ACCOMPLISHMENT REPORT - Bacolod City
ACCOMPLISHMENT REPORT - Bacolod City
ACCOMPLISHMENT REPORT - Bacolod City
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
I. COMPLET ED PROJECT S:<br />
N<br />
o.<br />
VI<br />
.<br />
I. January 1, 2012 to August 31, 2012<br />
Name of Projects Location Appropriation<br />
OTHERS: (Drainage, Electrical, Water<br />
& Footwalks)<br />
A. DRAINAGE<br />
1 Const./Impvt. of Drainage System @<br />
Prk. Sigay<br />
Republic of the Philippines<br />
OFFICE OF THE CITY ENGINEER<br />
<strong>City</strong> of <strong>Bacolod</strong><br />
<strong>ACCOMPLISHMENT</strong> <strong>REPORT</strong><br />
Status of Infrastructure Projects<br />
From July 1 , 2 0 0 4 to A ugust 3 1 , 2 0 1 2<br />
Source of<br />
Fund<br />
Account Code<br />
Brgy. 2 200,000.00 AIP 2011 6918-1107 (1)<br />
271<br />
Date<br />
Started<br />
Estimated<br />
Days to<br />
Complete<br />
Works<br />
% of<br />
Accomplis<br />
hment<br />
Engineer<br />
Incharge<br />
12/02/11 250 100.00% Aladino A.<br />
Agbones<br />
2 Drainage Cleaning - Prk. Golaluma II Brgy. 25 30,000.00 AIP 2011 6918-1134 02/18/12 60 100.00% Domingo L.<br />
Brey, Jr.<br />
3 Drainage Rehabilitation - Prk. Golaluma Brgy. 25 70,000.00 AIP 2011 6918-1134 (1) 02/16/12 60 100.00% Domingo L.<br />
I<br />
Brey, Jr.<br />
4 Const. of Drainage with Box Culvert @ Brgy. 27 50,000.00 AIP 2010 6918-10130 04/02/12 30 100.00% Domingo L.<br />
Prk. Acacia<br />
Brey, Jr.<br />
5 Rehab. of Drainage System, Prk. Sto.<br />
Niño<br />
6 Rehab. of Drainage System, Prk. San<br />
Sebastian<br />
7 Rehab. of Drainage System, Prk. St.<br />
Joseph<br />
8 Impvt. of Footwalk & Drainage, Prk.<br />
Cheriza I & II<br />
9 Cleaning & Reditching of Canals, Prk.<br />
Katilingban I & II<br />
Brgy. 37 30,000.00 AIP 2012 6918-12102 04/03/12 45 100.00% Domingo L.<br />
Brey, Jr.<br />
Brgy. 37 20,000.00 AIP 2012 6918-12103 04/03/12 30 100.00% Domingo L.<br />
Brey, Jr.<br />
Brgy. 37 20,000.00 AIP 2012 6918-12104 04/03/12 30 100.00% Domingo L.<br />
Brey, Jr.<br />
Brgy. 27 100,000.00 AIP 2012 6918-1294 05/08/12 90 100.00% Domingo L.<br />
Brey, Jr.<br />
Brgy. 39 60,000.00 AIP 2012 6918-12107 05/02/12 60 100.00% Domingo L.<br />
Brey, Jr.<br />
10 Const. of Drainage System, Prk. Fatima Brgy. 31 120,000.00 AIP 2012 6918-1298 05/08/12 60 100.00% Domingo L.<br />
Brey, Jr.<br />
11 Const. of Drainage System/Laying of Brgy. 39 150,000.00 AIP 2012 6918-12106 05/16/12 60 100.00% Domingo L.<br />
Culvert Pipe<br />
Brey, Jr.<br />
12 Drainage System Impvt., Prk.<br />
Sunflower(from San Sebastian St. to<br />
Rosario St.)<br />
13 Const. of Drainage System, Prk. San<br />
Sebastian<br />
Brgy. 33 90,000.00 AIP 2012 6918-12101 60 100.00% Domingo L.<br />
Brey, Jr.<br />
Brgy. 31 100,000.00 AIP 2012 6918-1299 08/06/12 60 100.00% Domingo L.<br />
Brey, Jr.<br />
14 Cleaning & Clearing of Drainage System Brgy. 24 60,000.00 AIP 2010 6918-1075 03/02/10 60 100.00% Armando T.<br />
Cordova<br />
15 Rehab. of Drainage @ West Portion @ Brgy. 34 180,000.00 AIP 2010 6918-1091 03/01/10 60 100.00% Armando T.<br />
Bagong Buhay St., Prk. Tapulanga<br />
Cordova<br />
16 Rehab. of Drainage Line along<br />
Aguinaldo St.<br />
Brgy. 3 & 4 1,500,000.00 Pres'l. Dev't.<br />
Asst. Fund<br />
(PDAF) - Trust<br />
300-439 (142) 07/20/11 180 100.00% Simeon G.<br />
Gantes, Jr.<br />
17 Reditching & Declogging of Canals Brgy. 23<br />
Fund<br />
30,000.00 AIP 2012 6918-1292 04/01/12 11 100.00% Noel V.<br />
Impreso<br />
18 Rehabilitation of Drainage @ Brgy. 16 Brgy. 16 100,000.00 AIP 2011 6918-1129 04/01/12 52 100.00% Noel V.<br />
Impreso<br />
19 Desilting of Mambuloc Creek Brgy. 10 50,000.00 AIP 2012 6918-1283 05/01/12 22 100.00% Noel V.<br />
Impreso<br />
20 Declogging of Mambuloc Creek Brgy. 21 100,000.00 AIP 2012 6918-1290 06/01/12 30 100.00% Noel V.<br />
Impreso<br />
21 Drainage Improvement @ Uno de Mayo Brgy. Villamonte 500,000.00 AIP 2010 6918-10142 08/01/11 150 100.00% Noel V.<br />
St.<br />
Impreso<br />
22 Impvt. of Drainage System Brgy. 23 40,000.00 AIP 2012 6918-1291 04/01/12 11 100.00% Noel V.<br />
23 Drainage Renovation @ Brgy. 3 Brgy. 3 45,000.00 AIP 2012<br />
3,645,000.00<br />
6918-1225 08/01/12 20 100.00%<br />
Impreso<br />
Noel V.<br />
B. ELECTRICAL<br />
1 Rehab. of Lighting Facilities of <strong>Bacolod</strong><br />
Public Plaza<br />
Brgy. 12 1,000,000.00 Trust Fund 300-439 (140) 12/01/11 100.00% Orlando G.<br />
Dalipe, Jr.<br />
2 Street Lights of Brgy. 23 Brgy. 23 50,000.00 AIP 2012 6918-1255 05/02/12 180 100.00% Orlando G.<br />
Dalipe, Jr.<br />
3 Street Lights of Brgy. Alangilan Brgy. Alangilan 100,000.00 AIP 2012 6918-1270 05/02/12 120 100.00% Orlando G.<br />
Dalipe, Jr.<br />
4 Street Lights of Brgy. 13 Brgy. 13 100,000.00 AIP 2009 6918-9036 08/01/11 180 100.00% Orlando G.<br />
Dalipe, Jr.<br />
5 Streetlights of Brgy. 24 Brgy. 24 25,000.00 AIP 2011 6918-1170 (24) 40 100.00% Orlando G.<br />
Dalipe, Jr.<br />
6 Street Lights of Brgy. Vista Alegre Brgy. Vista Alegre 100,000.00 AIP 2012 6918-1276 180 100.00% Orlando G.<br />
Dalipe, Jr.<br />
7 Streetlights of Brgy. 31 Brgy. 31 50,000.00 AIP 2012 6918-1266 75 100.00% Orlando G.<br />
Dalipe, Jr.<br />
8 Street Lights of Brgy. 9 Brgy. 9 65,000.00 AIP 2012 6918-1241 08/15/12 135 100.00% Orlando G.<br />
Dalipe, Jr.<br />
1,490,000.00<br />
C. WATER<br />
1 Installation of Water Purification Brgy. Mandalagan 597,200.00 2010 Capital 45-01-1011 (240) 08/01/12 30 100.00% Aladino A.<br />
System<br />
Outlay E<br />
Agbones<br />
2 Replacement of Artesian Wells @ Brgy. Brgy. 10 40,000.00 AIP 2010 6918-1051 04/11/12 10 100.00% Ephraem S.<br />
10<br />
Hechanova<br />
3 Const. of Artesian Wells @ Various Brgys. Cabug, Felisa, 997,000.00 AIP 2011 6918-1171 (26) 12/05/11 250 100.00% Amy G. Tentia<br />
Brgys. (Brgy. Cabug, Felisa, Villamonte, Villamonte,<br />
Handumanan & Vista Alegre)<br />
Handumanan, & Vista<br />
Alegre<br />
4 Const. of Artesian Wells @ Various Brgy. Cabug, Felisa & 1,000,000.00 Trust Fund 300-439 (154)13 06/15/12 180 100.00% Amy G. Tentia<br />
Brgys.(Cabug, Felisa & Alijis)<br />
D. FOOTWALKS<br />
Alijis<br />
2,634,200.00<br />
DILG<br />
1 Const. of Elevated Footwalk @ Prk. Brgy. 2 145,000.00 AIP 2011 6918-1107 (2) 12/02/11 250 100.00% Aladino A.<br />
Balinday<br />
273<br />
Agbones<br />
2 Const. of Footwalks Brgy. Singcang-Airport 110,000.00 AIP 2009<br />
255,000.00<br />
6918-9122 60 100.00% Arnold E. Ea<br />
3