaniha Balipashi Class room construction 3 lakh<br />
Kaniha Jarada School building of Jarada 8 lakh<br />
Kaniha Kulei Education (college) 10 lakh<br />
Kaniha Biru Education (U.P) 5 lakh<br />
Kaniha Bijigola Education 10 lakh<br />
Kaniha Gandamala Gandamala school house 5 lakh<br />
Kaniha Gandamala Kulabira school 5 lakh<br />
Kaniha Gandamala Sulei school 5 lakh<br />
Kaniha Gandamala Suleipal school kitchen room 2 lakh<br />
Kaniha Gandamala Kulabira Highs chool cycle stand 2 lakh<br />
Kaniha Gandamala Gandamala school kitchen room 3 lakh<br />
Kaniha Rengali Rengali Primary School 50 lakh<br />
Kaniha Bajrakot Education institution 60 lakh<br />
Kaniha Kamarei Education institution 60 lakh<br />
Talcher Gobara Education 50 lakh<br />
Talcher Tentulei Education 50 lakh<br />
Talcher Brajnathpur School building 10 lakh<br />
Talcher Gopal prasad Gopalprasad UP school to High school 20 lakh<br />
Talcher Danara School Building 10 lakh<br />
Talcher Kalam chhuin School building 15 lakh<br />
Talcher Kankili Class room of Bharati High school , Kankili 8 lakh<br />
Talcher Kankili Boundary wall of Ramchandrapur Primary school. 4 lakh<br />
Talcher Dharampur High school boundary 4 lakh<br />
Talcher Dharampur U.P.School building construction 3 lakh<br />
Talcher Dharampur Biharpur school boundary 5 lakh<br />
Talcher Dharampur Skatlandpur school boundary 3 lakh<br />
Talcher Dera School building construction 10 lakh<br />
Talcher Kandhal Education 10 lakh<br />
Talcher Santhapara Santhapada school 7 lakh<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
227
Talcher Education to class one to ten<br />
Chhendipada Bagadia Development of school building 25 lakh<br />
Chhendipada Jarapada Education 2 lakh<br />
Chhendipada Paranga Education/ Anganwadi 20 lakh<br />
Chhendipada Balipata School building construction 10 lakh<br />
Chhendipada Jeranga Dehuri<br />
sahi<br />
Education 10 lakh<br />
Chhendipada Kankarei Education 10 lakh<br />
Chhendipada Dhukuda Education 20 lakh<br />
Chhendipada Patakumunda School building 12 lakh<br />
Chhendipada Natada High school, ME school & UP school buidling 35 lakh<br />
Chhendipada Korada Education 10 lakh<br />
Chhendipada Kampasala Education 20 lakh<br />
Chhendipada Katada Boundary wall 6 lakh<br />
Chhendipada Katada Class room construction 15 lakh<br />
Chhendipada Machhakuta School building development 20 lakh<br />
Chhendipada Raijharan Raijharan school (Kodasahi) 5 lakh<br />
Chhendipada Tentulai Primary school class room 60 lakh<br />
Kodasahi<br />
Chhendipada Patrapada Gadamandal High school building 20 lakh<br />
Chhendipada Patrapada Primary school class room 60 lakh<br />
Chhendipada Patrapada Primary school drinking water supply 20 lakh<br />
Chhendipada Barapada Barapada Nodal school 10 lakh<br />
Chhendipada Barapada Chakundapal P.School 5 lakh<br />
Chhendipada Barapada Nandi chhod M.E.School 5 lakh<br />
Chhendipada Kukurpetta Telisahi school<br />
Chhendipada Durgapur school building development 25 lakh<br />
<strong>Angul</strong> Talagarh Education 50 lakh<br />
<strong>Angul</strong> Bantala Education 50 lakh<br />
<strong>Angul</strong> Baragaunia College 50 lakh<br />
<strong>Angul</strong> Baragaunia School building construction 5 lakh<br />
<strong>Angul</strong> Baragaunia School building construction 5 lakh<br />
<strong>Angul</strong> Baragaunia School building construction 5 lakh<br />
<strong>Angul</strong> Baragaunia School building construction 5 lakh<br />
<strong>Angul</strong> Baragaunia School building construction 5 lakh<br />
<strong>Angul</strong> Baragaunia School building construction 5 lakh<br />
<strong>Angul</strong> Baluakata Education 5 lakh<br />
<strong>Angul</strong> kumurisinga Education 8 lakh<br />
<strong>Angul</strong> Gadataras Education 30 lakh<br />
<strong>Angul</strong> Dhokata Dhokata school building 10 lakh<br />
<strong>Angul</strong> Pokatunga Pokatunga school building 2 lakh<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
228
<strong>Angul</strong> Chheliapada School cosntruction 5 lakh<br />
<strong>Angul</strong> Inkarabandh school construction 5 lakh<br />
<strong>Angul</strong> Balasinha Education 30 lakh<br />
<strong>Angul</strong> Kangulabentapur Education 55 lakh<br />
<strong>Angul</strong> Kothabhuin Kothabhuin UP school & Dalsihan LP school 10 lakh<br />
<strong>Angul</strong> Khinda Education 30 lakh<br />
<strong>Angul</strong> Bedasasan School building 5 lakh<br />
<strong>Angul</strong> Bedasasan School building 5 lakh<br />
<strong>Angul</strong> Bedasasan School building 5 lakh<br />
<strong>Angul</strong> Basala Berubania school boundary 5 lakh<br />
<strong>Angul</strong> Basala Basala UP school boundary 3 lakh<br />
<strong>Angul</strong> Basala Lakeipasi school room & boundary wall 5 lakh<br />
<strong>Angul</strong> Basala Sunabhuin school boundary & tube well 3 lakh<br />
<strong>Angul</strong> Mahidharpur education 25 lakh<br />
Banarpal Kukudanga Education 40 lakh<br />
Banarpal Bandaa school development 15 lakh<br />
Banarpal Tube Education 10 lakh<br />
Banarpal Talamul Education 50 lakh<br />
Banarpal Karadagadia Education 30 lakh<br />
Banarpal Jarasingha Construction of school building,desks,benches & books 30 lakh<br />
Banarpal Jarasingha School building repairing 2 lakh<br />
Banarpal Gadasantri school building de velopment 50 lakh<br />
Banarpal Gadasantri School building repairing 50 lakh<br />
Banarpal Tulasipal school 10 lakh<br />
Banarpal Bhogabereni Education 10 lakh<br />
Banarpal Badakerajang Education 25 lakh<br />
Banarpal San Kerajang Education<br />
Banarpal<br />
Baanrapal Sakosingha Devlopment of educational Institutions 1 Crore<br />
Baanrapal Sakosingha Sakosingha High School boundry & G.P boundary 50 lakh<br />
Baanrapal Nuahata Devlopment in educational institution 1 Crore<br />
Baanrapal Nuahata establishment of new educational institution 50 Lakh<br />
Baanrapal Kanjara Education 25 Lakh<br />
Baanrapal Gotamara Education 20 Lakh<br />
Baanrapal Fulagada School building construction 10 lakh<br />
Banarapal<br />
Banarapal Kurudol Education 20 lakh<br />
Banarpal Balaram Prasad Education 30 lakh<br />
Banarpal Bauligada Education 5 lakh<br />
Athamallik Budhapanka Devlopment in educational Institution 1 Crore<br />
Athamallik Kampala Establishment of Lower primary School at Ranjana<br />
village<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
229
Athamallik Tapdhool Class room & boundary construction 50 Lakh<br />
Athamallik Kurumtap Barapada Primary School 5 Lakh<br />
Athamallik Nagaon Establishment of Girls residential School 25 Lakh<br />
Athamallik Lunahandi Costruction of School building devlopment of education<br />
& its solution<br />
25 Lakh<br />
Athamallik Aida College 10 Lakh<br />
Athamallik Aida Girls High School 10 Lakh<br />
Athamallik Kantapada Construction of School class room&boundary ad<br />
employement of teacher<br />
21 Lakh<br />
Athamallik Paikasahi Education 60 Lakh<br />
Athamallik Maipura Construction of school building & devlopment of<br />
education & its solution<br />
25 lakh /year<br />
Athamallik Sapaghara Education 20 Lakh<br />
Athamallik Tusar Vedadiha school building, Bajapur School<br />
6 Lakh each<br />
building,Bahalabeda,Bhandarimunda,<br />
Jhudangamala,Bhujapur additional School building<br />
construction<br />
School<br />
Athamallik Jamudholi Construction of School building & Fill up all teachers<br />
post in all village<br />
6 LAKH<br />
Athamallik Kudgaon Education (School building construction) 6 Lakh<br />
Athamallik Pedipathara Establishment of Jharabainda Primary School 8 lakh<br />
Athamallik Pedipathara Repairing of Pedipathara,Jhilimunda,Achyutpur y<br />
,Badadadara, Baraha Primar School<br />
230<br />
35 lakh<br />
Athamallik Pedipathara Pedipathara UP School & Pedipathara-Baraha ME<br />
School house construction<br />
20 Lakh<br />
Pallahara Iswarnagar Education 46 lakh<br />
Pallahara Parachhat Education<br />
Pallahara Bandhabhuin Education 2 crore<br />
Pallahara Jharabeda Education 5 lakh<br />
Pallahara Rohila High school 5 lakh<br />
Pallahara Rohila High school 5 lakh<br />
Pallahara Allori Education 16 lakh<br />
Pallahara Khamar Construction of School boundary 500,000.00<br />
Pallahara Khamar Countruction of kitchen boundary wall 500,000.00<br />
Pallahara Khamar Countruction of boundary wall 800,000.00<br />
Pallahara Rajdang School building 1 Crore<br />
Pallahara Munduribeda Munduribeda school 10,000.00<br />
Pallahara Munduribeda School building 10,000.00<br />
Pallahara Balipasi School building 5 lakh<br />
Pallahara Balipasi School building 5 lakh<br />
Pallahara Balipasi School building 5 lakh<br />
Pallahara Badasada School building 10 lakh<br />
Pallahara Dimiria School building 10 lakh<br />
Pallahara Dimiria School building 5 lakh<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com
Pallahara Batisuan Education 30 lakh<br />
Pallahara Karadapal Education 1 Crore<br />
HEALTH<br />
Block GP Proposed work Estimated cost in<br />
rupees<br />
Kishorenagar Jamunali Construction of Health centre in Jamunali G.p 6 Lakh<br />
Baanrapal Sakosingha Health & Sanitation system 60 Lakh<br />
Kishore Nagar Raniakata PHC, House, Doctor appointment, 50 lakh<br />
Kishore Nagar Angapada Angapada health centre cosntruction & boundary 50 lakh<br />
Kishore Nagar Kanteikulia Sub health centre construction 5 lakh<br />
Kishore Nagar Nakchi PHC & doctor appointment 1 crore<br />
Kishore Nagar Oskapali PHC 10 lakh<br />
Kishore Nagar Joyrat health, Joyrat 0.1 lakh<br />
Kishore Nagar Urukula PHC, Parsumal 50 lakh<br />
Kishore Nagar Dhadarpal Dhadarpal/Natada Sub health centre construction 20 lakh<br />
Kishore Nagar Handapa Sub health centre construction 20 lakh<br />
Kishore Nagar Himitira PHC 10 lakh<br />
Kishore Nagar Kataranga Sub health centre 20 lakh<br />
Kishore Nagar Kadalimunda health 10 lakh<br />
Kishore Nagar Bamur PHC 5 lakh<br />
Kaniha Hanumanpur PHC 20 lakh<br />
Kaniha Badatribida Sub PHC 10 lakh<br />
Kaniha Sana Tribida Sub PHC 10 lakh<br />
Kaniha Burukuna Sub health centre 10 lakh<br />
Kaniha Badagunduri Sub health centre 10 lakh<br />
Kaniha Dalak Heal Centre 20 lakh<br />
Kaniha Talapada PHC 5 lakh<br />
Kaniha Kakudia Sub PHC Construction 10 lakh<br />
Kaniha Balipashi Sub PHC Construction 10 lakh<br />
Kaniha Samal PHC Construction 10 lakh<br />
Kaniha Kulei Sub Health centre 10 lakh<br />
Kaniha Kuluma Kuluma Sub Health centre 25 lakh<br />
Kaniha Bijigola Sub health centre 20 lakh<br />
Kaniha Gandamala Homeopathic Medical 5 lakh<br />
Kaniha Rengali G.P. Health centre 20 lakh<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
231
Kaniha Bajrakot Sub health centre 30 lakh<br />
Kaniha Kamarei Sub Health centre 25 lakh<br />
Kaniha Hariharpur Hariharpur suh health centre 5 lakh<br />
Talcher Ghantapada Sub health centre 20 lakh<br />
Talcher Gobara Health 20 lakh<br />
Talcher Tentulei Sub Health centre 20 lakh<br />
Talcher Bantol Health centre 10 lakh<br />
Talcher Gopal prasad Gopalprasad PHC 5 lakh<br />
Talcher Danara Sub Health centre construction 10 lakh<br />
Talcher Kandhal Health 3 lakh<br />
Pallahara Chasagurujang Beds for Patients 5 lakh<br />
Pallahara Chasagurujang To fulfill all the post of phc<br />
Pallahara Seegarh Health Centre 5 lakh<br />
Pallahara Iswarnagar Health centre construction<br />
Chhendipada Chhendipada Hitech Medical 500 crore<br />
Chhendipada Bagadia Modernisation of PHC 10 lakh<br />
Chhendipada Jarapada Modernisation of PHC 2 lakh<br />
Chhendipada Paranga Sub health centre 20 lakh<br />
Chhendipada Balipata Health centre / staff quarter 15 lakh<br />
Chhendipada Jeranga Dehuri sahi Sub health centre 3 lakh<br />
Chhendipada Kankarei Sub health centre 2 lakh<br />
Chhendipada Dhukuda Sub health centre 10 lakh<br />
Chhendipada Ogi Sub Health centre 5 lakh<br />
Chhendipada Patakumunda Sub Health Centre 10 lakh<br />
Chhendipada Natada Sub Health centre 15 lakh<br />
Chhendipada Nisha Sub health centre 15 lakh<br />
Chhendipada Korada Sub Health Centre 20 lakh<br />
Chhendipada Kampasala Sub health centre 20 lakh<br />
Chhendipada Para Sub health centre construction 50 lakh<br />
Chhendipada Brahmanabil Brahmanbi sub health centre repairing 25 thousand<br />
Chhendipada Katada Sub health centre construction 5 lakh<br />
Chhendipada Basanta pur Sub Health centre construction 10 lakh<br />
Chhendipada Kanaloi Sub Health centre construction 10 lakh<br />
Chhendipada Nuagaon Sub Health centre construction 10 lakh<br />
Chhendipada Bahal sahi Opening of Health centre 10 lakh<br />
Chhendipada Tentulai Kodasahi Sub health centre 20 lakh<br />
Chhendipada Patrapada Gadamandal health centre 10 lakh<br />
Chhendipada Koshala Canteen of Medical 2 lakh<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
232
Chhendipada Kukurpetta health centre<br />
Chhendipada Tangiri sub health centre construction 8 lakh<br />
Chhendipada Tangiri sub health centre construction 8 lakh<br />
Chhendipada Similipal Sub Health centre construction 10 lakh<br />
Chhendipada Durgapur Modernisation of health cente 10 lakh<br />
<strong>Angul</strong> Talagarh Sub health centre 15 lakh<br />
<strong>Angul</strong> Balanga health centre 15 lakh<br />
<strong>Angul</strong> Baragaunia PHC 60 lakh<br />
<strong>Angul</strong> Antulia Sub health centre 5 lakh<br />
<strong>Angul</strong> Baluakata Health centre 8 lakh<br />
<strong>Angul</strong> kumurisinga Health centre 6 lakh<br />
<strong>Angul</strong> Khalari Sub health centre 5 lakh<br />
<strong>Angul</strong> Sharadhapur Sub health centre construction 6 lakh<br />
<strong>Angul</strong> Gadataras Sub health centre construction 10 Crore<br />
<strong>Angul</strong> Matiasahi Malaria Preventive centre 5 lakh<br />
<strong>Angul</strong> Jagannathpur Sub health centre 30 lakh<br />
<strong>Angul</strong> Angarbandha Sub health centre 5 lakh<br />
<strong>Angul</strong> Inkarabandh health centre 4 lakh<br />
<strong>Angul</strong> Balasinha Sub health centre 10 lakh<br />
<strong>Angul</strong> Kangulabentapur health centre 15 lakh<br />
<strong>Angul</strong> Kothabhuin Sub health centre , Kothabhuin 5 LAKH<br />
<strong>Angul</strong> Khinda health centre, electrification, staff quarters 10 lakh<br />
<strong>Angul</strong> Bedasasan health centre 10 lakh<br />
<strong>Angul</strong> Basala Sub health centre 5 lakh<br />
<strong>Angul</strong> Basala Homeopathic Medical quarter boundary 5 lakh<br />
Banarpal Mahidharpur health 65 lakh<br />
Banarpal Kukudanga Health 6 lakh<br />
Banarpal Banda health, sanitation, 6 lakh<br />
Banarpal Tube health & sanitation 5 lakh<br />
Banarpal Kandasar health & sanitation 5 lakh<br />
Banarpal Talamul health 1.50 lakhs<br />
Banarpal Karadagadia health 1.20 lakh<br />
Banarpal Jarasingha Health & sanitation 10 lakh<br />
Banarpal Bada Santri Health & sanitation 30 lakh<br />
Banarpal Tulasipal Health & sanitation 10 lakh<br />
Banarpal Bhogabereni Health/ sanitation 10 lakh<br />
Banarpal Badakerajang Health/ sanitation 9 lakh<br />
Banarpal San Kerajang Health/ sanitation 9 lakh<br />
Banarpal Balaram Prasad Health 50 lakh<br />
Baanrapal Kanjara Health & Sanitation system 20 Lakh<br />
Baanrapal Nuahata Health & Sanitation system 40 Lakh<br />
Baanrapal Gotamara Health & Sanitation system 25 Lakh<br />
Baanrapal Bauligada Health & Sanitation system 4 Crore<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
233
Baanrapal Fulagada Health & Sanitation system 5 Crore<br />
Baanrapal Fulagada Health 10 Lakh<br />
Banarapal Kurudol Health 30 lakh<br />
Banarapal Balaram Prasad Health 50 lakh<br />
Athamallik Kiakata Medical 10 Lakh<br />
Athamallik Basudevpur Sub PHC Basudevpur 10 Lakh<br />
234<br />
Athamallik Tapdhool Establishment of Medical -<br />
Athamallik Sanahulla Sanahulla Medical 10 Lakh<br />
Athamallik Kurumtap Establishment of Health centre 2.5 Lakh<br />
Athamallik Aida Medical 10 Lakh<br />
Athamallik Kantapada Health & Family welfare 12 Lakh<br />
Athamallik Paikasahi Health 80 Lakh<br />
Athamallik Maipura Health service,PHC & Irradication of malaria 5 lakh /year<br />
Athamallik Sapaghara Health 50 Lakh<br />
Athamallik Tusar New Hospital - Tushar 10 Lakh<br />
Athamallik Jamudholi Fill up docter post<br />
Athamallik Kudagaon Establishment of Medical 5 Lakh<br />
Athamallik Purunamanahi Medical 5 Lakh<br />
Athamallik Pedipathar Establishment of Health centre 15 lakh<br />
Pallahara Seegarh Establishment of Health centre 5 lakh<br />
Pallahara Parachhat Health Centre<br />
Pallahara Bandhabhuin Health Centre 1 crore<br />
Pallahara Jharabeda Health Centre .50 Lakh<br />
Pallahara Pechamundi Health 10 Lakh<br />
Pallahara Nagira Health 50 Lakh<br />
Pallahara Nagira Sub Health Centre 700,000.00<br />
Pallahara Khemala Health Centre 5 lakh<br />
Pallahara Rajdang Construction of health centre 10 Lakh<br />
Pallahara Munduribeda Health 500,000.00<br />
Pallahara Injidi Construction of sub health centre 10 lakh<br />
Pallahara Parachhat Health Centre<br />
Pallahara Karadapal Sub Health Centre 20 lakh<br />
Pallahara Rohila Sub Health Centre 7 lakh<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com
ANGANWADI CENTRE<br />
Block GP Proposed work Estimated cost in rupees<br />
Kishorenagar Jamunali Quarter for ANM 3 lakh<br />
Kishorenagar Jamunali Anganwadi building construction 4nos 12 lakh<br />
Kishore Nagar Ambapal Anganwadi centre 2 lakh<br />
Kishore Nagar Jharabereni Anganwadi centre 2 lakh<br />
Kishore Nagar Angapada Phulajhari AWC 5 lakh<br />
Kishore Nagar Angapada Angapada-3, Turuda-2, Katada,<br />
Jientanali AWC<br />
35 lakh<br />
Kishore Nagar Nakchi AWC 15 lakh<br />
Raj Kishore<br />
Nagar<br />
Joyrat AWC 5 lakh<br />
Raj Kishore<br />
Nagar<br />
Joyrat Sribantmunda dohali AWC 0.5 lakh<br />
Kishore Nagar Urukula AWC, Satagerejia 5 lakh<br />
Kishore Nagar Urukula AWC, Khamar 5 lakh<br />
Kishore Nagar Urukula AWC, Raghunathpur 5 lakh<br />
Kishore Nagar Urukula AWC, Gadeimunda 5 lakh<br />
Kishore Nagar Gaon Bainda ANM Centre 5 lakh<br />
Kishore Nagar Nunukapasi AWC construction 20 lakh<br />
Kishore Nagar Himitira AWC 2 lakh<br />
Kishore Nagar Himitira AWC 2 lakh<br />
Kishore Nagar Himitira AWC 2 lakh<br />
Kishore Nagar Himitira AWC 2 lakh<br />
Kishore Nagar Kadalimunda Anganwadi centre construciton 20 lakh<br />
Kishore Nagar Bamur Anganwadi centre 3 lakh<br />
Kaniha Badagunduri 3 Anganwadi centre 20 lakh<br />
Kaniha Shusuba ANM Centre 3 lakh<br />
Kaniha Talapada Anganwadi 2 lakh<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
235
Kaniha Talapada Anganwadi 2 lakh<br />
Kaniha Talapada Anganwadi 2 lakh<br />
Kaniha Talapada Anganwadi 2 lakh<br />
Kaniha Arakil Karatakhaman Anganwadi centre 3 lakh<br />
Kaniha Gandamala Kulabira Anganwadi centre 3.5 lakh<br />
Kaniha Gandamala Gandamal Anganwadi 3.5 lakh<br />
Kaniha Parabila Gahama Bata sahi Anganwadi 3.5 lakh<br />
Kaniha Parabila Gahama Nuanla anganwadi centre 3.5 lakh<br />
Talcher Ghantapada Anganwadi centre 25 lakh<br />
Talcher Gobara Anganwadi centre construction 5 lakh<br />
Talcher Tentulei Anganwadi centre 25 lakh<br />
Talcher Danara Anganwadi centre construciton 36 lakh<br />
Talcher Kalamchhuin Anganwadi centre 6 lakh<br />
Talcher Kankili Anganwadi centre Telibahal and Kankili<br />
Krushak sahi<br />
3 lakh<br />
Talcher Dharampur Anganwadi centre construction, 3 lakh<br />
dharampur<br />
Talcher Dharampur Anganwadi centre , Khaithpal 3 lakh<br />
Talcher Dharampur Anganwadi centre 3 lakh<br />
Talcher Dharampur Anganwadi centre 3 lakh<br />
Talcher Dharampur Anganwadi centre 3 lakh<br />
Talcher Dharampur ANM centre 3 lakh<br />
Talcher Dera Anganwadi centre construction 10 lakh<br />
Chhendipada Ogi Anganwadi centre 15 lakh<br />
Chhendipada Patakumunda Anganwadi centre 3 lakh<br />
Chhendipada Nisha Anganwadi centre 10 lakh<br />
Chhendipada Brahmanabil Anganwadi 5 lakh<br />
Anganwadi 5 lakh<br />
Chhendipada Katada Anganwadi centre construction 5 lakh<br />
Chhendipada Raijharan Anganwadi centre construciton 20 lakh<br />
Chhendipada Barapada ANM Centre 5 lakh<br />
Chhendipada Barapada Barapada Angan wadi centre 3 lakh<br />
Chhendipada Koshala Chakradharpur AWC 2 lakh<br />
Chhendipada Koshala Jalapada AWC 2 lakh<br />
Chhendipada Koshala Kansanali AWC 2 lakh<br />
Chhendipada Koshala Similisahi AWC 2 lakh<br />
Chhendipada Kukurpetta new anganwadi centre<br />
<strong>Angul</strong> Talagarh Anganwadi centre 20 lakh<br />
<strong>Angul</strong> Talagarh Ghar dih jogan 70 lakh<br />
<strong>Angul</strong> Bantala Anganwadi centre construciton 30 lakh<br />
<strong>Angul</strong> Khalari Anganwadi centre 5 lakh<br />
<strong>Angul</strong> Gadataras Anganwadi centre 20 lakh<br />
<strong>Angul</strong> Matiasahi Anganwadi centre 5 lakh<br />
<strong>Angul</strong> Matiasahi Anganwadi centre 5 lakh<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
236
<strong>Angul</strong> Dhokata Dhokata AWC 5 lakh<br />
<strong>Angul</strong> Jagannathpur Anganwadi centre 10 lakh<br />
<strong>Angul</strong> Balasinha Anganwadi centre 10 lakh<br />
<strong>Angul</strong> Kangulabentapur Anganwadi centre 60 lakh<br />
<strong>Angul</strong> Khinda Anganwadi centre 20 lakh<br />
<strong>Angul</strong> Bedasasan Anganwadi centre, Hamamira 5 lakh<br />
<strong>Angul</strong> Bedasasan Anganwadi centre, Hamamira 5 lakh<br />
<strong>Angul</strong> Basala Basala Telisahi anganwadi 5 lakh<br />
<strong>Angul</strong> Basala Bherubania Anganwadi 5 lakh<br />
<strong>Angul</strong> Basala Kumakata Lakerapasi Anganwadi centre 5 lakh<br />
<strong>Angul</strong> Basala Anganwadi centre, Jhajiaghai 5 lakh<br />
<strong>Angul</strong> Basala Basala AWC Kitchen room 1 lakh<br />
Banarpal Tube Development of education 10 lakh<br />
Banarpal Kulad AWC 2 lakh<br />
Baanrapal Bauligada Constrution of Anganwadi centre 50 Lakh<br />
Baanrapal Fulagada Construction of A nganwadi Centre 30 Lakh<br />
Banarpal Kulad AWC 2 lakh<br />
Athamallik kampal Construction of Angan wadi centre in<br />
Madhyapur village<br />
Athamallik Basudevpur Establishment of Anganwadi centre at<br />
Basudevpur<br />
3 Lakh<br />
Athamallik Basudevpur Establishment of Anganwadi centre at<br />
Santipur<br />
3 Lakh<br />
Athamallik Luhasinga Establishment of Luhasinga Anganwadi<br />
centre<br />
2 Lakh<br />
Athamallik Kurumtap Barapalli Anganwadi centre construction 2 Lakh<br />
Athamallik Kurumtap Kurumtap Anganwadi centre<br />
construction<br />
2 Lakh<br />
Athamallik Tusar Tushar,Bhandarimunda,Bahalabeda,Jaga<br />
nathpur,Polamadulu Anganwadi new<br />
building construction<br />
5 Lakh each building<br />
Athamallik Krutibaspur Banamalipur Anganwadi centre 8 Lakh<br />
Athamallik Krutibaspur Karadabahali Anganwadi centre 3 Lakh<br />
Athamallik Krutibaspur Tentulipathar Anganwadi centre 4 Lakh<br />
Athamallik Kudagaon Establishment of Anganwadi centre 8 Lakh<br />
Athamallik Pedipathara Jharabainda AWC 2 Lakh<br />
Athamallik Pedipathara Achyutpur AWC 2 Lakh<br />
Athamallik Pedipathara Repairing & development of<br />
Pedipathara,Jahnimunda,Barahma,<br />
Bajajandara AWC<br />
5 lakh<br />
Pallahara Iswarnagar anganwadi centre in all wards<br />
Pallahara Khamar Construction of Anganwadi centre 3 Lakh<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
237
Pallahara Rajdang Construction of Anganwadi centre 20 lakh<br />
Pallahara Balipasi Construction of Anganwadi centre 2 lakh<br />
Pallahara Badasada Construction of Anganwadi centre 10 lakh<br />
Pallahara Sankhamur Construction of Anganwadi centre 8 Lakh<br />
Pallahara Dimiria Construction of Anganwadi centre 2 Lakh<br />
Pallahara Batisuan Establishment of ANM Centre 10 lakh<br />
ANIMAL RESOURCE DEVELOPMENT<br />
Block GP Proposed work Estimated<br />
cost in rupees<br />
Kishore Nagar Ambapal livestock centre 10 lakh<br />
Kishore Nagar Raniakata Sub Livestock centre<br />
construction<br />
10 lakh<br />
Kishore Nagar Kanteikulia Livestock centre 5 lakh<br />
Kishore Nagar Oskapali Livestock centre 10 lakh<br />
Kishore<br />
Nagar<br />
Kishore<br />
Nagar<br />
Kishore<br />
Nagar<br />
Bileinali Live stock centre 2 lakh<br />
Handapa Livestock centre 15 lakh<br />
Kataranga Livestock centre 15 lakh<br />
Kaniha Deranga Sub Livestock centre 4.5 lakh<br />
Kaniha Burukuna Livestock centre 7 Lakh<br />
Kaniha Kakudia Livestock centre 5 lakh<br />
Kaniha Balipashi Livestock centre 7 lakh<br />
Talcher Bantol Livestock centre 5 lakh<br />
Talcher Jagannathpur Livestock centre<br />
construction<br />
5 lakh<br />
Talcher Gopal prasad Gopalprasad<br />
livestock centre<br />
Talcher Kalamchhuin Livestock centre<br />
construction<br />
5 lakh<br />
Chhendipada Jeranga Dehuri sahi Livestock centre 5 lakh<br />
Chhendipada Changudia Livestock centre 5 lakh<br />
Chhendipada Katada Live stock centre 3 lakh<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
238
Chhendipada Bahal sahi Livestock centre<br />
opening<br />
20 lakh<br />
Chhendipada Barasahi LI centre 5 lakh<br />
<strong>Angul</strong> Balanga Livestock centre<br />
construction<br />
15 lakh<br />
<strong>Angul</strong> Khalari Livestock centre 5 lakh<br />
<strong>Angul</strong> Gadataras Livestock centre 10 lakh<br />
<strong>Angul</strong> Jagannathpur Live stock 5 lakh<br />
<strong>Angul</strong> Angarbandha Live stock 5 lakh<br />
<strong>Angul</strong> Balasinha Livestock centre 10 lakh<br />
<strong>Angul</strong> Kangulabentapur Livestock centre 5 lakh<br />
<strong>Angul</strong> Khinda Livestock 10 lakh<br />
<strong>Angul</strong> Basala Livestock centre 5 lakh<br />
Athamallik Kurumtap Vetenary medical<br />
centre establishment<br />
2.5 Lakh<br />
Athamallik Nagaon Sub vetenary medical<br />
cetre<br />
25 Lakh<br />
Athamallik Aida Sub vetenary medical<br />
cetre<br />
10 Lakh<br />
Athamallik Kantapada Establisment of L.I<br />
centre<br />
8 Lakh<br />
Athamallik Tusar Vetenary medical<br />
centre -Tushar<br />
5 Lakh<br />
Athamallik Pedipathara Vetenary centre 5 lakh<br />
Pallahara Parachhat Vetenary hospital<br />
Pallahara Khemala Vetenary hospital 10 lakh<br />
Pallahara Khamar L.I Centre 10 lakh<br />
Pallahara Rajdang Vetenary hospital 10 lakh<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
239
IRRIGATION<br />
Block GP Proposed work Estimated cost<br />
in rupees<br />
240<br />
Kishorenagar Jamunali Construction of embackment in G.P area 4 lakh<br />
Kishore Nagar Ambapal Adi bandh construction 30 lakh<br />
Kishore Nagar Angapada Jandaosta LI Point 10 crore<br />
Kishore Nagar Angapada Katada, Kasakelu LI Point 1 crore<br />
Kishore Nagar Angapada Phulajhari entry LI Point 50 lakh<br />
Kishore Nagar Angapada Turuda , Patahanakhol LI Point 30 lakh<br />
Kishore Nagar Kanteikulia Baraghai Adi Bandh 20 lakh<br />
Kishore Nagar Kanteikulia Khandanal adi bandh 1 crore<br />
Kishore Nagar Kanteikulia Badanal adi bandh 20 lakh<br />
Kishore Nagar Kanteikulia Gangamunda adi bandh 70 lakh<br />
Kishore Nagar Oskapali LI Point 50 lakh<br />
Kishore Nagar Oskapali Adi bandh yojana, Sahalbahal jora to<br />
Dalimukha via Oskapali canal,Barakholsag<br />
to Babaji canal<br />
1 crore<br />
Kishore Nagar Oskapali Babaji canal and adi bandh 50 lakh<br />
Kishore Nagar Urukula Pidhamundia LI point, Parsumal 10 crore<br />
Kishore Nagar Dhadarpal Natada Pitalipita Irrigation 50 lakh<br />
Kishore Nagar Bileinali Gadiajore LI Point, Bhejigoth 1 crore<br />
Kishore Nagar Gaon Bainda Gandheighai canal & bandh 5 lakh<br />
Kishore Nagar Gaon Bainda Nuataila adi bandh & canal 7 lakh<br />
Kishore Nagar Gaon Bainda Baghakhol 9 lakh<br />
Kishore Nagar Gaon Bainda Nuabandh 6 lakh<br />
Kishore Nagar Handapa LI Point 1 crore<br />
Kishore Nagar Handapa Handapa Badabandh develop 25 lakh<br />
Kishore Nagar Handapa Badabandh and Khaligadia adi bandh 15lakh<br />
Kishore Nagar Himitira LI point 30 lakh<br />
Kishore Nagar Sanjamura Satidar Canal 5 lakh<br />
Kishore Nagar Sanjamura Dhanjabandha canal 5 lakh<br />
Kishore Nagar Sanjamura Nandajali canal 5 lakh<br />
Kaniha Badatribida LI Point 50 lakh<br />
Kaniha Sana Tribida LI Point 5 lakh<br />
Kaniha Dalak LI Point 10 lakh<br />
Kaniha Shusuba Potagarh to Valiabeda Aadi Bandh 2 crore<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com
Kaniha Talapada Rengal to Durgapur LI point 100 crore<br />
Kaniha Arakil Arakil LI Point 5 lakh<br />
Kaniha Jarada Jarada pokhari Bandha 10 lakh<br />
Kaniha Samal Embackment river 8 crore<br />
Kaniha Karnapatta Canal repairing 5 km<br />
Kaniha Biru Colvert 10 lakh<br />
Kaniha Bijigola LI Point 50 lakh<br />
Kaniha Rengali Litf Irrigation 25 lakh<br />
Kaniha Bajrakot LI Point 40 lakh<br />
Kaniha Kamarei LI Point 80 lakh<br />
Talcher Ghantapada LI Point 30 lakh<br />
Talcher Tentulei LI Point 30 lakh<br />
Talcher Bantol LI Point 10 lakh<br />
Talcher Bantol Santaramunda Embackment 5 lakh<br />
Talcher Gopal prasad Bhalugadia Embakment development<br />
Talcher Gopal prasad Gopalprasad Mankadkenda embakment<br />
241<br />
Talcher Kankili LI point of Kankili village 10 lakh<br />
Talcher Dharampur Bangaru stone embackment 5 lakh<br />
Talcher Kandhal LI Point 10 lakh<br />
Talcher Santhapara Tulukumuni Embakment 7 lakh<br />
Talcher Santhapara Santhapada Nuasahi embackment<br />
4 lakh<br />
construction<br />
Chhendipada Chhendipada Cultivation,MIP & Adi Bandh 1.67 crore<br />
Chhendipada Bagadia Irrigation 8 lakh<br />
Chhendipada Jarapada LI Point 1 crore<br />
Chhendipada Balipata Lift Irrigation 25 lakh<br />
Chhendipada Kankarei Cultivation 1 lakh<br />
Chhendipada Dhukuda LI Point 1 crore<br />
Chhendipada Ogi LI 50 lakh<br />
Chhendipada Patakumunda LI point 8 lakh<br />
Chhendipada Changudia Kandanal MI Project 25 lakh<br />
Chhendipada Korada cultivation 10 lakh<br />
Chhendipada Para MIP 50 lakh<br />
Chhendipada Katada Adi bandh In Bauri Nala 20 lakh<br />
Chhendipada Basanta pur LI Point 20 lakh<br />
Chhendipada Kanaloi LI Point 1 crore<br />
Chhendipada Nuagaon LI Point 1 crore<br />
Chhendipada Machhakuta Irrigation 6 lakh<br />
Chhendipada Kushakila Excavation of Mala bandh 25 lakh<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com
Chhendipada Kushakila Water supply 10 lakh<br />
Chhendipada Patrapada Patrapada LI point 1 crore<br />
Chhendipada Barapada Mahakanda Khanan 50 lakh<br />
Chhendipada Kukurpetta Gadagadia nal LI construction 15 Lakh<br />
Chhendipada Similipal Lift Irrigation 40 lakh<br />
Chhendipada Barasahi Badabandh to Routalhataa (Bsaraha ghai) 10 thousand<br />
Chhendipada Barasahi Kausinal hata 5 thousand<br />
Chhendipada Barasahi Barasahi Badabandh 25 lakh<br />
Chhendipada Barasahi Achhei bandh 1 lakh<br />
Chhendipada Barasahi Kailasihata barasahi 5 lakh<br />
Chhendipada Durgapur LI 20 lakh<br />
<strong>Angul</strong> Talagarh LI point 50 lakh<br />
<strong>Angul</strong> Bantala LI Point 1 crore<br />
<strong>Angul</strong> Badakera Matalianadi LI development 1 crore<br />
<strong>Angul</strong> Badakera Piteimuni Talabhagabandh adi bandh 25 lakh<br />
242<br />
<strong>Angul</strong> Tainsi Maha bandha khanan (2 no) 20 lakh<br />
<strong>Angul</strong> Baragaunia Canal 20 lakh<br />
<strong>Angul</strong> Badakantakul Canal Tacharan 2 lakh<br />
<strong>Angul</strong> Badakantakul Panjasar talabandh 2 lakh<br />
<strong>Angul</strong> Badakantakul Kanjal bandh khanan 2 lakh<br />
<strong>Angul</strong> Shankhapur Bauli Canal 5 lakh<br />
<strong>Angul</strong> Shankhapur LI 10 lakh<br />
<strong>Angul</strong> Baluakata LI Point 3 lakh<br />
<strong>Angul</strong> kumurisinga LI Point 15 lakh<br />
<strong>Angul</strong> Sharadhapur Samarkata dam 1 crore<br />
<strong>Angul</strong> Sharadhapur Kumbhui nal 25 lakh<br />
<strong>Angul</strong> Sharadhapur Palamunda nal 5 lakh<br />
<strong>Angul</strong> Gadataras Lift Irrigation 50 lakh<br />
<strong>Angul</strong> Matiasahi Dholadimiri nal jalasechan 2 crore<br />
<strong>Angul</strong> Matiasahi Parabhaubha Adi bandha 50 lakh<br />
<strong>Angul</strong> Purunakote Purunakote Dam 1 lakh<br />
<strong>Angul</strong> Jagannathpur MIP 30 lakh<br />
<strong>Angul</strong> Pokatunga Kailash nal area 15 lakh<br />
<strong>Angul</strong> Inkarabandh LI point 5 lakh<br />
<strong>Angul</strong> Balasinha LI point 50 lakh<br />
<strong>Angul</strong> Kangulabentapur LI Point 50 lakh<br />
<strong>Angul</strong> Kothabhuin Dalasihan Nal Adi bandh & canal 15 lakh<br />
<strong>Angul</strong> Khinda LI 50 lakh<br />
<strong>Angul</strong> Basala Bhodabuda nal LI Point 10 lakh<br />
<strong>Angul</strong> Basala Adiasahi Bhodabudanal LI point 10 lakh<br />
<strong>Angul</strong> Basala Bherubania LI Point 10 lakh<br />
<strong>Angul</strong> Basala Baulinal Basala LI Point 10 lakh<br />
<strong>Angul</strong> Kumanda LI point 20lakh<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com
<strong>Angul</strong> Sanatarapur LI point 10 lakh<br />
<strong>Angul</strong> Matiasahi Madaliajor LI Point 10 lakh<br />
<strong>Angul</strong> Matiasahi Madaliajor LI Point 10 lakh<br />
Banarpal Mahidharpur LI Point 25 lakh<br />
Banarpal Kukudanga LI point 0.96 Lakh<br />
Banarpal Banda LI point 90 lakh<br />
Banarpal Tube Development of Cultivation 15 lakh<br />
Banarpal Talamul LI 70 lakh<br />
Banarpal Karadagadia Sanitation 75 lakh<br />
Banarpal Karadagadia LI Point 80 lakh<br />
Banarpal Jarasingha Pond renovation 20 lakh<br />
Baanrapal Sakosingha Renovation of Reservior 50 lakh<br />
Baanrapal Nuahata Renovation of reservers 55 Lakh<br />
Baanrapal Bauligada Renovation of reservers 50 Lakh<br />
Baanrapal Fulagada Renovation of reservers 70 Lakh<br />
Banarapal Balaram Prasad LI point 1.5 lakh<br />
Athamallik Kampala Costruction of embackment In Belapuji river<br />
bank<br />
Athamallik Basudevpur Construction of embackment in Mundapada<br />
river bank<br />
10 Lakh<br />
Athamallik Basudevpur Construction of embackment in Bura Ghat<br />
river bank<br />
10 Lakh<br />
Athamallik Basudevpur Construction of embackment in Bhoipada 15 Lakh<br />
river bank<br />
243<br />
Athamallik Tapdhool Irrigation 1 Crore<br />
Athamallik Tapdhool Taleighai Great embackment & Canal<br />
Athamallik Tapdhool Telikhala bar & canal<br />
Athamallik Thakurgad Renovation of Bileikhai embackment 25 Lakh<br />
Athamallik Thakurgad Renovation of Arampur Samanita<br />
Embackment<br />
25 Lakh<br />
Athamallik Sanahulla Excavation of Mahalanali canal 10 Lakh<br />
Athamallik Sanahulla Excavation of Ghodabandhuni project 10 Lakh<br />
Athamallik Sanahulla Sanahulla dry bar excavation 2 lakh<br />
Athamallik Madhapur Cross embackment 15 Lakh<br />
Athamallik Nagaon Cross embackment 15 Lakh<br />
Athamallik Aida Kutugaon Irrigation project 20 Crore<br />
Athamallik Aida Lift irrigatio project in the Mahanadi 2 Crore<br />
Athamallik Kantapada Mini irrigation programme 20 Lakh<br />
Athamallik Maimura Irrigation for agriculture 20 lakh<br />
Athamallik Sapaghara Agriculture 60 Lakh<br />
Athamallik Tusar Banapur canal irrigation project<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com
Athamallik Tusar Vandarimunda Mauli embackment<br />
Athamallik Tusar Tashrabeda village embackment<br />
Athamallik Tusar Orada village embackment<br />
Athamallik Ambasharmunda Hingagola Nala culvert 1 lakh<br />
Athamallik Ambasharmunda Dhalamaliha culvert .40 lakh<br />
Athamallik Ambasharmunda Siarimaliha culvert .40 lakh<br />
Athamallik Ambasharmunda Girida canal culvert .30 lakh<br />
Athamallik Ambasharmunda Bandhagaon Girida drain culvert .50 lakh<br />
Athamallik Ambasharmunda Potapodar drain culvert .40 lakh<br />
Athamallik Ambasharmunda Ragingi culvert .50 lakh<br />
Athamallik Ambasharmunda Akharakata to Rajingi road culvert 5 Lakh<br />
Athamallik Ambasharmunda Potapodar M.I.P construction 3 lakh<br />
Athamallik Ambasharmunda Bandhagaon Rajakata canal project<br />
1 lskh<br />
construction<br />
Athamallik Ambasharmunda Manmuri stream canal construction 1 lakh<br />
Athamallik Jamudoli Irrigation system 30 Lakh<br />
Athamallik Jamudoli Flood prevention 50 Lakh<br />
Athamallik Kudagaon Irrigation 10 Lakh<br />
Athamallik Pedipathara Badadadar Irrigation Project 30 Lakh<br />
Athamallik Pedipathara Jharabainda Irrigation Project 30 Lakh<br />
Athamallik Pedipathara Barahma Irrigation Project 30 Lakh<br />
Athamallik Pedipathara Development of Jhilimunda Irrigation 30 Lakh<br />
Project<br />
Athamallik Pedipathara Achyutpur Irrigation Project 30 Lakh<br />
Pallahara Parachhat Irrigation<br />
Pallahara Bandhabhuin Irrigation 50 lakh<br />
Pallahara Jharabeda Construction of canal 50 lakh<br />
Pallahara Pechamundi Irrigation 2 crores<br />
Pallahara Rohila Construction of canal 50 lakh<br />
Pallahara Khemala Water Reservoir project 20 lakh<br />
Pallahara Allori Irrigation 50 lakh<br />
Pallahara Khamar Cross embackment 20 lakh<br />
Pallahara Rajdang Construction of Canal and water reservoir 50,000,000.00<br />
Pallahara Munduribeda Irrigation 20,000,000.00<br />
Pallahara Munduribeda Kopaela field channel 20,000,000.00<br />
Pallahara Munduribeda Kachamunda canal 100,000.00<br />
Pallahara Balipasi LI 10 lakh<br />
Pallahara Badasara Irrigation 30 lakh<br />
Pallahara Sankhamur Irrigation 50 lakh<br />
Pallahara Dimiria Irrigation 10 lakh<br />
Pallahara Karadapal Irrigation 70 lakh<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
244
PONDS<br />
Block GP Proposed work Estimated cost in<br />
rupees<br />
Kishorenagar Jamunali Pond renovation 18 lakh<br />
Kishore Nagar Kataranga Guhira Mala bandh 10 LAKH<br />
Pallahara Seegarh Pond 5 lakh<br />
Pallahara Seegarh Pond 5 lakh<br />
Pallahara Seegarh Pond 5 lakh<br />
Pallahara Seegarh Pond 5 lakh<br />
Pallahara Seegarh Pond 5 lakh<br />
Chhendipada Paranga Big Pond &<br />
Cultivation<br />
25 lakh<br />
Chhendipada Natada Big Pond for<br />
irrigation<br />
30 lakh<br />
Chhendipada Changudia Big Pond 25 lakh<br />
Chhendipada Kampasala Big pond for<br />
cultivation<br />
25 lakh<br />
Chhendipada Brahmanabil big pond 25 lakh<br />
Chhendipada Tentulai Kodasahi Big pond for<br />
irrigation<br />
<strong>Angul</strong> Balanga Development of<br />
ponds in GP<br />
95 lakh<br />
30 lakh<br />
<strong>Angul</strong> Antulia Pond development<br />
(8 nos)<br />
20 lakh<br />
<strong>Angul</strong> Matiasahi Deulabandh uthajal 50 lakh<br />
<strong>Angul</strong> Angarbandha Ponds 1 crore<br />
<strong>Angul</strong> Chheliapada Pond digging 5 lakh<br />
<strong>Angul</strong> Inkarabandh pond digging 5 lakh<br />
<strong>Angul</strong> Kumanda pond digging 50 lakh<br />
<strong>Angul</strong> Sanatarapur Pond digging 30 lakh<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
245
Banarpal Tube Development of Pond 10 lakh<br />
Banarpal Bada Santri developent of pond 1 crore<br />
Banarpal Tulasipal Development of<br />
ponds<br />
20 lakh<br />
Banarpal Bhogabereni Development of pond 20 lakh<br />
Banarpal Badakerajang Development of pond 15 lakh<br />
Banarpal San Kerajang Development of pond 15 lakh<br />
Banarapal Kurudol stone packing in<br />
village pond side<br />
20 lakh<br />
Athamallik Lunahandi Irrigation for<br />
agriculture<br />
30 Lakh<br />
Pallahara Allori Water Reservoir<br />
Project<br />
3,000,000.00<br />
Pallahara Seegarh Pond renovation 5 lakh<br />
Pallahara Seegarh Pond 5 lakh<br />
Pallahara Seegarh Pond renovation 5 lakh<br />
Pallahara Seegarh Pond renovation 5 lakh<br />
Pallahara Seegarh Pond renovation 5 lakh<br />
AFFORESTATION/PLANTATION:<br />
Block GP Proposed work Estimated cost<br />
in rupees<br />
Raj Kishore Nagar Joyrat nutan jungle sarankshan 2.5 lakh<br />
Kishore Nagar Kadalimunda forest conservation<br />
project<br />
2.5 lakh<br />
Kishore Nagar Bamur Protection of forest<br />
Kaniha Samal Plantation 20 lakh<br />
Kaniha Samal Forest trench 50 lakh<br />
Talcher Gobara Pollution 10 lakh<br />
Talcher Danara Forest creation 25 lakh<br />
Talcher Kankili Plantation near Kankili 4 lakh<br />
roadside<br />
Talcher Kankili Plantation in Govt. land. 5 lakh<br />
Talcher Dera Forest creation 10 lakh<br />
Pallahara Chasagurujang Plantation on bothside of<br />
the roads<br />
Pallahara Iswarnagar Plantation in road side<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
246
Chhendipada Jeranga Dehuri sahi Forest Protection 50 lakh<br />
Chhendipada Patakumunda Plantation 3 lakh<br />
Chhendipada Basanta pur Plantation 20 lakh<br />
Chhendipada Tentulai Kodasahi Plantation 5 lakh<br />
Chhendipada Similipal Plantation 20 lakh<br />
<strong>Angul</strong> Talagarh Plantation 10 lakh<br />
<strong>Angul</strong> Bantala Plantation 20 lakh<br />
<strong>Angul</strong> Badakera Baladagoth<br />
(Ragudiapada) forest<br />
5 lakh<br />
creation,<br />
<strong>Angul</strong> Baluakata Forest 2 lakh<br />
<strong>Angul</strong> Gadataras Plantation 5 lakh<br />
<strong>Angul</strong> Purunakote Tuluku to Brakgh 1 lakh<br />
<strong>Angul</strong> Purunakote Chave to Kulu 1lakh<br />
<strong>Angul</strong> Inkarabandh forest 4 lakh<br />
<strong>Angul</strong> Balasinha Plantation 4 lakh<br />
<strong>Angul</strong> Kangulabentapur Plantation 10 lakh<br />
<strong>Angul</strong> Khinda Plantation 5 lakh<br />
Banarpal Kukudanga Forest 7 lakh<br />
Banarpal Kukudanga Paribesh Suraksha 90 lakh<br />
Banarpal Banda forest 8 lakh<br />
Banarpal Tube Forest<br />
Banarpal Talamul Forest 10 lakh<br />
Banarpal Talamul Paribes Suraksha 20 lakh<br />
Banarpal Karadagadia Paribes Suraksha 50 lakh<br />
Banarpal Karadagadia Forest 30 lakh<br />
Banarpal Jarasingha social foresty 15 lakh<br />
Banarpal Jarasingha Pollution control 30 lakh<br />
Banarpal Bada Santri Foresty 10 crore<br />
Banarpal Tulasipal Foresty 10 lakh<br />
Banarpal Tulasipal pollution control 20 lakh<br />
Banarpal Bhogabereni Foresty 10 lakh<br />
Banarpal Bhogabereni Pollution control 10 lakh<br />
Banarpal Badakerajang Forestry 10 lakh<br />
Banarpal Badakerajang Pollution control 25 lakh<br />
Banarpal San Kerajang Forestry 10 lakh<br />
Banarpal San Kerajang Pollution control 25 lakh<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
247
Baanrapal Sakosingha Afforstation 1 Crore<br />
Baanrapal Nuahata Afforstation 1 Crore<br />
Baanrapal Kanjara Afforstation 20 Lakh<br />
Baanrapal Gotamara Afforstation 20 Lakh<br />
Baanrapal Bauligada Afforstation 7 Lakh<br />
Baanrapal Fulagada Afforstation 10 Lakh<br />
Banarapal Kurudol Foresty 4 lakh<br />
Banarapal Kurudol Pollution control 10 lakh<br />
Banarapal Balaram Prasad Pollution 50 lakh<br />
Banarapal Balaram Prasad Plantation 5 lakh<br />
Athamallik Maipura Creation of more forests 5 lakh /year<br />
Athamallik Jamudholi Protection of Forest 15 Lakh<br />
Athamallik Kudgaon Afforstation 2 Lakh<br />
Pallahara Parachhat Forest<br />
Pallahara Karadapal Forest 60 lakh<br />
Pallahara Bandhabhuin Forest 10,000,000.00<br />
Pallahara Khemala Plantation 15 lakh<br />
Pallahara Rajdang Plantation 1 Crore<br />
Pallahara Munduribeda Forest creation 10,000.00<br />
Pallahara Munduribeda Forest creation 10,000.00<br />
Pallahara Batisuan Protection of Forest 50 lakh<br />
Pallahara Nijigada Plantation in Govt. land. 5 lakh<br />
ELECTRIFICATION<br />
Block GP Proposed work Estimated<br />
cost in<br />
rupees<br />
Kishore Dhadarpal Natada village road<br />
10 lakh<br />
Nagar<br />
electrification<br />
Kishore Bileinali Electrification to all village Exp. As per<br />
Nagar<br />
requirement<br />
Kaniha Rengali Electrification 50 lakh<br />
Kaniha Bajrakot Electrification 80 lakh<br />
Kaniha Kamarei Electrification 1 croe<br />
Talcher Ghantapada Electrification 5 lakh<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
248
Talcher Gobara Road electrification 10 lakh<br />
Talcher Tentulei Electrification 5 lakh<br />
Talcher Bantol Electrification<br />
Chhendipada Kukurpetta electricity supply to market<br />
complex<br />
<strong>Angul</strong> Shankhapur Electrification 20 lakh<br />
<strong>Angul</strong> Khalari Electrification 5 lakh<br />
<strong>Angul</strong> Gadataras Electrification 10 lakh<br />
<strong>Angul</strong> Jagannathpur Electrification 10 lakh<br />
<strong>Angul</strong> Inkarabandh Electrification 3 lakh<br />
<strong>Angul</strong> Balasinha Electrification 20 lakh<br />
<strong>Angul</strong> Khinda Electrification 10 lakh<br />
Banarpal Mahidharpur electrification 30 lakh<br />
Banarpal Kukudanga Electrification 8 crore<br />
Banarpal Tube Electrification & light<br />
Banarpal Talamul Electrification 25 lakh<br />
Banarpal Karadagadia Electrification 70 lakh<br />
Banarpal Jarasingha Electrification & light 30 lakh<br />
Banarpal Gadasantri Electrification & light 50 lakh<br />
Banarpal Tulasipal Electfificaion & lighting 20 lakh<br />
Banarpal Bhogabereni Electricity & lights 20 lakh<br />
Banarpal Badakerajang Electrification 30 lakh<br />
Banarpal San Kerajang Electricity & lights 30 lakh<br />
Baanrapal Sakosingha Electrification & Light system 60 Lakh<br />
Baanrapal Nuahata Electrification & light system 1 Crore<br />
Baanrapal Kanjara Electricity 20 Lakh<br />
Baanrapal Gotamara Electricity 20 Lakh<br />
Baanrapal Bauligada Electrification& Light system 50 Lakh<br />
Baanrapal Fulagada Electrification & light system 60 Lakh<br />
Banarapal Kurudol Electrification 15 lakh<br />
Banarpal Budhapanka Electrification & light system 60 Lakh<br />
Athamallik Kantapada Electricity supply 10 Lakh<br />
Pallahara Chasagurujang Street lights<br />
Pallahara Nagira Electricity 50 lakh<br />
AGRICULTURE<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
249
Block GP Proposed work Estimated<br />
cost in<br />
rupees<br />
Kaniha Kakudia Seeds Conservation centre 5 lakh<br />
Chhendipada Bahal sahi Hybrid seeds<br />
<strong>Angul</strong> Badakera Devloped cultivation, materials,<br />
seeds & cold store<br />
10 lakh<br />
Baanrapal Sakosingha Devlopment in agriculture 1 Crore<br />
Baanrapal Nuahata 8 80 Lakh<br />
Athamallik<br />
Establishment of Agriculture<br />
Kurumtap employemet centre 2 Lakh<br />
Athamallik Paikasahi Agriculture 80 Lakh<br />
Athamallik Maipura Fruit cultivation 5 lakh<br />
OTHER DEVELOPMENTAL WORKS<br />
Block GP Proposed work Estimated<br />
cost in<br />
rupees<br />
Kishore<br />
Nagar<br />
Kishore<br />
Nagar<br />
Kishore<br />
Nagar<br />
Kishore<br />
Nagar<br />
Kishore<br />
Nagar<br />
Gaon Bainda BO Post Office 5 lakh<br />
Nunukapasi Library 20 lakh<br />
Nunukapasi Playground 50 lakh<br />
Handapa Mini stadium 1 crore<br />
Kataranga Post office 5 lakh<br />
Kishore<br />
Nagar<br />
Bamur Industry 50 crore<br />
Kaniha Burukuna Saradhapur Play ground 15 lakh<br />
Kaniha Burukuna Burukuna Play ground 15 lakh<br />
Kaniha Shusuba Valiabeda play ground 5 lakh<br />
Kaniha Arakil Arakil Play ground 5<br />
Kaniha Arakil Iron wire for fence to<br />
save from elephant<br />
10 lakh<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
250
Kaniha Kakudia Gram Kalyan Kendra 20 lakh<br />
Kaniha Kakudia G. P. One Park 5 lakh<br />
Kaniha Kakudia Cold storage 10 lakh<br />
Kaniha Kakudia ____ centre in Every<br />
village<br />
5 lakh<br />
Kaniha Kakudia Kitchen room for Shiv<br />
Temple<br />
3 lakh<br />
Kaniha Kaniha Gram Kalyan Kendra for<br />
all<br />
10 lakh<br />
Kaniha Kaniha Play ground 5 lakh<br />
Kaniha Kaniha Smasan for all village 15 lakh<br />
Kaniha Kaniha Kaniha<br />
Kaniha Biru Elephant trench 10 lakh<br />
Kaniha Gandamala Suleipal playground 4 lakh<br />
Talcher Ghantapada Play ground 50 lakh<br />
Talcher Gobara Women's financial<br />
problem<br />
Talcher Gobara Play ground development 10 lakh<br />
Talcher Tentulei Play ground 50 lakh<br />
Talcher Bantol Drainage Problem 5 lakh<br />
Talcher Gopal prasad Hilika Jatra padia<br />
development<br />
10 lakh<br />
Talcher Gopal prasad Asan bahatika<br />
Talcher Kankili Kankili riverside stone<br />
packing<br />
50 lakh<br />
Pallahara Chasagurujang Preventive for Malaria<br />
Pallahara Chasagurujang Supply of sugar, rice,<br />
kirosene and wheat to all<br />
G.P, people<br />
Chhendipada Bagadia Drainage of water 10 lakh<br />
Chhendipada Balipata drainage of Water 5 lakh<br />
Chhendipada Jeranga Dehuri<br />
sahi<br />
Cultivation 5 lakh<br />
Chhendipada Jeranga Dehuri<br />
sahi<br />
Work for sports 3 lakh<br />
Chhendipada Jeranga Dehuri<br />
sahi<br />
Entertainment Centre 6 lakh<br />
Chhendipada Ogi Smal Industry 1 crore<br />
Chhendipada Para Small Industry 50 lakh<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
251
Chhendipada Katada Kanyashram 5 crore<br />
Chhendipada Kanaloi Tourist Place 10 lakh<br />
Chhendipada Nuagaon Tourist Place 10 lakh<br />
Chhendipada Durgapur drainage 10 lakh<br />
<strong>Angul</strong> Talagarh Playground 60 lakh<br />
<strong>Angul</strong> Bantala Playground 50 lakh<br />
<strong>Angul</strong> Bantala Kalyan Mandap 50 lakh<br />
<strong>Angul</strong> Baragaunia Bank 5 lakh<br />
<strong>Angul</strong> Badakantakul Badakantakul<br />
5 lakh<br />
Charangadapa<br />
<strong>Angul</strong> Badakantakul Kanji satagharia chhak 10 lakh<br />
<strong>Angul</strong> Badakantakul Nuanola Salpakharray 3 lakh<br />
<strong>Angul</strong> Shankhapur Drain construction 5 lakh<br />
<strong>Angul</strong> Khalari Play ground 20 lakh<br />
<strong>Angul</strong> Gadataras playground 50 lakh<br />
<strong>Angul</strong> Jagannathpur Play ground 15 lakh<br />
<strong>Angul</strong> Balasinha Playground 40 lakh<br />
<strong>Angul</strong> Kangulabentapur Playground 50 lakh<br />
<strong>Angul</strong> Khinda Playground 50 lakh<br />
Banarpal Kukudanga Natural Calamities 50 lakh<br />
Banarpal Kukudanga Eradication of Poverty 10 crore<br />
Banarpal Banda Pollution control 5 lakh<br />
Banarpal Tube pollution control 2 lakh<br />
Banarpal Kandasar Pollution control 5 lakh<br />
Banarpal Talamul natural calamities 10 lakh<br />
Banarpal Talamul Eradication of poverty 80 lakh<br />
Banarpal Karadagadia Natural Calamities 20 lakh<br />
Banarpal Karadagadia Eradication of poverty 70 lakh<br />
Banarpal Jarasingha Basti unnayan yojana /<br />
house construction<br />
30 lakh<br />
Banarpal Jarasingha Kalyan Mandap 2 lakh<br />
construction<br />
Banarpal Bada Santri Pollution control 10 lakh<br />
Bada Santri 8 Ana yojana<br />
Banarpal Gadasantri kalyan mandap 20 lakh<br />
Banarpal Kulad kalyan mandap 40 lakh<br />
Banarpal Bhogabereni house construction for<br />
basti development<br />
Banarpal Badakerajang Basti unnayan yojana 25 lakh<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
252
Banarpal San Kerajang Basti unnayan yojana/<br />
house construction<br />
25 lakh<br />
Baanrapal Sakosingha Sanitation of pollution 1 Crore<br />
Baanrapal Sakosingha Establishment of Kalyan<br />
Mandap<br />
50 Lakh<br />
Baanrapal Nuahata Environment pollution 1 Crore<br />
Baanrapal Nuahata Construction of<br />
Kalyanmandap<br />
50 Lakh<br />
Baanrapal Kanjara Supply of food 5 Lakh<br />
Baanrapal Gotamara Supply of food 5 Lakh<br />
Baanrapal Bauligada In the bank of<br />
Bauli&Lingara Canal<br />
stone packing &Step<br />
construction<br />
6 Crore<br />
Baanrapal Fulagada In the bank of Bauli<br />
Canal Stone packing &<br />
step Construction<br />
7 Crore<br />
Banarapal Kurudol Natural calamities 10 lakh<br />
Banarapal Kurudol Irradictation of poor 20 lakh<br />
Banarapal Balaram Prasad Natural Calamities 20 lakh<br />
Banarapal Balaram Prasad Irradictation of poor 20 lakh<br />
Banarapal Balaram Prasad Irradictation of poor 20 lakh<br />
Banarpal Kulad kalyan mandap 40 lakh<br />
Athamallik Thakurgad Construction o<br />
Thakuragad playground<br />
5 Lakh<br />
Athamallik Luhasinga Devlopment of pataka<br />
playground<br />
12 Lakh<br />
Athamallik Luhasinga The Mahanadi flood<br />
rehabiltatio centre<br />
construction<br />
3 Lakh<br />
Athamallik Aida Milk processing <strong>plan</strong>t 5 Lakh<br />
Athamallik Kantapada Establishment of small &<br />
cottage industry<br />
30 Lakh<br />
Athamallik Tusar Orada club building 3 Lakh<br />
Athamallik Krutibaspur Krutibaspur Siba temple<br />
construction<br />
10 Lakh<br />
Athamallik Pedipathara Establishment of fire<br />
station<br />
10 lakh<br />
Athamallik Pedipathara Establishment of VAW<br />
Centre<br />
5 lakh<br />
Athamallik Pedipathara Establishment of Bank 5 lakh<br />
Athamallik Jamudoli Devlopment of tourist 5 Lakh<br />
PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com<br />
253
Pallahara Rohila<br />
centre<br />
Post Office 200,000.00<br />
Pallahara Rohila Tourist place 5 lakh<br />
Pallahara Rohila Kala Bikash Kendra 5 lakh<br />
Pallahara Khemala Construction of play<br />
ground<br />
20 lakh<br />
Pallahara Allori Matru Mandal Kendra 16 lakh<br />
Pallahara Rajdang Construction of temple 3 crore<br />
Pallahara Rajdang Construction of play<br />
ground<br />
30 lakh<br />
Pallahara Rajdang Soil conservation 1 crore<br />
Pallahara Munduribeda Bustand play ground 10 lakh<br />
construction<br />
Pallahara Sankhamur Poultry & goatery 50 lakh<br />
Pallahara Batisuan Post Office 10 lakh<br />