Primer and<br />
Topcoat Applica-<br />
tion<br />
Operations (cont.)<br />
Primer and<br />
Topcoat Applica-<br />
tion<br />
Operations (cont.)<br />
TABLE 1. Process Releated Summary of US National Emissions Standards for<br />
Aerospace Manufacturing and Rework Facilities<br />
ltandards (cont.)<br />
jtandards (cont.)<br />
'erformance Test Periods<br />
md Tests<br />
Jncontrolled Topcoats<br />
I. Organic HAP content limit: 420 s/l (3.5 Ib/gal)(less<br />
Nater) as applied. (63.745(~)(3))<br />
5. VOC content limit: 420 g/l (3.5 Ib/gal) (less water and<br />
:xempt solvents). (63.745(~)(4))6.<br />
5. Achieve compliance as in<br />
3. above. (63.745(e))<br />
:ontrolled Primers and<br />
ropcoats<br />
7. If control system is used, must be designed to capture and<br />
:ontrol all emissions from the application operation and must<br />
ichieve an overall control efficiency of at least 81%.<br />
:63.745(d))<br />
411 Primers and Topcoats<br />
5. Specific application techniques must be used. If<br />
ilternative is sought, can only be used if emissions are less<br />
than or equal to HVLP or electrostatic spray application<br />
techniques. (63.745(f)( I))<br />
9. All application equipment must be operated according to<br />
manufacturer's specifications, company procedures, or<br />
locally specified operating procedures. (63.745(0(2))<br />
IO. Exemptions from No. 8 above provided for in certain<br />
situations. (63.745(9(3))<br />
1 1. Operating requirements<br />
for the application of primers or topcoats that contain<br />
inorganic HAP, including control with either particulate<br />
filters or waterwash, and shutdown if operated outside<br />
manufacturer's specified limits. (63.745(g)( 1) through (3))<br />
12. Exemptions from No. 11 provided for certain<br />
application operations. (63.745(g)(4))<br />
1. For "compliant" coatings:<br />
each 30-day period.<br />
For "averaged" coatings:<br />
each 30-day period.<br />
For "controlled" coatings,<br />
non-carbon adsorber:<br />
three I-hour runs.<br />
For "controlled" coatings, carbon adsorber:<br />
each rolling period. (63.749(e)(l))<br />
2. Initial performance test for all control devices to<br />
demonstrate compliance with overall control efficiency<br />
requirement. (63.749(e)(2))<br />
A-2<br />
7-9