I. COMPLET ED PROJECT S:<br />

N<br />

o.<br />

I. January 1, 2012 to August 31, 2012<br />

I. ROADS:<br />

Name of Projects Location Appropriation<br />

Source of<br />

Fund<br />

1 Conctg./Widening of Benares St., Capitol Brgy. Villamonte 2,800,000.00 2011 Flagship<br />

Heights Subd.<br />

Projects<br />

2 Conctg./Rehab. of Himul-awon St.,<br />

Capitol Heights Subd.<br />

3 Conctg. of Cypress Road, Rosario<br />

Heights Subd.<br />

Brgy. Villamonte 930,000.00 2011 Flagship<br />

Projects<br />

Account Code<br />

Date<br />

Started<br />

Estimated<br />

Days to<br />

Complete<br />

Works<br />

% of<br />

Accomplis<br />

hment<br />

Engineer<br />

Incharge<br />

6918-1171 (15) 08/08/11 300 100.00% Domingo L.<br />

Brey, Jr.<br />

6918-1171 (16) 10/28/11 150 100.00% Domingo L.<br />

Brey, Jr.<br />

Brgy. Taculing 345,000.00 AIP 2012 6918-1232 04/17/12 90 100.00% Domingo L.<br />

Brey, Jr.<br />

4 Conctg. of Road @ Prk. Katilingban Brgy. Bata 345,000.00 AIP 2012 6918-1229 05/02/12 90 100.00% Domingo L.<br />

Brey, Jr.<br />

5 Continuation of Concrete Rd., Prk.<br />

Barracuda<br />

6 Cementing of Roads @ Phase 5, Prk.<br />

Rosebell<br />

7 Conctg. of Gemini St. (Completion),<br />

Sharina Heights Subd.<br />

8 Conctg. of Road connecting Brgy. Alijis<br />

& Tangub (partial)<br />

9 Conctg. of San Antonio St., Prk. San<br />

Sebastian<br />

10 Conctg. of Saint Andrew St., Prk. San<br />

Sebastian<br />

11 Conctg. of Maple Road @ Rosario<br />

Heights Subd.<br />

Brgy. 1 75,000.00 AIP 2012 6918-1222 05/02/12 60 100.00% Domingo L.<br />

Brey, Jr.<br />

Brgy. Handumanan 345,000.00 AIP 2012 6918-1230 06/04/12 90 100.00% Domingo L.<br />

Brey, Jr.<br />

Brgy. Taculing 750,000.00 AIP 2011 6918-1171 (29) 02/13/12 75 100.00% Jaries E.<br />

Encabo<br />

Brgy. Alijis/Tangub 870,000.00 AIP 2011 6918-1171 (28) 03/01/12 150 100.00% Jaries E.<br />

Encabo<br />

Brgy. Sum-ag 1,500,000.00 AIP 2011 6918-1171 (22) 10/21/11 180 100.00% Simeon G.<br />

Gantes, Jr.<br />

Brgy. Sum-ag 1,500,000.00 AIP 2011 6918-1171 (21) 11/19/11 180 100.00% Simeon G.<br />

Gantes, Jr.<br />

Brgy. Taculing 1,000,000.00 AIP 2010 6918-10145 11/23/11 150 100.00% Simeon G.<br />

Gantes, Jr.<br />

12 Impv't./Widening of Lacson St. Brgy. Singcang-Airport 1,365,000.00 AIP 2011 6918-1171 (27) 01/24/12 180 100.00% Simeon G.<br />

Extension<br />

Gantes, Jr.<br />

13 Conctg. of Road Lot #6, Sharina Heights Brgy. Taculing 785,000.00 AIP 2010 6918-10144 11/17/11 150 100.00% Simeon G.<br />

Subd.<br />

Gantes, Jr.<br />

14 Conctg. of Aries St., Capitol Hills Subd. Brgy. Estefania 950,000.00 AIP 2010 6918-10143 11/23/11 150 100.00% Simeon G.<br />

Gantes, Jr.<br />

15 Road Widening of Gonzaga Ext., Doña Brgy. Taculing 4,700,000.00 AIP 2011 6918-1171 (3) 09/15/11 240 100.00% Simeon G.<br />

Juliana Subd.<br />

Gantes, Jr.<br />

16 Road Widening of Doña Juliana Drive,<br />

Doña Juliana Subd.<br />

17 Completion of Conc./Widening of Main<br />

Road<br />

Brgy. Taculing 4,500,000.00 AIP 2011 6918-1171 (4) 09/15/11 240 100.00% Simeon G.<br />

Gantes, Jr.<br />

Brgy. Handumanan 1,750,000.00 AIP 2011 6918-1171 (5) 11/23/11 250 100.00% Simeon G.<br />

Gantes, Jr.<br />

18 Impv't of Roads @ Prk. Akishola Brgy. Villamonte 1,500,000.00 AIP 2011 6918-1171 (23) 12/28/11 200 100.00% Simeon G.<br />

Gantes, Jr.<br />

19 Conctg. of Ivory St., <strong>City</strong> Heights Subd. Brgy. Taculing 1,300,000.00 AIP 2011 6918-1171 (19) 03/05/12 200 100.00% Simeon G.<br />

Gantes, Jr.<br />

20 Conctg. of UNO-R Ville Subd. Brgy. Mansilingan 500,000.00 Trust Fund -<br />

Sen. Teofisto<br />

Guingona III<br />

21 Concreting/Widening of Lacson Ext. St. Brgy. Singcang-Airport 1,500,000.00 Gen. Fund 2012 45-01-87-52(12)<br />

6<br />

22 Concreting of Palm Road @ Rosario Brgy. Taculing 1,000,000.00 Gen. Fund 2012 45-01-87-52(12)<br />

Heights Subd.<br />

7<br />

23 Development of Granada - Vista Alegre<br />

Relocation Site I & II (Additional Base<br />

for Item 201 & Shouldering)<br />

Brgy. Granada-Vista<br />

Alegre<br />

300-439 (152) 3 06/25/12 200 100.00% Simeon G.<br />

Gantes, Jr.<br />

07/02/12 180 100.00% Simeon G.<br />

Gantes, Jr.<br />

07/13/12 180 100.00% Simeon G.<br />

Gantes, Jr.<br />

5,000,000.00 Gen. Fund 2011 6918-1171 (1) 12/14/11 50 100.00% Ephraem S.<br />

Hechanova<br />

24 Conctg. of Prk. San Luis Road Brgy. Sum-ag 1,500,000.00 AIP 2011 6918-1171 (20) 10/01/11 180 100.00% Noel V.<br />

25 Conctg./Widening of Road fronting Brgy. Singcang-Airport 240,000.00 AIP 2011 6918-1171 (25) 04/01/12 17 100.00%<br />

Impreso<br />

Noel V.<br />

Magsungay Gym & Sto. Niño Chapel<br />

Impreso<br />

26 Conctg. of H.T. Jocson Road, Villa Celia<br />

Subd.<br />

27 Conctg. of Road leading to Prk.<br />

Meadows of Camelot<br />

Brgy. Taculing 950,000.00 AIP 2011 6918-1171 (12) 01/05/12 90 100.00% Amy G. Tentia<br />

Brgy. Estefania 1,464,565.00 AIP 2011 6918-1171 (11) 03/15/12 120 100.00% Amy G. Tentia<br />

28 Conctg. of Road @ Prk. Kabulakan II Brgy. Singcang-Airport 1,000,000.00 Trust<br />

Fund(PDAF<br />

Sen.Teofisto<br />

Guingona,III)<br />

40,464,565.00<br />

II BRIDGES:<br />

1. Complete Construction of Sanctuary<br />

Island Footbridge, Prk. Seawall<br />

2 Const. of Concrete Footbridge @ Prk.<br />

Kagaykay<br />

Republic of the Philippines<br />

OFFICE OF THE CITY ENGINEER<br />

<strong>City</strong> of <strong>Bacolod</strong><br />

<strong>ACCOMPLISHMENT</strong> <strong>REPORT</strong><br />

Status of Infrastructure Projects<br />

From July 1 , 2 0 0 4 to A ugust 3 1 , 2 0 1 2<br />

300-439 (152) 2 04/02/12 120 100.00% Amy G. Tentia<br />

Brgy. Punta Taytay 345,000.00 AIP 2010 6918-10116 11/22/11 120 100.00% Aladino A.<br />

Agbones<br />

Brgy. 2 200,000.00 AIP 2012 6918-1224 07/09/12 180 100.00% Aladino A.<br />

Agbones<br />

545,000.00<br />

1


I. COMPLET ED PROJECT S:<br />

N<br />

o.<br />

I. January 1, 2012 to August 31, 2012<br />

Name of Projects Location Appropriation<br />

II BUILDINGS (& STRUCTURES):<br />

I. 1 Renovation of Comfort Rooms @<br />

<strong>Bacolod</strong> Central Market<br />

Republic of the Philippines<br />

OFFICE OF THE CITY ENGINEER<br />

<strong>City</strong> of <strong>Bacolod</strong><br />

<strong>ACCOMPLISHMENT</strong> <strong>REPORT</strong><br />

Status of Infrastructure Projects<br />

From July 1 , 2 0 0 4 to A ugust 3 1 , 2 0 1 2<br />

Source of<br />

Fund<br />

Brgy. 12 200,000.00 Bldg. & Struc.<br />

Outlay<br />

Account Code<br />

45-01-8758 (11)<br />

D<br />

Date<br />

Started<br />

Estimated<br />

Days to<br />

Complete<br />

Works<br />

% of<br />

Accomplis<br />

hment<br />

Engineer<br />

Incharge<br />

12/02/11 90 100.00% Aladino A.<br />

Agbones<br />

2 Rehabilitation of Multi-Purpose Hall Brgy. 8 100,000.00 AIP 2011 6918-1111 01/16/12 90 100.00% Aladino A.<br />

Agbones<br />

3 Const. of Benches @ Brgy. Mini-Gym Brgy. 12 75,000.00 AIP 2011 6918-1119 (3) 01/03/12 60 100.00% Aladino A.<br />

Agbones<br />

4 Fencing of Brgy. Mini-Gym Brgy. 12 75,000.00 AIP 2011 6918-1119 (2) 01/03/12 90 100.00% Aladino A.<br />

Agbones<br />

5 Repainting of Brgy. Mini-Gym Brgy. 12 30,000.00 AIP 2011 6918-1119 (1) 01/03/12 30 100.00% Aladino A.<br />

Agbones<br />

6 Const. of Material Recovery Facility Brgy. Felisa 1,000,000.00 AIP 2011 1011-1110 01/18/12 60 100.00% Aladino A.<br />

Agbones<br />

7 Repair of Roofings of School Bldg.,<br />

<strong>Bacolod</strong> <strong>City</strong> College, Fortune Towne<br />

8 Impvt. of Multi-Purpose Bldg. @ Brgy.<br />

30<br />

9 Const. of Concrete Niches @ Brgy.<br />

Handumanan<br />

10 Impvt. of <strong>City</strong> Library (<strong>Bacolod</strong> <strong>City</strong><br />

Public Library)<br />

11 Const. of Bleachers & Enclosure of<br />

Brgy. Gym<br />

Brgy. Estefania 75,000.00 Other<br />

Structures<br />

Brgy. 30 345,000.00 AIP 2009 (Realigned)<br />

Res.#910 S'11<br />

Brgy. Handumanan 740,000.00 Other<br />

Structures<br />

439-13 02/16/12 90 100.00% Aladino A.<br />

Agbones<br />

6918-9074 02/22/12 120 100.00% Aladino A.<br />

Agbones<br />

6918-1206 (1) 02/23/12 150 100.00% Aladino A.<br />

Agbones<br />

Brgy. 36 200,000.00 AIP 2012 1122-1201-264 04/11/12 60 100.00% Aladino A.<br />

Agbones<br />

Brgy. Granada 345,000.00 AIP 2012 6918-1273 04/11/12 120 100.00% Aladino A.<br />

Agbones<br />

12 Impvt. of Toilet @ Brgy. Gym Brgy. Montevista 40,000.00 AIP 2012 6918-1275 04/13/12 30 100.00% Aladino A.<br />

Agbones<br />

13 Renovation of Brgy. Plaza Brgy. Montevista 100,000.00 AIP 2012 6918-1274 04/13/12 30 100.00% Aladino A.<br />

Agbones<br />

14 Renovation of Multi-Purpose Bldg. @ Brgy. 19 100,000.00 AIP 2012 6918-1250 05/07/12 90 100.00% Aladino A.<br />

Prk. Mabinuligon<br />

Agbones<br />

15 Impvt. of Fire Station @ Brgy. 16 Brgy. 16 480,000.00 PWD - Bldgs. 45-01-87-58 (12) 05/08/12 120 100.00% Aladino A.<br />

2012<br />

1<br />

Agbones<br />

16 Const. of Movable & Flexible Stage @ Brgy. 16 200,000.00 AIP 2012 6918-1246 05/07/12 90 100.00% Aladino A.<br />

Brgy. Gym<br />

Agbones<br />

17 Const. of Movable & Flexible Fence @<br />

Brgy. Gym<br />

Brgy. 16 145,000.00 AIP 2012 6918-1247 05/07/12 90 100.00% Aladino A.<br />

Agbones<br />

18 Repair & Maint. of Office Building<br />

30,000.00 Special 45-01-99-112-811 05/16/12 20 100.00% Aladino A.<br />

(Senior Citizen Dev't. Program), Old<br />

Proposed Appr.<br />

Agbones<br />

<strong>City</strong> Hall<br />

Fund 2012<br />

19 Const. of Multi-Purpose Building @ Brgy. 23 50,000.00 AIP 2012 6918-1131 05/23/12 90 100.00% Aladino A.<br />

Brgy. 23<br />

Agbones<br />

20 Impvt. of Communal Outlet @ Prk. Ylac Brgy. 1 85,000.00 AIP 2012 6918-1233 06/18/12 90 100.00% Aladino A.<br />

Agbones<br />

21 Total Reno. of Day Care Center & Multi- Brgy. 34 180,000.00 AIP 2012 6918-1267 06/18/12 150 100.00% Aladino A.<br />

Purpose Center Roof & Ceiling<br />

Agbones<br />

22 Installation of Commemorative Markers<br />

and Concrete Benches, NGC<br />

23 Renovation of Health Center @ Prk.<br />

Masinadyahon<br />

24 Renovation of Day Care Center @ Prk.<br />

Malipayon<br />

Brgy. Villamonte 300,000.00 PWD(Other<br />

Structures)<br />

45-01-8758 (10)<br />

C<br />

03/11/10 65 100.00% Aladino A.<br />

Agbones<br />

Brgy. 12 50,000.00 AIP 2012 6918-1244 07/17/12 60 100.00% Aladino A.<br />

Agbones<br />

Brgy. 12 50,000.00 AIP 2012 6918-1242 07/02/12 90 100.00% Aladino A.<br />

Agbones<br />

25 Repair of ETCS I Brgy. 14 350,000.00 SEF 2012 45-02-3311 (12) 07/16/12 90 100.00% Aladino A.<br />

2<br />

Agbones<br />

26 Repair of Banago ES I Brgy. Banago 500,000.00 SEF 2012 45-02-3311 (12) 07/23/12 120 100.00% Aladino A.<br />

1-812<br />

Agbones<br />

27 Impvt. of Multi-Purpose Hall Brgy. 9 100,000.00 AIP 2011 6918-1170 (11) 07/16/12 60 100.00% Aladino A.<br />

264<br />

Agbones<br />

28 Impv't. of 2nd Floor Extension of Brgy. 40 50,000.00 Repair & Maint. 45-01-88-11 01/02/12 30 100.00% Jaries E.<br />

Libertad South Market Office (Phase 4)<br />

- Market &<br />

Slaughter<br />

Encabo<br />

29 Park Impvt. @ Brgy. Cabug Brgy. Cabug 250,000.00 Capital Outlay 45-01-87-58 (11) 03/13/12 30 100.00% Jaries E.<br />

2011<br />

4<br />

Encabo<br />

30 Impvt. of <strong>Bacolod</strong> <strong>City</strong> Panaad Booth @ Brgy. Mansilingan 250,000.00 Capital Outlay 45-01-87-58 (12) 03/19/12 30 100.00% Jaries E.<br />

Brgy. Mansilingan<br />

2012<br />

2<br />

Encabo<br />

31 Rehab./Renov. of the Perimeter Fence<br />

of the Multi-Purpose Hall<br />

32 Renovation of Health Center @ Brgy.<br />

Villamonte<br />

33 Const. of Bleacher & Roofing of Sports<br />

Center @ the Brgy. Park<br />

34 Const. of Movable Steel Basketball<br />

Goals @ Brgy. 1<br />

Brgy. 17 100,000.00 AIP 2011 6918-1170 (12) 04/23/12 90 100.00% Jaries E.<br />

Encabo<br />

Brgy. Villamonte 345,000.00 AIP 2009 6918-9128 09/22/11 90 100.00% Jaries E.<br />

Encabo<br />

Brgy. Handumanan 345,000.00 AIP 2010 6918-10112 02/13/12 120 100.00% Jaries E.<br />

Encabo<br />

Brgy. 1 50,000.00 AIP 2011 6918-1105 10/18/11 15 100.00% Ephraem S.<br />

Hechanova<br />

7,335,000.00<br />

2


I. COMPLET ED PROJECT S:<br />

N<br />

o.<br />

VI<br />

.<br />

I. January 1, 2012 to August 31, 2012<br />

Name of Projects Location Appropriation<br />

OTHERS: (Drainage, Electrical, Water<br />

& Footwalks)<br />

A. DRAINAGE<br />

1 Const./Impvt. of Drainage System @<br />

Prk. Sigay<br />

Republic of the Philippines<br />

OFFICE OF THE CITY ENGINEER<br />

<strong>City</strong> of <strong>Bacolod</strong><br />

<strong>ACCOMPLISHMENT</strong> <strong>REPORT</strong><br />

Status of Infrastructure Projects<br />

From July 1 , 2 0 0 4 to A ugust 3 1 , 2 0 1 2<br />

Source of<br />

Fund<br />

Account Code<br />

Brgy. 2 200,000.00 AIP 2011 6918-1107 (1)<br />

271<br />

Date<br />

Started<br />

Estimated<br />

Days to<br />

Complete<br />

Works<br />

% of<br />

Accomplis<br />

hment<br />

Engineer<br />

Incharge<br />

12/02/11 250 100.00% Aladino A.<br />

Agbones<br />

2 Drainage Cleaning - Prk. Golaluma II Brgy. 25 30,000.00 AIP 2011 6918-1134 02/18/12 60 100.00% Domingo L.<br />

Brey, Jr.<br />

3 Drainage Rehabilitation - Prk. Golaluma Brgy. 25 70,000.00 AIP 2011 6918-1134 (1) 02/16/12 60 100.00% Domingo L.<br />

I<br />

Brey, Jr.<br />

4 Const. of Drainage with Box Culvert @ Brgy. 27 50,000.00 AIP 2010 6918-10130 04/02/12 30 100.00% Domingo L.<br />

Prk. Acacia<br />

Brey, Jr.<br />

5 Rehab. of Drainage System, Prk. Sto.<br />

Niño<br />

6 Rehab. of Drainage System, Prk. San<br />

Sebastian<br />

7 Rehab. of Drainage System, Prk. St.<br />

Joseph<br />

8 Impvt. of Footwalk & Drainage, Prk.<br />

Cheriza I & II<br />

9 Cleaning & Reditching of Canals, Prk.<br />

Katilingban I & II<br />

Brgy. 37 30,000.00 AIP 2012 6918-12102 04/03/12 45 100.00% Domingo L.<br />

Brey, Jr.<br />

Brgy. 37 20,000.00 AIP 2012 6918-12103 04/03/12 30 100.00% Domingo L.<br />

Brey, Jr.<br />

Brgy. 37 20,000.00 AIP 2012 6918-12104 04/03/12 30 100.00% Domingo L.<br />

Brey, Jr.<br />

Brgy. 27 100,000.00 AIP 2012 6918-1294 05/08/12 90 100.00% Domingo L.<br />

Brey, Jr.<br />

Brgy. 39 60,000.00 AIP 2012 6918-12107 05/02/12 60 100.00% Domingo L.<br />

Brey, Jr.<br />

10 Const. of Drainage System, Prk. Fatima Brgy. 31 120,000.00 AIP 2012 6918-1298 05/08/12 60 100.00% Domingo L.<br />

Brey, Jr.<br />

11 Const. of Drainage System/Laying of Brgy. 39 150,000.00 AIP 2012 6918-12106 05/16/12 60 100.00% Domingo L.<br />

Culvert Pipe<br />

Brey, Jr.<br />

12 Drainage System Impvt., Prk.<br />

Sunflower(from San Sebastian St. to<br />

Rosario St.)<br />

13 Const. of Drainage System, Prk. San<br />

Sebastian<br />

Brgy. 33 90,000.00 AIP 2012 6918-12101 60 100.00% Domingo L.<br />

Brey, Jr.<br />

Brgy. 31 100,000.00 AIP 2012 6918-1299 08/06/12 60 100.00% Domingo L.<br />

Brey, Jr.<br />

14 Cleaning & Clearing of Drainage System Brgy. 24 60,000.00 AIP 2010 6918-1075 03/02/10 60 100.00% Armando T.<br />

Cordova<br />

15 Rehab. of Drainage @ West Portion @ Brgy. 34 180,000.00 AIP 2010 6918-1091 03/01/10 60 100.00% Armando T.<br />

Bagong Buhay St., Prk. Tapulanga<br />

Cordova<br />

16 Rehab. of Drainage Line along<br />

Aguinaldo St.<br />

Brgy. 3 & 4 1,500,000.00 Pres'l. Dev't.<br />

Asst. Fund<br />

(PDAF) - Trust<br />

300-439 (142) 07/20/11 180 100.00% Simeon G.<br />

Gantes, Jr.<br />

17 Reditching & Declogging of Canals Brgy. 23<br />

Fund<br />

30,000.00 AIP 2012 6918-1292 04/01/12 11 100.00% Noel V.<br />

Impreso<br />

18 Rehabilitation of Drainage @ Brgy. 16 Brgy. 16 100,000.00 AIP 2011 6918-1129 04/01/12 52 100.00% Noel V.<br />

Impreso<br />

19 Desilting of Mambuloc Creek Brgy. 10 50,000.00 AIP 2012 6918-1283 05/01/12 22 100.00% Noel V.<br />

Impreso<br />

20 Declogging of Mambuloc Creek Brgy. 21 100,000.00 AIP 2012 6918-1290 06/01/12 30 100.00% Noel V.<br />

Impreso<br />

21 Drainage Improvement @ Uno de Mayo Brgy. Villamonte 500,000.00 AIP 2010 6918-10142 08/01/11 150 100.00% Noel V.<br />

St.<br />

Impreso<br />

22 Impvt. of Drainage System Brgy. 23 40,000.00 AIP 2012 6918-1291 04/01/12 11 100.00% Noel V.<br />

23 Drainage Renovation @ Brgy. 3 Brgy. 3 45,000.00 AIP 2012<br />

3,645,000.00<br />

6918-1225 08/01/12 20 100.00%<br />

Impreso<br />

Noel V.<br />

B. ELECTRICAL<br />

1 Rehab. of Lighting Facilities of <strong>Bacolod</strong><br />

Public Plaza<br />

Brgy. 12 1,000,000.00 Trust Fund 300-439 (140) 12/01/11 100.00% Orlando G.<br />

Dalipe, Jr.<br />

2 Street Lights of Brgy. 23 Brgy. 23 50,000.00 AIP 2012 6918-1255 05/02/12 180 100.00% Orlando G.<br />

Dalipe, Jr.<br />

3 Street Lights of Brgy. Alangilan Brgy. Alangilan 100,000.00 AIP 2012 6918-1270 05/02/12 120 100.00% Orlando G.<br />

Dalipe, Jr.<br />

4 Street Lights of Brgy. 13 Brgy. 13 100,000.00 AIP 2009 6918-9036 08/01/11 180 100.00% Orlando G.<br />

Dalipe, Jr.<br />

5 Streetlights of Brgy. 24 Brgy. 24 25,000.00 AIP 2011 6918-1170 (24) 40 100.00% Orlando G.<br />

Dalipe, Jr.<br />

6 Street Lights of Brgy. Vista Alegre Brgy. Vista Alegre 100,000.00 AIP 2012 6918-1276 180 100.00% Orlando G.<br />

Dalipe, Jr.<br />

7 Streetlights of Brgy. 31 Brgy. 31 50,000.00 AIP 2012 6918-1266 75 100.00% Orlando G.<br />

Dalipe, Jr.<br />

8 Street Lights of Brgy. 9 Brgy. 9 65,000.00 AIP 2012 6918-1241 08/15/12 135 100.00% Orlando G.<br />

Dalipe, Jr.<br />

1,490,000.00<br />

C. WATER<br />

1 Installation of Water Purification Brgy. Mandalagan 597,200.00 2010 Capital 45-01-1011 (240) 08/01/12 30 100.00% Aladino A.<br />

System<br />

Outlay E<br />

Agbones<br />

2 Replacement of Artesian Wells @ Brgy. Brgy. 10 40,000.00 AIP 2010 6918-1051 04/11/12 10 100.00% Ephraem S.<br />

10<br />

Hechanova<br />

3 Const. of Artesian Wells @ Various Brgys. Cabug, Felisa, 997,000.00 AIP 2011 6918-1171 (26) 12/05/11 250 100.00% Amy G. Tentia<br />

Brgys. (Brgy. Cabug, Felisa, Villamonte, Villamonte,<br />

Handumanan & Vista Alegre)<br />

Handumanan, & Vista<br />

Alegre<br />

4 Const. of Artesian Wells @ Various Brgy. Cabug, Felisa & 1,000,000.00 Trust Fund 300-439 (154)13 06/15/12 180 100.00% Amy G. Tentia<br />

Brgys.(Cabug, Felisa & Alijis)<br />

D. FOOTWALKS<br />

Alijis<br />

2,634,200.00<br />

DILG<br />

1 Const. of Elevated Footwalk @ Prk. Brgy. 2 145,000.00 AIP 2011 6918-1107 (2) 12/02/11 250 100.00% Aladino A.<br />

Balinday<br />

273<br />

Agbones<br />

2 Const. of Footwalks Brgy. Singcang-Airport 110,000.00 AIP 2009<br />

255,000.00<br />

6918-9122 60 100.00% Arnold E. Ea<br />

3


I. COMPLET ED PROJECT S:<br />

N<br />

o.<br />

I. January 1, 2012 to August 31, 2012<br />

Name of Projects Location Appropriation<br />

II ON-GOING PROJECT S:<br />

By Administration<br />

I. ROADS:<br />

Republic of the Philippines<br />

OFFICE OF THE CITY ENGINEER<br />

<strong>City</strong> of <strong>Bacolod</strong><br />

<strong>ACCOMPLISHMENT</strong> <strong>REPORT</strong><br />

Status of Infrastructure Projects<br />

From July 1 , 2 0 0 4 to A ugust 3 1 , 2 0 1 2<br />

Source of<br />

Fund<br />

1 Conctg./Widening of Benares St., Capitol Brgy. Villamonte 250,000.00 2012 General<br />

Heights Subd.<br />

Fund<br />

2 Widening of Concrete Road, corner<br />

Hernaez St. & Lopez Jaena St.<br />

Brgy. 31 1,200,000.00 2012 General<br />

Fund<br />

Account Code<br />

Date<br />

Started<br />

Estimated<br />

Days to<br />

Complete<br />

Works<br />

% of<br />

Accomplis<br />

hment<br />

Engineer<br />

Incharge<br />

45-01-87-52(12)2 07/02/12 120 20.00% Domingo L.<br />

Brey, Jr.<br />

45-01-87-52(12)4 07/09/12 150 48.22% Domingo L.<br />

Brey, Jr.<br />

3 Concreting/Completion of THASS I Subd. Brgy. Taculing 1,350,000.00 AIP 2010 6918-10147 07/09/12 150 50.43% Domingo L.<br />

Road, North Bound<br />

Brey, Jr.<br />

4 Conctg. of Roads @ Prk. Gaisano Brgy. Alijis 800,000.00 2012 General<br />

Fund<br />

5 Concreting of Road @ Prk. Paglaum Brgy. Taculing 325,000.00 2012 General<br />

Fund<br />

6 Concreting of Interior Road Lots of Villa Brgy. Tangub 1,600,000.00 2012 General<br />

Esperanza<br />

Fund<br />

7 Rehab. of Rosario St. (from San Juan St.<br />

to Nat'l. Road (Araneta St.)<br />

8 Rehab. of Hilado St. (from B.S. Aquino<br />

Drv. To Nat'l. Road (Burgos St.)<br />

9 Concreting of St. Mary's Ave., Doña<br />

Juliana Drive<br />

10 Concreting of Road @ Libra St., J.R.<br />

Torres Subd.<br />

1,000,000.00 Trust Fund 300-439 (154) 2<br />

DILG<br />

1,500,000.00 Trust Fund 300-439 (154) 5<br />

DILG<br />

Brgy. Taculing 870,000.00 Capital Outlay<br />

2012<br />

Brgy. Singcang-Airport 1,500,000.00 Gen. Fund 2012 45-01-87-52(12)<br />

5<br />

45-01-87-52(12)1 120 On-going Domingo L.<br />

Brey, Jr.<br />

45-01-87-52(12)3 75 On-going Domingo L.<br />

Brey, Jr.<br />

45-01-87-<br />

150 On-going Domingo L.<br />

52(12)18<br />

Brey, Jr.<br />

07/24/12 88 43.40% Jaries E.<br />

Encabo<br />

07/24/12 153 39.94% Jaries E.<br />

Encabo<br />

6918-1171 (28) 08/01/12 150 36.81% Jaries E.<br />

Encabo<br />

08/17/12 180 76.79% Simeon G.<br />

Gantes, Jr.<br />

11 Const. of Outer-Circumferencial Road Brgy. Vista Alegre 10,000,000.00 2000-20% 101-8918(40)'00 01/04/01 82 27.00% Ephraem S.<br />

Devt. Fund<br />

Hechanova<br />

12 Widening of Burgos St. Brgy. 10 1,000,000.00 AIP 2006; Item 101-6918-6040 12/01/06 69 25.90% Noel V.<br />

# 8 Cluster<br />

5(By Contract)<br />

Impreso<br />

13 Conctg. of Roads @ Prk. Pag-asa, Brgy. Estefania 1,000,000.00 AIP 2010 6918-10136 03/01/10 103 15.00% Noel V.<br />

Fortune Towne Relocation Site<br />

Impreso<br />

14 Rehab. of Aguinaldo St. (From 18th St.<br />

to Nat'l. Road (North Capitol Rd.)<br />

15 Rehab. of Magsaysay St.(From Corazon<br />

C. Aquino Drive to Nat'l. Road (Araneta<br />

St.)<br />

16 Const./Impvt.of Lacson St.<br />

Extension(From Magsungay Bridge to<br />

<strong>Bacolod</strong>-Murcia Rd.)<br />

17 Const./Completion of Aljis-Taculing<br />

Road - (Cluster II)<br />

II BRIDGES:<br />

1. Const. of Alijis - Taculing Road<br />

(Including Bridge Const.)<br />

2 Road & Bridge @ Gatuslao Ext. to<br />

connect back of Robinsons (Const. of<br />

30 ln.m. Post Tension Mandalagan<br />

II BUILDINGS (& STRUCTURES):<br />

I. 1 Tourist/Police Information and<br />

Restroom Project, Brgy. Punta Taytay<br />

Brgy. 4 1,500,000.00 LGSF 300-439 (154) 4 08/01/12 150 25.00% Noel V.<br />

Impreso<br />

Brgy. Singcang-<br />

Airport/Taculing<br />

2,000,000.00 LGSF 300-439 (154) 3 08/01/12 180 15.00% Noel V.<br />

Impreso<br />

Brgy. Singcang-Airport 3,000,000.00 LGSF 300-439 (154) 6 08/01/12 210 30.00% Noel V.<br />

Impreso<br />

Brgy. Alijis - Taculing 5,000,000.00 Capital Outlay<br />

2010<br />

33,895,000.00<br />

Brgy. Alijis - Taculing 14,590,000.00 2000-20%<br />

Devt. Fund<br />

Ephraem S.<br />

Hechanova<br />

101-6911 (45)'02 03/01/10 258 90.48% Ephraem S.<br />

Hechanova<br />

19,315,064.00 AIP 2009 6918-9001 04/29/10 280 84.24% Ephraem S.<br />

Hechanova<br />

33,905,064.00<br />

Brgy.Punta Taytay 573,249.37 Trust Fund 300-439(109) 05/02/06 100 62.77% Aladino A.<br />

Agbones<br />

2 Rehabilitation of Coastal Toilets Brgy. 1 - 6 950,000.00 Bldgs. 2008 45-01-8758 (08) 01/08/10 180 83.76% Aladino A.<br />

15<br />

Agbones<br />

3 Completion of PSCAB Multi-purpose Brgy. 16 500,000.00 Trust Fund- 300-439(130) 03/07/10 120 53.37% Aladino A.<br />

Center (Senior Citizen Gym)<br />

Presidential<br />

Social Fund<br />

Agbones<br />

4 Repair of Public Market Roofing/Gutters Brgy. 12 500,000.00 Nat'l. Fund- 300-439 (150) 06/18/12 40 75.00% Aladino A.<br />

(Central Market)<br />

Sen.Escudero<br />

Agbones<br />

5 Rehabilitation of Public Market (Central<br />

Market)<br />

Brgy. 12 1,500,000.00 Trust Fund 300-439 (154) 8 06/29/12 150 94.70% Aladino A.<br />

Agbones<br />

6 Impvt. of <strong>Bacolod</strong> <strong>City</strong> Government Brgy. Villamonte 1,350,000.00 Bldgs. 2012 45-01-8758 (12) 06/26/12 200 80.33% Aladino A.<br />

Center<br />

03<br />

Agbones<br />

7 Rehab. of Public Market (Libertad Brgy. 40 4,000,000.00 DILG 300-439 (154) 7 07/17/12 180 50.02% Aladino A.<br />

Market)<br />

Agbones<br />

8 Mini-Gym, Prk. Cabugwason Brgy. Mansilingan 1,500,000.00 PAGCOR Fund: 302-8-84 (3) 08/03/12 200 75.71% Aladino A.<br />

Res.#279, S'<br />

2012<br />

Agbones<br />

9 Installation of Temporary Enclosure of Brgy. 19 143,000.00 Trust Fund 439-048-0999- 08/24/12 60 77.52% Aladino A.<br />

Fire Damaged Structures @ North<br />

(Burgos) Public Market<br />

0001<br />

Agbones<br />

10 Clean & Green Projects Brgy. 28 40,000.00 AIP 2012 6918-1262 30 On-going Domingo L.<br />

Brey, Jr.<br />

11 Partial Const. of Mini-Coliseum (Phase Brgy. Estefania 345,000.00 AIP 2009 6918-9111 09/03/09 5.00% Jaries E.<br />

1), Brgy. Estefania<br />

Encabo<br />

12 Rehab. & Impvt. @ Libertad South<br />

Market<br />

13 Construction of Mini-gym @ Prk. San<br />

Mateo, Brgy. Banago (partial)<br />

14 Const. of Mini-gym @ ABADA ESCAY,<br />

Brgy. Vista Alegre (partial)<br />

Brgy. 40 3,000,000.00 Trust Fund 300-439 (154) 11 08/13/12 150 10.00% Jaries E.<br />

DILG<br />

Encabo<br />

Brgy. Banago 1,950,000.00 PAGCOR Fund 302-8-84 (02) 07/02/12 150 26.19% Amy G. Tentia<br />

Brgy. Vista Alegre 1,950,000.00 PAGCOR Fund 302-8-84 (01) 08/22/12 150 5.20% Amy G. Tentia<br />

18,301,249.37<br />

4


I. COMPLET ED PROJECT S:<br />

N<br />

o.<br />

VI<br />

.<br />

I. January 1, 2012 to August 31, 2012<br />

Name of Projects Location Appropriation<br />

OTHERS: (Drainage, Electrical, Water<br />

& Footwalks)<br />

A. DRAINAGE<br />

Republic of the Philippines<br />

OFFICE OF THE CITY ENGINEER<br />

<strong>City</strong> of <strong>Bacolod</strong><br />

<strong>ACCOMPLISHMENT</strong> <strong>REPORT</strong><br />

Status of Infrastructure Projects<br />

From July 1 , 2 0 0 4 to A ugust 3 1 , 2 0 1 2<br />

Source of<br />

Fund<br />

Account Code<br />

Date<br />

Started<br />

Estimated<br />

Days to<br />

Complete<br />

Works<br />

% of<br />

Accomplis<br />

hment<br />

Engineer<br />

Incharge<br />

1 Const. of Footwalk & Drainage with Box Brgy. 27 145,000.00 AIP 2012 6918-1295 90 On-going Domingo L.<br />

Culvert, Prk. Star Apple I & II<br />

Brey, Jr.<br />

2 Installation/Maintenance of Culverts w/<br />

Box & Cover, Prk. Ipil-ipil & Balunggay<br />

3 Drainage System Impvt., Prk.<br />

Sunflower(from Rosario St. to Lopez<br />

Jaena St.)<br />

Brgy. 28 100,000.00 AIP 2012 6918-1296 60 On-going Domingo L.<br />

Brey, Jr.<br />

Brgy. 33 90,000.00 AIP 2012 6918-12100 60 On-going Domingo L.<br />

Brey, Jr.<br />

4 Rehab. of Drainage @ Brgy. 35 Brgy. 35 50,000.00 AIP 2010 6918-1095 03/01/10 60 30.00% Armando T.<br />

Cordova<br />

5 Drainage Const. with Riprap along Sisi<br />

Pta. Magsungay, Brgy. Singcang-Airport<br />

Brgy. Singcang-Airport 110,000.00 AIP 2009 6918-9124 03/02/10 90 75.00% Arnold E. Ea<br />

6 Reconst./Decongestion of Damaged<br />

Drainage Channel from Mambuloc Creek<br />

Cutting across Reclamation Area<br />

7 Rehab. of Drainage System of Brgy. 5<br />

(Realigned from Rehab. of Damaged<br />

Retaining Wall along Mandalagan River @<br />

Brgy. 5 - SP Res.# 910 S. 2011)<br />

8 Drainage Impvt. & Rehabilitation of<br />

Doña Juliana Street<br />

8,500,000.00 PDAF -<br />

Presidential<br />

Dev't. Asst.<br />

Fund<br />

300-439 (142) 06/16/12 240 60.80% Simeon G.<br />

Gantes, Jr.<br />

Brgy. 5 100,000.00 AIP 2009 6918-9019 60 On-going Simeon G.<br />

Gantes, Jr.<br />

Brgy. 33 180,000.00 AIP 2011 6918-1170 (29) 06/01/11 120 10.00% Noel V.<br />

Impreso<br />

9 Drainage Improvement @ Brgy. 3 (From Brgy. 3 2,500,000.00 AIP 2011 6918-1171 (18) 11/01/11 300 94.00% Noel V.<br />

Gatuslao St. to San Juan St.)<br />

Impreso<br />

10 Riprap along Mambuloc Creek Brgy. 11 100,000.00 AIP 2012 6918-1285 07/01/12 14 90.00% Noel V.<br />

11,875,000.00<br />

B. ELECTRICAL<br />

1 Streetlights of Brgy. 24 Brgy. 24 40,000.00 AIP 2010 6918-1076 80 On-going Orlando G.<br />

Dalipe, Jr.<br />

2 Streetlights of Brgy. 6 Brgy. 6 35,000.00 AIP 2012 6918-1237 120 On-going Orlando G.<br />

Dalipe, Jr.<br />

3 Street Lights of Brgy. 17 Brgy. 17 35,000.00 AIP 2012 6918-1249 30 On-going Orlando G.<br />

Dalipe, Jr.<br />

4 Street Lights of Brgy. Montevista Brgy. Montevista 40,000.00 Res.# 425 S' 6918-1211 90 On-going Orlando G.<br />

12<br />

150,000.00<br />

Dalipe, Jr.<br />

C. WATER<br />

1 Const. of Water Refilling Station @<br />

Brgy. Mandalagan<br />

2 Const. of Artesian Wells @ Various<br />

Brgys.(Taculing, Bata, Mandalagan &<br />

Brgy.31)<br />

3 Const. of Artesian Wells @ Various<br />

Brgys.(B - 1, 2, 3, 4, 6, 10, 14 &<br />

Singcang)<br />

4 Const. of Artesian Wells @ Various<br />

Brgys.(Granada, Tangub, Pahanocoy,<br />

Brgy. 37, 38 & 39)<br />

Brgy. Mandalagan 450,000.00 Bldg. & Struc.<br />

Outlay<br />

Brgy. Taculing, Bata,<br />

Mandalagan & Brgy. 31<br />

Brgy. 1, 2, 3, 4, 6, 10,<br />

14 & Singcang<br />

Brgy.Granada, Tangub,<br />

Pahanocoy, 37, 38 &<br />

39<br />

45-01-87-58 (09)<br />

17<br />

1,000,000.00 Trust Fund 300-439 (154)14<br />

DILG<br />

1,000,000.00 Trust Fund 300-439 (154)18<br />

DILG<br />

1,000,000.00 Trust Fund 300-439 (154)16<br />

DILG<br />

3,450,000.00<br />

5<br />

03/18/10 120 5.00% Aladino A.<br />

Agbones<br />

05/21/12 180 85.00% Amy G. Tentia<br />

06/15/12 180 58.69% Amy G. Tentia<br />

07/16/12 180 75.00% Amy G. Tentia


I. COMPLET ED PROJECT S:<br />

N<br />

o.<br />

I. January 1, 2012 to August 31, 2012<br />

Name of Projects Location Appropriation<br />

S U M M A R Y<br />

I. COMPLETED PROJECTS:<br />

ROADS P 40,464,565.00<br />

BRIDGES 545,000.00<br />

BUILDINGS (& STRUCTURES) 7,335,000.00<br />

OTHERS (Drainage, Electrical, Water & Footwalks)<br />

Drainage 3,645,000.00<br />

Electrical 1,490,000.00<br />

Water 2,634,200.00<br />

Footwalks 255,000.00<br />

SUB-TOTAL P 56,368,765.00<br />

II. ON-GOING PROJECTS<br />

ROADS P 33,895,000.00<br />

BRIDGES 33,905,064.00<br />

BUILDINGS (& STRUCTURES) 18,301,249.37<br />

OTHERS (Drainage, Electrical, Water & Footwalks)<br />

Drainage 11,875,000.00<br />

Electrical 150,000.00<br />

Water 3,450,000.00<br />

SUB-TOTAL P 101,576,313.37<br />

T O T A L P 157,945,078.37<br />

Republic of the Philippines<br />

OFFICE OF THE CITY ENGINEER<br />

<strong>City</strong> of <strong>Bacolod</strong><br />

<strong>ACCOMPLISHMENT</strong> <strong>REPORT</strong><br />

Status of Infrastructure Projects<br />

From July 1 , 2 0 0 4 to A ugust 3 1 , 2 0 1 2<br />

6<br />

Source of<br />

Fund<br />

Account Code<br />

Date<br />

Started<br />

Estimated<br />

Days to<br />

Complete<br />

Works<br />

% of<br />

Accomplis<br />

hment<br />

Engineer<br />

Incharge

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!