23.07.2013 Views

AG PKT - 13 April KDOT.pdf - Kane County, IL

AG PKT - 13 April KDOT.pdf - Kane County, IL

AG PKT - 13 April KDOT.pdf - Kane County, IL

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

1.<br />

FRASZ, vice-chair Auger, Gillam, Haimann, Laesch, Molina, Smith, ex-officio Donahue<br />

Call to Order<br />

KANE COUNTY TRANSPORTATION COMMITTEE<br />

<strong>AG</strong>ENDA<br />

2. Approval of Minutes – March <strong>13</strong>, 20<strong>13</strong><br />

3. Public Comment – Items on the Agenda<br />

4.<br />

5.<br />

6.<br />

7.<br />

8.<br />

<strong>April</strong> 11, 20<strong>13</strong><br />

10:30 a.m.<br />

Finance<br />

A. <strong>Kane</strong> <strong>County</strong> Finance Department Report<br />

B. Transportation Financial Reports – thru March 31, 20<strong>13</strong><br />

C. Resolution: Approving Disbursement of Township Bridge Program Funds (TBP) to<br />

Elgin Township Road District for Hopps Road over Otter Creek, Section No. 04-<br />

08107-00-BR<br />

D. Resolution: Approving Disbursement of Township Bridge Program Funds (TBP) to<br />

St. Charles Township Road District for Burr Road over Otter Creek, Section No. 08-<br />

14117-00-BR<br />

Maintenance<br />

A. Maintenance Report<br />

B. Resolution: Fuel Delivery System Upgrade, <strong>Kane</strong> <strong>County</strong> Division of<br />

Transportation (Bid Number <strong>13</strong>-0<strong>13</strong>)<br />

C. Resolution: Approving an Intergovernmental Agreement with the Road District of<br />

Elgin Township for the Jurisdictional Transfer of a Portion of Plank Road from the<br />

<strong>County</strong> of <strong>Kane</strong> to the Road District of Elgin Township<br />

D. Adopt-A-Highway Approval(s)<br />

Planning & Programming<br />

A. Planning & Programming Report<br />

B. FY20<strong>13</strong>-2017 Transportation Improvement Program (TIP)<br />

Traffic & Permitting<br />

A. Traffic & Permitting Report<br />

B. <strong>Kane</strong> <strong>County</strong> Annual Pavement Marking<br />

a. Resolution: Approving Contract for 20<strong>13</strong> Urethane Pavement Marking, <strong>Kane</strong><br />

<strong>County</strong> Section No. <strong>13</strong>-00000-04-GM<br />

b. Resolution: Approving Contract for 20<strong>13</strong> Paint Pavement Marking, <strong>Kane</strong><br />

<strong>County</strong> Section No. <strong>13</strong>-00000-05-GM<br />

C. Speed Limit(s)<br />

a. Ordinance: Approving Alteration of Speed Limits, St. Charles Township<br />

Project Implementation<br />

A. Implementation Report


B. Design<br />

1. Montgomery Road<br />

a. Resolution: Approving a Phase I Engineering Services Agreement with HDR<br />

Engineering, Inc. for Montgomery Road from Illinois Route 25 to Hill<br />

Avenue, <strong>Kane</strong> <strong>County</strong> Section No. <strong>13</strong>-00127-00-WR<br />

2. Kirk Road over the UP RR<br />

a. Resolution: Approving a Phase I Engineering Services Agreement with<br />

Strand Associates, Inc. for Kirk Road over the Union Pacific Railroad, <strong>Kane</strong><br />

<strong>County</strong> Section No. 12-00192-04-BR<br />

b. Resolution: Approving an Intergovernmental Agreement with the State of<br />

Illinois for Phase I Engineering Services for Kirk Road over the Union<br />

Pacific Railroad, <strong>Kane</strong> <strong>County</strong> Section No. 12-00192-04-BR<br />

C. Construction<br />

1. Fabyan Parkway – East of <strong>IL</strong>25 to Nagel Boulevard<br />

a. Resolution: Approving an Intergovernmental Agreement with the State of<br />

Illinois Regarding Construction of Fabyan Parkway from East of Illinois<br />

Route 25 to Nagel Boulevard, <strong>Kane</strong> <strong>County</strong> Section No. 10-00404-00-CH<br />

2. Orchard Road over I-88<br />

a. Resolution: Approving a Phase III Construction Engineering Services<br />

Agreement with Omega Associates, Inc. for Orchard Road over I-88, <strong>Kane</strong><br />

<strong>County</strong> Section No. 11-00202-03-BR<br />

b. Resolution: Approving Contract for Construction, Orchard Road over I-88<br />

Bridge Deck Rehabilitation, <strong>Kane</strong> <strong>County</strong> Section No. 11-00202-03-BR<br />

3. Stearns Corridor Environmental Maintenance<br />

a. Resolution: Approving a Phase III Construction Engineering Services<br />

Agreement with Christopher B. Burke Engineering, Ltd. for Stearns Road<br />

Corridor Monitoring and Maintenance, <strong>Kane</strong> <strong>County</strong> Section No. <strong>13</strong>-00214-<br />

02-SM<br />

b. Resolution: Approving Contract for Construction, Stearns Road<br />

Environmental Maintenance, <strong>Kane</strong> <strong>County</strong> Section No. <strong>13</strong>-00214-02-SM<br />

4. Randall Road over I-90<br />

a. Resolution: Approving an Intergovernmental Agreement Between the<br />

Illinois State Toll Highway Authority and the <strong>County</strong> of <strong>Kane</strong> for the<br />

Improvement of the Randall Road (C.H. No. 34) Bridge Over I-90<br />

D. Land Acquisition<br />

1. Jericho Road over Blackberry Creek Wetland Credit Purchase<br />

a. Resolution: Approving a Wetland Mitigation Agreement with V3 Wetland<br />

Restoration, L.L.C. for Jericho Road over Blackberry Creek, <strong>Kane</strong> <strong>County</strong><br />

Section No. 04-00329-00-BR<br />

2. LaFox Road over Mill Creek Wetland Credit Purchase<br />

a. Resolution: Approving a Wetland Mitigation Agreement with V3 Wetland<br />

Restoration, L.L.C. for LaFox Road over Mill Creek, <strong>Kane</strong> <strong>County</strong> Section<br />

No. 11-00417-00-BR<br />

9. Executive Session – Land Acquisition<br />

10. Public Comment – Items not on the Agenda<br />

11. Adjourn


SUMMARY:<br />

Attachments:<br />

Detailed information<br />

available from :<br />

Staff Remarks /<br />

Recommendations:<br />

Committee Remarks:<br />

<strong>AG</strong>ENDA ITEM EXECUTIVE SUMMARY Agenda Item #<br />

Name:<br />

Assigned Committee:<br />

Staff Name:<br />

<strong>Kane</strong> <strong>County</strong> Finance Department Report<br />

4/11/20<strong>13</strong><br />

Presenter/Sponsor: Lynn Carlstrom<br />

Attached are the Transportation Budget, Pcard, and Accounts Payable Reports from the <strong>Kane</strong> <strong>County</strong> Finance Department<br />

for the period ending March 31, 20<strong>13</strong>.<br />

Transportation Budget, Pcard, and Accounts Payable Reports<br />

For information only.<br />

Transportation<br />

Lynn Carlstrom Phone: (630) 444-3123<br />

4A


DRAFT Transportation Committee Revenue Report - Summary*<br />

Through March 31, 20<strong>13</strong> (33.3% YTD)<br />

Current<br />

Month<br />

Transactions<br />

Total<br />

Amended<br />

Budget<br />

YTD Actual<br />

Transactions<br />

Total %<br />

Received<br />

520 Transportation 2,743,328 87,712,836 5,041,664 5.75%<br />

300 <strong>County</strong> Highway 25,476 8,453,841 90,423 1.07%<br />

301 <strong>County</strong> Bridge 176 640,000 475 0.07%<br />

302 Motor Fuel Tax 388,246 11,066,572 844,428 7.63%<br />

303 <strong>County</strong> Highway Matching 29 65,620 87 0.<strong>13</strong>%<br />

304 Motor Fuel Local Option 789,897 19,156,454 1,480,495 7.73%<br />

305 Transportation Sales Tax 1,346,627 28,707,535 2,388,115 8.32%<br />

5<strong>13</strong> Transit Sales Tax Bond Construct 0 0<br />

540 Transportation Capital 125,405 <strong>13</strong>,746,703 <strong>13</strong>6,611 0.99%<br />

550 Aurora Area Impact Fees 4,722 100,000 21,230 21.23%<br />

551 Campton Hills Impact Fees 3,619 329,984 59,306 17.97%<br />

552 Greater Elgin Impact Fees 27,757 1,280,497 (100,063) (7.81%)<br />

553 Northwest Impact Fees 7,664 296,639 16,197 5.46%<br />

554 Southwest Impact Fees 5,839 100,000 12,681 12.68%<br />

555 Tri-Cities Impact Fees 9,853 743,502 27,792 3.74%<br />

556 Upper Fox Impact Fees 1,308 2,096,607 156,377 7.46%<br />

557 West Central Impact Fees 2 8,882 299 3.37%<br />

558 North Impact Fees 83 280,000 (101,482) (36.24%)<br />

559 Central Impact Fees 4,741 340,000 4,890 1.44%<br />

560 South Impact Fees 1,883 300,000 3,802 1.27%<br />

Grand Total 2,743,328 87,712,836 5,041,664 5.75%<br />

* Does not include unposted transactions for the month of March 20<strong>13</strong>


DRAFT Transportation Committee Expenditure Report - Summary*<br />

Through March 31, 20<strong>13</strong> (33.3% YTD, 34.6% Payroll)<br />

Current<br />

Month<br />

Transactions<br />

Total<br />

Amended<br />

Budget<br />

YTD Actual<br />

Transactions<br />

YTD<br />

Encumbrances<br />

Total %<br />

Used<br />

520 Transportation 3,595,900 87,712,836 18,332,682 31,450,930 56.76%<br />

300 <strong>County</strong> Highway 311,451 8,453,841 1,352,560 1,763,193 36.86%<br />

301 <strong>County</strong> Bridge 0 640,000 15,648 403,876 65.55%<br />

302 Motor Fuel Tax 331,9<strong>13</strong> 11,066,572 4,563,308 1,771,025 57.24%<br />

303 <strong>County</strong> Highway Matching 65,620 63,175 2,387 99.91%<br />

304 Motor Fuel Local Option 1,439,095 19,156,454 1,825,938 10,585,308 64.79%<br />

305 Transportation Sales Tax 457,959 28,707,535 9,041,166 6,683,579 54.78%<br />

540 Transportation Capital 980,994 <strong>13</strong>,746,703 1,365,390 6,771,950 59.19%<br />

550 Aurora Area Impact Fees 100,000 0 51,059 51.06%<br />

553 Northwest Impact Fees 875 296,639 20,601 <strong>13</strong>2,066 51.47%<br />

554 Southwest Impact Fees 100,000 0 0 0.00%<br />

556 Upper Fox Impact Fees 626 2,096,607 9,676 9,440 0.91%<br />

557 West Central Impact Fees 8,882 0 0 0.00%<br />

559 Central Impact Fees 340,000 0 504,537 148.39%<br />

560 South Impact Fees 72,987 300,000 72,987 292,0<strong>13</strong> 121.67%<br />

551 Campton Hills Impact Fees 329,984 2,233 0 0.68%<br />

552 Greater Elgin Impact Fees 1,280,497 0 1,980,497 154.67%<br />

555 Tri-Cities Impact Fees 0 743,502 0 0 0.00%<br />

558 North Impact Fees 280,000 0 500,000 178.57%<br />

Grand Total 3,595,900 87,712,836 18,332,682 31,450,930 56.76%<br />

* Does not include unposted transactions for the month of March 20<strong>13</strong>


DRAFT Transportation Committee Expenditure Report - Detail*<br />

Through March 31, 20<strong>13</strong> (33.3% YTD, 34.6% Payroll)<br />

Current<br />

Month<br />

Transactions<br />

Total<br />

Amended<br />

Budget<br />

YTD Actual<br />

Transactions<br />

YTD<br />

Encumbrances<br />

Total %<br />

Used<br />

520 Transportation 3,595,900 87,712,836 18,332,682 31,450,930 56.76%<br />

300 <strong>County</strong> Highway 311,451 8,453,841 1,352,560 1,763,193 36.86%<br />

Personnel Services- Salaries & Wages 160,776 2,427,951 639,987 0 26.36%<br />

Personnel Services- Employee Benefits 46,303 936,216 230,575 0 24.63%<br />

Contractual Services 24,409 1,245,803 <strong>13</strong>3,347 434,414 45.57%<br />

Commodities 72,856 1,009,952 239,449 203,<strong>13</strong>5 43.82%<br />

Capital 7,107 2,833,919 109,202 1,125,644 43.57%<br />

301 <strong>County</strong> Bridge 0 640,000 15,648 403,876 65.55%<br />

Contractual Services 0 460,000 15,648 403,876 91.20%<br />

Capital 180,000 0 0 0.00%<br />

302 Motor Fuel Tax 331,9<strong>13</strong> 11,066,572 4,563,308 1,771,025 57.24%<br />

Personnel Services- Salaries & Wages 216,854 2,278,466 758,580 0 33.29%<br />

Personnel Services- Employee Benefits 115,060 898,183 287,352 0 31.99%<br />

Contractual Services 1,077,530 175 1,127,180 104.62%<br />

Commodities 668,780 23,589 643,845 99.80%<br />

Capital 2,650,000 0 0 0.00%<br />

Transfers Out 3,493,6<strong>13</strong> 3,493,6<strong>13</strong> 0 100.00%<br />

303 <strong>County</strong> Highway Matching 65,620 63,175 2,387 99.91%<br />

Commodities 65,620 63,175 2,387 99.91%<br />

304 Motor Fuel Local Option 1,439,095 19,156,454 1,825,938 10,585,308 64.79%<br />

Contractual Services 43,286 14,639,126 265,250 8,873,339 62.43%<br />

Commodities 62,448 1,034,<strong>13</strong>8 189,344 508,951 67.52%<br />

Capital 1,333,361 3,430,032 1,322,873 1,203,017 73.64%<br />

Transfers Out 53,158 48,471 0 91.18%<br />

305 Transportation Sales Tax 457,959 28,707,535 9,041,166 6,683,579 54.78%<br />

Contractual Services 36,704 5,494,968 169,108 415,515 10.64%<br />

Capital 421,255 14,788,601 448,092 6,268,063 45.41%<br />

Transfers Out 8,423,966 8,423,966 0 100.00%<br />

540 Transportation Capital 980,994 <strong>13</strong>,746,703 1,365,390 6,771,950 59.19%<br />

Contractual Services <strong>13</strong>5,950 1,547,412 335,837 1,030,298 88.29%<br />

Capital 845,044 12,199,291 1,029,553 5,741,652 55.50%<br />

550 Aurora Area Impact Fees 100,000 0 51,059 51.06%<br />

Capital 100,000 0 51,059 51.06%<br />

551 Campton Hills Impact Fees 329,984 2,233 0 0.68%<br />

Capital 329,984 2,233 0 0.68%<br />

552 Greater Elgin Impact Fees 1,280,497 0 1,980,497 154.67%<br />

Capital 1,280,497 0 1,980,497 154.67%<br />

553 Northwest Impact Fees 875 296,639 20,601 <strong>13</strong>2,066 51.47%<br />

Contractual Services 283,382 19,726 <strong>13</strong>2,066 53.56%<br />

Capital 875 <strong>13</strong>,257 875 0 6.60%<br />

554 Southwest Impact Fees 100,000 0 0 0.00%


DRAFT Transportation Committee Expenditure Report - Detail*<br />

Through March 31, 20<strong>13</strong> (33.3% YTD, 34.6% Payroll)<br />

Current<br />

Month<br />

Transactions<br />

Total<br />

Amended<br />

Budget<br />

YTD Actual<br />

Transactions<br />

YTD<br />

Encumbrances<br />

Total %<br />

Used<br />

Capital 100,000 0 0 0.00%<br />

555 Tri-Cities Impact Fees 0 743,502 0 0 0.00%<br />

Contractual Services 125,300 0 0 0.00%<br />

Capital 0 618,202 0 0 0.00%<br />

556 Upper Fox Impact Fees 626 2,096,607 9,676 9,440 0.91%<br />

Contractual Services 25,850 0 3,650 14.12%<br />

Capital 626 2,070,757 9,676 5,790 0.75%<br />

557 West Central Impact Fees 8,882 0 0 0.00%<br />

Capital 8,882 0 0 0.00%<br />

558 North Impact Fees 280,000 0 500,000 178.57%<br />

Capital 275,000 0 500,000 181.82%<br />

Transfers Out 5,000 0 0 0.00%<br />

559 Central Impact Fees 340,000 0 504,537 148.39%<br />

Contractual Services 335,000 0 504,537 150.61%<br />

Transfers Out 5,000 0 0 0.00%<br />

560 South Impact Fees 72,987 300,000 72,987 292,0<strong>13</strong> 121.67%<br />

Contractual Services 72,987 250,000 72,987 292,0<strong>13</strong> 146.00%<br />

Capital 45,000 0 0 0.00%<br />

Transfers Out 5,000 0 0 0.00%<br />

Grand Total 3,595,900 87,712,836 18,332,682 31,450,930 56.76%<br />

* Does not include unposted transactions for the month of March 20<strong>13</strong>, including the last payroll.


<strong>Kane</strong> <strong>County</strong> Purchasing Card Information<br />

Transportation Committee<br />

Statement Due Date 4/29/20<strong>13</strong><br />

520 TRANSPORTATION<br />

Transaction Date Merchant Name Additional Information Transaction Amount<br />

03/06/20<strong>13</strong> AMERICAN PUBLIC WORKS 08164726100<br />

<strong>13</strong>5.00<br />

4/5/20<strong>13</strong><br />

03/06/20<strong>13</strong> P & G KEENE ELECTRICAL BENSENV<strong>IL</strong>LE<br />

195.00<br />

03/08/20<strong>13</strong> S&S AUTOMOTIVE GROUP 06302791600<br />

396.00<br />

03/11/20<strong>13</strong> MYERS TIRE SUPPLY AKRON<br />

99.55<br />

03/<strong>13</strong>/20<strong>13</strong> AMAZON MKTPLACE PMTS AMZN.COM/B<strong>IL</strong>L<br />

175.79<br />

03/22/20<strong>13</strong> FEDEXOFFICE 00036244 SAINT CHARLES<br />

42.49<br />

Department Total<br />

Committee Total<br />

1,043.83<br />

1,043.83<br />

Page 1 of 1


Vendor<br />

Fund 300 - <strong>County</strong> Highway<br />

Department 520 - Transportation<br />

Invoice No. Invoice Description Status Held Reason Invoice Date Due Date G/L Date Received Date Payment Date Invoice Amount<br />

Sub-Department 520 - <strong>County</strong> Highway<br />

Account 50140 - Engineering Services<br />

1059 - Christopher B. Burke Engineering,<br />

Ltd.<br />

7-2012-877 08-00376-00-DR<br />

HampshireCkBankStab,<br />

1/1/<strong>13</strong>-1/31/<strong>13</strong><br />

Account 50160 - Legal Services<br />

1168 - J Patrick Jaeger 0201<strong>13</strong> Legal fee/ ROW Atty<br />

February 20<strong>13</strong><br />

Account 50480 - Security Services<br />

1191 - Alarm Detection Systems Inc <strong>13</strong>8661-1026 XX8661 Quarterly<br />

charges / Apr-Jun<br />

Account 52000 - Disposal and Water Softener Srvs<br />

1216 - Waste Management of Illinois -<br />

West<br />

1216 - Waste Management of Illinois -<br />

West<br />

1216 - Waste Management of Illinois -<br />

West<br />

3184230-2011-<br />

0-R<br />

3193741-2011-<br />

5<br />

3307402-2011-<br />

7<br />

Account 52010 - Janitorial Services<br />

8196 - PCI Servicies Inc (DBA Peterson<br />

Cleaning Inc)<br />

101-0090469-2011-<br />

3;Corrected,<br />

Misapplication by<br />

vendor, Jan 20<strong>13</strong><br />

XX2011-3 Waste<br />

services March 20<strong>13</strong><br />

XX2011-6 Waste<br />

services Feb 20<strong>13</strong><br />

month end<br />

24367 <strong>KDOT</strong> Janitorial<br />

services March 20<strong>13</strong><br />

Account 52140 - Repairs and Maint- Copiers<br />

6128 - Canon Solutions America Inc 4008938081 XX5996 Copier<br />

maintenance SHPZB45<br />

permit dept<br />

1027 - Illinois Paper & Copier Co IN39966 XX2534 Konica<br />

Minolta/750 copier<br />

maintenance<br />

1<strong>13</strong>5 - Konica Minolta Business Solutions 223923652 160879 Copier<br />

maintenance<br />

Paid by Check<br />

# 3291<strong>13</strong><br />

Paid by Check<br />

# 329242<br />

Paid by EFT #<br />

17436<br />

Paid by Check<br />

# 329053<br />

Paid by Check<br />

# 329385<br />

Paid by Check<br />

# 329386<br />

02/14/20<strong>13</strong> 03/06/20<strong>13</strong> 03/06/20<strong>13</strong> 03/25/20<strong>13</strong> 1,904.36<br />

Account 50140 - Engineering Services Totals Invoice Transactions 1 $1,904.36<br />

02/01/20<strong>13</strong> 03/08/20<strong>13</strong> 03/08/20<strong>13</strong> 03/25/20<strong>13</strong> 4,000.00<br />

Account 50160 - Legal Services Totals Invoice Transactions 1 $4,000.00<br />

03/03/20<strong>13</strong> 03/08/20<strong>13</strong> 03/08/20<strong>13</strong> 03/25/20<strong>13</strong> 165.00<br />

Account 50480 - Security Services Totals Invoice Transactions 1 $165.00<br />

01/01/20<strong>13</strong> 03/01/20<strong>13</strong> 03/01/20<strong>13</strong> 03/11/20<strong>13</strong> 84.00<br />

03/01/20<strong>13</strong> 03/06/20<strong>13</strong> 03/06/20<strong>13</strong> 03/25/20<strong>13</strong> 92.40<br />

03/01/20<strong>13</strong> 03/06/20<strong>13</strong> 03/06/20<strong>13</strong> 03/25/20<strong>13</strong> 325.21<br />

Account 52000 - Disposal and Water Softener Srvs Totals Invoice Transactions 3 $501.61<br />

Paid by EFT #<br />

17547<br />

03/01/20<strong>13</strong> 03/06/20<strong>13</strong> 03/06/20<strong>13</strong> 03/25/20<strong>13</strong> 1,386.00<br />

Account 52010 - Janitorial Services Totals Invoice Transactions 1 $1,386.00<br />

Paid by EFT #<br />

17458<br />

Paid by Check<br />

# 329235<br />

Transportation Accounts Payable by GL<br />

Distribution<br />

Payment Date Range 03/01/<strong>13</strong> - 03/31/<strong>13</strong><br />

03/01/20<strong>13</strong> 03/15/20<strong>13</strong> 03/15/20<strong>13</strong> 03/25/20<strong>13</strong> 71.35<br />

03/07/20<strong>13</strong> 03/<strong>13</strong>/20<strong>13</strong> 03/<strong>13</strong>/20<strong>13</strong> 03/25/20<strong>13</strong> 452.96<br />

Paid by Check<br />

# 329259<br />

03/02/20<strong>13</strong> 03/<strong>13</strong>/20<strong>13</strong> 03/<strong>13</strong>/20<strong>13</strong> 03/25/20<strong>13</strong> 261.57<br />

Account 52140 - Repairs and Maint- Copiers Totals Invoice Transactions 3 $785.88<br />

Run by Finance Reports on 04/05/20<strong>13</strong> 09:09:19 AM Page 1 of 14


Vendor Invoice No. Invoice Description Status Held Reason Invoice Date Due Date G/L Date Received Date Payment Date Invoice Amount<br />

Fund 300 - <strong>County</strong> Highway<br />

Department 520 - Transportation<br />

Sub-Department 520 - <strong>County</strong> Highway<br />

Account 52230 - Repairs and Maint- Vehicles<br />

<strong>13</strong>70 - Zimmerman Ford Inc 74626 <strong>KDOT</strong> M45270<br />

Truck#66 repair cooler,<br />

oil cooler & turbo<br />

cleaning<br />

Account 53100 - Conferences and Meetings<br />

1104 - Forest Preserve District of <strong>Kane</strong><br />

<strong>County</strong><br />

0301<strong>13</strong>-<br />

LaFleurP<br />

Rental of Oak Room at<br />

Brewster Creek Lodge<br />

on 03/<strong>13</strong>/<strong>13</strong><br />

Paid by Check<br />

# 329398<br />

03/11/20<strong>13</strong> 03/15/20<strong>13</strong> 03/15/20<strong>13</strong> 03/25/20<strong>13</strong> 6,201.72<br />

Account 52230 - Repairs and Maint- Vehicles Totals Invoice Transactions 1 $6,201.72<br />

Paid by Check<br />

# 328844<br />

Transportation Accounts Payable by GL<br />

Distribution<br />

Payment Date Range 03/01/<strong>13</strong> - 03/31/<strong>13</strong><br />

03/01/20<strong>13</strong> 03/01/20<strong>13</strong> 03/01/20<strong>13</strong> 03/11/20<strong>13</strong> 40.00<br />

4512 - Paul Holcomb 031120<strong>13</strong> APWA Chapter Awards Paid by EFT #<br />

03/11/20<strong>13</strong> 03/11/20<strong>13</strong> 03/11/20<strong>13</strong> 03/25/20<strong>13</strong> 70.00<br />

Lunch/conference 17492<br />

4127 - Jay Seyller 030620<strong>13</strong> Utility Coordination mtg Paid by Check<br />

# 329243<br />

03/06/20<strong>13</strong> 03/11/20<strong>13</strong> 03/11/20<strong>13</strong> 03/25/20<strong>13</strong> 183.94<br />

4653 - Carl Schoedel 030720<strong>13</strong> APWA mtg/Trans- Paid by EFT #<br />

03/07/20<strong>13</strong> 03/11/20<strong>13</strong> 03/11/20<strong>13</strong> 03/25/20<strong>13</strong> 482.98<br />

Highway Engineer<br />

conference<br />

17562<br />

5283 - Thomas F. Szabo 030720<strong>13</strong> CMAP RTOC mtg Paid by Check<br />

# 329362<br />

03/07/20<strong>13</strong> 03/11/20<strong>13</strong> 03/11/20<strong>13</strong> 03/25/20<strong>13</strong> 22.97<br />

4526 - Fifth Third Bank 0305<strong>13</strong>- 0321-5870;<br />

Paid by EFT #<br />

03/05/20<strong>13</strong> 03/05/20<strong>13</strong> 03/05/20<strong>13</strong> 03/25/20<strong>13</strong> 70.00<br />

SchoedelC AmerPublicWorks -<br />

Awards Luncheon C<br />

Schoedel<br />

17480<br />

Account 53100 - Conferences and Meetings Totals Invoice Transactions 6 $869.89<br />

Account 53110 - Employee Training<br />

6036 - Brown Traffic Products, Inc. CH120<strong>13</strong>- TrainTechSemAdvTrffc Paid by Check<br />

03/04/20<strong>13</strong> 03/08/20<strong>13</strong> 03/08/20<strong>13</strong> 03/25/20<strong>13</strong> 260.00<br />

KAN001 MgtSys-<br />

Szabo,DB,PH,BH,AK,KN<br />

; 2/27-2/28/<strong>13</strong><br />

# 329102<br />

4526 - Fifth Third Bank 0305<strong>13</strong>-RiveraA 0357-9150; ACEC IDOT Paid by EFT #<br />

03/05/20<strong>13</strong> 03/05/20<strong>13</strong> 03/05/20<strong>13</strong> 03/25/20<strong>13</strong> 570.00<br />

Training: Becker,<br />

Sullivan, Coffinbargar<br />

17480<br />

4526 - Fifth Third Bank 0314<strong>13</strong>-RiveraA 0357-9150; APWA - Paid by EFT #<br />

03/14/20<strong>13</strong> 03/14/20<strong>13</strong> 03/14/20<strong>13</strong> 03/25/20<strong>13</strong> <strong>13</strong>5.00<br />

IDOT MatlsCloseout-<br />

ResEng Seminar (3<br />

ee's)<br />

17480<br />

Account 53110 - Employee Training Totals Invoice Transactions 3 $965.00<br />

Run by Finance Reports on 04/05/20<strong>13</strong> 09:09:19 AM Page 2 of 14


Vendor<br />

Fund 300 - <strong>County</strong> Highway<br />

Department 520 - Transportation<br />

Invoice No. Invoice Description Status Held Reason Invoice Date Due Date G/L Date Received Date Payment Date Invoice Amount<br />

Sub-Department 520 - <strong>County</strong> Highway<br />

Account 53120 - Employee Mileage Expense<br />

4791 - William Dickson 031520<strong>13</strong> IDOT class/mileage Paid by Check<br />

# 329173<br />

03/15/20<strong>13</strong> 03/11/20<strong>13</strong> 03/11/20<strong>13</strong> 03/25/20<strong>13</strong> 29.38<br />

4422 - Joy Yehnert 030720<strong>13</strong> Jan & Feb mileage Paid by EFT #<br />

17585<br />

03/07/20<strong>13</strong> 03/11/20<strong>13</strong> 03/11/20<strong>13</strong> 03/25/20<strong>13</strong> 114.69<br />

Account 53120 - Employee Mileage Expense Totals Invoice Transactions 2 $144.07<br />

Account 60000 - Office Supplies<br />

8232 - Lentkoproducts 4384 HP inkjet Oem Black Paid by EFT #<br />

01/30/20<strong>13</strong> 03/15/20<strong>13</strong> 03/15/20<strong>13</strong> 03/25/20<strong>13</strong> 60.00<br />

toner<br />

3578 - Warehouse Direct Office Products 1869740-0 XX2052 Flags, G2<br />

Refills, CD's, Battery 3volt,<br />

Labels, Pads<br />

3578 - Warehouse Direct Office Products 1876007-0 XX2052 Coffee,<br />

creamer & sugar<br />

3578 - Warehouse Direct Office Products 1878169-0 XX2052 Plastic Forks,<br />

Spoons & Knives<br />

Account 60010 - Operating Supplies<br />

4526 - Fifth Third Bank 0314<strong>13</strong>-<br />

LindsayJ<br />

0357-9<strong>13</strong>5; Kimball,<br />

P&GKeene, S&SAuto,<br />

MyersTire<br />

Account 60210 - Uniform Supplies<br />

2225 - Cintas Corp #344 344565957 XX8337 Maintenance<br />

uniforms & carpets<br />

17519<br />

Paid by EFT #<br />

17578<br />

Paid by EFT #<br />

17578<br />

Paid by EFT #<br />

17578<br />

Paid by EFT #<br />

17480<br />

Paid by Check<br />

# 329114<br />

Transportation Accounts Payable by GL<br />

Distribution<br />

Payment Date Range 03/01/<strong>13</strong> - 03/31/<strong>13</strong><br />

03/01/20<strong>13</strong> 03/08/20<strong>13</strong> 03/08/20<strong>13</strong> 03/25/20<strong>13</strong> 89.58<br />

03/08/20<strong>13</strong> 03/15/20<strong>13</strong> 03/15/20<strong>13</strong> 03/25/20<strong>13</strong> 232.26<br />

03/11/20<strong>13</strong> 03/15/20<strong>13</strong> 03/15/20<strong>13</strong> 03/25/20<strong>13</strong> 51.00<br />

Account 60000 - Office Supplies Totals Invoice Transactions 4 $432.84<br />

03/14/20<strong>13</strong> 03/14/20<strong>13</strong> 03/14/20<strong>13</strong> 03/25/20<strong>13</strong> 396.00<br />

Account 60010 - Operating Supplies Totals Invoice Transactions 1 $396.00<br />

03/11/20<strong>13</strong> 03/<strong>13</strong>/20<strong>13</strong> 03/<strong>13</strong>/20<strong>13</strong> 03/25/20<strong>13</strong> 185.29<br />

Account 60210 - Uniform Supplies Totals Invoice Transactions 1 $185.29<br />

Account 60340 - Buildings and Grounds Supplies<br />

3183 - HP Products Corp (Kraft Paper I1581691 XXCO26100 Wypalls Paid by Check<br />

01/30/20<strong>13</strong> 03/08/20<strong>13</strong> 03/08/20<strong>13</strong> 03/25/20<strong>13</strong> 354.32<br />

Sales)<br />

# 329216<br />

5716 - Laport Inc 170782 XX<strong>KDOT</strong> Toilet tissue 2 Paid by EFT #<br />

01/31/20<strong>13</strong> 03/08/20<strong>13</strong> 03/08/20<strong>13</strong> 03/25/20<strong>13</strong> 56.00<br />

ply - 500 Sheets/rl 96<br />

rolls per case<br />

175<strong>13</strong><br />

<strong>13</strong>90 - Menards <strong>13</strong>268 XX0351 Ice melt, saw Paid by Check<br />

02/28/20<strong>13</strong> 03/06/20<strong>13</strong> 03/06/20<strong>13</strong> 03/25/20<strong>13</strong> 251.70<br />

blade, spider light,<br />

airwick, gang box<br />

# 329285<br />

1496 - Steiner Electric Co Inc SOO4252905.0 XX4429 F32T8/TL741 Paid by EFT #<br />

02/21/20<strong>13</strong> 03/08/20<strong>13</strong> 03/08/20<strong>13</strong> 03/25/20<strong>13</strong> 129.00<br />

01<br />

Philips Alto 4'<br />

Flourescent<br />

17567<br />

Account 60340 - Buildings and Grounds Supplies Totals Invoice Transactions 4 $791.02<br />

Run by Finance Reports on 04/05/20<strong>13</strong> 09:09:19 AM Page 3 of 14


Vendor Invoice No. Invoice Description Status Held Reason Invoice Date Due Date G/L Date Received Date Payment Date Invoice Amount<br />

Fund 300 - <strong>County</strong> Highway<br />

Department 520 - Transportation<br />

Sub-Department 520 - <strong>County</strong> Highway<br />

Account 60430 - Sign Material<br />

4526 - Fifth Third Bank 0319<strong>13</strong>-<br />

LindsayJ<br />

0357-9<strong>13</strong>5;<br />

Amazon/TCP Global,<br />

Sign Material<br />

<strong>13</strong>90 - Menards <strong>13</strong>274 XX0351 Post mount<br />

standard steel<br />

6035 - Western Remac Inc 43118 XX<strong>KDOT</strong> 8.5" <strong>Kane</strong><br />

<strong>County</strong> <strong>IL</strong> Logo Decals<br />

Account 63000 - Utilities- Natural Gas<br />

1066 - ProLiance Energy LLC 20<strong>13</strong>02I002157<br />

DOT<br />

50401; Prod Month<br />

2/20<strong>13</strong>, Gas,<br />

Act#3572881000<br />

2253 - Nicor Gas 3073717-2/<strong>13</strong> 39-82-88-1000 0<br />

41W011 Burlington<br />

1/23/<strong>13</strong>-2/22/<strong>13</strong><br />

2253 - Nicor Gas 3814320-2/<strong>13</strong> 36-44-94-1000 4<br />

40W969 Burlington<br />

1/23/<strong>13</strong>-2/22/<strong>13</strong><br />

Account 63010 - Utilities- Electric<br />

3222 - MidAmerican Energy Co 5835950-<br />

227629<br />

3222 - MidAmerican Energy Co 5840207-<br />

227083<br />

Account 63020 - Utilities- Intersect Lighting<br />

3380 - City of Batavia 1<strong>13</strong>557782-<br />

2/<strong>13</strong><br />

3380 - City of Batavia 1<strong>13</strong>557781-<br />

2/<strong>13</strong><br />

7610795006-<br />

14<strong>13</strong>76169 41W011<br />

Burlington 1/29/<strong>13</strong>-<br />

2/27/<strong>13</strong><br />

7523064009-<br />

140024771 Seavey Rd<br />

2/6/<strong>13</strong>-3/8/<strong>13</strong><br />

192005410.00 Kirk &<br />

Hubbard 1/25/<strong>13</strong> -<br />

2/21/<strong>13</strong><br />

194069300.00 Kirk &<br />

Wilson 1/25/<strong>13</strong> -<br />

2/21/<strong>13</strong><br />

3380 - City of Batavia 19773281-3/<strong>13</strong> 49205<strong>13</strong>06.00<br />

Fabyan/Batavia Ave<br />

1054 - ComEd 141605358-<br />

2/<strong>13</strong><br />

1/15/<strong>13</strong> - 2/<strong>13</strong>/<strong>13</strong><br />

6063129097 Weather<br />

station Randall Rd<br />

1/24/<strong>13</strong>-2/22/<strong>13</strong><br />

Paid by EFT #<br />

17480<br />

Paid by Check<br />

# 329285<br />

Paid by Check<br />

# 329390<br />

Paid by EFT #<br />

17588<br />

Paid by Check<br />

# 329304<br />

Paid by Check<br />

# 329305<br />

Paid by EFT #<br />

17532<br />

Paid by EFT #<br />

17533<br />

Paid by Check<br />

# 329122<br />

Paid by Check<br />

# 329122<br />

Paid by Check<br />

# 329122<br />

Paid by Check<br />

# 329161<br />

Transportation Accounts Payable by GL<br />

Distribution<br />

Payment Date Range 03/01/<strong>13</strong> - 03/31/<strong>13</strong><br />

03/19/20<strong>13</strong> 03/19/20<strong>13</strong> 03/19/20<strong>13</strong> 03/25/20<strong>13</strong> 175.79<br />

02/28/20<strong>13</strong> 03/<strong>13</strong>/20<strong>13</strong> 03/<strong>13</strong>/20<strong>13</strong> 03/25/20<strong>13</strong> 199.40<br />

02/26/20<strong>13</strong> 03/08/20<strong>13</strong> 03/08/20<strong>13</strong> 03/25/20<strong>13</strong> 496.00<br />

Account 60430 - Sign Material Totals Invoice Transactions 3 $871.19<br />

03/20/20<strong>13</strong> 03/21/20<strong>13</strong> 03/21/20<strong>13</strong> 03/22/20<strong>13</strong> 1,814.58<br />

02/26/20<strong>13</strong> 03/06/20<strong>13</strong> 03/06/20<strong>13</strong> 03/25/20<strong>13</strong> 3,200.89<br />

02/25/20<strong>13</strong> 03/06/20<strong>13</strong> 03/06/20<strong>13</strong> 03/25/20<strong>13</strong> 724.33<br />

Account 63000 - Utilities- Natural Gas Totals Invoice Transactions 3 $5,739.80<br />

03/01/20<strong>13</strong> 03/08/20<strong>13</strong> 03/08/20<strong>13</strong> 03/25/20<strong>13</strong> 3,095.29<br />

03/11/20<strong>13</strong> 03/15/20<strong>13</strong> 03/15/20<strong>13</strong> 03/25/20<strong>13</strong> 250.80<br />

Account 63010 - Utilities- Electric Totals Invoice Transactions 2 $3,346.09<br />

02/21/20<strong>13</strong> 03/06/20<strong>13</strong> 03/06/20<strong>13</strong> 03/25/20<strong>13</strong> 17.68<br />

02/21/20<strong>13</strong> 03/06/20<strong>13</strong> 03/06/20<strong>13</strong> 03/25/20<strong>13</strong> 17.00<br />

03/07/20<strong>13</strong> 03/15/20<strong>13</strong> 03/15/20<strong>13</strong> 03/25/20<strong>13</strong> 30.57<br />

02/22/20<strong>13</strong> 03/06/20<strong>13</strong> 03/06/20<strong>13</strong> 03/25/20<strong>13</strong> 29.88<br />

Run by Finance Reports on 04/05/20<strong>13</strong> 09:09:19 AM Page 4 of 14


Vendor<br />

Fund 300 - <strong>County</strong> Highway<br />

Department 520 - Transportation<br />

Invoice No. Invoice Description Status Held Reason Invoice Date Due Date G/L Date Received Date Payment Date Invoice Amount<br />

Sub-Department 520 - <strong>County</strong> Highway<br />

Account 63020 - Utilities- Intersect Lighting<br />

1054 - ComEd 0414000061-<br />

2/<strong>13</strong><br />

1054 - ComEd 4278050001-<br />

2/<strong>13</strong><br />

1054 - ComEd 0039051173-<br />

2/<strong>13</strong><br />

1054 - ComEd 117872917-<br />

3/<strong>13</strong><br />

1054 - ComEd 14<strong>13</strong>00292-<br />

3/<strong>13</strong><br />

1054 - ComEd 141609601-<br />

3/<strong>13</strong><br />

1054 - ComEd 140449207-<br />

3/<strong>13</strong><br />

0414000061 Various<br />

Traffic lights 1/22/<strong>13</strong>-<br />

2/20/<strong>13</strong><br />

4278050001 TFLT<br />

Rt/25-Corron Campton<br />

twp 1/30/<strong>13</strong>-2/28/<strong>13</strong><br />

0039051173 Rt<br />

25/Corron Rd 1/30/<strong>13</strong>-<br />

2/28/<strong>13</strong><br />

2672169007 McLean/Rt<br />

23/Bowes 1/30/<strong>13</strong>-<br />

3/1/<strong>13</strong><br />

1603046065<br />

Spring/McLean Blvd<br />

1/31/<strong>13</strong>-3/4/<strong>13</strong><br />

5281099004 7N416 Rt<br />

31 1/31/<strong>13</strong>-3/4/<strong>13</strong><br />

4539103069<br />

Orchard/Aucutt St<br />

lights 2/6/<strong>13</strong>-3/7/<strong>13</strong><br />

1054 - ComEd 5067<strong>13</strong>8019-R 5067<strong>13</strong>8019 Trffc lghts<br />

Unpaid balance<br />

due/comed mis-app<br />

1054 - ComEd 1163141072-<br />

3/<strong>13</strong><br />

3222 - MidAmerican Energy Co 5832589-<br />

227081<br />

3222 - MidAmerican Energy Co 5833607-<br />

226559<br />

Aug 12<br />

1163141072 various<br />

trffc lghts 2/4/<strong>13</strong>-<br />

3/5/<strong>13</strong><br />

8019229002-<br />

141475536 Randall Rd<br />

1/24/<strong>13</strong>-2/22/<strong>13</strong><br />

8185694006-<br />

Rndl/Msn1415909308<br />

2/8-2/22; 084366308<br />

1/24-2/8<br />

Account 63040 - Fuel- Vehicles<br />

6477 - Al Warren Oil Company Inc IO769044 C06450; 50/50<br />

Unleaded Winter Blend,<br />

7089 Gal<br />

Paid by Check<br />

# 329162<br />

Paid by Check<br />

# 329163<br />

Paid by Check<br />

# 329164<br />

Paid by Check<br />

# 329155<br />

Paid by Check<br />

# 329156<br />

Paid by Check<br />

# 329157<br />

Paid by Check<br />

# 329158<br />

Paid by Check<br />

# 329159<br />

Paid by Check<br />

# 329160<br />

Paid by EFT #<br />

17534<br />

Paid by EFT #<br />

17535<br />

02/26/20<strong>13</strong> 03/06/20<strong>13</strong> 03/06/20<strong>13</strong> 03/25/20<strong>13</strong> 4,245.01<br />

02/28/20<strong>13</strong> 03/08/20<strong>13</strong> 03/08/20<strong>13</strong> 03/25/20<strong>13</strong> 43.76<br />

02/28/20<strong>13</strong> 03/08/20<strong>13</strong> 03/08/20<strong>13</strong> 03/25/20<strong>13</strong> 10.84<br />

03/01/20<strong>13</strong> 03/08/20<strong>13</strong> 03/08/20<strong>13</strong> 03/25/20<strong>13</strong> 175.03<br />

03/04/20<strong>13</strong> 03/<strong>13</strong>/20<strong>13</strong> 03/<strong>13</strong>/20<strong>13</strong> 03/25/20<strong>13</strong> 106.12<br />

03/04/20<strong>13</strong> 03/<strong>13</strong>/20<strong>13</strong> 03/<strong>13</strong>/20<strong>13</strong> 03/25/20<strong>13</strong> 98.79<br />

03/07/20<strong>13</strong> 03/<strong>13</strong>/20<strong>13</strong> 03/<strong>13</strong>/20<strong>13</strong> 03/25/20<strong>13</strong> 89.83<br />

12/07/2012 03/15/20<strong>13</strong> 03/15/20<strong>13</strong> 03/25/20<strong>13</strong> 62.80<br />

03/06/20<strong>13</strong> 03/15/20<strong>13</strong> 03/15/20<strong>13</strong> 03/25/20<strong>13</strong> 2,361.24<br />

02/25/20<strong>13</strong> 03/06/20<strong>13</strong> 03/06/20<strong>13</strong> 03/25/20<strong>13</strong> 342.88<br />

02/26/20<strong>13</strong> 03/06/20<strong>13</strong> 03/06/20<strong>13</strong> 03/25/20<strong>13</strong> 315.74<br />

Account 63020 - Utilities- Intersect Lighting Totals Invoice Transactions 15 $7,947.17<br />

Paid by Check<br />

# 329077<br />

Transportation Accounts Payable by GL<br />

Distribution<br />

Payment Date Range 03/01/<strong>13</strong> - 03/31/<strong>13</strong><br />

03/04/20<strong>13</strong> 03/08/20<strong>13</strong> 03/08/20<strong>13</strong> 03/25/20<strong>13</strong> 25,743.36<br />

Account 63040 - Fuel- Vehicles Totals Invoice Transactions 1 $25,743.36<br />

Run by Finance Reports on 04/05/20<strong>13</strong> 09:09:19 AM Page 5 of 14


Vendor Invoice No. Invoice Description Status Held Reason Invoice Date Due Date G/L Date Received Date Payment Date Invoice Amount<br />

Fund 300 - <strong>County</strong> Highway<br />

Department 520 - Transportation<br />

Sub-Department 520 - <strong>County</strong> Highway<br />

Account 70060 - Communications Equipment<br />

3224 - Chicago Communications LLC 246459 XX2123 SNV-12<br />

Receiver Voter Chassis<br />

& SMV-2 Site Voter<br />

Modules<br />

Fund 304 - Motor Fuel Local Option<br />

Department 520 - Transportation<br />

Sub-Department 524 - Motor Fuel Local Option<br />

Account 50140 - Engineering Services<br />

7971 - Gewalt Hamilton Associates, Inc. 4-<br />

Rev1/22/<strong>13</strong>201<br />

3152 - T Y Lin International Inc <strong>13</strong>-2010-43-<br />

FINAL<br />

5563 - Wills Burke Kelsey Associates,<br />

Limited (WBK)<br />

5563 - Wills Burke Kelsey Associates,<br />

Limited (WBK)<br />

5563 - Wills Burke Kelsey Associates,<br />

Limited (WBK)<br />

5563 - Wills Burke Kelsey Associates,<br />

Limited (WBK)<br />

1<br />

12689-2012-<br />

544<br />

12706-2012-<br />

2021<br />

127<strong>13</strong>-2009-<br />

2636<br />

12688-2011-<br />

2008<br />

11-00333-02-EG;<br />

2011&2012 Traffic<br />

Data Collection<br />

09-00364-01-EG; Traf<br />

Eng Svcs, 03/01/12-<br />

11/30/12<br />

04-00329-00-BR;(R)<br />

JrchoOvrBlckbryCrkStru<br />

cRepl,1/27/<strong>13</strong>-2/23/<strong>13</strong><br />

08-00386-00-BR; [R]<br />

FrenchRdOvrBurlington<br />

Crk, P2, 1/27/<strong>13</strong>-<br />

2/23/<strong>13</strong><br />

08-00<strong>13</strong>3-01-BR; (r)<br />

WalkerRdOvrBurlington<br />

Ck, 1/1/<strong>13</strong>-2/23/<strong>13</strong><br />

11-00417-00-BR;<br />

LaFox/Mill Ck Structure<br />

Repl, 1/27/<strong>13</strong>-2/23/<strong>13</strong><br />

Paid by Check<br />

# 329111<br />

03/07/20<strong>13</strong> 03/15/20<strong>13</strong> 03/15/20<strong>13</strong> 03/25/20<strong>13</strong> 7,106.92<br />

Account 70060 - Communications Equipment Totals Invoice Transactions 1 $7,106.92<br />

Sub-Department 520 - <strong>County</strong> Highway Totals Invoice Transactions 57 $69,483.21<br />

Department 520 - Transportation Totals Invoice Transactions 57 $69,483.21<br />

Fund 300 - <strong>County</strong> Highway Totals Invoice Transactions 57 $69,483.21<br />

Paid by Check<br />

# 329205<br />

Paid by EFT #<br />

17569<br />

Paid by EFT #<br />

17583<br />

Paid by EFT #<br />

17583<br />

Paid by EFT #<br />

17583<br />

Paid by EFT #<br />

17583<br />

Transportation Accounts Payable by GL<br />

Distribution<br />

Payment Date Range 03/01/<strong>13</strong> - 03/31/<strong>13</strong><br />

11/12/2012 03/15/20<strong>13</strong> 03/15/20<strong>13</strong> 03/25/20<strong>13</strong> 8,050.48<br />

03/08/20<strong>13</strong> 03/<strong>13</strong>/20<strong>13</strong> 03/<strong>13</strong>/20<strong>13</strong> 03/25/20<strong>13</strong> 1,618.66<br />

03/05/20<strong>13</strong> 03/<strong>13</strong>/20<strong>13</strong> 03/<strong>13</strong>/20<strong>13</strong> 03/25/20<strong>13</strong> 4,205.26<br />

03/05/20<strong>13</strong> 03/<strong>13</strong>/20<strong>13</strong> 03/<strong>13</strong>/20<strong>13</strong> 03/25/20<strong>13</strong> 17,522.51<br />

03/06/20<strong>13</strong> 03/<strong>13</strong>/20<strong>13</strong> 03/<strong>13</strong>/20<strong>13</strong> 03/25/20<strong>13</strong> 715.97<br />

03/05/20<strong>13</strong> 03/<strong>13</strong>/20<strong>13</strong> 03/<strong>13</strong>/20<strong>13</strong> 03/25/20<strong>13</strong> 4,169.22<br />

Account 50140 - Engineering Services Totals Invoice Transactions 6 $36,282.10<br />

Run by Finance Reports on 04/05/20<strong>13</strong> 09:09:19 AM Page 6 of 14


Vendor Invoice No. Invoice Description Status Held Reason Invoice Date Due Date G/L Date Received Date Payment Date Invoice Amount<br />

Fund 304 - Motor Fuel Local Option<br />

Department 520 - Transportation<br />

Sub-Department 524 - Motor Fuel Local Option<br />

Dave Morris<br />

Account 52020 - Repairs and Maintenance- Roads<br />

0304<strong>13</strong>-MorrisD Mailbox and Post<br />

Damage<br />

Reimbursement<br />

02.22.<strong>13</strong><br />

<strong>13</strong>90 - Menards <strong>13</strong>271 XX0351 Post mount<br />

Paid by Check<br />

# 329068<br />

Transportation Accounts Payable by GL<br />

Distribution<br />

Payment Date Range 03/01/<strong>13</strong> - 03/31/<strong>13</strong><br />

03/01/20<strong>13</strong> 03/01/20<strong>13</strong> 03/01/20<strong>13</strong> 03/11/20<strong>13</strong> 50.00<br />

Paid by Check<br />

02/28/20<strong>13</strong> 03/06/20<strong>13</strong> 03/06/20<strong>13</strong> 03/25/20<strong>13</strong> 19.94<br />

standard steel # 329285<br />

<strong>13</strong>90 - Menards <strong>13</strong>892 XX0351 Atriumgrate - Paid by Check<br />

03/11/20<strong>13</strong> 03/15/20<strong>13</strong> 03/15/20<strong>13</strong> 03/25/20<strong>13</strong> 5.19<br />

green<br />

# 329285<br />

Account 52020 - Repairs and Maintenance- Roads Totals Invoice Transactions 3 $75.<strong>13</strong><br />

Account 60210 - Uniform Supplies<br />

2225 - Cintas Corp #344 344562318 XX8337 Maintenance Paid by Check<br />

03/04/20<strong>13</strong> 03/06/20<strong>13</strong> 03/06/20<strong>13</strong> 03/25/20<strong>13</strong> 185.29<br />

uniforms & carpets # 329114<br />

Account 60210 - Uniform Supplies Totals Invoice Transactions 1 $185.29<br />

Account 60330 - Vehicle Parts/Supplies<br />

5852 - Battery Service Corporation 230652 <strong>13</strong>4KAN 6 volt rayovac Paid by Check<br />

03/12/20<strong>13</strong> 03/15/20<strong>13</strong> 03/15/20<strong>13</strong> 03/25/20<strong>13</strong> 23.40<br />

industrial spring<br />

terminal battery<br />

# 329096<br />

1177 - Chicago International Trucks 11042272 XX0528 Valve Paid by Check<br />

03/11/20<strong>13</strong> 03/15/20<strong>13</strong> 03/15/20<strong>13</strong> 03/25/20<strong>13</strong> 220.88<br />

BX801479<br />

# 329112<br />

1177 - Chicago International Trucks 11042332 XX0528 Spring, bolt, Paid by Check<br />

03/<strong>13</strong>/20<strong>13</strong> 03/15/20<strong>13</strong> 03/15/20<strong>13</strong> 03/25/20<strong>13</strong> 635.79<br />

nut & washer<br />

# 329112<br />

1177 - Chicago International Trucks 11042358 XX0528 Filter & kit Paid by Check<br />

# 329112<br />

03/12/20<strong>13</strong> 03/15/20<strong>13</strong> 03/15/20<strong>13</strong> 03/25/20<strong>13</strong> 172.36<br />

3583 - Elburn NAPA Inc 464856 XX1170 CREDIT Paid by EFT #<br />

02/14/20<strong>13</strong> 03/06/20<strong>13</strong> 03/06/20<strong>13</strong> 03/25/20<strong>13</strong> (67.26)<br />

Warranty Inv#464551<br />

& 456799<br />

17476<br />

3583 - Elburn NAPA Inc 465477 XX1170 CREDIT Filter Paid by EFT #<br />

02/21/20<strong>13</strong> 03/06/20<strong>13</strong> 03/06/20<strong>13</strong> 03/25/20<strong>13</strong> (28.02)<br />

kit<br />

17476<br />

3583 - Elburn NAPA Inc 465820 XX1170 CREDIT Hose Paid by EFT #<br />

02/26/20<strong>13</strong> 03/06/20<strong>13</strong> 03/06/20<strong>13</strong> 03/25/20<strong>13</strong> (2.67)<br />

clamp<br />

17476<br />

3583 - Elburn NAPA Inc 466005 XX1170 Air filter Paid by EFT #<br />

17476<br />

02/28/20<strong>13</strong> 03/08/20<strong>13</strong> 03/08/20<strong>13</strong> 03/25/20<strong>13</strong> 109.08<br />

3583 - Elburn NAPA Inc 466293 XX1170 radiator cap, Paid by EFT #<br />

03/04/20<strong>13</strong> 03/08/20<strong>13</strong> 03/08/20<strong>13</strong> 03/25/20<strong>13</strong> 74.14<br />

lamp & clamp 17476<br />

3583 - Elburn NAPA Inc 465978 XX1170 Exhaust elbow, Paid by EFT #<br />

02/27/20<strong>13</strong> 03/08/20<strong>13</strong> 03/08/20<strong>13</strong> 03/25/20<strong>13</strong> <strong>13</strong>3.29<br />

cabin air filter, fuel<br />

filters, glue gel<br />

17476<br />

3583 - Elburn NAPA Inc 466406 XX1170 Vehicle speed Paid by EFT #<br />

03/05/20<strong>13</strong> 03/08/20<strong>13</strong> 03/08/20<strong>13</strong> 03/25/20<strong>13</strong> 23.89<br />

sensor 2007 Ford<br />

Focus<br />

17476<br />

3583 - Elburn NAPA Inc 466492 XX1170 Inspection Paid by EFT #<br />

03/06/20<strong>13</strong> 03/08/20<strong>13</strong> 03/08/20<strong>13</strong> 03/25/20<strong>13</strong> 17.63<br />

mirror<br />

17476<br />

Run by Finance Reports on 04/05/20<strong>13</strong> 09:09:19 AM Page 7 of 14


Transportation Accounts Payable by GL<br />

Distribution<br />

Payment Date Range 03/01/<strong>13</strong> - 03/31/<strong>13</strong><br />

Vendor<br />

Fund 304 - Motor Fuel Local Option<br />

Department 520 - Transportation<br />

Invoice No. Invoice Description Status Held Reason Invoice Date Due Date G/L Date Received Date Payment Date Invoice Amount<br />

Sub-Department 524 - Motor Fuel Local Option<br />

Account 60330 - Vehicle Parts/Supplies<br />

3583 - Elburn NAPA Inc 465477-CR XX1170 CREDIT Filter Paid by EFT #<br />

02/21/20<strong>13</strong> 03/<strong>13</strong>/20<strong>13</strong> 03/<strong>13</strong>/20<strong>13</strong> 03/25/20<strong>13</strong> (28.02)<br />

kit<br />

17476<br />

3583 - Elburn NAPA Inc 466924-CR XX1170 CREDIT Paid by EFT #<br />

03/11/20<strong>13</strong> 03/<strong>13</strong>/20<strong>13</strong> 03/<strong>13</strong>/20<strong>13</strong> 03/25/20<strong>13</strong> (1.99)<br />

Gasket<br />

17476<br />

3583 - Elburn NAPA Inc 467020 XX1170 Air filter Paid by EFT #<br />

17476<br />

03/12/20<strong>13</strong> 03/15/20<strong>13</strong> 03/15/20<strong>13</strong> 03/25/20<strong>13</strong> <strong>13</strong>5.54<br />

3583 - Elburn NAPA Inc 466966 XX1170 Gasket Paid by EFT #<br />

17476<br />

03/11/20<strong>13</strong> 03/15/20<strong>13</strong> 03/15/20<strong>13</strong> 03/25/20<strong>13</strong> 1.99<br />

3583 - Elburn NAPA Inc 466761 XX1170 Gasket, combo Paid by EFT #<br />

sprg brake less, syn brk 17476<br />

cal grs tub<br />

03/08/20<strong>13</strong> 03/15/20<strong>13</strong> 03/15/20<strong>13</strong> 03/25/20<strong>13</strong> 7<strong>13</strong>.28<br />

3583 - Elburn NAPA Inc 466888 XX1170 Alternator Paid by EFT #<br />

03/11/20<strong>13</strong> 03/15/20<strong>13</strong> 03/15/20<strong>13</strong> 03/25/20<strong>13</strong> 63.82<br />

bearing<br />

17476<br />

3583 - Elburn NAPA Inc 467089 XX1170 Oil & fuel Paid by EFT #<br />

03/12/20<strong>13</strong> 03/15/20<strong>13</strong> 03/15/20<strong>13</strong> 03/25/20<strong>13</strong> 224.07<br />

filters<br />

17476<br />

3583 - Elburn NAPA Inc 467119 XX1170 Straight tubing Paid by EFT #<br />

17476<br />

03/<strong>13</strong>/20<strong>13</strong> 03/15/20<strong>13</strong> 03/15/20<strong>13</strong> 03/25/20<strong>13</strong> 124.90<br />

4526 - Fifth Third Bank 0305<strong>13</strong>- 0357-9<strong>13</strong>5; Northern Paid by EFT #<br />

03/05/20<strong>13</strong> 03/05/20<strong>13</strong> 03/05/20<strong>13</strong> 03/25/20<strong>13</strong> 234.67<br />

LindsayJ Tool, P&G Keene,<br />

GoLight;<br />

Tools/VehPartsSup<br />

17480<br />

4526 - Fifth Third Bank 0314<strong>13</strong>- 0357-9<strong>13</strong>5; Kimball, Paid by EFT #<br />

03/14/20<strong>13</strong> 03/14/20<strong>13</strong> 03/14/20<strong>13</strong> 03/25/20<strong>13</strong> 294.55<br />

LindsayJ P&GKeene, S&SAuto,<br />

MyersTire<br />

17480<br />

1563 - Firestone Tire & Service Center 26141 322746 7129 Net Paid by Check<br />

03/04/20<strong>13</strong> 03/08/20<strong>13</strong> 03/08/20<strong>13</strong> 03/25/20<strong>13</strong> 64.88<br />

Affinity Touring BL<br />

P195/60R15 87T<br />

# 329193<br />

2<strong>13</strong>3 - Inland Power Group Inc 5453706-00 XX5599 Clamp Paid by EFT #<br />

17496<br />

02/26/20<strong>13</strong> 03/06/20<strong>13</strong> 03/06/20<strong>13</strong> 03/25/20<strong>13</strong> 28.85<br />

5220 - McNeilus Truck & Manu. 2120170 XX8024 Stud, wheel, Paid by Check<br />

03/06/20<strong>13</strong> 03/15/20<strong>13</strong> 03/15/20<strong>13</strong> 03/25/20<strong>13</strong> 737.31<br />

hub pilot M-H axle # 329282<br />

<strong>13</strong>05 - NAPA Auto Parts - St. Charles 387635 XX6157 Flat black Paid by Check<br />

# 329296<br />

03/12/20<strong>13</strong> 03/15/20<strong>13</strong> 03/15/20<strong>13</strong> 03/25/20<strong>13</strong> 10.05<br />

1125 - Transchicago Truck Group & <strong>13</strong>17387 XX8245 Gasket, bolt- Paid by Check<br />

02/28/20<strong>13</strong> 03/08/20<strong>13</strong> 03/08/20<strong>13</strong> 03/25/20<strong>13</strong> 361.73<br />

Northwest Ford<br />

flange, spacer, tube,<br />

seals<br />

# 329372<br />

1125 - Transchicago Truck Group & <strong>13</strong>18820 XX8245 Stud wheel Paid by Check<br />

03/06/20<strong>13</strong> 03/08/20<strong>13</strong> 03/08/20<strong>13</strong> 03/25/20<strong>13</strong> 57.40<br />

Northwest Ford<br />

# 329372<br />

1125 - Transchicago Truck Group & <strong>13</strong>18820-CR CREDIT #CR31660 Paid by Check<br />

03/07/20<strong>13</strong> 03/08/20<strong>13</strong> 03/08/20<strong>13</strong> 03/25/20<strong>13</strong> (57.40)<br />

Northwest Ford<br />

Stud wheel<br />

# 329372<br />

1125 - Transchicago Truck Group & <strong>13</strong>19594 XX8245 Pockets, Paid by Check<br />

03/11/20<strong>13</strong> 03/15/20<strong>13</strong> 03/15/20<strong>13</strong> 03/25/20<strong>13</strong> 52.01<br />

Northwest Ford<br />

connection<br />

# 329372<br />

Run by Finance Reports on 04/05/20<strong>13</strong> 09:09:19 AM Page 8 of 14


Vendor<br />

Fund 304 - Motor Fuel Local Option<br />

Department 520 - Transportation<br />

Invoice No. Invoice Description Status Held Reason Invoice Date Due Date G/L Date Received Date Payment Date Invoice Amount<br />

Sub-Department 524 - Motor Fuel Local Option<br />

Account 60330 - Vehicle Parts/Supplies<br />

1125 - Transchicago Truck Group & <strong>13</strong>20820 XX8245 Pipe sterling Paid by Check<br />

03/<strong>13</strong>/20<strong>13</strong> 03/15/20<strong>13</strong> 03/15/20<strong>13</strong> 03/25/20<strong>13</strong> 167.96<br />

Northwest Ford<br />

# 329372<br />

1125 - Transchicago Truck Group & <strong>13</strong>21<strong>13</strong>6 XX8245 Righ HD/LP Paid by Check<br />

03/14/20<strong>13</strong> 03/15/20<strong>13</strong> 03/15/20<strong>13</strong> 03/25/20<strong>13</strong> 10.91<br />

Northwest Ford<br />

# 329372<br />

1125 - Transchicago Truck Group & <strong>13</strong>19981 XX8245 Pocket Paid by Check<br />

03/<strong>13</strong>/20<strong>13</strong> 03/15/20<strong>13</strong> 03/15/20<strong>13</strong> 03/25/20<strong>13</strong> 39.68<br />

Northwest Ford<br />

2396 - Valley Hydraulic Service Inc 170698 K0351 Breather assy,<br />

stainless basket flange<br />

mount<br />

# 329372<br />

Paid by Check<br />

# 329377<br />

Transportation Accounts Payable by GL<br />

Distribution<br />

Payment Date Range 03/01/<strong>13</strong> - 03/31/<strong>13</strong><br />

03/11/20<strong>13</strong> 03/15/20<strong>13</strong> 03/15/20<strong>13</strong> 03/25/20<strong>13</strong> 26.26<br />

<strong>13</strong>70 - Zimmerman Ford Inc 50788 XXKI Wheel assy Paid by Check<br />

# 329398<br />

03/05/20<strong>13</strong> 03/08/20<strong>13</strong> 03/08/20<strong>13</strong> 03/25/20<strong>13</strong> 146.89<br />

Account 60330 - Vehicle Parts/Supplies Totals Invoice Transactions 35 $4,721.85<br />

Account 60360 - Equipment Parts/Supplies<br />

1665 - DeKalb Iron & Metal Company 178330 XX7000 Truct rect tube Paid by Check<br />

03/11/20<strong>13</strong> 03/15/20<strong>13</strong> 03/15/20<strong>13</strong> 03/25/20<strong>13</strong> 371.30<br />

(DIMCO)<br />

# 329170<br />

3583 - Elburn NAPA Inc 466016 XX1170 4707 Merit Q Paid by EFT #<br />

02/28/20<strong>13</strong> 03/08/20<strong>13</strong> 03/08/20<strong>13</strong> 03/25/20<strong>13</strong> 867.88<br />

23K HD, brake drum &<br />

drive wheel set<br />

17476<br />

6646 - Martin Implement Sales Inc A24390 KANE0004 Throttle Paid by Check<br />

03/04/20<strong>13</strong> 03/08/20<strong>13</strong> 03/08/20<strong>13</strong> 03/25/20<strong>13</strong> 8.75<br />

trigger<br />

# 329275<br />

6646 - Martin Implement Sales Inc A24391 KANE0004 Flat spring Paid by Check<br />

03/04/20<strong>13</strong> 03/08/20<strong>13</strong> 03/08/20<strong>13</strong> 03/25/20<strong>13</strong> 25.87<br />

& hand guard # 329275<br />

3719 - McCann Industries Inc 7156705 XX4117 Rigid tube Paid by Check<br />

# 329280<br />

03/07/20<strong>13</strong> 03/14/20<strong>13</strong> 03/14/20<strong>13</strong> 03/25/20<strong>13</strong> 287.17<br />

3719 - McCann Industries Inc 7155816 XX4117 Switch ignition Paid by Check<br />

# 329280<br />

02/04/20<strong>13</strong> 03/14/20<strong>13</strong> 03/14/20<strong>13</strong> 03/25/20<strong>13</strong> 40.93<br />

3719 - McCann Industries Inc 7155848 XX4117 Reman and Paid by Check<br />

02/05/20<strong>13</strong> 03/14/20<strong>13</strong> 03/14/20<strong>13</strong> 03/25/20<strong>13</strong> 548.46<br />

Core alternator # 329280<br />

3719 - McCann Industries Inc 7155581 XX4117 CREDIT Paid by Check<br />

01/29/20<strong>13</strong> 03/14/20<strong>13</strong> 03/14/20<strong>13</strong> 03/25/20<strong>13</strong> (661.37)<br />

Control original<br />

Inv#07154991<br />

# 329280<br />

3719 - McCann Industries Inc 7156685 XX4117 CREDIT Core Paid by Check<br />

03/07/20<strong>13</strong> 03/14/20<strong>13</strong> 03/14/20<strong>13</strong> 03/25/20<strong>13</strong> (117.00)<br />

Alternator<br />

# 329280<br />

<strong>13</strong>25 - Priority Products Inc 826017 XX64 Fiber disc, bulb, Paid by Check<br />

03/08/20<strong>13</strong> 03/15/20<strong>13</strong> 03/15/20<strong>13</strong> 03/25/20<strong>13</strong> 375.40<br />

cable ties, nipple, quick # 329330<br />

cnnct, washers<br />

<strong>13</strong>25 - Priority Products Inc 826174 XX64 Oring elbow Paid by Check<br />

# 329330<br />

03/12/20<strong>13</strong> 03/12/20<strong>13</strong> 03/15/20<strong>13</strong> 03/25/20<strong>13</strong> 37.01<br />

Account 60360 - Equipment Parts/Supplies Totals Invoice Transactions 11 $1,784.40<br />

Run by Finance Reports on 04/05/20<strong>13</strong> 09:09:19 AM Page 9 of 14


Vendor Invoice No. Invoice Description Status Held Reason Invoice Date Due Date G/L Date Received Date Payment Date Invoice Amount<br />

Fund 304 - Motor Fuel Local Option<br />

Department 520 - Transportation<br />

Sub-Department 524 - Motor Fuel Local Option<br />

Account 60370 - Tools<br />

4526 - Fifth Third Bank 0305<strong>13</strong>-<br />

LindsayJ<br />

4526 - Fifth Third Bank 0314<strong>13</strong>-<br />

LindsayJ<br />

0357-9<strong>13</strong>5; Northern<br />

Tool, P&G Keene,<br />

GoLight;<br />

Tools/VehPartsSup<br />

0357-9<strong>13</strong>5; Kimball,<br />

P&GKeene, S&SAuto,<br />

MyersTire<br />

Account 63020 - Utilities- Intersect Lighting<br />

1063 - Meade Electric Co Inc 658640/<strong>13</strong>382 12-00000-01-GM; 20<strong>13</strong><br />

Elec Maint Contract;<br />

Feb 20<strong>13</strong> Svcs<br />

Account 73000 - Road Construction<br />

1021 - State of <strong>IL</strong> Treasurer-IDOT 105747-1836 01-00266-00-<br />

BR;BgTmbrOvrTyler/Pi<br />

ngreeCrk 5/31/12-<br />

7/17/12<br />

Account 74010 - Highway Right of Way<br />

4949 - Lorenz and Associates Ltd 2332-FINAL 08-00377-00-CH;<br />

P.0001TE & 0002&TE,<br />

Appraisals,<br />

Kirk@Douglas<br />

8882 - Frederick E. Mills 0315<strong>13</strong>-002 11-00417-00-BR;<br />

LafxOvrMillCrk, Parcel<br />

002, 0.22 acres<br />

Paid by EFT #<br />

17480<br />

Paid by EFT #<br />

17480<br />

Paid by EFT #<br />

17527<br />

03/05/20<strong>13</strong> 03/05/20<strong>13</strong> 03/05/20<strong>13</strong> 03/25/20<strong>13</strong> 34.74<br />

03/14/20<strong>13</strong> 03/14/20<strong>13</strong> 03/14/20<strong>13</strong> 03/25/20<strong>13</strong> 225.43<br />

Account 60370 - Tools Totals Invoice Transactions 2 $260.17<br />

02/28/20<strong>13</strong> 03/<strong>13</strong>/20<strong>13</strong> 03/<strong>13</strong>/20<strong>13</strong> 03/25/20<strong>13</strong> 32,821.00<br />

Account 63020 - Utilities- Intersect Lighting Totals Invoice Transactions 1 $32,821.00<br />

Paid by Check<br />

# 329357<br />

Paid by EFT #<br />

17523<br />

Paid by Check<br />

# 329290<br />

Transportation Accounts Payable by GL<br />

Distribution<br />

Payment Date Range 03/01/<strong>13</strong> - 03/31/<strong>13</strong><br />

02/28/20<strong>13</strong> 03/18/20<strong>13</strong> 03/18/20<strong>13</strong> 03/25/20<strong>13</strong> 147,848.22<br />

Account 73000 - Road Construction Totals Invoice Transactions 1 $147,848.22<br />

03/12/20<strong>13</strong> 03/15/20<strong>13</strong> 03/15/20<strong>13</strong> 03/25/20<strong>13</strong> 3,000.00<br />

03/15/20<strong>13</strong> 03/15/20<strong>13</strong> 03/15/20<strong>13</strong> 03/25/20<strong>13</strong> 2,000.00<br />

Account 74010 - Highway Right of Way Totals Invoice Transactions 2 $5,000.00<br />

Sub-Department 524 - Motor Fuel Local Option Totals Invoice Transactions 62 $228,978.16<br />

Department 520 - Transportation Totals Invoice Transactions 62 $228,978.16<br />

Fund 304 - Motor Fuel Local Option Totals Invoice Transactions 62 $228,978.16<br />

Run by Finance Reports on 04/05/20<strong>13</strong> 09:09:19 AM Page 10 of 14


Vendor<br />

Fund 305 - Transportation Sales Tax<br />

Department 520 - Transportation<br />

Invoice No. Invoice Description Status Held Reason Invoice Date Due Date G/L Date Received Date Payment Date Invoice Amount<br />

Sub-Department 527 - Transportation Sales Tax<br />

Account 50140 - Engineering Services<br />

7397 - AMEC Environment & Infrastructure<br />

Inc<br />

7397 - AMEC Environment & Infrastructure<br />

Inc<br />

11-N28100564 06-00214-11-LS,[R]<br />

StearnsMcLeanFenAdap<br />

MgmtPlan,12/1/12-<br />

12/31/12<br />

12-N28100592 06-00214-11-LS,[R]<br />

StearnsMcLeanFenAdap<br />

MgmtPlan, 1/1/<strong>13</strong>-<br />

1/31/<strong>13</strong><br />

1<strong>13</strong>7 - Engineering Enterprises Inc 6-2012-7<strong>13</strong> 10-00404-00-CH; (r)<br />

FbynPkwy, Rt25 to<br />

NagelBlvd 1/21/<strong>13</strong>-<br />

5563 - Wills Burke Kelsey Associates,<br />

Limited (WBK)<br />

12705-2011-<br />

2652<br />

2/20/<strong>13</strong><br />

11-00<strong>13</strong>2-01-BR(R)<br />

AllenOvrHmpshCkStruc<br />

Repl, 1/27/<strong>13</strong>-2/23/<strong>13</strong><br />

Account 73000 - Road Construction<br />

1021 - State of <strong>IL</strong> Treasurer-IDOT 105765-32905 08-00389-00-<br />

TL,<strong>IL</strong>64/Brlngtn/TrafSig<br />

Intrcnt 6/8/12-8/14/12<br />

Paid by Check<br />

# 329078<br />

Paid by Check<br />

# 329078<br />

Paid by EFT #<br />

17477<br />

Paid by EFT #<br />

17583<br />

Paid by Check<br />

# 329357<br />

Transportation Accounts Payable by GL<br />

Distribution<br />

Payment Date Range 03/01/<strong>13</strong> - 03/31/<strong>13</strong><br />

01/25/20<strong>13</strong> 03/07/20<strong>13</strong> 03/07/20<strong>13</strong> 03/25/20<strong>13</strong> 10,094.56<br />

02/05/20<strong>13</strong> 03/07/20<strong>13</strong> 03/07/20<strong>13</strong> 03/25/20<strong>13</strong> 2,364.12<br />

03/08/20<strong>13</strong> 03/18/20<strong>13</strong> 03/18/20<strong>13</strong> 03/25/20<strong>13</strong> 11,321.01<br />

03/05/20<strong>13</strong> 03/<strong>13</strong>/20<strong>13</strong> 03/<strong>13</strong>/20<strong>13</strong> 03/25/20<strong>13</strong> 10,273.05<br />

Account 50140 - Engineering Services Totals Invoice Transactions 4 $34,052.74<br />

03/08/20<strong>13</strong> 03/18/20<strong>13</strong> 03/18/20<strong>13</strong> 03/25/20<strong>13</strong> 30,201.88<br />

Account 73000 - Road Construction Totals Invoice Transactions 1 $30,201.88<br />

Run by Finance Reports on 04/05/20<strong>13</strong> 09:09:19 AM Page 11 of 14


Vendor Invoice No. Invoice Description Status Held Reason Invoice Date Due Date G/L Date Received Date Payment Date Invoice Amount<br />

Fund 305 - Transportation Sales Tax<br />

Department 520 - Transportation<br />

Sub-Department 527 - Transportation Sales Tax<br />

Account 74010 - Highway Right of Way<br />

8870 - John W. Barnard 0305<strong>13</strong>-0003TE 10-00404-00-CH;<br />

Parcel 0003TE; 3 Year,<br />

0.002 Acres<br />

1287 - Civiltech Engineering Inc 40634 98-00214-02-BR;<br />

Parcel 1ST0241, R-91-<br />

083-01,<br />

CaseNo.12ED31<br />

3428 - Fox Valley Labor News 0214<strong>13</strong>-<strong>13</strong>ED4 98-00214-02-BR;<br />

Parcel 1ST0064,<br />

3528 - <strong>Kane</strong> <strong>County</strong> Treasurer 0318<strong>13</strong>-<br />

1ST0066<br />

3528 - <strong>Kane</strong> <strong>County</strong> Treasurer 0318<strong>13</strong>-<br />

1ST0241<br />

(Brewster) <strong>13</strong> ED 4<br />

98-00214-02-BR;<br />

1ST0066 & TE,<br />

Case#12ED23, 5yrTE<br />

98-00214-02-BR;<br />

Stearns, 1ST0241,<br />

Case#12ED31, 0.858<br />

Acres<br />

8871 - Petersen Health Care III, LLC 0305<strong>13</strong>-0005TE 10-00404-00-CH;<br />

Parcel 0005TE; 3 year,<br />

0.017 acres<br />

8885 - David & Marianne Snyder 0318<strong>13</strong>-0004TE 10-00404-00-CH;<br />

FbynPkw<strong>IL</strong>25Nagle,<br />

Parcel 0004TE, 3 Yr<br />

3184 - T Engineering Services Ltd 0318<strong>13</strong>-<br />

1ST0066<br />

0.017 Acre<br />

98-00214-02-BR; R-91-<br />

083-01; 1ST0066,<br />

Eminent Domain<br />

Paid by Check<br />

# 329095<br />

Paid by Check<br />

# 329<strong>13</strong>4<br />

Paid by Check<br />

# 329198<br />

Paid by Check<br />

# 329249<br />

Paid by Check<br />

# 329250<br />

Paid by Check<br />

# 329320<br />

Paid by Check<br />

# 329352<br />

Paid by Check<br />

# 329363<br />

Transportation Accounts Payable by GL<br />

Distribution<br />

Payment Date Range 03/01/<strong>13</strong> - 03/31/<strong>13</strong><br />

03/05/20<strong>13</strong> 03/06/20<strong>13</strong> 03/06/20<strong>13</strong> 03/25/20<strong>13</strong> 300.00<br />

02/08/20<strong>13</strong> 03/05/20<strong>13</strong> 03/05/20<strong>13</strong> 03/25/20<strong>13</strong> 3,000.00<br />

02/08/20<strong>13</strong> 03/05/20<strong>13</strong> 03/05/20<strong>13</strong> 03/25/20<strong>13</strong> 562.50<br />

03/18/20<strong>13</strong> 03/18/20<strong>13</strong> 03/18/20<strong>13</strong> 03/25/20<strong>13</strong> 75,300.00<br />

03/18/20<strong>13</strong> 03/18/20<strong>13</strong> 03/18/20<strong>13</strong> 03/25/20<strong>13</strong> 271,000.00<br />

03/05/20<strong>13</strong> 03/06/20<strong>13</strong> 03/06/20<strong>13</strong> 03/25/20<strong>13</strong> 1,200.00<br />

03/18/20<strong>13</strong> 03/18/20<strong>13</strong> 03/18/20<strong>13</strong> 03/25/20<strong>13</strong> 1,600.00<br />

02/22/20<strong>13</strong> 03/18/20<strong>13</strong> 03/18/20<strong>13</strong> 03/25/20<strong>13</strong> 1,000.00<br />

Account 74010 - Highway Right of Way Totals Invoice Transactions 8 $353,962.50<br />

Sub-Department 527 - Transportation Sales Tax Totals Invoice Transactions <strong>13</strong> $418,217.12<br />

Department 520 - Transportation Totals Invoice Transactions <strong>13</strong> $418,217.12<br />

Fund 305 - Transportation Sales Tax Totals Invoice Transactions <strong>13</strong> $418,217.12<br />

Run by Finance Reports on 04/05/20<strong>13</strong> 09:09:19 AM Page 12 of 14


Vendor Invoice No. Invoice Description Status Held Reason Invoice Date Due Date G/L Date Received Date Payment Date Invoice Amount<br />

Fund 540 - Transportation Capital<br />

Department 520 - Transportation<br />

Sub-Department 525 - Transportation Capital<br />

Account 50140 - Engineering Services<br />

1287 - Civiltech Engineering Inc 2476-22-2011-<br />

563<br />

5694 - Omega & Associates Inc 5109-18-2011-<br />

977<br />

5694 - Omega & Associates Inc 5109-19-2011-<br />

977<br />

4900 - STV Inc 20026040-12-<br />

2504<br />

99-00232-01-WR;<br />

Orchard/Jericho/Rt30<br />

2/1/<strong>13</strong>-2/28/<strong>13</strong><br />

06-00214-27-BR; (r)<br />

Stearns, Umbdenstock<br />

Brig Rpl,1/1/<strong>13</strong>-<br />

1/31/<strong>13</strong><br />

06-00214-27-BR; (r)<br />

Stearns, Umbdenstock<br />

Br Rplc 2/1/<strong>13</strong>-2/28/<strong>13</strong><br />

11-00202-03-BR;<br />

OrchardRdOvrI88Reha<br />

b, 11/3/12-2/1/<strong>13</strong><br />

Account 73000 - Road Construction<br />

1021 - State of <strong>IL</strong> Treasurer-IDOT 105769-32905 10-00403-00-TL;<br />

Kirk/Dnhm/TrffcSgnl/In<br />

trcnt 5/31/12-7/27/12<br />

Account 73010 - Bridge Construction<br />

1021 - State of <strong>IL</strong> Treasurer-IDOT 105555-FINAL 06-00214-08-BR;<br />

32905;<br />

StearnOvrNArmBrewste<br />

rCk, Stg1A<br />

Paid by Check<br />

# 329<strong>13</strong>3<br />

Paid by Check<br />

# 329311<br />

Paid by Check<br />

# 329311<br />

Paid by Check<br />

# 329359<br />

Paid by Check<br />

# 329357<br />

Paid by Check<br />

# 329357<br />

Transportation Accounts Payable by GL<br />

Distribution<br />

Payment Date Range 03/01/<strong>13</strong> - 03/31/<strong>13</strong><br />

03/08/20<strong>13</strong> 03/18/20<strong>13</strong> 03/18/20<strong>13</strong> 03/25/20<strong>13</strong> 30,840.88<br />

02/07/20<strong>13</strong> 03/06/20<strong>13</strong> 03/06/20<strong>13</strong> 03/25/20<strong>13</strong> 17,785.35<br />

03/07/20<strong>13</strong> 03/18/20<strong>13</strong> 03/18/20<strong>13</strong> 03/25/20<strong>13</strong> 15,192.70<br />

02/25/20<strong>13</strong> 03/06/20<strong>13</strong> 03/06/20<strong>13</strong> 03/25/20<strong>13</strong> 14,456.31<br />

Account 50140 - Engineering Services Totals Invoice Transactions 4 $78,275.24<br />

03/08/20<strong>13</strong> 03/18/20<strong>13</strong> 03/18/20<strong>13</strong> 03/25/20<strong>13</strong> 14,125.10<br />

Account 73000 - Road Construction Totals Invoice Transactions 1 $14,125.10<br />

12/14/2012 03/<strong>13</strong>/20<strong>13</strong> 03/<strong>13</strong>/20<strong>13</strong> 03/25/20<strong>13</strong> 170,172.57<br />

Account 73010 - Bridge Construction Totals Invoice Transactions 1 $170,172.57<br />

Sub-Department 525 - Transportation Capital Totals Invoice Transactions 6 $262,572.91<br />

Department 520 - Transportation Totals Invoice Transactions 6 $262,572.91<br />

Fund 540 - Transportation Capital Totals Invoice Transactions 6 $262,572.91<br />

Run by Finance Reports on 04/05/20<strong>13</strong> 09:09:19 AM Page <strong>13</strong> of 14


Vendor Invoice No. Invoice Description Status Held Reason Invoice Date Due Date G/L Date Received Date Payment Date Invoice Amount<br />

Fund 560 - South Impact Fees<br />

Department 520 - Transportation<br />

Sub-Department 560 - South Impact Fees<br />

Account 50140 - Engineering Services<br />

7579 - Thomas Engineering Group, LLC 1-12115-2012-<br />

781<br />

7579 - Thomas Engineering Group, LLC 2-<strong>13</strong>012-2012-<br />

781<br />

11-00201-04-CH; (r)<br />

FabyanPkwy@Kirk,<br />

P1Eng, 11/1/12-<br />

12/31/12<br />

11-00201-04-CH; (r)<br />

FabyanPkwy@Kirk,<br />

P1Eng, 1/1/<strong>13</strong>-1/31/<strong>13</strong><br />

Paid by Check<br />

# 329366<br />

Paid by Check<br />

# 329366<br />

Transportation Accounts Payable by GL<br />

Distribution<br />

Payment Date Range 03/01/<strong>13</strong> - 03/31/<strong>13</strong><br />

03/07/20<strong>13</strong> 03/14/20<strong>13</strong> 03/14/20<strong>13</strong> 03/25/20<strong>13</strong> 40,875.70<br />

03/07/20<strong>13</strong> 03/14/20<strong>13</strong> 03/14/20<strong>13</strong> 03/25/20<strong>13</strong> 32,111.16<br />

Account 50140 - Engineering Services Totals Invoice Transactions 2 $72,986.86<br />

Sub-Department 560 - South Impact Fees Totals Invoice Transactions 2 $72,986.86<br />

Department 520 - Transportation Totals Invoice Transactions 2 $72,986.86<br />

Fund 560 - South Impact Fees Totals Invoice Transactions 2 $72,986.86<br />

Grand Totals Invoice Transactions 140 $1,052,238.26<br />

Run by Finance Reports on 04/05/20<strong>13</strong> 09:09:19 AM Page 14 of 14


SUMMARY:<br />

Attachments:<br />

Detailed information<br />

available from :<br />

Staff Remarks /<br />

Recommendations:<br />

Committee Remarks:<br />

<strong>AG</strong>ENDA ITEM EXECUTIVE SUMMARY Agenda Item #<br />

Name:<br />

Assigned Committee:<br />

Staff Name:<br />

Transportation Financial Reports - thru March 31, 20<strong>13</strong><br />

4/11/20<strong>13</strong><br />

Presenter/Sponsor: Tom Rickert<br />

<strong>County</strong> transportation fund balances total $83,1<strong>13</strong>,784 with contractual/debt obligations at $72,466,809. Contractual/debt<br />

obligations only include current contracts. Contractual/debt obligations do not include all budgeted projects and required<br />

federal matching commitments for subsequent project phases within the 5-Year TIP.<br />

Fund outflows year-to-date were $16.3 million or 18.6% of budget. Debt service transfers comprise of $3.5 million for the<br />

MFT Bond and $8.4 million for the Transportation Sales Tax Bond.<br />

Collections for the month of March were $0.6 million.<br />

The receivables balance at the end of March was $0.4 million.<br />

Receivable Aging<br />

$0.4 million current<br />

$0.0 million 1-30 days<br />

$0.0 million 31-60 days<br />

$0.0 million 61-90 days<br />

$0.0 million over 90 days<br />

Please be advised - as we go forward into FY20<strong>13</strong>, budget adjustments may be required for projects in conjunction with<br />

IDOT let projects that have not closed out as planned from previous budget years (such as Stearns Road Bridge Corridor,<br />

Randall & <strong>IL</strong>64, McLean - Bowes to Hopps).<br />

Contractual Obligations, Fund Status Reports<br />

For information only.<br />

Transportation<br />

Gary Sirotzke, Chief of Finance Phone: (630) 845-7872<br />

4B


Fund<br />

Special Revenue Funds<br />

Beginning Fund<br />

Balance<br />

M-T-D<br />

Revenues<br />

Fund Status Report<br />

Report Date: 3/31/20<strong>13</strong> (unaudited)<br />

Y-T-D<br />

Revenues<br />

M-T-D<br />

Expenses<br />

Y-T-D<br />

Expenses Fund Balance<br />

Contractual<br />

Obligations<br />

Debt Service<br />

Obligations<br />

2-Apr-<strong>13</strong><br />

Fund Balance<br />

Less<br />

Obligations A/R<br />

300 - <strong>County</strong> Highway $9,973,<strong>13</strong>9 $24,494 $89,442 $276,572 $1,317,681 $8,741,444 $1,741,364 $7,000,080 $3,456<br />

301 - <strong>County</strong> Bridge $601,558 $112 $411 $0 $15,648 $582,745 $403,876 $178,868 $3,577<br />

302 - Motor Fuel Tax $11,210,952 $387,404 $843,586 $294,656 $4,526,050 $7,528,488 $1,771,025 $24,468,388 ($18,710,925) $0<br />

303 - <strong>County</strong> Highway Matching $67,837 $29 $87 $0 $63,175 $4,749 $2,387 $2,362 $0<br />

304 - Motor Fuel Local Option $21,774,811 $787,410 $1,478,008 $228,978 $615,822 $22,526,102 $<strong>13</strong>,970,769 $438,762 $8,116,570 $110,896<br />

Special Revenue Funds Subtotal: $43,628,298 $1,199,450 $2,411,534 $800,206 $6,538,376 $39,383,527 $17,889,422 $24,907,150 ($3,4<strong>13</strong>,044) $117,929<br />

Restricted Capital Funds<br />

305 - Transportation Sales Tax $24,510,926 $1,344,665 $2,386,154 $418,217 $9,001,424 $17,766,425 $7,629,350 $8,441,460 $1,695,616 $129,231<br />

540 - Transportation Capital $17,284,874 $123,544 $<strong>13</strong>4,750 $262,573 $646,969 $16,615,729 $9,003,415 $7,612,314 $156,926<br />

550 - Aurora Area Impact Fees $250,076 $4,692 $21,201 $0 $0 $271,276 $51,059 $220,217 $0<br />

551 - Campton Hills Impact Fees $480,236 $3,560 $59,246 $0 $2,233 $537,249 $0 $537,249 $0<br />

552 - Greater Elgin Impact Fees $2,626,005 $27,478 $49,735 $0 $0 $2,675,740 $1,980,497 $695,242 $0<br />

553 - Northwest Impact Fees $263,851 $7,636 $16,168 $0 $19,726 $260,293 $<strong>13</strong>2,066 $128,227 $0<br />

554 - Southwest Impact Fees $434,898 $5,790 $12,632 $0 $0 $447,529 $0 $447,529 $0<br />

555 - Tri-Cities Impact Fees $1,126,896 $9,708 $27,646 $0 $0 $1,154,542 $729,000 $425,542 $0<br />

556 - Upper Fox Impact Fees $2,020,064 $1,068 $156,<strong>13</strong>7 $0 $9,050 $2,167,151 $406,840 $1,760,311 $0<br />

557 - West Central Impact Fees $12,390 $0 $298 $0 $0 $12,688 $0 $12,688 $0<br />

558 - North Impact Fees $851,092 $0 $153 $0 $0 $851,245 $500,000 $351,245 $0<br />

559 - Central Impact Fees $600,932 $4,674 $4,823 $0 $0 $605,755 $504,537 $101,218 $0<br />

560 - South Impact Fees $433,866 $1,836 $3,755 $72,987 $72,987 $364,634 $292,0<strong>13</strong> $72,621 $0<br />

IF Subtotal $9,100,305 $66,442 $351,794 $72,987 $103,997 $9,348,102 $4,596,0<strong>13</strong> $0 $4,752,089 $0<br />

Restricted Capital Funds Subtotal: $50,896,104 $1,534,651 $2,872,698 $753,777 $9,752,389 $43,730,257 $21,228,777 $8,441,460 $14,060,019 $286,156<br />

Grand Total: $94,524,402 $2,734,101 $5,284,232 $1,553,983 $16,290,765 $83,1<strong>13</strong>,784 $39,118,199 $33,348,610 $10,646,975 $404,085<br />

Please note the Fund Balance is less Accounts Receivable.<br />

Additionally, please note during the fiscal year cutoff/audit period the beginning fund balance will be adjusted for late arriving invoices posted to FY2012.


Acct (All) K.C.D.O.T.<br />

ABF A 3/31/20<strong>13</strong><br />

Project Mgr (All) Contractual Obligations<br />

P.O. Status Open (unaudited)<br />

Row Labels<br />

Values<br />

Open Contract Contract Amount Funding Remaining A/R<br />

2010 Culvert Maintenance & Replacement $77,235.95 $ 4<strong>13</strong>,000.00 $ - $<br />

-<br />

Burlington over Trib. of Virgil Ditch No.1<br />

Homer L. Chastain & Associates, LLP<br />

2010-2197<br />

304 $5,<strong>13</strong>1.59 $ 40,350.00 $ - $<br />

-<br />

Burlington Over Virgil Ditch No.3<br />

Homer L. Chastain & Associates, LLP<br />

2010-2196<br />

304 $3,791.45 $ 42,000.00 $ - $<br />

-<br />

<strong>County</strong> Line Culvert s/o I88<br />

Homer L. Chastain & Associates, LLP<br />

2010-2195<br />

304 $3,759.53 $ 22,215.00 $ - $<br />

-<br />

Empire Rd. over Ferson Crk<br />

Homer L. Chastain & Associates, LLP<br />

2010-2174<br />

304 $6,470.51 $ 33,785.00 $ - $<br />

-<br />

Empire Rd. over Trib. of Ferson Crk<br />

Homer L. Chastain & Associates, LLP<br />

2010-2175<br />

304 $5,545.35 $ 36,235.00 $ - $<br />

-<br />

Empire Rd. Over Unnamed Stream<br />

Homer L. Chastain & Associates, LLP<br />

2010-2177<br />

304 $18,590.25 $ 51,400.00 $ - $<br />

-<br />

Harmony over Harmony Crk<br />

Homer L. Chastain & Associates, LLP<br />

2010-2181<br />

304 $7,307.15 $ 30,530.00 $ - $<br />

-<br />

Harmony over Trib. of Hampshire Crk<br />

Homer L. Chastain & Associates, LLP<br />

2010-2182<br />

304 $4,742.88 $ 37,205.00 $ - $<br />

-<br />

Plank Rd Ovr Burlington Creek<br />

Homer L. Chastain & Associates, LLP<br />

2010-2176<br />

304 $6,406.64 $ 44,515.00 $ - $<br />

-<br />

Randall Culvert n/o US 20<br />

Homer L. Chastain & Associates, LLP<br />

2010-2194<br />

304 $6,659.68 $ 40,830.00 $ - $<br />

-<br />

Silver Glen Drainage Ditch<br />

Homer L. Chastain & Associates, LLP<br />

2010-2173<br />

304 $8,830.92 $ 33,935.00 $ - $<br />

-<br />

2012 Traffic Safety Improvement Project $116,257.92 $ 259,996.12 $ (176,335.06) $ (18,649.21)<br />

(E2)<br />

ESI Consultants, LTD<br />

2012-796<br />

540 $116,257.92 $ 259,996.12 $ (176,335.06) $<br />

(18,649.21)<br />

Page 1 of 20


Acct (All) K.C.D.O.T.<br />

ABF A 3/31/20<strong>13</strong><br />

Project Mgr (All) Contractual Obligations<br />

P.O. Status Open (unaudited)<br />

Row Labels<br />

Values<br />

Open Contract Contract Amount Funding Remaining A/R<br />

20<strong>13</strong> Traffic Safety Improvement Project $249,996.87 $ 249,996.87 $ (224,997.18) $<br />

-<br />

(E2)<br />

Christopher B. Burke Engineering LTD.<br />

Pending<br />

540 $249,996.87 $ 249,996.87 $ (224,997.18) $<br />

-<br />

Allen Road Over Hampshire Creek (045-3035)<br />

(E1)<br />

(E1)<br />

Wills Burke Kelsey Associates, Limited (WBK)<br />

2011-2652<br />

$40,660.99 $ 159,968.22 $ (60,776.43) $ (20,029.21)<br />

305 $40,660.99 $ 159,968.22 $ (60,776.43) $ (20,029.21)<br />

Anderson Road Extension - <strong>IL</strong>38 to Keslinger(41)<br />

(CONST)<br />

(CONST)<br />

AT&T<br />

Pending<br />

$4,104,590.96 $ 5,460,027.81 $ (1,273,744.00) $<br />

-<br />

305 $225,000.00 $ 290,000.00 $ - $<br />

-<br />

(E2)<br />

HR Green (formerly SEC Group, Inc.)<br />

2009-1073<br />

305 $<strong>13</strong>6,275.48 $ 377,931.86 $ - $<br />

-<br />

5<strong>13</strong> $0.00 $ 888,780.47 $ - $<br />

-<br />

557 $0.00 $ 160,000.00 $ - $<br />

-<br />

(E3)<br />

(E3)<br />

HR Green (formerly SEC Group, Inc.)<br />

2012-2074<br />

302 $1,127,180.00 $ 1,127,180.00 $ (1,127,180.00) $<br />

-<br />

559 $465,000.40 $ 465,000.40 $ (146,564.00) $<br />

-<br />

(ROW)<br />

(ROW)<br />

Covington Court Partnership<br />

Pending<br />

304 $1,266,673.08 $ 1,266,673.08 $ - $<br />

-<br />

State Bank of Geneva as Trustee Trust DTD 12/22/97<br />

Pending<br />

304 $10,427.00 $ 10,427.00 $ - $<br />

-<br />

Elburn Station Property Company LLC<br />

Pending<br />

304 $34,300.00 $ 34,300.00 $ - $<br />

-<br />

540 $839,735.00 $ 839,735.00 $ - $<br />

-<br />

BigTimberEmbankmentStabilization<br />

(CONST)<br />

(CONST)<br />

Martam Construction<br />

2012-2184<br />

$<strong>13</strong>7,737.75 $ 968,021.00 $ - $<br />

-<br />

305 $<strong>13</strong>7,737.75 $ 968,021.00 $ - $<br />

-<br />

BigTimberOvrTyler&Pingree 045-3323<br />

(CONST)<br />

(CONST)<br />

State of <strong>IL</strong> Treasurer-IDOT<br />

2011-1675<br />

$327,811.08 $ 1,496,370.59 $ (66,995.04) $ (12,522.70)<br />

304 $<strong>13</strong>4,537.64 $ 378,486.66 $ - $<br />

-<br />

Page 2 of 20


Acct (All) K.C.D.O.T.<br />

ABF A 3/31/20<strong>13</strong><br />

Project Mgr (All) Contractual Obligations<br />

P.O. Status Open (unaudited)<br />

Row Labels<br />

Values<br />

Open Contract Contract Amount Funding Remaining A/R<br />

5<strong>13</strong> $0.00 $ <strong>13</strong>4,059.34 $ - $<br />

-<br />

(E2)<br />

Christopher B Burke Engineering LTD<br />

2007-388<br />

304 $23,106.93 $ 354,938.18 $ (27,780.35) $ (6,263.74)<br />

(E3)<br />

(E3)<br />

Cotter Consulting, Inc.<br />

2011-588<br />

304 $64,382.86 $ 483,312.00 $ (25,700.37) $ (4,546.68)<br />

(MONITORING)<br />

Cotter Consulting, Inc.<br />

2011-587<br />

304 $105,783.65 $ 145,574.41 $ (<strong>13</strong>,514.32) $ (1,712.28)<br />

Bliss Road over Blackberry Creek<br />

(E1)<br />

(E1)<br />

Wills Burke Kelsey Associates, Limited (WBK)<br />

2009-2637<br />

$25,245.03 $ 204,885.23 $ (20,196.02) $<br />

-<br />

304 $25,245.03 $ 204,885.23 $ (20,196.02) $<br />

-<br />

BowesRd Ovr Fitchie Creek<br />

(E3)<br />

Monitoring<br />

V3 Companies of Illinois Ltd<br />

2010-1845<br />

$8,560.00 $ 20,000.00 $ - $<br />

-<br />

304 $8,560.00 $ 20,000.00 $ - $<br />

-<br />

Bridge Inspections<br />

(E1)<br />

Bridge Inspections<br />

Collins Engineers, Inc.<br />

20<strong>13</strong>-963<br />

$403,876.41 $ 760,000.00 $ (3,576.63) $ (3,576.63)<br />

301 $400,000.00 $ 400,000.00 $ - $<br />

-<br />

Hampton Lenzini & Renwick, Inc. (HLR)<br />

2012-162<br />

301 $3,876.41 $ 360,000.00 $ - $<br />

-<br />

Virgil Township<br />

2009-104<br />

301 $0.00 $ (566.57) $ (566.57)<br />

2011-70<br />

301 $0.00 $ (2,502.00) $ (2,502.00)<br />

(blank)<br />

301 $0.00 $ (508.06) $ (508.06)<br />

Burlington @ <strong>IL</strong> Route 47 $253,577.50 $ 424,614.58 $ (247,526.48) $ (56,993.48)<br />

(E2)<br />

Burns & McDonnell Engineering Co<br />

2011-2656<br />

540 $38,633.14 $ 209,670.22 $ (56,993.48) $ (56,993.48)<br />

(E3)<br />

(E3)<br />

STV Inc<br />

Page 3 of 20


Acct (All) K.C.D.O.T.<br />

ABF A 3/31/20<strong>13</strong><br />

Project Mgr (All) Contractual Obligations<br />

P.O. Status Open (unaudited)<br />

Row Labels<br />

Pending<br />

Values<br />

Open Contract Contract Amount Funding Remaining A/R<br />

540 $214,944.36 $ 214,944.36 $ (190,533.00) $<br />

-<br />

Burlington Over VirgilDitch2 $4,492.37 $ 165,955.25 $ - $<br />

-<br />

(E2)<br />

Stantec Consulting Services (Entran) Inc.<br />

2009-1673<br />

304 $4,492.37 $ 165,955.25 $ - $<br />

-<br />

CrackSealing<br />

(CONST)<br />

Crack Filling/Crack Routing<br />

SKC Construction Inc.<br />

Pending<br />

$610,759.18 $ 610,759.16 $ - $<br />

-<br />

304 $610,759.18 $ 610,759.16 $ - $<br />

-<br />

Damisch Road over Tyler Creek<br />

(CONST)<br />

(CONST)<br />

State of <strong>IL</strong> Treasurer-IDOT<br />

2010-1421<br />

$44,305.24 $ 93,553.18 $ - $<br />

-<br />

5<strong>13</strong> $0.00 $ 49,247.94 $ - $<br />

-<br />

540 $44,305.24 $ 44,305.24 $ - $<br />

-<br />

Dauberman Over Welch Crk 045-3107 $95,228.04 $ 95,228.04 $ (76,182.43) $<br />

-<br />

(E2)<br />

exp U.S. Services, Inc.<br />

2012-2024<br />

304 $95,228.04 $ 95,228.04 $ (76,182.43) $<br />

-<br />

External Grants<br />

July 2012<br />

Ride in <strong>Kane</strong> Mobility Mgmt Services<br />

Association for Individual Development (AID)<br />

(blank)<br />

$0.00 $ (2,751.99) $ (2,751.99)<br />

300 $0.00 $ (514.27) $ (514.27)<br />

Aug 2012<br />

Ride in <strong>Kane</strong> Mobility Mgmt Services<br />

Association for Individual Development (AID)<br />

(blank)<br />

300 $0.00 $ (385.70) $ (385.70)<br />

Sept 2012<br />

Ride in <strong>Kane</strong> Mobility Mgmt Services<br />

Association for Individual Development (AID)<br />

(blank)<br />

300 $0.00 $ (385.70) $ (385.70)<br />

Oct 2012<br />

Ride in <strong>Kane</strong> Mobility Mgmt Services<br />

Association for Individual Development (AID)<br />

(blank)<br />

300 $0.00 $ (342.85) $ (342.85)<br />

Nov 2012<br />

Ride in <strong>Kane</strong> Mobility Mgmt Services<br />

Association for Individual Development (AID)<br />

(blank)<br />

300 $0.00 $ (385.70) $ (385.70)<br />

Dec 2012<br />

Page 4 of 20


Acct (All) K.C.D.O.T.<br />

ABF A 3/31/20<strong>13</strong><br />

Project Mgr (All) Contractual Obligations<br />

P.O. Status Open (unaudited)<br />

Row Labels<br />

Ride in <strong>Kane</strong> Mobility Mgmt Services<br />

Association for Individual Development (AID)<br />

(blank)<br />

Values<br />

Open Contract Contract Amount Funding Remaining A/R<br />

300 $0.00 $ (342.85) $ (342.85)<br />

Jan 20<strong>13</strong><br />

Ride in <strong>Kane</strong> Mobility Mgmt Services<br />

Association for Individual Development (AID)<br />

(blank)<br />

300 $0.00 $ (394.92) $ (394.92)<br />

Fabyan Pkwy - <strong>IL</strong>25 to Nagel Blvd<br />

(E1)<br />

(E1)<br />

Engineering Enterprises Inc<br />

2010-738<br />

$95,043.09 $ 301,074.00 $ (80,079.90) $ (33,320.36)<br />

305 $59,580.17 $ 172,914.67 $ (9,332.40) $<br />

-<br />

(E2)<br />

Engineering Enterprises Inc<br />

2012-7<strong>13</strong><br />

305 $35,462.92 $ 128,159.33 $ (70,747.50) $ (33,320.36)<br />

Fabyan Pkwy & <strong>Kane</strong>ville<br />

(E1)<br />

(E1)<br />

Burns & McDonnell<br />

2012-715<br />

$110,433.53 $ 127,700.25 $ (83,709.77) $<br />

-<br />

540 $5,796.32 $ 23,063.04 $ - $<br />

-<br />

2012-873<br />

540 $104,637.21 $ 104,637.21 $ (83,709.77) $<br />

-<br />

Fabyan Pkwy & Kirk Road<br />

(E1)<br />

(E1)<br />

Thomas Engineering Group, LLC<br />

2012-781<br />

$331,550.12 $ 404,536.98 $ (285,000.00) $<br />

-<br />

559 $39,536.98 $ 39,536.98 $ - $<br />

-<br />

560 $292,0<strong>13</strong>.14 $ 365,000.00 $ (285,000.00) $<br />

-<br />

Fabyan Pkwy & Van Nortwick<br />

(CONST)<br />

(CONST)<br />

State of <strong>IL</strong> Treasurer-IDOT<br />

2010-959<br />

$142,766.39 $ 245,294.00 $ - $<br />

-<br />

304 $142,766.39 $ 245,294.00 $ - $<br />

-<br />

Fabyan Pkwy Ovr Mill Creek<br />

(CONST)<br />

(CONST)<br />

State of <strong>IL</strong> Treasurer-IDOT<br />

2008-119<br />

$245,983.94 $ 367,641.28 $ - $<br />

-<br />

300 $245,983.94 $ 367,641.28 $ - $<br />

-<br />

French Road Bridge over Burlington Creek<br />

(CONST)<br />

(Permit Fees)<br />

<strong>Kane</strong>-DuPage Soil & Water Conservation District<br />

LRC-2010-363<br />

$143,832.45 $ 315,311.87 $ (142,403.79) $ (12,360.58)<br />

304 $0.00 $ 1,199.00 $ (959.20) $<br />

-<br />

(E1)<br />

Page 5 of 20


Acct (All) K.C.D.O.T.<br />

ABF A 3/31/20<strong>13</strong><br />

Project Mgr (All) Contractual Obligations<br />

P.O. Status Open (unaudited)<br />

Row Labels<br />

(E1)<br />

Wills Burke Kelsey Associates, Limited (WBK)<br />

2009-2635<br />

Values<br />

Open Contract Contract Amount Funding Remaining A/R<br />

304 $14,783.96 $ 152,091.14 $ (11,827.19) $<br />

-<br />

(E2)<br />

Wills Burke Kelsey Associates, Limited (WBK)<br />

2012-2021<br />

304 $129,048.49 $ 162,021.73 $ (129,617.40) $ (12,360.58)<br />

GIS-Technologies<br />

(blank)<br />

GIS Professional Services<br />

GIS Solutions, Inc.<br />

2012-2394<br />

$47,100.00 $ 57,000.00 $ - $<br />

-<br />

300 $47,100.00 $ 57,000.00 $ - $<br />

-<br />

Haegers Bend @ <strong>County</strong> Line Rd<br />

(CONST)<br />

(CONST)<br />

State of <strong>IL</strong> Treasurer-IDOT<br />

2011-2628<br />

$375.25 $ 1,437.50 $ - $<br />

-<br />

304 $375.25 $ 1,437.50 $ - $<br />

-<br />

HampshireCreekStreambankStabilization<br />

(CONST)<br />

(CONST)<br />

Earthworks Land Improvement<br />

2012-712<br />

$298,391.91 $ 969,544.97 $ - $<br />

-<br />

300 $194,286.51 $ 828,308.00 $ - $<br />

-<br />

(E3)<br />

(E3)<br />

Christopher B. Burke Engineering LTD<br />

2012-877<br />

300 $62,852.53 $ 99,984.10 $ - $<br />

-<br />

(MONITORING)<br />

Christopher B. Burke Engineering LTD<br />

2012-876<br />

300 $41,252.87 $ 41,252.87 $ - $<br />

-<br />

Highland - Randall to McLean<br />

(E1)<br />

(E1)<br />

City of Elgin<br />

2007-24<br />

$1<strong>13</strong>,292.50 $ 1<strong>13</strong>,292.50 $ - $<br />

-<br />

304 $1<strong>13</strong>,292.50 $ 1<strong>13</strong>,292.50 $ - $<br />

-<br />

Huntley - Square Barn to Sleepy Hollow Interconnect<br />

(CONST)<br />

(CONST)<br />

State of <strong>IL</strong> Treasurer-IDOT<br />

2011-597<br />

$83,564.72 $ 128,965.00 $ - $<br />

-<br />

540 $83,564.72 $ 128,965.00 $ - $<br />

-<br />

Huntley & Galligan Intersection Improvement $56,362.89 $ 169,948.90 $ (45,090.30) $<br />

-<br />

(E2)<br />

Crawford Murphy & Tilly Inc (CMT)<br />

2011-1858<br />

540 $56,362.89 $ 169,948.90 $ (45,090.30) $<br />

-<br />

Page 6 of 20


Acct (All) K.C.D.O.T.<br />

ABF A 3/31/20<strong>13</strong><br />

Project Mgr (All) Contractual Obligations<br />

P.O. Status Open (unaudited)<br />

Row Labels<br />

Values<br />

Open Contract Contract Amount Funding Remaining A/R<br />

I90 / <strong>IL</strong>47 Interchange<br />

(CONST)<br />

(CONST)<br />

Illinois State Toll Highway Authority<br />

2012-2286<br />

$3,981,758.45 $ 5,5<strong>13</strong>,204.00 $ - $<br />

-<br />

305 $1,992,204.00 $ 1,992,204.00 $ - $<br />

-<br />

540 $1,989,554.45 $ 3,521,000.00 $ - $<br />

-<br />

IceControl<br />

(blank)<br />

Rock Salt 9,834 tons @ $67.87<br />

North American Salt Company<br />

20<strong>13</strong>-60<br />

$646,231.67 $ 732,996.00 $ - $<br />

-<br />

302 $643,844.68 $ 667,433.58 $ - $<br />

-<br />

Rock Salt 966 tons @ $67.87<br />

North American Salt Company<br />

20<strong>13</strong>-61<br />

303 $2,386.99 $ 65,562.42 $ - $<br />

-<br />

<strong>IL</strong>64 Traffic Signal Interconnect - Randall to Burlington<br />

(CONST)<br />

(CONST)<br />

State of <strong>IL</strong> Treasurer-IDOT<br />

2011-2009<br />

$42,684.34 $ 415,211.91 $ (3,617.15) $ (704.00)<br />

305 $39,042.92 $ 119,470.63 $ - $<br />

-<br />

(E2)<br />

Delcan Corporation<br />

2009-2639<br />

300 $3,641.42 $ 295,741.28 $ (3,617.15) $ (704.00)<br />

<strong>IL</strong>72 & Tyrrell<br />

(CONST)<br />

(CONST)<br />

State of <strong>IL</strong> Treasurer-IDOT<br />

2012-820<br />

$526.70 $ 747.50 $ - $<br />

-<br />

304 $526.70 $ 747.50 $ - $<br />

-<br />

Impact Fee Program<br />

(blank)<br />

Impact Fee Ordinance Update<br />

CH2M Hill Inc.<br />

2011-1800<br />

$26,189.42 $ 180,760.00 $ - $<br />

-<br />

300 $26,189.42 $ 180,760.00 $ - $<br />

-<br />

Jericho Over Blackberry Crk<br />

(CONST)<br />

(Wetland Credits)<br />

V3 Wetland Restoration, LLC<br />

Pending<br />

$<strong>13</strong>2,346.00 $ 259,230.87 $ (123,955.41) $ (29,874.39)<br />

305 $35,200.00 $ 35,200.00 $ (<strong>13</strong>,000.00) $<br />

-<br />

(E2)<br />

Wills Burke Kelsey Associates, Limited (WBK)<br />

2012-544<br />

304 $97,146.00 $ 224,030.87 $ (110,955.41) $ (29,874.39)<br />

Jericho Over Drainage Ditch $7,503.80 $ 192,357.36 $ - $<br />

-<br />

(E2)<br />

Stantec Consulting Services (Entran) Inc.<br />

Page 7 of 20


Acct (All) K.C.D.O.T.<br />

ABF A 3/31/20<strong>13</strong><br />

Project Mgr (All) Contractual Obligations<br />

P.O. Status Open (unaudited)<br />

Row Labels<br />

2009-1672<br />

Values<br />

Open Contract Contract Amount Funding Remaining A/R<br />

304 $7,503.80 $ 192,357.36 $ - $<br />

-<br />

Keslinger Road over Mill Creek Trib (West) $17,171.09 $ 243,893.11 $ - $<br />

-<br />

(E2)<br />

Ciorba Group Inc.<br />

2009-2545<br />

540 $17,171.09 $ 243,893.11 $ - $<br />

-<br />

KeslingerOvrMillCrkBranch<br />

(CONST)<br />

(CONST)<br />

Plote Construction Inc. of Hoffman Estates, <strong>IL</strong><br />

2009-1295<br />

$50,000.00 $ 1,668,059.01 $ - $<br />

-<br />

5<strong>13</strong> $0.00 $ 1,618,059.01 $ - $<br />

-<br />

540 $50,000.00 $ 50,000.00 $ - $<br />

-<br />

KeslingerOvrWelchCrk<br />

(CONST)<br />

(CONST)<br />

State of <strong>IL</strong> Treasurer-IDOT<br />

2010-344<br />

$20,730.31 $ 178,000.00 $ - $<br />

-<br />

304 $20,730.31 $ 178,000.00 $ - $<br />

-<br />

Kirk & Douglas<br />

(E1)<br />

(E1)<br />

H.W. Lochner, Inc.<br />

2009-107<br />

$32,645.95 $ 288,564.21 $ - $<br />

-<br />

304 $14,741.61 $ <strong>13</strong>9,962.72 $ - $<br />

-<br />

(E2)<br />

H.W. Lochner, Inc.<br />

2011-121<br />

300 $16,904.34 $ 147,601.49 $ - $<br />

-<br />

(ROW)<br />

(ROW)<br />

Polach Appraisal Group, Inc.<br />

20<strong>13</strong>-806<br />

304 $1,000.00 $ 1,000.00 $ - $<br />

-<br />

Kirk Road & Rt.64<br />

(CONST)<br />

(CONST)<br />

State of <strong>IL</strong> Treasurer-IDOT<br />

2012-771<br />

$38,640.00 $ 38,640.00 $ - $<br />

-<br />

305 $38,640.00 $ 38,640.00 $ - $<br />

-<br />

Kirk Road at Illinois Prairie Path Crossing<br />

(CONST)<br />

(Warning Beacon)<br />

(Warning Beacon)<br />

Pending<br />

$14,042.50 $ 14,042.50 $ - $<br />

-<br />

305 $14,042.50 $ 14,042.50 $ - $<br />

-<br />

Kirk Road Median Improvements<br />

(CONST)<br />

(CONST)<br />

Acura, Inc. of Bensenville, Illinois<br />

2012-3230<br />

$11,811.06 $ 49,452.80 $ - $<br />

-<br />

304 $11,811.06 $ 49,452.80 $ - $<br />

-<br />

Page 8 of 20


Acct (All) K.C.D.O.T.<br />

ABF A 3/31/20<strong>13</strong><br />

Project Mgr (All) Contractual Obligations<br />

P.O. Status Open (unaudited)<br />

Values<br />

Row Labels Open Contract Contract Amount Funding Remaining A/R<br />

Kirk/Dunham Interconnect (Rt.56 to Stearns)<br />

(CONST)<br />

(CONST)<br />

State of <strong>IL</strong> Treasurer-IDOT<br />

2012-777<br />

$255,388.99 $ 537,056.98 $ (78,164.38) $ (11,729.62)<br />

540 $173,893.97 $ 237,241.56 $ - $<br />

-<br />

(E2)<br />

Jacobs Engineering<br />

2010-737<br />

305 $0.00 $ 150,193.29 $ (1,238.74) $<br />

-<br />

(E3)<br />

(E3)<br />

Ciorba Group Inc.<br />

2012-173<br />

540 $81,495.02 $ 149,622.<strong>13</strong> $ (76,925.64) $ (11,729.62)<br />

LaFox Road over Mill Creek 045-5557<br />

(CONST)<br />

(Wetland Credits)<br />

V3 Wetland Restoration, L.L.C.<br />

Pending<br />

$112,225.75 $ 470,182.16 $ - $<br />

-<br />

305 $55,280.00 $ 55,280.00 $ - $<br />

-<br />

(E2)<br />

Wills Burke Kelsey Associates, Limited (WBK)<br />

2011-2008<br />

304 $56,945.75 $ 414,902.16 $ - $<br />

-<br />

Land Survey Assistance<br />

(E1)<br />

Land Survey Assistance<br />

Trotter & Associates, Inc.<br />

2012-782<br />

$77,267.00 $ 84,000.00 $ - $<br />

-<br />

304 $77,267.00 $ 84,000.00 $ - $<br />

-<br />

LongMeadow Pkwy Bridge<br />

(ROW)<br />

(Plat of Survey)<br />

Engineering Enterprises Inc<br />

2010-1756<br />

$575,220.91 $ 710,879.38 $ - $<br />

-<br />

304 $168,380.91 $ 229,979.38 $ - $<br />

-<br />

(ROW)<br />

Federal IGA - ROW Local Match<br />

Pending<br />

556 $397,400.00 $ 397,400.00 $ - $<br />

-<br />

Polach Appraisal Group Inc<br />

2007-89<br />

556 $5,790.00 $ 20,200.00 $ - $<br />

-<br />

(ROW) Title, Insurance, Appraisals, etc.<br />

Civiltech Engineering Inc<br />

2007-34<br />

556 $3,650.00 $ 63,300.00 $ - $<br />

-<br />

Main St & Nelson Lake Rd<br />

(E1)<br />

(E1)<br />

$83,968.30 $ 239,872.00 $ (54,445.68) $<br />

-<br />

Page 9 of 20


Acct (All) K.C.D.O.T.<br />

ABF A 3/31/20<strong>13</strong><br />

Project Mgr (All) Contractual Obligations<br />

P.O. Status Open (unaudited)<br />

Row Labels<br />

H.W. Lochner, Inc.<br />

2009-108<br />

Values<br />

Open Contract Contract Amount Funding Remaining A/R<br />

304 $15,911.19 $ 171,814.89 $ - $<br />

-<br />

(E2)<br />

SE3, LLC<br />

2012-2376<br />

304 $68,057.11 $ 68,057.11 $ (54,445.68) $<br />

-<br />

Main St. over Blackberry Creek<br />

(E1)<br />

(E1)<br />

exp U.S. Services, Inc.<br />

2009-2022<br />

$16,657.53 $ 100,742.50 $ (<strong>13</strong>,548.81) $<br />

-<br />

304 $16,657.53 $ 100,742.50 $ (<strong>13</strong>,548.81) $<br />

-<br />

Mapping<br />

(blank)<br />

Mapping<br />

Northern Illinois University<br />

20<strong>13</strong>-59<br />

$2,900.00 $ 2,900.00 $ - $<br />

-<br />

300 $2,900.00 $ 2,900.00 $ - $<br />

-<br />

Material Testing<br />

(E3)<br />

Material Testing<br />

Rubino Engineering, Inc.<br />

2012-870<br />

$104,723.00 $ 150,000.00 $ - $<br />

-<br />

304 $104,723.00 $ 150,000.00 $ - $<br />

-<br />

McLean- Hopps to Bowes<br />

(CONST)<br />

(CONST)<br />

State of <strong>IL</strong> Treasurer-IDOT<br />

2007-127<br />

$1,543,682.34 $ 2,114,657.46 $ - $<br />

-<br />

300 $263,185.00 $ 263,185.00 $ - $<br />

-<br />

552 $1,280,497.34 $ 1,851,472.46 $ - $<br />

-<br />

McLean- Hopps to Bowes (Bikepath)<br />

(CONST)<br />

(CONST) Bikepath<br />

State of <strong>IL</strong> Treasurer-IDOT<br />

2010-345<br />

$11,352.84 $ 39,759.00 $ - $<br />

-<br />

304 $11,352.84 $ 39,759.00 $ - $<br />

-<br />

Meredith & <strong>IL</strong>38<br />

(CONST)<br />

(CONST)<br />

State of <strong>IL</strong> Treasurer-IDOT<br />

2011-1951<br />

$11,272.70 $ 17,250.00 $ - $<br />

-<br />

304 $11,272.70 $ 17,250.00 $ - $<br />

-<br />

Mooseheart Rd. & <strong>IL</strong>31<br />

(CONST)<br />

(CONST)<br />

State of <strong>IL</strong> Treasurer-IDOT<br />

Pending<br />

$215,051.00 $ 215,051.00 $ - $<br />

-<br />

305 $215,051.00 $ 215,051.00 $ - $<br />

-<br />

Orchard -Jericho to Rt.30<br />

(CONST)<br />

(CONST)<br />

State of <strong>IL</strong> Treasurer-IDOT<br />

$1,240,986.88 $ 7,128,<strong>13</strong>5.00 $ - $<br />

-<br />

Page 10 of 20


Acct (All) K.C.D.O.T.<br />

ABF A 3/31/20<strong>13</strong><br />

Project Mgr (All) Contractual Obligations<br />

P.O. Status Open (unaudited)<br />

Row Labels<br />

2011-1674<br />

Values<br />

Open Contract Contract Amount Funding Remaining A/R<br />

302 $0.00 $ 1,007,256.00 $ - $<br />

-<br />

304 $0.00 $ 1,065,919.53 $ - $<br />

-<br />

5<strong>13</strong> $0.00 $ 1,109,674.<strong>13</strong> $ - $<br />

-<br />

540 $1,145,899.91 $ 1,806,646.34 $ - $<br />

-<br />

550 $51,059.25 $ 324,000.00 $ - $<br />

-<br />

(E3)<br />

(E3)<br />

Civiltech Engineering Inc<br />

2011-563<br />

5<strong>13</strong> $0.00 $ 244,032.34 $ - $<br />

-<br />

540 $44,027.72 $ 1,020,606.66 $ - $<br />

-<br />

550 $0.00 $ 550,000.00 $ - $<br />

-<br />

Orchard Road over I-88<br />

(CONST)<br />

(CONST)<br />

Areatha Construction Company, Inc.<br />

Pending<br />

$1,008,000.11 $ 1,122,578.38 $ - $<br />

-<br />

540 $926,875.25 $ 926,875.25 $ - $<br />

-<br />

(E2)<br />

STV, Inc.<br />

2011-2504<br />

540 $81,124.86 $ 195,703.<strong>13</strong> $ - $<br />

-<br />

Orchard Traffic Signal Interconnect - Randall to Rochester<br />

(CONST)<br />

(CONST)<br />

State of <strong>IL</strong> Treasurer-IDOT<br />

2011-1076<br />

$36,352.17 $ <strong>13</strong>7,320.00 $ - $<br />

-<br />

304 $36,352.17 $ <strong>13</strong>7,320.00 $ - $<br />

-<br />

Pavement Marking<br />

(CONST)<br />

Pavement Striping - Paint<br />

Preform Traffic Control System<br />

Pending<br />

$920,2<strong>13</strong>.30 $ 1,180,549.39 $ - $<br />

-<br />

304 $450,287.57 $ 450,287.57 $ - $<br />

-<br />

Pavement Striping - Urethane<br />

AC Pavement Striping<br />

Pending<br />

304 $449,005.95 $ 449,005.95 $ - $<br />

-<br />

Roadsafe Traffic Systems, Inc.<br />

2012-948<br />

304 $20,919.78 $ 281,255.87 $ - $<br />

-<br />

Pavement Mgmt System $143,200.00 $ 143,200.00 $ - $<br />

-<br />

(E2)<br />

Applied Research Associates, Inc.<br />

2012-3226<br />

300 $143,200.00 $ 143,200.00 $ - $<br />

-<br />

Pavement Preservation<br />

(CONST)<br />

Pavement Preservation<br />

AC Pavement Striping<br />

Pending<br />

$665,014.61 $ 665,014.61 $ - $<br />

-<br />

304 $665,014.61 $ 665,014.61 $ - $<br />

-<br />

Page 11 of 20


Acct (All) K.C.D.O.T.<br />

ABF A 3/31/20<strong>13</strong><br />

Project Mgr (All) Contractual Obligations<br />

P.O. Status Open (unaudited)<br />

Values<br />

Row Labels Open Contract Contract Amount Funding Remaining A/R<br />

Pavement Resurfacing<br />

(CONST)<br />

Dugan Road Resurfacing<br />

Builders Paving, LLC D/B/A Hardin Paving<br />

2012-2374<br />

$6,398,346.35 $ 6,573,155.93 $ - $<br />

-<br />

304 $0.00 $ 169,449.24 $ - $<br />

-<br />

Preform Traffic Control System<br />

2012-3010<br />

304 $0.00 $ 2,717.48 $ - $<br />

-<br />

Rubino Engineering, Inc.<br />

(blank)<br />

304 $0.00 $ 1,116.00 $ - $<br />

-<br />

Traffic & Parking Control Company<br />

2012-3045<br />

300 $0.00 $ 1,526.86 $ - $<br />

-<br />

Resurfacing/Paved shoulders<br />

Curran Contracting Co<br />

20<strong>13</strong>-959<br />

304 $6,398,346.35 $ 6,398,346.35 $ - $<br />

-<br />

Penny Road - <strong>IL</strong>68 to Cook <strong>County</strong> Line<br />

(CONST)<br />

(CONST)<br />

Cook <strong>County</strong><br />

2010-736<br />

$200,000.00 $ 200,000.00 $ - $<br />

-<br />

304 $200,000.00 $ 200,000.00 $ - $<br />

-<br />

Plank Rd. & <strong>IL</strong>47<br />

(CONST)<br />

(CONST)<br />

Plote Construction Inc. of Hoffman Estates, <strong>IL</strong><br />

2012-875<br />

$286,818.32 $ 2,382,531.68 $ (82,262.05) $<br />

-<br />

540 $154,752.42 $ 1,467,440.94 $ - $<br />

-<br />

553 $0.00 $ 625,000.00 $ (82,262.05) $<br />

-<br />

(E3)<br />

(E3)<br />

Bollinger, Lach, and Associates<br />

2012-778<br />

553 $<strong>13</strong>2,065.90 $ 290,090.74 $ - $<br />

-<br />

Plank Rd. Realignment $47,959.25 $ 517,682.77 $ - $<br />

-<br />

(E2)<br />

Crawford Murphy & Tilly Inc (CMT)<br />

2010-1869<br />

305 $47,959.25 $ 96,859.61 $ - $<br />

-<br />

553 $0.00 $ 420,823.16 $ - $<br />

-<br />

Randall - <strong>County</strong> Line to Binnie Interconnect<br />

(CONST)<br />

(CONST)<br />

State of <strong>IL</strong> Treasurer-IDOT<br />

2011-597<br />

$26,990.38 $ 90,805.00 $ - $<br />

-<br />

540 $26,990.38 $ 90,805.00 $ - $<br />

-<br />

Randall & Big Timber<br />

(CONST)<br />

(CONST)<br />

$95,357.37 $ 180,051.81 $ - $<br />

-<br />

Page 12 of 20


Acct (All) K.C.D.O.T.<br />

ABF A 3/31/20<strong>13</strong><br />

Project Mgr (All) Contractual Obligations<br />

P.O. Status Open (unaudited)<br />

Row Labels<br />

State of <strong>IL</strong> Treasurer-IDOT<br />

20<strong>13</strong>-98<br />

Values<br />

Open Contract Contract Amount Funding Remaining A/R<br />

305 $92,327.56 $ 92,327.56 $ - $<br />

-<br />

(E2)<br />

Gewalt Hamilton Associates, Inc.<br />

2011-1676<br />

304 $1,029.81 $ 85,724.25 $ - $<br />

-<br />

(ROW)<br />

(ROW)<br />

T Engineering Services Ltd<br />

2012-316<br />

304 $2,000.00 $ 2,000.00 $ - $<br />

-<br />

Randall & Bolcum<br />

(CONST)<br />

(CONST)<br />

State of <strong>IL</strong> Treasurer-IDOT<br />

2011-1075<br />

($49,782.47) $ <strong>13</strong>3,733.00 $ - $<br />

-<br />

304 ($49,782.47) $ <strong>13</strong>3,733.00 $ - $<br />

-<br />

Randall & Fabyan<br />

(CONST)<br />

(CONST)<br />

State of <strong>IL</strong> Treasurer-IDOT<br />

2011-1074<br />

$160,274.80 $ 830,439.46 $ - $<br />

-<br />

5<strong>13</strong> $0.00 $ 366,167.29 $ - $<br />

-<br />

540 $159,838.03 $ 190,721.69 $ - $<br />

-<br />

(E3)<br />

(E3)<br />

Transystems, Inc.<br />

2011-598<br />

305 $436.77 $ 273,550.48 $ - $<br />

-<br />

Randall & Foothill<br />

(CONST)<br />

(CONST)<br />

State of <strong>IL</strong> Treasurer-IDOT<br />

2012-783<br />

$354,589.56 $ 660,865.57 $ (52,673.55) $ (19,267.42)<br />

304 $312,831.90 $ 458,632.00 $ - $<br />

-<br />

(E3)<br />

(E3)<br />

Homer L. Chastain & Associates, LLP<br />

2012-163<br />

304 $41,757.66 $ 202,233.57 $ (52,673.55) $ (19,267.42)<br />

Randall & Gyorr Permanent Traffic Signal<br />

(CONST)<br />

(CONST)<br />

H & H Electric<br />

2012-2027<br />

$222,091.62 $ 406,184.40 $ - $<br />

-<br />

305 $222,091.62 $ 406,184.40 $ - $<br />

-<br />

Randall & <strong>IL</strong> Rt64<br />

(CONST)<br />

(CONST)<br />

State of <strong>IL</strong> Treasurer-IDOT<br />

2007-123<br />

$1,371,636.00 $ 3,342,704.38 $ - $<br />

-<br />

540 $1,371,636.00 $ 3,342,704.38 $ - $<br />

-<br />

Page <strong>13</strong> of 20


Acct (All) K.C.D.O.T.<br />

ABF A 3/31/20<strong>13</strong><br />

Project Mgr (All) Contractual Obligations<br />

P.O. Status Open (unaudited)<br />

Row Labels<br />

Values<br />

Open Contract Contract Amount Funding Remaining A/R<br />

Randall & Rt. 72<br />

(CONST)<br />

(CONST)<br />

State of <strong>IL</strong> Treasurer-IDOT<br />

2011-2557<br />

$6,437.55 $ 27,600.00 $ - $<br />

-<br />

305 $6,437.55 $ 27,600.00 $ - $<br />

-<br />

Randall Over I-88<br />

(CONST)<br />

(CONST)<br />

Herlihy Mid-Continent Company<br />

2011-1010<br />

$0.00 $ 973,546.38 $ (34,345.10) $ (34,345.10)<br />

5<strong>13</strong> $0.00 $ 973,546.38 $ - $<br />

-<br />

540 $0.00 $ - $ (34,345.10) $ (34,345.10)<br />

Randall Traffic Signal Interconnect - Dean to Main<br />

(CONST)<br />

(CONST)<br />

State of <strong>IL</strong> Treasurer-IDOT<br />

2011-596<br />

$55,175.20 $ 205,400.00 $ - $<br />

-<br />

305 $55,175.20 $ 205,400.00 $ - $<br />

-<br />

Route 529 Bus Access Plan $16,762.26 $ 101,742.65 $ - $<br />

-<br />

Route 529 Bus Access Plan<br />

V3 Companies of Illinois Ltd<br />

2011-412<br />

305 $16,762.26 $ 101,742.65 $ - $<br />

-<br />

Rural Sign Upgrade Program<br />

Big Rock Township<br />

Rural Sign Upgrade Program<br />

Hall Signs, Inc.<br />

2012-23<strong>13</strong><br />

$0.00 $ 30,097.14 $ (30,097.14) $<br />

-<br />

300 $0.00 $ 8,556.52 $ (8,556.52) $<br />

-<br />

Burlington Township<br />

Rural Sign Upgrade Program<br />

Hall Signs, Inc.<br />

2012-23<strong>13</strong><br />

300 $0.00 $ 9,393.38 $ (9,393.38) $<br />

-<br />

Campton Township<br />

Rural Sign Upgrade Program<br />

Hall Signs, Inc.<br />

2012-23<strong>13</strong><br />

300 $0.00 $ 7,120.61 $ (7,120.61) $<br />

-<br />

Village of Big Rock<br />

Rural Sign Upgrade Program<br />

Hall Signs, Inc.<br />

2012-23<strong>13</strong><br />

300 $0.00 $ 2,166.01 $ (2,166.01) $<br />

-<br />

Village of Virgil<br />

Rural Sign Upgrade Program<br />

Hall Signs, Inc.<br />

2012-23<strong>13</strong><br />

300 $0.00 $ 1,339.03 $ (1,339.03) $<br />

-<br />

Virgil Township<br />

Rural Sign Upgrade Program<br />

Hall Signs, Inc.<br />

2012-23<strong>13</strong><br />

Page 14 of 20


Acct (All) K.C.D.O.T.<br />

ABF A 3/31/20<strong>13</strong><br />

Project Mgr (All) Contractual Obligations<br />

P.O. Status Open (unaudited)<br />

Row Labels<br />

Values<br />

Open Contract Contract Amount Funding Remaining A/R<br />

300 $0.00 $ 1,521.59 $ (1,521.59) $<br />

-<br />

Seavey Rd Resurfacing<br />

(CONST)<br />

(CONST)<br />

Geneva Construction Company<br />

2012-2375<br />

$0.00 $ 303,197.01 $ (67,839.49) $ (67,839.49)<br />

305 $0.00 $ 303,197.01 $ (67,839.49) $ (67,839.49)<br />

South St Bike Path Extension<br />

(CONST)<br />

(CONST)<br />

State of <strong>IL</strong> Treasurer-IDOT<br />

2012-3070<br />

$474,044.47 $ 731,050.60 $ (122,127.00) $ (26,014.80)<br />

540 $374,759.00 $ 374,759.00 $ - $<br />

-<br />

(E2)<br />

Wills Burke Kelsey Associates, Limited (WBK)<br />

2011-589<br />

305 $6,496.66 $ 176,718.60 $ (5,197.33) $<br />

-<br />

(E3)<br />

(E3)<br />

Civiltech Engineering Inc<br />

2012-1946<br />

540 $92,788.81 $ 179,573.00 $ (116,929.67) $ (26,014.80)<br />

Special Purpose Equipment<br />

(blank)<br />

Replace Fuel Island & Dispensers<br />

Integrity Environmental Services Inc.<br />

2012-3374<br />

$226,593.00 $ 226,593.00 $ - $<br />

-<br />

304 $<strong>13</strong>,950.00 $ <strong>13</strong>,950.00 $ - $<br />

-<br />

Stenstrom Petroleum Services Group<br />

Pending<br />

304 $212,643.00 $ 212,643.00 $ - $<br />

-<br />

Stearns Corridor Environmental Monitoring $2,179.99 $ 24,029.43 $ - $<br />

-<br />

Environmental Monitoring<br />

Wills Burke Kelsey Associates, Limited (WBK)<br />

2012-2278<br />

304 $2,179.99 $ 24,029.43 $ - $<br />

-<br />

Stearns Corridor Traffic System $160,144.27 $ 160,144.27 $ (128,115.40) $<br />

-<br />

(E2)<br />

Jacobs Engineering Group, Inc.<br />

2012-849<br />

540 $160,144.27 $ 160,144.27 $ (128,115.40) $<br />

-<br />

Stearns Rd Bridge - Stg 2 New Stearns at McLean Blvd and McLean & <strong>IL</strong>31<br />

(CONST)<br />

(CONST)<br />

State of <strong>IL</strong> Treasurer-IDOT<br />

2009-2021<br />

$649,669.00 $ 649,669.00 $ - $<br />

-<br />

305 $149,669.00 $ 149,669.00 $ - $<br />

-<br />

558 $500,000.00 $ 500,000.00 $ - $<br />

-<br />

Stearns Rd Bridge - Stg 2A McLean Fen Adaptive Mgmt Plan<br />

(CONST)<br />

(CONST)<br />

$149,528.45 $ 241,617.78 $ (53,050.80) $ (8,041.66)<br />

Page 15 of 20


Acct (All) K.C.D.O.T.<br />

ABF A 3/31/20<strong>13</strong><br />

Project Mgr (All) Contractual Obligations<br />

P.O. Status Open (unaudited)<br />

Row Labels<br />

State of <strong>IL</strong> Treasurer-IDOT<br />

2012-543<br />

Values<br />

Open Contract Contract Amount Funding Remaining A/R<br />

305 $114,628.31 $ 114,628.31 $ - $<br />

-<br />

(E3)<br />

(E3)<br />

AMEC Environmental & Infrastructure, Inc.<br />

2011-2036<br />

305 $34,900.14 $ 126,989.47 $ (53,050.80) $ (8,041.66)<br />

Stearns Rd Bridge - Stg 3 Stearns Road / Dunham / <strong>IL</strong> 25 Int.<br />

(CONST)<br />

(CONST)<br />

State of <strong>IL</strong> Treasurer-IDOT<br />

2009-2027<br />

$1,288,898.00 $ 1,288,898.00 $ (588,898.00) $<br />

-<br />

305 $588,898.00 $ 588,898.00 $ (588,898.00) $<br />

-<br />

552 $700,000.00 $ 700,000.00 $ - $<br />

-<br />

Stearns Rd Bridge - Stg 3A <strong>IL</strong>25 from Dunham to CC&P RR<br />

(CONST)<br />

(CONST)<br />

State of <strong>IL</strong> Treasurer-IDOT<br />

Pending<br />

$1,285,724.69 $ 2,985,609.48 $ (839,242.33) $ (33,685.25)<br />

555 $729,000.00 $ 729,000.00 $ - $<br />

-<br />

(E2)<br />

Alfred Benesch & Co.<br />

2010-<strong>13</strong>7<br />

304 $353,636.69 $ 811,587.11 $ (334,468.<strong>13</strong>) $ (33,685.25)<br />

5<strong>13</strong> $0.00 $ 875,709.37 $ - $<br />

-<br />

540 $0.00 $ - $<br />

-<br />

(ROW)<br />

(ROW)<br />

T Engineering Services Ltd<br />

2011-2318<br />

300 $0.00 $ 8,600.00 $ - $<br />

-<br />

(blank)<br />

305 $0.00 $ 1,000.00 $ - $<br />

-<br />

Gary Steinhofer and Kevin Coll<br />

1st0241<br />

305 $0.00 $ 271,000.00 $ (243,900.00) $<br />

-<br />

Salvador and Elvira Hernandez<br />

1st0066<br />

305 $0.00 $ 75,300.00 $ (67,770.00) $<br />

-<br />

H-B Unlimited, Inc.<br />

1st0243TE<br />

305 $0.00 $ 2,000.00 $ (2,000.00) $<br />

-<br />

White Gates Skeet Club (<strong>Kane</strong> <strong>County</strong> Treasurer)<br />

1st0252TE<br />

305 $0.00 $ 8,325.00 $ (8,325.00) $<br />

-<br />

Union Pacific Railroad (<strong>Kane</strong> <strong>County</strong> Treasurer)<br />

1st0244PE<br />

305 $60,641.00 $ 60,641.00 $ (54,576.90) $<br />

-<br />

1st0245PE<br />

305 $142,447.00 $ 142,447.00 $ (128,202.30) $<br />

-<br />

Page 16 of 20


Acct (All) K.C.D.O.T.<br />

ABF A 3/31/20<strong>13</strong><br />

Project Mgr (All) Contractual Obligations<br />

P.O. Status Open (unaudited)<br />

Values<br />

Row Labels Open Contract Contract Amount Funding Remaining A/R<br />

Stearns Rd Bridge - Stg 4 McLean to <strong>IL</strong>25<br />

(CONST)<br />

(CONST)<br />

State of <strong>IL</strong> Treasurer-IDOT<br />

2009-<strong>13</strong>16<br />

$1,602,510.81 $ 3,856,<strong>13</strong>0.00 $ 0.00 $ 0.00<br />

305 $589,531.81 $ 589,531.81 $ 0.00 $ 0.00<br />

5<strong>13</strong> $0.00 $ 2,223,984.19 $ - $<br />

-<br />

(CONST) Advance STP-C Payback<br />

Lake <strong>County</strong><br />

2010-<strong>13</strong>29<br />

305 $506,920.00 $ 536,555.00 $ - $<br />

-<br />

Will <strong>County</strong><br />

2010-<strong>13</strong>28<br />

305 $506,059.00 $ 506,059.00 $ - $<br />

-<br />

Stearns Rd Bridge - Stg 4A South Elgin Sedge Meadow Adaptive Mgmt Plan<br />

(E3)<br />

(MONITORING)<br />

Wills Burke Kelsey Associates, Limited (WBK)<br />

2009-152<br />

$25,776.76 $ 31,872.71 $ - $<br />

-<br />

540 $25,776.76 $ 31,872.71 $ - $<br />

-<br />

Stearns Rd Bridge - Stg 5 McLean Blvd to Randall<br />

(CONST)<br />

(CONST)<br />

State of <strong>IL</strong> Treasurer-IDOT<br />

2009-2026<br />

$308,497.49 $ 1,024,053.00 $ - $<br />

-<br />

305 $308,497.49 $ 503,835.65 $ - $<br />

-<br />

5<strong>13</strong> $0.00 $ 520,217.35 $ - $<br />

-<br />

Stearns Rd Bridge - Stg 5B Umbdenstock over CC&P RR<br />

(CONST)<br />

(CONST)<br />

ComEd<br />

2011-2007<br />

$942,487.53 $ 1,656,342.57 $ (630,429.48) $ (9,193.36)<br />

305 $632,000.00 $ 632,000.00 $ (568,800.00) $<br />

-<br />

State of <strong>IL</strong> Treasurer-IDOT<br />

2011-1946<br />

305 $285,203.22 $ 285,203.22 $ - $<br />

-<br />

(E2)<br />

Civiltech Engineering Inc<br />

2009-2774<br />

540 $117.73 $ 326,390.00 $ (105.96) $<br />

-<br />

(E3)<br />

(E3)<br />

Omega & Associates Inc.<br />

2011-977<br />

5<strong>13</strong> $0.00 $ 141,908.16 $ - $<br />

-<br />

540 $25,166.58 $ 270,841.19 $ (61,523.52) $ (9,193.36)<br />

Stearns Road Bridge<br />

(CONST)<br />

(CONST)<br />

Alfred Benesch & Co.<br />

2009-621<br />

$571,015.14 $ 846,484.05 $ (162,639.92) $<br />

-<br />

304 $4,712.56 $ 14,900.00 $ - $<br />

-<br />

Page 17 of 20


Acct (All) K.C.D.O.T.<br />

ABF A 3/31/20<strong>13</strong><br />

Project Mgr (All) Contractual Obligations<br />

P.O. Status Open (unaudited)<br />

Row Labels<br />

(Environmental Maintenance)<br />

(blank)<br />

Pending<br />

Values<br />

Open Contract Contract Amount Funding Remaining A/R<br />

305 $219,<strong>13</strong>3.55 $ 219,<strong>13</strong>3.55 $ - $<br />

-<br />

(CONST) - Landscaping<br />

(CONST) - Landscaping<br />

State of <strong>IL</strong> Treasurer-IDOT<br />

2011-1077<br />

540 $166,458.00 $ 166,458.00 $ - $<br />

-<br />

(E3) - Landscaping<br />

(E3) - Landscaping<br />

Hey and Associates, Inc.<br />

2010-2418<br />

5<strong>13</strong> $0.00 $ 265,281.47 $ - $<br />

-<br />

540 $180,711.03 $ 180,711.03 $ (162,639.92) $<br />

-<br />

StormWater Mgmt $21,679.60 $ 27,878.00 $ - $<br />

-<br />

Bolcum over Ferson Creek<br />

Hampton Lenzini & Renwick, Inc. (HLR)<br />

2011-732<br />

300 $1,334.84 $ 3,378.00 $ - $<br />

-<br />

Stormwater Mgmt<br />

Wills Burke Kelsey Associates, Limited (WBK)<br />

2011-1863<br />

300 $20,344.76 $ 24,500.00 $ - $<br />

-<br />

Tanner Over Lake Run Creek $11,745.14 $ 170,795.41 $ - $<br />

-<br />

(E2)<br />

Baxter & Woodman, Inc.<br />

2011-2019<br />

305 $7,745.14 $ 166,795.41 $ - $<br />

-<br />

(ROW)<br />

(ROW)<br />

T Engineering Services Ltd<br />

20<strong>13</strong>-439<br />

300 $4,000.00 $ 4,000.00 $ - $<br />

-<br />

Thatcher Over VirgilDitch1 $11,211.24 $ 191,632.59 $ - $<br />

-<br />

(E2)<br />

Baxter & Woodman, Inc.<br />

2011-2020<br />

305 $8,211.24 $ 188,632.59 $ - $<br />

-<br />

(ROW)<br />

(ROW)<br />

T Engineering Services Ltd<br />

20<strong>13</strong>-438<br />

305 $3,000.00 $ 3,000.00 $ - $<br />

-<br />

Traffic - Intersection Improvements<br />

(CONST)<br />

Burlington @ <strong>IL</strong>64<br />

State of <strong>IL</strong> Treasurer-IDOT<br />

2012-824<br />

$2,720.86 $ 4,082.50 $ - $<br />

-<br />

300 $0.00 $ 1,092.50 $ - $<br />

-<br />

Jericho @ US30/<strong>IL</strong>47<br />

Page 18 of 20


Acct (All) K.C.D.O.T.<br />

ABF A 3/31/20<strong>13</strong><br />

Project Mgr (All) Contractual Obligations<br />

P.O. Status Open (unaudited)<br />

Row Labels<br />

State of <strong>IL</strong> Treasurer-IDOT<br />

2012-824<br />

Values<br />

Open Contract Contract Amount Funding Remaining A/R<br />

300 $650.86 $ 920.00 $ - $<br />

-<br />

Keslinger @ <strong>IL</strong>47<br />

State of <strong>IL</strong> Treasurer-IDOT<br />

2012-824<br />

300 $1,322.50 $ 1,322.50 $ - $<br />

-<br />

LaFox @ <strong>IL</strong>38<br />

State of <strong>IL</strong> Treasurer-IDOT<br />

2012-824<br />

300 $747.50 $ 747.50 $ - $<br />

-<br />

Traffic Data Collection<br />

(E1)<br />

Traffic Data Collection<br />

Gewalt Hamilton Associates, Inc.<br />

2011-1895<br />

$56,587.22 $ 119,996.22 $ - $<br />

-<br />

304 $56,587.22 $ 119,996.22 $ - $<br />

-<br />

Traffic Design Engineering Assistance $108,182.48 $ 170,000.00 $ - $<br />

-<br />

Traffic Design Engineering Assistance<br />

Hanson Professional Services, Inc.<br />

2012-727<br />

304 $108,182.48 $ 170,000.00 $ - $<br />

-<br />

Traffic Operations Center $415,467.87 $ 449,306.90 $ (<strong>13</strong>9,299.26) $<br />

-<br />

Building Addition -Engineering<br />

Hampton Lenzini & Renwick, Inc. (HLR)<br />

20<strong>13</strong>-990<br />

300 $3,600.00 $ 3,600.00 $ - $<br />

-<br />

Wills Burke Kelsey Associates, Limited (WBK)<br />

2012-663<br />

300 $953.50 $ 19,600.00 $ - $<br />

-<br />

(E3)<br />

Building Addition -Engineering<br />

Knight E/A, Inc.<br />

2012-1678<br />

300 $174,124.07 $ 174,124.07 $ (<strong>13</strong>9,299.26) $<br />

-<br />

Traffic Management Software<br />

Transcore ITS, LLC.<br />

2012-1611<br />

300 $236,790.30 $ 251,982.83 $ - $<br />

-<br />

Traffic Signal /Lighting - Maint. & Repair<br />

(CONST)<br />

Traffic Signal /Lighting - Maint. & Repair<br />

Meade Electric Co Inc<br />

2012-3<br />

$469,314.33 $ 1,027,276.00 $ (1,309.80) $ (1,309.80)<br />

304 $469,314.33 $ 1,027,276.00 $ - $<br />

-<br />

4th Quarter 2012<br />

Meade Electric Co Inc<br />

2012-3<br />

304 $0.00 $ (1,309.80) $ (1,309.80)<br />

Traffic Signal Mgmt/Timing Assistance $451,784.56 $ 470,000.00 $ - $<br />

-<br />

Page 19 of 20


Acct (All) K.C.D.O.T.<br />

ABF A 3/31/20<strong>13</strong><br />

Project Mgr (All) Contractual Obligations<br />

P.O. Status Open (unaudited)<br />

Row Labels<br />

Traffic Signal Mgmt/Timing Assistance<br />

Hampton Lenzini & Renwick, Inc. (HLR)<br />

20<strong>13</strong>-681<br />

Values<br />

Open Contract Contract Amount Funding Remaining A/R<br />

304 $451,784.56 $ 470,000.00 $ - $<br />

-<br />

Walker Over Burlington Crk<br />

(E1)<br />

(E1)<br />

Wills Burke Kelsey Associates, Limited (WBK)<br />

2009-2636<br />

$12,217.15 $ 153,729.40 $ (12,222.27) $ (1,875.76)<br />

304 $12,217.15 $ 153,729.40 $ (12,222.27) $ (1,875.76)<br />

Wayside Horns on UPRR<br />

(CONST)<br />

(CONST)<br />

(CONST)<br />

Pending<br />

$250,000.00 $ 250,000.00 $ (187,500.00) $<br />

-<br />

300 $187,000.00 $ 187,000.00 $ (124,500.00) $<br />

-<br />

(E2)<br />

Hanson Professional Services, Inc.<br />

Pending<br />

300 $63,000.00 $ 63,000.00 $ (63,000.00) $<br />

-<br />

West <strong>County</strong> Line Rd Over Union Ditch #3 $212,772.21 $ 212,772.21 $ (175,196.63) $<br />

-<br />

(E2)<br />

Fehr-Graham & Associates, LLC<br />

2012-2218<br />

304 $212,772.21 $ 212,772.21 $ (175,196.63) $<br />

-<br />

Grand Total $39,118,199.25 $ 73,348,<strong>13</strong>0.73 $ (6,370,344.67) $<br />

(404,084.81)<br />

Page 20 of 20


If not budgeted,<br />

explain funding<br />

source<br />

<strong>AG</strong>ENDA ITEM EXECUTIVE SUMMARY Agenda Item #<br />

Presenter/Sponsor:<br />

Name<br />

Budget Information: Was this item budgeted?<br />

SUMMARY:<br />

Attachments:<br />

Detailed information available from :<br />

Resolution/Ordinance Tracking:<br />

Staff Name:<br />

Appropriation Amount:<br />

Mike Zakosek Phone: 1-630-406-7346<br />

Assigned Committee: Transportation Sent to: Executive<br />

on: 04/11/20<strong>13</strong><br />

If Other, specify:<br />

Committee Remarks:<br />

<strong>County</strong> Board Date:<br />

Resolution<br />

Ordinance<br />

Yes<br />

No N/A<br />

Next Committee: Executive Sent to: <strong>County</strong> Board on: 05/08/20<strong>13</strong><br />

If Other, specify:<br />

Committee Remarks:<br />

Next Committee: Sent to: on:<br />

Committee Remarks:<br />

Approving Disbursement of Township Bridge Program Funds (TBP) to Elgin Township<br />

Road District for Hopps Road over Otter Creek, Section No. 04-08107-00-BR<br />

Tom Rickert - Deputy Director of Transportation<br />

4C<br />

$215,000.00<br />

For several years, Elgin Township has been working to replace the Hopps Road over Otter Creek bridge. The new bridge was<br />

constructed in 2012. 80% was funded with Highway Bridge Program (HBP) funds. HBP is a Federal Highway Administration<br />

(FHWA) program administered by the Illinois Department of Transportation (IDOT).<br />

The Township Bridge Program (TBP) is a State of Illinois funding program that provides up to 80% of the cost of a bridge<br />

rehabilitation or replacement project for eligible township road districts. For the 16 Township Road Districts within <strong>Kane</strong><br />

<strong>County</strong>, the <strong>County</strong> administers the TBP funds on behalf of IDOT. Townships may use TBP funds as part of their local match<br />

for a HBP project. When using State TBP to match Federal HBP, a township road district pays 20% of 20%, or 4% with local<br />

funds.<br />

The Elgin Township Highway Commissioner is requesting approximately $215,000 of TBP funds for Hopps Road, which<br />

represents approximately 16% of the estimated project cost of $1,344,000. The <strong>County</strong> acts as administrator of these funds,<br />

wherein IDOT transfers these funds to the <strong>County</strong>, and the <strong>County</strong> transfers the funds to the Township.<br />

Staff requests authorization to disburse $215,000 of TBP funds, as available and received from the State, for this project.<br />

Resolution<br />

05/14/20<strong>13</strong>


STATE OF <strong>IL</strong>LINOIS<br />

COUNTY OF KANE<br />

RESOLUTION NO. <strong>13</strong> -<br />

APPROVING DISBURSEMENT OF TOWNSHIP BRIDGE PROGRAM FUNDS (TBP)<br />

TO ELGIN TOWNSHIP ROAD DISTRICT<br />

FOR HOPPS ROAD OVER OTTER CREEK<br />

SECTION NO. 04-08107-00-BR<br />

WHEREAS, the <strong>County</strong> Engineer through the <strong>Kane</strong> <strong>County</strong> Division of Transportation acts as<br />

administrator of Township Bridge Program Funds (TBP); and<br />

WHEREAS, Elgin Township Road District has previously solicited and received sealed bids for the<br />

work and/or construction described as:<br />

ELGIN TOWNSHIP ROAD DISTRICT SEC. NO. 04-08107-00-BR<br />

HOPPS ROAD OVER OTTER CREEK<br />

(hereinafter the “Project”); and<br />

WHEREAS, Project costs, in the amount of $215,000.00, are required to be paid from the<br />

Township Bridge Fund (706).<br />

NOW, THEREFORE, BE IT RESOLVED by the <strong>Kane</strong> <strong>County</strong> Board that the Township Bridge<br />

Program Funds in the amount of $215,000.00 is hereby authorized for disbursement to the Elgin Township<br />

Road District to partially fund the Project (Section No. 04-08107-00-BR).<br />

Passed by the <strong>Kane</strong> <strong>County</strong> Board on May 14, 20<strong>13</strong>.<br />

______________________________________ ___________________________________<br />

John A. Cunningham Christopher J. Lauzen<br />

Clerk, <strong>County</strong> Board Chairman, <strong>County</strong> Board<br />

<strong>Kane</strong> <strong>County</strong>, Illinois <strong>Kane</strong> <strong>County</strong>, Illinois<br />

Vote:<br />

Yes _____<br />

No _____<br />

Voice _____<br />

Abstentions _____<br />

5ELBTWPBR-HOPPS.4LH


If not budgeted,<br />

explain funding<br />

source<br />

<strong>AG</strong>ENDA ITEM EXECUTIVE SUMMARY Agenda Item #<br />

Presenter/Sponsor:<br />

Name<br />

Budget Information: Was this item budgeted?<br />

SUMMARY:<br />

Attachments:<br />

Detailed information available from :<br />

Resolution/Ordinance Tracking:<br />

Staff Name:<br />

Appropriation Amount:<br />

Mike Zakosek Phone: 1-630-406-7346<br />

Assigned Committee: Transportation Sent to: Executive<br />

on: 04/11/20<strong>13</strong><br />

If Other, specify:<br />

Committee Remarks:<br />

<strong>County</strong> Board Date:<br />

Resolution<br />

Ordinance<br />

Yes<br />

No N/A<br />

Next Committee: Executive Sent to: <strong>County</strong> Board on: 05/08/20<strong>13</strong><br />

If Other, specify:<br />

Committee Remarks:<br />

Next Committee: Sent to: on:<br />

Committee Remarks:<br />

Approving Disbursement of Township Bridge Program Funds (TBP) to St. Charles<br />

Township Road District for Burr Road over Otter Creek, Section No. 08-14117-00-BR<br />

Tom Rickert - Deputy Director of Transportation<br />

4D<br />

$220,000.00<br />

For several years, St. Charles Township has been working to replace the Burr Road over Otter Creek bridge. The new bridge<br />

was constructed in 2012. 80% was funded with Highway Bridge Program (HBP) funds. HBP is a Federal Highway<br />

Administration (FHWA) program administered by the Illinois Department of Transportation (IDOT).<br />

The Township Bridge Program (TBP) is a State of Illinois funding program that provides up to 80% of the cost of a bridge<br />

rehabilitation or replacement project for eligible township road districts. For the 16 Township Road Districts within <strong>Kane</strong><br />

<strong>County</strong>, the <strong>County</strong> administers the TBP funds on behalf of IDOT. Townships may use TBP funds as part of their local match<br />

for a HBP project. When using State TBP to match Federal HBP, a township road district pays 20% of 20%, or 4% with local<br />

funds.<br />

The St. Charles Township Highway Commissioner is requesting approximately $220,000 of TBP funds for Burr Road, which<br />

represents approximately 16% of the estimated project cost of $1,374, 000. The <strong>County</strong> acts as administrator of these funds,<br />

wherein IDOT transfers these funds to the <strong>County</strong>, and the <strong>County</strong> transfers the funds to the Township.<br />

Staff requests authorization to disburse $220,000 of TBP funds, as available and received from the State, for this project.<br />

Resolution<br />

05/14/20<strong>13</strong>


STATE OF <strong>IL</strong>LINOIS<br />

COUNTY OF KANE<br />

RESOLUTION NO. <strong>13</strong> -<br />

APPROVING DISBURSEMENT OF TOWNSHIP BRIDGE PROGRAM FUNDS (TBP)<br />

TO ST. CHARLES TOWNSHIP ROAD DISTRICT<br />

FOR BURR ROAD OVER OTTER CREEK<br />

SECTION NO. 08-14117-00-BR<br />

WHEREAS, the <strong>County</strong> Engineer through the <strong>Kane</strong> <strong>County</strong> Division of Transportation acts as<br />

administrator of Township Bridge Program Funds (TBP); and<br />

WHEREAS, St. Charles Township has previously solicited and received sealed bids for the work<br />

and/or construction described as:<br />

ST. CHARLES TOWNSHIP SEC. NO. 08-14117-00-BR<br />

BURR ROAD OVER OTTER CREEK<br />

(hereinafter the “Project”); and<br />

WHEREAS, Project costs, in the amount of $220,000.00, are required to be paid from the<br />

Township Bridge Fund (706).<br />

NOW, THEREFORE, BE IT RESOLVED by the <strong>Kane</strong> <strong>County</strong> Board that the Township Bridge<br />

Program Funds in the amount of $220,000.00 is hereby authorized for disbursement to the St. Charles<br />

Township Road District to partially fund the Project (Section No. 08-14117-00-BR).<br />

Passed by the <strong>Kane</strong> <strong>County</strong> Board on May 14, 20<strong>13</strong>.<br />

______________________________________ ___________________________________<br />

John A. Cunningham Christopher J. Lauzen<br />

Clerk, <strong>County</strong> Board Chairman, <strong>County</strong> Board<br />

<strong>Kane</strong> <strong>County</strong>, Illinois <strong>Kane</strong> <strong>County</strong>, Illinois<br />

Vote:<br />

Yes _____<br />

No _____<br />

Voice _____<br />

Abstentions _____<br />

5STCHTWPBR-BURR.4LH


SUMMARY:<br />

Attachments:<br />

Detailed information<br />

available from :<br />

Staff Remarks /<br />

Recommendations:<br />

Committee Remarks:<br />

<strong>AG</strong>ENDA ITEM EXECUTIVE SUMMARY Agenda Item #<br />

Name:<br />

Assigned Committee:<br />

Staff Name:<br />

Maintenance Report<br />

4/11/<strong>13</strong><br />

Presenter/Sponsor: Tom Rickert<br />

Maintenance Activities<br />

• Transitioning to summer routine and preparing equipment<br />

• Miscellaneous roadway repairs<br />

• Tree / brush trimming<br />

• Culvert replacement – will be replacing 20 cross culverts in coordination with with this year’s resurfacing contract<br />

FY2014 Rock Salt – Bulk Rock Salt requests were submitted to the State (CMS) for the <strong>County</strong> and Townships. The <strong>County</strong><br />

request was for 9,000 tons. The State contract will require us to purchase a minimum of 80% and a maximum of 120% of the<br />

projected quantity at the contract price.<br />

N/A<br />

For information only.<br />

Transportation<br />

Bill Edwards, Maintenance Superintendent Phone: 630/584-1172<br />

5A


If not budgeted,<br />

explain funding<br />

source<br />

<strong>AG</strong>ENDA ITEM EXECUTIVE SUMMARY Agenda Item #<br />

Presenter/Sponsor:<br />

Name<br />

Budget Information: Was this item budgeted?<br />

SUMMARY:<br />

Attachments:<br />

Detailed information available from :<br />

Resolution/Ordinance Tracking:<br />

Staff Name:<br />

Appropriation Amount:<br />

Chris Rossman Phone: 630-444-3186<br />

Assigned Committee: Transportation Sent to: Executive<br />

on: 04/11/20<strong>13</strong><br />

If Other, specify:<br />

Committee Remarks:<br />

<strong>County</strong> Board Date:<br />

Resolution<br />

Ordinance<br />

Yes<br />

No N/A<br />

Next Committee: Executive Sent to: <strong>County</strong> Board on: 05/08/20<strong>13</strong><br />

If Other, specify:<br />

Committee Remarks:<br />

Next Committee: Sent to: on:<br />

Committee Remarks:<br />

Fuel Delivery System Upgrade, <strong>Kane</strong> <strong>County</strong> Division of Transportation (Bid Number<br />

<strong>13</strong>-0<strong>13</strong>)<br />

Tom Rickert - Deputy Director of Transportation<br />

5B<br />

$223,275.00<br />

<strong>Kane</strong> <strong>County</strong> Purchasing Department publicly bid the replacement of the fuel delivery system for <strong>Kane</strong> <strong>County</strong> Division of<br />

Transportation. Advertised on the <strong>County</strong> Web from March 6th to 14th and with the <strong>Kane</strong> <strong>County</strong> Chronicle from March 6th<br />

to the 27th, with a bid opening on March 27th. Four (4) bids were submitted. Low bidder was Stenstrom Petroleum Services<br />

Group of Rockford, <strong>IL</strong> at $212, 643.00. Appropriation is $223,275.00 , which includes a 5% contingency.<br />

The current system is 22 years old and is in need of replacement and updating. We will be replacing underground piping,<br />

fueling dispensers and the concrete islands.<br />

Resolution, Bid Tab<br />

05/14/20<strong>13</strong>


STATE OF <strong>IL</strong>LINOIS<br />

COUNTY OF KANE<br />

RESOLUTION NO. <strong>13</strong> -<br />

FUEL DELIVERY SYSTEM UPGRADE<br />

KANE COUNTY DIVISION OF TRANSPORTATION<br />

(BID NUMBER <strong>13</strong>-0<strong>13</strong>)<br />

WHEREAS, bids were solicited and received by the <strong>Kane</strong> <strong>County</strong> Purchasing Department for the<br />

upgrade of the fuel delivery system (UST systems) for the <strong>Kane</strong> <strong>County</strong> Division of Transportation (<strong>KDOT</strong>)<br />

[hereinafter the “Project”]; and<br />

WHEREAS, the lowest qualified bid for the Project was $212,643.00 from Stenstrom Petroleum<br />

Services Group, 2422 Center Street, Rockford, Illinois 61108.<br />

NOW, THEREFORE, BE IT RESOLVED by the <strong>Kane</strong> <strong>County</strong> Board that a contract for the<br />

Project described hereinabove shall be awarded to the lowest responsible bidder in the amount as<br />

indicated hereinabove and that the <strong>County</strong> Board Chairman is hereby authorized and directed to<br />

execute a contract and contractor’s bond therefor.<br />

BE IT FURTHER RESOLVED by the <strong>Kane</strong> <strong>County</strong> Board to appropriates the not to exceed sum<br />

of Two Hundred Twenty Three Thousand Two Hundred Seventy Five Dollars ($223,275.00) [including a<br />

5% contingency] from Local Option Fund #304, Line Item #70120 (Special Purpose Equipment) to pay<br />

for said Project (fuel delivery system upgrade).<br />

Line Item Line Item Description Was<br />

personnel/item/service<br />

approved in original<br />

budget or a subsequent<br />

304.520.524.70120<br />

Special Purpose<br />

Equipment<br />

budget revision?<br />

Yes<br />

Passed by the <strong>Kane</strong> <strong>County</strong> Board on May 14, 20<strong>13</strong>.<br />

Are funds currently<br />

available for this<br />

personnel/item/service in<br />

the specific line item?<br />

Yes<br />

If funds are not<br />

currently available in<br />

the specified line item,<br />

where are the funds<br />

available?<br />

______________________________________ ___________________________________<br />

John A. Cunningham Christopher J. Lauzen<br />

Clerk, <strong>County</strong> Board Chairman, <strong>County</strong> Board<br />

<strong>Kane</strong> <strong>County</strong>, Illinois <strong>Kane</strong> <strong>County</strong>, Illinois<br />

Vote:<br />

Yes _____<br />

No _____<br />

Voice _____<br />

Abstentions _____<br />

5FUELSYSTEMUPGRADE.4LH


If not budgeted,<br />

explain funding<br />

source<br />

<strong>AG</strong>ENDA ITEM EXECUTIVE SUMMARY Agenda Item #<br />

Presenter/Sponsor:<br />

Name<br />

Budget Information: Was this item budgeted?<br />

SUMMARY:<br />

Attachments:<br />

Detailed information available from :<br />

Resolution/Ordinance Tracking:<br />

Staff Name:<br />

Appropriation Amount:<br />

Jerry Dickson Phone: 630/845-3798<br />

Assigned Committee: Transportation Sent to: Executive<br />

on: 04/11/20<strong>13</strong><br />

If Other, specify:<br />

Committee Remarks:<br />

<strong>County</strong> Board Date:<br />

Resolution<br />

Ordinance<br />

Yes<br />

No N/A<br />

Next Committee: Executive Sent to: <strong>County</strong> Board on: 05/08/20<strong>13</strong><br />

If Other, specify:<br />

Committee Remarks:<br />

Next Committee: Sent to: on:<br />

Committee Remarks:<br />

Approving a Local Agency Agreement for the Jurisdictional Transfer of a Portion of<br />

Plank Road from the <strong>County</strong> of <strong>Kane</strong> to the Road District of Elgin Township<br />

Tom Rickert - Deputy Director of Transportation<br />

The Illinois Department of Transportation (IDOT) realigned the Plank Road/US20 intersection several years ago which<br />

resulted in a cul-de-sac at the most easterly portion of existing Plank Road south of US 20. The result of this cul-de-sac<br />

created a maintenance problem for the <strong>County</strong> during snow removal and mowing seasons. <strong>KDOT</strong> approached the Elgin<br />

Township Road Commissioner concerning transfer of the jurisdiction and maintenance of this small section of roadway and<br />

the Commissioner agreed to take jurisdiction. The jurisdictional transfer will pass the ownership and maintenance of the<br />

cul-de-sac from the edge of right-of-way for existing Plank Road easterly to the dead-end in its entirety to the Elgin<br />

Township Road District.<br />

IDOT Local Agency Jurisdictional Transfer Agreement, Location M<br />

05/14/20<strong>13</strong><br />

N/A<br />

5C


STATE OF <strong>IL</strong>LINOIS<br />

COUNTY OF KANE<br />

RESOLUTION NO. <strong>13</strong> -<br />

APPROVING A LOCAL <strong>AG</strong>ENCY <strong>AG</strong>REEMENT<br />

FOR THE JURISDICTIONAL TRANSFER OF A PORTION OF PLANK ROAD<br />

FROM THE COUNTY OF KANE TO THE ROAD DISTRICT OF ELGIN TOWNSHIP<br />

WHEREAS, the Illinois Constitution of 1970, Article VII, Section 10 and the Illinois Compiled<br />

Statutes (5 <strong>IL</strong>CS 220/1 et seq.) authorizes the Road District of Elgin Township (hereinafter the “Road<br />

District”) and the <strong>County</strong> of <strong>Kane</strong> (<strong>County</strong>) to cooperate in the performance of their respective duties<br />

and responsibilities by contract and other agreements; and<br />

WHEREAS, the <strong>County</strong> has exclusive jurisdiction over <strong>County</strong> Highway No. 2 (also known as<br />

Plank Road) and desires to permanently delete from the county highway system and transfer exclusive<br />

jurisdiction of the most easterly portion thereof from its intersection with realigned Plank Road easterly<br />

to its dead end (hereinafter Old Plank Road) to the Road District under the terms and conditions as set<br />

forth in the Local Agency Agreement for Jurisdictional Transfer (a copy of which is on file with the <strong>Kane</strong><br />

<strong>County</strong> Clerk; and<br />

WHEREAS, the Road District desire to accept exclusive jurisdiction of Old Plank Road as<br />

aforesaid in its entirety pursuant to the aforementioned Local Agency Agreement for Jurisdictional<br />

Transfer.<br />

NOW, THEREFORE, BE IT RESOLVED by the <strong>Kane</strong> <strong>County</strong> Board that the <strong>County</strong> of <strong>Kane</strong><br />

transfer in its entirety, exclusive jurisdiction of the most easterly portion <strong>Kane</strong> <strong>County</strong> Highway No. 2,<br />

also known as Plank Road (referred to as Old Plank Road) from its intersection with realigned Plank<br />

Road easterly to its dead end to the Road District of Elgin Township and that the <strong>County</strong> Board<br />

Chairman is authorized to execute an agreement and any other documents necessary to accomplish<br />

the same; said jurisdictional transfer to be effective in accordance with the Local Agency Agreement for<br />

Jurisdictional Transfer executed by the <strong>County</strong> of <strong>Kane</strong>, the Road District of Elgin Township, and the<br />

Illinois Department of Transportation.<br />

BE IT FURTHER RESOLVED that with Illinois Department of Transportation approval, the<br />

above highway location, identified as <strong>County</strong> Highway No. 2 (Plank Road) from its intersection with<br />

realigned Plank Road easterly to its dead end, be permanently deleted from the highway system of<br />

<strong>Kane</strong> <strong>County</strong>.


Page 2 of 2, Res. #<strong>13</strong>-<br />

BE IT ALSO FURTHER RESOLVED that the <strong>County</strong> Clerk is hereby directed to transmit<br />

certified copies of this Resolution to the State of Illinois through the Illinois Department of<br />

Transportation’s Regional Engineer’s Office at Schaumburg, Illinois.<br />

Passed by the <strong>Kane</strong> <strong>County</strong> Board on May 14, 20<strong>13</strong>.<br />

______________________________________ ___________________________________<br />

John A. Cunningham Christopher J. Lauzen<br />

Clerk, <strong>County</strong> Board Chairman, <strong>County</strong> Board<br />

<strong>Kane</strong> <strong>County</strong>, Illinois <strong>Kane</strong> <strong>County</strong>, Illinois<br />

Vote:<br />

Yes _____<br />

No _____<br />

Voice _____<br />

Abstentions _____<br />

5PLNKJRSDCTNLTRNSFR.4LH


Local Agency Agreement for<br />

Jurisdictional Transfer<br />

Local Agency No. 1 (Conveyor) Local Agency No. 2 (Recipient)<br />

Municipality: Municipality:<br />

Township/Road District: Township/Road District: Elgin Township<br />

<strong>County</strong>: <strong>Kane</strong> <strong>County</strong>:<br />

In accordance with authority granted in Section 4-409 of the Illinois Highway Code, this agreement is made and entered<br />

into between the above Local Agency No. 1, hereinafter referred to as “Conveyor” and the above Local Agency No. 2,<br />

hereinafter referred to as “Recipient”, to transfer the jurisdiction of the designated location from the Conveyor to the<br />

Recipient.<br />

Location Description<br />

Name Old Plank Road Route Length<br />

Termini from Plank Road easterly on Old Plank Road to dead-end<br />

This transfer does does not include Structure No.<br />

, in its entirety.<br />

Include for Municipalities Only<br />

WHEREAS, the authority to make changes to the Municipal Street System is granted to the Municipality by Section 7-101 of<br />

the Illinois Highway Code.<br />

NOW THEREFORE IT IS <strong>AG</strong>REED that the corporate authority of said municipality will pass an ordinance providing for<br />

the transfer of the above location and shall attach hereto and make a part thereof a copy of the ordinance, and<br />

Include for Counties Only<br />

WHEREAS, the authority to make changes to the <strong>County</strong> Highway System is granted to the <strong>County</strong> by Section 5-105 of the<br />

Illinois Highway Code.<br />

NOW THEREFORE IT IS <strong>AG</strong>REED that the <strong>County</strong> Board of said <strong>County</strong> will pass a resolution providing for the transfer<br />

of the above location and shall attach hereto and make a part thereof a copy of the resolution, and<br />

Include for Township/Road Districts Only<br />

WHEREAS, the authority to make changes to the Township Road District System is granted to the Highway Commissioner<br />

under Section 6-201.3 of the Illinois Highway Code.<br />

The Conveyor Agrees to prepare a map of the above location and attach a copy of such location map hereto.<br />

IT IS MUTUALLY <strong>AG</strong>REED, that this jurisdictional transfer will become effective:<br />

upon IDOT approval calendar days after .<br />

Supplements<br />

Additional information and/or stipulations, if any, are hereby attached and identified below as being a part of this agreement.<br />

Supplement location map and resolution<br />

(Insert supplement numbers or letters and page numbers, if applicable)<br />

2<br />

IT IS FURTHER <strong>AG</strong>REED, that the provisions of this agreement shall be binding upon and inure to the benefit of the parties<br />

hereto, their successors and assigns.<br />

APPROVED BY CONVEYOR APPROVED BY RECIPIENT<br />

Name Chris Lauzen Name Rick Burnidge<br />

Title Chairman <strong>County</strong> Board Title Highway Commissioner<br />

Chairman <strong>County</strong> Board/Mayor/Village President/etc. Chairman <strong>County</strong> Board/Mayor/Village President/etc.<br />

Signature Signature<br />

APPROVED<br />

STATE OF <strong>IL</strong>LINOIS<br />

DEPARTMENT OF TRANSPORTATION By:<br />

Director of Highways Date<br />

Printed 4/3/20<strong>13</strong> BLR 05212 (Rev. 04/08/08)


. Jurisdictional Transfer<br />

Jurisdiction<br />

State<br />

<strong>County</strong><br />

! ! ! Municipality<br />

Township<br />

PLANK RD<br />

<strong>Kane</strong> <strong>County</strong> to Elgin Township<br />

Old Plank Road<br />

from Plank Road easterly to dead-end,<br />

in its entirety<br />

£¤ 20<br />

OLD PLANK RD


22<br />

0 500 1,000 2,000 3,000 4,000<br />

Feet<br />

Highland Ave.<br />

33<br />

0 1 Miles<br />

Plank Rd<br />

Coombs Rd.<br />

Nesler Rd.<br />

M:\dotserver2\USERS\Committee\20<strong>13</strong>04 <strong>April</strong>\Maintenance\JT of Plank Road cul-de-sac\Map Standard_Plank Rd at US <strong>IL</strong> 20 loc map.mxd<br />

47<br />

Jurisdiction<br />

Transfer<br />

Udina<br />

Water Rd.<br />

Plank Road Cul-De-Sac Jurisdiction Transfer<br />

Legend<br />

467 34<br />

§¨¦ 88<br />

£¤ 30<br />

!( 31<br />

Hampshire Rutland Dundee<br />

Burlington Plato<br />

Virgil<br />

Big Rock<br />

Campton<br />

Interstates<br />

Fox River<br />

Elgin<br />

Geneva<br />

<strong>Kane</strong>ville Blackberry<br />

Batavia<br />

Aurora<br />

20<br />

US Roads<br />

State Roads<br />

<strong>County</strong> Roads<br />

Other Roads<br />

Rail Roads<br />

<strong>County</strong> Boundry<br />

Township Boundry<br />

Forest Preserves<br />

Municipalities<br />

/


22<br />

0 500 1,000 2,000 3,000 4,000<br />

Feet<br />

Highland Ave.<br />

33<br />

0 1 Miles<br />

Plank Rd<br />

Coombs Rd.<br />

Nesler Rd.<br />

47<br />

Udina<br />

Water Rd.<br />

M:\dotserver2\USERS\Committee\20<strong>13</strong>04 <strong>April</strong>\Maintenance\JT of Plank Road cul-de-sac\Map Standard Aerial_Plank Rd at US <strong>IL</strong> 20 loc map.mxd<br />

Jurisdiction<br />

Transfer<br />

Plank Road Cul-De-Sac Jurisdiction Transfer<br />

Legend<br />

467 34<br />

§¨¦ 88<br />

£¤ 30<br />

!( 31<br />

Hampshire Rutland Dundee<br />

Burlington Plato<br />

Virgil<br />

Big Rock<br />

Campton<br />

Interstates<br />

Fox River<br />

Elgin<br />

Geneva<br />

<strong>Kane</strong>ville Blackberry<br />

Batavia<br />

Aurora<br />

20<br />

US Roads<br />

State Roads<br />

<strong>County</strong> Roads<br />

Other Roads<br />

Rail Roads<br />

<strong>County</strong> Boundry<br />

Township Boundry<br />

Forest Preserves<br />

Municipalities<br />

/


SUMMARY:<br />

Attachments:<br />

Detailed information<br />

available from :<br />

Staff Remarks /<br />

Recommendations:<br />

Committee Remarks:<br />

<strong>AG</strong>ENDA ITEM EXECUTIVE SUMMARY Agenda Item #<br />

Name:<br />

Assigned Committee:<br />

Staff Name:<br />

Adopt-A-Highway Approval(s)<br />

4/11/20<strong>13</strong><br />

Presenter/Sponsor: Tom Rickert<br />

The following attached requests have been received for <strong>Kane</strong> <strong>County</strong>'s Adopt-A-Highway Program:<br />

New:<br />

1. Bii Hair Salon-Huntley Road, Randall Road to Miller Road-both sides, .5 Miles<br />

Renewals:<br />

1. Batavia Robotics-Kirk Road, Fabyan Parkway to Wilson Street-east side, 1 Mile<br />

2. Boy Scout Troop No. 2-Big Timber Road, Coombs Road to Randall Road-both sides, 2.25 Miles<br />

3. Boy Scout Troop No. 7-Hughes Road, Bunker Road to Fabyan Parkway-both sides, 1.5 Miles<br />

4. Boy Scout Troop 25 & St. Charles Episcopal Church-Burlington Road, Corron Rd. to Route 64, both sides, 1.25 Miles<br />

5. Cornerstone Church Youth Group-Plato Road, Burlington Road to Route 47- both sides, 1.5 Miles<br />

6. Fox Valley Robotics-Randall Road, Fabyan Parkway to Mill Creek-east side, 2 Miles<br />

7. Friends of the Geneva Park District-<strong>Kane</strong>ville Road-Fabyan Parkway to Peck Road-both sides, 1 Mile<br />

8. Geneva School District 304 School Bus Drivers-Keslinger Road, Brundige Road to Peck Road, 1.5 Miles<br />

9. Hampshire High School Paws for a Cause-Big Timber Road, Widmayer Road to Route 20-both sides, 1.5 Miles<br />

10. Hintz Trucking-Bowes Road, Crawford Road to Muirhead Road-both sides, .5 Miles<br />

11. Iron Deer Farm-Ellithorpe Road, McGough Road to Peplow Road-both sides, 1.75 Miles<br />

12. John B. Sanfilippo & Son, Inc.-Randall Road, I90 to Big Timber Road-east side, 1 Mile<br />

<strong>13</strong>. Larson Farms-West <strong>County</strong> Line Road, Route 38 to Keslinger Road-both sides, 1.25 Miles<br />

14. Knights of Columbus #12497-Randall Road, Silver Glen Road to Red Gate Road-both sides-1.25 Miles<br />

15. Q Center of St. Charles-Dunham Road, Stearns Road to Army Trail Road-both sides-1.75 Miles<br />

16. St. Pat's Boy Scout Troop 10-Silver Glen Road, Burr Road to Randall Road-both sides, 1 Mile<br />

17. The Phillips Family-Peck Road, Keslinger Road to <strong>Kane</strong>ville Road-both sides, .75 Miles<br />

18. The Rizza Family-Huntley Road, Miller Road to Sleepy Hollow Road-both sides, .75 Miles<br />

19. WCC Business Club, Alpha Beta Gamma-Harter Road, Seavey Road to Scott Road-both sides, 1.75 Miles<br />

20. Women of the Moose Elgin Chapter-McLean Boulevard, Bowes Road to Spring Street-both sides, .75 Miles<br />

Groups, Participants and Road Miles<br />

New Groups for 20<strong>13</strong> = 4<br />

Total # of Adopt-A-Highway Groups = 110<br />

Number of Participants = 1,346<br />

Road miles adopted = 164.5<br />

See Adopt-A-Highway updated Map on our Web Site at: http://www.co.kane.il.us/dot/maintenance/adoptHiway.aspx<br />

Agreement(s), Adopt-A-Highway map<br />

Transportation<br />

Glenda Starcevich Phone: (630) 584-1171<br />

Staff has reviewed the applications and recommends that the Transportation Committee authorize the <strong>County</strong><br />

Engineer to execute the agreements for the above groups.<br />

5D


W. <strong>County</strong> Line<br />

West <strong>County</strong> Line<br />

41<br />

West <strong>County</strong> Line<br />

KANE COUNTY ADOPT-A-HIGHWAY<br />

Perry Rd.<br />

Swan Rd.<br />

Hinckley Rd<br />

Allen Rd.<br />

Plank Rd.<br />

Marcy Rd.<br />

McGough Rd.<br />

Walker Rd.<br />

Thatcher Rd.<br />

Schrader Rd.<br />

Harter Rd.<br />

Owens Rd.<br />

Rd.<br />

McGough Rd.<br />

Winters Rd.<br />

Root Ln.<br />

28<br />

Peterson Rd.<br />

Ellithorpe Rd.<br />

Keslinger Rd.<br />

Main St<br />

Jericho Rd.<br />

Rd.<br />

Nelson<br />

McDermott Rd.<br />

Engel Rd.<br />

Bushnell Rd.<br />

Rd.<br />

Percy Rd.<br />

Snyder Rd.<br />

Maple Park<br />

Troxel<br />

Shaw<br />

30<br />

44<br />

Fabris Rd.<br />

Miner Rd.<br />

Walker Rd.<br />

38<br />

28<br />

Howard Rd.<br />

46<br />

Lawrence<br />

Burlington<br />

McGough Rd.<br />

4<br />

Barron Rd.<br />

24<br />

Watson Rd.<br />

Waughon Rd<br />

23<br />

Lasher Rd.<br />

Granart Rd.<br />

0 1 2 Miles<br />

Davis Rd.<br />

1<br />

Peplow Rd.<br />

French Rd.<br />

Florence Rd.<br />

Meredith Rd.<br />

St.<br />

Harmony Rd.<br />

I.C. Tr<br />

Base Line Rd.<br />

Getty Rd.<br />

Big Timber Rd.<br />

Burlington Rd<br />

Sauber Rd<br />

Jones<br />

State<br />

Getzelman Rd.<br />

Dauberman Rd.<br />

Granart<br />

Rd.<br />

Kelley Rd.<br />

Lenschow Rd.<br />

Burlington<br />

Virgil<br />

<strong>Kane</strong>ville<br />

35<br />

10<br />

44<br />

45<br />

11<br />

Middleton Rd.<br />

Rhodes<br />

Higgins Rd.<br />

Chapman Rd.<br />

Virgil<br />

Allen Rd.<br />

Ramm Rd.<br />

Beith Rd.<br />

Scott Rd.<br />

Rd.<br />

Francis Rd.<br />

Thomas Rd.<br />

Widmayer Rd.<br />

Freeland Rd.<br />

Gast Rd.<br />

Hampshire<br />

Wheeler Rd.<br />

Clark Rd.<br />

Romke Rd.<br />

Welter Rd.<br />

Bateman<br />

Big Rock<br />

Dietrich Rd.<br />

Lees Rd.<br />

Reed Rd.<br />

Seavey Rd<br />

Jetter<br />

Ketchum Rd.<br />

Berner Rd.<br />

Bahr Rd.<br />

McDonald Rd.<br />

Harter Rd.<br />

Ashe Rd.<br />

Brier Hill Rd.<br />

Rohrsen Rd.<br />

Rowe<br />

Dugan Rd.<br />

Schneider Rd.<br />

Lorang Rd.<br />

Tower Rd.<br />

Thurnau<br />

Rd.<br />

Plato Rd.<br />

Rd.<br />

Main St.<br />

Prairie St.<br />

Mighell Rd.<br />

Hennig Rd.<br />

Lily<br />

Lake<br />

Hanson Rd.<br />

Plank Rd.<br />

Burlington<br />

Elburn<br />

Scott Rd.<br />

Anderson Rd.<br />

Sanwald Rd.<br />

Huntley<br />

Kendall Rd.<br />

Smith Rd.<br />

Green<br />

Merill Rd.<br />

Sugar Grove<br />

Pouley Rd.<br />

Jericho Rd.<br />

Swanberg Rd.<br />

Reinking Rd.<br />

Rd.<br />

Pingree Grove<br />

Dittman Rd.<br />

Beith Rd.<br />

Rippburger Rd.<br />

Marshall Rd.<br />

Manning<br />

Rd.<br />

Lenz Rd.<br />

Hughes Rd<br />

Bliss Rd.<br />

Bowes Rd<br />

Silver Glen Rd.<br />

Empire Rd.<br />

Town Hall Rd.<br />

Campton Hills Rd.<br />

Harley Rd.<br />

Muirhead Rd.<br />

Kreutzer Rd.<br />

Russell Rd.<br />

Bunker Rd.<br />

Rd.<br />

Norris<br />

Corron Rd.<br />

Lafox Rd.<br />

Powers Rd.<br />

Freeman Rd.<br />

Crawford<br />

Damisch Rd.<br />

Healy Rd<br />

Denny Rd.<br />

Keslinger Rd.<br />

Fabyan<br />

Seavey Rd.<br />

Hankes<br />

Elgin<br />

Big Timber Rd.<br />

Rd.<br />

Main St<br />

Deerpath<br />

Orchard Rd.<br />

Galligan Rd.<br />

Coombs Rd.<br />

McDonald Rd.<br />

Campton<br />

Hills<br />

Rd.<br />

Galena Blvd.<br />

Barnes<br />

Bolcum Rd.<br />

Brundige Rd.<br />

Nesler Rd.<br />

Peck Rd.<br />

<strong>Kane</strong>ville Rd.<br />

Tanner Rd.<br />

Rd.<br />

Burr Rd<br />

Stevens Rd.<br />

Huntley Rd.<br />

Gilberts<br />

Nelson Lake Rd.<br />

Water Rd.<br />

Tyrrell Rd.<br />

Orchard Rd.<br />

Aucutt Rd.<br />

Mason Rd.<br />

Randall Rd.<br />

Highland Ave.<br />

Bowes Rd.<br />

Crane Rd.<br />

Randall Rd.<br />

Boyer Rd.<br />

Binnie Rd.<br />

Hopps Rd.<br />

Oak St.<br />

Aurora<br />

Edgelawn Dr.<br />

Montgomery<br />

Dean St.<br />

Bricher Rd.<br />

Randall Rd.<br />

Fox<br />

Randall Rd.<br />

Red<br />

Ln.<br />

Crane Rd.<br />

Sullivan Rd.<br />

Prairie St.<br />

South St.<br />

Fabyan<br />

Wilson St.<br />

North Aurora<br />

Indian Trail Rd.<br />

N. <strong>County</strong> Line Rd.<br />

Algonquin<br />

Sleepy Hollow Rd.<br />

McLean Blvd<br />

South St.<br />

Illinois Ave.<br />

Larkin Ave.<br />

Gate Rd.<br />

Miller Rd.<br />

Hampshire Rutland<br />

Dundee<br />

11<br />

49<br />

14<br />

36<br />

S<br />

Big Rock<br />

0 4,900 9,800 14,700 19,600<br />

Feet<br />

56<br />

62<br />

88<br />

2<br />

72<br />

27<br />

<strong>Kane</strong>ville<br />

48<br />

3<br />

90<br />

22<br />

23<br />

20<br />

Routes in Use<br />

4<br />

47<br />

21<br />

30<br />

47<br />

69<br />

5<br />

Plato<br />

Plato Center<br />

33<br />

Campton<br />

Blackberry<br />

30<br />

47<br />

51<br />

26<br />

47<br />

52<br />

38<br />

2<br />

Sugar<br />

Grove<br />

Wasco<br />

64<br />

78<br />

16<br />

56<br />

24<br />

22<br />

80<br />

81<br />

La Fox<br />

41<br />

E<br />

15<br />

33<br />

8<br />

6<br />

83<br />

Udina<br />

83<br />

47<br />

10<br />

17<br />

8<br />

59<br />

84<br />

5<br />

30<br />

72<br />

21<br />

21<br />

20<br />

W<br />

34<br />

71<br />

34<br />

34<br />

90<br />

E<br />

E<br />

W E<br />

Mooseheart<br />

Elgin<br />

St.<br />

Charles<br />

Geneva<br />

Mooseheart Rd.<br />

Aurora<br />

25<br />

31<br />

31<br />

18<br />

Sleepy<br />

Hollow<br />

Boncosky Rd.<br />

Elgin<br />

Wing St.<br />

Spring St.<br />

South<br />

Elgin<br />

Batavia<br />

88<br />

31<br />

Montgomery Rd.<br />

Army Trail Rd.<br />

CountryClub Rd.<br />

Members list http://www.co.kane.il.us/dot/maintenance/adoptHiway/adoptHiwayMemberList.<strong>pdf</strong><br />

W<br />

Text<br />

W<br />

E<br />

E<br />

E<br />

N<br />

W<br />

W<br />

W<br />

W<br />

E<br />

E<br />

E<br />

E<br />

Longmeadow Pkwy<br />

S<br />

Stearns Rd<br />

Stearns Rd<br />

St. Charles<br />

New Members will be restricted to one side of 4 Lane Routes<br />

Renewing Members will have to choose a side of 4 Lane Routes<br />

N<br />

N<br />

N<br />

29<br />

Tyler<br />

Batavia<br />

Church Rd.<br />

Hill Ave.<br />

Gilbert St.<br />

Kirk Rd.<br />

Cherry<br />

Wilson St.<br />

Pine St.<br />

56<br />

Raddant Rd.<br />

Sheffer<br />

Farnsworth Ave.<br />

Algonquin Rd.<br />

Dunham Rd.<br />

Fabyan<br />

Kirk Rd.<br />

Bilter Rd.<br />

Rd.<br />

5th Ave.<br />

Bolz Rd.<br />

LakeMarianRd.<br />

Summit St.<br />

Villa St.<br />

Middle St.<br />

Rd.<br />

Geneva<br />

Carpentersville<br />

West<br />

Dundee<br />

N<br />

Stearns Rd<br />

8<br />

64<br />

W<br />

W<br />

W<br />

25<br />

Wayne 19<br />

77<br />

77<br />

E<br />

E<br />

38<br />

Molitor Rd.<br />

New York St.<br />

34<br />

Bartlett<br />

Lake - Cook Rd.<br />

West<br />

Bartlett<br />

Rd.<br />

61<br />

20<br />

Stearns<br />

Rd.<br />

37<br />

Kautz Rd.<br />

25<br />

62<br />

Helm Rd.<br />

68<br />

East<br />

Dundee<br />

72<br />

Barrington<br />

Hills<br />

Penny<br />

Rd.<br />

40<br />

Burlington<br />

Virgil<br />

<strong>Kane</strong>ville<br />

Big Rock<br />

Hoffman<br />

Estates<br />

Legend<br />

Hampshire<br />

467 34<br />

§¨¦ 88<br />

£¤ 30<br />

!( 31<br />

/<br />

Requested Route<br />

ADOPTED SECTIONS<br />

Both Sides<br />

121.75 Miles-BLUE<br />

One Side<br />

45.5 Miles-GREEN<br />

N,S.E.W - denotes<br />

side of highway adopted<br />

Interstates<br />

US Roads<br />

State Roads<br />

<strong>County</strong> Roads<br />

Other Roads<br />

Rail Roads<br />

<strong>County</strong> Boundry<br />

Township Boundry<br />

Fox River<br />

Forest Preserves<br />

Municipalities<br />

Plato<br />

Campton<br />

Blackberry<br />

Sugar Grove<br />

Rutland Dundee<br />

Elgin<br />

Saint Charles<br />

Geneva<br />

Batavia<br />

112 ACTIVE GROUPS<br />

<strong>13</strong>72 ACTIVE MEMBERS<br />

Aurora<br />

Upated 3-18-20<strong>13</strong><br />

See Members<br />

List for Routes


SUMMARY:<br />

Attachments:<br />

Detailed information<br />

available from :<br />

Staff Remarks /<br />

Recommendations:<br />

Committee Remarks:<br />

<strong>AG</strong>ENDA ITEM EXECUTIVE SUMMARY Agenda Item #<br />

Name:<br />

Assigned Committee:<br />

Staff Name:<br />

Planning and Programming Report<br />

4/11/20<strong>13</strong><br />

Presenter/Sponsor: Tom Rickert<br />

20<strong>13</strong>-2014 <strong>Kane</strong> <strong>County</strong> Highway Map and <strong>Kane</strong> & Northern Kendall Counties Bicycle Map - Publication of the updated map<br />

is anticipated in <strong>April</strong> 20<strong>13</strong>.<br />

Transit - CMAP is providing assistance to help identify a Primary Transit Network (PTN) within <strong>Kane</strong> <strong>County</strong>. A PTN is a<br />

network of transit corridors planned and developed for the greatest transit ridership and community benefit. Based on<br />

input from the KKCOM Transit Committee, Pace, and local stakeholders, CMAP has performed a roadway corridor analysis<br />

and has identified a preliminary PTN. An Oversight Steering Committee meeting will be held at the end of <strong>April</strong> to discuss<br />

the findings and to obtain input and comments.<br />

Randall Road Route 529 Transit Passenger Amenities - Construction of the remaining Pace bus passenger pads/shelters and<br />

sidewalk segments will begin this month. Installation of pedestrian crossing signals and crosswalks at sites along Randall<br />

Road is expected to begin this summer.<br />

Highway Safety Project Program - The federal Highway Safety Improvement Program (HSIP) has a goal of achieving a<br />

significant reduction in traffic fatalities and serious injuries on all public roads. Highway safety improvement projects correct<br />

or improve a location, feature, or safety problem that is contributing to severe crashes on the roadway. A call for projects<br />

has been released and the application deadline is <strong>April</strong> 15 , 20<strong>13</strong>. <strong>KDOT</strong> staff are reviewing crash data within <strong>Kane</strong> <strong>County</strong><br />

and identifying project locations for potential funding. Additional information on this program is available at:<br />

www.trafficsafetygrantsillinois.org/default.asp.<br />

KKCOM Transportation Policy Committee - The next scheduled meeting is on <strong>April</strong> 18th at 1:00pm.<br />

<strong>Kane</strong> <strong>County</strong> Impact Fee Program - The attached monthly report shows total fees collected as of March 31, 20<strong>13</strong>.<br />

Impact Fee Monthly Report<br />

For information only<br />

Transportation<br />

Jan Ward, Chief of Planning & Programming Phone: (630) 444-3143<br />

6A


Service Area FY04 FY05 FY06 FY07 FY08 FY09 FY10 FY11 FY12 FY<strong>13</strong> TOTAL<br />

Aurora Area $261,925.98 $300,592.56 $718,9<strong>13</strong>.31 $478,080.47 $256,911.24 $17,193.97 $18,854.63 $11,789.12 $112,427.90 $21,201.00 $2,197,890.18<br />

Campton Hills $272,437.27 $688,163.10 $546,802.47 $439,982.39 $<strong>13</strong>4,868.41 $53,097.80 $72,439.31 $<strong>13</strong>9,712.82 $1<strong>13</strong>,940.50 $59,246.00 $2,520,690.07<br />

Greater Elgin*** $358,840.40 $964,601.20 $1,235,871.43 $808,002.53 $766,560.27 $110,533.57 ($259,096.92) $65,097.83 $158,885.64 $49,735.00 $4,259,030.95<br />

Northwest** $119,995.42 $338,821.27 $562,387.09 $275,978.04 $95,606.84 $35,016.80 $644,873.64 $36,585.40 $51,484.80 $16,168.00 $2,176,917.30<br />

Southwest $253,934.24 $502,460.39 $483,849.59 $221,680.64 $129,001.53 $69,198.43 $31,784.96 $35,402.09 $6,755.00 $12,632.00 $1,746,698.87<br />

Tri-Cities $435,020.02 $1,579,205.20 $1,467,232.28 $1,483,214.49 $384,381.54 $148,285.54 $185,904.19 $60,811.64 $186,373.54 $27,646.00 $5,958,074.44<br />

Upper Fox** $378,268.28 $491,892.18 $276,569.20 $395,220.61 $216,563.73 $42,562.23 $140,889.21 $66,374.57 $94,483.02 $156,<strong>13</strong>7.00 $2,258,960.03<br />

West Central $51,970.10 $70,097.57 $103,211.05 $45,757.33 $21,862.81 $2,994.64 $3,978.43 $3,174.60 $4,555.02 $298.00 $307,899.55<br />

North $283,924.07 $357,826.05 $14,587.21 $52,728.00 $243,239.33 $153.00 $952,457.66<br />

Central $39,086.16 $335,728.28 $77,085.60 $26,787.70 $146,152.50 $4,823.00 $629,663.24<br />

South $143,148.54 $1,891.68 $126,936.23 $92,618.00 $67,701.39 $3,755.00 $436,050.84<br />

Grand Total $2,<strong>13</strong>2,391.71 $4,935,833.47 $5,394,836.42 $4,147,916.50 $2,471,915.14 $1,174,328.99 $1,058,236.49 $591,081.77 $1,185,998.64 $351,794.00 $23,444,333.<strong>13</strong><br />

* Includes any late fees; <strong>County</strong> fiscal year begins December 1st of every year<br />

** Includes prepayments<br />

*** Includes refunds<br />

ROADWAY IMPACT FEE COLLECTIONS BY FISCAL YEAR as of March 31, 20<strong>13</strong>*


SUMMARY:<br />

Attachments:<br />

Detailed information<br />

available from :<br />

Staff Remarks /<br />

Recommendations:<br />

Committee Remarks:<br />

<strong>AG</strong>ENDA ITEM EXECUTIVE SUMMARY Agenda Item #<br />

Name:<br />

Assigned Committee:<br />

Staff Name:<br />

FY20<strong>13</strong>-2017 Transportation Improvement Program (TIP)<br />

4/11/20<strong>13</strong><br />

Presenter/Sponsor: Tom Rickert<br />

Staff will provide the Transportation Committee with copies of the most current FY20<strong>13</strong>-2017 Transportation Improvement<br />

Program (TIP). The TIP is a working document that represents the Division's 5-Year Financial Plan.<br />

The 5-Year TIP shows the anticipated transportation improvements and outlines estimates of revenues and expenditures.<br />

This document is updated from time to time as project scopes, years, funding sources, and cost estimates change. The<br />

current FY20<strong>13</strong>-2017 TIP contains over a hundred primary projects, estimated to cost $272 million, while the annual FY20<strong>13</strong><br />

Budget & TIP contains eighty-three (83) primary projects estimated to cost $87.7 million.<br />

This document is being provided to the Committee as a basis to begin budget discussions for the FY2014 Budget & TIP.<br />

FY20<strong>13</strong>-2017 Transportation Improvement Program Report<br />

For information only<br />

Transportation<br />

Jan Ward, Chief of Planning & Programming Phone: (630) 444-3143<br />

6B


SUMMARY:<br />

Attachments:<br />

Detailed information<br />

available from :<br />

Staff Remarks /<br />

Recommendations:<br />

Committee Remarks:<br />

<strong>AG</strong>ENDA ITEM EXECUTIVE SUMMARY Agenda Item #<br />

Name:<br />

Assigned Committee:<br />

Staff Name:<br />

Traffic & Permitting Report<br />

4/11/20<strong>13</strong><br />

Presenter/Sponsor: Tom Rickert<br />

TRAFFIC<br />

1. Arterial Operations Center (AOC) - Building design is near completion for addition to Building A with construction<br />

anticipated to begin in Spring/Summer 20<strong>13</strong> and completed in late 20<strong>13</strong> or early 2014. ATMS Software Development &<br />

Integration is underway. These projects are primarily funded with federal CMAQ & EECBG funds.<br />

2. Stearns Corridor Traffic System Project – Engineering underway for $1,800,000 in CMAQ funds to deploy various ITS<br />

(Intelligent Transportation System) technologies and improvements along the Stearns Road Corridor. Construction<br />

planned for 2014.<br />

3. 2012 HSIP Funded Safety Projects – Engineering underway for $2,340,000 in federal safety funds to implement various<br />

safety improvements on sections of Burlington, Randall and Huntley Roads. Construction planned for 20<strong>13</strong>/2014.<br />

4. 20<strong>13</strong> HSIP Funded Safety Projects – QBS Consultant selection for Phase II design completed for $2,443,500 in federal<br />

safety funds to implement various safety improvements on sections of Fabyan Parkway, Hughes, Orchard and Randall<br />

Roads. Construction planned for 2014.<br />

6. Corron Road & McDonald Road New Multi-way Stop - Engineering underway; implementation targeted for Spring 20<strong>13</strong>.<br />

7. <strong>IL</strong> Route 38 & Kautz Road (IDOT) -- Grade-separated intersection/overpass project with construction traffic control delays.<br />

PERMITTING<br />

Attached are spreadsheets showing issued permits for the past year and all open projects (listed by road name) currently in<br />

the review or construction stage. Also attached are the comparison graphs for access, utility and moving permits showing<br />

the number of permits issued for FY20<strong>13</strong> versus FY2012. On-going permit projects:<br />

1. Keslinger Road at Bartelt Road (Autumn Green Animal Hospital) -- Installation of left and right turn lanes on Keslinger<br />

Road at Bartelt Road. Construction expected to begin in Spring, 20<strong>13</strong>.<br />

2. Plank Road east of Burlington Road (Elgin Community College Public Safety & Sustainability Center) -- Installation of left<br />

and right turn lanes on Plank Road at the proposed access. Construction expected to begin in Summer, 20<strong>13</strong>.<br />

3. Randall Road at Recreation Drive, east side (Randall Apartment Complex) -- Installation of left and right turn lanes on<br />

Randall Road at the proposed access, along with traffic signal modifications. Access approval is subject to<br />

intergovernmental agreement.<br />

ACCESS <strong>AG</strong>REEMENTS<br />

On-going development of intergovernmental agreements:<br />

1. Randall Road - <strong>IL</strong> Route 72 to Binnie Road with the Village of West Dundee and Dundee Township Park District.<br />

2. Plank Road Realignment - with the Village of Burlington possibly including planning elements for other roadways in the<br />

general area.<br />

Permitting spreadsheets and charts<br />

For information only.<br />

Transportation<br />

Kurt Nika - Traffic & Permitting Chief / Tom Szabo - Traffic Phone: (630)406-7372 / 208-3<strong>13</strong>9<br />

7A


Current Issued Permits Comparison<br />

FY 2012 (Dec. 2011 to Nov. 2012) FY 20<strong>13</strong> (Dec. 2012 to Nov. 20<strong>13</strong>)<br />

Months Access Utility Moving Months Access Utility Moving<br />

December 2011 12 7 120 December 2 12 101<br />

January 2 9 86 January 4 12 53<br />

February 3 10 <strong>13</strong>9 February 1 10 66<br />

March 6 9 117 March 3 <strong>13</strong> 86<br />

<strong>April</strong> 5 7 173 <strong>April</strong><br />

May 9 6 180 May<br />

June 6 5 231 June<br />

July 5 <strong>13</strong> 177 July<br />

August 7 11 210 August<br />

September 2 10 189 September<br />

October 0 8 276 October<br />

November 4 14 211 November<br />

Total thru Mar. 2012 23 35 462 Total thru Mar. 20<strong>13</strong> 10 47 306<br />

Change % - 57 % + 34 % - 34 %


Issued Permits<br />

Permit Department Fiscal Year Comparisons<br />

Fiscal Year 2012 2012 PERMITS ISSUED<br />

2012 REVENUE $ COLLECTED<br />

Month Utility Temp Major Minimum Detour Events Ag R.O.W. Subdivison Water Draw Stormwater Moving Moving $ Access $<br />

DEC. 2011 7 1 1 0 0 0 0 1 0 0 0 120 $4,625.00 $3,050.00<br />

Jan. 2012 9 1 0 0 0 0 0 1 0 0 0 86 $15,195.00 $5,050.00<br />

Feb 10 1 0 0 0 0 0 1 0 1 0 <strong>13</strong>9 $5,665.00 $3,500.00<br />

Mar 9 0 0 0 2 1 0 2 0 0 1 117 $11,603.00 $5,950.00<br />

Apr 7 2 0 1 0 1 0 1 0 0 0 173 $6,855.00 $4,100.00<br />

May 6 0 0 1 2 2 0 0 0 2 2 180 $11,275.00 $1,050.00<br />

June 5 0 1 0 1 1 0 2 0 1 0 231 $18,110.00 $4,864.00<br />

July <strong>13</strong> 0 0 0 1 3 0 0 0 1 0 177 $19,080.00 $6,900.00<br />

Aug 11 0 0 0 0 3 0 1 0 3 0 210 $<strong>13</strong>,895.00 $5,850.00<br />

Sept 10 0 0 0 0 1 0 1 0 0 0 189 $18,035.00 $<strong>13</strong>,450.00<br />

Oct 8 0 0 0 0 0 0 0 0 0 0 276 $17,830.00 $6,850.00<br />

Nov 0 1 0 0 1 0 0 1 0 1 0 211 $22,495.00 $10,450.00<br />

Total thru Mar. 2012 35 3 1 0 2 1 0 5 0 1 1 462 $37,088.00 $17,550.00<br />

DECEMBER 2011 THRU NOVEMBER 2012- Fiscal Year<br />

Fiscal Year 20<strong>13</strong> 20<strong>13</strong> PERMITS ISSUED<br />

20<strong>13</strong> REVENUE $ COLLECTED<br />

Month Utility Temp Major Minimum Detour Events Ag R.O.W. Subdivison Water Draw Stormwater Moving Moving $ Access $<br />

DEC. 2012 12 0 0 0 0 0 0 2 0 0 0 101 $<strong>13</strong>,940.00 $10,250.00<br />

Jan. 20<strong>13</strong> 12 1 0 0 1 0 0 1 0 1 0 53 $7,620.00 $4,000.00<br />

Feb 10 1 0 0 0 0 0 0 0 0 0 66 $8,575.00 $6,550.00<br />

Mar<br />

Apr<br />

May<br />

June<br />

July<br />

Aug<br />

Sept<br />

Oct<br />

Nov<br />

<strong>13</strong> 0 0 1 0 0 0 2 0 0 0 86 $5,215.00 $11,350.00<br />

Total thru Mar. 20<strong>13</strong> 47 2 0 1 1 0 0 5 0 1 0 306 $35,350.00 $32,150.00<br />

DECEMBER 2012 THRU NOVEMBER 20<strong>13</strong>- Fiscal Year


N<br />

u<br />

m<br />

b<br />

e<br />

r<br />

o<br />

f<br />

P<br />

e<br />

r<br />

m<br />

i<br />

t<br />

s<br />

I<br />

s<br />

s<br />

u<br />

e<br />

d<br />

14<br />

12<br />

10<br />

8<br />

6<br />

4<br />

2<br />

0<br />

12<br />

2<br />

2<br />

4<br />

March 2012 Total = 6 Issued<br />

3<br />

1<br />

Access Permit Comparison Chart<br />

6<br />

3<br />

5<br />

9<br />

6<br />

5<br />

FY 2012 FY 20<strong>13</strong> March 20<strong>13</strong> Total = 3 Issued<br />

7<br />

2<br />

0<br />

4


N<br />

u<br />

m<br />

b<br />

e<br />

r<br />

o<br />

f<br />

P<br />

e<br />

r<br />

m<br />

i<br />

t<br />

s<br />

I<br />

s<br />

s<br />

u<br />

e<br />

d<br />

16<br />

14<br />

12<br />

10<br />

8<br />

6<br />

4<br />

2<br />

0<br />

7<br />

12 12<br />

9<br />

10 10<br />

Utility Permit Comparison Chart<br />

9<br />

<strong>13</strong><br />

7<br />

6<br />

March 2012 Total = 9 Issued *** *** March 20<strong>13</strong> Total = <strong>13</strong> Issued<br />

5<br />

<strong>13</strong><br />

FY 2012 FY 20<strong>13</strong><br />

11<br />

10<br />

8<br />

14


N<br />

u<br />

m<br />

b<br />

e<br />

r<br />

o<br />

f<br />

P<br />

e<br />

r<br />

m<br />

i<br />

t<br />

s<br />

I<br />

s<br />

s<br />

u<br />

e<br />

d<br />

300<br />

250<br />

200<br />

150<br />

100<br />

50<br />

0<br />

120<br />

101<br />

86<br />

53<br />

<strong>13</strong>9<br />

Moving Permit Comparison Chart<br />

66<br />

117<br />

86<br />

173<br />

180<br />

231<br />

177<br />

March 2012 Total = 117 Issued<br />

March 20<strong>13</strong> Total = 86 Issued<br />

210<br />

189<br />

276<br />

211<br />

FY 2012<br />

FY 20<strong>13</strong>


If not budgeted,<br />

explain funding<br />

source<br />

<strong>AG</strong>ENDA ITEM EXECUTIVE SUMMARY Agenda Item #<br />

Presenter/Sponsor:<br />

Name<br />

Budget Information: Was this item budgeted?<br />

SUMMARY:<br />

Attachments:<br />

Detailed information available from :<br />

Resolution/Ordinance Tracking:<br />

Staff Name:<br />

Appropriation Amount:<br />

Ray Johnson, Traffic / Utility Coordinator Phone: 630/406-7356<br />

Assigned Committee: Transportation Sent to: Executive<br />

on: 04/10/20<strong>13</strong><br />

If Other, specify:<br />

Committee Remarks:<br />

<strong>County</strong> Board Date:<br />

Resolution<br />

Ordinance<br />

Yes<br />

No N/A<br />

Next Committee: Executive Sent to: <strong>County</strong> Board on: 05/08/20<strong>13</strong><br />

If Other, specify:<br />

Committee Remarks:<br />

Next Committee: Sent to: on:<br />

Committee Remarks:<br />

7B-a<br />

Approving Contract for 20<strong>13</strong> Urethane Pavement Marking, <strong>Kane</strong> <strong>County</strong> Section No.<br />

<strong>13</strong>-00000-04-GM<br />

Tom Rickert - Deputy Director of Transportation<br />

$449,005.95<br />

On March 27, 20<strong>13</strong>, construction bids were opened at the Division of Transportation office for the 20<strong>13</strong> <strong>County</strong> Urethane<br />

Pavement Marking Program. The scope of this project involves the striping of approximately 46 miles of roads in the <strong>County</strong><br />

including portions of Kirk Road, Randall Road, Orchard Road, McLean Boulevard, Bowes Road, Burlington Road, Keslinger<br />

Road, La Fox Road, Plank Road, Silver Glen Road & West Bartlett Road. Past performance of urethane markings demonstrate<br />

that this material will last for at least 3 years after initial placement without need for touch up or maintenance. The high<br />

performance characteristic of urethane compared to that of paint makes it an ideal choice for higher volume highways,<br />

requiring less maintenance which translates to less disruption to traffic and better visibility, especially during the winter<br />

months.<br />

The low bidder is A.C. Pavement Striping Company, of Elgin, Illinois and the proposed contract amount for the project is<br />

$449,005.95. The low bid amount is approximately 23% below the engineer’s estimate of $583,967.75.<br />

Resolution, Bid Tabulation, Location Map<br />

05/14/20<strong>13</strong>


STATE OF <strong>IL</strong>LINOIS<br />

COUNTY OF KANE<br />

RESOLUTION NO. <strong>13</strong> -<br />

APPROVING CONTRACT FOR<br />

20<strong>13</strong> URETHANE PAVEMENT MARKING<br />

KANE COUNTY SECTION NO. <strong>13</strong>-00000-04-GM<br />

WHEREAS, the <strong>Kane</strong> <strong>County</strong> Division of Transportation has solicited and received bids for the<br />

work and/or construction described as:<br />

KANE COUNTY SECTION NO. <strong>13</strong>-00000-04-GM<br />

20<strong>13</strong> URETHANE PAVEMENT MARKING<br />

(hereinafter the “Project”)<br />

WHEREAS, the lowest responsible bidder for the Project is:<br />

A.C. PAVEMENT STRIPING COMPANY OF ELGIN, <strong>IL</strong>LINOIS<br />

with a low bid of<br />

$449,005.95<br />

NOW, THEREFORE, BE IT RESOLVED by the <strong>Kane</strong> <strong>County</strong> Board that a contract for the<br />

Project described hereinabove shall be awarded to the lowest responsible bidder in the amount as<br />

indicated hereinabove and that the <strong>County</strong> Board Chairman is hereby authorized and directed to<br />

execute a contract and contractor’s bond therefor.<br />

BE IT FURTHER RESOLVED that there is hereby appropriated the sum of Four Hundred Fifty<br />

Eight Thousand Dollars ($458,000.00) [including a 2% contingency] from Local Option Fund #304, Line<br />

Item #52070 (Repair / Maintenance – Pavement Marking) to pay for the Project.<br />

Line Item Line Item Description Was<br />

personnel/item/service<br />

approved in original<br />

budget or a subsequent<br />

304.520.524.52070<br />

Repair / Maintenance –<br />

Pavement Marking<br />

budget revision?<br />

Yes<br />

Are funds currently<br />

available for this<br />

personnel/item/service in<br />

the specific line item?<br />

Yes<br />

If funds are not<br />

currently available in<br />

the specified line item,<br />

where are the funds<br />

available?


Passed by the <strong>Kane</strong> <strong>County</strong> Board on May 14, 20<strong>13</strong>.<br />

Page 2 of 2, Res. #<strong>13</strong>-<br />

______________________________________ ___________________________________<br />

John A. Cunningham Christopher J. Lauzen<br />

Clerk, <strong>County</strong> Board Chairman, <strong>County</strong> Board<br />

<strong>Kane</strong> <strong>County</strong>, Illinois <strong>Kane</strong> <strong>County</strong>, Illinois<br />

Vote:<br />

Yes _____<br />

No _____<br />

Voice _____<br />

Abstentions _____<br />

5APCNURETHNEPVMNTMRKNG.4LH


TOWNSHIP<br />

KANE COUNTY DIVISION OF TRANSPORTATION COUNTY KANE<br />

BID TAB SECTION <strong>13</strong>-00000-04-GM<br />

20<strong>13</strong> <strong>Kane</strong> <strong>County</strong> Urethane Pavement Marking"<br />

Non-MFT<br />

ENGINEERS ESTIMATE AC Pavement Striping<br />

RoadSafe Traffic Systems<br />

Marking Specialist<br />

DATE: March 27, 20<strong>13</strong><br />

Company<br />

ITEM # ITEMS UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL<br />

1 URETHANE PAVEMENT MARKING - LINE, 4" FOOT 1034305 0.35 $362,006.75 $0.290 $299,948.45 $0.35 $362,006.75 $0.41 $424,065.05<br />

2 URETHANE PAVEMENT MARKING - LINE, 6" FOOT 32670 0.75 $24,502.50 $0.45 $14,701.50 $0.75 $24,502.50 $0.80 $26,<strong>13</strong>6.00<br />

3 URETHANE PAVEMENT MARKING - LINE, 8" FOOT 40020 1.00 $40,020.00 $0.74 $29,614.80 $1.25 $50,025.00 $1.07 $42,821.40<br />

4 URETHANE PAVEMENT MARKING - LINE, 12" FOOT 17765 1.60 $28,424.00 $1.20 $21,318.00 $2.00 $35,530.00 $3.00 $53,295.00<br />

5 URETHANE PAVEMENT MARKING - LINE, 24" FOOT 6235 3.50 $21,822.50 $3.00 $18,705.00 $3.00 $18,705.00 $6.00 $37,410.00<br />

6 URETHANE PAVEMENT MARKING - LETTER & SYMBOLS SQ FT 6963 4.00 $27,852.00 $3.00 $20,889.00 $3.00 $20,889.00 $3.50 $24,370.50<br />

7 URETHANE PAVEMENT MARKING - MEDIAN SQ FT 1960 4.00 $7,840.00 1.42 $2,783.20 2.00 $3,920.00 3.25 $6,370.00<br />

8 TRAFFIC CONTROL & PROTECTION (SPECIAL) FOOT 1 15,000.00 $15,000.00 1.00 $1.00 1.00 $1.00 12,500.00 $12,500.00<br />

9 PAVEMENT MARKING REMOVAL FOOT 19500 1.00 $19,500.00 0.31 $6,045.00 1.00 $19,500.00 0.90 $17,550.00<br />

10 ITEMS AS ORDERED BY THE ENGINEER FOOT 30000 1.00 $30,000.00 1.00 $30,000.00 1.00 $30,000.00 1.00 $30,000.00<br />

11 RA<strong>IL</strong>ROAD PROTECTIVE LIAB<strong>IL</strong>ITY INSURANCE FOOT 1 7,000.00 $7,000.00 5,000.00 $5,000.00 4,900.00 $4,900.00 15,000.00 $15,000.00<br />

AS READ $583,967.75 $449,005.95 $569,979.25 $689,517.95<br />

AS CORRECTED<br />

% +/- ESTIMATE -23.11% -2.40% 18.07%


W. <strong>County</strong> Line<br />

West <strong>County</strong> Line<br />

41<br />

20<strong>13</strong> <strong>Kane</strong> <strong>County</strong> Urethane Pavement Marking<br />

(<br />

West <strong>County</strong><br />

Plank Rd.<br />

Marcy Rd.<br />

McGough Rd.<br />

Hinckley<br />

Schrader Rd.<br />

Harter Rd.<br />

Perry Rd.<br />

Owens Rd.<br />

Rd.<br />

Allen Rd.<br />

McGough Rd.<br />

Winters Rd.<br />

Root Ln.<br />

28<br />

Peterson Rd.<br />

Main<br />

Swan Rd.<br />

Walker Rd.<br />

Thatcher Rd.<br />

Keslinger Rd.<br />

Jericho Rd.<br />

Rd.<br />

Nelson<br />

McDermott Rd.<br />

Engel Rd.<br />

Bushnell Rd.<br />

Rd.<br />

Percy Rd.<br />

Snyder Rd.<br />

Maple Park<br />

Troxel<br />

Shaw<br />

30<br />

44<br />

Fabris Rd.<br />

Miner Rd.<br />

Walker Rd.<br />

38<br />

28<br />

Howard Rd.<br />

46<br />

Lawrence<br />

Ellithorpe Rd.<br />

Granart Rd.<br />

Burlington<br />

Burlington<br />

McGough Rd.<br />

Barron Rd.<br />

4<br />

24<br />

Watson Rd.<br />

23<br />

1<br />

Lasher Rd.<br />

Davis Rd.<br />

Peplow Rd.<br />

35<br />

10<br />

44<br />

45<br />

French Rd.<br />

11<br />

11<br />

Base Line Rd.<br />

St.<br />

Harmony Rd.<br />

I.C.<br />

Meredith Rd.<br />

Sauber<br />

Dauberman Rd.<br />

Getty Rd.<br />

Big Timber Rd.<br />

State<br />

Godfrey Rd.<br />

Florence Rd. Middleton Rd.<br />

Rhodes<br />

Jones<br />

Granart<br />

Rd.<br />

Kelley Rd.<br />

Lenschow Rd.<br />

49<br />

14<br />

36<br />

Getzelman Rd.<br />

56<br />

Virgil<br />

Big Rock<br />

Higgins Rd.<br />

Chapman Rd.<br />

62<br />

Ramm Rd.<br />

Beith Rd.<br />

(<br />

Allen Rd.<br />

Scott Rd.<br />

Rd.<br />

Francis Rd.<br />

Thomas Rd.<br />

Harter Rd.<br />

Wheeler Rd.<br />

Clark Rd.<br />

Romke Rd.<br />

Welter Rd.<br />

88<br />

Widmayer Rd.<br />

Freeland Rd.<br />

Gast Rd.<br />

Hampshire<br />

2<br />

72<br />

Bateman<br />

27<br />

<strong>Kane</strong>ville<br />

48<br />

Dietrich Rd.<br />

3<br />

Lees Rd.<br />

Reed Rd.<br />

Seavey Rd<br />

Jetter<br />

Ketchum Rd.<br />

Berner Rd.<br />

Bahr Rd.<br />

McDonald Rd.<br />

Ashe Rd.<br />

Brier Hill Rd.<br />

Rohrsen Rd.<br />

Rowe<br />

Dugan Rd.<br />

Schneider Rd.<br />

Lorang Rd.<br />

Tower Rd.<br />

Main<br />

Thurnau<br />

Rd.<br />

Plato Rd.<br />

Rd.<br />

Prairie St.<br />

Mighell Rd.<br />

Hennig Rd.<br />

Lily<br />

Lake<br />

Hanson Rd.<br />

Scott Rd.<br />

Plank Rd.<br />

Burlington<br />

Anderson Rd.<br />

Sanwald Rd.<br />

Jericho Rd.<br />

Huntley<br />

Kendall Rd.<br />

Elburn<br />

Smith Rd.<br />

Green<br />

Merill Rd.<br />

Swanberg Rd.<br />

Reinking Rd.<br />

Rd.<br />

Pingree Grove<br />

Pouley Rd.<br />

Dittman Rd.<br />

Beith Rd.<br />

Rippburger Rd.<br />

Marshall Rd.<br />

(<br />

Empire Rd.<br />

Town Hall Rd.<br />

Hughes<br />

Manning<br />

Rd.<br />

Lenz Rd.<br />

Harley Rd.<br />

Bliss Rd.<br />

Muirhead Rd.<br />

Kreutzer Rd.<br />

Russell Rd.<br />

Bowes<br />

Bunker Rd.<br />

Norris<br />

(<br />

Healy Rd<br />

Rd.<br />

Powers Rd.<br />

Freeman Rd.<br />

Plato Center<br />

33<br />

Campton Hills Rd.<br />

Denny Rd.<br />

Sugar Grove<br />

Crawford<br />

Damisch Rd.<br />

Corron Rd.<br />

Wasco<br />

64<br />

M:\dotserver2\USERS\Committee\20<strong>13</strong>04 <strong>April</strong>\Traffic & Permitting\Traffic\Urethane Pavement Marking\20<strong>13</strong> Urethane Pavement Striping.mxd<br />

90<br />

22<br />

23<br />

20<br />

4<br />

47<br />

21<br />

30<br />

47<br />

69<br />

5<br />

30<br />

47<br />

51<br />

26<br />

47<br />

52<br />

38<br />

2<br />

78<br />

16<br />

Lafox Rd.<br />

(<br />

Silver<br />

Fabyan<br />

Seavey Rd.<br />

56<br />

24<br />

22<br />

80<br />

Hankes<br />

Big Timber Rd.<br />

Highland Ave.<br />

Galena Blvd.<br />

Barnes<br />

Rd.<br />

Deerpath<br />

Coombs Rd.<br />

McDonald Rd.<br />

Campton<br />

Hills<br />

81<br />

Elgin<br />

La Fox<br />

41<br />

15<br />

Rd.<br />

33<br />

Bolcum Rd.<br />

Brundige Rd.<br />

8<br />

Orchard Rd.<br />

Galligan Rd.<br />

(<br />

Nesler Rd.<br />

Main St.<br />

Huntley Rd.<br />

Peck Rd.<br />

<strong>Kane</strong>ville Rd.<br />

Tanner Rd. 83<br />

Rd.<br />

6<br />

83<br />

Gilberts<br />

Nelson Lake Rd.<br />

Water Rd.<br />

Stevens Rd.<br />

Burr Rd<br />

47<br />

Udina<br />

Tyrrell Rd.<br />

Bowes Rd.<br />

Keslinger Rd.<br />

Fabyan<br />

Orchard Rd.<br />

Aucutt Rd.<br />

Mason Rd.<br />

Randall Rd.<br />

Crane Rd.<br />

Boyer Rd.<br />

Binnie Rd.<br />

Hopps Rd.<br />

10<br />

17<br />

Oak St.<br />

Edgelawn Dr.<br />

8<br />

59<br />

84<br />

5<br />

Randall Rd.<br />

Dean St.<br />

Bricher Rd.<br />

McKee St.<br />

Montgomery<br />

30<br />

72<br />

21<br />

21<br />

20<br />

Randall Rd.<br />

Fox<br />

34<br />

71<br />

Randall Rd.<br />

Red<br />

(<br />

Ln.<br />

Crane Rd.<br />

Sullivan Rd.<br />

Prairie St.<br />

South St.<br />

34<br />

34<br />

Wilson St.<br />

Mooseheart Rd.<br />

North Aurora<br />

Indian Trail Rd.<br />

Aurora<br />

N. <strong>County</strong> Line Rd.<br />

Algonquin<br />

90<br />

Sleepy Hollow Rd.<br />

McLean<br />

South St.<br />

Illinois Ave.<br />

Larkin Ave.<br />

Gate Rd.<br />

Geneva<br />

Mooseheart<br />

25<br />

31<br />

Batavia<br />

31<br />

18<br />

Miller Rd.<br />

Montgomery Rd.<br />

Sleepy<br />

Hollow<br />

Boncosky Rd.<br />

Wing St.<br />

Elgin<br />

Spring St.<br />

88<br />

South<br />

Elgin<br />

31<br />

Army Trail Rd.<br />

Tyler<br />

Church Rd.<br />

Hill Ave.<br />

Gilbert St.<br />

CountryClubRd.<br />

St. Charles<br />

29<br />

Cherry<br />

Kirk Rd.<br />

Farnsworth Ave.<br />

Algonquin Rd.<br />

Kirk Rd.<br />

Wilson St.<br />

Pine St.<br />

56<br />

Raddant Rd.<br />

Sheffer<br />

Dunham Rd.<br />

Fabyan<br />

Bilter Rd.<br />

Rd.<br />

5th Ave.<br />

Bolz Rd.<br />

LakeMarianRd.<br />

Summit St.<br />

Villa St.<br />

Middle St.<br />

Rd.<br />

Carpentersville<br />

West<br />

Dundee<br />

8<br />

64<br />

Wayne<br />

19<br />

77<br />

77<br />

Molitor Rd.<br />

New York St.<br />

25<br />

Bartlett<br />

38<br />

61<br />

20<br />

34<br />

Kautz Rd.<br />

25<br />

Lake - Cook Rd.<br />

West<br />

Bartlett<br />

Rd.<br />

37<br />

62<br />

Helm Rd.<br />

68<br />

East<br />

Dundee<br />

72<br />

Stearns<br />

Rd.<br />

Barrington<br />

Hills<br />

40<br />

Penny<br />

Rd.<br />

Hoffman<br />

Estates<br />

Legend<br />

§¨¦ 88<br />

£¤ 30<br />

!( 31<br />

467 34<br />

/<br />

Hampshire<br />

Burlington<br />

0 1 2 Miles<br />

Virgil<br />

Rutland Dundee<br />

Plato<br />

Elgin<br />

Campton Saint Charles<br />

Geneva<br />

<strong>Kane</strong>ville Blackberry<br />

Batavia<br />

Big Rock Sugar Grove Aurora<br />

Interstates<br />

US Roads<br />

State Roads<br />

<strong>County</strong> Roads<br />

Other Roads<br />

Rail Roads<br />

<strong>County</strong> Boundry<br />

Township Boundry<br />

Fox River<br />

Forest Preserves<br />

Municipalities<br />

Urethane<br />

0 3,800 7,600 11,400 15,200<br />

Feet


If not budgeted,<br />

explain funding<br />

source<br />

<strong>AG</strong>ENDA ITEM EXECUTIVE SUMMARY Agenda Item #<br />

Presenter/Sponsor:<br />

Name<br />

Budget Information: Was this item budgeted?<br />

SUMMARY:<br />

Attachments:<br />

Detailed information available from :<br />

Resolution/Ordinance Tracking:<br />

Staff Name:<br />

Appropriation Amount:<br />

Ray Johnson, Traffic / Utility Coordinator Phone: 630/406-7356<br />

Assigned Committee: Transportation Sent to: Executive<br />

on: 04/10/20<strong>13</strong><br />

If Other, specify:<br />

Committee Remarks:<br />

<strong>County</strong> Board Date:<br />

Resolution<br />

Ordinance<br />

Yes<br />

No N/A<br />

Next Committee: Executive Sent to: <strong>County</strong> Board on: 05/08/20<strong>13</strong><br />

If Other, specify:<br />

Committee Remarks:<br />

Next Committee: Sent to: on:<br />

Committee Remarks:<br />

7B-b<br />

Approving Contract for 20<strong>13</strong> Paint Pavement Marking, <strong>Kane</strong> <strong>County</strong> Section No.<br />

<strong>13</strong>-00000-05-GM<br />

Tom Rickert - Deputy Director of Transportation<br />

$450,287.57<br />

On March 27, 20<strong>13</strong>, construction bids were opened at the Division of Transportation office for the 20<strong>13</strong> <strong>County</strong> Paint<br />

Pavement Marking Program. The scope of this project involves the striping of 208 miles of roads in the <strong>County</strong> including<br />

various lower volume rural <strong>County</strong> Highways.<br />

The low bidder is Preform Traffic Control, LTD. of Elk Grove Village, Illinois for the proposed amount of $450,287.57. The low<br />

bid amount is approximately 17% below the engineer's estimate of $540,265.70.<br />

Resolution, Bid Tabulation, Location Map<br />

05/14/20<strong>13</strong>


STATE OF <strong>IL</strong>LINOIS<br />

COUNTY OF KANE<br />

RESOLUTION NO. <strong>13</strong> -<br />

APPROVING CONTRACT FOR<br />

20<strong>13</strong> PAINT PAVEMENT MARKING<br />

KANE COUNTY SECTION NO. <strong>13</strong>-00000-05-GM<br />

WHEREAS, the <strong>Kane</strong> <strong>County</strong> Division of Transportation has solicited and received bids for the<br />

work and/or construction described as:<br />

KANE COUNTY SECTION NO. <strong>13</strong>-00000-05-GM<br />

20<strong>13</strong> PAINT PAVEMENT MARKING<br />

(hereinafter the “Project”)<br />

WHEREAS, the lowest responsible bidder for the Project is:<br />

PREFORM TRAFFIC CONTROL SYSTEMS, LTD. OF ELK GROVE V<strong>IL</strong>L<strong>AG</strong>E, <strong>IL</strong>LINOIS<br />

with a low bid of<br />

$450,287.57<br />

NOW, THEREFORE, BE IT RESOLVED by the <strong>Kane</strong> <strong>County</strong> Board that a contract for the<br />

Project described hereinabove shall be awarded to the lowest responsible bidder in the amount as<br />

indicated hereinabove and that the <strong>County</strong> Board Chairman is hereby authorized and directed to<br />

execute a contract and contractor’s bond therefor.<br />

BE IT FURTHER RESOLVED that there is hereby appropriated the sum of Four Hundred Fifty<br />

Nine Thousand Three Hundred Dollars ($459,300.00) [including a 2% contingency] from Local Option<br />

Fund #304, Line Item #52070 (Repair / Maintenance – Pavement Marking) to pay for the Project.<br />

Line Item Line Item Description Was<br />

personnel/item/service<br />

approved in original<br />

budget or a subsequent<br />

304.520.524.52070<br />

Repair / Maintenance –<br />

Pavement Marking<br />

budget revision?<br />

Yes<br />

Are funds currently<br />

available for this<br />

personnel/item/service in<br />

the specific line item?<br />

Yes<br />

If funds are not<br />

currently available in<br />

the specified line item,<br />

where are the funds<br />

available?


Passed by the <strong>Kane</strong> <strong>County</strong> Board on May 14, 20<strong>13</strong>.<br />

Page 2 of 2, Res. #<strong>13</strong>-<br />

______________________________________ ___________________________________<br />

John A. Cunningham Christopher J. Lauzen<br />

Clerk, <strong>County</strong> Board Chairman, <strong>County</strong> Board<br />

<strong>Kane</strong> <strong>County</strong>, Illinois <strong>Kane</strong> <strong>County</strong>, Illinois<br />

Vote:<br />

Yes _____<br />

No _____<br />

Voice _____<br />

Abstentions _____<br />

5APCNPAINTPVMNTMRKNG.4LH


TOWNSHIP<br />

KANE COUNTY DIVISION OF TRANSPORTATION COUNTY KANE<br />

BID TAB SECTION <strong>13</strong>-00000-05-GM<br />

20<strong>13</strong> <strong>Kane</strong> <strong>County</strong> Paint Pavement Marking"<br />

Non-MFT ENGINEERS ESTIMATE<br />

AC Pavement Marking<br />

Preform Traffic Control Systems<br />

DATE: March 27,20<strong>13</strong> Ltd.<br />

ITEM # ITEMS UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL<br />

1 PAINT PAVEMENT MARKING - LINE, 4" FOOT 3,410,798 0.10 341,079.80 $0.10 $341,079.80 0.087 $296,739.43<br />

2 PAINT PAVEMENT MARKING - LINE, 6" FOOT 36,682 0.50 18,341.00 $0.46 $16,873.72 $0.40 $14,672.80<br />

3 PAINT PAVEMENT MARKING - LINE, 8" FOOT 225,100 0.25 56,275.00 $0.19 $42,769.00 $0.16 $36,016.00<br />

4 PAINT PAVEMENT MARKING - LINE, 12" FOOT 19,621 1.50 29,431.50 $1.30 $25,507.30 $1.27 $24,918.67<br />

5 PAINT PAVEMENT MARKING - LINE, 24" FOOT 7,871 2.00 15,742.00 $1.85 $14,561.35 $1.79 $14,089.09<br />

6 PAINT PAVEMENT MARKING - LETTER & SYMBOLS SQ FT 14,888 2.00 29,776.40 $1.90 $28,287.58 $1.79 $26,649.88<br />

7 PAINT PAVEMENT MARKING - MEDIAN SQ FT 3,810 2.00 7,620.00 1.35 $5,143.50 1.27 $4,838.70<br />

8 TRAFFIC CONTROL & PROTECTION (SPECIAL) LUMP SUM 1 15,000.00 15,000.00 10,000.00 $10,000.00 7,500.00 $7,500.00<br />

9 ITEMS AS ORDERED BY THE ENGINEER UNIT 20,000 1.00 20,000.00 1.00 $20,000.00 1.00 $20,000.00<br />

10 RA<strong>IL</strong>ROAD PROTECTIVE LIAB<strong>IL</strong>ITY INSURANCE UNIT 1 7,000.00 7,000.00 10,000.00 $10,000.00 4,863.00 $4,863.00<br />

AS READ $540,265.70 $514,222.25 $450,287.57<br />

AS CORRECTED<br />

% +/- ESTIMATE -4.82% -16.65%


W. <strong>County</strong> Line<br />

West <strong>County</strong> Line<br />

41<br />

(<br />

West <strong>County</strong><br />

Plank Rd.<br />

Marcy Rd.<br />

McGough Rd.<br />

Hinckley<br />

Schrader Rd.<br />

Harter Rd.<br />

Perry Rd.<br />

Owens Rd.<br />

Rd.<br />

Allen Rd.<br />

McGough Rd.<br />

Winters Rd.<br />

Root Ln.<br />

28<br />

Peterson Rd.<br />

Main<br />

Swan Rd.<br />

Walker Rd.<br />

Thatcher Rd.<br />

Keslinger Rd.<br />

Jericho Rd.<br />

Rd.<br />

McDermott Rd.<br />

20<strong>13</strong> <strong>Kane</strong> <strong>County</strong> Paint Pavement Marking<br />

Nelson<br />

Engel Rd.<br />

Bushnell Rd.<br />

Rd.<br />

Percy Rd.<br />

Snyder Rd.<br />

Maple Park<br />

Troxel<br />

Shaw<br />

30<br />

44<br />

Fabris Rd.<br />

Miner Rd.<br />

Walker Rd.<br />

38<br />

28<br />

Howard Rd.<br />

46<br />

Lawrence<br />

Ellithorpe Rd.<br />

Granart Rd.<br />

Burlington<br />

Burlington<br />

McGough Rd.<br />

Barron Rd.<br />

4<br />

24<br />

Watson Rd.<br />

23<br />

1<br />

Lasher Rd.<br />

Davis Rd.<br />

Peplow Rd.<br />

35<br />

10<br />

44<br />

45<br />

French Rd.<br />

11<br />

11<br />

Base Line Rd.<br />

St.<br />

Harmony Rd.<br />

I.C.<br />

Meredith Rd.<br />

Sauber<br />

Dauberman Rd.<br />

Getty Rd.<br />

Big Timber Rd.<br />

State<br />

Godfrey Rd.<br />

Florence Rd. Middleton Rd.<br />

Rhodes<br />

Jones<br />

Granart<br />

Rd.<br />

Kelley Rd.<br />

Lenschow Rd.<br />

49<br />

14<br />

36<br />

Getzelman Rd.<br />

56<br />

Virgil<br />

Big Rock<br />

Higgins Rd.<br />

Chapman Rd.<br />

62<br />

Ramm Rd.<br />

Beith Rd.<br />

(<br />

Allen Rd.<br />

Scott Rd.<br />

Rd.<br />

Francis Rd.<br />

Thomas Rd.<br />

Harter Rd.<br />

Wheeler Rd.<br />

Clark Rd.<br />

Romke Rd.<br />

Welter Rd.<br />

88<br />

Widmayer Rd.<br />

Freeland Rd.<br />

Gast Rd.<br />

Hampshire<br />

2<br />

Bateman<br />

<strong>Kane</strong>ville<br />

Dietrich Rd.<br />

Lees Rd.<br />

Reed Rd.<br />

Seavey Rd<br />

Jetter<br />

Ketchum Rd.<br />

Berner Rd.<br />

McDonald Rd.<br />

Ashe Rd.<br />

Brier Hill Rd.<br />

Rohrsen Rd.<br />

Rowe<br />

Bahr Rd.<br />

Dugan Rd.<br />

Schneider Rd.<br />

Lorang Rd.<br />

Tower Rd.<br />

Main<br />

Thurnau<br />

Rd.<br />

Plato Rd.<br />

Rd.<br />

Prairie St.<br />

Mighell Rd.<br />

Hennig Rd.<br />

Lily<br />

Lake<br />

Hanson Rd.<br />

Scott Rd.<br />

Plank Rd.<br />

Burlington<br />

Anderson Rd.<br />

Sanwald Rd.<br />

Jericho Rd.<br />

Huntley<br />

Kendall Rd.<br />

Elburn<br />

Smith Rd.<br />

Green<br />

Merill Rd.<br />

Swanberg Rd.<br />

Reinking Rd.<br />

Rd.<br />

Pingree Grove<br />

Pouley Rd.<br />

Dittman Rd.<br />

Beith Rd.<br />

Rippburger Rd.<br />

Marshall Rd.<br />

(<br />

Empire Rd.<br />

Town Hall Rd.<br />

Hughes<br />

Manning<br />

Rd.<br />

Lenz Rd.<br />

Campton Hills Rd.<br />

Harley Rd.<br />

Bliss Rd.<br />

Muirhead Rd.<br />

Kreutzer Rd.<br />

Russell Rd.<br />

Bowes<br />

Bunker Rd.<br />

Norris<br />

(<br />

Healy Rd<br />

Rd.<br />

Powers Rd.<br />

Freeman Rd.<br />

Denny Rd.<br />

Sugar Grove<br />

M:\dotserver2\USERS\Committee\20<strong>13</strong>04 <strong>April</strong>\Traffic & Permitting\Traffic\Paint Pavement Marking\20<strong>13</strong> Paint Pavement Striping<br />

72<br />

27<br />

48<br />

3<br />

90<br />

22<br />

23<br />

20<br />

4<br />

47<br />

21<br />

30<br />

47<br />

69<br />

5<br />

30<br />

47<br />

51<br />

26<br />

47<br />

52<br />

38<br />

Plato Center<br />

33<br />

2<br />

Crawford<br />

Damisch Rd.<br />

Corron Rd.<br />

Wasco<br />

64<br />

78<br />

16<br />

Lafox Rd.<br />

(<br />

Silver<br />

Fabyan<br />

Seavey Rd.<br />

56<br />

24<br />

22<br />

80<br />

Hankes<br />

Big Timber Rd.<br />

Highland Ave.<br />

Galena Blvd.<br />

Barnes<br />

Rd.<br />

Deerpath<br />

Coombs Rd.<br />

McDonald Rd.<br />

Campton<br />

Hills<br />

81<br />

Elgin<br />

La Fox<br />

41<br />

15<br />

Rd.<br />

33<br />

Bolcum Rd.<br />

Brundige Rd.<br />

8<br />

Orchard Rd.<br />

Galligan Rd.<br />

(<br />

Nesler Rd.<br />

Main St.<br />

Huntley Rd.<br />

Peck Rd.<br />

<strong>Kane</strong>ville Rd.<br />

Tanner Rd. 83<br />

Rd.<br />

6<br />

83<br />

Gilberts<br />

Nelson Lake Rd.<br />

Water Rd.<br />

Stevens Rd.<br />

Burr Rd<br />

47<br />

Udina<br />

Tyrrell Rd.<br />

Bowes Rd.<br />

Keslinger Rd.<br />

Fabyan<br />

Orchard Rd.<br />

Aucutt Rd.<br />

Mason Rd.<br />

Randall Rd.<br />

Crane Rd.<br />

Boyer Rd.<br />

Binnie Rd.<br />

Hopps Rd.<br />

10<br />

17<br />

Oak St.<br />

Edgelawn Dr.<br />

8<br />

59<br />

84<br />

5<br />

Randall Rd.<br />

Dean St.<br />

Bricher Rd.<br />

McKee St.<br />

Montgomery<br />

30<br />

72<br />

21<br />

21<br />

20<br />

Randall Rd.<br />

Fox<br />

34<br />

71<br />

Randall Rd.<br />

Red<br />

(<br />

Ln.<br />

Crane Rd.<br />

Sullivan Rd.<br />

Prairie St.<br />

South St.<br />

34<br />

34<br />

Wilson St.<br />

Mooseheart Rd.<br />

North Aurora<br />

Indian Trail Rd.<br />

Aurora<br />

N. <strong>County</strong> Line Rd.<br />

Algonquin<br />

90<br />

Sleepy Hollow Rd.<br />

McLean<br />

South St.<br />

Illinois Ave.<br />

Larkin Ave.<br />

Gate Rd.<br />

Geneva<br />

Mooseheart<br />

25<br />

31<br />

Batavia<br />

31<br />

18<br />

Miller Rd.<br />

Montgomery Rd.<br />

Sleepy<br />

Hollow<br />

Boncosky Rd.<br />

Wing St.<br />

Elgin<br />

Spring St.<br />

88<br />

South<br />

Elgin<br />

31<br />

Army Trail Rd.<br />

Tyler<br />

Church Rd.<br />

Hill Ave.<br />

Gilbert St.<br />

CountryClubRd.<br />

St. Charles<br />

29<br />

Cherry<br />

Kirk Rd.<br />

Farnsworth Ave.<br />

Algonquin Rd.<br />

Kirk Rd.<br />

Wilson St.<br />

Pine St.<br />

56<br />

Raddant Rd.<br />

Sheffer<br />

Dunham Rd.<br />

Fabyan<br />

Bilter Rd.<br />

Rd.<br />

5th Ave.<br />

Bolz Rd.<br />

LakeMarianRd.<br />

Summit St.<br />

Villa St.<br />

Middle St.<br />

Rd.<br />

Carpentersville<br />

West<br />

Dundee<br />

8<br />

64<br />

Wayne<br />

19<br />

77<br />

77<br />

Molitor Rd.<br />

New York St.<br />

25<br />

Bartlett<br />

38<br />

61<br />

20<br />

34<br />

Kautz Rd.<br />

25<br />

Lake - Cook Rd.<br />

West<br />

Bartlett<br />

Rd.<br />

37<br />

62<br />

Helm Rd.<br />

68<br />

East<br />

Dundee<br />

72<br />

Stearns<br />

Rd.<br />

Barrington<br />

Hills<br />

40<br />

Penny<br />

Rd.<br />

Hoffman<br />

Estates<br />

Legend<br />

§¨¦ 88<br />

£¤ 30<br />

!( 31<br />

467 34<br />

/<br />

Hampshire<br />

Burlington<br />

0 1 2 Miles<br />

Virgil<br />

Rutland Dundee<br />

Plato<br />

Elgin<br />

Campton Saint Charles<br />

Geneva<br />

<strong>Kane</strong>ville Blackberry<br />

Batavia<br />

Big Rock Sugar Grove Aurora<br />

Interstates<br />

US Roads<br />

State Roads<br />

<strong>County</strong> Roads<br />

Other Roads<br />

Rail Roads<br />

<strong>County</strong> Boundry<br />

Township Boundry<br />

Fox River<br />

Forest Preserves<br />

Municipalities<br />

Paint<br />

0 3,800 7,600 11,400 15,200<br />

Feet


If not budgeted,<br />

explain funding<br />

source<br />

<strong>AG</strong>ENDA ITEM EXECUTIVE SUMMARY Agenda Item #<br />

Presenter/Sponsor:<br />

Name<br />

Budget Information: Was this item budgeted?<br />

SUMMARY:<br />

Attachments:<br />

Detailed information available from :<br />

Resolution/Ordinance Tracking:<br />

Staff Name:<br />

Appropriation Amount:<br />

Kurt Nika, Chief of Traffic & Permitting Phone: 630/406-7372<br />

Assigned Committee: Transportation Sent to: Executive<br />

on: 04/10/20<strong>13</strong><br />

If Other, specify:<br />

Committee Remarks:<br />

<strong>County</strong> Board Date:<br />

Resolution<br />

Ordinance<br />

Yes<br />

No N/A<br />

Next Committee: Executive Sent to: <strong>County</strong> Board on: 05/08/20<strong>13</strong><br />

If Other, specify:<br />

Committee Remarks:<br />

Next Committee: Sent to: on:<br />

Committee Remarks:<br />

Approving Alteration of Speed Limits, St. Charles Township<br />

Tom Rickert - Deputy Director of Transportation<br />

The following proposed speed limit alteration has been determined in accordance with <strong>Kane</strong> <strong>County</strong> Resolution No. 01-419<br />

(Policy for the Establishment and Posting of Altered Speed Limits on <strong>County</strong> and Township Roads) and is being submitted<br />

for approval in accordance with 625 5/11-604 of the Illinois Compiled Statutes.<br />

At the request of the St. Charles Township Road District, an engineering investigation was performed for Ronsu Lane, Leola<br />

Lane, and Deer Pond Drive, which has a current (unposted) statutory speed limit of 55 mph. Staff is recommending the<br />

speed limit on these roads be reduced to 25 mph based on the following factors:<br />

-- The roads are subdivision roads used exclusively for residential use<br />

-- The winding curvature of the road geometry, which result in prevailing speeds lower than statutory speeds limit<br />

-- Township Road District support<br />

Ordinance, Location Map<br />

05/14/20<strong>13</strong><br />

N/A<br />

7C-a


STATE OF <strong>IL</strong>LINOIS<br />

COUNTY OF KANE<br />

ORDINANCE NO. <strong>13</strong> -<br />

APPROVING ALTERATION OF SPEED LIMITS<br />

ST. CHARLES TOWNSHIP<br />

WHEREAS, <strong>County</strong> of <strong>Kane</strong> through its Division of Transportation has caused an engineering and<br />

traffic investigation to be conducted on Ronsu Lane, Leola Lane and Deer Pond Drive, each of which is a<br />

highway not otherwise under the jurisdiction of the Illinois Department of Transportation; and<br />

WHEREAS, the Transportation Committee of the <strong>Kane</strong> <strong>County</strong> Board has reviewed the results of<br />

said investigation and has recommended the alteration of the existing maximum speed limit of fifty five (55)<br />

miles per hour as set forth in the Illinois Vehicle Code, (625 <strong>IL</strong>CS 5/11-604), so as to be both reasonable,<br />

safe and proper.<br />

NOW, THEREFORE, BE IT ORDAINED by the <strong>Kane</strong> <strong>County</strong> Board, that pursuant to the Illinois<br />

Vehicle Code, (625 <strong>IL</strong>CS 5/11-604), the maximum speed limit on Ronsu Lane, Leola Lane, and Deer Pond<br />

Drive in St. Charles Township as described hereunder shall be twenty five (25) miles per hour as indicated<br />

in the schedule as set forth below.<br />

BE IT FURTHER ORDAINED that this Ordinance shall be effective upon the approval of the <strong>Kane</strong><br />

<strong>County</strong> Board as provided by statute and the posting of signs giving notice of said twenty five (25) miles<br />

per hour maximum speed limit.<br />

LIMITS<br />

(IF NOT ENTIRE LENGTH)<br />

STREET<br />

FROM TO<br />

Ronsu Lane Crane Road<br />

Deer Pond<br />

Drive<br />

Leola Lane<br />

Red Gate<br />

Road<br />

Deer Pond Drive Leola Lane<br />

*miles per hour<br />

Ronsu Lane<br />

Deer Pond<br />

Court<br />

ST. CHARLES TOWNSHIP<br />

SUBDIVISION<br />

Baker Acres Units #1 & #2,<br />

Deer Pond Woods<br />

Baker Acres Unit #3 & #4<br />

Deer Pond Woods, Deer Pond<br />

Estates<br />

EXISTING<br />

SPEED LIMIT<br />

(MPH)*<br />

REPEALED<br />

MAXIMUM<br />

SPEED LIMIT<br />

(MPH)*<br />

55 25<br />

55 25<br />

55 25


Passed by the <strong>Kane</strong> <strong>County</strong> Board on May 14, 20<strong>13</strong>.<br />

Page 2 of 2, Res. #<strong>13</strong>-<br />

______________________________________ ___________________________________<br />

John A. Cunningham Christopher J. Lauzen<br />

Clerk, <strong>County</strong> Board Chairman, <strong>County</strong> Board<br />

<strong>Kane</strong> <strong>County</strong>, Illinois <strong>Kane</strong> <strong>County</strong>, Illinois<br />

Vote:<br />

Yes _____<br />

No _____<br />

Voice _____<br />

Abstentions _____<br />

5ORDSTCHASTWP.4LH


Burr Rd<br />

5<br />

Speed Limit<br />

Alteration<br />

Crane Rd.<br />

Randall Rd.<br />

Dean St.<br />

34<br />

Red<br />

Gate Rd.<br />

Crane Rd.<br />

31<br />

Speed Limit Alteration<br />

Leola Lane, Ronsu Lane and Deer Pond Drive<br />

0 485 970 1,940 2,910 3,880<br />

Feet<br />

0 1 Miles<br />

Legend<br />

Hampshire Rutland Dundee<br />

M:\dotserver2\USERS\Committee\20<strong>13</strong>04 <strong>April</strong>\Traffic & Permitting\Traffic\Ronsu Leola Deer Pond Speed Limit Reduction\Map Standard_Speed Limit Alteration - Leola Ln loc map<br />

467 34<br />

§¨¦ 88<br />

£¤ 30<br />

!( 31<br />

Burlington<br />

Virgil<br />

Plato<br />

Campton<br />

Elgin<br />

Geneva<br />

<strong>Kane</strong>ville Blackberry<br />

Batavia<br />

Big Rock Sugar Grove Aurora<br />

Interstates<br />

US Roads<br />

State Roads<br />

<strong>County</strong> Roads<br />

Other Roads<br />

Rail Roads<br />

<strong>County</strong> Boundry<br />

Township Boundry<br />

Fox River<br />

Forest Preserves<br />

Municipalities<br />

/<br />

Co<br />

S


Burr Rd<br />

5<br />

Speed Limit<br />

Alteration<br />

Crane Rd.<br />

Randall Rd.<br />

Dean St.<br />

34<br />

Red<br />

Gate Rd.<br />

Crane Rd.<br />

Speed Limit Alteration<br />

Leola Lane, Ronsu Lane and Deer Pond Drive<br />

0 485 970 1,940 2,910 3,880<br />

Feet<br />

0 1 Miles<br />

31<br />

Legend<br />

M:\dotserver2\USERS\Committee\20<strong>13</strong>04 <strong>April</strong>\Traffic & Permitting\Traffic\Ronsu Leola Deer Pond Speed Limit Reduction\Map Standard Aerial_Speed Limit Alteration - Ronsu Leola Ln loc map<br />

467 34<br />

§¨¦ 88<br />

£¤ 30<br />

!( 31<br />

Hampshire Rutland Dundee<br />

Burlington<br />

Virgil<br />

Plato<br />

Campton<br />

Elgin<br />

Geneva<br />

<strong>Kane</strong>ville Blackberry<br />

Batavia<br />

Big Rock Sugar Grove Aurora<br />

Interstates<br />

US Roads<br />

State Roads<br />

<strong>County</strong> Roads<br />

Other Roads<br />

Rail Roads<br />

<strong>County</strong> Boundry<br />

Township Boundry<br />

Fox River<br />

Forest Preserves<br />

Municipalities<br />

/<br />

Co


SUMMARY:<br />

Attachments:<br />

Detailed information<br />

available from :<br />

Staff Remarks /<br />

Recommendations:<br />

Committee Remarks:<br />

<strong>AG</strong>ENDA ITEM EXECUTIVE SUMMARY Agenda Item #<br />

Name:<br />

Assigned Committee:<br />

Current Construction Projects:<br />

Staff Name:<br />

Implementation Report<br />

4/11/20<strong>13</strong><br />

Presenter/Sponsor: Steve Coffinbargar<br />

~ Stearns Road Corridor Landscaping – Contract is substantially complete. Contractor is working on final quantities and<br />

paperwork. Replacement of dead trees and shrub under contract warranty will occur in spring 20<strong>13</strong>.<br />

~ McLean Blvd Fen Adaptive Management Program – Crews have completed the foot bridge and will resume work on the<br />

project once the weather breaks in the spring. Project is scheduled for completion June 20<strong>13</strong>.<br />

~ Kirk/Dunham Road - <strong>IL</strong> 56 to Stearns Road Interconnect and ITS Upgrade – Signal equipment work continues. Project is<br />

scheduled for substantial completion <strong>April</strong> 20<strong>13</strong> and contract completion June 20<strong>13</strong>.<br />

~ Randall Road at US 20/Foothill Road Intersection Channelization – Project is substantially complete and contractor is<br />

working on punch list items which have been affected by weather. Some minor site grading may be required this spring.<br />

~ Plank Road at <strong>IL</strong> 47 Intersection Channelization – Contractor is substantially complete with the traffic signal and street<br />

lighting improvements on the project. Seeding and minor landscaping restoration will occur spring 20<strong>13</strong>.<br />

~Hampshire Creek Stream Bank Stabilization – Construction is substantially complete. Contract will remain open to monitor<br />

vegetation growth and compliance to plans and specifications in the spring.<br />

~ 2012 Urethane Striping – Project is substantially complete. Crews are working on punch list items which has been affected<br />

by inclement weather. Project completion is anticipated for spring 20<strong>13</strong>.<br />

~ Randall Road at Gyorr Road Traffic Signal Modernization – Concrete and underground work is complete; traffic signal work<br />

will occur during 20<strong>13</strong>. Project completion anticipated for spring 20<strong>13</strong>, weather permitting.<br />

~South Street Trail Underpass at Randall/Keslinger Roads – Contractor continues to work on construction submittals for<br />

tunnel work. Thrust block wall and tunneling platform installation on the west side of the project is expected to begin<br />

within the next two weeks, weather permitting. Project completion is anticipated for fall 20<strong>13</strong>.<br />

~Randall Road at Big Timber Road Intersection Improvement – Installation of temporary traffic signals has begun and will<br />

continue for the next 9 weeks, weather permitting. Project completion is anticipated for fall 20<strong>13</strong>.<br />

~Mooseheart Road at <strong>IL</strong> 31 Intersection Channelization (Const. by IDOT) – Project was recently let for construction. Project<br />

completion anticipated for fall 20<strong>13</strong>, weather permitting.<br />

Design Highlights:<br />

~ Anderson Road Extension – <strong>IL</strong> 38 to Keslinger Road – Land acquisition continues & engineering plans nearly complete. The<br />

goal is to have project under construction during 20<strong>13</strong> and 2014.<br />

~ Longmeadow Parkway – Coordination with IDOT continues regarding final elements of Phase I Engineering. Plat of<br />

highways, appraisals and right of way acquisition continues at locations where requirements have been defined. Phase II<br />

Engineering to start during 20<strong>13</strong>.<br />

~ Burlington Road at <strong>IL</strong> 47 – Project scope includes construction of a single lane roundabout primarily funded with Federal<br />

CMAQ funds. Phase II Engineering and right of way acquisition are ongoing.<br />

~ Stearns Road, Stage 3A, <strong>IL</strong> 25 – Dunham Road to South of Stearns Road (Const. by IDOT) – Phase II Engineering & right of<br />

way acquisition are nearly complete. Construction is targeting a spring 20<strong>13</strong> IDOT letting; construction during<br />

20<strong>13</strong>/2014/2015.<br />

~ Various Engineering Projects – there are dozens of other projects underway. Please contact our office if you have any<br />

questions on the status of any other project.<br />

Project Update Photos<br />

For information only.<br />

Transportation<br />

Steve Coffinbargar, Assistant Director Phone: (630) 406-7170<br />

8A


If not budgeted,<br />

explain funding<br />

source<br />

<strong>AG</strong>ENDA ITEM EXECUTIVE SUMMARY Agenda Item #<br />

Presenter/Sponsor:<br />

Name<br />

Budget Information: Was this item budgeted?<br />

SUMMARY:<br />

Attachments:<br />

Detailed information available from :<br />

Resolution/Ordinance Tracking:<br />

Staff Name:<br />

Appropriation Amount:<br />

Steve Coffinbargar Phone: 630-406-7170<br />

Assigned Committee: Transportation Sent to: Executive<br />

on: 04/11/20<strong>13</strong><br />

If Other, specify:<br />

Committee Remarks:<br />

<strong>County</strong> Board Date:<br />

Resolution<br />

Ordinance<br />

Yes<br />

No N/A<br />

Next Committee: Executive Sent to: <strong>County</strong> Board on: 05/08/20<strong>13</strong><br />

If Other, specify:<br />

Committee Remarks:<br />

Next Committee: Sent to: on:<br />

Committee Remarks:<br />

8B-1a<br />

Approving a Phase I Engineering Services Agreement with HDR Engineering, Inc. for<br />

Montgomery Road from Illinois Route 25 to Hill Avenue, <strong>Kane</strong> <strong>County</strong> Section No.<br />

<strong>13</strong>-00127-00-WR<br />

Steve Coffinbargar - Assistant Director of Transportation<br />

$961,633.48<br />

Staff has completed the qualifications based consultant selection process and has negotiated a contract with HDR, Inc. for<br />

Phase One Engineering services for a corridor improvement project on Montgomery Road. The limits are from Illinois Route<br />

25 easterly to Hill Avenue. The improvement will generally consist of the addition of a continuous center turn lane along<br />

with other drainage and pedestrian enhancements. Phase One services will include, but not be limited to, the following:<br />

•Providing detailed surveys as necessary for planning and design of the project<br />

•Environmental planning documents as necessary<br />

•Intersection Design Studies<br />

•Prepare traffic studies and counts, analyze accident date, and any other special intersection studies that may be required<br />

•Project Development Report (PDR)<br />

•Engineers opinion of probable construction costs<br />

•Obtaining design approval from IDOT<br />

•Coordinate with IDOT and other involved parties/agencies as necessary.<br />

The negotiated contract is for an amount not to exceed $961,633.48. Information on the QBS process and selection details<br />

can be found on the <strong>KDOT</strong> website.<br />

Resolution, Engineering Agreement, Location Map<br />

05/14/20<strong>13</strong>


STATE OF <strong>IL</strong>LINOIS<br />

COUNTY OF KANE<br />

RESOLUTION NO. <strong>13</strong> -<br />

APPROVING A PHASE I ENGINEERING SERVICES <strong>AG</strong>REEMENT<br />

WITH HDR ENGINEERING, INC. FOR<br />

MONTGOMERY ROAD FROM <strong>IL</strong>LINOIS ROUTE 25 TO H<strong>IL</strong>L AVENUE<br />

KANE COUNTY SECTION NO. <strong>13</strong>-00127-00-WR<br />

WHEREAS, Phase I Engineering services are required for the proposed improvement of <strong>Kane</strong><br />

<strong>County</strong> Highway No. 29 (also known as Montgomery Road) from Illinois Route 25 to Hill Avenue<br />

(herein referred to as the “Improvement”); and<br />

WHEREAS, in order to accomplish the Improvement, it is necessary to retain the services of a<br />

professional engineering firm to provide Phase I Engineering services therefor; and<br />

WHEREAS, HDR Engineering, Inc., 8550 Bryn Mawr Avenue, Suite 900, Chicago, <strong>IL</strong> 60631-<br />

3223 has experience and professional expertise in Phase I Engineering and is willing to perform the<br />

required services for an amount not to exceed Nine Hundred Sixty One Thousand Six Hundred Thirty<br />

Three and 48/100 Dollars ($961,633.48) as set forth in the Phase I Engineering services agreement (a<br />

copy of which is on file with the <strong>County</strong> Clerk’s Office).<br />

NOW, THEREFORE, BE IT RESOLVED by the <strong>Kane</strong> <strong>County</strong> Board that the Chairman thereof<br />

is hereby authorized to execute a Phase I Engineering services agreement with HDR Engineering, Inc..<br />

BE IT FURTHER RESOLVED that the <strong>Kane</strong> <strong>County</strong> Board appropriates the not to exceed sum<br />

of Nine Hundred Sixty One Thousand Six Hundred Thirty Three and 48/100 Dollars ($961,633.48) from<br />

Transportation Sales Tax Fund #305, Line Item #50140 (Engineering Services) to pay for said Phase I<br />

Engineering services for the Improvement.<br />

Line Item Line Item Description Was<br />

personnel/item/service<br />

approved in original<br />

budget or a subsequent<br />

budget revision?<br />

Are funds currently<br />

available for this<br />

personnel/item/service in<br />

the specific line item?<br />

305.520.527.50140 Engineering Services Yes Yes<br />

If funds are not<br />

currently available in<br />

the specified line item,<br />

where are the funds<br />

available?


Passed by the <strong>Kane</strong> <strong>County</strong> Board on May 14, 20<strong>13</strong>.<br />

Page 2 of 2, Res. #<strong>13</strong>-<br />

______________________________________ ___________________________________<br />

John A. Cunningham Christopher J. Lauzen<br />

Clerk, <strong>County</strong> Board Chairman, <strong>County</strong> Board<br />

<strong>Kane</strong> <strong>County</strong>, Illinois <strong>Kane</strong> <strong>County</strong>, Illinois<br />

Vote:<br />

Yes _____<br />

No _____<br />

Voice _____<br />

Abstentions _____<br />

5MNTGMRYPHI HDR.4LH


AN <strong>AG</strong>REEMENT BETWEEN THE COUNTY OF KANE AND<br />

HDR INC. FOR PHASE I ENGINEERING FOR<br />

MONTGOMERY ROAD C.H 29<br />

KANE COUNTY SECTION NO. <strong>13</strong>-00127-00-WR<br />

PURCHASE ORDER #___________________<br />

This <strong>AG</strong>REEMENT, made this 19th day of February 20<strong>13</strong> between COUNTY OF KANE, a<br />

body corporate and politic of the State of Illinois (hereinafter referred to as the “COUNTY”), of<br />

719 South Batavia Avenue, Geneva, Illinois 60<strong>13</strong>4 and HDR ENGINEERING, INC, a Nebraska<br />

corporation authorized to do business in the State of Illinois and an Illinois licensed professional<br />

engineering firm, with offices at 8550 West Bryn Mawr Avenue, Suite 900 Chicago, Illinois<br />

60631(hereinafter referred to as the “CONSULTANT”). The COUNTY and the CONSULTANT<br />

are sometimes hereinafter collectively referred to as the “PARTIES” and individually as a<br />

“PARTY”.<br />

WITNESSETH<br />

WHEREAS, it is deemed to be in the best interest of the COUNTY and the motoring<br />

public to improve and maintain the various highways throughout <strong>Kane</strong> <strong>County</strong>; and,<br />

WHEREAS, the COUNTY desires to improve <strong>Kane</strong> <strong>County</strong> Highway No. 29,<br />

(Montgomery Road) (hereinafter referred to as the “PROJECT”); and,<br />

WHEREAS, in order to accomplish the PROJECT it is necessary to retain the services of<br />

a professional engineering firm to perform Phase I Engineering services for the PROJECT; and,<br />

WHEREAS, the CONSULTANT has experience and professional expertise in Phase I<br />

services and is willing to perform said services for the PROJECT for an amount not to exceed<br />

Nine Hundred Sixty-One Thousand, Six Hundred Thirty-Three Dollars and Forty-Eight Cents.<br />

($961,633.48),<br />

WHEREAS, the COUNTY has determined that it is in the COUNTY’S best interest to<br />

enter into this <strong>AG</strong>REEMENT with the CONSULTANT.<br />

NOW, THEREFORE, in consideration of the above stated preambles, the mutual<br />

covenants and agreements herein set forth, the PARTIES do hereby mutually covenant, promise,<br />

agree and bind themselves as follows:<br />

1.0 INCORPORATION<br />

1.1 All of the preambles set forth hereinabove are incorporated into and made part of<br />

this <strong>AG</strong>REEMENT.<br />

2.0 SCOPE OF SERVICES<br />

2.1 Services for the PROJECT are to be provided by the CONSULTANT according<br />

to the specifications set forth in Exhibit “A” which is attached hereto and<br />

1


incorporated herein. The services are sometimes hereinafter also referred to as the<br />

“work”.<br />

3.0 NOTICE TO PROCEED<br />

3.1 Authorization to proceed with the work described and as otherwise set forth in<br />

Exhibit “A” shall be given on behalf of the COUNTY by the <strong>Kane</strong> <strong>County</strong><br />

Engineer, in the form of a written notice to proceed (hereinafter “Notice to<br />

Proceed”), following execution of this <strong>AG</strong>REEMENT by the <strong>County</strong> Board<br />

Chairman of the COUNTY.<br />

4.0 TECHNICAL SUB-CONSULTANTS<br />

4.1 The prior written approval of the <strong>Kane</strong> <strong>County</strong> Engineer shall be required before<br />

any sub-consultants are hired by the CONSULTANT to perform any of the work.<br />

4.2 Any such sub-consultants shall be hired and supervised by the CONSULTANT<br />

and the CONSULTANT shall be solely responsible for any and all work<br />

performed by said sub-consultants in the same manner and with the same liability<br />

as if performed by the CONSULTANT.<br />

5.0 TIME FOR PERFORMANCE<br />

5.1 The CONSULTANT shall commence work on the PROJECT as directed in the<br />

Notice to Proceed. The COUNTY is not liable and will not pay the<br />

CONSULTANT for any work performed prior to the date of the Notice to<br />

Proceed or after termination of this <strong>AG</strong>REEMENT.<br />

5.2 Within ten (10) days after the Notice to Proceed is mailed or otherwise<br />

transmitted to the CONSULTANT, the CONSULTANT shall submit a schedule<br />

for completion of the PROJECT. The schedule is subject to approval by the <strong>Kane</strong><br />

<strong>County</strong> Engineer.<br />

6.0 COMPENSATION<br />

6.1 The COUNTY shall only pay the CONSULTANT for work performed and shall<br />

pay only in accordance with the provisions of this <strong>AG</strong>REEMENT.<br />

6.2 For work performed, the COUNTY shall pay the CONSULTANT based upon the<br />

hourly rates set forth in Exhibit “B”, which is attached hereto and incorporated<br />

herein and which rates includes overhead and profit.<br />

6.3 For direct expenses, the COUNTY shall pay the CONSULTANT for supplies and<br />

materials required for the completion of all work defined in the Exhibit “A”<br />

which is attached hereto.<br />

2


6.4 For direct expenses, the CONSULTANT shall include copies of receipts from<br />

suppliers for expendable materials with its invoice to the COUNTY. Computer<br />

charges will not be allowed as direct expenses.<br />

6.5 Within 45 days of receipt, review and approval of properly documented invoices,<br />

the COUNTY shall pay or cause to be paid to the CONSULTANT partial<br />

payments of the compensation specified in this <strong>AG</strong>REEMENT. Payment will be<br />

made in the amount of sums earned less previous partial payments. However, the<br />

COUNTY reserves the right to hold back a sum equal to five percent (5%) of the<br />

total <strong>AG</strong>REEMENT sum to ensure performance satisfactory to the <strong>Kane</strong> <strong>County</strong><br />

Engineer.<br />

6.6 All invoices shall be submitted on the most current Illinois Department of<br />

Transportation Bureau of Design and Environment invoicing form appropriate for<br />

the PROJECT.<br />

6.7 The CONSULTANT agrees to receive all payment for work performed under this<br />

<strong>AG</strong>REEMENT via the COUNTY’s automatic clearing house program.<br />

6.8 All invoicing will be based upon calendar months solely.<br />

6.9 Total payments to the CONSULTANT under the terms of this <strong>AG</strong>REEMENT<br />

shall not exceed Nine Hundred Sixty-One Thousand, Six Hundred Thirty-Three<br />

Dollars and Forty-Eight Cents. ($961,633.48).<br />

7.0 DELIVERABLES.<br />

7.1 The CONSULTANT shall provide the COUNTY, prior to the termination of this<br />

<strong>AG</strong>REEMENT, or at such time as the <strong>Kane</strong> <strong>County</strong> Engineer directs, any required<br />

deliverables related to work performed under this <strong>AG</strong>REEMENT.<br />

7.2 Upon receipt, review and acceptance of all deliverables by the COUNTY (if<br />

required), final payment will be made to the CONSULTANT by the COUNTY.<br />

8.0 CONSULTANT'S INSURANCE<br />

8.1 The CONSULTANT shall, during the term of this <strong>AG</strong>REEMENT and as may be<br />

required thereafter, maintain, at its sole expense, insurance coverage including:<br />

A. Worker's Compensation Insurance in the statutory amounts.<br />

B. Employer's Liability Insurance in an amount not less than Five<br />

Hundred Thousand Dollars ($500,000) each accident/injury and Five<br />

Hundred Thousand Dollars ($500,000) each employee/disease.<br />

C. Commercial General Liability Insurance, (including contractual<br />

liability) with limits of not less than One Million Dollars ($1,000,000)<br />

per occurrence bodily injury/property damage combined single limit;<br />

3


Two Million Dollars ($2,000,000) excess liability coverage in the<br />

aggregate for injury/property damage combined single limit and Two<br />

Million Dollars ($2,000,000) in the aggregate for products-completed<br />

operations.<br />

D. Commercial Automobile Liability Insurance with minimum limits of<br />

at least One Million Dollars ($1,000,000) for any one person and One<br />

Million Dollars ($1,000,000) for any one occurrence of bodily injury<br />

or property damage.<br />

E. Professional Errors and Omissions Insurance with a minimum limit of<br />

One Million Dollars ($1,000,000.00).<br />

8.2 It shall be the duty of the CONSULTANT to provide to the COUNTY copies of<br />

the CONSULTANT'S certificates of insurance before issuance of the Notice to<br />

Proceed. The certificates of insurance shall include the name of the <strong>Kane</strong> <strong>County</strong><br />

PROJECT, as well as the section number. The CONSULTANT shall provide the<br />

COUNTY and maintain a certificate of insurance for its General Liability,<br />

Automobile, Professional Errors and Omissions, and Umbrella Insurance Policies,<br />

if applicable, which certificate, with the exception of the Professional Errors and<br />

Omissions, shall include the COUNTY as additional named insured, and the<br />

certificate holder as the COUNTY, 719 S. Batavia Ave., Geneva, <strong>IL</strong> 60<strong>13</strong>4. The<br />

additional named insured endorsement included on the CONSULTANT’S<br />

Commercial General Liability, Automobile and Umbrella Policies shall provide<br />

the following:<br />

A. That the coverage afforded the additional named insured will be primary<br />

insurance for the additional named insured with respect to claims arising out<br />

of operations performed by or on behalf of the CONSULTANT;<br />

B. That if the additional named insured has other insurance which is applicable to<br />

the loss, such other insurance will be only on an excess or contingent basis;<br />

C. That the amount of the CONSULTANT’S liability under the insurance policy<br />

will not be reduced by the existence of such other insurance; and,<br />

D. That the certificate of insurance shall contain a provision or endorsement that<br />

the coverage afforded will not be canceled until at least thirty (30) days prior<br />

written notice has been given to COUNTY.<br />

8.3 The insurance required to be purchased and maintained by CONSULTANT shall<br />

be provided by an insurance company acceptable to the COUNTY with an AM<br />

Best rating of A- or better, and licensed to do business in the State of Illinois; and<br />

shall include at least the specified coverage and be written for not less than the<br />

limits of the liability specified herein or required by law or regulation whichever<br />

is greater. In no event shall any failure of the COUNTY to receive policies or<br />

certificates of insurance or to demand receipt of the same be construed as a waiver<br />

4


of the CONSULTANT’S obligation to obtain and keep in force the required<br />

insurance.<br />

9.0 INDEMNIFICATION.<br />

9.1 To the fullest extent permitted by law, the CONSULTANT shall indemnify and<br />

hold harmless the COUNTY, and its officials, directors, officers, agents, and<br />

employees from and against any and all claims, damages, losses, and expenses,<br />

including but not limited to reasonable court costs and attorney's fees, arising out<br />

of or resulting from performance of the work, provided that such claim, loss or<br />

expense is attributable to bodily injury, sickness, disease or death, or to injury to<br />

or destruction of property, including loss of use resulting therefrom, but only to<br />

the extent caused in whole or in part by negligent acts or omissions of the<br />

CONSULTANT, a sub-consultant, anyone directly or indirectly employed by<br />

them or anyone for whose acts they may be liable, excluding any proportionate<br />

amount of any claim, damage, loss or expense which is caused by the negligence<br />

of the COUNTY. Such obligation shall not be construed to negate, abridge or<br />

reduce other rights or obligations of indemnity, which would otherwise exist as to<br />

a PARTY or person described in this paragraph. In claims against the COUNTY<br />

and its officials, directors, officers, agents, and employees by an employee of the<br />

CONSULTANT, a sub-consultant, anyone directly or indirectly employed by<br />

them or anyone for whose acts they may be liable, the indemnification obligation<br />

under this paragraph shall not be limited by a limitation on the amount or type of<br />

damages, compensation or benefits payable by or for the CONSULTANT or a<br />

sub-consultant under workmen's compensation acts, disability benefit acts or<br />

other employee benefit acts.<br />

9.2 Nothing contained herein shall be construed as prohibiting the COUNTY, its<br />

officials, directors, officers, agents, and employees, from defending through the<br />

selection and use of their own agents, attorneys and experts, to defend any claims,<br />

actions or suits brought against them.<br />

9.3 If any errors, omissions, intentional or negligent acts are made by the<br />

CONSULTANT or sub-consultant in any phase of the work, the correction of<br />

which requires additional field or office work, the CONSULTANT shall be<br />

required to perform such additional work as may be necessary to remedy same<br />

without undue delay and without charge to the COUNTY.<br />

9.4 Acceptance of the work by the COUNTY will not relieve the CONSULTANT of<br />

the responsibility for the quality of the work, nor of the CONSULTANT’S<br />

liability for loss or damage to property or persons resulting therefrom.<br />

10.0 SATISFACTORY PERFORMANCE.<br />

10.1 The CONSULTANT'S and sub-consultant's standard of performance under the<br />

terms of this <strong>AG</strong>REEMENT shall be that which the Consultant shall perform in a<br />

manner consistent with that degree of care and skill ordinarily exercised by<br />

5


members of the same profession currently practicing under similar circumstances<br />

commonly accepted in the industry in the Chicago metropolitan area.<br />

11.0 CONFLICT OF INTEREST.<br />

11.1 The CONSULTANT covenants that it has no conflicting public or private interest<br />

and shall not acquire directly or indirectly any such interest which would conflict<br />

in any manner with the performance of CONSULTANT'S services under this<br />

<strong>AG</strong>REEMENT.<br />

11.2 The CONSULTANT, by its signature on this <strong>AG</strong>REEMENT, certifies that it has<br />

not been barred from being awarded a contract or subcontract under the Illinois<br />

Purchasing Act; and further certifies that it has not been barred from contracting<br />

with a unit of State or Local government as a result of a violation of Section 33E-<br />

3 or 33E-4 of the Illinois Criminal Code (Illinois Compiled Statutes, 1992,<br />

Chapter 720, paragraph 5/33E-3).<br />

12.0 OWNERSHIP OF DOCUMENTS.<br />

12.1 The CONSULTANT agrees that all survey data, reports, drafting, studies,<br />

specifications, estimates, maps, documents and computations prepared by the<br />

CONSULTANT under the terms of this <strong>AG</strong>REEMENT shall be properly<br />

arranged, indexed and delivered to the COUNTY within ninety (90) days of<br />

written request therefor. The CONSULTANT’s obligation hereunder shall survive<br />

the termination of this <strong>AG</strong>REEMENT.<br />

12.2 The documents and materials made or maintained under this <strong>AG</strong>REEMENT shall<br />

be and will remain the property of the COUNTY. The COUNTY shall not reuse<br />

or make any modification to the construction documents without the prior written<br />

authorization of the CONSULTANT. The COUNTY agrees, to the fullest extent<br />

permitted by law, to defend, indemnify and hold harmless the CONSULTANT, its<br />

officers, directors, employees and subconsultants (collectively, CONSULTANT)<br />

against any damages, liabilities or costs, including reasonable attorneys' fees and<br />

defense costs, arising from or allegedly arising from or in any way connected with<br />

the unauthorized reuse or modification of the construction documents by the<br />

COUNTY or any person or entity that acquires or obtains the construction<br />

documents from or through the COUNTY without the written authorization of the<br />

CONSULTANT..<br />

<strong>13</strong>.0 COMPLIANCE WITH STATE AND OTHER LAWS – PREVA<strong>IL</strong>ING W<strong>AG</strong>E ACT.<br />

<strong>13</strong>.1 The CONSULTANT and any sub-consultants will comply with all State, Federal<br />

and Local statutes, ordinances and regulations; and will obtain all permits as are<br />

applicable.<br />

6


<strong>13</strong>.2 The CONSULTANT and any sub-consultants shall not discriminate against any<br />

worker, job applicant, employee or any member of the public, because of race,<br />

creed, color, sex, age, handicap, or national origin, or otherwise commit an unfair<br />

employment practice.<br />

<strong>13</strong>.3 The CONSULTANT and any sub-consultant(s) shall comply with all applicable<br />

State and Federal Prevailing Rate of Wage Laws, and shall take all steps<br />

necessary to remain in compliance therewith. (See Exhibit “C”)<br />

<strong>13</strong>.4 The CONSULTANT and any subconsultants shall comply with the <strong>Kane</strong> <strong>County</strong><br />

Ethics Ordinance (Article II, Division 3, Section 2-211), (See Exhibit “D”).<br />

14.0 MODIFICATION OR AMENDMENT.<br />

14.1 The terms of this <strong>AG</strong>REEMENT may only be modified or amended by a written<br />

document duly executed by both PARTIES.<br />

15.0 TERM OF THIS <strong>AG</strong>REEMENT.<br />

15.1 The term of this <strong>AG</strong>REEMENT shall begin on the date this <strong>AG</strong>REEMENT is<br />

fully executed and shall continue in full force and effect until the earlier of the<br />

following occurs:<br />

A. The PARTY’S termination of this <strong>AG</strong>REEMENT in accordance with the<br />

terms of Section 16.0; or,<br />

B. Upon the 548 th day after receipt by the CONSULTANT of the Notice to<br />

Proceed from the <strong>Kane</strong> <strong>County</strong> Engineer on behalf of the COUNTY. (The<br />

fee payable to the CONSULTANT for services rendered shall be for 548<br />

calendar days during the periods from June 20<strong>13</strong> to November 2014 as set<br />

forth on Exhibit A attached hereto).<br />

15.2 In the event the required calendar days as stated in Section 15.1 B above are<br />

exceeded and/or anticipated personnel requirements are not adequate and<br />

remaining funds are not sufficient to complete the PROJECT, adjustments in total<br />

compensation to the CONSULTANT may, at the sole option of the COUNTY be<br />

determined through negotiation between the COUNTY and the CONSULTANT.<br />

The COUNTY shall however, have no obligation to agree to any adjustment in<br />

total compensation or in the term of this <strong>AG</strong>REEMENT.<br />

15.3 The date of the first calendar day for this <strong>AG</strong>REEMENT shall be the date of<br />

receipt of the Notice to Proceed by the CONSULTANT from the COUNTY. In<br />

the event the PROJECT work is suspended by the COUNTY as recorded on the<br />

"Report of Starting and Completion Date," the calendar days for this<br />

<strong>AG</strong>REEMENT will also be suspended for a like amount of time.<br />

15.4 Notwithstanding anything in Section 15.0 to the contrary, the <strong>Kane</strong> <strong>County</strong><br />

Engineer may at his sole option, upon the request of the CONSULTANT, extend<br />

7


the term of this <strong>AG</strong>REEMENT for a period of time up to but not exceeding two,<br />

one-year periods.<br />

16.0 TERMINATION ON WRITTEN NOTICE.<br />

16.1 Except as otherwise set forth in this <strong>AG</strong>REEMENT, the CONSULTANT shall<br />

have the right to terminate this <strong>AG</strong>REEMENT for cause upon serving sixty (60)<br />

days written notice upon the COUNTY.<br />

16.2 The COUNTY may terminate this <strong>AG</strong>REEMENT at any time for any reason upon<br />

written notice to the CONSULTANT.<br />

16.3 Upon termination of this <strong>AG</strong>REEMENT, the obligations of the PARTIES to this<br />

<strong>AG</strong>REEMENT shall cease, but they shall not be relieved of the duty to perform<br />

their obligations up to the date of termination. Notwithstanding anything in this<br />

<strong>AG</strong>REEMENT to the contrary however, the obligations of the CONSULTANT to<br />

indemnify and hold harmless the COUNTY as provided for in Section 9.0 of the<br />

<strong>AG</strong>REEMENT shall survive the termination of this <strong>AG</strong>REEMENT.<br />

16.4 Upon termination of this <strong>AG</strong>REEMENT, all data, work products, reports and<br />

documents produced, as a result of this <strong>AG</strong>REEMENT shall become the property<br />

of the COUNTY.<br />

17.0 ENTIRE <strong>AG</strong>REEMENT.<br />

17.1 This <strong>AG</strong>REEMENT contains the entire agreement and understandings between<br />

the PARTIES.<br />

17.2 There are no other covenants, promises, conditions or understandings, either oral<br />

or written, other than those contained herein.<br />

18.0 NON-ASSIGNMENT.<br />

18.1 This <strong>AG</strong>REEMENT shall not be assigned by a PARTY without prior written<br />

approval of the other PARTY.<br />

19.0 SEVERAB<strong>IL</strong>ITY.<br />

19.1 In the event any provision of this <strong>AG</strong>REEMENT is held to be unenforceable for<br />

any reason, the enforceability thereof shall not affect the remainder of the<br />

<strong>AG</strong>REEMENT, which will remain in full force and effect and enforceability in<br />

accordance with its terms.<br />

20.0 GOVERNING LAW.<br />

20.1 This <strong>AG</strong>REEMENT shall be governed by the laws of the State of Illinois both as<br />

to interpretation and performance.<br />

8


20.2 Venue for any dispute arising hereunder shall be in the Circuit Court of the<br />

Sixteenth Judicial Circuit, <strong>Kane</strong> <strong>County</strong>, Illinois.<br />

21.0 NOTICE.<br />

Any required notice shall be sent to the following addresses and party:<br />

KANE COUNTY DIVISION OF TRANSPORTATION<br />

41W011 Burlington Road<br />

Saint Charles, <strong>IL</strong> 60175<br />

Attn.: Carl Schoedel, P.E., <strong>Kane</strong> <strong>County</strong> Engineer<br />

HDR ENGINEERING, INC.<br />

8550 West Bryn Mawr Avenue Suite 900<br />

Chicago, Illinois 60631<br />

Attn.: Patrick J. Pechnick<br />

IN WITNESS WHEREOF, the parties set their hands and seals as of the date first written above.<br />

COUNTY OF KANE<br />

_____________________________<br />

Christopher J. Lauzen<br />

CHAIRMAN, KANE COUNTY BOARD<br />

ATTEST:<br />

_____________________________<br />

JOHN A. CUNNINGHAM<br />

KANE COUNTY CLERK<br />

(Seal)<br />

9<br />

HDR ENGINEERING, INC.<br />

_______________________________<br />

By: Patrick J. Pechnick<br />

VICE PRESIDENT<br />

ATTEST:<br />

________________________________<br />

By: Aniko Filo<br />

PROJECT CONTROLLER


EXHIBIT “C”<br />

PREVA<strong>IL</strong>ING W<strong>AG</strong>E RATES<br />

It is the policy of the State of Illinois as declared in the Illinois Prevailing Wage Act (820 <strong>IL</strong>CS<br />

<strong>13</strong>0/1 et seq.) “that a wage of no less than the general prevailing hourly rate as paid for work of a<br />

similar character in the locality in which the work is performed, shall be paid to all laborers,<br />

workers and mechanics employed by or on behalf of any and all public bodies engaged in public<br />

works”.<br />

The CONSULTANT agrees to pay, when applicable, the current Illinois Department of Labor<br />

Prevailing Wage Rates for all <strong>County</strong> of <strong>Kane</strong> projects. Current prevailing wage rates are<br />

available from the Illinois Department of Labor at their website:<br />

http://www.state.il.us/agency/idol/rates/rates.HTM.<br />

Prevailing wage rates are subject to revision monthly. The CONSULTANT acknowledges its<br />

responsibility, for payment of any applicable future adjustment thereof.<br />

The CONSULTANT further acknowledges its responsibility to notify any sub-consultant of the<br />

applicability of the Prevailing Wage Act.<br />

When applicable, the CONSULTANT agrees to provide the <strong>Kane</strong> <strong>County</strong> Division of<br />

Transportation “certified payrolls” as required by the Prevailing Wage Act.<br />

12<br />

______________________________<br />

Company Name<br />

______________________________<br />

Signature of Officer of Company<br />

______________________________<br />

Title<br />

_____________________________<br />

Date


EXHIBIT “D”<br />

CONTRACTOR DISCLOSURE ACKNOWLEDGEMENT<br />

KANE COUNTY CODE, ARTICLE III, DIVISION 3, SECTION 2-211<br />

1. Prior to award, every contractor or vendor who is seeking or who has obtained contracts<br />

or change orders to contracts or two (2) or more individual contracts with <strong>Kane</strong> <strong>County</strong><br />

resulting in an amount greater than Fifteen Thousand Dollars ($15,000) shall disclose to<br />

the <strong>Kane</strong> <strong>County</strong> Purchasing Department, in writing all cumulative campaign<br />

contributions, (which includes multiple candidates) made within the previous twelve (12)<br />

months of awarding of the contract made by that contractor, union, or vendor to any<br />

current officer or countywide elected officer whose office the contract to be awarded will<br />

benefit. Disclosure shall be updated annually during the term of a multi-year contract and<br />

prior to any change order or renewal requiring Board level approval. For purposes of this<br />

disclosure requirement, “contractor or vendor” shall include owners, officers, managers,<br />

insurance brokers, lobbyists, agents, consultants, bond counsel and underwriters counsel,<br />

subcontractors, corporations, partnerships, associations, business trusts, estates, trustees,<br />

and/or beneficiaries under the control of the contracting person, and political action<br />

committees to which the contracting person has made contributions.<br />

2. All contractors and vendors who have obtained or are seeking contracts with <strong>Kane</strong><br />

<strong>County</strong> must disclose the following information which shall be certified and attached to<br />

the application or document. Penalties for knowingly violating disclosure requirements<br />

will potentially result in immediate cancellation of the contract, and possible disbarment<br />

from future <strong>County</strong> contracts:<br />

A. Name, address and percentage of ownership interest of each individual or entity<br />

having a legal or a beneficial interest of more than five percent (5%) in the<br />

applicant. Any entity required by law to file a statement providing substantially<br />

the information required by this paragraph with any other government agency<br />

may file a duplicate of such statement;<br />

B. Names and contact information of their lobbyists, agents and representatives and<br />

all individuals who are or will be having contact with <strong>County</strong> employees or<br />

officials in relation to the contract or bid. This information disclosure must be<br />

updated when any changes to the information occurs.<br />

C. Whenever any interest required to be disclosed in paragraph (a) above is held by<br />

an agent or agents, or a nominee or nominees, the principals for whom such<br />

agents or nominees hold such interest shall also be disclosed. The application of a<br />

spouse or any other party, if constructively controlled by another person, or legal<br />

entity as set forth above, shall state the name and address and percentage of<br />

beneficial interest of such person or entity possessing such constructive control<br />

and the relationship under which such control is being or may be exercised.<br />

Whenever a stock or beneficial interest is held by a corporation or other legal<br />

entity, such shareholder or beneficiary shall also make disclosure as required by<br />

paragraph (a) above.<br />

<strong>13</strong>


D. A statement under oath that the applicant has withheld no disclosures as to<br />

economic interests in the undertaking nor reserved any information, data or plan<br />

as to the intended use or purpose for which it seeks <strong>County</strong> Board or other county<br />

agency action.<br />

3. All disclosures and information shall be current as of the date upon which the application<br />

is presented and shall be maintained current until such time as <strong>Kane</strong> <strong>County</strong> shall take<br />

action on the application. Furthermore, this information shall be maintained in a database<br />

by the Purchasing Department, and made available for public viewing.<br />

4. Notwithstanding any of the above provisions, the <strong>County</strong> Purchasing Department with<br />

respect to contracts awarded may require any such additional information from any<br />

applicant which is reasonably intended to achieve full disclosure relevant to the<br />

application for action by the <strong>County</strong> Board or any other <strong>County</strong> agency.<br />

5. Any failure to comply with the provisions of this section shall render any ordinance,<br />

ordinance amendment, <strong>County</strong> Board approval or other <strong>County</strong> action in behalf of the<br />

applicant failing to comply voidable at the option of the <strong>County</strong> Board or other <strong>County</strong><br />

agency involved upon the recommendation of the <strong>County</strong> Board Chairman or the<br />

majority of the <strong>County</strong> Board.<br />

6. Contractor Disclosure information shall be sent to the <strong>Kane</strong> <strong>County</strong> Purchasing<br />

Department and the <strong>Kane</strong> <strong>County</strong> Division of Transportation at the following address, or<br />

via email, prior to Transportation Committee of the <strong>Kane</strong> <strong>County</strong> Board:<br />

<strong>Kane</strong> <strong>County</strong> Government Center<br />

Purchasing Department, Bldg A<br />

719 S. Batavia Ave. Geneva, <strong>IL</strong> 60<strong>13</strong>4<br />

purchasing@countyofkane.org<br />

<strong>Kane</strong> <strong>County</strong> Division of Transportation<br />

Linda Haines<br />

41W011 Burlington Road<br />

St. Charles, <strong>IL</strong> 60175<br />

haineslinda@countyofkane.org<br />

Company Name: HDR ENGINEERING, INC.<br />

Contact Person: Patrick J. Pechnick<br />

Address: 8550 West Bryn Mawr Avenue, Suite 900<br />

City: Chicago<br />

State: Illinois<br />

Zip Code: 60631<br />

Phone: 773-380-7900<br />

14


.<br />

31<br />

!( 25<br />

0 485 970 1,940 2,910 3,880<br />

Feet<br />

Montgomery Rd.<br />

0 1 Miles<br />

Road Improvements<br />

Section Number <strong>13</strong>-00127-00-WR<br />

Montgomery Road Corridor<br />

29 4Û<br />

M:\dotserver2\USERS\Committee\20<strong>13</strong>02 February\Implementation\Design\Montgomery Road\Map Standard_Montgomery Rd loc map<br />

Hill Ave.<br />

New Y<br />

Legend<br />

467 34<br />

§¨¦ 88<br />

£¤ 30<br />

!( 31<br />

Hampshire Rutland Dundee<br />

Burlington<br />

Virgil<br />

Plato<br />

Elgin<br />

Campton Saint Charles<br />

Geneva<br />

<strong>Kane</strong>ville Blackberry<br />

Batavia<br />

Big Rock Sugar Grove Aurora<br />

Interstates<br />

US Roads<br />

State Roads<br />

<strong>County</strong> Roads<br />

Other Roads<br />

Rail Roads<br />

<strong>County</strong> Boundry<br />

Township Boundry<br />

Fox River<br />

Forest Preserves<br />

Municipalities<br />

/<br />

5t


.<br />

31<br />

!( 25<br />

0 485 970 1,940 2,910 3,880<br />

Feet<br />

Montgomery Rd.<br />

0 1 Miles<br />

Road Improvements<br />

Section Number <strong>13</strong>-00127-00-WR<br />

Montgomery Road Corridor<br />

4Û 29<br />

M:\dotserver2\USERS\Committee\20<strong>13</strong>02 February\Implementation\Design\Montgomery Road\Map Standard Aerial_Montgomery Rd loc map<br />

Hill Ave.<br />

New Y<br />

Legend<br />

467 34<br />

§¨¦ 88<br />

£¤ 30<br />

!( 31<br />

Hampshire Rutland Dundee<br />

Burlington<br />

Virgil<br />

Plato<br />

Elgin<br />

Campton Saint Charles<br />

Geneva<br />

<strong>Kane</strong>ville Blackberry<br />

Batavia<br />

Big Rock Sugar Grove Aurora<br />

Interstates<br />

US Roads<br />

State Roads<br />

<strong>County</strong> Roads<br />

Other Roads<br />

Rail Roads<br />

<strong>County</strong> Boundry<br />

Township Boundry<br />

Fox River<br />

Forest Preserves<br />

Municipalities<br />

/<br />

5t


If not budgeted,<br />

explain funding<br />

source<br />

<strong>AG</strong>ENDA ITEM EXECUTIVE SUMMARY Agenda Item #<br />

Presenter/Sponsor:<br />

Name<br />

Budget Information: Was this item budgeted?<br />

SUMMARY:<br />

Attachments:<br />

Detailed information available from :<br />

Resolution/Ordinance Tracking:<br />

Staff Name:<br />

Appropriation Amount:<br />

Steve Coffinbargar, Assistant Director Phone: 630-406-7170<br />

Assigned Committee: Transportation Sent to: Executive<br />

on: 04/11/20<strong>13</strong><br />

If Other, specify:<br />

Committee Remarks:<br />

<strong>County</strong> Board Date:<br />

Resolution<br />

Ordinance<br />

Yes<br />

No N/A<br />

Next Committee: Executive Sent to: <strong>County</strong> Board on: 05/08/20<strong>13</strong><br />

If Other, specify:<br />

Committee Remarks:<br />

Next Committee: Sent to: on:<br />

Committee Remarks:<br />

8B-2a<br />

Approving a Phase I Engineering Services Agreement with Strand Associates, Inc. for<br />

Kirk Road over the Union Pacific Railroad, <strong>Kane</strong> <strong>County</strong> Section No. 12-00192-04-BR<br />

Steve Coffinbargar - Assistant Director of Transportation<br />

$838,967.46<br />

The Kirk Road over the Union Pacific Railroad bridge was constructed in 1973. The bridge has a total length of nearly 1,400';<br />

comprised of 18 spans. The bridge is a concrete deck constructed on steel beams. It received a new wearing surface in 1987<br />

and new expansion joints plus various other repairs in 2003. Recent inspections have determined that the bridge is eligible<br />

for federal funds (STP-Bridge) for rehabilitation. Work will consist of removal and replacement of the bridge deck and<br />

related repairs.<br />

The phase I engineering process will consider maintaining the structure in its current configuration, widening on the<br />

existing substructure, widening the substructure and deck, and finally widening and shortening the overall bridge length.<br />

Any widening would be considered to meet projected future traffic needs within the Kirk Road corridor.<br />

Staff utilized the qualifications based consultant selection process in order to select Strand Associates, Inc. The negotiated<br />

contract is for an amount to not exceed $838,967.46. Information on the QBS process and selection details can be found on<br />

the <strong>KDOT</strong> website.<br />

Resolution, Engineering Agreement, Location Maps<br />

05/14/20<strong>13</strong>


STATE OF <strong>IL</strong>LINOIS<br />

COUNTY OF KANE<br />

RESOLUTION NO. <strong>13</strong> -<br />

APPROVING A PHASE I ENGINEERING SERVICES <strong>AG</strong>REEMENT<br />

WITH STRAND ASSOCIATES, INC. FOR<br />

KIRK ROAD OVER THE UNION PACIFIC RA<strong>IL</strong>ROAD<br />

KANE COUNTY SECTION NO. 12-00192-04-BR<br />

WHEREAS, Phase I Engineering services are needed for the proposed improvement of <strong>Kane</strong><br />

<strong>County</strong> Highway No. 77 (also known as Kirk Road) Bridge over the Union Pacific Railroad tracks<br />

(herein referred to as the “Improvement”); and<br />

WHEREAS, in order to accomplish the Improvement, it is necessary to retain the services of a<br />

professional engineering firm to provide Phase I Engineering services therefor; and<br />

WHEREAS, Strand Associates, Inc., 1170 South Houbolt Road, Joliet, <strong>IL</strong> 60431 has experience<br />

and professional expertise in Phase I Engineering and is willing to perform the required services for an<br />

amount not to exceed Eight Hundred Thirty Eight Thousand Nine Hundred Sixty Seven and 46/100<br />

Dollars ($838,967.46) as set forth in the Phase I Engineering services agreement (a copy of which is on<br />

file with the <strong>County</strong> Clerk’s Office).<br />

NOW, THEREFORE, BE IT RESOLVED by the <strong>Kane</strong> <strong>County</strong> Board that the Chairman thereof<br />

is hereby authorized to execute a Phase I Engineering services agreement with Strand Associates.<br />

BE IT FURTHER RESOLVED that the <strong>Kane</strong> <strong>County</strong> Board appropriates the not to exceed sum<br />

of Eight Hundred Thirty Eight Thousand Nine Hundred Sixty Seven and 46/100 Dollars ($838,967.46)<br />

from Transportation Sales Tax Fund #305, Line Item #50140 (Engineering) to pay for said Phase I<br />

Engineering services for the Improvement with approximately eighty percent (80%) thereof to be<br />

reimbursed to the <strong>County</strong> from federal funds.<br />

Line Item Line Item Description Was<br />

personnel/item/service<br />

approved in original<br />

budget or a subsequent<br />

budget revision?<br />

Are funds currently<br />

available for this<br />

personnel/item/service in<br />

the specific line item?<br />

305.520.527.50140 Engineering Services Yes Yes<br />

If funds are not<br />

currently available in<br />

the specified line item,<br />

where are the funds<br />

available?


Passed by the <strong>Kane</strong> <strong>County</strong> Board on May 14, 20<strong>13</strong>.<br />

Page 2 of 2, Res. #<strong>13</strong>-<br />

______________________________________ ___________________________________<br />

John A. Cunningham Christopher J. Lauzen<br />

Clerk, <strong>County</strong> Board Chairman, <strong>County</strong> Board<br />

<strong>Kane</strong> <strong>County</strong>, Illinois <strong>Kane</strong> <strong>County</strong>, Illinois<br />

Vote:<br />

Yes _____<br />

No _____<br />

Voice _____<br />

Abstentions _____<br />

5KRKOVERUPRRPHI-STRAND.4LH


Local Agency<br />

<strong>Kane</strong> <strong>County</strong><br />

<strong>County</strong><br />

<strong>Kane</strong><br />

Section<br />

12-00192-04-BR<br />

Project No.<br />

BROS-4003(164)<br />

Job No.<br />

TBD<br />

Contact Name/Phone/E-mail Address<br />

Michael Zakosek, P.E.<br />

630/406-7346<br />

zakosekmike@co.kane.il.us<br />

L<br />

O<br />

C<br />

A<br />

L<br />

A<br />

G<br />

E<br />

N<br />

C<br />

Y<br />

Preliminary Engineering<br />

Services Agreement<br />

For<br />

Federal Participation<br />

Page 1 of 5 BLR 05610 (Rev. 9/06)<br />

Printed on 3/31/20<strong>13</strong> 11:04:06 AM<br />

C<br />

O<br />

N<br />

S<br />

U<br />

L<br />

T<br />

A<br />

N<br />

T<br />

Consultant<br />

Strand Associates, Inc.<br />

Address<br />

1170 Houbolt Road<br />

City<br />

Joliet<br />

State<br />

<strong>IL</strong><br />

Zip Code<br />

60431<br />

Contact Name/Phone/E-mail Address<br />

Anthony Standish, P.E., S.E.<br />

815/744-4200<br />

tony.standish@strand.com<br />

THIS <strong>AG</strong>REEMENT is made and entered into this day of , between the above<br />

Local Agency (LA) and Consultant (ENGINEER) and covers certain professional engineering services in connection with the PROJECT.<br />

Federal-aid funds allotted to the LA by the state of Illinois under the general supervision of the Illinois Department of Transportation<br />

(STATE) will be used entirely or in part to finance engineering services as described under <strong>AG</strong>REEMENT PROVISIONS.<br />

Project Description<br />

Name Kirk Road Route CH 77 Length 0.50 mi. Structure No. 045-3096<br />

Termini Over the Union Pacific RR<br />

Description Phase I Engineering for bridge rehabilitation project<br />

I. THE ENGINEER <strong>AG</strong>REES,<br />

1.<br />

2.<br />

Agreement Provisions<br />

To perform or be responsible for the performance, in accordance with STATE approved design standards and policies, of<br />

engineering services for the LA for the proposed improvement herein described.<br />

To attend any and all meetings and visit the site of the proposed improvement at any reasonable time when requested by<br />

representatives of the LA or STATE.<br />

3. To complete the services herein described within 730 calendar days from the date of the Notice to Proceed from the<br />

LA, excluding from consideration periods of delay caused by circumstances beyond the control of the ENGINEER. (See Exhibit C)<br />

4. The classifications of the employees used in the work should be consistent with the employee classifications and estimated manhours<br />

shown in EXHIBIT A. If higher-salaried personnel of the firm, including the Principal Engineer, perform services that are<br />

indicated in Exhibit A to be performed by lesser-salaried personnel, the wage rate billed for such services shall be commensurate<br />

with the payroll rate for the work performed.<br />

5. That the ENGINEER is qualified technically and is entirely conversant with the design standards and policies applicable for the<br />

PROJECT; and that the ENGINEER has sufficient properly trained, organized and experienced personnel to perform the services<br />

enumerated herein.<br />

6. That the ENGINEER shall be responsible for the accuracy of the work and shall promptly make necessary revisions or corrections<br />

resulting from the ENGINEER’s errors, omissions or negligent acts without additional compensation. Acceptance of work by the<br />

STATE will not relieve the ENGINEER of the responsibility to make subsequent correction of any such errors or omissions or for<br />

clarification of any ambiguities.<br />

7. That all plans and other documents furnished by the ENGINEER pursuant to this <strong>AG</strong>REEMENT will be endorsed by the ENGINEER<br />

and will affix the ENGINEER’s professional seal when such seal is required by law. Plans for structures to be built as a part of the<br />

improvement will be prepared under the supervision of a registered structural engineer and will affix structural engineer seal when<br />

such seal is required by law. It will be the ENGINEER’s responsibility to affix the proper seal as required by the Bureau of Local<br />

Roads and Streets manual published by the STATE.<br />

8. That the ENGINEER will comply with applicable federal statutes, state of Illinois statutes, and local laws or ordinances of the LA.


9. The undersigned certifies neither the ENGINEER nor I have:<br />

a. employed or retained for commission, percentage, brokerage, contingent fee or other considerations, any firm or person (other<br />

than a bona fide employee working solely for me or the above ENGINEER) to solicit or secure this <strong>AG</strong>REEMENT,<br />

b. agreed, as an express or implied condition for obtaining this <strong>AG</strong>REEMENT, to employ or retain the services of any firm or<br />

person in connection with carrying out the <strong>AG</strong>REEMENT or<br />

c. paid, or agreed to pay any firm, organization or person (other than a bona fide employee working solely for me or the above<br />

ENGINEER) any fee, contribution, donation or consideration of any kind for, or in connection with, procuring or carrying out the<br />

<strong>AG</strong>REEMENT.<br />

d. are not presently debarred, suspended, proposed for debarment, declared ineligible or voluntarily excluded from covered<br />

transactions by any Federal department or agency,<br />

e. have not within a three-year period preceding the <strong>AG</strong>REEMENT been convicted of or had a civil judgment rendered against<br />

them for commission of fraud or criminal offense in connection with obtaining, attempting to obtain or performing a public<br />

(Federal, State or local) transaction; violation of Federal or State antitrust statutes or commission of embezzlement, theft,<br />

forgery, bribery, falsification or destruction of records, making false statements or receiving stolen property,<br />

f. are not presently indicted for or otherwise criminally or civilly charged by a government entity (Federal, State or local) with<br />

commission of any of the offenses enumerated in paragraph (e) and<br />

g. have not within a three-year period preceding this <strong>AG</strong>REEMENT had one or more public transactions (Federal, State or local)<br />

terminated for cause or default.<br />

10. To pay its subconsultants for satisfactory performance no later than 30 days from receipt of each payment from the LA.<br />

11. To submit all invoices to the LA within one year of the completion of the work called for in this <strong>AG</strong>REEMENT or any subsequent<br />

Amendment or Supplement.<br />

12. To submit BLR 056<strong>13</strong>, Engineering Payment Report, to the STATE upon completion of the project (Exhibit B).<br />

<strong>13</strong>. Scope of Services to be provided by the ENGINEER: See Exhibit D for Scope clarification.<br />

Make such detailed surveys as are necessary for the planning and design of the PROJECT.<br />

Make stream and flood plain hydraulic surveys and gather both existing bridge upstream and downstream high water data and<br />

flood flow histories.<br />

Prepare applications for U.S. Army Corps of Engineers Permit, Illinois Department of Natural Resources Office of Water<br />

Resources Permit and Illinois Environmental Protection Agency Section 404 Water Quality Certification.<br />

Design and/or approve cofferdams and superstructure shop drawings.<br />

Prepare Bridge Condition Report and Preliminary Bridge Design and Hydraulic Report, (including economic analysis of bridge or<br />

culvert types and high water effects on roadway overflows and bridge approaches).<br />

Prepare the necessary environmental and planning documents including the Project Development Report, Environmental Class of<br />

Action Determination or Environmental Assessment, State Clearinghouse, Substate Clearinghouse and all necessary<br />

environmental clearances.<br />

Make such soil surveys or subsurface investigations including borings and soil profiles as may be required to furnish sufficient data<br />

for the design of the proposed improvement. Such investigations to be made in accordance with the current Standard<br />

Specifications for Road and Bridge Construction, Bureau of Local Roads and Streets Administrative Policies, Federal-Aid<br />

Procedures for Local Highway Improvements or any other applicable requirements of the STATE.<br />

Analyze and evaluate the soil surveys and structure borings to determine the roadway structural design and bridge foundation.<br />

Prepare preliminary roadway and drainage structure plans and meet with representatives of the LA and STATE at the site of the<br />

improvement for review of plans prior to the establishment of final vertical and horizontal alignment, location and size of drainage<br />

structures, and compliance with applicable design requirements and policies.<br />

Make or cause to be made such traffic studies and counts and special intersection studies as may be required to furnish sufficient<br />

data for the design of the proposed improvement.<br />

Complete the general and detailed plans, special provisions and estimate of cost. Contract plans shall be prepared in accordance<br />

with the guidelines contained in the Bureau of Local Roads and Streets manual. The special provisions and detailed estimate of<br />

cost shall be furnished in quadruplicate.<br />

Furnish the LA with survey and drafts in quadruplicate all necessary right-of-way dedications, construction easements and borrow<br />

pit and channel change agreements including prints of the corresponding plats and staking as required.<br />

Page 2 of 5 BLR 05610 (Rev. 9/06)<br />

Printed on 3/31/20<strong>13</strong> 11:04:06 AM


II. THE LA <strong>AG</strong>REES,<br />

1. To furnish the ENGINEER all presently available survey data and information<br />

2. To pay the ENGINEER as compensation for all services rendered in accordance with this <strong>AG</strong>REEMENT, on the basis of the<br />

following compensation formulas:<br />

Cost Plus Fixed Fee CPFF = 14.5%[DL + R(DL) + OH(DL) + IHDC], or<br />

CPFF = 14.5%[DL + R(DL) + 1.4(DL) + IHDC], or<br />

CPFF = 14.5%[(2.3 + R)DL + IHDC]<br />

Specific Rate (Pay per element)<br />

Lump Sum<br />

Where: DL = Direct Labor<br />

IHDC = In House Direct Costs<br />

OH = Consultant Firm’s Actual Overhead Factor<br />

R = Complexity Factor<br />

3. To pay the ENGINEER using one of the following methods as required by 49 CFR part 26 and 605 <strong>IL</strong>CS 5/5-409:<br />

With Retainage<br />

a) For the first 50% of completed work, and upon receipt of monthly invoices from the ENGINEER and the approval thereof by<br />

the LA, monthly payments for the work performed shall be due and payable to the ENGINEER, such payments to be equal to<br />

90% of the value of the partially completed work minus all previous partial payments made to the ENGINEER.<br />

b) After 50% of the work are completed, and upon receipt of monthly invoices from the ENGINEER and the approval thereof by<br />

the LA, monthly payments covering work performed shall be due and payable to the ENGINEER, such payments to be equal to<br />

95% of the value of the partially completed work minus all previous partial payments made to the ENGINEER.<br />

c) Final Payment – Upon approval of the work by the LA but not later than 60 days after the work is completed and reports have<br />

been made and accepted by the LA and the STATE, a sum of money equal to the basic fee as determined in this<br />

<strong>AG</strong>REEMENT less the total of the amounts of partial payments previously paid to the ENGINEER shall be due and payable to<br />

the ENGINEER.<br />

Without Retainage<br />

a) For progressive payments – Upon receipt of monthly invoices from the ENGINEER and the approval thereof by the LA,<br />

monthly payments for the work performed shall be due and payable to the ENGINEER, such payments to be equal to the value<br />

of the partially completed work minus all previous partial payments made to the ENGINEER.<br />

b) Final Payment – Upon approval of the workby the LA but not later than 60 days after the work is completed and reports have<br />

been made and accepted by the LA and STATE, a sum o money equal to the basic fee as determined in this <strong>AG</strong>REEMENT<br />

less the total of the amounts of partial payments previously paid to the ENGINEER shall be due and payable to the ENGINEER.<br />

4. The recipient shall not discriminate on the basis of race, color, national origin or sex in the award and performance of any DOTassisted<br />

contract or in the administration of its DBE program or the requirements of 49 CFR part 26. The recipient shall take all<br />

necessary and reasonable steps under 49 CFR part 26 to ensure nondiscrimination in the award and administration of DOT-assisted<br />

contracts. The recipient’s DBE program, as required by 49 CFR part 26 and as approved by DOT, is incorporated by reference in<br />

this agreement. Implementation of this program is a legal obligation and failure to carry out its terms shall be treated as violation of<br />

this agreement. Upon notification to the recipient of its failure to carry out its approved program, the Department may impose<br />

sanctions as provided for under part 26 and may, in appropriate cases, refer the matter for enforcement under 18 U.S.C. 1001 and/or<br />

the Program Fraud Civil Remedies Act of 1986 (31U.S.C. 3801 et seq.).<br />

III. IT IS MUTALLY <strong>AG</strong>REED,<br />

1. That no work shall be commenced by the ENGINEER prior to issuance by the LA of a written Notice to Proceed.<br />

2. That tracings, plans, specifications, estimates, maps and other documents prepared by the ENGINEER in accordance with this<br />

<strong>AG</strong>REEMENT shall be delivered to and become the property of the LA and that basic survey notes, sketches, charts and other data<br />

prepared or obtained in accordance with this <strong>AG</strong>REEMENT shall be made available, upon request, to the LA or to the STATE,<br />

without restriction or limitation as to their use.<br />

Page 3 of 5 BLR 05610 (Rev. 9/06)<br />

Printed on 3/31/20<strong>13</strong> 11:04:06 AM


3. That all reports, plans, estimates and special provisions furnished by the ENGINEER shall be in accordance with the current<br />

Standard Specifications for Road and Bridge Construction, Bureau of Local Roads and Streets Administrative Policies, Federal-Aid<br />

Procedures for Local Highway Improvements or any other applicable requirements of the STATE, it being understood that all such<br />

furnished documents shall be approved by the LA and the STATE before final acceptance. During the performance of the<br />

engineering services herein provided for, the ENGINEER shall be responsible for any loss or damage to the documents herein<br />

enumerated while they are in the ENGINEER’s possession and any such loss or damage shall be restored at the ENGINEER’s<br />

expense.<br />

4. That none of the services to be furnished by the ENGINEER shall be sublet, assigned or transferred to any other party or parties<br />

without written consent of the LA. The consent to sublet, assign or otherwise transfer any portion of the services to be furnished by<br />

the ENGINEER shall not be construed to relieve the ENGINEER of any responsibility for the fulfillment of this agreement.<br />

5. To maintain, for a minimum of 3 years after the completion of the contract, adequate books, records and supporting documents to<br />

verify the amounts, recipients and uses of all disbursements of funds passing in conjunction with the contract; the contract and all<br />

books, records and supporting documents related to the contract shall be available for review and audit by the Auditor General and<br />

the STATE; and to provide full access to all relevant materials. Failure to maintain the books, records and supporting documents<br />

required by this section shall establish a presumption in favor of the STATE for the recovery of any funds paid by the STATE under<br />

the contract for which adequate books, records and supporting documentation are not available to support their purported<br />

disbursement.<br />

6. The payment by the LA in accordance with numbered paragraph 3 of Section II will be considered payment in full for all services<br />

rendered in accordance with this <strong>AG</strong>REEMENT whether or not they be actually enumerated in this <strong>AG</strong>REEMENT.<br />

7. That the ENGINEER shall be responsible for any and all damages to property or persons arising out of an error, omission and/or<br />

negligent act in the prosecution of the ENGINEER’s work and shall indemnify and save harmless the LA, the STATE, and their<br />

officers, agents and employees from all suits, claims, actions or damages of any nature whatsoever resulting there from. These<br />

indemnities shall not be limited by the listing of any insurance policy.<br />

8. This <strong>AG</strong>REEMENT may be terminated by the LA upon giving notice in writing to the ENGINEER at the ENGINEER’s last known post<br />

office address. Upon such termination, the ENGINEER shall cause to be delivered to the LA all drawings, plats, surveys, reports,<br />

permits, agreements, soils and foundation analysis, provisions, specifications, partial and completed estimates and data, if any from<br />

soil survey and subsurface investigation with the understanding that all such material becomes the property of the LA. The LA will be<br />

responsible for reimbursement of all eligible expenses to date of the written notice of termination.<br />

9. This certification is required by the Drug Free Workplace Act (30<strong>IL</strong>CS 580). The Drug Free Workplace Act requires that no grantee<br />

or contractor shall receive a grant or be considered for the purpose of being awarded a contract for the procurement of any property<br />

or service from the State unless that grantee or contractor will provide a drug free workplace. False certification or violation of the<br />

certification may result in sanctions including, but not limited to, suspension of contract or grant payments, termination of a contract or<br />

grant and debarment of the contracting or grant opportunities with the State for at least one (1) year but no more than five (5) years.<br />

For the purpose of this certification, “grantee” or “contractor” means a corporation, partnership or other entity with twenty-five (25) or<br />

more employees at the time of issuing the grant, or a department, division or other unit thereof, directly responsible for the specific<br />

performance under a contract or grant of $5,000 or more from the State, as defined in the Act.<br />

The contractor/grantee certifies and agrees that it will provide a drug free workplace by:<br />

a. Publishing a statement:<br />

(1) Notifying employees that the unlawful manufacture, distribution, dispensing, possession or use of a controlled substance,<br />

including cannabis, is prohibited in the grantee’s or contractor’s workplace.<br />

(2) Specifying the actions that will be taken against employees for violations of such prohibition.<br />

(3) Notifying the employee that, as a condition of employment on such contract or grant, the employee will:<br />

(a) abide by the terms of the statement; and<br />

(b) notify the employer of any criminal drug statute conviction for a violation occurring in the workplace no later than five (5)<br />

days after such conviction.<br />

b. Establishing a drug free awareness program to inform employees about:<br />

(1) The dangers of drug abuse in the workplace;<br />

(2) The grantee’s or contractor’s policy of maintaining a drug free workplace;<br />

(3) Any available drug counseling, rehabilitation and employee assistance program; and<br />

(4) The penalties that may be imposed upon an employee for drug violations.<br />

c. Providing a copy of the statement required by subparagraph (a) to each employee engaged in the performance of the contract or<br />

grant and to post the statement in a prominent place in the workplace.<br />

d. Notifying the contracting or granting agency within ten (10) days after receiving notice under part (B) of paragraph (3) of<br />

subsection (a) above from an employee or otherwise receiving actual notice of such conviction.<br />

e. Imposing a sanction on, or requiring the satisfactory participation in a drug abuse assistance or rehabilitation program by,<br />

f. Assisting employees in selecting a course of action in the event drug counseling, treatment and rehabilitation is required and<br />

indicating that a trained referral team is in place.<br />

g. Making a good faith effort to continue to maintain a drug free workplace through implementation of the Drug Free Workplace Act.<br />

Page 4 of 5 BLR 05610 (Rev. 9/06)<br />

Printed on 3/31/20<strong>13</strong> 11:04:06 AM


10. The ENGINEER or subconsultant shall not discriminate on the basis of race, color, national origin or sex in the performance of this<br />

<strong>AG</strong>REEMENT. The ENGINEER shall carry out applicable requirements of 49 CFR part 26 in the administration of DOT assisted<br />

contracts. Failure by the ENGINEER to carry out these requirements is a material breach of this <strong>AG</strong>REEMENT, which may result in<br />

the termination of this <strong>AG</strong>REEMENT or such other remedy as the LA deems appropriate.<br />

Agreement Summary<br />

Prime Consultant: TIN Number Agreement Amount<br />

Strand Associates, Inc. 39-1020418 $595,520.06<br />

Sub-Consultants: TIN Number Agreement Amount<br />

Images, Inc. 45-0482737 $23,510.72<br />

Hampton, Lenzini, and Renwick 36-2555986 $91,936.68<br />

Testing Service Corporation 35-0937582 $128,000.00<br />

Executed by the LA: <strong>Kane</strong> <strong>County</strong><br />

ATTEST:<br />

By: By:<br />

Sub-Consultant Total: $243,447.40<br />

Prime Consultant Total: $595,520.06<br />

Total for all work: $838,967.46<br />

(Municipality/Township/<strong>County</strong>)<br />

<strong>Kane</strong> <strong>County</strong> Clerk Title: <strong>Kane</strong> <strong>County</strong> Board Chairman<br />

(SEAL)<br />

Executed by the ENGINEER:<br />

ATTEST: Strand Associates, Inc. ®<br />

By: By:<br />

Title: Title: Corporate Secretary<br />

Page 5 of 5 BLR 05610 (Rev. 9/06)<br />

Printed on 3/31/20<strong>13</strong> 11:04:06 AM


Exhibit A - Preliminary Engineering<br />

Route:<br />

Local Agency: *Firm’s approved rates on file with IDOT’S<br />

(Municipality/Township/<strong>County</strong>) Bureau of Accounting and Auditing:<br />

Section:<br />

Project: Overhead Rate (OH) 0.00 %<br />

Job No.: Complexity Factor (R) 0.00<br />

Calendar Days<br />

Method of Compensation:<br />

Cost Plus Fixed Fee 1 14.5%[DL + R(DL) + OH(DL) + IHDC]<br />

Cost Plus Fixed Fee 2 14.5%[DL + R(DL) + 1.4(DL) + IHDC]<br />

Cost Plus Fixed Fee 3 14.5%[(2.3 + R)DL + IHDC]<br />

Specific Rate<br />

Lump Sum<br />

Element of Work<br />

Employee<br />

Classification<br />

Man-<br />

Hours<br />

Totals 0.00<br />

Cost Estimate of Consultant’s Services in Dollars<br />

Payroll<br />

Rate<br />

Payroll<br />

Costs (DL)<br />

Overhead*<br />

SEE ATTACHED EXHIBIT A<br />

Services by<br />

Others<br />

In-House<br />

Direct Costs<br />

(IHDC)<br />

Profit Total<br />

Page 6 of 7 BLR 05610 (Rev. 9/06)<br />

Printed on 3/28/20<strong>13</strong> 9:35:21 AM


Prime Consultant<br />

Name Strand Associates, Inc. ®<br />

Address 1170 Houbolt Road, Joliet, <strong>IL</strong> 60431<br />

Telephone (815) 744-4200<br />

TIN Number 39-1020418<br />

Project Information<br />

Local Agency <strong>Kane</strong> <strong>County</strong><br />

Section Number 12-00192-04-BR<br />

Project Number BROS-4003(164)<br />

Job Number TBD<br />

Exhibit B<br />

Engineering Payment Report<br />

This form is to verify the amount paid to the Sub-consultant on the above captioned contract. Under penalty of law for<br />

perjury or falsification, the undersigned certifies that work was executed by the Sub-consultant for the amount listed below.<br />

Sub-Consultant Name<br />

TIN Number Actual Payment<br />

from Prime<br />

Hampton, Lenzini, and Renwick 36-2555986<br />

Images, Inc. 45-0482737<br />

Testing Service Corporation 35-0937582<br />

Sub-Consultant Total:<br />

Prime Consultant Total:<br />

Total for all Work<br />

Services Completed:<br />

Signature and title of Prime Consultant Date<br />

Note: The Department of Transportation is requesting disclosure of information that is necessary to accomplish the statutory<br />

purpose as outlined under state and federal law. Disclosure of this information is REQUIRED and shall be deemed as<br />

concurring with the payment amount specified above.<br />

Page 7 of 7 BLR 05610 (Rev. 9/06)<br />

Printed on 3/28/20<strong>13</strong> 9:35:21 AM


EXHIBIT “E”<br />

PREVA<strong>IL</strong>ING W<strong>AG</strong>E RATES<br />

It is the policy of the State of Illinois as declared in the Illinois Prevailing Wage Act (820 <strong>IL</strong>CS<br />

<strong>13</strong>0/1 et seq.) “that a wage of no less than the general prevailing hourly rate as paid for work of a<br />

similar character in the locality in which the work is performed, shall be paid to all laborers,<br />

workers and mechanics employed by or on behalf of any and all public bodies engaged in public<br />

works”.<br />

The CONSULTANT agrees to pay, when applicable, the current Illinois Department of Labor<br />

Prevailing Wage Rates for all <strong>County</strong> of <strong>Kane</strong> projects. Current prevailing wage rates are<br />

available from the Illinois Department of Labor at their website:<br />

http://www.state.il.us/agency/idol/rates/rates.HTM.<br />

Prevailing wage rates are subject to revision monthly. The CONSULTANT acknowledges its<br />

responsibility, for payment of any applicable future adjustment thereof.<br />

The CONSULTANT further acknowledges its responsibility to notify any sub-consultant of the<br />

applicability of the Prevailing Wage Act.<br />

When applicable, the CONSULTANT agrees to provide the <strong>Kane</strong> <strong>County</strong> Division of<br />

Transportation “certified payrolls” as required by the Prevailing Wage Act.<br />

______________________________<br />

Company Name<br />

______________________________<br />

Signature of Officer of Company<br />

______________________________<br />

Title<br />

_____________________________<br />

Date


EXHIBIT “F”<br />

CONTRACTOR DISCLOSURE ACKNOWLEDGEMENT<br />

KANE COUNTY CODE, ARTICLE III, DIVISION 3, SECTION 2-211<br />

1. Prior to award, every contractor or vendor who is seeking or who has obtained contracts<br />

or change orders to contracts or two (2) or more individual contracts with <strong>Kane</strong> <strong>County</strong><br />

resulting in an amount greater than Fifteen Thousand Dollars ($15,000) shall disclose to<br />

the <strong>Kane</strong> <strong>County</strong> Purchasing Department, in writing all cumulative campaign<br />

contributions, (which includes multiple candidates) made within the previous twelve (12)<br />

months of awarding of the contract made by that contractor, union, or vendor to any<br />

current officer or countywide elected officer whose office the contract to be awarded will<br />

benefit. Disclosure shall be updated annually during the term of a multi-year contract and<br />

prior to any change order or renewal requiring Board level approval. For purposes of this<br />

disclosure requirement, “contractor or vendor” shall include owners, officers, managers,<br />

insurance brokers, lobbyists, agents, consultants, bond counsel and underwriters counsel,<br />

subcontractors, corporations, partnerships, associations, business trusts, estates, trustees,<br />

and/or beneficiaries under the control of the contracting person, and political action<br />

committees to which the contracting person has made contributions.<br />

2. All contractors and vendors who have obtained or are seeking contracts with <strong>Kane</strong><br />

<strong>County</strong> must disclose the following information which shall be certified and attached to<br />

the application or document. Penalties for knowingly violating disclosure requirements<br />

will potentially result in immediate cancellation of the contract, and possible disbarment<br />

from future <strong>County</strong> contracts:<br />

A. Name, address and percentage of ownership interest of each individual or entity<br />

having a legal or a beneficial interest of more than five percent (5%) in the<br />

applicant. Any entity required by law to file a statement providing substantially<br />

the information required by this paragraph with any other government agency<br />

may file a duplicate of such statement;<br />

B. Names and contact information of their lobbyists, agents and representatives and<br />

all individuals who are or will be having contact with <strong>County</strong> employees or<br />

officials in relation to the contract or bid. This information disclosure must be<br />

updated when any changes to the information occurs.<br />

C. Whenever any interest required to be disclosed in paragraph (a) above is held by<br />

an agent or agents, or a nominee or nominees, the principals for whom such<br />

agents or nominees hold such interest shall also be disclosed. The application of a<br />

spouse or any other party, if constructively controlled by another person, or legal<br />

entity as set forth above, shall state the name and address and percentage of<br />

beneficial interest of such person or entity possessing such constructive control<br />

and the relationship under which such control is being or may be exercised.<br />

Whenever a stock or beneficial interest is held by a corporation or other legal<br />

entity, such shareholder or beneficiary shall also make disclosure as required by<br />

paragraph (a) above.


D. A statement under oath that the applicant has withheld no disclosures as to<br />

economic interests in the undertaking nor reserved any information, data or plan<br />

as to the intended use or purpose for which it seeks <strong>County</strong> Board or other county<br />

agency action.<br />

3. All disclosures and information shall be current as of the date upon which the application<br />

is presented and shall be maintained current until such time as <strong>Kane</strong> <strong>County</strong> shall take<br />

action on the application. Furthermore, this information shall be maintained in a database<br />

by the Purchasing Department, and made available for public viewing.<br />

4. Notwithstanding any of the above provisions, the <strong>County</strong> Purchasing Department with<br />

respect to contracts awarded may require any such additional information from any<br />

applicant which is reasonably intended to achieve full disclosure relevant to the<br />

application for action by the <strong>County</strong> Board or any other <strong>County</strong> agency.<br />

5. Any failure to comply with the provisions of this section shall render any ordinance,<br />

ordinance amendment, <strong>County</strong> Board approval or other <strong>County</strong> action in behalf of the<br />

applicant failing to comply voidable at the option of the <strong>County</strong> Board or other <strong>County</strong><br />

agency involved upon the recommendation of the <strong>County</strong> Board Chairman or the<br />

majority of the <strong>County</strong> Board.<br />

6. Contractor Disclosure information shall be sent to the <strong>Kane</strong> <strong>County</strong> Purchasing<br />

Department and the <strong>Kane</strong> <strong>County</strong> Division of Transportation at the following address, or<br />

via email, prior to Transportation Committee of the <strong>Kane</strong> <strong>County</strong> Board:<br />

Company Name:<br />

Contact Person:<br />

Address:<br />

City:<br />

State:<br />

Zip Code:<br />

Phone:<br />

<strong>Kane</strong> <strong>County</strong> Government Center<br />

Purchasing Department, Bldg A<br />

719 S. Batavia Ave. Geneva, <strong>IL</strong> 60<strong>13</strong>4<br />

purchasing@countyofkane.org<br />

<strong>Kane</strong> <strong>County</strong> Division of Transportation<br />

Linda Haines<br />

41W011 Burlington Road<br />

St. Charles, <strong>IL</strong> 60175<br />

haineslinda@countyofkane.org


If not budgeted,<br />

explain funding<br />

source<br />

<strong>AG</strong>ENDA ITEM EXECUTIVE SUMMARY Agenda Item #<br />

Presenter/Sponsor:<br />

Name<br />

Budget Information: Was this item budgeted?<br />

SUMMARY:<br />

Attachments:<br />

Detailed information available from :<br />

Resolution/Ordinance Tracking:<br />

Staff Name:<br />

Appropriation Amount:<br />

Jan Ward, Chief of Planning/Programming Phone: 630-444-3143<br />

Assigned Committee: Transportation Sent to: Executive<br />

on: 04/11/20<strong>13</strong><br />

If Other, specify:<br />

Committee Remarks:<br />

<strong>County</strong> Board Date:<br />

Resolution<br />

Ordinance<br />

Yes<br />

No N/A<br />

Next Committee: Executive Sent to: <strong>County</strong> Board on: 05/08/20<strong>13</strong><br />

If Other, specify:<br />

Committee Remarks:<br />

Next Committee: Sent to: on:<br />

Committee Remarks:<br />

8B-2b<br />

Approving an Intergovernmental Agreement with the State of Illinois for Phase I<br />

Engineering Services for Kirk Road over the Union Pacific Railroad, <strong>Kane</strong> <strong>County</strong><br />

Section No. 12-00192-04-BR<br />

Steve Coffinbargar - Assistant Director of Transportation<br />

Attached is the draft intergovernmental agreement with IDOT that will provide for Federal reimbursement of a portion of<br />

Phase I Engineering for the Kirk Road over Union Pacific Railroad improvement. The anticipated funding split is as follows:<br />

Federal HBP funds of $671,174 (80%), and the <strong>County</strong> local match of $167,793 (20%) of the estimated cost of $838,967.<br />

05/14/20<strong>13</strong><br />

N/A


STATE OF <strong>IL</strong>LINOIS<br />

COUNTY OF KANE<br />

RESOLUTION NO. <strong>13</strong> -<br />

APPROVING AN INTERGOVERNMENTAL <strong>AG</strong>REEMENT WITH THE STATE OF <strong>IL</strong>LINOIS<br />

FOR PHASE I ENGINEERING SERVICES FOR<br />

KIRK ROAD OVER THE UNION PACIFIC RA<strong>IL</strong>ROAD<br />

KANE COUNTY SECTION NO. 12-00192-04-BR<br />

WHEREAS, the Illinois Constitution of 1970, Article VII, Section 10 and the Illinois Compiled<br />

Statutes, (5 <strong>IL</strong>CS 220/1, et seq.) authorizes the <strong>County</strong> of <strong>Kane</strong> (<strong>County</strong>) and the State of Illinois (State)<br />

to cooperate in the performance of their respective duties and responsibilities by contract and other<br />

agreements; and<br />

WHEREAS, the <strong>County</strong> and the State (through its Illinois Department of Transportation) desire<br />

to cooperate among themselves to accomplish the improvement of <strong>Kane</strong> <strong>County</strong> Highway No. 77 (also<br />

known as Kirk Road) over the Union Pacific Railroad (hereinafter referred to as the “Improvement”);<br />

and<br />

WHEREAS, the <strong>County</strong> and the State desire to undertake Phase I Engineering services for the<br />

Improvement at an estimated cost of Eight Hundred Thirty Eight Thousand Nine Hundred Sixty Seven<br />

Dollars ($838,967.00); and<br />

WHEREAS, the Improvement is deemed by the <strong>County</strong> and the State to be of immediate benefit<br />

to the residents of the <strong>County</strong> of <strong>Kane</strong> and the State of Illinois in that it shall facilitate the safe and<br />

efficient movement of traffic, provide for the safety of the motoring public, and preserve and protect<br />

sensitive environmental features from adjacent highway improvements; and<br />

WHEREAS, the <strong>County</strong> and the State have determined a mutually satisfactory allocation of<br />

responsibilities and costs for said Improvement as set forth in an intergovernmental agreement with the<br />

State (a copy of which is on file with the <strong>County</strong> Clerk's Office), with the <strong>County</strong>’s share of the Phase I<br />

Engineering estimated to be $167,793.00.<br />

NOW, THEREFORE, BE IT RESOLVED by the <strong>Kane</strong> <strong>County</strong> Board that the Chairman thereof<br />

is hereby authorized to execute an intergovernmental agreement(s) with the State of Illinois acting<br />

through the Illinois Department of Transportation for Phase I Engineering for the Improvement.


Passed by the <strong>Kane</strong> <strong>County</strong> Board on May 14, 20<strong>13</strong>.<br />

Page 2 of 2, Res. #<strong>13</strong>-<br />

______________________________________ ___________________________________<br />

John A. Cunningham Christopher J. Lauzen<br />

Clerk, <strong>County</strong> Board Chairman, <strong>County</strong> Board<br />

<strong>Kane</strong> <strong>County</strong>, Illinois <strong>Kane</strong> <strong>County</strong>, Illinois<br />

Vote:<br />

Yes _____<br />

No _____<br />

Voice _____<br />

Abstentions _____<br />

5KRKOVERUPRRPHI-IDOT.4LH


Local Agency Agreement<br />

for Federal Participation<br />

Local Agency<br />

<strong>County</strong> of <strong>Kane</strong><br />

Section<br />

12-00192-04-BR<br />

State Contract<br />

Fund Type<br />

Day Labor<br />

Local Contract<br />

Printed on 3/31/20<strong>13</strong> Page 1 of 5 BLR 05310 (Rev. 01/10/<strong>13</strong>)<br />

HBP<br />

X<br />

RR Force Account<br />

ITEP and/or SRTS Number<br />

Construction Engineering Right-of-Way<br />

Job Number Project Number Job Number Project Number Job Number Project Number<br />

P-91-221-<strong>13</strong> BROS-4003(164)<br />

This Agreement is made and entered into between the above local agency hereinafter referred to as the “LA” and the state of Illinois, acting<br />

by and through its Department of Transportation, hereinafter referred to as “STATE”. The STATE and LA jointly propose to improve the<br />

designated location as described below. The improvement shall be constructed in accordance with plans approved by the STATE and the<br />

STATE’s policies and procedures approved and/or required by the Federal Highway Administration hereinafter referred to as “FHWA”.<br />

Location<br />

Local Name Kirk Rd Route CH 77 Length 0.66 miles<br />

Termini<br />

over U.P. Railroad<br />

Current Jurisdiction LA Existing Structure No 045-3096<br />

Phase I Engineering for bridge rehabilitation project<br />

Project Description<br />

Division of Cost<br />

Type of Work FHWA % STATE % LA % Total<br />

Participating Construction ( ) ( ) ( )<br />

Non-Participating Construction ( ) ( ) ( )<br />

Preliminary Engineering 671,174 ( * ) ( ) 167,793 ( Bal ) 838,967<br />

Construction Engineering ( ) ( ) ( )<br />

Right of Way ( ) ( ) ( )<br />

Railroads ( ) ( ) ( )<br />

Utilities ( ) ( ) ( )<br />

Materials<br />

TOTAL $ 671,174 $ $ 167,793 $ 838,967<br />

NOTE:<br />

*Maximum FHWA (HBP) participation 80% not to exceed $671,174.<br />

The costs shown in the Division of Cost table are approximate and subject to change. The final LA share is dependent on the final Federal and<br />

State participation. The actual costs will be used in the final division of cost for billing and reimbursment.<br />

If funding is not a percentage of the total, place an asterisk in the space provided for the percentage and explain above.<br />

Local Agency Appropriation<br />

By execution of this Agreement, the LA is indicating sufficient funds have been set aside to cover the local share of the project cost and<br />

additional funds will be appropriated, if required, to cover the LA’s total cost.<br />

Method of Financing (State Contract Work)<br />

METHOD A---Lump Sum (80% of LA Obligation)<br />

METHOD B--- Monthly Payments of<br />

METHOD C---LA’s Share divided by estimated total cost multiplied by actual progress payment.<br />

(See page two for details of the above methods and the financing of Day Labor and Local Contracts)


THE LA <strong>AG</strong>REES:<br />

Agreement Provisions<br />

(1) To acquire in its name, or in the name of the state if on the state highway system, all right-of-way necessary for this project in<br />

accordance with the requirements of Titles II and III of the Uniform Relocation Assistance and Real Property Acquisition Policies<br />

Act of 1970, and established state policies and procedures. Prior to advertising for bids, the LA shall certify to the STATE that all<br />

requirements of Titles II and III of said Uniform Act have been satisfied. The disposition of encroachments, if any, will be<br />

cooperatively determined by representatives of the LA, and STATE and the FHWA, if required.<br />

(2) To provide for all utility adjustments, and to regulate the use of the right-of-way of this improvement by utilities, public and private,<br />

in accordance with the current Utility Accommodation Policy for Local Agency Highway and Street Systems.<br />

(3) To provide for surveys and the preparation of plans for the proposed improvement and engineering supervision during construction<br />

of the proposed improvement.<br />

(4) To retain jurisdiction of the completed improvement unless specified otherwise by addendum (addendum should be accompanied<br />

by a location map). If the improvement location is currently under road district jurisdiction, an addendum is required.<br />

(5) To maintain or cause to be maintained, in a manner satisfactory to the STATE and FHWA, the completed improvement, or that<br />

portion of the completed improvement within its jurisdiction as established by addendum referred to in item 4 above.<br />

(6) To comply with all applicable Executive Orders and Federal Highway Acts pursuant to the Equal Employment Opportunity and<br />

Nondiscrimination Regulations required by the U.S. Department of Transportation.<br />

(7) To maintain, for a minimum of 3 years after the completion of the contract, adequate books, records and supporting documents to<br />

verify the amounts, recipients and uses of all disbursements of funds passing in conjunction with the contract; the contract and all<br />

books, records and supporting documents related to the contract shall be available for review and audit by the Auditor General and<br />

the department; and the LA agrees to cooperate fully with any audit conducted by the Auditor General and the department; and to<br />

provide full access to all relevant materials. Failure to maintain the books, records and supporting documents required by this<br />

section shall establish a presumption in favor of the STATE for the recovery of any funds paid by the STATE under the contract for<br />

which adequate books, records and supporting documentation are not available to support their purported disbursement.<br />

(8) To provide if required, for the improvement of any railroad-highway grade crossing and rail crossing protection within the limits of<br />

the proposed improvement.<br />

(9) To comply with Federal requirements or possibly lose (partial or total) Federal participation as determined by the FHWA.<br />

(10) (State Contracts Only) That the method of payment designated on page one will be as follows:<br />

Method A - Lump Sum Payment. Upon award of the contract for this improvement, the LA will pay to the STATE, in lump sum,<br />

an amount equal to 80% of the LA’s estimated obligation incurred under this Agreement, and will pay to the STATE<br />

the remainder of the LA’s obligation (including any nonparticipating costs) in a lump sum, upon completion of the<br />

project based upon final costs.<br />

Method B - Monthly Payments. Upon award of the contract for this improvement, the LA will pay to the STATE, a specified<br />

amount each month for an estimated period of months, or until 80% of the LA’s estimated obligation under the<br />

provisions of the Agreement has been paid, and will pay to the STATE the remainder of the LA’s obligation (including<br />

any nonparticipating costs) in a lump sum, upon completion of the project based upon final costs.<br />

Method C - Progress Payments. Upon receipt of the contractor’s first and subsequent progressive bills for this improvement, the<br />

LA will pay to the STATE, an amount equal to the LA’s share of the construction cost divided by the estimated total<br />

cost, multiplied by the actual payment (appropriately adjusted for nonparticipating costs) made to the contractor until<br />

the entire obligation incurred under this Agreement has been paid.<br />

(11) (Day Labor or Local Contracts) To provide or cause to be provided all of the initial funding, equipment, labor, material and services<br />

necessary to construct the complete project.<br />

(12) (Preliminary Engineering) In the event that right-of-way acquisition for, or actual construction of the project for which this<br />

preliminary engineering is undertaken with Federal participation is not started by the close of the tenth fiscal year following the<br />

fiscal year in which this agreement is executed, the LA will repay the STATE any Federal funds received under the terms of this<br />

Agreement.<br />

(<strong>13</strong>) (Right-of-Way Acquisition) In the event that the actual construction of the project on this right-of-way is not undertaken by the<br />

close of the twentieth fiscal year following the fiscal year in which this Agreement is executed, the LA will repay the STATE any<br />

Federal Funds received under the terms of this Agreement.<br />

Printed on 3/31/20<strong>13</strong> Page 2 of 5 BLR 05310 (Rev. 01/10/<strong>13</strong>)


(14) (Railroad Related Work Only) The estimates and general layout plans for at-grade crossing improvements should be forwarded to<br />

the Rail Safety and Project Engineer, Room 204, Illinois Department of Transportation, 2300 South Dirksen Parkway, Springfield,<br />

Illinois, 62764. Approval of the estimates and general layout plans should be obtained prior to the commencement of railroad<br />

related work. All railroad related work is also subject to approval be the Illinois Commerce Commission (ICC). Final inspection for<br />

railroad related work should be coordinated through appropriate IDOT District Bureau of Local Roads and Streets office.<br />

Plans and preemption times for signal related work that will be interconnected with traffic signals shall be submitted to the ICC for<br />

review and approval prior to the commencement of work. Signal related work involving interconnects with state maintained traffic<br />

signals should also be coordinated with the IDOT’s District Bureau of Operations.<br />

The LA is responsible for the payment of the railroad related expenses in accordance with the LA/railroad agreement prior to<br />

requesting reimbursement from IDOT. Requests for reimbursement should be sent to the appropriate IDOT District Bureau of<br />

Local Roads and Streets office.<br />

Engineer’s Payment Estimates in accordance with the Division of Cost on page one.<br />

(15) And certifies to the best of its knowledge and belief its officials:<br />

(a) are not presently debarred, suspended, proposed for debarment, declared ineligible or voluntarily excluded from covered<br />

transactions by any Federal department or agency;<br />

(b) have not within a three-year period preceding this Agreement been convicted of or had a civil judgment rendered against them<br />

for commission of fraud or a criminal offense in connection with obtaining, attempting to obtain or performing a public (Federal,<br />

State or local) transaction or contract under a public transaction; violation of Federal or State antitrust statutes or commission<br />

of embezzlement, theft, forgery, bribery, falsification or destruction of records, making false statements receiving stolen<br />

property;<br />

(c) are not presently indicted for or otherwise criminally or civilly charged by a governmental entity (Federal, State, local) with<br />

commission of any of the offenses enumerated in item (b) of this certification; and<br />

(d) have not within a three-year period preceding the Agreement had one or more public transactions (Federal, State, local)<br />

terminated for cause or default.<br />

(16) To include the certifications, listed in item 15 above and all other certifications required by State statutes, in every contract,<br />

including procurement of materials and leases of equipment.<br />

(17) (State Contracts) That execution of this agreement constitutes the LA’s concurrence in the award of the construction contract to<br />

the responsible low bidder as determined by the STATE.<br />

(18) That for agreements exceeding $100,000 in federal funds, execution of this Agreement constitutes the LA’s certification that:<br />

(a) No Federal appropriated funds have been paid or will be paid, by or on behalf of the undersigned, to any person for<br />

influencing or attempting to influence an officer or employee of any agency, a Member of Congress, an officer or employee of<br />

Congress or any employee of a Member of Congress in connection with the awarding of any Federal contract, the making of<br />

any cooperative agreement, and the extension, continuation, renewal, amendment or modification of any Federal contract,<br />

grant, loan or cooperative agreement;<br />

(b) If any funds other than Federal appropriated funds have been paid or will be paid to any person for influencing or attempting to<br />

influence an officer or employee of any agency, a Member of Congress, an officer or employee of Congress or an employee of<br />

a Member of Congress, in connection with this Federal contract, grant, loan or cooperative agreement, the undersigned shall<br />

complete and submit Standard Form-LLL, “Disclosure Form to Report Lobbying”, in accordance with its instructions;<br />

(c) The LA shall require that the language of this certification be included in the award documents for all subawards at all ties<br />

(including subcontracts, subgrants and contracts under grants, loans and cooperative agreements) and that all subrecipients<br />

shall certify and disclose accordingly.<br />

(19) To regulate parking and traffic in accordance with the approved project report.<br />

(20) To regulate encroachments on public right-of-way in accordance with current Illinois Compiled Statutes.<br />

(21) To regulate the discharge of sanitary sewage into any storm water drainage system constructed with this improvement in<br />

accordance with current Illinois Compiled Statutes.<br />

(22) That the LA may invoice the STATE monthly for the FHWA and/or STATE share of the costs incurred for this phase of the<br />

improvement. The LA will submit supporting documentation with each request for reimbursement from the STATE. Supporting<br />

documentation is defined as verification of payment, certified time sheets, vendor invoices, vendor receipts, and other<br />

documentation supporting the requested reimbursement amount.<br />

(23) To complete this phase of the project within three years from the date this agreement is approved by the STATE if this portion of<br />

the project described in the Project Description does not exceed $1,000,000 (five years if the project costs exceed $1,000,000).<br />

(24) Upon completion of this phase of the improvement, the LA will submit to the STATE a complete and detailed final invoice with all<br />

applicable supporting supporting documentation of all incurred costs, less previous payments, no later than one year from the date<br />

of completion of this phase of the improvement. If a final invoice is not received within one year of completion of this phase of the<br />

improvement, the most recent invoice may be considered the final invoice and the obligation of the funds closed.<br />

Printed on 3/31/20<strong>13</strong> Page 3 of 5 BLR 05310 (Rev. 01/10/<strong>13</strong>)


(25) (Single Audit Requirements) That if the LA expends $500,000 or more a year in federal financial assistance they shall have an<br />

audit made in accordance with the Office of Management and Budget (OMB) Circular No. A-<strong>13</strong>3. LA’s that expend less than<br />

$500,000 a year shall be exempt from compliance. A copy of the audit report must be submitted to the STATE with 30 days after<br />

the completion of the audit, but no later than one year after the end of the LA’s fiscal year. The CFDA number for all highway<br />

planning and construction activities is 20.205.<br />

(26) That the LA is required to register with the Central Contractor Registration (CCR), which is a web-enabled government-wide<br />

application that collects, validates, stores, and disseminates business information about the federal government’s trading partners<br />

in support of the contract award and the electronic payment processes. If you do not have a CCR number, you must register at<br />

https://www.uscontractorregistration.com. If the LA, as a sub-recipient of a federal funding, receives an amount equal to or greater<br />

than $25,000 (or which equals or exceeds that amount by addition of subsequent funds), this agreement is subject to the following<br />

award terms: http://edocket.access.gpo.gov/2010/<strong>pdf</strong>/2010-22705.<strong>pdf</strong> and http://edocket.access.gpo.gov/2010/<strong>pdf</strong>/2010-<br />

22706.<strong>pdf</strong>.<br />

THE STATE <strong>AG</strong>REES:<br />

(1) To provide such guidance, assistance and supervision and to monitor and perform audits to the extent necessary to assure validity<br />

of the LA’s certification of compliance with Titles II and III requirements.<br />

(2) (State Contracts) To receive bids for the construction of the proposed improvement when the plans have been approved by the<br />

STATE (and FHWA, if required) and to award a contract for construction of the proposed improvement, after receipt of a<br />

satisfactory bid.<br />

(3) (Day Labor) To authorize the LA to proceed with the construction of the improvement when Agreed Unit Prices are approved and<br />

to reimburse the LA for that portion of the cost payable from Federal and/or State funds based on the Agreed Unit Prices and<br />

Engineer’s Payment Estimates in accordance with the Division of Cost on page one.<br />

(4) (Local Contracts) That for agreements with Federal and/or State funds in engineering, right-of-way, utility work and/or construction<br />

work:<br />

(a) To reimburse the LA for the Federal and/or State share on the basis of periodic billings, provided said billings contain sufficient<br />

cost information and show evidence of payment by the LA;<br />

(b) To provide independent assurance sampling, to furnish off-site material inspection and testing at sources normally visited by<br />

STATE inspectors of steel, cement, aggregate, structural steel and other materials customarily tested by the STATE.<br />

IT IS MUTUALLY <strong>AG</strong>REED:<br />

(1) Construction of the project will utilize domestic steel as required by Section 106.01 of the current edition of the Standard<br />

Specifications for Road and Bridge Construction.<br />

(2) That this Agreement and the covenants contained herein shall become null and void in the event that the FHWA does not approve<br />

the proposed improvement for Federal-aid participation or the contract covering the construction work contemplated herein is not<br />

awarded within three years of the date of execution of this Agreement.<br />

(3) This Agreement shall be binding upon the parties, their successors and assigns.<br />

(4) For contracts awarded by the LA, the LA shall not discriminate on the basis of race, color, national origin or sex in the award and<br />

performance of any USDOT – assisted contract or in the administration of its DBE program or the requirements of 49 CFR part 26.<br />

The LA shall take all necessary and reasonable steps under 49 CFR part 26 to ensure nondiscrimination in the award and<br />

administration of USDOT – assisted contracts. The LA’s DBE program, as required by 49 CFR part 26 and as approved by<br />

USDOT, is incorporated by reference in this Agreement. Upon notification to the recipient of its failure to carry out its approved<br />

program, the department may impose sanctions as provided for under part 26 and may, in appropriate cases, refer the matter for<br />

enforcement under 18 U.S.C. 1001 and/or the Program Fraud Civil Remedies Act of 1986 (31U.S.C. 3801 et seq.). In the absence<br />

of a USDOT – approved LA DBE Program or on State awarded contracts, this Agreement shall be administered under the<br />

provisions of the STATE’s USDOT approved Disadvantaged Business Enterprise Program.<br />

(5) In cases where the STATE is reimbursing the LA, obligations of the STATE shall cease immediately without penalty or further<br />

payment being required if, in any fiscal year, the Illinois General Assembly or applicable Federal Funding source fails to<br />

appropriate or otherwise make available funds for the work contemplated herein.<br />

(6) All projects for the construction of fixed works which are financed in whole or in part with funds provided by this Agreement and/or<br />

amendment shall be subject to the Prevailing Wage Act (820 <strong>IL</strong>CS <strong>13</strong>0/0.01 et seq.) unless the provisions of that Act exempt its<br />

application<br />

Printed on 3/31/20<strong>13</strong> Page 4 of 5 BLR 05310 (Rev. 01/10/<strong>13</strong>)


ADDENDA<br />

Additional information and/or stipulations are hereby attached and identified below as being a part of this Agreement.<br />

Number 1 Location Map<br />

(Insert addendum numbers and titles as applicable)<br />

The LA further agrees, as a condition of payment, that it accepts and will comply with the applicable provisions set forth in this<br />

Agreement and all exhibits indicated above.<br />

APPROVED APPROVED<br />

Local Agency State of Illinois<br />

Department of Transportation<br />

Christopher J. Lauzen<br />

Name of Official (Print or Type Name) Ann L. Schneider, Secretary of Transportation Date<br />

<strong>County</strong> Board Chairman By:<br />

Title (<strong>County</strong> Board Chairperson/Mayor/Village President/etc.) Aaron A. Weatherholt, Deputy Director of Highways Date<br />

(Signature) Date<br />

Omer Osman, Director of Highways/Chief Engineer Date<br />

The above signature certifies the agency’s TIN number is Michael A. Forti, Chief Counsel Date<br />

36-6006585 conducting business as a Governmental<br />

Entity.<br />

DUNS Number 945248565 Matthew R. Hughes, Director of Finance and Administration Date<br />

NOTE: If signature is by an APPOINTED official, a resolution<br />

authorizing said appointed official to execute this agreement is<br />

required.<br />

Printed on 3/31/20<strong>13</strong> Page 5 of 5 BLR 05310 (Rev. 01/10/<strong>13</strong>)


31<br />

25<br />

0 485 970 1,940 2,910 3,880<br />

Feet<br />

Cherry<br />

8<br />

Wilson St.<br />

0 1 Miles<br />

Kirk Rd<br />

77<br />

38<br />

Fabyan<br />

Section Number 12-00192-04-BR<br />

Kirk Road over Union Pacific Railroad<br />

M:\DotserverD\USERS\Shared File System\GIS\Projects\Press Releases\Kirk Rd\Map Standard_Kirk Rd over UP RR loc map.mxd<br />

K<br />

Kirk Rd. over<br />

Union Pacific RR<br />

Legend<br />

467 34<br />

§¨¦ 88<br />

£¤ 30<br />

!( 31<br />

Hampshire Rutland Dundee<br />

Burlington Plato<br />

Virgil Campton<br />

<strong>Kane</strong>ville<br />

Big Rock<br />

Elgin<br />

Geneva<br />

Blackberry<br />

Batavia<br />

Interstates<br />

US Roads<br />

State Roads<br />

<strong>County</strong> Roads<br />

Other Roads<br />

Rail Roads<br />

<strong>County</strong> Boundry<br />

Township Boundry<br />

Fox River<br />

Forest Preserves<br />

Municipalities<br />

Aurora<br />

/


31<br />

25<br />

0 485 970 1,940 2,910 3,880<br />

Feet<br />

Cherry<br />

8<br />

Wilson St.<br />

0 1 Miles<br />

Kirk Rd<br />

77<br />

38<br />

Fabyan<br />

Section Number 12-00192-04-BR<br />

Kirk Road over Union Pacific Railroad<br />

M:\DotserverD\USERS\Shared File System\GIS\Projects\Press Releases\Kirk Rd\Map Standard Aerial_Kirk Rd over UP RR loc map.mxd<br />

K<br />

Kirk Rd. over<br />

Union Pacific RR<br />

Legend<br />

467 34<br />

§¨¦ 88<br />

£¤ 30<br />

!( 31<br />

Hampshire Rutland Dundee<br />

Burlington Plato<br />

Virgil Campton<br />

<strong>Kane</strong>ville<br />

Big Rock<br />

Elgin<br />

Geneva<br />

Blackberry<br />

Batavia<br />

Interstates<br />

US Roads<br />

State Roads<br />

<strong>County</strong> Roads<br />

Other Roads<br />

Rail Roads<br />

<strong>County</strong> Boundry<br />

Township Boundry<br />

Fox River<br />

Forest Preserves<br />

Municipalities<br />

Aurora<br />

/


If not budgeted,<br />

explain funding<br />

source<br />

<strong>AG</strong>ENDA ITEM EXECUTIVE SUMMARY Agenda Item #<br />

Presenter/Sponsor:<br />

Name<br />

Budget Information: Was this item budgeted?<br />

SUMMARY:<br />

Attachments:<br />

Detailed information available from :<br />

Resolution/Ordinance Tracking:<br />

Staff Name:<br />

Appropriation Amount:<br />

Jan Ward, Chief of Planning/Programming Phone: 630.444.3143<br />

Assigned Committee: Transportation Sent to: Executive<br />

on: 04/11/20<strong>13</strong><br />

If Other, specify:<br />

Committee Remarks:<br />

<strong>County</strong> Board Date:<br />

Resolution<br />

Ordinance<br />

Yes<br />

No N/A<br />

Next Committee: Executive Sent to: <strong>County</strong> Board on: 05/08/20<strong>13</strong><br />

If Other, specify:<br />

Committee Remarks:<br />

Next Committee: Sent to: on:<br />

Committee Remarks:<br />

8C-1a<br />

Approving an Intergovernmental Agreement with the State of Illinois Regarding<br />

Construction of Fabyan Parkway from East of Illinois Route 25 to Nagel Boulevard,<br />

<strong>Kane</strong> <strong>County</strong> Section No. 10-00404-00-CH<br />

Steve Coffinbargar - Assistant Director of Transportation<br />

Attached is the draft intergovernmental agreement with IDOT that will provide for Federal reimbursement of a portion of<br />

the Construction cost of the Fabyan Parkway, east of <strong>IL</strong> Route 25 to Nagel Boulevard improvement. The anticipated funding<br />

split is as follows: Federal CMAQ funds of $1,026,319 (80%), and the <strong>County</strong> local match of $256,580 (20%) of the estimated<br />

cost of $1,282,899.<br />

This improvement will improve safety and and address congestion by providing a median and center left turn lane along<br />

this segment of Fabyan Parkway.<br />

Resolution, Draft Funding Agreement<br />

05/14/20<strong>13</strong><br />

N/A


STATE OF <strong>IL</strong>LINOIS<br />

COUNTY OF KANE<br />

RESOLUTION NO. <strong>13</strong> –<br />

APPROVING AN INTERGOVERNMENTAL <strong>AG</strong>REEMENT WITH THE STATE OF <strong>IL</strong>LINOIS<br />

REGARDING CONSTRUCTION OF FABYAN PARKWAY<br />

FROM EAST OF <strong>IL</strong>LINOIS ROUTE 25 TO N<strong>AG</strong>EL BOULEVARD<br />

KANE COUNTY SECTION NO. 10-00404-00-CH<br />

WHEREAS, the Illinois Constitution of 1970, Article VII, Section 10 and 5 <strong>IL</strong>CS 220/1, et seq.<br />

authorizes the <strong>County</strong> of <strong>Kane</strong> (<strong>County</strong>) and the State of Illinois (State) to cooperate in the performance<br />

of their respective duties and responsibilities by contract and other agreements; and<br />

WHEREAS, the <strong>County</strong> and the State (acting through its Department of Transportation) desire<br />

to cooperate among themselves to accomplish the improvement of Fabyan Parkway from east of Illinois<br />

Route 25 to Nagel Boulevard (hereinafter referred to as the “Improvement”); and<br />

WHEREAS, the <strong>County</strong> and the State desire to undertake Phase III Construction for the<br />

Improvement at an estimated cost of $1,282,899.00; and<br />

WHEREAS, the Improvement is deemed by the <strong>County</strong> and the State to be of immediate benefit<br />

to the residents of the <strong>County</strong> of <strong>Kane</strong> and the State of Illinois in that it shall facilitate the safe and<br />

efficient movement of traffic and shall provide for the safety of the motoring public; and<br />

WHEREAS, the <strong>County</strong> and the State have determined a mutually satisfactory allocation of<br />

responsibilities and costs for said Improvement as set forth in an agreement with the State (a copy of<br />

which is on file with the <strong>County</strong> Clerk's Office), with the <strong>County</strong>’s share of the Phase III Construction<br />

estimated to be Two Hundred Fifty Six Thousand Five Hundred Eighty Dollars ($256,580.00).<br />

NOW, THEREFORE, BE IT RESOLVED by the <strong>Kane</strong> <strong>County</strong> Board that the Chairman thereof<br />

is hereby authorized to execute an intergovernmental agreement with the State of Illinois acting through<br />

the Illinois Department of Transportation for Phase III Construction for the Improvement.


Passed by the <strong>Kane</strong> <strong>County</strong> Board on May 14, 20<strong>13</strong>.<br />

Page 2 of 2, Res. #<strong>13</strong>-<br />

______________________________________ ___________________________________<br />

John A. Cunningham Christopher J. Lauzen<br />

Clerk, <strong>County</strong> Board Chairman, <strong>County</strong> Board<br />

<strong>Kane</strong> <strong>County</strong>, Illinois <strong>Kane</strong> <strong>County</strong>, Illinois<br />

Vote:<br />

Yes _____<br />

No _____<br />

Voice _____<br />

Abstentions _____<br />

5FBYN-N<strong>AG</strong>LTO<strong>IL</strong>25 PHIII-IDOT.4LH


Local Agency Agreement<br />

for Federal Participation<br />

Local Agency<br />

<strong>County</strong> of <strong>Kane</strong><br />

Section<br />

10-00404-00-CH<br />

State Contract<br />

Fund Type<br />

Day Labor<br />

Local Contract<br />

Printed on 3/31/20<strong>13</strong> Page 1 of 5 BLR 05310 (Rev. 01/10/<strong>13</strong>)<br />

STA<br />

X<br />

RR Force Account<br />

ITEP and/or SRTS Number<br />

Construction Engineering Right-of-Way<br />

Job Number Project Number Job Number Project Number Job Number Project Number<br />

C-91-274-<strong>13</strong> CMM-9003(627)<br />

This Agreement is made and entered into between the above local agency hereinafter referred to as the “LA” and the state of Illinois, acting<br />

by and through its Department of Transportation, hereinafter referred to as “STATE”. The STATE and LA jointly propose to improve the<br />

designated location as described below. The improvement shall be constructed in accordance with plans approved by the STATE and the<br />

STATE’s policies and procedures approved and/or required by the Federal Highway Administration hereinafter referred to as “FHWA”.<br />

Location<br />

Local Name Fabyan Parkway Route FAP 0363 Length 0.40 mile<br />

Termini<br />

East of <strong>IL</strong> Route 25 to Nagel Blvd<br />

Current Jurisdiction LA Existing Structure No<br />

Construction to widen/install bi-directional left turn lanes<br />

Project Description<br />

Division of Cost<br />

Type of Work FHWA % STATE % LA % Total<br />

Participating Construction 1,026,319 ( * ) ( ) 256,580 ( BAL ) 1,282,899<br />

Non-Participating Construction ( ) ( ) ( )<br />

Preliminary Engineering ( ) ( ) ( )<br />

Construction Engineering ( ) ( ) ( )<br />

Right of Way ( ) ( ) ( )<br />

Railroads ( ) ( ) ( )<br />

Utilities ( ) ( ) ( )<br />

Materials<br />

TOTAL $ 1,026,319 $ $ 256,580 $ 1,282,899<br />

NOTE:<br />

*Maximum FHWA (STA) participation 80%, not to exceed $1,026,319<br />

The costs shown in the Division of Cost table are approximate and subject to change. The final LA share is dependent on the final Federal and<br />

State participation. The actual costs will be used in the final division of cost for billing and reimbursment.<br />

If funding is not a percentage of the total, place an asterisk in the space provided for the percentage and explain above.<br />

Local Agency Appropriation<br />

By execution of this Agreement, the LA is indicating sufficient funds have been set aside to cover the local share of the project cost and<br />

additional funds will be appropriated, if required, to cover the LA’s total cost.<br />

Method of Financing (State Contract Work)<br />

METHOD A---Lump Sum (80% of LA Obligation)<br />

METHOD B--- Monthly Payments of<br />

METHOD C---LA’s Share divided by estimated total cost multiplied by actual progress payment.<br />

(See page two for details of the above methods and the financing of Day Labor and Local Contracts)


THE LA <strong>AG</strong>REES:<br />

Agreement Provisions<br />

(1) To acquire in its name, or in the name of the state if on the state highway system, all right-of-way necessary for this project in<br />

accordance with the requirements of Titles II and III of the Uniform Relocation Assistance and Real Property Acquisition Policies<br />

Act of 1970, and established state policies and procedures. Prior to advertising for bids, the LA shall certify to the STATE that all<br />

requirements of Titles II and III of said Uniform Act have been satisfied. The disposition of encroachments, if any, will be<br />

cooperatively determined by representatives of the LA, and STATE and the FHWA, if required.<br />

(2) To provide for all utility adjustments, and to regulate the use of the right-of-way of this improvement by utilities, public and private,<br />

in accordance with the current Utility Accommodation Policy for Local Agency Highway and Street Systems.<br />

(3) To provide for surveys and the preparation of plans for the proposed improvement and engineering supervision during construction<br />

of the proposed improvement.<br />

(4) To retain jurisdiction of the completed improvement unless specified otherwise by addendum (addendum should be accompanied<br />

by a location map). If the improvement location is currently under road district jurisdiction, an addendum is required.<br />

(5) To maintain or cause to be maintained, in a manner satisfactory to the STATE and FHWA, the completed improvement, or that<br />

portion of the completed improvement within its jurisdiction as established by addendum referred to in item 4 above.<br />

(6) To comply with all applicable Executive Orders and Federal Highway Acts pursuant to the Equal Employment Opportunity and<br />

Nondiscrimination Regulations required by the U.S. Department of Transportation.<br />

(7) To maintain, for a minimum of 3 years after the completion of the contract, adequate books, records and supporting documents to<br />

verify the amounts, recipients and uses of all disbursements of funds passing in conjunction with the contract; the contract and all<br />

books, records and supporting documents related to the contract shall be available for review and audit by the Auditor General and<br />

the department; and the LA agrees to cooperate fully with any audit conducted by the Auditor General and the department; and to<br />

provide full access to all relevant materials. Failure to maintain the books, records and supporting documents required by this<br />

section shall establish a presumption in favor of the STATE for the recovery of any funds paid by the STATE under the contract for<br />

which adequate books, records and supporting documentation are not available to support their purported disbursement.<br />

(8) To provide if required, for the improvement of any railroad-highway grade crossing and rail crossing protection within the limits of<br />

the proposed improvement.<br />

(9) To comply with Federal requirements or possibly lose (partial or total) Federal participation as determined by the FHWA.<br />

(10) (State Contracts Only) That the method of payment designated on page one will be as follows:<br />

Method A - Lump Sum Payment. Upon award of the contract for this improvement, the LA will pay to the STATE, in lump sum,<br />

an amount equal to 80% of the LA’s estimated obligation incurred under this Agreement, and will pay to the STATE<br />

the remainder of the LA’s obligation (including any nonparticipating costs) in a lump sum, upon completion of the<br />

project based upon final costs.<br />

Method B - Monthly Payments. Upon award of the contract for this improvement, the LA will pay to the STATE, a specified<br />

amount each month for an estimated period of months, or until 80% of the LA’s estimated obligation under the<br />

provisions of the Agreement has been paid, and will pay to the STATE the remainder of the LA’s obligation (including<br />

any nonparticipating costs) in a lump sum, upon completion of the project based upon final costs.<br />

Method C - Progress Payments. Upon receipt of the contractor’s first and subsequent progressive bills for this improvement, the<br />

LA will pay to the STATE, an amount equal to the LA’s share of the construction cost divided by the estimated total<br />

cost, multiplied by the actual payment (appropriately adjusted for nonparticipating costs) made to the contractor until<br />

the entire obligation incurred under this Agreement has been paid.<br />

(11) (Day Labor or Local Contracts) To provide or cause to be provided all of the initial funding, equipment, labor, material and services<br />

necessary to construct the complete project.<br />

(12) (Preliminary Engineering) In the event that right-of-way acquisition for, or actual construction of the project for which this<br />

preliminary engineering is undertaken with Federal participation is not started by the close of the tenth fiscal year following the<br />

fiscal year in which this agreement is executed, the LA will repay the STATE any Federal funds received under the terms of this<br />

Agreement.<br />

(<strong>13</strong>) (Right-of-Way Acquisition) In the event that the actual construction of the project on this right-of-way is not undertaken by the<br />

close of the twentieth fiscal year following the fiscal year in which this Agreement is executed, the LA will repay the STATE any<br />

Federal Funds received under the terms of this Agreement.<br />

Printed on 3/31/20<strong>13</strong> Page 2 of 5 BLR 05310 (Rev. 01/10/<strong>13</strong>)


(14) (Railroad Related Work Only) The estimates and general layout plans for at-grade crossing improvements should be forwarded to<br />

the Rail Safety and Project Engineer, Room 204, Illinois Department of Transportation, 2300 South Dirksen Parkway, Springfield,<br />

Illinois, 62764. Approval of the estimates and general layout plans should be obtained prior to the commencement of railroad<br />

related work. All railroad related work is also subject to approval be the Illinois Commerce Commission (ICC). Final inspection for<br />

railroad related work should be coordinated through appropriate IDOT District Bureau of Local Roads and Streets office.<br />

Plans and preemption times for signal related work that will be interconnected with traffic signals shall be submitted to the ICC for<br />

review and approval prior to the commencement of work. Signal related work involving interconnects with state maintained traffic<br />

signals should also be coordinated with the IDOT’s District Bureau of Operations.<br />

The LA is responsible for the payment of the railroad related expenses in accordance with the LA/railroad agreement prior to<br />

requesting reimbursement from IDOT. Requests for reimbursement should be sent to the appropriate IDOT District Bureau of<br />

Local Roads and Streets office.<br />

Engineer’s Payment Estimates in accordance with the Division of Cost on page one.<br />

(15) And certifies to the best of its knowledge and belief its officials:<br />

(a) are not presently debarred, suspended, proposed for debarment, declared ineligible or voluntarily excluded from covered<br />

transactions by any Federal department or agency;<br />

(b) have not within a three-year period preceding this Agreement been convicted of or had a civil judgment rendered against them<br />

for commission of fraud or a criminal offense in connection with obtaining, attempting to obtain or performing a public (Federal,<br />

State or local) transaction or contract under a public transaction; violation of Federal or State antitrust statutes or commission<br />

of embezzlement, theft, forgery, bribery, falsification or destruction of records, making false statements receiving stolen<br />

property;<br />

(c) are not presently indicted for or otherwise criminally or civilly charged by a governmental entity (Federal, State, local) with<br />

commission of any of the offenses enumerated in item (b) of this certification; and<br />

(d) have not within a three-year period preceding the Agreement had one or more public transactions (Federal, State, local)<br />

terminated for cause or default.<br />

(16) To include the certifications, listed in item 15 above and all other certifications required by State statutes, in every contract,<br />

including procurement of materials and leases of equipment.<br />

(17) (State Contracts) That execution of this agreement constitutes the LA’s concurrence in the award of the construction contract to<br />

the responsible low bidder as determined by the STATE.<br />

(18) That for agreements exceeding $100,000 in federal funds, execution of this Agreement constitutes the LA’s certification that:<br />

(a) No Federal appropriated funds have been paid or will be paid, by or on behalf of the undersigned, to any person for<br />

influencing or attempting to influence an officer or employee of any agency, a Member of Congress, an officer or employee of<br />

Congress or any employee of a Member of Congress in connection with the awarding of any Federal contract, the making of<br />

any cooperative agreement, and the extension, continuation, renewal, amendment or modification of any Federal contract,<br />

grant, loan or cooperative agreement;<br />

(b) If any funds other than Federal appropriated funds have been paid or will be paid to any person for influencing or attempting to<br />

influence an officer or employee of any agency, a Member of Congress, an officer or employee of Congress or an employee of<br />

a Member of Congress, in connection with this Federal contract, grant, loan or cooperative agreement, the undersigned shall<br />

complete and submit Standard Form-LLL, “Disclosure Form to Report Lobbying”, in accordance with its instructions;<br />

(c) The LA shall require that the language of this certification be included in the award documents for all subawards at all ties<br />

(including subcontracts, subgrants and contracts under grants, loans and cooperative agreements) and that all subrecipients<br />

shall certify and disclose accordingly.<br />

(19) To regulate parking and traffic in accordance with the approved project report.<br />

(20) To regulate encroachments on public right-of-way in accordance with current Illinois Compiled Statutes.<br />

(21) To regulate the discharge of sanitary sewage into any storm water drainage system constructed with this improvement in<br />

accordance with current Illinois Compiled Statutes.<br />

(22) That the LA may invoice the STATE monthly for the FHWA and/or STATE share of the costs incurred for this phase of the<br />

improvement. The LA will submit supporting documentation with each request for reimbursement from the STATE. Supporting<br />

documentation is defined as verification of payment, certified time sheets, vendor invoices, vendor receipts, and other<br />

documentation supporting the requested reimbursement amount.<br />

(23) To complete this phase of the project within three years from the date this agreement is approved by the STATE if this portion of<br />

the project described in the Project Description does not exceed $1,000,000 (five years if the project costs exceed $1,000,000).<br />

(24) Upon completion of this phase of the improvement, the LA will submit to the STATE a complete and detailed final invoice with all<br />

applicable supporting supporting documentation of all incurred costs, less previous payments, no later than one year from the date<br />

of completion of this phase of the improvement. If a final invoice is not received within one year of completion of this phase of the<br />

improvement, the most recent invoice may be considered the final invoice and the obligation of the funds closed.<br />

Printed on 3/31/20<strong>13</strong> Page 3 of 5 BLR 05310 (Rev. 01/10/<strong>13</strong>)


(25) (Single Audit Requirements) That if the LA expends $500,000 or more a year in federal financial assistance they shall have an<br />

audit made in accordance with the Office of Management and Budget (OMB) Circular No. A-<strong>13</strong>3. LA’s that expend less than<br />

$500,000 a year shall be exempt from compliance. A copy of the audit report must be submitted to the STATE with 30 days after<br />

the completion of the audit, but no later than one year after the end of the LA’s fiscal year. The CFDA number for all highway<br />

planning and construction activities is 20.205.<br />

(26) That the LA is required to register with the Central Contractor Registration (CCR), which is a web-enabled government-wide<br />

application that collects, validates, stores, and disseminates business information about the federal government’s trading partners<br />

in support of the contract award and the electronic payment processes. If you do not have a CCR number, you must register at<br />

https://www.uscontractorregistration.com. If the LA, as a sub-recipient of a federal funding, receives an amount equal to or greater<br />

than $25,000 (or which equals or exceeds that amount by addition of subsequent funds), this agreement is subject to the following<br />

award terms: http://edocket.access.gpo.gov/2010/<strong>pdf</strong>/2010-22705.<strong>pdf</strong> and http://edocket.access.gpo.gov/2010/<strong>pdf</strong>/2010-<br />

22706.<strong>pdf</strong>.<br />

THE STATE <strong>AG</strong>REES:<br />

(1) To provide such guidance, assistance and supervision and to monitor and perform audits to the extent necessary to assure validity<br />

of the LA’s certification of compliance with Titles II and III requirements.<br />

(2) (State Contracts) To receive bids for the construction of the proposed improvement when the plans have been approved by the<br />

STATE (and FHWA, if required) and to award a contract for construction of the proposed improvement, after receipt of a<br />

satisfactory bid.<br />

(3) (Day Labor) To authorize the LA to proceed with the construction of the improvement when Agreed Unit Prices are approved and<br />

to reimburse the LA for that portion of the cost payable from Federal and/or State funds based on the Agreed Unit Prices and<br />

Engineer’s Payment Estimates in accordance with the Division of Cost on page one.<br />

(4) (Local Contracts) That for agreements with Federal and/or State funds in engineering, right-of-way, utility work and/or construction<br />

work:<br />

(a) To reimburse the LA for the Federal and/or State share on the basis of periodic billings, provided said billings contain sufficient<br />

cost information and show evidence of payment by the LA;<br />

(b) To provide independent assurance sampling, to furnish off-site material inspection and testing at sources normally visited by<br />

STATE inspectors of steel, cement, aggregate, structural steel and other materials customarily tested by the STATE.<br />

IT IS MUTUALLY <strong>AG</strong>REED:<br />

(1) Construction of the project will utilize domestic steel as required by Section 106.01 of the current edition of the Standard<br />

Specifications for Road and Bridge Construction.<br />

(2) That this Agreement and the covenants contained herein shall become null and void in the event that the FHWA does not approve<br />

the proposed improvement for Federal-aid participation or the contract covering the construction work contemplated herein is not<br />

awarded within three years of the date of execution of this Agreement.<br />

(3) This Agreement shall be binding upon the parties, their successors and assigns.<br />

(4) For contracts awarded by the LA, the LA shall not discriminate on the basis of race, color, national origin or sex in the award and<br />

performance of any USDOT – assisted contract or in the administration of its DBE program or the requirements of 49 CFR part 26.<br />

The LA shall take all necessary and reasonable steps under 49 CFR part 26 to ensure nondiscrimination in the award and<br />

administration of USDOT – assisted contracts. The LA’s DBE program, as required by 49 CFR part 26 and as approved by<br />

USDOT, is incorporated by reference in this Agreement. Upon notification to the recipient of its failure to carry out its approved<br />

program, the department may impose sanctions as provided for under part 26 and may, in appropriate cases, refer the matter for<br />

enforcement under 18 U.S.C. 1001 and/or the Program Fraud Civil Remedies Act of 1986 (31U.S.C. 3801 et seq.). In the absence<br />

of a USDOT – approved LA DBE Program or on State awarded contracts, this Agreement shall be administered under the<br />

provisions of the STATE’s USDOT approved Disadvantaged Business Enterprise Program.<br />

(5) In cases where the STATE is reimbursing the LA, obligations of the STATE shall cease immediately without penalty or further<br />

payment being required if, in any fiscal year, the Illinois General Assembly or applicable Federal Funding source fails to<br />

appropriate or otherwise make available funds for the work contemplated herein.<br />

(6) All projects for the construction of fixed works which are financed in whole or in part with funds provided by this Agreement and/or<br />

amendment shall be subject to the Prevailing Wage Act (820 <strong>IL</strong>CS <strong>13</strong>0/0.01 et seq.) unless the provisions of that Act exempt its<br />

application<br />

Printed on 3/31/20<strong>13</strong> Page 4 of 5 BLR 05310 (Rev. 01/10/<strong>13</strong>)


ADDENDA<br />

Additional information and/or stipulations are hereby attached and identified below as being a part of this Agreement.<br />

Number 1 Location Map<br />

(Insert addendum numbers and titles as applicable)<br />

The LA further agrees, as a condition of payment, that it accepts and will comply with the applicable provisions set forth in this<br />

Agreement and all exhibits indicated above.<br />

APPROVED APPROVED<br />

Local Agency State of Illinois<br />

Department of Transportation<br />

Christopher J. Lauzen<br />

Name of Official (Print or Type Name) Ann L. Schneider, Secretary of Transportation Date<br />

<strong>County</strong> Board Chairman<br />

By:<br />

Title (<strong>County</strong> Board Chairperson/Mayor/Village President/etc.) Aaron A. Weatherholt, Deputy Director of Highways Date<br />

(Signature) Date<br />

Omer Osman, Director of Highways/Chief Engineer Date<br />

The above signature certifies the agency’s TIN number is Michael A. Forti, Chief Counsel Date<br />

36-6006585 conducting business as a Governmental<br />

Entity.<br />

DUNS Number 945248565 Matthew R. Hughes, Director of Finance and Administration Date<br />

NOTE: If signature is by an APPOINTED official, a resolution<br />

authorizing said appointed official to execute this agreement is<br />

required.<br />

Printed on 3/31/20<strong>13</strong> Page 5 of 5 BLR 05310 (Rev. 01/10/<strong>13</strong>)


South St.<br />

Geneva<br />

Batavia<br />

n St.<br />

31<br />

0 500 1,000 2,000 3,000 4,000<br />

Feet<br />

0 1 Miles<br />

25<br />

Cherry<br />

Road Improvements<br />

Wilson St.<br />

Pine St.<br />

Section Number: 10-00404-00-CH<br />

Fabyan Parkway - <strong>IL</strong> Route 25 to Nagel Boulevard<br />

Roadway Improvements<br />

M:\dotserver2\USERS\Committee\201112 December\Implementation\Design\Fabyan_<strong>IL</strong>25 to Nagel\Map Standard_Fabyan Pkwy - <strong>IL</strong> Rte 25 to Nagel Blvd loc map.mxd<br />

Rd.<br />

8<br />

Kirk Rd<br />

77<br />

38<br />

Fabyan<br />

Legend<br />

Hampshire Rutland Dundee<br />

Burlington Plato<br />

Elgin<br />

Virgil Campton St. Charles<br />

Geneva<br />

<strong>Kane</strong>ville Blackberry<br />

Batavia<br />

Big Rock<br />

467 34<br />

§¨¦ 88<br />

tu 30<br />

!( 31<br />

Aurora<br />

Interstates<br />

US Roads<br />

State Roads<br />

<strong>County</strong> Roads<br />

Other Roads<br />

Rail Roads<br />

<strong>County</strong> Boundry<br />

Township Boundry<br />

Fox River<br />

Forest Preserves<br />

Municipalities<br />

/


uth St.<br />

t.<br />

31<br />

Cherry<br />

Wilson St.<br />

Pine St.<br />

Rd.<br />

8<br />

77<br />

Section Number 10-00404-00-CH<br />

Fabyan Parkway - Illinois Route 25 to Nagel Boulevard<br />

Roadway Improvements<br />

0 485 970 1,940 2,910 3,880<br />

Feet<br />

25<br />

0 1 Miles<br />

Road Improvements<br />

Kirk Rd<br />

38<br />

Fabyan<br />

Legend<br />

M:\dotserver2\USERS\Committee\20<strong>13</strong>04 <strong>April</strong>\Implementation\Construction\Fabyan Pkwy-Nagel to <strong>IL</strong> 25\Map Standard Aerial_Fabyan Pkwy - <strong>IL</strong> 25 to Nagel loc map<br />

467 34<br />

§¨¦ 88<br />

£¤ 30<br />

!( 31<br />

Hampshire Rutland Dundee<br />

Burlington Plato<br />

Virgil Campton<br />

<strong>Kane</strong>ville<br />

Big Rock<br />

Elgin<br />

Geneva<br />

Blackberry<br />

Batavia<br />

Interstates<br />

US Roads<br />

State Roads<br />

<strong>County</strong> Roads<br />

Other Roads<br />

Rail Roads<br />

<strong>County</strong> Boundry<br />

Township Boundry<br />

Fox River<br />

Forest Preserves<br />

Municipalities<br />

Aurora<br />

/


If not budgeted,<br />

explain funding<br />

source<br />

<strong>AG</strong>ENDA ITEM EXECUTIVE SUMMARY Agenda Item #<br />

Presenter/Sponsor:<br />

Name<br />

Budget Information: Was this item budgeted?<br />

SUMMARY:<br />

Attachments:<br />

Detailed information available from :<br />

Resolution/Ordinance Tracking:<br />

Staff Name:<br />

Appropriation Amount:<br />

Steve Coffinbargar, Assistant Director Phone: 630.406.7170<br />

Assigned Committee: Transportation Sent to: Executive<br />

on: 04/11/20<strong>13</strong><br />

If Other, specify:<br />

Committee Remarks:<br />

<strong>County</strong> Board Date:<br />

Resolution<br />

Ordinance<br />

Yes<br />

No N/A<br />

Next Committee: Executive Sent to: <strong>County</strong> Board on: 05/08/20<strong>13</strong><br />

If Other, specify:<br />

Committee Remarks:<br />

Next Committee: Sent to: on:<br />

Committee Remarks:<br />

8C-2a<br />

Approving a Phase III Construction Engineering Services Agreement with Omega<br />

Associates, Inc. for Orchard Road over I-88, <strong>Kane</strong> <strong>County</strong> Section No. 11-00202-03-BR<br />

Steve Coffinbargar - Assistant Director of Transportation<br />

$<strong>13</strong>9,996.45<br />

This improvement will replace the old wearing surface on the existing Orchard Road bridge over I88 with a new latex<br />

modified deck. Other project features include parapet repairs, expansion joint replacement and HMA resurfacing. <strong>Kane</strong><br />

<strong>County</strong> requires engineering assistance for Phase III Engineering Services (Construction Engineering). To initiate Phase III<br />

Engineering, staff completed the consultant selection process using current QBS Procedures.<br />

The QBS Process entailed notification of the122 consulting firms within Transportation’s Consultant Database by email of<br />

the <strong>County</strong>’s need for engineering services. Twenty one (21) consulting firms responded and submitted a Statement of<br />

Interest (SOI). Three (3) pre-qualified consulting firms were short-listed and requested to submit a proposal. Staff conducted<br />

face to face interviews, which along with the proposal, were used to develop an overall score for each firm. The overall score<br />

of each firm is as follows: Wight and Co. - 74.0, AMEC - 82.0, Omega and Assoc., Inc. - 85.0.<br />

Omega was selected and a contract was negotiated to provide Phase III Engineering Services. The negotiated contract is for<br />

a not to exceed amount of $<strong>13</strong>9,996.45. Information on the QBS process and selection details can be found on the <strong>KDOT</strong><br />

website.<br />

Resolution, Engineering Agreement<br />

05/14/20<strong>13</strong>


STATE OF <strong>IL</strong>LINOIS<br />

COUNTY OF KANE<br />

RESOLUTION NO. <strong>13</strong> -<br />

APPROVING A PHASE III CONSTRUCTION ENGINEERING SERVICES <strong>AG</strong>REEMENT<br />

WITH OMEGA ASSOCIATES, INC. FOR<br />

ORCHARD ROAD BRIDGE OVER I-88<br />

KANE COUNTY SECTION NO. 11-00202-03-BR<br />

WHEREAS, Phase III Engineering services are needed for the Orchard Road Bridge over I-88<br />

improvement (herein referred to as the “Improvement”); and<br />

WHEREAS, in order to accomplish the Improvement, it is necessary to retain the services of a<br />

professional engineering firm to provide Phase III Engineering services therefor; and<br />

WHEREAS, Omega Associates, Inc., 333 Warrenville Road, Suite <strong>13</strong>0, Lisle, <strong>IL</strong> 60532 has<br />

experience and professional expertise in Phase III Engineering and is willing to perform the required<br />

services for an amount not to exceed One Hundred Thirty Nine Thousand Nine Hundred Ninety Six and<br />

45/100 ($<strong>13</strong>9,996.45) as set forth in the Phase III Engineering Services agreement (a copy of which is<br />

on file with the <strong>County</strong> Clerk’s Office).<br />

NOW, THEREFORE, BE IT RESOLVED by the <strong>Kane</strong> <strong>County</strong> Board that the Chairman thereof<br />

is hereby authorized to execute a Phase III Engineering services agreement with Omega Associates,<br />

Inc.<br />

BE IT FURTHER RESOLVED that the <strong>Kane</strong> <strong>County</strong> Board appropriates the not to exceed sum<br />

of One Hundred Thirty Nine Thousand Nine Hundred Ninety Six and 45/100 ($<strong>13</strong>9,996.45) from<br />

Transportation Capital Fund #540, Line Item #50140 (Engineering) to pay for said Phase III<br />

Engineering services for the Improvement.<br />

Line Item Line Item Description Was<br />

personnel/item/service<br />

approved in original<br />

budget or a subsequent<br />

budget revision?<br />

Are funds currently<br />

available for this<br />

personnel/item/service in<br />

the specific line item?<br />

540.520.525.50140 Engineering Yes Yes<br />

If funds are not<br />

currently available in<br />

the specified line item,<br />

where are the funds<br />

available?


Passed by the <strong>Kane</strong> <strong>County</strong> Board on May 14, 20<strong>13</strong>.<br />

Page 2 of 2, Res. #<strong>13</strong>-<br />

______________________________________ ___________________________________<br />

John A. Cunningham Christopher J. Lauzen<br />

Clerk, <strong>County</strong> Board Chairman, <strong>County</strong> Board<br />

<strong>Kane</strong> <strong>County</strong>, Illinois <strong>Kane</strong> <strong>County</strong>, Illinois<br />

Vote:<br />

Yes _____<br />

No _____<br />

Voice _____<br />

Abstentions _____<br />

5ORCHRD OVER I-88 PHIII- OMEGA.4LH


Tanner Rd.<br />

Deerpath<br />

83 Feet<br />

83<br />

Orchard Rd.<br />

Section Number 11-00202-03-BR<br />

Orchard Road at I-88 Tollway Improvements<br />

0 500 1,000 2,000 3,000 4,000<br />

0 1 Miles<br />

Tollway Improvements<br />

Indian Trail Rd<br />

M:\dotserver2\USERS\Committee\20<strong>13</strong>04 <strong>April</strong>\Implementation\Construction\Orchard over I88 award\Map Standard_Orchard Rd at I88 loc map<br />

Mooseheart Rd.<br />

North Aurora<br />

88<br />

71<br />

Legend<br />

Aurora<br />

Virgil<br />

Hampshire Rutland Dundee<br />

Burlington<br />

467 34<br />

§¨¦ 88<br />

£¤ 30<br />

!( 31<br />

Plato<br />

Elgin<br />

Campton St. Charles<br />

Geneva<br />

<strong>Kane</strong>ville Blackberry<br />

Batavia<br />

Big Rock Sugar Grove Aurora<br />

Interstates<br />

US Roads<br />

State Roads<br />

<strong>County</strong> Roads<br />

Other Roads<br />

Rail Roads<br />

<strong>County</strong> Boundry<br />

Township Boundry<br />

Fox River<br />

Forest Preserves<br />

Municipalities<br />

/


Tanner Rd.<br />

Deerpath<br />

83 Feet<br />

83<br />

Orchard Rd.<br />

Section Number 11-00202-03-BR<br />

Orchard Road at I-88 Tollway Improvements<br />

0 500 1,000 2,000 3,000 4,000<br />

0 1<br />

Miles<br />

Tollway Improvements<br />

Indian Trail Rd<br />

88<br />

M:\dotserver2\USERS\Committee\20<strong>13</strong>04 <strong>April</strong>\Implementation\Construction\Orchard over I88 award\Map Standard Aerial_Orchard Rd at I88 loc map<br />

71<br />

Legend<br />

Hampshire Rutland Dundee<br />

Burlington<br />

Virgil<br />

§¨¦ 88<br />

£¤ 30<br />

467 34<br />

!( 31<br />

Plato<br />

Elgin<br />

Campton St. Charles<br />

Geneva<br />

<strong>Kane</strong>ville Blackberry<br />

Batavia<br />

Big Roc k Sugar Grove Aurora<br />

Interstates<br />

US Roads<br />

State Roads<br />

<strong>County</strong> Roads<br />

Other Roads<br />

Rail Roads<br />

<strong>County</strong> Boundry<br />

Township Boundry<br />

Fox River<br />

Forest Preserves<br />

Municipalities<br />

/


If not budgeted,<br />

explain funding<br />

source<br />

<strong>AG</strong>ENDA ITEM EXECUTIVE SUMMARY Agenda Item #<br />

Presenter/Sponsor:<br />

Name<br />

Budget Information: Was this item budgeted?<br />

SUMMARY:<br />

Attachments:<br />

Detailed information available from :<br />

Resolution/Ordinance Tracking:<br />

Staff Name:<br />

Appropriation Amount:<br />

Steve Coffinbargar, Assistant Director Phone: 630/406-7170<br />

Assigned Committee: Transportation Sent to: Executive<br />

on: 04/11/20<strong>13</strong><br />

If Other, specify:<br />

Committee Remarks:<br />

<strong>County</strong> Board Date:<br />

Resolution<br />

Ordinance<br />

Yes<br />

No N/A<br />

Next Committee: Executive Sent to: <strong>County</strong> Board on: 05/08/20<strong>13</strong><br />

If Other, specify:<br />

Committee Remarks:<br />

Next Committee: Sent to: on:<br />

Committee Remarks:<br />

8C-2b<br />

Approving Contract for Construction, Orchard Road over I-88 Bridge Deck<br />

Rehabilitation, <strong>Kane</strong> <strong>County</strong> Section No. 11-00202-03-BR<br />

Steve Coffinbargar - Assistant Director of Transportation<br />

$926,875.25<br />

On March 26, 20<strong>13</strong>, construction bids were opened at the Division of Transportation office for the Orchard over I-88<br />

Improvement project. This project involves removal and replacement of the existing deck wearing surface with a new latex<br />

modified concrete deck. Other features of the project will be parapet repairs, expansion joint replacement, partial deck<br />

repairs and approach slab resurfacing. The project will involve coordination with the local agencies and the Illinois Toll<br />

Highway as the project limits are located in between the eastbound and westbound ramps to the I-88 Toll way.<br />

Construction is anticipated to start in June, with an anticipated duration of approximately 4-5 months, and completion by<br />

the end of 20<strong>13</strong>.<br />

The apparent low bidder is Areatha Construction Company, Inc. of Streamwood, Illinois with a proposed contract amount<br />

of $926,875.25. The low bid amount is approximately 36.53% below the engineer’s estimate of $1,460,322.77 dollars.<br />

Resolution, Bid Tabulation, Location Map<br />

05/14/20<strong>13</strong>


STATE OF <strong>IL</strong>LINOIS<br />

COUNTY OF KANE<br />

RESOLUTION NO. <strong>13</strong> -<br />

APPROVING CONTRACT FOR CONSTRUCTION<br />

ORCHARD ROAD OVER I-88 BRIDGE DECK REHAB<strong>IL</strong>ITATION<br />

KANE COUNTY SECTION NO. 11-00202-03-BR<br />

WHEREAS, the <strong>Kane</strong> <strong>County</strong> Division of Transportation has solicited and received bids for the<br />

work and/or construction described as:<br />

KANE COUNTY SEC. NO. 11-00202-03-BR<br />

ORCHARD ROAD BRIDGE OVER I-88<br />

(hereinafter the “Project”)<br />

WHEREAS, the lowest responsible bidder for the Project is:<br />

AREATHA CONSTRUCTION COMPANY, INC. OF STREAMWOOD, <strong>IL</strong>LINOIS<br />

with a low bid of<br />

$926,875.25<br />

NOW, THEREFORE, BE IT RESOLVED by the <strong>Kane</strong> <strong>County</strong> Board that a contract for the<br />

Project described hereinabove shall be awarded to the lowest responsible bidder in the amount as<br />

indicated hereinabove and that the <strong>County</strong> Board Chairman is hereby authorized and directed to<br />

execute a contract and contractor’s bond therefor.<br />

BE IT FURTHER RESOLVED that there is hereby appropriated the sum of Nine Hundred<br />

Twenty Six Thousand Eight Hundred Seventy Five and 25/100 Dollars ($926,875.25) from<br />

Transportation Capital Fund #540, Line Item #73010 (Bridge Construction) to pay for the Project.<br />

Line Item Line Item Description Was<br />

personnel/item/service<br />

approved in original<br />

budget or a subsequent<br />

budget revision?<br />

540.520.525.73010<br />

Bridge Construction<br />

Yes<br />

Are funds currently<br />

available for this<br />

personnel/item/service in<br />

the specific line item?<br />

Yes<br />

If funds are not<br />

currently available in<br />

the specified line item,<br />

where are the funds<br />

available?


Passed by the <strong>Kane</strong> <strong>County</strong> Board on May 14, 20<strong>13</strong>.<br />

Page 2 of 2, Res. #<strong>13</strong>-<br />

______________________________________ ___________________________________<br />

John A. Cunningham Christopher J. Lauzen<br />

Clerk, <strong>County</strong> Board Chairman, <strong>County</strong> Board<br />

<strong>Kane</strong> <strong>County</strong>, Illinois <strong>Kane</strong> <strong>County</strong>, Illinois<br />

Vote:<br />

Yes _____<br />

No _____<br />

Voice _____<br />

Abstentions _____<br />

5APCNORCHOVERI-88.4LH


KANE COUNTY DIVISION OF TRANSPORTATION<br />

TOWNSHIP<br />

COUNTY KANE<br />

BID TAB SECTION 11-00202-03-BR<br />

1 2 3 4 5 6<br />

7<br />

Orchard Rd over I 88 Tollway Improvement Bidders 7<br />

Apparent low bidder<br />

ENGINEERS ESTIMATE Areatha Constr. Co., Inc<br />

Herlihy Mid-Continent Co. Albin Carlson and Co. Sjostrom and Sons, Inc. Martam Construction, Inc. D Construction, Inc Alliance Contractors, Inc<br />

DATE: March 26, 20<strong>13</strong><br />

Streamwood, Illinois Romeoville, Illinois<br />

Lisle, Illinois<br />

Rockford, Illinois<br />

Elgin, Illinois<br />

Coal City, Illinois<br />

Woodstock, Illinois<br />

ITEM # ITEMS UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL<br />

1 TOPSO<strong>IL</strong> FURNISH AND PLACE, 6" SQ YD 421 7.50 3,157.50 5.00 2,105.00 4.80 2,020.80 10.00 4,210.00 12.00 5,052.00 8.00 3,368.00 7.00 2,947.00 4.80 2,021<br />

2 SEEDING, CLASS 2A ACRE 0.09 3,000.00 270.00 10000.00 900.00 10,000.00 900.00 15000.00 1,350.00 <strong>13</strong>000.00 1,170.00 20,000.00 1,800.00 10,000.00 900.00 10,000.00 900<br />

3 BITUMINOUS MATERIALS (PRIME COAT) GALLON 82 2.00 164.00 6.00 492.00 6.00 492.00 6.00 492.00 12.00 984.00 6.00 492.00 0.01 0.82 6.00 492<br />

4 <strong>AG</strong>GREGATE (PRIME COAT) TON 4 27.00 108.00 1.00 4.00 1.00 4.00 1.00 4.00 50.00 200.00 1.00 4.00 0.01 0.04 1.00 4<br />

5 POLYMERIZED HOT-MIX ASPHALT SURFACE COURSE, TON 98 110.00<br />

MIX "F", N90<br />

10,780.00 185.00 18,<strong>13</strong>0.00 185.00 18,<strong>13</strong>0.00 185.00 18,<strong>13</strong>0.00 290.00 28,420.00 200.00 19,600.00 95.00 9,310.00 185.00 18,<strong>13</strong>0<br />

6 PAVED SHOULDER REMOVAL SQ YD 815 15.00 12,225.00 8.00 6,520.00 8.00 6,520.00 12.00 9,780.00 9.00 7,335.00 8.00 6,520.00 10.00 8,150.00 8.00 6,520<br />

7 HOT-MIX ASPHALT SHOULDERS, 6" SQ YD 815 30.00 24,450.00 27.50 22,412.50 27.50 22,412.50 27.50 22,412.50 50.00 40,750.00 28.00 22,820.00 36.00 29,340.00 27.50 22,4<strong>13</strong><br />

8 CONCRETE REMOVAL CU YD 16 1,400.00 22,400.00 736.25 11,780.00 2,692.33 43,077.28 1650.00 26,400.00 3073.50 49,176.00 1,200.00 19,200.00 700.00 11,200.00 5,200.00 83,200<br />

9 PROTECTIVE SHIELD SQ YD 146 60.00 8,760.00 10.00 1,460.00 0.10 14.60 85.00 12,410.00 87.20 12,731.20 85.00 12,410.00 75.00 10,950.00 150.00 21,900<br />

10 CONCRETE SUPERSTRUCTURE CU YD 16 1,200.00 19,200.00 2634.00 42,144.00 2,246.83 35,949.28 1690.00 27,040.00 2777.90 44,446.40 2,600.00 41,600.00 1,800.00 28,800.00 5,840.00 93,440<br />

11 BRIDGE DECK GROOVING SQ YD 2543 8.00 20,344.00 5.75 14,622.25 4.55 11,570.65 5.75 14,622.25 6.70 17,038.10 6.00 15,258.00 8.00 20,344.00 5.65 14,368<br />

12 REINFORCEMENT BARS, EPOXY COATED POUND 2260 1.50 3,390.00 2.35 5,311.00 3.41 7,706.60 3.00 6,780.00 2.50 5,650.00 2.00 4,520.00 1.75 3,955.00 1.60 3,616<br />

<strong>13</strong> BAR SPLICERS EACH 36 40.00 1,440.00 34.40 1,238.40 37.54 1,351.44 32.00 1,152.00 28.70 1,033.20 30.00 1,080.00 25.00 900.00 40.00 1,440<br />

14 PREFORMED JOINT STRIP SEAL FOOT 172 300.00 51,600.00 161.30 27,743.60 167.32 28,779.04 190.00 32,680.00 <strong>13</strong>0.70 22,480.40 185.00 31,820.00 125.00 21,500.00 <strong>13</strong>6.00 23,392<br />

15 CONCRETE SEALER SQ FT 454 2.00 908.00 2.30 1,044.20 0.69 3<strong>13</strong>.26 1.35 612.90 2.60 1,180.40 5.00 2,270.00 1.75 794.50 1.00 454<br />

16 EPOXY CRACK INJECTION FOOT 438 50.00 21,900.00 30.00 <strong>13</strong>,140.00 28.00 12,264.00 28.00 12,264.00 28.00 12,264.00 32.00 14,016.00 28.00 12,264.00 28.00 12,264<br />

17 CONTROLLED LOW-STRENGTH MATERIAL CU YD 5 1,200.00 6,000.00 80.00 400.00 163.00 815.00 1200.00 6,000.00 200.00 1,000.00 180.00 900.00 225.00 1,125.00 78.00 390<br />

18 REMOVE AND REERECT RA<strong>IL</strong> ELEMENT OF EXISTING FOOT 37.5 100.00<br />

GUARDRA<strong>IL</strong><br />

3,750.00 21.00 787.50 21.00 787.50 21.00 787.50 21.00 787.50 20.00 750.00 15.00 562.50 36.50 1,369<br />

19 MOB<strong>IL</strong>IZATION L SUM 1 78,000.00 78,000.00 50000.00 50,000.00 57,000.00 57,000.00 14500.00 14,500.00 65000.00 65,000.00 72,000.00 72,000.00 45,000.00 45,000.00 25,390.00 25,390<br />

20 TRAFFIC CONTROL AND PROTECTION, STANDARD L SUM 1 30,000.00<br />

701606<br />

30,000.00 17500.00 17,500.00 16,800.00 16,800.00 17500.00 17,500.00 27400.00 27,400.00 70,000.00 70,000.00 10,000.00 10,000.00 17,500.00 17,500<br />

21 TRAFFIC CONTROL AND PROTECTION, STANDARD L SUM 1 3,000.00<br />

701701<br />

3,000.00 1000.00 1,000.00 1,000.00 1,000.00 1000.00 1,000.00 1.00 1.00 1.00 1.00 10,000.00 10,000.00 1,000.00 1,000<br />

22 CHANGEABLE MESS<strong>AG</strong>E SIGN CAL MO 8 2,500.00 20,000.00 850.00 6,800.00 850.00 6,800.00 850.00 6,800.00 400.00 3,200.00 500.00 4,000.00 1,350.00 10,800.00 850.00 6,800<br />

23 SHORT TERM PAVEMENT MARKING FOOT 1500 0.50 750.00 0.01 15.00 1.00 1,500.00 2.00 3,000.00 2.00 3,000.00 1.00 1,500.00 1.00 1,500.00 1.00 1,500<br />

24 PAVEMENT MARKING TAPE, TYPE III - LETTERS AND SQ FT 835 3.50<br />

SYMBOLS<br />

2,922.50 3.00 2,505.00 3.00 2,505.00 3.00 2,505.00 4.00 3,340.00 4.00 3,340.00 4.00 3,340.00 3.00 2,505<br />

25 PAVEMENT MARKING TAPE, TYPE III 4" FOOT 39043 0.65 25,377.95 0.85 33,186.55 0.85 33,186.55 0.85 33,186.55 1.00 39,043.00 1.00 39,043.00 1.20 46,851.60 0.85 33,187<br />

26 PAVEMENT MARKING TAPE, TYPE III 6" FOOT 5035 1.25 6,293.75 1.20 6,042.00 1.20 6,042.00 1.20 6,042.00 1.40 7,049.00 1.50 7,552.50 1.40 7,049.00 1.20 6,042<br />

27 PAVEMENT MARKING TAPE, TYPE III 12" FOOT 1711 3.00 5,<strong>13</strong>3.00 2.80 4,790.80 2.80 4,790.80 2.80 4,790.80 3.00 5,<strong>13</strong>3.00 3.00 5,<strong>13</strong>3.00 3.00 5,<strong>13</strong>3.00 2.80 4,791<br />

28 PAVEMENT MARKING TAPE, TYPE III 24" FOOT 470 6.00 2,820.00 5.00 2,350.00 5.00 2,350.00 5.00 2,350.00 6.00 2,820.00 7.00 3,290.00 6.00 2,820.00 5.00 2,350<br />

29 WORK ZONE PAVEMENT MARKING REMOVAL SQ FT 19018 0.50 9,509.00 0.30 5,705.40 0.30 5,705.40 0.30 5,705.40 0.01 190.18 0.01 190.18 1.50 28,527.00 0.30 5,705<br />

30 TEMPORARY CONCRETE BARRIER FOOT 1012.5 40.00 40,500.00 25.70 26,021.25 16.00 16,200.00 17.00 17,212.50 22.70 22,983.75 18.00 18,225.00 23.00 23,287.50 21.25 21,516<br />

31 RELOCATE TEMPORARY CONCRETE BARRIER FOOT 1050 10.00 10,500.00 3.60 3,780.00 3.70 3,885.00 7.00 7,350.00 5.20 5,460.00 6.00 6,300.00 12.00 12,600.00 8.75 9,188<br />

32 MODIFIED URETHANE PAVEMENT MARKING - LETTERS SQ FT 292 4.00<br />

AND SYMBOLS<br />

1,168.00 5.00 1,460.00 5.00 1,460.00 5.00 1,460.00 1.00 292.00 4.00 1,168.00 5.50 1,606.00 5.00 1,460<br />

33 MODIFIED URETHANE PAVEMENT MARKING - LINE 4" FOOT <strong>13</strong>000 1.00 <strong>13</strong>,000.00 0.55 7,150.00 0.55 7,150.00 0.55 7,150.00 0.70 9,100.00 1.10 14,300.00 0.72 9,360.00 0.55 7,150<br />

34 MODIFIED URETHANE PAVEMENT MARKING - LINE 6" FOOT 1589 1.25 1,986.25 1.00 1,589.00 1.00 1,589.00 1.00 1,589.00 1.10 1,747.90 1.80 2,860.20 1.10 1,747.90 1.00 1,589<br />

35 MODIFIED URETHANE PAVEMENT MARKING - LINE 12" FOOT 563 2.25 1,266.75 2.00 1,126.00 2.00 1,126.00 2.00 1,126.00 2.10 1,182.30 3.60 2,026.80 2.75 1,548.25 2.00 1,126<br />

36 MODIFIED URETHANE PAVEMENT MARKING - LINE 24" FOOT 162 6.00 972.00 5.00 810.00 5.00 810.00 5.00 810.00 4.10 664.20 7.20 1,166.40 5.50 891.00 5.00 810<br />

37 PAVEMENT MARKING REMOVAL SQ FT 6307 2.01 12,677.07 1.15 7,253.05 1.05 6,622.35 1.00 6,307.00 0.01 63.07 0.01 63.07 1.65 10,406.55 1.00 6,307<br />

38 MAINTENANCE OF EXISTING TRAFFIC SIGNAL<br />

EACH 1 4,000.00<br />

INSTALLATION<br />

4,000.00 3800.00 3,800.00 1,500.00 1,500.00 1400.00 1,400.00 1400.00 1,400.00 3,900.00 3,900.00 1,650.00 1,650.00 1,400.00 1,400<br />

39 MODIFY EXISTING CONTROLLER EACH 1 4,000.00 4,000.00 4395.00 4,395.00 3,000.00 3,000.00 3720.00 3,720.00 3720.00 3,720.00 3,600.00 3,600.00 3,300.00 3,300.00 3,720.00 3,720<br />

40 BRIDGE DECK SCARIFICATION 1 1/2" SQ YD 2765 50.00 <strong>13</strong>8,250.00 35.20 97,328.00 32.00 88,480.00 62.00 171,430.00 46.10 127,466.50 42.00 116,<strong>13</strong>0.00 45.00 124,425.00 83.40 230,601<br />

41 STRUCTURAL REPAIR OF CONCRETE (DEPTH EQUAL SQ FT 10 200.00<br />

TO OR LESS THAN 5 INCHES)<br />

2,000.00 165.00 1,650.00 200.00 2,000.00 150.00 1,500.00 280.50 2,805.00 360.00 3,600.00 150.00 1,500.00 610.00 6,100<br />

42 CONSTRUCTION LAYOUT EACH 1 8,000.00 8,000.00 2800.00 2,800.00 700.00 700.00 2000.00 2,000.00 5000.00 5,000.00 0.00 0.00 6,000.00 6,000.00 1,800.00 1,800<br />

43 DECK SLAB REPAIR (PARTIAL) SQ YD 216 300.00 64,800.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0<br />

44 IMPACT ATTENUATORS, TEMPORARY (FULLY<br />

EACH 2 6,500.00<br />

REDIRECTIVE, NARROW), TEST LEVEL 3<br />

<strong>13</strong>,000.00 4400.00 8,800.00 4,400.00 8,800.00 4400.00 8,800.00 4400.00 8,800.00 5,000.00 10,000.00 3,200.00 6,400.00 4,400.00 8,800<br />

45 IMPACT ATTENUATORS, RELOCATE<br />

EACH 2 2,400.00<br />

(FULLYREDIRECTIVE, NARROW), TEST LEVEL 3<br />

4,800.00 2340.00 4,680.00 2,340.00 4,680.00 2340.00 4,680.00 2340.00 4,680.00 2,500.00 5,000.00 1,250.00 2,500.00 2,340.00 4,680<br />

46 VIDEO VEHICLE DETECTION SYSTEM EACH 1 30,000.00 30,000.00 <strong>13</strong>780.00 <strong>13</strong>,780.00 15,000.00 15,000.00 12220.00 12,220.00 12220.00 12,220.00 15,000.00 15,000.00 16,500.00 16,500.00 12,220.00 12,220<br />

47 BRIDGE DECK LATEX CONCRETE OVERLAY 1 1/2 SQ YD 2765 150.00<br />

INCHES<br />

414,750.00 50.75 140,323.75 57.17 158,075.05 78.00 215,670.00 80.50 222,582.50 63.00 174,195.00 80.00 221,200.00 85.80 237,237<br />

48 ITEMS AS ORDERED BY ENGINEER DOLLAR 300000 1.00<br />

S<br />

300,000.00 1.00 300,000.00 1.00 300,000.00 1.00 300,000.00 1.00 300,000.00 1.00 300,000.00 1.00 300,000.00 1.00 300,000<br />

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0<br />

AS READ $1,460,322.77 $926,875.25 $951,865.10 $1,058,931.40 $1,<strong>13</strong>7,981.00 $1,087,012.15 $1,078,985.66 $1,268,784.88<br />

AS CORRECTED $1,<strong>13</strong>8,041.60 $1,078,644.15<br />

% +/- ESTIMATE -36.53 -34.82 -27.49 -22.07 -26.14 -26.1<strong>13</strong>20715 -<strong>13</strong>.116<strong>13</strong>425


Tanner Rd.<br />

Deerpath<br />

83 Feet<br />

83<br />

Orchard Rd.<br />

Section Number 11-00202-03-BR<br />

Orchard Road at I-88 Tollway Improvements<br />

0 500 1,000 2,000 3,000 4,000<br />

0 1 Miles<br />

Tollway Improvements<br />

Indian Trail Rd<br />

M:\dotserver2\USERS\Committee\20<strong>13</strong>04 <strong>April</strong>\Implementation\Construction\Orchard over I88 award\Map Standard_Orchard Rd at I88 loc map<br />

Mooseheart Rd.<br />

North Aurora<br />

88<br />

71<br />

Legend<br />

Aurora<br />

Virgil<br />

Hampshire Rutland Dundee<br />

Burlington<br />

467 34<br />

§¨¦ 88<br />

£¤ 30<br />

!( 31<br />

Plato<br />

Elgin<br />

Campton St. Charles<br />

Geneva<br />

<strong>Kane</strong>ville Blackberry<br />

Batavia<br />

Big Rock Sugar Grove Aurora<br />

Interstates<br />

US Roads<br />

State Roads<br />

<strong>County</strong> Roads<br />

Other Roads<br />

Rail Roads<br />

<strong>County</strong> Boundry<br />

Township Boundry<br />

Fox River<br />

Forest Preserves<br />

Municipalities<br />

/


Tanner Rd.<br />

Deerpath<br />

83 Feet<br />

83<br />

Orchard Rd.<br />

Section Number 11-00202-03-BR<br />

Orchard Road at I-88 Tollway Improvements<br />

0 500 1,000 2,000 3,000 4,000<br />

0 1<br />

Miles<br />

Tollway Improvements<br />

Indian Trail Rd<br />

88<br />

M:\dotserver2\USERS\Committee\20<strong>13</strong>04 <strong>April</strong>\Implementation\Construction\Orchard over I88 award\Map Standard Aerial_Orchard Rd at I88 loc map<br />

71<br />

Legend<br />

Hampshire Rutland Dundee<br />

Burlington<br />

Virgil<br />

§¨¦ 88<br />

£¤ 30<br />

467 34<br />

!( 31<br />

Plato<br />

Elgin<br />

Campton St. Charles<br />

Geneva<br />

<strong>Kane</strong>ville Blackberry<br />

Batavia<br />

Big Roc k Sugar Grove Aurora<br />

Interstates<br />

US Roads<br />

State Roads<br />

<strong>County</strong> Roads<br />

Other Roads<br />

Rail Roads<br />

<strong>County</strong> Boundry<br />

Township Boundry<br />

Fox River<br />

Forest Preserves<br />

Municipalities<br />

/


If not budgeted,<br />

explain funding<br />

source<br />

<strong>AG</strong>ENDA ITEM EXECUTIVE SUMMARY Agenda Item #<br />

Presenter/Sponsor:<br />

Name<br />

Budget Information: Was this item budgeted?<br />

SUMMARY:<br />

Attachments:<br />

Detailed information available from :<br />

Resolution/Ordinance Tracking:<br />

Staff Name:<br />

Appropriation Amount:<br />

Steve Coffinbargar, Assistant Director Phone: 630.406.7170<br />

Assigned Committee: Transportation Sent to: Executive<br />

on: 04/11/20<strong>13</strong><br />

If Other, specify:<br />

Committee Remarks:<br />

<strong>County</strong> Board Date:<br />

Resolution<br />

Ordinance<br />

Yes<br />

No N/A<br />

Next Committee: Executive Sent to: <strong>County</strong> Board on: 05/08/20<strong>13</strong><br />

If Other, specify:<br />

Committee Remarks:<br />

Next Committee: Sent to: on:<br />

Committee Remarks:<br />

8C-3a<br />

Approving a Phase III Construction Engineering Services Agreement with Christopher<br />

B. Burke Engineering, Ltd. for Stearns Road Corridor Monitoring and Maintenance,<br />

<strong>Kane</strong> <strong>County</strong> Section No. <strong>13</strong>-00214-02-SM<br />

Steve Coffinbargar - Assistant Director of Transportation<br />

$49,848.10<br />

<strong>Kane</strong> <strong>County</strong> requires Phase III Engineering Services (Construction Engineering) to oversee this improvement to eliminate<br />

invasive species and keep the existing site in compliance with the environmental permit for the Stearns Corridor. To initiate<br />

Phase III Engineering, staff completed the consultant selection process using current QBS Procedures.<br />

The QBS Process entailed notification of the122 consulting firms within Transportation’s Consultant Database by email of<br />

the <strong>County</strong>’s need for engineering services. Seven (7) consulting firms responded and submitted a Statement of Interest.<br />

Three (3) prequalified consulting firms were short-listed and requested to submit a proposal. Staff conducted face to face<br />

interviews, which along with the proposal, were used to develop an overall score for each firm. The overall score of each<br />

firm is as follows: Christopher B. Burke Engineering, Ltd - 86, WBK - 81, James J. Benes and Assoc., Inc. - 70.<br />

Christopher B. Burke Engineering, Inc. was selected and a contract was negotiated to provide Phase III Engineering Services.<br />

The negotiated contract is for a not to exceed amount of $49,848.10.<br />

Resolution, Engineering Agreement, Maps<br />

05/14/20<strong>13</strong>


STATE OF <strong>IL</strong>LINOIS<br />

COUNTY OF KANE<br />

RESOLUTION NO. <strong>13</strong> -<br />

APPROVING A PHASE III CONSTRUCTION ENGINEERING SERVICES <strong>AG</strong>REEMENT<br />

WITH CHRISTOPHER B. BURKE ENGINEERING, LTD. FOR<br />

STEARNS ROAD CORRIDOR MONITORING AND MAINTENANCE<br />

KANE COUNTY SECTION NO. <strong>13</strong>-00214-02-SM<br />

WHEREAS, Phase III Engineering services are needed for the Stearns Road Corridor<br />

Monitoring and Maintenance project (herein referred to as the “Project”); and<br />

WHEREAS, in order to accomplish the Project, it is necessary to retain the services of a<br />

professional engineering firm to provide Phase III Engineering services therefor; and<br />

WHEREAS, Christopher B. Burke Engineering, Ltd., 9575 West Higgins Road, Suite 600,<br />

Rosemont, <strong>IL</strong> 60018 has experience and professional expertise in Phase III Engineering and is willing<br />

to perform the required services for an amount not to exceed Forty Nine Thousand Eight Hundred Forty<br />

Eight and 10/100 ($49,848.10) as set forth in the Phase III Engineering Services agreement (a copy of<br />

which is on file with the <strong>County</strong> Clerk’s Office).<br />

NOW, THEREFORE, BE IT RESOLVED by the <strong>Kane</strong> <strong>County</strong> Board that the Chairman thereof<br />

is hereby authorized to execute a Phase III Engineering services agreement with Christopher B. Burke<br />

Engineering, Ltd..<br />

BE IT FURTHER RESOLVED that the <strong>Kane</strong> <strong>County</strong> Board appropriates the not to exceed sum<br />

of Forty Nine Thousand Eight Hundred Forty Eight and 10/100 ($49,848.10) from Transportation Sales<br />

Tax Fund #305, Line Item #50140 (Engineering) to pay for said Phase III Engineering services for the<br />

Improvement.<br />

Line Item Line Item Description Was<br />

personnel/item/service<br />

approved in original<br />

budget or a subsequent<br />

budget revision?<br />

Are funds currently<br />

available for this<br />

personnel/item/service in<br />

the specific line item?<br />

305.520.527.50140 Engineering Yes Yes<br />

If funds are not<br />

currently available in<br />

the specified line item,<br />

where are the funds<br />

available?


Passed by the <strong>Kane</strong> <strong>County</strong> Board on May 14, 20<strong>13</strong>.<br />

Page 2 of 2, Res. #<strong>13</strong>-<br />

______________________________________ ___________________________________<br />

John A. Cunningham Christopher J. Lauzen<br />

Clerk, <strong>County</strong> Board Chairman, <strong>County</strong> Board<br />

<strong>Kane</strong> <strong>County</strong>, Illinois <strong>Kane</strong> <strong>County</strong>, Illinois<br />

Vote:<br />

Yes _____<br />

No _____<br />

Voice _____<br />

Abstentions _____<br />

5STRNSCRRDRMNT-PHIII-BURKE .4LH


Legend<br />

467 34<br />

§¨¦ 88<br />

tu 30<br />

!( 31<br />

Randall Rd.<br />

Interstates<br />

US Roads<br />

State Roads<br />

<strong>County</strong> Roads<br />

Other Roads<br />

Rail Roads<br />

<strong>County</strong> Boundry<br />

Township Boundry<br />

Fox River<br />

Forest Preserves<br />

Municipalities<br />

McLean<br />

31<br />

Stearns Road Corridor<br />

8<br />

South<br />

Elgin<br />

0 1<br />

Miles<br />

M:\dotserver2\USERS\Committee\1003 34March<br />

2010\Implementation\Design\Stearns, Corridor Maintenance\MapStandard_Stearns Road Corridor Loc Map.mxd<br />

Stearns Road Corridor<br />

Army Trail Rd.<br />

Wayne<br />

m Rd.<br />

Burlington Plato<br />

Virgil Campton<br />

Big Rock<br />

Bartlet<br />

19<br />

61<br />

Elgin<br />

20<br />

St.<br />

Charles<br />

Hampshire Rutland Dundee<br />

Geneva<br />

<strong>Kane</strong>ville<br />

Blackberry<br />

Batavia<br />

Sugar<br />

Grove<br />

Aurora<br />

37<br />

/


Legend<br />

467 34<br />

§¨¦ 88<br />

tu 30<br />

!( 31<br />

Randall Rd.<br />

Interstates<br />

US Roads<br />

State Roads<br />

<strong>County</strong> Roads<br />

Other Roads<br />

Rail Roads<br />

<strong>County</strong> Boundry<br />

Township Boundry<br />

Fox River<br />

Forest Preserves<br />

Municipalities<br />

McLean<br />

31<br />

Stearns Road Corridor<br />

0 1<br />

Miles<br />

M:\dotserver2\USERS\Committee\1003 34March<br />

2010\Implementation\Design\Stearns, Corridor Maintenance\MapStandard_Stearns Road Corridor Loc Map.mxd<br />

8<br />

Stearns Road Corridor<br />

Army Trail Rd.<br />

m Rd.<br />

Burlington Plato<br />

Virgil Campton<br />

Big Rock<br />

19<br />

61<br />

Elgin<br />

20<br />

St.<br />

Charles<br />

Hampshire Rutland Dundee<br />

Geneva<br />

<strong>Kane</strong>ville<br />

Blackberry<br />

Batavia<br />

Sugar<br />

Grove<br />

Aurora<br />

37<br />

/


If not budgeted,<br />

explain funding<br />

source<br />

<strong>AG</strong>ENDA ITEM EXECUTIVE SUMMARY Agenda Item #<br />

Presenter/Sponsor:<br />

Name<br />

Budget Information: Was this item budgeted?<br />

SUMMARY:<br />

Attachments:<br />

Detailed information available from :<br />

Resolution/Ordinance Tracking:<br />

Staff Name:<br />

Appropriation Amount:<br />

Steve Coffinbargar, Assistant Director Phone: 630-406-7170<br />

Assigned Committee: Transportation Sent to: Executive<br />

on: 04/11/20<strong>13</strong><br />

If Other, specify:<br />

Committee Remarks:<br />

<strong>County</strong> Board Date:<br />

Resolution<br />

Ordinance<br />

Yes<br />

No N/A<br />

Next Committee: Executive Sent to: <strong>County</strong> Board on: 05/08/20<strong>13</strong><br />

If Other, specify:<br />

Committee Remarks:<br />

Next Committee: Sent to: on:<br />

Committee Remarks:<br />

8C-3b<br />

Approving Contract for Construction, Stearns Road Environmental Maintenance,<br />

<strong>Kane</strong> <strong>County</strong> Section No. <strong>13</strong>-00214-02-SM<br />

Steve Coffinbargar - Assistant Director of Transportation<br />

$179,782.00<br />

On March 28, 20<strong>13</strong>, construction bids were opened at the Division of Transportation office for the Stearns Road Corridor<br />

Environmental Maintenance project. The scope of this project involves controlled burning, weed control and seeding at<br />

various locations along the Stearns Road Corridor to control invasive species and keep the corridor environmental sites in<br />

compliance with the USACOE permit. Construction is anticipated to take approximately 6-7 months and the work will be<br />

conducted within the corridor with little impact to daily traffic. The project is scheduled to be completed by the end of 20<strong>13</strong>.<br />

The apparent low bidder is Nettle Creek Nursery, Inc. of Morris, Illinois with a proposed contract amount of $179,782.00. The<br />

low bid amount is approximately 18.28% below the engineer’s estimate of $220,000.00.<br />

Resolution, Bid Tabulation, Location Map<br />

05/14/20<strong>13</strong>


STATE OF <strong>IL</strong>LINOIS<br />

COUNTY OF KANE<br />

RESOLUTION NO. <strong>13</strong> -<br />

APPROVING CONTRACT FOR CONSTRUCTION<br />

STEARNS ROAD ENVIRONMENTAL MAINTENANCE<br />

KANE COUNTY SECTION NO. <strong>13</strong>-00214-02-SM<br />

WHEREAS, the <strong>Kane</strong> <strong>County</strong> Division of Transportation has solicited and received bids for the<br />

work and/or construction described as:<br />

KANE COUNTY SEC. NO. <strong>13</strong>-00214-02-SM<br />

STEARNS ROAD ENVIRONMENTAL MAINTENANCE<br />

(hereinafter the “Project”)<br />

WHEREAS, the lowest responsible bidder for the Project is:<br />

NETTLE CREEK NURSERY, INC. OF MORRIS, <strong>IL</strong>LINOIS<br />

with a low bid of<br />

$179,782.00<br />

NOW, THEREFORE, BE IT RESOLVED by the <strong>Kane</strong> <strong>County</strong> Board that a contract for the<br />

Project described hereinabove shall be awarded to the lowest responsible bidder in the amount as<br />

indicated hereinabove and that the <strong>County</strong> Board Chairman is hereby authorized and directed to<br />

execute a contract and contractor’s bond therefor.<br />

BE IT FURTHER RESOLVED that there is hereby appropriated the sum of One Hundred<br />

Seventy Nine Thousand Seventy Hundred Eighty Two Dollars ($179,782.00) from Transportation Sales<br />

Tax Fund #305, Line Item #73000 (Road Construction) to pay for the Project.<br />

Line Item Line Item Description Was<br />

personnel/item/service<br />

approved in original<br />

budget or a subsequent<br />

budget revision?<br />

305.520.527.73000<br />

Road Construction<br />

Yes<br />

Are funds currently<br />

available for this<br />

personnel/item/service in<br />

the specific line item?<br />

Yes<br />

If funds are not<br />

currently available in<br />

the specified line item,<br />

where are the funds<br />

available?


Passed by the <strong>Kane</strong> <strong>County</strong> Board on May 14, 20<strong>13</strong>.<br />

Page 2 of 2, Res. #<strong>13</strong>-<br />

______________________________________ ___________________________________<br />

John A. Cunningham Christopher J. Lauzen<br />

Clerk, <strong>County</strong> Board Chairman, <strong>County</strong> Board<br />

<strong>Kane</strong> <strong>County</strong>, Illinois <strong>Kane</strong> <strong>County</strong>, Illinois<br />

Vote:<br />

Yes _____<br />

No _____<br />

Voice _____<br />

Abstentions _____<br />

5APCNSTRNSCRRDRMNT.4LH


TOWNSHIP<br />

KANE COUNTY DIVISION OF TRANSPORTATION COUNTY KANE<br />

BID TAB SECTION <strong>13</strong>-00214-02-SM<br />

Environmental Maintenance Stearns Road Corridor<br />

ENGINEERS ESTIMATE Nettle Creek Nursery, Inc. McGinty Bros. Inc Encap, Inc.<br />

DATE: Mar 28, 20<strong>13</strong><br />

APPARENT LOW BID<br />

ITEM # ITEMS UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL<br />

8 TRAFFIC CONTROL AND PROTECTION L SUM 1.00 $5,000.00 5,000.00 778.00 778.00 6,500.00 6,500.00 2500.00 2,500.00<br />

9 WEED CONTROL, NON-SELECTIVE AND NON-<br />

RESIDUAL WEED CONTROL, (UPLAND) NON-SELECTIVE AND NON-<br />

ACRE 1.84 $1,200.00 2,208.00 400.00 736.00 500.00 920.00 1700.00 3,128.00<br />

11 RESIDUAL (WETLAND) ACRE 2.96 $1,500.00 4,440.00 400.00 1,184.00 500.00 1,480.00 1860.00 5,505.60<br />

12 WEED CONTROL, NON-SELECTIVE AND NON-<br />

RESIDUAL (UPLAND) & WEED CONTROL, TEASEL ACRE 7.50 $1,300.00 9,750.00 450.00 3,375.00 700.00 5,250.00 1575.00 11,812.50<br />

<strong>13</strong> WEED CONTROL, NON-SELECTIVE AND NON-<br />

RESIDUAL (WETLAND) ACRE 6.68 $1,400.00 9,352.00 400.00 2,672.00 500.00 3,340.00 1400.00 9,352.00<br />

14 WEED CONTROL, NON-SELECTIVE AND NON-<br />

RESIDUAL (UPLAND) & WEED CONTROL, TEASEL ACRE 27.85 $600.00 16,710.00 450.00 12,532.50 500.00 <strong>13</strong>,925.00 1550.00 43,167.50<br />

18 CONTROL BURN ACRE 11.84 $500.00 5,920.00 250.00 2,960.00 440.00 5,209.60 400.00 4,736.00<br />

19 CONTROL BURN ACRE 30.00 $500.00 15,000.00 250.00 7,500.00 440.00 <strong>13</strong>,200.00 365.00 10,950.00<br />

20 CONTROL BURN ACRE 8.91 $500.00 4,455.00 250.00 2,227.50 440.00 3,920.40 350.00 3,118.50<br />

21 CONTROL BURN ACRE 37.14 $500.00 18,570.00 250.00 9,285.00 440.00 16,341.60 345.00 12,8<strong>13</strong>.30<br />

25 WEED CONTROL, HAND REMOVAL ACRE 0.28 $4,000.00 1,120.00 1500.00 420.00 11,250.00 3,150.00 4000.00 1,120.00<br />

34 SEEDING, CLASS 4 (MODIFIED) DETENTION BASIN ACRE 2.96 1,800.00 5,328.00 2400.00 7,104.00 1,475.00 4,366.00 1825.00 5,402.00<br />

35 SEEDING, CLASS 4 (MODIFIED) MESIC PRAIRIE &<br />

SEEDING, CLASS 5 (MODIFIED) MESIC PRAIRIE ACRE 7.50 1,800.00 <strong>13</strong>,500.00 1900.00 14,250.00 1,860.00 <strong>13</strong>,950.00 1225.00 9,187.50<br />

36 SEEDING, CLASS 4 (MODIFIED) DETENTION BASIN ACRE 6.68 1,700.00 11,356.00 2,400.00 16,032.00 1,475.00 9,853.00 1,650.00 11,022.00<br />

37 SEEDING, CLASS 4 (MODIFIED) MESIC PRAIRIE &<br />

SEEDING, CLASS 5 (MODIFIED) MESIC PRAIRIE ACRE 27.85 1,600.00 44,560.00 1,900.00 52,915.00 1,860.00 51,801.00 1,100.00 30,635.00<br />

40 SELECTIVE CLEARING ACRE 1.50 2,000.00 3,000.00 600.00 900.00 6,700.00 10,050.00 1,925.00 2,887.50<br />

55 WEED CONTROL, HAND REMOVAL ACRE 9.64 2,000.00 19,280.00 1,500.00 14,460.00 900.00 8,676.00 1,500.00 14,460.00<br />

56 ITEMS AS ORDERED BY ENGINEER DOLLAR 30451.00 1.00 30,451.00 1.00 30,451.00 1.00 30,451.00 1.00 30,451.00<br />

AS READ $220,000.00 $179,782.00 $202,383.60 $212,248.40<br />

AS CORRECTED<br />

% +/- ESTIMATE -18.28 -8.01 -3.52


Legend<br />

467 34<br />

§¨¦ 88<br />

tu 30<br />

!( 31<br />

Randall Rd.<br />

Interstates<br />

US Roads<br />

State Roads<br />

<strong>County</strong> Roads<br />

Other Roads<br />

Rail Roads<br />

<strong>County</strong> Boundry<br />

Township Boundry<br />

Fox River<br />

Forest Preserves<br />

Municipalities<br />

McLean<br />

31<br />

Stearns Road Corridor<br />

8<br />

South<br />

Elgin<br />

0 1<br />

Miles<br />

M:\dotserver2\USERS\Committee\1003 34March<br />

2010\Implementation\Design\Stearns, Corridor Maintenance\MapStandard_Stearns Road Corridor Loc Map.mxd<br />

Stearns Road Corridor<br />

Army Trail Rd.<br />

Wayne<br />

m Rd.<br />

Burlington Plato<br />

Virgil Campton<br />

Big Rock<br />

Bartlet<br />

19<br />

61<br />

Elgin<br />

20<br />

St.<br />

Charles<br />

Hampshire Rutland Dundee<br />

Geneva<br />

<strong>Kane</strong>ville<br />

Blackberry<br />

Batavia<br />

Sugar<br />

Grove<br />

Aurora<br />

37<br />

/


Legend<br />

467 34<br />

§¨¦ 88<br />

tu 30<br />

!( 31<br />

Randall Rd.<br />

Interstates<br />

US Roads<br />

State Roads<br />

<strong>County</strong> Roads<br />

Other Roads<br />

Rail Roads<br />

<strong>County</strong> Boundry<br />

Township Boundry<br />

Fox River<br />

Forest Preserves<br />

Municipalities<br />

McLean<br />

31<br />

Stearns Road Corridor<br />

0 1<br />

Miles<br />

M:\dotserver2\USERS\Committee\1003 34March<br />

2010\Implementation\Design\Stearns, Corridor Maintenance\MapStandard_Stearns Road Corridor Loc Map.mxd<br />

8<br />

Stearns Road Corridor<br />

Army Trail Rd.<br />

m Rd.<br />

Burlington Plato<br />

Virgil Campton<br />

Big Rock<br />

19<br />

61<br />

Elgin<br />

20<br />

St.<br />

Charles<br />

Hampshire Rutland Dundee<br />

Geneva<br />

<strong>Kane</strong>ville<br />

Blackberry<br />

Batavia<br />

Sugar<br />

Grove<br />

Aurora<br />

37<br />

/


If not budgeted,<br />

explain funding<br />

source<br />

<strong>AG</strong>ENDA ITEM EXECUTIVE SUMMARY Agenda Item #<br />

Presenter/Sponsor:<br />

Name<br />

Budget Information: Was this item budgeted?<br />

SUMMARY:<br />

Attachments:<br />

Detailed information available from :<br />

Resolution/Ordinance Tracking:<br />

Staff Name:<br />

Appropriation Amount:<br />

Steve Coffinbargar, Assistant Director Phone: 630-406-7170<br />

Assigned Committee: Transportation Sent to: Executive<br />

on: 04/11/20<strong>13</strong><br />

If Other, specify:<br />

Committee Remarks:<br />

<strong>County</strong> Board Date:<br />

Resolution<br />

Ordinance<br />

Yes<br />

No N/A<br />

Next Committee: Executive Sent to: <strong>County</strong> Board on: 05/08/20<strong>13</strong><br />

If Other, specify:<br />

Committee Remarks:<br />

Next Committee: Sent to: on:<br />

Committee Remarks:<br />

8C-4a<br />

Approving an Intergovernmental Agreement Between the Illinois State Toll Highway<br />

Authority and the <strong>County</strong> of <strong>Kane</strong> for the Improvement of the Randall Road (C.H. No.<br />

34) Bridge Over I-90<br />

Steve Coffinbargar, Assistant Director of Transportation<br />

$47,916.00<br />

The Illinois Tollway's proposed Jane Addams Tollway (I-90) add lanes/reconstruction improvement from U.S. Route 20 to the<br />

Elgin Toll Plaza is targeting construction during 20<strong>13</strong> and 2014. The Illinois Tollway approached <strong>Kane</strong> <strong>County</strong> asking if we<br />

would like to include the minor bridge superstructure repairs to replace the bridge joints in their overall I-90 mainline<br />

construction contract. <strong>KDOT</strong> had previously programmed dollars towards engineering and construction in future fiscal<br />

years for a stand-alone contract for miscellaneous repairs to the Randall Road over I-90 bridge superstructure. By combining<br />

our proposed bridge joint replacement work with their overall corridor improvement will likely result in a cost savings<br />

compared to <strong>KDOT</strong> engineering and letting a stand-alone contract.<br />

<strong>Kane</strong> <strong>County</strong>'s share of towards engineering and construction is estimated at $39,930.00, plus 20% contingency, totals<br />

$47,916.00.<br />

Location Maps<br />

05/14/20<strong>13</strong>


STATE OF <strong>IL</strong>LINOIS<br />

COUNTY OF KANE<br />

RESOLUTION NO. <strong>13</strong> -<br />

APPROVING AN INTERGOVERNMENTAL <strong>AG</strong>REEMENT BETWEEN<br />

THE <strong>IL</strong>LINOIS STATE TOLL HIGHWAY AUTHORITY AND THE COUNTY OF KANE<br />

FOR THE IMPROVEMENT OF THE<br />

RANDALL ROAD (C.H. NO. 34) BRIDGE OVER I-90<br />

WHEREAS, the Illinois Constitution of 1970, Article VII, Section 10 and 5 <strong>IL</strong>CS 220/1 et seq.<br />

authorizes the <strong>County</strong> of <strong>Kane</strong> (hereinafter “<strong>Kane</strong>”) and the Illinois State Toll Highway Authority<br />

(hereinafter “ISTHA”) to cooperate in the performance of their respective duties and responsibilities by<br />

contract and the other agreements; and<br />

WHEREAS, <strong>Kane</strong> and ISTHA, in order to facilitate the free flow of traffic and ensure safety to<br />

the motoring public, desire to improve the bridge superstructure of the <strong>Kane</strong> <strong>County</strong> Highway No. 34<br />

(also known as “Randall Road”) Bridge over I-90 (hereinafter the “Project”); and<br />

WHEREAS, <strong>Kane</strong> and ISTHA desire to enter into an intergovernmental agreement (a copy of<br />

which is on file with the <strong>County</strong> Clerk's Office) for the Phase III Construction of the Project; and<br />

WHEREAS, <strong>Kane</strong> and ISTHA have determined a mutually satisfactory allocation of<br />

responsibilities and all costs for the Project as set forth in the intergovernmental agreement; and<br />

WHEREAS, <strong>Kane</strong> <strong>County</strong>’s financial participation in the Phase III Construction is estimated to<br />

be $47,916.00 which represents the <strong>County</strong>’s estimated share of the Project cost plus a 20%<br />

contingency.<br />

NOW, THEREFORE, BE IT RESOLVED that the <strong>Kane</strong> <strong>County</strong> Board hereby approve an<br />

intergovernmental agreement between the <strong>County</strong> of <strong>Kane</strong> and the Illinois State Toll Highway Authority<br />

and that the <strong>Kane</strong> <strong>County</strong> Board Chairman is hereby authorized to execute an intergovernmental<br />

agreement for the Phase III Construction of the Project.<br />

BE IT FURTHER RESOLVED that the <strong>Kane</strong> <strong>County</strong> Board hereby appropriates the sum of<br />

Forty Seven Thousand Nine Hundred Sixteen Dollars ($47,916.00) from Transportation Sales Tax Fund<br />

#305, Line Item #73010 (Bridge Construction) for the <strong>County</strong>’s share of the cost of the Project.<br />

Line Item Line Item Description Was<br />

personnel/item/service<br />

approved in original<br />

budget or a subsequent<br />

budget revision?<br />

Are funds currently<br />

available for this<br />

personnel/item/service in<br />

the specific line item?<br />

305.520.527.73010 Bridge Construction Yes Yes<br />

If funds are not<br />

currently available in<br />

the specified line item,<br />

where are the funds<br />

available?


Passed by the <strong>Kane</strong> <strong>County</strong> Board on May 14, 20<strong>13</strong><br />

Page 2 of 2, Res. #<strong>13</strong>-<br />

______________________________________ ___________________________________<br />

John A. Cunningham Christopher J. Lauzen<br />

Clerk, <strong>County</strong> Board Chairman, <strong>County</strong> Board<br />

<strong>Kane</strong> <strong>County</strong>, Illinois <strong>Kane</strong> <strong>County</strong>, Illinois<br />

Vote:<br />

Yes _____<br />

No _____<br />

Voice _____<br />

Abstentions _____<br />

5RND I-90 ISTHA IGA.4LH


INTERGOVERNMENTAL <strong>AG</strong>REEMENT BETWEEN<br />

THE <strong>IL</strong>LINOIS STATE TOLL HIGHWAY AUTHORITY<br />

AND<br />

THE COUNTY OF KANE<br />

This INTERGOVERNMENTAL <strong>AG</strong>REEMENT (hereinafter referred to as the<br />

“<strong>AG</strong>REEMENT”) is entered into this ______ day of May , 20<strong>13</strong>, by and between the<br />

<strong>IL</strong>LINOIS STATE TOLL HIGHWAY AUTHORITY, an instrumentality and<br />

administrative agency of the State of Illinois, hereinafter called the "TOLLWAY", and<br />

the COUNTY OF KANE, a body corporate and politic of the State of Illinois, hereinafter<br />

called the "COUNTY". The COUNTY and the TOLLWAY are each hereinafter<br />

individually referred to as a “PARTY”, and collectively referred to as the “PARTIES”.<br />

WITNESSETH:<br />

WHEREAS, the TOLLWAY in order to facilitate the free flow of traffic and<br />

ensure the safety of the motoring public, is desirous of improving the Jane Addams<br />

Tollway (I-90) from U.S. Route 20 to the Elgin Plaza (hereinafter sometimes referred to<br />

as the "Toll Highway"). The desired improvements include work on the <strong>Kane</strong> <strong>County</strong><br />

Highway No 34 (also known as Randall Road) Bridge over the Toll Highway (hereinafter<br />

the “Bridge”) which improvements are part of TOLLWAY construction contract(s)<br />

including but not limited to Contract __________ (hereinafter referred to as the<br />

"PROJECT"). The improvements include the following:<br />

Minor structural repairs including epoxy crack injections at piers and abutments.<br />

Performing formed concrete repairs at piers and abutments with crash wall modification<br />

at the piers. Encase the “Raymond Piles” columns with a 6 inch thick concrete jacket.<br />

Clean and paint the bearings. Clean the bearing seats, and by performing any other work<br />

in accordance with the approved plans and specifications; and<br />

WHEREAS, the COUNTY requests that the TOLLWAY include in the<br />

PROJECT the replacement of the expansion joint strip seals on the Bridge’s abutments;<br />

and<br />

WHEREAS, the TOLLWAY agrees to the COUNTY's request to replace the<br />

expansion joint strip seals as aforesaid; and<br />

WHEREAS, the TOLLWAY and the COUNTY by this instrument, desire to<br />

determine and establish their respective responsibilities toward engineering, right of way<br />

acquisition, utility relocation, construction, funding and maintenance of the PROJECT as<br />

proposed; and<br />

WHEREAS, the TOLLWAY by virtue of its powers as set forth in the "Toll<br />

Highway Act," 605 <strong>IL</strong>CS 10/1 et seq. is authorized to enter into this <strong>AG</strong>REEMENT; and<br />

1


WHEREAS, the COUNTY by virtue of its powers as set forth in the Counties<br />

Code 55 <strong>IL</strong>CS 5/1-1001 et seq. is authorized to enter into this <strong>AG</strong>REEMENT; and<br />

WHEREAS, a cooperative Intergovernmental Agreement is appropriate and such<br />

an Agreement is authorized by Article VII, Section 10 of the Illinois Constitution and the<br />

“Intergovernmental Cooperation Act”, 5 <strong>IL</strong>CS 220/1 et seq.<br />

NOW, THEREFORE, in consideration of the aforementioned recitals and the<br />

mutual covenants contained herein, the PARTIES hereto agree as follows:<br />

I. ENGINEERING<br />

A. The TOLLWAY agrees to perform preliminary and final design engineering,<br />

obtain necessary surveys, and prepare the final plans and specifications for the<br />

PROJECT, subject to reimbursement by the COUNTY as hereinafter stipulated.<br />

B. The COUNTY shall review the plans and specifications which impact the<br />

COUNTY's maintained highway (Randall Road) within fifteen (15) calendar days<br />

of receipt thereof. If the TOLLWAY does not receive comments or objections<br />

from the COUNTY within this time period, the lack of response shall be deemed<br />

approval of the plans and specifications. Approval by the COUNTY shall mean<br />

the COUNTY agrees with all specifications in the plans, including alignment and<br />

location of the PROJECT improvements which impact the COUNTY's<br />

maintained highways. In the event of disapproval, the COUNTY will detail in<br />

writing its objections to the proposed plans and specifications for review and<br />

consideration by the TOLLWAY. Notwithstanding, any disapproval by the<br />

COUNTY, the TOLLWAY after considering the COUNTY's objections shall<br />

proceed as the Chief Engineer of the TOLLWAY deems appropriate.<br />

C. Any dispute concerning the plans and specifications shall be resolved in<br />

accordance with Section IX of this <strong>AG</strong>REEMENT.<br />

D. The final approved plans and specifications for the PROJECT shall be promptly<br />

delivered to the COUNTY by the TOLLWAY.<br />

E. The TOLLWAY agrees to assume the overall PROJECT responsibility, including<br />

assuring that all permits (U.S. Army Corps of Engineers, Illinois Department of<br />

Natural Resources, Metropolitan Water Reclamation District of Greater Chicago,<br />

Environmental Protection Agency, etc.) and joint participation and/or force<br />

account agreements (<strong>County</strong>, Township, Municipal, Railroad, Utility, etc.), as<br />

may be required by the PROJECT, are secured by the PARTIES hereto in support<br />

of general project schedules and deadlines. All PARTIES hereto agree to<br />

cooperate, insofar as their individual jurisdictional authorities allow, with the<br />

timely acquisition and clearance of said permits and agreements and in complying<br />

with all applicable Federal, State, and local regulations and requirements<br />

pertaining to work proposed for the PROJECT.<br />

2


F. The COUNTY shall grant and consent to any and all permits, rights of access<br />

(ingress and egress), temporary use to the TOLLWAY, without charge to the<br />

TOLLWAY. Any permit for right of access, temporary use shall not be<br />

unreasonably withheld by the COUNTY.<br />

II. RIGHT OF WAY<br />

A. The acquisition or transfer of right of way is not required for the construction of<br />

the PROJECT pursuant to the approved plans and specifications. Therefore, it is<br />

understood by the PARTIES hereto that there will be no exchange of any interest<br />

in the COUNTY’s right of way or of the TOLLWAY’s right of way.<br />

B. In the event, the TOLLWAY identifies areas of the COUNTY’s right of way<br />

needed for the TOLLWAY to enter, access and use to allow the TOLLWAY<br />

and/or its contractor(s) to complete the PROJECT, the COUNTY shall allow the<br />

TOLLWAY and its contractors to utilize said right of way. In addition, the<br />

COUNTY shall waive the contractor’s surety bonding requirement. The<br />

TOLLWAY agrees upon completion of the PROJECT, that those areas of the<br />

COUNTY’s right of way used are to be restored to an “as good as – or – better”<br />

than pre-construction condition.<br />

III. UT<strong>IL</strong>ITY RELOCATION<br />

A. The TOLLWAY agrees to provide the COUNTY, as soon as they are identified,<br />

the locations (existing and proposed) of public and/or private utility facilities<br />

within existing COUNTY rights of way which require adjustment as part of the<br />

PROJECT. As part of its PROJECT engineering responsibilities, the TOLLWAY<br />

shall identify adjustments to the aforementioned existing utilities.<br />

B. The TOLLWAY agrees to make all reasonable efforts to minimize the number of<br />

utility adjustments in the design of improvements: 1) to TOLLWAY facilities<br />

where they cross COUNTY highway rights of way; and 2) to COUNTY facilities<br />

improved as part of the PROJECT.<br />

C. The COUNTY agrees to make arrangements for and issue all utility permits for<br />

COUNTY rights of way for the PROJECT and cooperate with necessary<br />

adjustments to existing utilities located within existing COUNTY rights of way<br />

where improvements to COUNTY highways are proposed by the COUNTY to be<br />

done in conjunction with the PROJECT, at no expense to the TOLLWAY.<br />

D. The TOLLWAY agrees to make arrangements for and issue all utility permits for<br />

PROJECT required adjustments to utility facilities located on existing<br />

TOLLWAY rights of way, and on proposed TOLLWAY rights of way which are<br />

outside areas of COUNTY jurisdiction, where improvements to TOLLWAY<br />

3


facilities are proposed to be done as part of the PROJECT, at no expense to the<br />

COUNTY.<br />

E. At all locations where utilities are located on COUNTY rights of way and must be<br />

adjusted due to work proposed by the TOLLWAY, the COUNTY agrees to<br />

cooperate with the TOLLWAY in making arrangements with the applicable utility<br />

and issue all permits for the requisite adjustment(s) at no cost to the TOLLWAY.<br />

The TOLLWAY agrees to reimburse and/or credit the COUNTY for any and all<br />

out of pocket costs the COUNTY may incur in causing the aforementioned utility<br />

or utilities to be adjusted.<br />

F. At all locations where utilities are located on TOLLWAY rights of way and must<br />

be adjusted due to work proposed by the COUNTY, the TOLLWAY agrees to<br />

make arrangements with the applicable utility and issue all permits for the<br />

requisite adjustment(s). At all locations where the COUNTY's utilities are<br />

located on TOLLWAY rights of way and must be adjusted due to work proposed<br />

by the COUNTY or due to work proposed by the TOLLWAY, the COUNTY<br />

agrees to obtain from the TOLLWAY an approved permit for the facility, and to<br />

abide by all conditions set forth therein. The COUNTY agrees to reimburse the<br />

TOLLWAY for any and all out of pocket costs the TOLLWAY may incur in<br />

causing the aforementioned utility or utilities to be adjusted.<br />

G. In the event that the work proposed by the COUNTY results in a conflict with the<br />

TOLLWAY's fiber optic cable system, the COUNTY shall reimburse the<br />

TOLLWAY for the cost to locate, mark, design, protect, adjust and/or relocate the<br />

system.<br />

H. At all locations where the TOLLWAY's infrastructure (remote traffic microwave<br />

sensors, message signs, weather stations, weigh-in-motion sites, signs, roadway<br />

lighting controllers, electrical services and data connections) that are currently in<br />

place within the PROJECT limits and must be adjusted due to work proposed by<br />

the COUNTY, the COUNTY agrees to reimburse the TOLLWAY for any and all<br />

out of pocket costs the TOLLWAY may incur in causing the aforementioned<br />

infrastructure to be adjusted.<br />

IV. CONSTRUCTION<br />

A. The TOLLWAY shall advertise and receive bids, obtain COUNTY concurrence<br />

as to the amount of bids (for work to be funded wholly or partially by the<br />

COUNTY before award), award the contract(s), provide construction engineering<br />

inspections and cause the PROJECT to be constructed in accordance with the<br />

PROJECT plans and specifications, subject to reimbursement by the COUNTY as<br />

hereinafter stipulated.<br />

B. After award of the construction contract(s), any proposed deviations from the<br />

plans and specifications that affect the COUNTY shall be submitted to the<br />

4


COUNTY for approval prior to commencing such work. The COUNTY shall<br />

review the proposed deviations and indicate its approval or disapproval thereof in<br />

writing. If the proposed deviation to the plans and specifications are not<br />

acceptable, the COUNTY shall detail in writing its specific objections. If the<br />

TOLLWAY receives no written response from the COUNTY within fifteen (15)<br />

calendar days after delivery to the COUNTY of the proposed deviation, the<br />

proposed deviation shall be deemed approved by the COUNTY. Notwithstanding<br />

any disapproval by the COUNTY, the TOLLWAY may, after considering the<br />

COUNTY's objections, proceed as the Chief Engineer of the TOLLWAY deems<br />

appropriate.<br />

C. After award of the construction contract(s), assuming there are no proposed<br />

deviations from the plans and specifications that affect the COUNTY, the<br />

TOLLWAY shall provide no less than five (5) calendar days’ written notice to the<br />

COUNTY prior to commencement of work on the PROJECT.<br />

D. The COUNTY and its authorized agents shall have all reasonable rights of<br />

inspection (including pre-final and final inspection) during the progress of work<br />

included in the PROJECT that affects the COUNTY's system. The COUNTY<br />

shall assign personnel to perform inspections on behalf of the COUNTY of all<br />

work included in the PROJECT that affects the COUNTY's system, and will<br />

deliver written notices to the Chief Engineer of the TOLLWAY advising the<br />

TOLLWAY as to the identity of the individual(s) assigned to perform said<br />

inspections.<br />

E. Notices required to be delivered by either PARTY pursuant to this <strong>AG</strong>REEMENT<br />

shall be delivered as indicated in Section IX of this <strong>AG</strong>REEMENT.<br />

F. The TOLLWAY shall give notice to the COUNTY upon completion of 70% and<br />

100% of all PROJECT construction contracts to be subsequently maintained by<br />

the COUNTY, and the COUNTY shall make an inspection thereof not later than<br />

seven (7) calendar days after notice thereof. If the COUNTY does not perform a<br />

final inspection within seven (7) calendar days after receiving notice of<br />

completion of 100% of all PROJECT construction contracts or other inspection<br />

arrangements are not agreed to by the parties hereto, the PROJECT shall be<br />

deemed accepted by the COUNTY. At the request of the COUNTY, the<br />

TOLLWAY's representative shall join in on such inspection. In the event said<br />

inspections disclose work that does not conform to the approved final plans and<br />

specifications, the COUNTY's representative shall give immediate verbal notice<br />

to the TOLLWAY's representative of any deficiency, and shall thereafter deliver<br />

within five (5) calendar days a written list identifying such deficiencies to the<br />

Chief Engineer of the TOLLWAY. Deficiencies thus identified shall be subject<br />

to joint re-inspection upon completion of the corrective work. The COUNTY<br />

shall perform such joint re-inspections within seven (7) calendar days after<br />

receiving notice from the TOLLWAY that the deficiencies have been remedied.<br />

5


G. The TOLLWAY shall have the right, in its sole judgment and discretion, to cancel<br />

or alter any or all portions of the work due to circumstances either known or<br />

unknown at the time of bidding or arising after the Contract(s) was entered into,<br />

in accordance with the TOLLWAY Supplemental Specifications for construction,<br />

issued on February 7, 2012 or the Canceled Items provision in the applicable<br />

version of the Illinois State Toll Highway Authority's Standard or Supplemental<br />

Specifications.<br />

V. FINANCIAL<br />

A. Except as otherwise identified herein, the TOLLWAY agrees to pay all PROJECT<br />

related engineering, right of way, construction engineering and construction costs<br />

subject to reimbursement by the COUNTY as hereinafter stipulated.<br />

B. It is mutually agreed by the PARTIES hereto that preliminary and design<br />

engineering costs shall be computed as 5% of the actual construction costs. It is<br />

further agreed that construction engineering shall be computed as 10% of actual<br />

construction costs and mobilization shall be 6% of actual final construction costs.<br />

C. It is mutually agreed by the PARTIES hereto that the estimated cost to the<br />

COUNTY is $33,000 for construction costs, $1,650 (5% of construction costs) for<br />

preliminary and design engineering, $3,300 (10% of construction costs) for<br />

construction engineering and $1,980 (6% of construction costs) for mobilization,<br />

for a total estimated cost of $39,930.<br />

D. It is further agreed that notwithstanding the estimated cost, the COUNTY shall be<br />

responsible for the actual costs associated with the requested expansion joint strip<br />

seal replacement described in the preambles of this <strong>AG</strong>REEMENT.<br />

E. The COUNTY agrees that upon award of the contract for this improvement and<br />

receipt of an invoice from the TOLLWAY, the COUNTY will pay to the<br />

TOLLWAY, an amount equal to 80% of its obligation incurred under this<br />

<strong>AG</strong>REEMENT, based upon actual bid prices, and will pay to said TOLLWAY the<br />

remainder of its obligation in a lump sum, upon completion of the PROJECT,<br />

based on final costs.<br />

F. Either the COUNTY or the TOLLWAY may request, after the construction<br />

contract(s) are let by the TOLLWAY, that supplemental work that increases the<br />

total costs of the PROJECT or more costly substitute work be added to the<br />

construction contract(s). The TOLLWAY will cause said supplemental work or<br />

such substitute work to be added to the construction contract(s), provided that said<br />

work will not delay construction of the PROJECT. The PARTY requesting or<br />

causing said supplemental work or more costly substitute work shall pay for the<br />

cost increases of said work in full.<br />

VI. MAINTENANCE - DEFINITIONS<br />

6


A. The term "local" means any PARTY to this <strong>AG</strong>REEMENT other than the<br />

TOLLWAY. With respect to this <strong>AG</strong>REEMENT, it means the COUNTY.<br />

B. The term "local road" refers to any highway, road or street under the jurisdiction<br />

of the COUNTY.<br />

C. As used herein, the terms "maintenance" or "maintain" mean keeping the facility<br />

being maintained in good and sufficient repair and appearance. Such maintenance<br />

includes the full responsibility for the construction, removal, replacement of the<br />

maintained facility when needed, and unless specifically excluded in Section VII,<br />

MAINTENANCE - RESPONSIB<strong>IL</strong>ITIES, other activities as more specifically set<br />

forth in the following subparts of this Section VI. Maintenance includes but is not<br />

limited to:<br />

D. "Routine maintenance" refers to the day to day pavement maintenance, pothole<br />

repair, anti-icing and de-icing, snow removal, sweeping, pavement marking,<br />

mowing, litter and debris removal, and grate and scupper cleaning and repair,<br />

including compliance with state laws and local ordinances.<br />

E. "Structural maintenance" refers to the integrity of the grade separation structure,<br />

including abutments, bridge deck beams, bridge deck (except wearing surface),<br />

expansion joints, parapet walls and drainage structures.<br />

F. "Signal maintenance" refers to all aspects of installation, repair, replacement,<br />

timing, and operation of traffic signals, including signal loops, signal supports or<br />

bases, interconnects to Ramp Queue Detection Warning Systems and power, but<br />

shall not include permanently installed variable message signs or temporary<br />

signals or signs relating to construction or repair projects.<br />

G. "Lighting maintenance" refers to all aspects of installation, repair, replacement<br />

and operation of roadway lighting including power, but shall not include<br />

temporary lighting relating to construction or repair projects.<br />

H. “Emergency maintenance" refers to any maintenance activity which must be<br />

performed immediately in order to avoid or to repair a condition on the roadway<br />

or right of way which causes or threatens imminent danger or destruction to<br />

roadway facilities or rights of way of the PARTIES hereto, to the motoring<br />

public, to public health, safety or welfare, including but not limited to accident<br />

restoration, chemical or biological removal or remediation, or response to acts of<br />

God or terrorism.<br />

I. The term "drainage facilities" refers to both open and enclosed systems. The term<br />

"drainage structures" refers to enclosed systems only, and includes those elements<br />

of the drainage facility affixed to the bridge superstructures downstream from the<br />

scupper.<br />

7


J. The terms "notify", "give notice" and "notification" refer to written, verbal or<br />

digital communication from one PARTY to another concerning a matter covered<br />

by this <strong>AG</strong>REEMENT, for which the PARTY transmitting the communication<br />

produces and retains a record which substantiates the content, date, time, manner<br />

of communication, identification of sender and recipient, and manner in which the<br />

recipient may respond to the sender, as to the communication.<br />

K. The terms "be responsible for" or "responsibility" refer to the obligation to ensure<br />

performance of a duty or provision of a service under this <strong>AG</strong>REEMENT,<br />

provided, that a PARTY may arrange for actual performance of the duty or<br />

provision of the service by another competent entity if the other PARTY to this<br />

<strong>AG</strong>REEMENT is notified of such arrangement, but in no case shall the entity<br />

with the duty be relieved of ultimate responsibility for performance of the duty or<br />

provision of the service.<br />

L. The terms "consultation" or "consult with" refer to the duty of a PARTY to give<br />

notice to the other PARTY of a proposed action, with reasonable time for that<br />

PARTY to respond, but the PARTY with the duty to consult may proceed with<br />

the proposed action if the other PARTY does not respond within the time frame<br />

set forth in the notice provided, or in the case of the TOLLWAY, it may proceed<br />

with the proposed action if deemed necessary by the Chief Engineer.<br />

M. The term "approve" refers to the duty of a PARTY not only to consult with the<br />

other PARTY but also to provide consent for the proposed action and to retain a<br />

record which documents such consent.<br />

N. The term "grade separation structure" refers to all structural elements between the<br />

abutments and below the wearing surface of a bridge carrying one roadway over<br />

another, unless otherwise specified.<br />

O. These are three types of bridge structures that intersect the TOLLWAY rights of<br />

way:<br />

Type 1. An intersection where a grade separation structure has been constructed<br />

to carry the toll highway over the local road.<br />

Type 2. An intersection where a grade separation structure has been constructed<br />

to carry the local road over the toll highway.<br />

Type 3. An intersection where a partial or complete ramp interchange system, as<br />

well as a grade separation structure, has been constructed between the local road<br />

and the toll highway.<br />

VII. MAINTENANCE - RESPONSIB<strong>IL</strong>ITIES<br />

8


A. It is understood and agreed by the PARTIES that the TOLLWAY shall retain<br />

jurisdiction and maintenance responsibilities for I-90 in its entirety and the<br />

COUNTY shall retain jurisdiction and maintenance responsibilities for Randall<br />

Road in its entirety. The PARTIES maintenance responsibilities are further<br />

detailed in the Intergovernmental Agreements executed on June 29, 1989 and<br />

November 14, 1995, which are referred hereto by reference.<br />

B. The bridge improvements being constructed under this <strong>AG</strong>REEMENT are of the<br />

following types as described in Section VI, Paragraph O above and involve the<br />

following roadway(s):<br />

Type of Bridge Structure Affected Roadway<br />

Type 3 Randall Road<br />

C. The PARTIES agree that the TOLLWAY reserves the exclusive right to approve<br />

the following:<br />

i. Any and all signage affixed to the grade separation structure or placed on<br />

TOLLWAY right of way;<br />

ii. The permitting of any and all loads traversing the grade separation<br />

structure which exceed the limits set forth in Title 92 Chapter 4 Part 2520<br />

Appendix A of the Illinois Administrative Code;<br />

iii. Pavement markings, including embedded reflectors on the Toll Highway;<br />

iv. Standards governing right of way maintenance for the TOLLWAY’s right<br />

of way.<br />

D. The PARTIES agree that each PARTY has the duty to perform such regular<br />

inspections, surveys and reviews as are reasonably necessary to fulfill their<br />

respective obligations under this <strong>AG</strong>REEMENT.<br />

VIII. ADDITIONAL MAINTENANCE PROVISIONS<br />

A. During construction, the COUNTY shall continue to maintain all portions of the<br />

PROJECT within the COUNTY's right of way that are not to be improved or<br />

maintained by the construction contractor(s) pursuant to the approved plans and<br />

specifications, and the TOLLWAY shall continue to maintain all portions of the<br />

Toll Highway that are not required to be maintained by the construction<br />

contractor(s).<br />

B. The COUNTY and the TOLLWAY agree to remove all snow and ice from the<br />

roadways under their respective jurisdiction, and such removal shall be<br />

9


accomplished in such a manner as not to block or obstruct any roadway of the<br />

other party.<br />

C. Nothing herein is intended to prevent or preclude the COUNTY and the<br />

TOLLWAY from entering into reciprocal agreements in the future for any<br />

particular interchange for the efficient removal of snow, ice, and debris or for<br />

incident management.<br />

IX. GENERAL PROVISIONS<br />

A. It is understood and agreed that this is an <strong>AG</strong>REEMENT between the <strong>County</strong> of<br />

<strong>Kane</strong> and the Illinois State Toll Highway Authority.<br />

B. It is understood and agreed by the PARTIES hereto, that the TOLLWAY shall<br />

have jurisdiction of I-90. The COUNTY shall retain jurisdiction of Randall Road<br />

traversed or affected by I-90. For the purpose of this <strong>AG</strong>REEMENT, jurisdiction<br />

shall mean the authority and obligation to administer, control, construct, maintain,<br />

and operate.<br />

C. It is understood and agreed that this <strong>AG</strong>REEMENT constitutes the complete and<br />

exclusive statement of the agreement of the PARTIES relative to the subject<br />

matter hereof and supersedes all previous oral and written proposals, negotiations,<br />

representations or understandings concerning such subject matter.<br />

D. Wherever in this <strong>AG</strong>REEMENT approval or review by either the COUNTY or<br />

the TOLLWAY is provided for, said approval or review shall not be unreasonably<br />

delayed or withheld.<br />

E. Not later than fourteen (14) calendar days after execution of this <strong>AG</strong>REEMENT<br />

each PARTY shall designate in writing a representative who shall serve as the full<br />

time representative of the said PARTY during the carrying out of the execution of<br />

this <strong>AG</strong>REEMENT. Each representative shall have authority, on behalf of such<br />

PARTY, to make decisions relating to the work covered by this <strong>AG</strong>REEMENT.<br />

Representatives may be changed, from time to time, by subsequent written notice.<br />

Each representative shall be readily available to the other PARTY.<br />

F. In the event of a dispute between the COUNTY and the TOLLWAY in the<br />

carrying out of the terms of this <strong>AG</strong>REEMENT, the Chief Engineer of the<br />

TOLLWAY and the Director of Transportation/<strong>County</strong> Engineer of the COUNTY<br />

shall meet and resolve the issue. In the event that they cannot mutually agree on<br />

the resolution of a dispute concerning the plans and specifications or in the<br />

carrying out of the terms of this <strong>AG</strong>REEMENT, the decision of the Chief<br />

Engineer of the TOLLWAY shall be final.<br />

10


G. This <strong>AG</strong>REEMENT may be executed in two (2) or more counterparts, each of<br />

which shall be deemed an original and all of which shall be deemed one and the<br />

same instrument.<br />

H. Under penalties of perjury, the COUNTY certifies that its correct Federal Tax<br />

Identification number is 36-6006585 and it is doing business as a governmental<br />

entity, whose mailing address is <strong>Kane</strong> <strong>County</strong> Division of Transportation,<br />

41W011 Burlington Road, St. Charles, Illinois 60175.<br />

I. This <strong>AG</strong>REEMENT may only be modified by written modification executed by<br />

duly authorized representatives of the PARTIES hereto.<br />

J. This <strong>AG</strong>REEMENT and the covenants contained herein shall become null and<br />

void in the event the contract covering the construction work contemplated herein<br />

is not awarded within three (3) years subsequent to the date of execution of this<br />

<strong>AG</strong>REEMENT.<br />

K. This <strong>AG</strong>REEMENT shall be binding upon and inure to the benefit of the<br />

PARTIES hereto and their respective successors and approved assigns.<br />

L. The failure by the TOLLWAY or the COUNTY to seek redress for violation of or<br />

to insist upon the strict performance of any condition or covenant of this<br />

<strong>AG</strong>REEMENT shall not constitute a waiver of any such breach or subsequent<br />

breach of such covenants, terms, conditions, rights and remedies. No provision of<br />

this <strong>AG</strong>REEMENT shall be deemed waived by the TOLLWAY or the COUNTY<br />

unless such provision is waived in writing.<br />

M. It is agreed that the laws of the State of Illinois shall apply to this <strong>AG</strong>REEMENT<br />

and that, in the event of litigation, venue shall lie in DuPage <strong>County</strong>, Illinois.<br />

N. All written reports, notices and other communications related to this<br />

<strong>AG</strong>REEMENT shall be in writing and shall be personally delivered, mailed via<br />

certified mail, overnight mail delivery, or electronic mail delivery to the following<br />

persons at the following addresses:<br />

To the TOLLWAY: The Illinois Toll Highway Authority<br />

2700 Ogden Avenue<br />

Downers Grove, Illinois 60515<br />

Attn: Chief Engineer<br />

To the COUNTY: <strong>Kane</strong> <strong>County</strong> Division of Transportation<br />

41W011 Burlington Road<br />

St. Charles, Illinois 60175<br />

Attn: Director of Transportation/<strong>County</strong> Engineer<br />

11


O. The COUNTY agrees to maintain books and records related to the performance of<br />

this <strong>AG</strong>REEMENT and necessary to support amounts charged to the TOLLWAY<br />

and/or the COUNTY under the <strong>AG</strong>REEMENT for a minimum of three (3) years<br />

from the last action on the <strong>AG</strong>REEMENT. The COUNTY further agree to<br />

cooperate fully with any audit and to make its books and records, and books and<br />

records within its custody or control available to the Illinois Attorney General, the<br />

Illinois Auditor General, the TOLLWAY Inspector General, the TOLLWAY<br />

Department of Internal Audit, the TOLLWAY or any other governmental agency<br />

or agent thereof that is authorized to audit or inspect such books and records.<br />

P. The introductory recitals included at the beginning of this <strong>AG</strong>REEMENT are<br />

agreed to and incorporated into this <strong>AG</strong>REEMENT.<br />

IN WITNESS THEREOF, the PARTIES have executed this <strong>AG</strong>REEMENT on<br />

the dates indicated.<br />

KANE COUNTY<br />

By: ___________________________ Attest: _______________________<br />

Christopher J. Lauzen, Chairman John A. Cunningham, Clerk<br />

<strong>Kane</strong> <strong>County</strong> Board <strong>Kane</strong> <strong>County</strong> Board<br />

Date: _________________<br />

THE <strong>IL</strong>LINOIS STATE TOLL HIGHWAY AUTHORITY<br />

By: ___________________________ Date: _____________________<br />

Kristi Lafleur, Executive Director<br />

Approved as to Form and Constitutionality<br />

_______________________________________________________<br />

Tiffany I. Bohn, Assistant Attorney General, State of Illinois<br />

JMR_IGA_<strong>Kane</strong> <strong>County</strong>_I-90 – U.S.20 to Elgin Plaza.docx<br />

12


ts<br />

Tyrrell Rd.<br />

59<br />

72<br />

21<br />

Randall Rd.<br />

90<br />

Randall Road at I-90 Tollway Improvements<br />

0 500 1,000 2,000 3,000 4,000<br />

Feet<br />

0 1 Miles<br />

Tollway Improvements<br />

M:\dotserver2\USERS\Committee\20<strong>13</strong>04 <strong>April</strong>\Implementation\Construction\I-90 at Randall Rd ISTHA IGA\Map Standard_Randall Rd at I90 loc map.mxd<br />

Sleepy<br />

Hollow<br />

Legend<br />

Hampshire Rutland Dundee<br />

Burlington<br />

Virgil<br />

467 34<br />

§¨¦ 88<br />

£¤ 30<br />

!( 31<br />

Plato<br />

Elgin<br />

Campton St. Charles<br />

Geneva<br />

<strong>Kane</strong>ville Blackberry<br />

Batavia<br />

Big Rock Sugar Grove Aurora<br />

Interstates<br />

US Roads<br />

State Roads<br />

<strong>County</strong> Roads<br />

Other Roads<br />

Rail Roads<br />

<strong>County</strong> Boundry<br />

Township Boundry<br />

Fox River<br />

Forest Preserves<br />

Municipalities<br />

/


Tyrrell Rd.<br />

59<br />

72<br />

21<br />

Randall Rd.<br />

90<br />

Randall Road at I-90 Tollway Improvements<br />

0 500 1,000 2,000 3,000 4,000<br />

Feet<br />

0 1 Miles<br />

Tollway Improvements<br />

M:\dotserver2\USERS\Committee\20<strong>13</strong>04 <strong>April</strong>\Implementation\Construction\I-90 at Randall Rd ISTHA IGA\Map Standard Aerial_Randall Rd at I90 loc map.mxd<br />

Legend<br />

Hampshire Rutland Dundee<br />

Burlington<br />

Virgil<br />

467 34<br />

§¨¦ 88<br />

£¤ 30<br />

!( 31<br />

Plato<br />

Elgin<br />

Campton St. Charles<br />

Geneva<br />

<strong>Kane</strong>ville Blackberry<br />

Batavia<br />

Big Rock Sugar Grove Aurora<br />

Interstates<br />

US Roads<br />

State Roads<br />

<strong>County</strong> Roads<br />

Other Roads<br />

Rail Roads<br />

<strong>County</strong> Boundry<br />

Township Boundry<br />

Fox River<br />

Forest Preserves<br />

Municipalities<br />

/


If not budgeted,<br />

explain funding<br />

source<br />

<strong>AG</strong>ENDA ITEM EXECUTIVE SUMMARY Agenda Item #<br />

Presenter/Sponsor:<br />

Name<br />

Budget Information: Was this item budgeted?<br />

SUMMARY:<br />

Attachments:<br />

Detailed information available from :<br />

Resolution/Ordinance Tracking:<br />

Staff Name:<br />

Appropriation Amount:<br />

Steve Coffinbargar, Assistant Director Phone: 630-406-7170<br />

Assigned Committee: Transportation Sent to: Executive<br />

on: 04/11/20<strong>13</strong><br />

If Other, specify:<br />

Committee Remarks:<br />

<strong>County</strong> Board Date:<br />

Resolution<br />

Ordinance<br />

Yes<br />

No N/A<br />

Next Committee: Executive Sent to: <strong>County</strong> Board on: 05/08/20<strong>13</strong><br />

If Other, specify:<br />

Committee Remarks:<br />

Next Committee: Sent to: on:<br />

Committee Remarks:<br />

8D-1a<br />

Approving a Wetland Mitigation Agreement with V3 Wetland Restoration, L.L.C. for<br />

Jericho Road over Blackberry Creek, <strong>Kane</strong> <strong>County</strong> Section No. 04-00329-00-BR<br />

Steve Coffinbargar - Assistant Director of Transportation<br />

$35,200.00<br />

The proposed Jericho Road over Blackberry Creek bridge replacement improvement is in design engineering and<br />

construction is programmed for 2014. Prior to construction, a permit from the Army Corps of Engineers (ACOE) must be<br />

obtained to allow work to occur in Waters of the United States. Wetland mitigation is required due to impacts to these<br />

areas. Mitigation is addressed either through the purchase of mitigation credits from existing "wetland banks" or, when not<br />

available, the design,acquisition, construction and monitoring of a wetland at a greater cost.<br />

Staff has negotiated an agreement with V3 Wetland Restoration, L.L.C., to provide wetland mitigation credits for impacts to<br />

0.22 acres at a cost of $35,200.00. The mitigation will take place at the ACOE approved Blackberry Creek Headwaters<br />

Wetland Mitigation Bank.<br />

Resolution, Agreement, Maps<br />

05/14/20<strong>13</strong>


STATE OF <strong>IL</strong>LINOIS<br />

COUNTY OF KANE<br />

RESOLUTION NO. <strong>13</strong> -<br />

APPROVING A WETLAND MITIGATION <strong>AG</strong>REEMENT<br />

WITH V3 WETLAND RESTORATION, L.L.C.<br />

FOR JERICHO ROAD OVER BLACKBERRY CREEK<br />

KANE COUNTY SECTION NO. 04-00329-00-BR<br />

WHEREAS, it is deemed to be in the best interest of the <strong>County</strong> of <strong>Kane</strong> and the motoring<br />

public to undertake the improvement of <strong>Kane</strong> <strong>County</strong> Highway No. 24 (Jericho Road) over Blackberry<br />

Creek (hereinafter the “Improvement”); and<br />

WHEREAS, due to the Improvement, approximately 0.22 acres of existing wetlands will be<br />

disturbed; and<br />

WHEREAS, in order to mitigate the wetland impacts as required by the US Army Corp of<br />

Engineers permit issued in conjunction with the Improvement, 0.44 acres of wetland will be purchased<br />

at an approved wetland mitigation bank (hereinafter the “credit”) for an amount not to exceed Thirty<br />

Five Thousand Two Hundred Dollars ($35,200.00); and<br />

WHEREAS, V3 Wetland Restoration LLC operates an approved wetland mitigation bank<br />

appropriate for the mitigation of wetland impacts caused by the Improvement.<br />

NOW, THEREFORE, BE IT RESOLVED by the <strong>Kane</strong> <strong>County</strong> Board that the Chairman thereof<br />

is hereby authorized to execute an agreement with V3 Wetland Restoration, L.L.C. (a copy of which is<br />

on file with the <strong>County</strong> Clerk's Office) for the purchase of the credit for the wetland mitigation.<br />

BE IT FURTHER RESOLVED that the <strong>Kane</strong> <strong>County</strong> Board appropriates the not to exceed sum<br />

of Thirty Five Thousand Two Hundred Dollars ($35,200.00) to pay for said credit for wetland mitigation<br />

and that said funds be paid from Transportation Sales Tax Bond Fund #305, Line Item # 73010 (Bridge<br />

Construction).<br />

Line Item Line Item Description Was<br />

personnel/item/service<br />

approved in original<br />

budget or a subsequent<br />

budget revision?<br />

Are funds currently<br />

available for this<br />

personnel/item/service in<br />

the specific line item?<br />

305.520.527.73010 Bridge Construction Yes Yes<br />

If funds are not<br />

currently available in<br />

the specified line item,<br />

where are the funds<br />

available?


Passed by the <strong>Kane</strong> <strong>County</strong> Board on May 14, 20<strong>13</strong>.<br />

Page 2 of 2, Res. #<strong>13</strong>-<br />

______________________________________ ___________________________________<br />

John A. Cunningham Christopher J. Lauzen<br />

Clerk, <strong>County</strong> Board Chairman, <strong>County</strong> Board<br />

<strong>Kane</strong> <strong>County</strong>, Illinois <strong>Kane</strong> <strong>County</strong>, Illinois<br />

Vote:<br />

Yes _____<br />

No _____<br />

Voice _____<br />

Abstentions _____<br />

5JRCHO OVER BLKBRRY-WTLNDMTGTN.4LH


Galena Blvd.<br />

Bridge Work<br />

Jericho Rd<br />

0 475 950 1,900 2,850 3,800<br />

Feet<br />

Barnes<br />

Rd.<br />

0 1 Miles<br />

Orchard Rd.<br />

Section Number 04-00329-00-BR<br />

Jericho Road over Blackberry Creek<br />

83<br />

M:\dotserver2\USERS\Committee\201211 November\Implementation\Design\Jericho over Blackberry Creek\Map Standard_Jericho Rd over Blackberry Crk loc map<br />

Edgelawn Dr.<br />

Montgomery<br />

Aucutt Rd.<br />

Legend<br />

Hampshire Rutland Dundee<br />

Burlington<br />

Virgil<br />

467 34<br />

§¨¦ 88<br />

tu 30<br />

!( 31<br />

Plato<br />

Campton<br />

A<br />

Prairie<br />

Elgin<br />

Geneva<br />

<strong>Kane</strong>ville Blackberry<br />

Batavia<br />

Big Rock Sugar Grove Aurora<br />

Interstates<br />

US Roads<br />

State Roads<br />

<strong>County</strong> Roads<br />

Other Roads<br />

Rail Roads<br />

<strong>County</strong> Boundry<br />

Township Boundry<br />

Fox River<br />

Forest Preserves<br />

Municipalities<br />

/


Galena Blvd.<br />

Bridge Work<br />

Jericho Rd<br />

0 475 950 1,900 2,850 3,800<br />

Feet<br />

Barnes<br />

Rd.<br />

0 1 Miles<br />

Orchard Rd.<br />

83<br />

Section Number 04-00329-00-BR<br />

Jericho Road over Blackberry Creek<br />

Edgelawn Dr.<br />

Aucutt Rd.<br />

M:\dotserver2\USERS\Committee\201211 November\Implementation\Design\Jericho over Blackberry Creek\Map Standard Aerial_Jericho Rd over Blackberry Crk loc map<br />

Legend<br />

Hampshire Rutland Dundee<br />

Burlington<br />

Virgil<br />

467 34<br />

§¨¦ 88<br />

tu 30<br />

!( 31<br />

Plato<br />

Campton<br />

Prairie<br />

Elgin<br />

Geneva<br />

<strong>Kane</strong>ville Blackberry<br />

Batavia<br />

Big Rock Sugar Grove Aurora<br />

Interstates<br />

US Roads<br />

State Roads<br />

<strong>County</strong> Roads<br />

Other Roads<br />

Rail Roads<br />

<strong>County</strong> Boundry<br />

Township Boundry<br />

Fox River<br />

Forest Preserves<br />

Municipalities<br />

/


If not budgeted,<br />

explain funding<br />

source<br />

<strong>AG</strong>ENDA ITEM EXECUTIVE SUMMARY Agenda Item #<br />

Presenter/Sponsor:<br />

Name<br />

Budget Information: Was this item budgeted?<br />

SUMMARY:<br />

Attachments:<br />

Detailed information available from :<br />

Resolution/Ordinance Tracking:<br />

Staff Name:<br />

Appropriation Amount:<br />

Steve Coffinbargar, Assistant Director Phone: 630-406-7170<br />

Assigned Committee: Transportation Sent to: Executive<br />

on: 04/11/20<strong>13</strong><br />

If Other, specify:<br />

Committee Remarks:<br />

<strong>County</strong> Board Date:<br />

Resolution<br />

Ordinance<br />

Yes<br />

No N/A<br />

Next Committee: Executive Sent to: <strong>County</strong> Board on: 05/08/20<strong>13</strong><br />

If Other, specify:<br />

Committee Remarks:<br />

Next Committee: Sent to: on:<br />

Committee Remarks:<br />

8D-2a<br />

Approving a Wetland Mitigation Agreement with V3 Wetland Restoration, L.L.C. for<br />

the LaFox Road over Mill Creek, <strong>Kane</strong> <strong>County</strong> Section No. 11-00417-00-BR<br />

Steve Coffinbargar - Assistant Director of Transportation<br />

$55,280.00<br />

The proposed LaFox Road over Mill Creek bridge replacements are in design engineering and construction is programmed<br />

for 2014. Prior to construction, a permit from the Army Corps of Engineers (ACOE) must be obtained to allow work to occur<br />

in Waters of the United States. Wetland mitigation is required, due to impacts to these areas. Mitigation is addressed either<br />

through the purchase of mitigation credits from existing "wetland banks" or, when not available, the design,acquisition,<br />

construction and monitoring of a wetland at a greater cost.<br />

Staff has negotiated an agreement with V3 Wetland Restoration, L.L.C., to provide wetland mitigation credits for impacts to<br />

0.1984 acres at a cost of $55,280.00. The mitigation will take place at the ACOE approved Blackberry Creek Headwaters<br />

Wetland Mitigation Bank. Due to the high quality of wetlands impacted at this location, the required mitigation ratio and<br />

associated cost is higher than at other locations.<br />

Resolution, Agreement<br />

05/14/20<strong>13</strong>


STATE OF <strong>IL</strong>LINOIS<br />

COUNTY OF KANE<br />

RESOLUTION NO. <strong>13</strong> -<br />

APPROVING A WETLAND MITIGATION <strong>AG</strong>REEMENT<br />

WITH V3 WETLAND RESTORATION, L.L.C.<br />

FOR LAFOX ROAD OVER M<strong>IL</strong>L CREEK<br />

KANE COUNTY SECTION NO. 11-00417-00-BR<br />

WHEREAS, it is deemed to be in the best interest of the <strong>County</strong> of <strong>Kane</strong> and the motoring<br />

public to undertake the improvement of <strong>Kane</strong> <strong>County</strong> Highway No. 81 (LaFox Road) over Mill Creek<br />

(hereinafter the “Improvement”); and<br />

WHEREAS, due to the Improvement, approximately 0.1984 acres of existing wetlands will be<br />

disturbed; and<br />

WHEREAS, in order to mitigate the wetland impacts as required by the US Army Corp of<br />

Engineers permit issued in conjunction with the Improvement, 0.691 acres of wetland will be<br />

purchased at an approved wetland mitigation bank (hereinafter the “credit”) for an amount not to<br />

exceed Fifty Five Thousand Two Hundred Eighty Dollars ($55,280.00); and<br />

WHEREAS, V3 Wetland Restoration LLC operates an approved wetland mitigation bank,<br />

appropriate for the mitigation of wetland impacts caused by Improvement.<br />

NOW, THEREFORE, BE IT RESOLVED by the <strong>Kane</strong> <strong>County</strong> Board that the Chairman thereof<br />

is hereby authorized to execute an agreement with V3 Wetland Restoration, L.L.C. (a copy of which is<br />

on file with the <strong>County</strong> Clerk's Office) for the purchase of the credit for wetland mitigation.<br />

BE IT FURTHER RESOLVED that the <strong>Kane</strong> <strong>County</strong> Board appropriates the not to exceed sum<br />

of Fifty Five Thousand Two Hundred Eighty Dollars ($55,280.00) to pay for said credit for wetland<br />

mitigation and that said funds be paid from Transportation Sales Tax Fund #305, Line Item # 73010<br />

(Bridge Construction).<br />

Line Item Line Item Description Was<br />

personnel/item/service<br />

approved in original<br />

budget or a subsequent<br />

budget revision?<br />

Are funds currently<br />

available for this<br />

personnel/item/service in<br />

the specific line item?<br />

305.520.527.73010 Bridge Construction Yes Yes<br />

If funds are not<br />

currently available in<br />

the specified line item,<br />

where are the funds<br />

available?


Passed by the <strong>Kane</strong> <strong>County</strong> Board on May 14, 20<strong>13</strong>.<br />

Page 2 of 2, Res. #<strong>13</strong>-<br />

______________________________________ ___________________________________<br />

John A. Cunningham Christopher J. Lauzen<br />

Clerk, <strong>County</strong> Board Chairman, <strong>County</strong> Board<br />

<strong>Kane</strong> <strong>County</strong>, Illinois <strong>Kane</strong> <strong>County</strong>, Illinois<br />

Vote:<br />

Yes _____<br />

No _____<br />

Voice _____<br />

Abstentions _____<br />

5LFXOVERM<strong>IL</strong>LCR-WTLNDMTGTN.4LH


Town Hall Rd.<br />

Harley Rd.<br />

Rd.<br />

Wasco<br />

64<br />

0 600 1,200 2,400 3,600 4,800<br />

Feet<br />

0 1 Miles<br />

Lafox Rd.<br />

81<br />

La Fox<br />

41<br />

Bridge<br />

Replacement<br />

Campton Hills Rd<br />

Brundige Rd.<br />

Section Number 11-00417-00-BR<br />

LaFox Road over Mill Creek - Structure Replacement<br />

M:\dotserver2\USERS\Committee\201107 July\Implementation\Engineering\LaFox Road over Mill Creek - Phase I&II Engineering\Map Standard_LaFox Rd over Mill Crk Phase I&II Enginerring loc map.mxd<br />

Bu<br />

38<br />

Legend<br />

467 34<br />

§¨¦ 88<br />

£¤ 30<br />

!( 31<br />

Hampshire Rutland Dundee<br />

Burlington Plato<br />

Virgil<br />

Big Rock<br />

Campton<br />

Interstates<br />

US Roads<br />

State Roads<br />

<strong>County</strong> Roads<br />

Other Roads<br />

Rail Roads<br />

Elgin<br />

Geneva<br />

<strong>Kane</strong>ville Blackberry<br />

Batavia<br />

Aurora<br />

Peck Rd.<br />

Fox River<br />

d.<br />

84<br />

<strong>County</strong> Boundry<br />

Township Boundry<br />

Forest Preserves<br />

Municipalities<br />

/<br />

B<br />

Ke


Town Hall Rd.<br />

Harley Rd.<br />

Rd.<br />

Wasco<br />

64<br />

0 600 1,200 2,400 3,600 4,800<br />

Feet<br />

0 1 Miles<br />

Lafox Rd.<br />

81<br />

La Fox<br />

41<br />

Bridge<br />

Replacement<br />

Campton Hills Rd<br />

Brundige Rd.<br />

Section Number 11-00417-00-BR<br />

LaFox Road over Mill Creek - Structure Replacement<br />

Bu<br />

38<br />

Legend<br />

Hampshire Rutland Dundee<br />

Peck Rd.<br />

M:\dotserver2\USERS\Committee\201107 July\Implementation\Engineering\LaFox Road over Mill Creek - Phase I&II Engineering\Map Standard Aerial_LaFox Rd over Mill Crk Phase I&II Enginerring loc map.mxd<br />

467 34<br />

§¨¦ 88<br />

£¤ 30<br />

!( 31<br />

Burlington Plato<br />

Virgil<br />

Big Rock<br />

Campton<br />

Interstates<br />

US Roads<br />

State Roads<br />

<strong>County</strong> Roads<br />

Other Roads<br />

Rail Roads<br />

Fox River<br />

Elgin<br />

Geneva<br />

<strong>Kane</strong>ville Blackberry<br />

Batavia<br />

Aurora<br />

d.<br />

84<br />

<strong>County</strong> Boundry<br />

Township Boundry<br />

Forest Preserves<br />

Municipalities<br />

/<br />

B<br />

Ke

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!