Highway 407 Transitway Green Corridor - “The Golden River” - GTA Mega-Region’s Economic Generator<br />

407 Transitway - “Levels the Playing Field”<br />

407 Transitway Corridor Design Imperatives<br />

Ensure the 407 Transitway has instant ridership success day one<br />

The aim is to design and build the 407 Transitway to move people as efficient and timely as possible<br />

The goal would be to achieve a 80% modal split by creating great Transit Dependent Development Nodes<br />

Can’t get 407 Rail Transit without Density and Can’t have Density without Rail Transit (conundrum)<br />

Bury the hydro lines where it is economical around major transit nodes and reclaim the land for TOD transit dependent development<br />

(eliminate the blight - return the earth to be more environmentally friendly and humane )<br />

Design, Build and Integrated, rail transit dependent complete communities (retail, <strong>of</strong>fice, residential, entertainment, recreation,<br />

institutional parks and the public realm)<br />

Transit Oriented Development Built Form at <strong>10</strong>-<strong>12</strong> times FSI - 700-<strong>10</strong>00 jobs or people per hectare<br />

Build concourses, atriums, convention centre, sports facilities and fieldhouses over the 407 Transitway to link both sides <strong>of</strong> the 407<br />

when and where appropriate<br />

Redirect the population growth to the 407 Transitway’s integrated Transit Dependent Development Nodes along the 407 corridor<br />

Use the 407 Corridor Lands efficiently - create a great pubic realm<br />

No surface parking - underground and structured paid parking only<br />

Design 407 rail transitway for <strong>10</strong>,000 - <strong>10</strong>0,000 transit riders per hour<br />

407 Rail Transitway should never leave the 407’s Right-<strong>of</strong>-Way (ROW)<br />

Harness the Power <strong>of</strong> the Grid - create a versatile competitive network for the people living in the GTA Mega-Region - 8 Go-Transit<br />

Lines, 4 LTRs and 2 Subway Line plus <strong>10</strong>-20 Bus Transit lines interfacing at station stops and will stimulate more north/south LRTs<br />

No station stops should be planned just for parking<br />

All station platforms are 200-300 metres long - to accommodate trainsets <strong>of</strong> 200 metres plus<br />

Create the Mega-Region’s 407 Rail Transitway spine (the 407 TransitwayNetwork should be the Metrolinx Board’s highest priority<br />

If a 53 Station 407 Transitway (milk-run) station design is needed, then design for 4 tracks instead <strong>of</strong> just two tracks<br />

Rail Transit Network should be design to be an synchronous network versus an asynchronous networks we currently have<br />

407 Transitway E/A should be designed for high-speed Rail Transit (forget bus - obsolete business plan)<br />

Current Environment Assessment (E/A) Process is obsolete for Rail Transit - should be based on cost to build , operate and<br />

efficiency for both the transit rider and transit operations and then mitigate the environment<br />

GTA Economy Productivity: The 407 Rail Transitway should be designed and planned for a total <strong>of</strong> one hour trip across the GTA<br />

which includes travel and dwell time from Burlington (Freeman Interchange) to Oshawa (Harmony) roughly 140km<br />

The design and build for the 407 Rail Transitway should be grade separated and elevated tracks only<br />

Design, Build & Integrate the TOD (TDD) Development along the 407 Transitway<br />

Solarize the 407 Highway Corridor - 407 - “The Green 407 Corridor”<br />

Design the 407 Rail Transitway for speeds <strong>of</strong> 200 km per hour for local transit and 500 for high-speed from Montreal to Windsor<br />

Design speed <strong>of</strong> 130-150km per hour between 4km station stops - faster for express or longer distances<br />

Dwell time at all stations stops - 30 seconds - 407 Transitway is highest level <strong>of</strong> transit<br />

Design an grade-separated, elevated, straight as possible, electrified 407 Rail Transitway<br />

Eliminate Rupe Goldberg Interfaces - it seriously marginalizes 407 Transitway Investment - quite frankly it is an insult to the<br />

engineering pr<strong>of</strong>ession<br />

Design the 407 Transitway Corridor to reduce the Carbon Footprint significantly<br />

Design, Build & Integrate as efficient and as tightly integrated as possible from the ground up an TDD & 407 Transitway Environment<br />

Should 62 be designed with automated train control<br />

Train Frequencies - <strong>12</strong> trains an hour in peak times and 6 Trains in <strong>of</strong>f peak times (6 car trains initially expandable to <strong>12</strong> car trains)<br />

Financial and Economy Consideration<br />

407 Transitway - Key Economy Generator - Helps Establishes a Worldwide Competitive GTA Mega-Region for jobs and investments<br />

Develop a Competitive P3 and ensuring it is win for all parties<br />

Create a Re wealth, Re-Development versus De wealth, Development Environment<br />

Create special development tools for the 407 TDD Transitway project<br />

Fares - basic & distance<br />

Work with MCAP to not tax underground parking and structure parking in the 407 Corridor but tax surface parking<br />

Automatic Collection method - RFID - eliminate cash<br />

Using TIF’s - should ensure it discourage sprawl<br />

Re Wealth the 407 Transitway Corridor spine and Environment - Up to $1 Trillion opportunity - after development it should be a<br />

great place to live and truly transit dependent development<br />

Involved the Pension Funds - P3 or Alternative Financing Method - Develop a comprehensive holistic financial development solution<br />

Encourage larger size apartment/condo units - maybe development charges are the same for all unit sizes /reduce property tax<br />

Investigate the possibility that the tracks in the evening <strong>11</strong>pm - 5 pm could be used for freight<br />

The Premier become involved in the transformation <strong>of</strong> the 407 Transitway Corridor<br />

Premier instruct all the ministries, agencies, crown corporations, 407 ETR and Hydro One to work together for the good <strong>of</strong> the GTA<br />

meg-region economy and premier police this initiative it to ensure that it is happening on a on-going basis<br />

MTO, PIR, Finance, Metrolinx, Hydro One, 407ETR, Minister <strong>of</strong> Environment, should become part <strong>of</strong> the Can Do Team versus being<br />

the Can’t Do Team<br />

Places to Grow - 407 Transitway Corridor will contribute Up to $1 trillion dollars in economic development<br />

opportunity, home for approximately 2 million people, 840 -800,000 jobs, <strong>12</strong>5,000,000 square feet <strong>of</strong> <strong>of</strong>fice/commercial and 750,000-<br />

1,000,000 transit trips a day when fully build-out<br />

Eliminate 15 million tons <strong>of</strong> CO2 emissions a year with a savings <strong>of</strong> $3,000,000,000 a year<br />

Help eliminate Gridlock with a savings <strong>of</strong> $<strong>10</strong>-15 billion dollars a year<br />

Eliminate the need for <strong>10</strong>,500,000,000 gallons <strong>of</strong> fuel a year<br />

Eliminate 350,000,000,000 vehicle miles travelled a year in the GTA, saving 42,<strong>12</strong>5,000,000 litres <strong>of</strong> fuel a year<br />

Reduces health care costs because less pollutants going into the atmosphere<br />

TDD - 1,000,000 cars <strong>of</strong>f the road - 1,000,000 people will be taking transit on a daily basis over time - as 407 corridor get build-out<br />

York Region 407 Transitway Hubs - Approximately 4km spacing<br />

Municipality YR Anchor & Gateway Hubs Hydro Costs Acres Units Pop Office sq ft. Jobs<br />

Vaughan Martin Grove/Kipling - Hwy 27 52,000,000 <strong>10</strong>0 20,000 35,000 2,000,000 <strong>10</strong>,000<br />

Bolton Go-Transit 35,000,000 <strong>10</strong>0 20,000 35,000 2,000,000 <strong>10</strong>,000<br />

Vaughan Corporate Centre 71,000,000 700 60,000 <strong>12</strong>5,000 20,000,000 <strong>10</strong>0,000<br />

Bradford Go-Transit 35,000,000 <strong>10</strong>0 20,000 35,000 2,000,000 <strong>10</strong>,000<br />

Bathurst Street 35,000,000 20 5,000 2,500 1,000,000 5,000<br />

<strong>Markham</strong> Langstaff/Richmond Hill <strong>10</strong>0,000,000 400 30,000 70,000 <strong>10</strong>,000,000 40,000<br />

Leslie Street 35,000,000 <strong>10</strong>0 <strong>10</strong>,000 25,000 2,000,000 <strong>10</strong>,000<br />

Woodbine Avenue 35,000,000 <strong>10</strong>0 <strong>10</strong>,000 25,000 2,000,000 <strong>10</strong>,000<br />

<strong>Markham</strong> Centre <strong>12</strong>0,000,000 500 35,000 80,000 15,000,000 60,000<br />

<strong>Markham</strong> Road - Hwy 48 55,000,000 <strong>10</strong>0 <strong>10</strong>,000 25,000 1,000,000 5,000<br />

Havelock / Don Cousen Pky 150 <strong>10</strong>,000 25,000 2,000,000 <strong>10</strong>,000<br />

York Region $573,000,000 2,370 230,000 482,5000 59,000,000 270,000