<strong>GLEN</strong> <strong>Site</strong><br />

TheNewMUHC<br />

<strong>Site</strong> <strong>GLEN</strong> <strong>Site</strong>


Agenda<br />

• TheDesignoftheGlen<strong>Site</strong><br />

• Transforming thePatientHospital<br />

Experience<br />

• Accessing theGlen<strong>Site</strong><br />

<strong>Site</strong> <strong>GLEN</strong> <strong>Site</strong><br />

2


RobertHamilton<br />

SeniorDirector MUHCGlenCampusDevelopment<br />

<strong>Site</strong> <strong>GLEN</strong> <strong>Site</strong><br />

3


<strong>GLEN</strong> <strong>Site</strong><br />

TheNewMUHC<br />

View from Decarie<br />

Constructioncomplete:Fall 2014<br />

Firstpatients:Spring/Summer 2015<br />

<strong>Site</strong> <strong>GLEN</strong> <strong>Site</strong>


<strong>GLEN</strong> <strong>Site</strong><br />

TheNewMUHC<br />

<strong>Site</strong> <strong>GLEN</strong> <strong>Site</strong>


<strong>Site</strong> <strong>GLEN</strong> <strong>Site</strong>


AneasyPATIENTEXPERIENCE<br />

Easyairportstyledropoffzones<br />

atallpublicentrances<br />

Colourcodedwayfinding signs<br />

Clearnetworkofinteriorstreets<br />

<strong>Site</strong> <strong>GLEN</strong> <strong>Site</strong>


AneasyPATIENTEXPERIENCE<br />

Galleria mainstreet<br />

Separatehallwaysandelevators<br />

forinpatients<br />

forvisitorsandoutpatients<br />

ensuringmoreintimacyforpatients<br />

<strong>Site</strong> <strong>GLEN</strong> <strong>Site</strong>


CarefullyplannedAROUNDTHEPATIENT<br />

ThefirstinQuebectounitepediatricandadultspecialties<br />

underoneroof,offeringcontinuouscarethroughoutour<br />

patients lives<br />

Childpatientroom<br />

<strong>Site</strong> <strong>GLEN</strong> <strong>Site</strong><br />

9


CarefullyplannedAROUNDTHEPATIENT<br />

Adult patientroom<br />

500individualpatientroomswithprivatebathrooms,air<br />

conditioningandroomforlovedonestostaythenight<br />

<strong>Site</strong> <strong>GLEN</strong> <strong>Site</strong><br />

10


AttheforefrontofINNOVATION<br />

Thelateststateoftheartequipment,puttingthe<br />

Glenattheforefrontoftechnology,thushelping<br />

reducewaittimesfortreatment<br />

1PETMRI(Magneticresonanceimaging)tobetter<br />

screenanddiagnosecancerpatients<br />

7MRIs,morethandoublingtheMUHC s imaging<br />

capacity<br />

8linearaccelerators,includingthreespecialty<br />

accelerators,allowingustotreatthemostcomplex<br />

cancercases<br />

<strong>Site</strong> <strong>GLEN</strong> <strong>Site</strong><br />

11


AttheforefrontofINNOVATION<br />

Interventional platform<br />

• Someofthemostmodern<br />

operatingroomsinNorthAmerica<br />

• All20operatingroomsand21<br />

interventionroomswillbe<br />

clustered<br />

• Increasedefficiencyand<br />

optimizationofresourcesmeaning<br />

fasterandmoreeffectivecarefor<br />

patients<br />

• Adjacenttokeydepartments<br />

<strong>Site</strong> <strong>GLEN</strong> <strong>Site</strong><br />

12


AttheforefrontofINNOVATION<br />

Emergengy Department Plan<br />

• Two EmergencyDepartments:one<br />

adult,onepediatric<br />

• Canbeexpandedorcontracted,<br />

likeanaccordion,toallow<br />

flexibility<br />

• Separatepatientsfromstaff,<br />

creatingprivacyforpatients<br />

• 100%singlepatientrooms,even<br />

intheemergencydepartments<br />

<strong>Site</strong> <strong>GLEN</strong> <strong>Site</strong><br />

13


DesignedforGROUNDBREAKINGRESEARCH<br />

Research Instituteat night<br />

• The<strong>Centre</strong>forInnovative<br />

Medicineandthe<strong>Centre</strong>for<br />

TranslationalBiologywillbe<br />

uniqueinCanada,helping<br />

movediscoveriesfromthelab<br />

benchtothebedside<br />

• Researcherswillhaveanedge<br />

overthecompetitionwith<br />

directaccesstocliniciansand<br />

patients<br />

<strong>Site</strong> <strong>GLEN</strong> <strong>Site</strong>


Designedtobe GREEN<br />

Atriumat adult hospitals<br />

Atriumat adult hospitals/cafeteria<br />

Fouratriathroughoutthehospital<br />

complex<br />

Acresofgreenspace,includinga<br />

park,achildren splayground,azen<br />

gardenandwalkingpathsonsite<br />

Willadheretostringent<br />

environmentalstandards<br />

(LEED ® Silvercertificationand<br />

BOMABESt)<br />

<strong>Site</strong> <strong>GLEN</strong> <strong>Site</strong><br />

15


<strong>GLEN</strong> <strong>Site</strong><br />

TheNewMUHC<br />

View from Decarie<br />

Constructioncomplete:Fall 2014<br />

Firstpatients:Spring/Summer 2015<br />

<strong>Site</strong> <strong>GLEN</strong> <strong>Site</strong>


PierreMajor<br />

InterimDirector,Redevelopment,PlanningandRealEstateManagement<br />

<strong>Site</strong> <strong>GLEN</strong> <strong>Site</strong><br />

17


Plandesite/<strong>Site</strong>Plan <strong>Site</strong> <strong>GLEN</strong> <strong>Site</strong><br />

18


Accesstothesiteviapublictransit:<br />

LINKSTOVENDÔME<br />

Glen<strong>Site</strong>from Vendome station<br />

TheonlyhospitalinQuebectohaveadirectlinktoanintermodalstation<br />

(metro,bus,train)<br />

Thedistancebetweentheplanned2 <strong>Site</strong> <strong>GLEN</strong> <strong>Site</strong><br />

nd metrolinkandthehospital:<br />

230feetlessthanthedistancebetweenDrummondandStanley!


Accessingbycar:FROMDECARIE<br />

(publicentrance)<br />

<strong>Site</strong> <strong>GLEN</strong> <strong>Site</strong> 20


Accessingbycar:FROMDECARIE<br />

(publicentrance)<br />

SouthentranceoffDecarie<br />

EntranceoffDecarieat Crowley<br />

Distancebetween Decarieandtheentrance:<br />

<strong>Site</strong> <strong>GLEN</strong> <strong>Site</strong><br />

295feet thedistancebetween StanleyandPeel!


AccessingbyBICYCLEandBYFOOT<br />

CityofMontreal s bikepath onDecarie<br />

GlenRoad<br />

• Bicyclepathcircling<br />

thecomplex,linked<br />

totheCityof<br />

Montreal sbikepath<br />

andWestmountvia<br />

theGlenRoad<br />

• Pedestrianlinksonall<br />

foursidesofthesite<br />

• Bikeracksand<br />

showersonsitefor<br />

employeeswhocycle<br />

towork<br />

<strong>Site</strong> <strong>GLEN</strong> <strong>Site</strong>


AccessfromtheSouth:FROMTHESUDOUEST<br />

Employee parking<br />

• Vehicleaccessfor<br />

ambulances,<br />

employeesand<br />

servicevehicles<br />

• Pedestrianaccess<br />

<strong>Site</strong> <strong>GLEN</strong> <strong>Site</strong>


AccessfromtheSouth:FROMTHESUDOUEST<br />

• Pedestrianaccess<br />

severaloptions<br />

<strong>Site</strong> <strong>GLEN</strong> <strong>Site</strong>


Information<br />

muhc.ca/construction<br />

OurProjectOffice<br />

CrowleyArtsCenter<br />

5325Crowleyavenue,2 nd floor<br />

Montreal(Quebec)H4A2C6<br />

BusinessHours:<br />

Thursday:9a.m.to7:30p.m.<br />

Friday:9a.m.to4:30p.m.<br />

Orbyappointmentbycalling5149348317<br />

5149348317<br />

construction@muhc.mcgill.ca<br />

twitter.com/CampusGlen<br />

www.facebook.com/CUSM.MUHC<br />

GoodNeighbourly RelationsCommittee<br />

Meets every 68weeks<br />

<strong>Site</strong> <strong>GLEN</strong> <strong>Site</strong><br />

25


MUHC’s Glen Campus<br />

PUBLIC INFORMATION<br />

SESSION<br />

Groupe immobilier santé <strong>McGill</strong><br />

JANUARY 24, 2012


CONSTRUCTION UPDATE


Aerial View<br />

MUHC’s Glen Campus


Construction Timeline


Construction Update


Construction Update<br />

Buildings Level Reached<br />

BlockA Ground Floor<br />

BlockB N3<br />

BlockC N4<br />

BlockD N6<br />

BlockE Penthouse<br />

BlockF Excavation<br />

BlockG Foundations andP2


Construction Work for 2012<br />

TypeofWork<br />

Excavation: BlockF<br />

Concrete: BlocksA,B,C&D: EndinJune 2012<br />

BlockF: EndinJanuary 2013<br />

BlockG: EndinDecember 2012<br />

Electromechanics: Ventilation,plumbing,fire protection<br />

BuildingEnvelope<br />

Interior Design<br />

Infrastructure: Drainage,acqueduct,electrical<br />

conducts,etc.


Acqueduct<br />

Storm Sewer<br />

Sanitary Sewer<br />

Combined Sewer – Connection to the municipal network<br />

Water<br />

retention basin


Infrastructures on St-Jacques


WE CARE embodies SNC-Lavalin’s key corporate values and<br />

beliefs. It is the cornerstone of everything we do as a company.<br />

<strong>Health</strong> and safety, employees, the environment, communities<br />

and quality: these values all influence the decisions we make<br />

every day. And importantly, they guide us in how we serve our<br />

clients and therefore affect how we are perceived by our external<br />

partners. WE CARE is integral to the way we perform on a daily<br />

basis. It is both a responsibility and a source of satisfaction and<br />

pride by providing such important standards to all we do.<br />

WE CARE about the health and safety of our employees, of those who work under our care, and<br />

of the people our projects serve.<br />

WE CARE about our employees, their personal growth, career development and general wellbeing.<br />

WE CARE about the communities where we live and work and their sustainable development, and we commit to<br />

fulfilling our responsibilities as a global citizen.<br />

WE CARE about the environment and about conducting our business in an environmentally responsible manner.<br />

WE CARE about the quality of our work.


Presentation of<br />

Ministère des Transports Work<br />

Access to MUHC<br />

By: Mr. Alain Dubé<br />

January 24, 2012


Background<br />

Project initiated by the Québec Ministère des<br />

Transports and the MUHC aimed at constructing a<br />

permanent service road to the MUHC from the Rue<br />

Saint-Jacques, as agreed upon in the<br />

memorandum of understanding signed in 2011.<br />

Coordinating MTQ work with work on the MUHC<br />

site, maximizing the speed of implementation and<br />

limiting impacts to traffic and the population.<br />

37


Work planned for 2012 (MTQ and MUHC)<br />

Roadwork Schedule Detour<br />

Saint-Jacques exit ramp<br />

Excavation<br />

Overpass and retaining<br />

walls<br />

Access road to MUHC<br />

Massif de la CSEM<br />

From mid-February<br />

2012<br />

to September 2012<br />

From mid-February<br />

2012<br />

to November 2012<br />

Autoroute 20 West, exit<br />

Angrignon. From<br />

Boulevard Angrignon, take<br />

Rue Pullman and then Rue<br />

Saint-Jacques.<br />

-<br />

38


Saint-Jacques exit ramp<br />

Rue Pullman<br />

Future site of<br />

MUHC – Glen<br />

Campus<br />

Rue Carillon<br />

Saint-Jacques<br />

exit ramp<br />

Rue Saint-Jacques<br />

Rue Saint-Rémi<br />

39


Saint-Jacques exit ramp<br />

Rue Pullman<br />

Saint-Jacques<br />

exit ramp<br />

Future site of<br />

MUHC – Glen<br />

Campus Rue Saint-Jacques<br />

Rue Carillon<br />

Closure of the Saint-Jacques exit from Autoroute 720 West<br />

• From the beginning of February to September 2012<br />

Rue Saint-Rémi<br />

40


Saint-Jacques exit ramp<br />

Boulevard Sainte-<br />

Anne-de-Bellevue<br />

Boulevard<br />

Angrignon<br />

Futur site du<br />

CUSM –<br />

campus Glen<br />

Rue Saint-Jacques<br />

Rue Pullman<br />

Angrignon exit<br />

Bretelle sortie<br />

Saint-Jacques<br />

41


Pedestrian access<br />

Within the scope of the Turcot project, new pedestrian<br />

walkways will improve the links between the Village des<br />

tanneries and the MUHC site.<br />

• Sidewalks on Saint-Jacques<br />

•Sidewalks along the access road to the MUHC<br />

•Sidewalks integrated into the landscaping between the<br />

escarpment and the Rue Saint-Jacques/Boulevard Décarie<br />

intersection<br />

•Stairs connecting the future Boulevard Pullman<br />

to Rue Saint-Jacques


Pedestrian access


Pedestrian access


Pedestrian access


Pedestrian access


Pedestrian access


MUHC access road<br />

MUHC access<br />

road<br />

48


Mandatory route MCG2<br />

for trucks<br />

Turcot yard<br />

Rue Pullman<br />

Future site of<br />

MUHC – Glen<br />

Campus<br />

Rue Saint-Jacques<br />

Rue Carillon<br />

Rue Saint-Rémi<br />

49


Slide 49<br />

MCG2 It's not just one road--it's which roads they'll have to take to get there (based on the arrows on the map)<br />

mcgingras, 23/01/2012


Summer 2012<br />

Rue Pullman<br />

Work on connecting the drainage system<br />

Future site of<br />

MUHC – Glen<br />

Campus<br />

Rue Rue Saint-Jacques<br />

Saint-Jacques<br />

• Restricted traffic on Rue Saint-Jacques near Rue Saint-Rémi<br />

• Summer 2012 – 2 weekends<br />

• Complete westbound closure<br />

• Closure of one eastbound lane<br />

Rue Saint-Rémi<br />

50


Coordination of actions<br />

• In light of the scope and the number of work sites in<br />

this sector:<br />

Continuous coordination of actions with all players in the sector:<br />

city, boroughs, Transports Québec, MUHC, STM and AMT<br />

• Various working committees:<br />

– Technical committee on the mobility of people and goods in<br />

the Montréal region<br />

– Technical sub-committee on the mobility of people and<br />

goods in the Montréal region for the downtown sector<br />

(Turcot interchange, MUHC, downtown arterial road<br />

network, Autoroute Bonaventure, Champlain Bridge)


Other actions in 2012<br />

• Work requiring the long-term closure<br />

of one of the two lanes in five exits<br />

• Complete closure of many exits at night<br />

• Weekend closure of exits<br />

52


Communication tools implemented, as<br />

needed, depending on the traffic<br />

restrictions and the impact<br />

• Meetings and interactions with various partners<br />

• Interactions with traffic reporters<br />

• Advertisement in local newspapers<br />

• Press releases<br />

• Québec 511<br />

• Radio Circulation<br />

• Variable message signs<br />

• Notice to shoreline property owners<br />

• Twitter feed<br />

For information: quebec511.info/en


Municipal works planned for 2012<br />

January 24, 2012


Municipal works<br />

Objectives<br />

• Present municipal works planned for Glen site vicinity<br />

in 2012:<br />

- Reconstruction of infrastructures on west side of Boulevard<br />

Décarie and new railway bridge<br />

- Upcoming improvements to sewer system north of Boulevard<br />

De Maisonneuve<br />

- Improvements to infrastructures on Rue Saint-Jacques<br />

• Review links and means of communication<br />

2


Connection Construction Finishing Redevelopment and of of beautification Avenue a of new the railway of<br />

Phasing of municipal work required to prepare the<br />

Crowley combined bridge Boulevard intersection on to the collector Décarie Chemin of CP Boulevard tracks and sewer Upper- the De<br />

Glen site for the new MUHC<br />

Lachine Rue Maisonneuve Saint-Jacques<br />

intersection<br />

Development Work Summer completed 2011 of the – Spring remaining (Fall 2010 2013<br />

space Work –Summer on completed Chemin 2011) Upper-<br />

Lachine<br />

Winter (Summer 2012 2009 – Summer – Summer 2013<br />

2010)<br />

Winter 2013 – Spring 2014


Municipal works<br />

Upcoming work around the Glen site in 2012<br />

4


Municipal works<br />

Reconstruction of infrastructures on the west side<br />

of Boulevard Décarie and construction of a new<br />

railway bridge<br />

• Work area on Décarie:<br />

1. CSÉM, west side : January to February<br />

2. Sewers and water main, west side : February to May<br />

3. Railway bridge : summer 2012 to summer 2013<br />

2


Municipal works<br />

Upgrading of the sewer system north of Boulevard<br />

De Maisonneuve<br />

• Work area on De Maisonneuve:<br />

1. Phase 1 : June to August 2012<br />

2. Phase 2 : July to December 2012<br />

3. Phase 3 : July to December 2012<br />

4. Phase 4 : to be determined<br />

2


Municipal works<br />

Improvements to infrastructures on Rue Saint-<br />

Jacques<br />

• Work area on Saint-Jacques:<br />

1. GISM, connection of collector sewer: February to May<br />

2012<br />

2. MTQ, preparatory work Turcot and ramp: February to<br />

September 2012<br />

3. Infrastructure improvement work : fall 2012<br />

2


Municipal works<br />

Communication channels<br />

• Contact us:<br />

- By telephone:<br />

514-872-3777 from 8:30 a.m. to 4:30 p.m. Monday to Friday (Info-Travaux line)<br />

311 on evenings and weekends<br />

- By e-mail: info-travaux@ville.montreal.qc.ca<br />

• Reaching you:<br />

- News bulletins at start of major phases<br />

- Notices to residents and merchants distributed regularly<br />

- Notices informing traffic columnists of major obstructions<br />

- Notices in local newspapers<br />

- Website: ville.montreal.qc.ca/chantiers<br />

- Information signs<br />

8


PROJECT FOR CONNECTING<br />

<strong>GLEN</strong> CAMPUS TO VENDÔME<br />

MÉTRO AND COMMUTER<br />

TRAIN STATIONS<br />

Guylaine Di Tomaso, STM<br />

Nicolas Tanguay, AMT<br />

January 24, 2012


63<br />

Project objective<br />

In partnership with the STM-MUHC-AMT:<br />

Develop a solution to ensure universal access<br />

by public transit to the MUHC site.


64<br />

Common goal<br />

Accessibility to MUHC future hospital is an important<br />

concern for all, considering:<br />

the actual hospital clientèle<br />

the intermodal nature of Vendôme métro and the<br />

commuter train station<br />

the commitment to reduce the use of private cars<br />

(employees, visitors and patients)


65<br />

Station’s neighbourhood map


66<br />

Project description<br />

Prolongement<br />

du tunnel<br />

Édicule dicule et<br />

tunnel actuel<br />

Campus Glen<br />

5100, bd De<br />

Maisonneuve<br />

Zone pour un 2 e<br />

édicule dicule et<br />

nouveau tunnel


67<br />

Guidelines to meet for selected<br />

solution<br />

Universal access<br />

Improvement on the evacuation response time<br />

in the station<br />

Public transit service within the area<br />

Larger station capacity to respond to ridership<br />

increase<br />

Easy transfers between commuter train and<br />

métro stations


68<br />

Next steps<br />

Complete pre-feasibility studies<br />

Structural, architectural technical studies etc.<br />

Concept completion<br />

Project cost estimates<br />

Research project financing<br />

Finally, we can assure you that we are all working<br />

together towards a common goal in this project.


69<br />

Available bus service near Vendôme<br />

métro station


Questions ?<br />

<strong>Site</strong> <strong>GLEN</strong> <strong>Site</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!