EA for the Proposed STP Project Description<br />

OPERATION AND MAINTANCE COST:<br />

Table 2.3 O & M Cost (5 years)<br />

S.No Description Amount<br />

1 Fixed cost (Man power, maintenance of all Civil Structures and entire<br />

plant House Keeping, all repairs including spares & Replacement, Oil<br />

& Grease cost)<br />

2<br />

Variable cost (except TNEB power charges, Diesel cost, Chlorine<br />

Dosage costs) other chemical consumable cost and safe disposal<br />

grit / sludge transportation to site<br />

(in Rs.)<br />

63,10,000<br />

8,12,850<br />

i) Greenbelt 1,10,200<br />

ii) Safety training and emergency measures 3,47,450<br />

iii) <strong>Environmental</strong> Monitoring Plan during Operation Phase 4,11,500<br />

3. Trial Run Cost for 6 months 7,29,470<br />

TOTAL (Rupees Eighty Seven Lakhs, Twenty One Thousand, Four<br />

Hundred and Seventy Only)<br />

2.5 MANPOWER<br />

87,21,470<br />

The STP will have the following employees for its operation. Table 2.4 shows the total<br />

manpower requirement for Dharmapuri STP.<br />

Table 2.4 Manpower<br />

S.No Description Nos<br />

1 Plant operator 2<br />

2 Lab Chemist 1<br />

3 Lab Assistant 1<br />

4 Watchman / helper 2<br />

5 Gardener / Farm Assistant 2<br />

Note: 1. No labor below the age of 18 years shall be employed on the work.<br />

2. The work shall be carried out on a 24 hr basis.<br />