AG PKT - 13 April KDOT.pdf - Kane County, IL
AG PKT - 13 April KDOT.pdf - Kane County, IL
AG PKT - 13 April KDOT.pdf - Kane County, IL
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
1.<br />
FRASZ, vice-chair Auger, Gillam, Haimann, Laesch, Molina, Smith, ex-officio Donahue<br />
Call to Order<br />
KANE COUNTY TRANSPORTATION COMMITTEE<br />
<strong>AG</strong>ENDA<br />
2. Approval of Minutes – March <strong>13</strong>, 20<strong>13</strong><br />
3. Public Comment – Items on the Agenda<br />
4.<br />
5.<br />
6.<br />
7.<br />
8.<br />
<strong>April</strong> 11, 20<strong>13</strong><br />
10:30 a.m.<br />
Finance<br />
A. <strong>Kane</strong> <strong>County</strong> Finance Department Report<br />
B. Transportation Financial Reports – thru March 31, 20<strong>13</strong><br />
C. Resolution: Approving Disbursement of Township Bridge Program Funds (TBP) to<br />
Elgin Township Road District for Hopps Road over Otter Creek, Section No. 04-<br />
08107-00-BR<br />
D. Resolution: Approving Disbursement of Township Bridge Program Funds (TBP) to<br />
St. Charles Township Road District for Burr Road over Otter Creek, Section No. 08-<br />
14117-00-BR<br />
Maintenance<br />
A. Maintenance Report<br />
B. Resolution: Fuel Delivery System Upgrade, <strong>Kane</strong> <strong>County</strong> Division of<br />
Transportation (Bid Number <strong>13</strong>-0<strong>13</strong>)<br />
C. Resolution: Approving an Intergovernmental Agreement with the Road District of<br />
Elgin Township for the Jurisdictional Transfer of a Portion of Plank Road from the<br />
<strong>County</strong> of <strong>Kane</strong> to the Road District of Elgin Township<br />
D. Adopt-A-Highway Approval(s)<br />
Planning & Programming<br />
A. Planning & Programming Report<br />
B. FY20<strong>13</strong>-2017 Transportation Improvement Program (TIP)<br />
Traffic & Permitting<br />
A. Traffic & Permitting Report<br />
B. <strong>Kane</strong> <strong>County</strong> Annual Pavement Marking<br />
a. Resolution: Approving Contract for 20<strong>13</strong> Urethane Pavement Marking, <strong>Kane</strong><br />
<strong>County</strong> Section No. <strong>13</strong>-00000-04-GM<br />
b. Resolution: Approving Contract for 20<strong>13</strong> Paint Pavement Marking, <strong>Kane</strong><br />
<strong>County</strong> Section No. <strong>13</strong>-00000-05-GM<br />
C. Speed Limit(s)<br />
a. Ordinance: Approving Alteration of Speed Limits, St. Charles Township<br />
Project Implementation<br />
A. Implementation Report
B. Design<br />
1. Montgomery Road<br />
a. Resolution: Approving a Phase I Engineering Services Agreement with HDR<br />
Engineering, Inc. for Montgomery Road from Illinois Route 25 to Hill<br />
Avenue, <strong>Kane</strong> <strong>County</strong> Section No. <strong>13</strong>-00127-00-WR<br />
2. Kirk Road over the UP RR<br />
a. Resolution: Approving a Phase I Engineering Services Agreement with<br />
Strand Associates, Inc. for Kirk Road over the Union Pacific Railroad, <strong>Kane</strong><br />
<strong>County</strong> Section No. 12-00192-04-BR<br />
b. Resolution: Approving an Intergovernmental Agreement with the State of<br />
Illinois for Phase I Engineering Services for Kirk Road over the Union<br />
Pacific Railroad, <strong>Kane</strong> <strong>County</strong> Section No. 12-00192-04-BR<br />
C. Construction<br />
1. Fabyan Parkway – East of <strong>IL</strong>25 to Nagel Boulevard<br />
a. Resolution: Approving an Intergovernmental Agreement with the State of<br />
Illinois Regarding Construction of Fabyan Parkway from East of Illinois<br />
Route 25 to Nagel Boulevard, <strong>Kane</strong> <strong>County</strong> Section No. 10-00404-00-CH<br />
2. Orchard Road over I-88<br />
a. Resolution: Approving a Phase III Construction Engineering Services<br />
Agreement with Omega Associates, Inc. for Orchard Road over I-88, <strong>Kane</strong><br />
<strong>County</strong> Section No. 11-00202-03-BR<br />
b. Resolution: Approving Contract for Construction, Orchard Road over I-88<br />
Bridge Deck Rehabilitation, <strong>Kane</strong> <strong>County</strong> Section No. 11-00202-03-BR<br />
3. Stearns Corridor Environmental Maintenance<br />
a. Resolution: Approving a Phase III Construction Engineering Services<br />
Agreement with Christopher B. Burke Engineering, Ltd. for Stearns Road<br />
Corridor Monitoring and Maintenance, <strong>Kane</strong> <strong>County</strong> Section No. <strong>13</strong>-00214-<br />
02-SM<br />
b. Resolution: Approving Contract for Construction, Stearns Road<br />
Environmental Maintenance, <strong>Kane</strong> <strong>County</strong> Section No. <strong>13</strong>-00214-02-SM<br />
4. Randall Road over I-90<br />
a. Resolution: Approving an Intergovernmental Agreement Between the<br />
Illinois State Toll Highway Authority and the <strong>County</strong> of <strong>Kane</strong> for the<br />
Improvement of the Randall Road (C.H. No. 34) Bridge Over I-90<br />
D. Land Acquisition<br />
1. Jericho Road over Blackberry Creek Wetland Credit Purchase<br />
a. Resolution: Approving a Wetland Mitigation Agreement with V3 Wetland<br />
Restoration, L.L.C. for Jericho Road over Blackberry Creek, <strong>Kane</strong> <strong>County</strong><br />
Section No. 04-00329-00-BR<br />
2. LaFox Road over Mill Creek Wetland Credit Purchase<br />
a. Resolution: Approving a Wetland Mitigation Agreement with V3 Wetland<br />
Restoration, L.L.C. for LaFox Road over Mill Creek, <strong>Kane</strong> <strong>County</strong> Section<br />
No. 11-00417-00-BR<br />
9. Executive Session – Land Acquisition<br />
10. Public Comment – Items not on the Agenda<br />
11. Adjourn
SUMMARY:<br />
Attachments:<br />
Detailed information<br />
available from :<br />
Staff Remarks /<br />
Recommendations:<br />
Committee Remarks:<br />
<strong>AG</strong>ENDA ITEM EXECUTIVE SUMMARY Agenda Item #<br />
Name:<br />
Assigned Committee:<br />
Staff Name:<br />
<strong>Kane</strong> <strong>County</strong> Finance Department Report<br />
4/11/20<strong>13</strong><br />
Presenter/Sponsor: Lynn Carlstrom<br />
Attached are the Transportation Budget, Pcard, and Accounts Payable Reports from the <strong>Kane</strong> <strong>County</strong> Finance Department<br />
for the period ending March 31, 20<strong>13</strong>.<br />
Transportation Budget, Pcard, and Accounts Payable Reports<br />
For information only.<br />
Transportation<br />
Lynn Carlstrom Phone: (630) 444-3123<br />
4A
DRAFT Transportation Committee Revenue Report - Summary*<br />
Through March 31, 20<strong>13</strong> (33.3% YTD)<br />
Current<br />
Month<br />
Transactions<br />
Total<br />
Amended<br />
Budget<br />
YTD Actual<br />
Transactions<br />
Total %<br />
Received<br />
520 Transportation 2,743,328 87,712,836 5,041,664 5.75%<br />
300 <strong>County</strong> Highway 25,476 8,453,841 90,423 1.07%<br />
301 <strong>County</strong> Bridge 176 640,000 475 0.07%<br />
302 Motor Fuel Tax 388,246 11,066,572 844,428 7.63%<br />
303 <strong>County</strong> Highway Matching 29 65,620 87 0.<strong>13</strong>%<br />
304 Motor Fuel Local Option 789,897 19,156,454 1,480,495 7.73%<br />
305 Transportation Sales Tax 1,346,627 28,707,535 2,388,115 8.32%<br />
5<strong>13</strong> Transit Sales Tax Bond Construct 0 0<br />
540 Transportation Capital 125,405 <strong>13</strong>,746,703 <strong>13</strong>6,611 0.99%<br />
550 Aurora Area Impact Fees 4,722 100,000 21,230 21.23%<br />
551 Campton Hills Impact Fees 3,619 329,984 59,306 17.97%<br />
552 Greater Elgin Impact Fees 27,757 1,280,497 (100,063) (7.81%)<br />
553 Northwest Impact Fees 7,664 296,639 16,197 5.46%<br />
554 Southwest Impact Fees 5,839 100,000 12,681 12.68%<br />
555 Tri-Cities Impact Fees 9,853 743,502 27,792 3.74%<br />
556 Upper Fox Impact Fees 1,308 2,096,607 156,377 7.46%<br />
557 West Central Impact Fees 2 8,882 299 3.37%<br />
558 North Impact Fees 83 280,000 (101,482) (36.24%)<br />
559 Central Impact Fees 4,741 340,000 4,890 1.44%<br />
560 South Impact Fees 1,883 300,000 3,802 1.27%<br />
Grand Total 2,743,328 87,712,836 5,041,664 5.75%<br />
* Does not include unposted transactions for the month of March 20<strong>13</strong>
DRAFT Transportation Committee Expenditure Report - Summary*<br />
Through March 31, 20<strong>13</strong> (33.3% YTD, 34.6% Payroll)<br />
Current<br />
Month<br />
Transactions<br />
Total<br />
Amended<br />
Budget<br />
YTD Actual<br />
Transactions<br />
YTD<br />
Encumbrances<br />
Total %<br />
Used<br />
520 Transportation 3,595,900 87,712,836 18,332,682 31,450,930 56.76%<br />
300 <strong>County</strong> Highway 311,451 8,453,841 1,352,560 1,763,193 36.86%<br />
301 <strong>County</strong> Bridge 0 640,000 15,648 403,876 65.55%<br />
302 Motor Fuel Tax 331,9<strong>13</strong> 11,066,572 4,563,308 1,771,025 57.24%<br />
303 <strong>County</strong> Highway Matching 65,620 63,175 2,387 99.91%<br />
304 Motor Fuel Local Option 1,439,095 19,156,454 1,825,938 10,585,308 64.79%<br />
305 Transportation Sales Tax 457,959 28,707,535 9,041,166 6,683,579 54.78%<br />
540 Transportation Capital 980,994 <strong>13</strong>,746,703 1,365,390 6,771,950 59.19%<br />
550 Aurora Area Impact Fees 100,000 0 51,059 51.06%<br />
553 Northwest Impact Fees 875 296,639 20,601 <strong>13</strong>2,066 51.47%<br />
554 Southwest Impact Fees 100,000 0 0 0.00%<br />
556 Upper Fox Impact Fees 626 2,096,607 9,676 9,440 0.91%<br />
557 West Central Impact Fees 8,882 0 0 0.00%<br />
559 Central Impact Fees 340,000 0 504,537 148.39%<br />
560 South Impact Fees 72,987 300,000 72,987 292,0<strong>13</strong> 121.67%<br />
551 Campton Hills Impact Fees 329,984 2,233 0 0.68%<br />
552 Greater Elgin Impact Fees 1,280,497 0 1,980,497 154.67%<br />
555 Tri-Cities Impact Fees 0 743,502 0 0 0.00%<br />
558 North Impact Fees 280,000 0 500,000 178.57%<br />
Grand Total 3,595,900 87,712,836 18,332,682 31,450,930 56.76%<br />
* Does not include unposted transactions for the month of March 20<strong>13</strong>
DRAFT Transportation Committee Expenditure Report - Detail*<br />
Through March 31, 20<strong>13</strong> (33.3% YTD, 34.6% Payroll)<br />
Current<br />
Month<br />
Transactions<br />
Total<br />
Amended<br />
Budget<br />
YTD Actual<br />
Transactions<br />
YTD<br />
Encumbrances<br />
Total %<br />
Used<br />
520 Transportation 3,595,900 87,712,836 18,332,682 31,450,930 56.76%<br />
300 <strong>County</strong> Highway 311,451 8,453,841 1,352,560 1,763,193 36.86%<br />
Personnel Services- Salaries & Wages 160,776 2,427,951 639,987 0 26.36%<br />
Personnel Services- Employee Benefits 46,303 936,216 230,575 0 24.63%<br />
Contractual Services 24,409 1,245,803 <strong>13</strong>3,347 434,414 45.57%<br />
Commodities 72,856 1,009,952 239,449 203,<strong>13</strong>5 43.82%<br />
Capital 7,107 2,833,919 109,202 1,125,644 43.57%<br />
301 <strong>County</strong> Bridge 0 640,000 15,648 403,876 65.55%<br />
Contractual Services 0 460,000 15,648 403,876 91.20%<br />
Capital 180,000 0 0 0.00%<br />
302 Motor Fuel Tax 331,9<strong>13</strong> 11,066,572 4,563,308 1,771,025 57.24%<br />
Personnel Services- Salaries & Wages 216,854 2,278,466 758,580 0 33.29%<br />
Personnel Services- Employee Benefits 115,060 898,183 287,352 0 31.99%<br />
Contractual Services 1,077,530 175 1,127,180 104.62%<br />
Commodities 668,780 23,589 643,845 99.80%<br />
Capital 2,650,000 0 0 0.00%<br />
Transfers Out 3,493,6<strong>13</strong> 3,493,6<strong>13</strong> 0 100.00%<br />
303 <strong>County</strong> Highway Matching 65,620 63,175 2,387 99.91%<br />
Commodities 65,620 63,175 2,387 99.91%<br />
304 Motor Fuel Local Option 1,439,095 19,156,454 1,825,938 10,585,308 64.79%<br />
Contractual Services 43,286 14,639,126 265,250 8,873,339 62.43%<br />
Commodities 62,448 1,034,<strong>13</strong>8 189,344 508,951 67.52%<br />
Capital 1,333,361 3,430,032 1,322,873 1,203,017 73.64%<br />
Transfers Out 53,158 48,471 0 91.18%<br />
305 Transportation Sales Tax 457,959 28,707,535 9,041,166 6,683,579 54.78%<br />
Contractual Services 36,704 5,494,968 169,108 415,515 10.64%<br />
Capital 421,255 14,788,601 448,092 6,268,063 45.41%<br />
Transfers Out 8,423,966 8,423,966 0 100.00%<br />
540 Transportation Capital 980,994 <strong>13</strong>,746,703 1,365,390 6,771,950 59.19%<br />
Contractual Services <strong>13</strong>5,950 1,547,412 335,837 1,030,298 88.29%<br />
Capital 845,044 12,199,291 1,029,553 5,741,652 55.50%<br />
550 Aurora Area Impact Fees 100,000 0 51,059 51.06%<br />
Capital 100,000 0 51,059 51.06%<br />
551 Campton Hills Impact Fees 329,984 2,233 0 0.68%<br />
Capital 329,984 2,233 0 0.68%<br />
552 Greater Elgin Impact Fees 1,280,497 0 1,980,497 154.67%<br />
Capital 1,280,497 0 1,980,497 154.67%<br />
553 Northwest Impact Fees 875 296,639 20,601 <strong>13</strong>2,066 51.47%<br />
Contractual Services 283,382 19,726 <strong>13</strong>2,066 53.56%<br />
Capital 875 <strong>13</strong>,257 875 0 6.60%<br />
554 Southwest Impact Fees 100,000 0 0 0.00%
DRAFT Transportation Committee Expenditure Report - Detail*<br />
Through March 31, 20<strong>13</strong> (33.3% YTD, 34.6% Payroll)<br />
Current<br />
Month<br />
Transactions<br />
Total<br />
Amended<br />
Budget<br />
YTD Actual<br />
Transactions<br />
YTD<br />
Encumbrances<br />
Total %<br />
Used<br />
Capital 100,000 0 0 0.00%<br />
555 Tri-Cities Impact Fees 0 743,502 0 0 0.00%<br />
Contractual Services 125,300 0 0 0.00%<br />
Capital 0 618,202 0 0 0.00%<br />
556 Upper Fox Impact Fees 626 2,096,607 9,676 9,440 0.91%<br />
Contractual Services 25,850 0 3,650 14.12%<br />
Capital 626 2,070,757 9,676 5,790 0.75%<br />
557 West Central Impact Fees 8,882 0 0 0.00%<br />
Capital 8,882 0 0 0.00%<br />
558 North Impact Fees 280,000 0 500,000 178.57%<br />
Capital 275,000 0 500,000 181.82%<br />
Transfers Out 5,000 0 0 0.00%<br />
559 Central Impact Fees 340,000 0 504,537 148.39%<br />
Contractual Services 335,000 0 504,537 150.61%<br />
Transfers Out 5,000 0 0 0.00%<br />
560 South Impact Fees 72,987 300,000 72,987 292,0<strong>13</strong> 121.67%<br />
Contractual Services 72,987 250,000 72,987 292,0<strong>13</strong> 146.00%<br />
Capital 45,000 0 0 0.00%<br />
Transfers Out 5,000 0 0 0.00%<br />
Grand Total 3,595,900 87,712,836 18,332,682 31,450,930 56.76%<br />
* Does not include unposted transactions for the month of March 20<strong>13</strong>, including the last payroll.
<strong>Kane</strong> <strong>County</strong> Purchasing Card Information<br />
Transportation Committee<br />
Statement Due Date 4/29/20<strong>13</strong><br />
520 TRANSPORTATION<br />
Transaction Date Merchant Name Additional Information Transaction Amount<br />
03/06/20<strong>13</strong> AMERICAN PUBLIC WORKS 08164726100<br />
<strong>13</strong>5.00<br />
4/5/20<strong>13</strong><br />
03/06/20<strong>13</strong> P & G KEENE ELECTRICAL BENSENV<strong>IL</strong>LE<br />
195.00<br />
03/08/20<strong>13</strong> S&S AUTOMOTIVE GROUP 06302791600<br />
396.00<br />
03/11/20<strong>13</strong> MYERS TIRE SUPPLY AKRON<br />
99.55<br />
03/<strong>13</strong>/20<strong>13</strong> AMAZON MKTPLACE PMTS AMZN.COM/B<strong>IL</strong>L<br />
175.79<br />
03/22/20<strong>13</strong> FEDEXOFFICE 00036244 SAINT CHARLES<br />
42.49<br />
Department Total<br />
Committee Total<br />
1,043.83<br />
1,043.83<br />
Page 1 of 1
Vendor<br />
Fund 300 - <strong>County</strong> Highway<br />
Department 520 - Transportation<br />
Invoice No. Invoice Description Status Held Reason Invoice Date Due Date G/L Date Received Date Payment Date Invoice Amount<br />
Sub-Department 520 - <strong>County</strong> Highway<br />
Account 50140 - Engineering Services<br />
1059 - Christopher B. Burke Engineering,<br />
Ltd.<br />
7-2012-877 08-00376-00-DR<br />
HampshireCkBankStab,<br />
1/1/<strong>13</strong>-1/31/<strong>13</strong><br />
Account 50160 - Legal Services<br />
1168 - J Patrick Jaeger 0201<strong>13</strong> Legal fee/ ROW Atty<br />
February 20<strong>13</strong><br />
Account 50480 - Security Services<br />
1191 - Alarm Detection Systems Inc <strong>13</strong>8661-1026 XX8661 Quarterly<br />
charges / Apr-Jun<br />
Account 52000 - Disposal and Water Softener Srvs<br />
1216 - Waste Management of Illinois -<br />
West<br />
1216 - Waste Management of Illinois -<br />
West<br />
1216 - Waste Management of Illinois -<br />
West<br />
3184230-2011-<br />
0-R<br />
3193741-2011-<br />
5<br />
3307402-2011-<br />
7<br />
Account 52010 - Janitorial Services<br />
8196 - PCI Servicies Inc (DBA Peterson<br />
Cleaning Inc)<br />
101-0090469-2011-<br />
3;Corrected,<br />
Misapplication by<br />
vendor, Jan 20<strong>13</strong><br />
XX2011-3 Waste<br />
services March 20<strong>13</strong><br />
XX2011-6 Waste<br />
services Feb 20<strong>13</strong><br />
month end<br />
24367 <strong>KDOT</strong> Janitorial<br />
services March 20<strong>13</strong><br />
Account 52140 - Repairs and Maint- Copiers<br />
6128 - Canon Solutions America Inc 4008938081 XX5996 Copier<br />
maintenance SHPZB45<br />
permit dept<br />
1027 - Illinois Paper & Copier Co IN39966 XX2534 Konica<br />
Minolta/750 copier<br />
maintenance<br />
1<strong>13</strong>5 - Konica Minolta Business Solutions 223923652 160879 Copier<br />
maintenance<br />
Paid by Check<br />
# 3291<strong>13</strong><br />
Paid by Check<br />
# 329242<br />
Paid by EFT #<br />
17436<br />
Paid by Check<br />
# 329053<br />
Paid by Check<br />
# 329385<br />
Paid by Check<br />
# 329386<br />
02/14/20<strong>13</strong> 03/06/20<strong>13</strong> 03/06/20<strong>13</strong> 03/25/20<strong>13</strong> 1,904.36<br />
Account 50140 - Engineering Services Totals Invoice Transactions 1 $1,904.36<br />
02/01/20<strong>13</strong> 03/08/20<strong>13</strong> 03/08/20<strong>13</strong> 03/25/20<strong>13</strong> 4,000.00<br />
Account 50160 - Legal Services Totals Invoice Transactions 1 $4,000.00<br />
03/03/20<strong>13</strong> 03/08/20<strong>13</strong> 03/08/20<strong>13</strong> 03/25/20<strong>13</strong> 165.00<br />
Account 50480 - Security Services Totals Invoice Transactions 1 $165.00<br />
01/01/20<strong>13</strong> 03/01/20<strong>13</strong> 03/01/20<strong>13</strong> 03/11/20<strong>13</strong> 84.00<br />
03/01/20<strong>13</strong> 03/06/20<strong>13</strong> 03/06/20<strong>13</strong> 03/25/20<strong>13</strong> 92.40<br />
03/01/20<strong>13</strong> 03/06/20<strong>13</strong> 03/06/20<strong>13</strong> 03/25/20<strong>13</strong> 325.21<br />
Account 52000 - Disposal and Water Softener Srvs Totals Invoice Transactions 3 $501.61<br />
Paid by EFT #<br />
17547<br />
03/01/20<strong>13</strong> 03/06/20<strong>13</strong> 03/06/20<strong>13</strong> 03/25/20<strong>13</strong> 1,386.00<br />
Account 52010 - Janitorial Services Totals Invoice Transactions 1 $1,386.00<br />
Paid by EFT #<br />
17458<br />
Paid by Check<br />
# 329235<br />
Transportation Accounts Payable by GL<br />
Distribution<br />
Payment Date Range 03/01/<strong>13</strong> - 03/31/<strong>13</strong><br />
03/01/20<strong>13</strong> 03/15/20<strong>13</strong> 03/15/20<strong>13</strong> 03/25/20<strong>13</strong> 71.35<br />
03/07/20<strong>13</strong> 03/<strong>13</strong>/20<strong>13</strong> 03/<strong>13</strong>/20<strong>13</strong> 03/25/20<strong>13</strong> 452.96<br />
Paid by Check<br />
# 329259<br />
03/02/20<strong>13</strong> 03/<strong>13</strong>/20<strong>13</strong> 03/<strong>13</strong>/20<strong>13</strong> 03/25/20<strong>13</strong> 261.57<br />
Account 52140 - Repairs and Maint- Copiers Totals Invoice Transactions 3 $785.88<br />
Run by Finance Reports on 04/05/20<strong>13</strong> 09:09:19 AM Page 1 of 14
Vendor Invoice No. Invoice Description Status Held Reason Invoice Date Due Date G/L Date Received Date Payment Date Invoice Amount<br />
Fund 300 - <strong>County</strong> Highway<br />
Department 520 - Transportation<br />
Sub-Department 520 - <strong>County</strong> Highway<br />
Account 52230 - Repairs and Maint- Vehicles<br />
<strong>13</strong>70 - Zimmerman Ford Inc 74626 <strong>KDOT</strong> M45270<br />
Truck#66 repair cooler,<br />
oil cooler & turbo<br />
cleaning<br />
Account 53100 - Conferences and Meetings<br />
1104 - Forest Preserve District of <strong>Kane</strong><br />
<strong>County</strong><br />
0301<strong>13</strong>-<br />
LaFleurP<br />
Rental of Oak Room at<br />
Brewster Creek Lodge<br />
on 03/<strong>13</strong>/<strong>13</strong><br />
Paid by Check<br />
# 329398<br />
03/11/20<strong>13</strong> 03/15/20<strong>13</strong> 03/15/20<strong>13</strong> 03/25/20<strong>13</strong> 6,201.72<br />
Account 52230 - Repairs and Maint- Vehicles Totals Invoice Transactions 1 $6,201.72<br />
Paid by Check<br />
# 328844<br />
Transportation Accounts Payable by GL<br />
Distribution<br />
Payment Date Range 03/01/<strong>13</strong> - 03/31/<strong>13</strong><br />
03/01/20<strong>13</strong> 03/01/20<strong>13</strong> 03/01/20<strong>13</strong> 03/11/20<strong>13</strong> 40.00<br />
4512 - Paul Holcomb 031120<strong>13</strong> APWA Chapter Awards Paid by EFT #<br />
03/11/20<strong>13</strong> 03/11/20<strong>13</strong> 03/11/20<strong>13</strong> 03/25/20<strong>13</strong> 70.00<br />
Lunch/conference 17492<br />
4127 - Jay Seyller 030620<strong>13</strong> Utility Coordination mtg Paid by Check<br />
# 329243<br />
03/06/20<strong>13</strong> 03/11/20<strong>13</strong> 03/11/20<strong>13</strong> 03/25/20<strong>13</strong> 183.94<br />
4653 - Carl Schoedel 030720<strong>13</strong> APWA mtg/Trans- Paid by EFT #<br />
03/07/20<strong>13</strong> 03/11/20<strong>13</strong> 03/11/20<strong>13</strong> 03/25/20<strong>13</strong> 482.98<br />
Highway Engineer<br />
conference<br />
17562<br />
5283 - Thomas F. Szabo 030720<strong>13</strong> CMAP RTOC mtg Paid by Check<br />
# 329362<br />
03/07/20<strong>13</strong> 03/11/20<strong>13</strong> 03/11/20<strong>13</strong> 03/25/20<strong>13</strong> 22.97<br />
4526 - Fifth Third Bank 0305<strong>13</strong>- 0321-5870;<br />
Paid by EFT #<br />
03/05/20<strong>13</strong> 03/05/20<strong>13</strong> 03/05/20<strong>13</strong> 03/25/20<strong>13</strong> 70.00<br />
SchoedelC AmerPublicWorks -<br />
Awards Luncheon C<br />
Schoedel<br />
17480<br />
Account 53100 - Conferences and Meetings Totals Invoice Transactions 6 $869.89<br />
Account 53110 - Employee Training<br />
6036 - Brown Traffic Products, Inc. CH120<strong>13</strong>- TrainTechSemAdvTrffc Paid by Check<br />
03/04/20<strong>13</strong> 03/08/20<strong>13</strong> 03/08/20<strong>13</strong> 03/25/20<strong>13</strong> 260.00<br />
KAN001 MgtSys-<br />
Szabo,DB,PH,BH,AK,KN<br />
; 2/27-2/28/<strong>13</strong><br />
# 329102<br />
4526 - Fifth Third Bank 0305<strong>13</strong>-RiveraA 0357-9150; ACEC IDOT Paid by EFT #<br />
03/05/20<strong>13</strong> 03/05/20<strong>13</strong> 03/05/20<strong>13</strong> 03/25/20<strong>13</strong> 570.00<br />
Training: Becker,<br />
Sullivan, Coffinbargar<br />
17480<br />
4526 - Fifth Third Bank 0314<strong>13</strong>-RiveraA 0357-9150; APWA - Paid by EFT #<br />
03/14/20<strong>13</strong> 03/14/20<strong>13</strong> 03/14/20<strong>13</strong> 03/25/20<strong>13</strong> <strong>13</strong>5.00<br />
IDOT MatlsCloseout-<br />
ResEng Seminar (3<br />
ee's)<br />
17480<br />
Account 53110 - Employee Training Totals Invoice Transactions 3 $965.00<br />
Run by Finance Reports on 04/05/20<strong>13</strong> 09:09:19 AM Page 2 of 14
Vendor<br />
Fund 300 - <strong>County</strong> Highway<br />
Department 520 - Transportation<br />
Invoice No. Invoice Description Status Held Reason Invoice Date Due Date G/L Date Received Date Payment Date Invoice Amount<br />
Sub-Department 520 - <strong>County</strong> Highway<br />
Account 53120 - Employee Mileage Expense<br />
4791 - William Dickson 031520<strong>13</strong> IDOT class/mileage Paid by Check<br />
# 329173<br />
03/15/20<strong>13</strong> 03/11/20<strong>13</strong> 03/11/20<strong>13</strong> 03/25/20<strong>13</strong> 29.38<br />
4422 - Joy Yehnert 030720<strong>13</strong> Jan & Feb mileage Paid by EFT #<br />
17585<br />
03/07/20<strong>13</strong> 03/11/20<strong>13</strong> 03/11/20<strong>13</strong> 03/25/20<strong>13</strong> 114.69<br />
Account 53120 - Employee Mileage Expense Totals Invoice Transactions 2 $144.07<br />
Account 60000 - Office Supplies<br />
8232 - Lentkoproducts 4384 HP inkjet Oem Black Paid by EFT #<br />
01/30/20<strong>13</strong> 03/15/20<strong>13</strong> 03/15/20<strong>13</strong> 03/25/20<strong>13</strong> 60.00<br />
toner<br />
3578 - Warehouse Direct Office Products 1869740-0 XX2052 Flags, G2<br />
Refills, CD's, Battery 3volt,<br />
Labels, Pads<br />
3578 - Warehouse Direct Office Products 1876007-0 XX2052 Coffee,<br />
creamer & sugar<br />
3578 - Warehouse Direct Office Products 1878169-0 XX2052 Plastic Forks,<br />
Spoons & Knives<br />
Account 60010 - Operating Supplies<br />
4526 - Fifth Third Bank 0314<strong>13</strong>-<br />
LindsayJ<br />
0357-9<strong>13</strong>5; Kimball,<br />
P&GKeene, S&SAuto,<br />
MyersTire<br />
Account 60210 - Uniform Supplies<br />
2225 - Cintas Corp #344 344565957 XX8337 Maintenance<br />
uniforms & carpets<br />
17519<br />
Paid by EFT #<br />
17578<br />
Paid by EFT #<br />
17578<br />
Paid by EFT #<br />
17578<br />
Paid by EFT #<br />
17480<br />
Paid by Check<br />
# 329114<br />
Transportation Accounts Payable by GL<br />
Distribution<br />
Payment Date Range 03/01/<strong>13</strong> - 03/31/<strong>13</strong><br />
03/01/20<strong>13</strong> 03/08/20<strong>13</strong> 03/08/20<strong>13</strong> 03/25/20<strong>13</strong> 89.58<br />
03/08/20<strong>13</strong> 03/15/20<strong>13</strong> 03/15/20<strong>13</strong> 03/25/20<strong>13</strong> 232.26<br />
03/11/20<strong>13</strong> 03/15/20<strong>13</strong> 03/15/20<strong>13</strong> 03/25/20<strong>13</strong> 51.00<br />
Account 60000 - Office Supplies Totals Invoice Transactions 4 $432.84<br />
03/14/20<strong>13</strong> 03/14/20<strong>13</strong> 03/14/20<strong>13</strong> 03/25/20<strong>13</strong> 396.00<br />
Account 60010 - Operating Supplies Totals Invoice Transactions 1 $396.00<br />
03/11/20<strong>13</strong> 03/<strong>13</strong>/20<strong>13</strong> 03/<strong>13</strong>/20<strong>13</strong> 03/25/20<strong>13</strong> 185.29<br />
Account 60210 - Uniform Supplies Totals Invoice Transactions 1 $185.29<br />
Account 60340 - Buildings and Grounds Supplies<br />
3183 - HP Products Corp (Kraft Paper I1581691 XXCO26100 Wypalls Paid by Check<br />
01/30/20<strong>13</strong> 03/08/20<strong>13</strong> 03/08/20<strong>13</strong> 03/25/20<strong>13</strong> 354.32<br />
Sales)<br />
# 329216<br />
5716 - Laport Inc 170782 XX<strong>KDOT</strong> Toilet tissue 2 Paid by EFT #<br />
01/31/20<strong>13</strong> 03/08/20<strong>13</strong> 03/08/20<strong>13</strong> 03/25/20<strong>13</strong> 56.00<br />
ply - 500 Sheets/rl 96<br />
rolls per case<br />
175<strong>13</strong><br />
<strong>13</strong>90 - Menards <strong>13</strong>268 XX0351 Ice melt, saw Paid by Check<br />
02/28/20<strong>13</strong> 03/06/20<strong>13</strong> 03/06/20<strong>13</strong> 03/25/20<strong>13</strong> 251.70<br />
blade, spider light,<br />
airwick, gang box<br />
# 329285<br />
1496 - Steiner Electric Co Inc SOO4252905.0 XX4429 F32T8/TL741 Paid by EFT #<br />
02/21/20<strong>13</strong> 03/08/20<strong>13</strong> 03/08/20<strong>13</strong> 03/25/20<strong>13</strong> 129.00<br />
01<br />
Philips Alto 4'<br />
Flourescent<br />
17567<br />
Account 60340 - Buildings and Grounds Supplies Totals Invoice Transactions 4 $791.02<br />
Run by Finance Reports on 04/05/20<strong>13</strong> 09:09:19 AM Page 3 of 14
Vendor Invoice No. Invoice Description Status Held Reason Invoice Date Due Date G/L Date Received Date Payment Date Invoice Amount<br />
Fund 300 - <strong>County</strong> Highway<br />
Department 520 - Transportation<br />
Sub-Department 520 - <strong>County</strong> Highway<br />
Account 60430 - Sign Material<br />
4526 - Fifth Third Bank 0319<strong>13</strong>-<br />
LindsayJ<br />
0357-9<strong>13</strong>5;<br />
Amazon/TCP Global,<br />
Sign Material<br />
<strong>13</strong>90 - Menards <strong>13</strong>274 XX0351 Post mount<br />
standard steel<br />
6035 - Western Remac Inc 43118 XX<strong>KDOT</strong> 8.5" <strong>Kane</strong><br />
<strong>County</strong> <strong>IL</strong> Logo Decals<br />
Account 63000 - Utilities- Natural Gas<br />
1066 - ProLiance Energy LLC 20<strong>13</strong>02I002157<br />
DOT<br />
50401; Prod Month<br />
2/20<strong>13</strong>, Gas,<br />
Act#3572881000<br />
2253 - Nicor Gas 3073717-2/<strong>13</strong> 39-82-88-1000 0<br />
41W011 Burlington<br />
1/23/<strong>13</strong>-2/22/<strong>13</strong><br />
2253 - Nicor Gas 3814320-2/<strong>13</strong> 36-44-94-1000 4<br />
40W969 Burlington<br />
1/23/<strong>13</strong>-2/22/<strong>13</strong><br />
Account 63010 - Utilities- Electric<br />
3222 - MidAmerican Energy Co 5835950-<br />
227629<br />
3222 - MidAmerican Energy Co 5840207-<br />
227083<br />
Account 63020 - Utilities- Intersect Lighting<br />
3380 - City of Batavia 1<strong>13</strong>557782-<br />
2/<strong>13</strong><br />
3380 - City of Batavia 1<strong>13</strong>557781-<br />
2/<strong>13</strong><br />
7610795006-<br />
14<strong>13</strong>76169 41W011<br />
Burlington 1/29/<strong>13</strong>-<br />
2/27/<strong>13</strong><br />
7523064009-<br />
140024771 Seavey Rd<br />
2/6/<strong>13</strong>-3/8/<strong>13</strong><br />
192005410.00 Kirk &<br />
Hubbard 1/25/<strong>13</strong> -<br />
2/21/<strong>13</strong><br />
194069300.00 Kirk &<br />
Wilson 1/25/<strong>13</strong> -<br />
2/21/<strong>13</strong><br />
3380 - City of Batavia 19773281-3/<strong>13</strong> 49205<strong>13</strong>06.00<br />
Fabyan/Batavia Ave<br />
1054 - ComEd 141605358-<br />
2/<strong>13</strong><br />
1/15/<strong>13</strong> - 2/<strong>13</strong>/<strong>13</strong><br />
6063129097 Weather<br />
station Randall Rd<br />
1/24/<strong>13</strong>-2/22/<strong>13</strong><br />
Paid by EFT #<br />
17480<br />
Paid by Check<br />
# 329285<br />
Paid by Check<br />
# 329390<br />
Paid by EFT #<br />
17588<br />
Paid by Check<br />
# 329304<br />
Paid by Check<br />
# 329305<br />
Paid by EFT #<br />
17532<br />
Paid by EFT #<br />
17533<br />
Paid by Check<br />
# 329122<br />
Paid by Check<br />
# 329122<br />
Paid by Check<br />
# 329122<br />
Paid by Check<br />
# 329161<br />
Transportation Accounts Payable by GL<br />
Distribution<br />
Payment Date Range 03/01/<strong>13</strong> - 03/31/<strong>13</strong><br />
03/19/20<strong>13</strong> 03/19/20<strong>13</strong> 03/19/20<strong>13</strong> 03/25/20<strong>13</strong> 175.79<br />
02/28/20<strong>13</strong> 03/<strong>13</strong>/20<strong>13</strong> 03/<strong>13</strong>/20<strong>13</strong> 03/25/20<strong>13</strong> 199.40<br />
02/26/20<strong>13</strong> 03/08/20<strong>13</strong> 03/08/20<strong>13</strong> 03/25/20<strong>13</strong> 496.00<br />
Account 60430 - Sign Material Totals Invoice Transactions 3 $871.19<br />
03/20/20<strong>13</strong> 03/21/20<strong>13</strong> 03/21/20<strong>13</strong> 03/22/20<strong>13</strong> 1,814.58<br />
02/26/20<strong>13</strong> 03/06/20<strong>13</strong> 03/06/20<strong>13</strong> 03/25/20<strong>13</strong> 3,200.89<br />
02/25/20<strong>13</strong> 03/06/20<strong>13</strong> 03/06/20<strong>13</strong> 03/25/20<strong>13</strong> 724.33<br />
Account 63000 - Utilities- Natural Gas Totals Invoice Transactions 3 $5,739.80<br />
03/01/20<strong>13</strong> 03/08/20<strong>13</strong> 03/08/20<strong>13</strong> 03/25/20<strong>13</strong> 3,095.29<br />
03/11/20<strong>13</strong> 03/15/20<strong>13</strong> 03/15/20<strong>13</strong> 03/25/20<strong>13</strong> 250.80<br />
Account 63010 - Utilities- Electric Totals Invoice Transactions 2 $3,346.09<br />
02/21/20<strong>13</strong> 03/06/20<strong>13</strong> 03/06/20<strong>13</strong> 03/25/20<strong>13</strong> 17.68<br />
02/21/20<strong>13</strong> 03/06/20<strong>13</strong> 03/06/20<strong>13</strong> 03/25/20<strong>13</strong> 17.00<br />
03/07/20<strong>13</strong> 03/15/20<strong>13</strong> 03/15/20<strong>13</strong> 03/25/20<strong>13</strong> 30.57<br />
02/22/20<strong>13</strong> 03/06/20<strong>13</strong> 03/06/20<strong>13</strong> 03/25/20<strong>13</strong> 29.88<br />
Run by Finance Reports on 04/05/20<strong>13</strong> 09:09:19 AM Page 4 of 14
Vendor<br />
Fund 300 - <strong>County</strong> Highway<br />
Department 520 - Transportation<br />
Invoice No. Invoice Description Status Held Reason Invoice Date Due Date G/L Date Received Date Payment Date Invoice Amount<br />
Sub-Department 520 - <strong>County</strong> Highway<br />
Account 63020 - Utilities- Intersect Lighting<br />
1054 - ComEd 0414000061-<br />
2/<strong>13</strong><br />
1054 - ComEd 4278050001-<br />
2/<strong>13</strong><br />
1054 - ComEd 0039051173-<br />
2/<strong>13</strong><br />
1054 - ComEd 117872917-<br />
3/<strong>13</strong><br />
1054 - ComEd 14<strong>13</strong>00292-<br />
3/<strong>13</strong><br />
1054 - ComEd 141609601-<br />
3/<strong>13</strong><br />
1054 - ComEd 140449207-<br />
3/<strong>13</strong><br />
0414000061 Various<br />
Traffic lights 1/22/<strong>13</strong>-<br />
2/20/<strong>13</strong><br />
4278050001 TFLT<br />
Rt/25-Corron Campton<br />
twp 1/30/<strong>13</strong>-2/28/<strong>13</strong><br />
0039051173 Rt<br />
25/Corron Rd 1/30/<strong>13</strong>-<br />
2/28/<strong>13</strong><br />
2672169007 McLean/Rt<br />
23/Bowes 1/30/<strong>13</strong>-<br />
3/1/<strong>13</strong><br />
1603046065<br />
Spring/McLean Blvd<br />
1/31/<strong>13</strong>-3/4/<strong>13</strong><br />
5281099004 7N416 Rt<br />
31 1/31/<strong>13</strong>-3/4/<strong>13</strong><br />
4539103069<br />
Orchard/Aucutt St<br />
lights 2/6/<strong>13</strong>-3/7/<strong>13</strong><br />
1054 - ComEd 5067<strong>13</strong>8019-R 5067<strong>13</strong>8019 Trffc lghts<br />
Unpaid balance<br />
due/comed mis-app<br />
1054 - ComEd 1163141072-<br />
3/<strong>13</strong><br />
3222 - MidAmerican Energy Co 5832589-<br />
227081<br />
3222 - MidAmerican Energy Co 5833607-<br />
226559<br />
Aug 12<br />
1163141072 various<br />
trffc lghts 2/4/<strong>13</strong>-<br />
3/5/<strong>13</strong><br />
8019229002-<br />
141475536 Randall Rd<br />
1/24/<strong>13</strong>-2/22/<strong>13</strong><br />
8185694006-<br />
Rndl/Msn1415909308<br />
2/8-2/22; 084366308<br />
1/24-2/8<br />
Account 63040 - Fuel- Vehicles<br />
6477 - Al Warren Oil Company Inc IO769044 C06450; 50/50<br />
Unleaded Winter Blend,<br />
7089 Gal<br />
Paid by Check<br />
# 329162<br />
Paid by Check<br />
# 329163<br />
Paid by Check<br />
# 329164<br />
Paid by Check<br />
# 329155<br />
Paid by Check<br />
# 329156<br />
Paid by Check<br />
# 329157<br />
Paid by Check<br />
# 329158<br />
Paid by Check<br />
# 329159<br />
Paid by Check<br />
# 329160<br />
Paid by EFT #<br />
17534<br />
Paid by EFT #<br />
17535<br />
02/26/20<strong>13</strong> 03/06/20<strong>13</strong> 03/06/20<strong>13</strong> 03/25/20<strong>13</strong> 4,245.01<br />
02/28/20<strong>13</strong> 03/08/20<strong>13</strong> 03/08/20<strong>13</strong> 03/25/20<strong>13</strong> 43.76<br />
02/28/20<strong>13</strong> 03/08/20<strong>13</strong> 03/08/20<strong>13</strong> 03/25/20<strong>13</strong> 10.84<br />
03/01/20<strong>13</strong> 03/08/20<strong>13</strong> 03/08/20<strong>13</strong> 03/25/20<strong>13</strong> 175.03<br />
03/04/20<strong>13</strong> 03/<strong>13</strong>/20<strong>13</strong> 03/<strong>13</strong>/20<strong>13</strong> 03/25/20<strong>13</strong> 106.12<br />
03/04/20<strong>13</strong> 03/<strong>13</strong>/20<strong>13</strong> 03/<strong>13</strong>/20<strong>13</strong> 03/25/20<strong>13</strong> 98.79<br />
03/07/20<strong>13</strong> 03/<strong>13</strong>/20<strong>13</strong> 03/<strong>13</strong>/20<strong>13</strong> 03/25/20<strong>13</strong> 89.83<br />
12/07/2012 03/15/20<strong>13</strong> 03/15/20<strong>13</strong> 03/25/20<strong>13</strong> 62.80<br />
03/06/20<strong>13</strong> 03/15/20<strong>13</strong> 03/15/20<strong>13</strong> 03/25/20<strong>13</strong> 2,361.24<br />
02/25/20<strong>13</strong> 03/06/20<strong>13</strong> 03/06/20<strong>13</strong> 03/25/20<strong>13</strong> 342.88<br />
02/26/20<strong>13</strong> 03/06/20<strong>13</strong> 03/06/20<strong>13</strong> 03/25/20<strong>13</strong> 315.74<br />
Account 63020 - Utilities- Intersect Lighting Totals Invoice Transactions 15 $7,947.17<br />
Paid by Check<br />
# 329077<br />
Transportation Accounts Payable by GL<br />
Distribution<br />
Payment Date Range 03/01/<strong>13</strong> - 03/31/<strong>13</strong><br />
03/04/20<strong>13</strong> 03/08/20<strong>13</strong> 03/08/20<strong>13</strong> 03/25/20<strong>13</strong> 25,743.36<br />
Account 63040 - Fuel- Vehicles Totals Invoice Transactions 1 $25,743.36<br />
Run by Finance Reports on 04/05/20<strong>13</strong> 09:09:19 AM Page 5 of 14
Vendor Invoice No. Invoice Description Status Held Reason Invoice Date Due Date G/L Date Received Date Payment Date Invoice Amount<br />
Fund 300 - <strong>County</strong> Highway<br />
Department 520 - Transportation<br />
Sub-Department 520 - <strong>County</strong> Highway<br />
Account 70060 - Communications Equipment<br />
3224 - Chicago Communications LLC 246459 XX2123 SNV-12<br />
Receiver Voter Chassis<br />
& SMV-2 Site Voter<br />
Modules<br />
Fund 304 - Motor Fuel Local Option<br />
Department 520 - Transportation<br />
Sub-Department 524 - Motor Fuel Local Option<br />
Account 50140 - Engineering Services<br />
7971 - Gewalt Hamilton Associates, Inc. 4-<br />
Rev1/22/<strong>13</strong>201<br />
3152 - T Y Lin International Inc <strong>13</strong>-2010-43-<br />
FINAL<br />
5563 - Wills Burke Kelsey Associates,<br />
Limited (WBK)<br />
5563 - Wills Burke Kelsey Associates,<br />
Limited (WBK)<br />
5563 - Wills Burke Kelsey Associates,<br />
Limited (WBK)<br />
5563 - Wills Burke Kelsey Associates,<br />
Limited (WBK)<br />
1<br />
12689-2012-<br />
544<br />
12706-2012-<br />
2021<br />
127<strong>13</strong>-2009-<br />
2636<br />
12688-2011-<br />
2008<br />
11-00333-02-EG;<br />
2011&2012 Traffic<br />
Data Collection<br />
09-00364-01-EG; Traf<br />
Eng Svcs, 03/01/12-<br />
11/30/12<br />
04-00329-00-BR;(R)<br />
JrchoOvrBlckbryCrkStru<br />
cRepl,1/27/<strong>13</strong>-2/23/<strong>13</strong><br />
08-00386-00-BR; [R]<br />
FrenchRdOvrBurlington<br />
Crk, P2, 1/27/<strong>13</strong>-<br />
2/23/<strong>13</strong><br />
08-00<strong>13</strong>3-01-BR; (r)<br />
WalkerRdOvrBurlington<br />
Ck, 1/1/<strong>13</strong>-2/23/<strong>13</strong><br />
11-00417-00-BR;<br />
LaFox/Mill Ck Structure<br />
Repl, 1/27/<strong>13</strong>-2/23/<strong>13</strong><br />
Paid by Check<br />
# 329111<br />
03/07/20<strong>13</strong> 03/15/20<strong>13</strong> 03/15/20<strong>13</strong> 03/25/20<strong>13</strong> 7,106.92<br />
Account 70060 - Communications Equipment Totals Invoice Transactions 1 $7,106.92<br />
Sub-Department 520 - <strong>County</strong> Highway Totals Invoice Transactions 57 $69,483.21<br />
Department 520 - Transportation Totals Invoice Transactions 57 $69,483.21<br />
Fund 300 - <strong>County</strong> Highway Totals Invoice Transactions 57 $69,483.21<br />
Paid by Check<br />
# 329205<br />
Paid by EFT #<br />
17569<br />
Paid by EFT #<br />
17583<br />
Paid by EFT #<br />
17583<br />
Paid by EFT #<br />
17583<br />
Paid by EFT #<br />
17583<br />
Transportation Accounts Payable by GL<br />
Distribution<br />
Payment Date Range 03/01/<strong>13</strong> - 03/31/<strong>13</strong><br />
11/12/2012 03/15/20<strong>13</strong> 03/15/20<strong>13</strong> 03/25/20<strong>13</strong> 8,050.48<br />
03/08/20<strong>13</strong> 03/<strong>13</strong>/20<strong>13</strong> 03/<strong>13</strong>/20<strong>13</strong> 03/25/20<strong>13</strong> 1,618.66<br />
03/05/20<strong>13</strong> 03/<strong>13</strong>/20<strong>13</strong> 03/<strong>13</strong>/20<strong>13</strong> 03/25/20<strong>13</strong> 4,205.26<br />
03/05/20<strong>13</strong> 03/<strong>13</strong>/20<strong>13</strong> 03/<strong>13</strong>/20<strong>13</strong> 03/25/20<strong>13</strong> 17,522.51<br />
03/06/20<strong>13</strong> 03/<strong>13</strong>/20<strong>13</strong> 03/<strong>13</strong>/20<strong>13</strong> 03/25/20<strong>13</strong> 715.97<br />
03/05/20<strong>13</strong> 03/<strong>13</strong>/20<strong>13</strong> 03/<strong>13</strong>/20<strong>13</strong> 03/25/20<strong>13</strong> 4,169.22<br />
Account 50140 - Engineering Services Totals Invoice Transactions 6 $36,282.10<br />
Run by Finance Reports on 04/05/20<strong>13</strong> 09:09:19 AM Page 6 of 14
Vendor Invoice No. Invoice Description Status Held Reason Invoice Date Due Date G/L Date Received Date Payment Date Invoice Amount<br />
Fund 304 - Motor Fuel Local Option<br />
Department 520 - Transportation<br />
Sub-Department 524 - Motor Fuel Local Option<br />
Dave Morris<br />
Account 52020 - Repairs and Maintenance- Roads<br />
0304<strong>13</strong>-MorrisD Mailbox and Post<br />
Damage<br />
Reimbursement<br />
02.22.<strong>13</strong><br />
<strong>13</strong>90 - Menards <strong>13</strong>271 XX0351 Post mount<br />
Paid by Check<br />
# 329068<br />
Transportation Accounts Payable by GL<br />
Distribution<br />
Payment Date Range 03/01/<strong>13</strong> - 03/31/<strong>13</strong><br />
03/01/20<strong>13</strong> 03/01/20<strong>13</strong> 03/01/20<strong>13</strong> 03/11/20<strong>13</strong> 50.00<br />
Paid by Check<br />
02/28/20<strong>13</strong> 03/06/20<strong>13</strong> 03/06/20<strong>13</strong> 03/25/20<strong>13</strong> 19.94<br />
standard steel # 329285<br />
<strong>13</strong>90 - Menards <strong>13</strong>892 XX0351 Atriumgrate - Paid by Check<br />
03/11/20<strong>13</strong> 03/15/20<strong>13</strong> 03/15/20<strong>13</strong> 03/25/20<strong>13</strong> 5.19<br />
green<br />
# 329285<br />
Account 52020 - Repairs and Maintenance- Roads Totals Invoice Transactions 3 $75.<strong>13</strong><br />
Account 60210 - Uniform Supplies<br />
2225 - Cintas Corp #344 344562318 XX8337 Maintenance Paid by Check<br />
03/04/20<strong>13</strong> 03/06/20<strong>13</strong> 03/06/20<strong>13</strong> 03/25/20<strong>13</strong> 185.29<br />
uniforms & carpets # 329114<br />
Account 60210 - Uniform Supplies Totals Invoice Transactions 1 $185.29<br />
Account 60330 - Vehicle Parts/Supplies<br />
5852 - Battery Service Corporation 230652 <strong>13</strong>4KAN 6 volt rayovac Paid by Check<br />
03/12/20<strong>13</strong> 03/15/20<strong>13</strong> 03/15/20<strong>13</strong> 03/25/20<strong>13</strong> 23.40<br />
industrial spring<br />
terminal battery<br />
# 329096<br />
1177 - Chicago International Trucks 11042272 XX0528 Valve Paid by Check<br />
03/11/20<strong>13</strong> 03/15/20<strong>13</strong> 03/15/20<strong>13</strong> 03/25/20<strong>13</strong> 220.88<br />
BX801479<br />
# 329112<br />
1177 - Chicago International Trucks 11042332 XX0528 Spring, bolt, Paid by Check<br />
03/<strong>13</strong>/20<strong>13</strong> 03/15/20<strong>13</strong> 03/15/20<strong>13</strong> 03/25/20<strong>13</strong> 635.79<br />
nut & washer<br />
# 329112<br />
1177 - Chicago International Trucks 11042358 XX0528 Filter & kit Paid by Check<br />
# 329112<br />
03/12/20<strong>13</strong> 03/15/20<strong>13</strong> 03/15/20<strong>13</strong> 03/25/20<strong>13</strong> 172.36<br />
3583 - Elburn NAPA Inc 464856 XX1170 CREDIT Paid by EFT #<br />
02/14/20<strong>13</strong> 03/06/20<strong>13</strong> 03/06/20<strong>13</strong> 03/25/20<strong>13</strong> (67.26)<br />
Warranty Inv#464551<br />
& 456799<br />
17476<br />
3583 - Elburn NAPA Inc 465477 XX1170 CREDIT Filter Paid by EFT #<br />
02/21/20<strong>13</strong> 03/06/20<strong>13</strong> 03/06/20<strong>13</strong> 03/25/20<strong>13</strong> (28.02)<br />
kit<br />
17476<br />
3583 - Elburn NAPA Inc 465820 XX1170 CREDIT Hose Paid by EFT #<br />
02/26/20<strong>13</strong> 03/06/20<strong>13</strong> 03/06/20<strong>13</strong> 03/25/20<strong>13</strong> (2.67)<br />
clamp<br />
17476<br />
3583 - Elburn NAPA Inc 466005 XX1170 Air filter Paid by EFT #<br />
17476<br />
02/28/20<strong>13</strong> 03/08/20<strong>13</strong> 03/08/20<strong>13</strong> 03/25/20<strong>13</strong> 109.08<br />
3583 - Elburn NAPA Inc 466293 XX1170 radiator cap, Paid by EFT #<br />
03/04/20<strong>13</strong> 03/08/20<strong>13</strong> 03/08/20<strong>13</strong> 03/25/20<strong>13</strong> 74.14<br />
lamp & clamp 17476<br />
3583 - Elburn NAPA Inc 465978 XX1170 Exhaust elbow, Paid by EFT #<br />
02/27/20<strong>13</strong> 03/08/20<strong>13</strong> 03/08/20<strong>13</strong> 03/25/20<strong>13</strong> <strong>13</strong>3.29<br />
cabin air filter, fuel<br />
filters, glue gel<br />
17476<br />
3583 - Elburn NAPA Inc 466406 XX1170 Vehicle speed Paid by EFT #<br />
03/05/20<strong>13</strong> 03/08/20<strong>13</strong> 03/08/20<strong>13</strong> 03/25/20<strong>13</strong> 23.89<br />
sensor 2007 Ford<br />
Focus<br />
17476<br />
3583 - Elburn NAPA Inc 466492 XX1170 Inspection Paid by EFT #<br />
03/06/20<strong>13</strong> 03/08/20<strong>13</strong> 03/08/20<strong>13</strong> 03/25/20<strong>13</strong> 17.63<br />
mirror<br />
17476<br />
Run by Finance Reports on 04/05/20<strong>13</strong> 09:09:19 AM Page 7 of 14
Transportation Accounts Payable by GL<br />
Distribution<br />
Payment Date Range 03/01/<strong>13</strong> - 03/31/<strong>13</strong><br />
Vendor<br />
Fund 304 - Motor Fuel Local Option<br />
Department 520 - Transportation<br />
Invoice No. Invoice Description Status Held Reason Invoice Date Due Date G/L Date Received Date Payment Date Invoice Amount<br />
Sub-Department 524 - Motor Fuel Local Option<br />
Account 60330 - Vehicle Parts/Supplies<br />
3583 - Elburn NAPA Inc 465477-CR XX1170 CREDIT Filter Paid by EFT #<br />
02/21/20<strong>13</strong> 03/<strong>13</strong>/20<strong>13</strong> 03/<strong>13</strong>/20<strong>13</strong> 03/25/20<strong>13</strong> (28.02)<br />
kit<br />
17476<br />
3583 - Elburn NAPA Inc 466924-CR XX1170 CREDIT Paid by EFT #<br />
03/11/20<strong>13</strong> 03/<strong>13</strong>/20<strong>13</strong> 03/<strong>13</strong>/20<strong>13</strong> 03/25/20<strong>13</strong> (1.99)<br />
Gasket<br />
17476<br />
3583 - Elburn NAPA Inc 467020 XX1170 Air filter Paid by EFT #<br />
17476<br />
03/12/20<strong>13</strong> 03/15/20<strong>13</strong> 03/15/20<strong>13</strong> 03/25/20<strong>13</strong> <strong>13</strong>5.54<br />
3583 - Elburn NAPA Inc 466966 XX1170 Gasket Paid by EFT #<br />
17476<br />
03/11/20<strong>13</strong> 03/15/20<strong>13</strong> 03/15/20<strong>13</strong> 03/25/20<strong>13</strong> 1.99<br />
3583 - Elburn NAPA Inc 466761 XX1170 Gasket, combo Paid by EFT #<br />
sprg brake less, syn brk 17476<br />
cal grs tub<br />
03/08/20<strong>13</strong> 03/15/20<strong>13</strong> 03/15/20<strong>13</strong> 03/25/20<strong>13</strong> 7<strong>13</strong>.28<br />
3583 - Elburn NAPA Inc 466888 XX1170 Alternator Paid by EFT #<br />
03/11/20<strong>13</strong> 03/15/20<strong>13</strong> 03/15/20<strong>13</strong> 03/25/20<strong>13</strong> 63.82<br />
bearing<br />
17476<br />
3583 - Elburn NAPA Inc 467089 XX1170 Oil & fuel Paid by EFT #<br />
03/12/20<strong>13</strong> 03/15/20<strong>13</strong> 03/15/20<strong>13</strong> 03/25/20<strong>13</strong> 224.07<br />
filters<br />
17476<br />
3583 - Elburn NAPA Inc 467119 XX1170 Straight tubing Paid by EFT #<br />
17476<br />
03/<strong>13</strong>/20<strong>13</strong> 03/15/20<strong>13</strong> 03/15/20<strong>13</strong> 03/25/20<strong>13</strong> 124.90<br />
4526 - Fifth Third Bank 0305<strong>13</strong>- 0357-9<strong>13</strong>5; Northern Paid by EFT #<br />
03/05/20<strong>13</strong> 03/05/20<strong>13</strong> 03/05/20<strong>13</strong> 03/25/20<strong>13</strong> 234.67<br />
LindsayJ Tool, P&G Keene,<br />
GoLight;<br />
Tools/VehPartsSup<br />
17480<br />
4526 - Fifth Third Bank 0314<strong>13</strong>- 0357-9<strong>13</strong>5; Kimball, Paid by EFT #<br />
03/14/20<strong>13</strong> 03/14/20<strong>13</strong> 03/14/20<strong>13</strong> 03/25/20<strong>13</strong> 294.55<br />
LindsayJ P&GKeene, S&SAuto,<br />
MyersTire<br />
17480<br />
1563 - Firestone Tire & Service Center 26141 322746 7129 Net Paid by Check<br />
03/04/20<strong>13</strong> 03/08/20<strong>13</strong> 03/08/20<strong>13</strong> 03/25/20<strong>13</strong> 64.88<br />
Affinity Touring BL<br />
P195/60R15 87T<br />
# 329193<br />
2<strong>13</strong>3 - Inland Power Group Inc 5453706-00 XX5599 Clamp Paid by EFT #<br />
17496<br />
02/26/20<strong>13</strong> 03/06/20<strong>13</strong> 03/06/20<strong>13</strong> 03/25/20<strong>13</strong> 28.85<br />
5220 - McNeilus Truck & Manu. 2120170 XX8024 Stud, wheel, Paid by Check<br />
03/06/20<strong>13</strong> 03/15/20<strong>13</strong> 03/15/20<strong>13</strong> 03/25/20<strong>13</strong> 737.31<br />
hub pilot M-H axle # 329282<br />
<strong>13</strong>05 - NAPA Auto Parts - St. Charles 387635 XX6157 Flat black Paid by Check<br />
# 329296<br />
03/12/20<strong>13</strong> 03/15/20<strong>13</strong> 03/15/20<strong>13</strong> 03/25/20<strong>13</strong> 10.05<br />
1125 - Transchicago Truck Group & <strong>13</strong>17387 XX8245 Gasket, bolt- Paid by Check<br />
02/28/20<strong>13</strong> 03/08/20<strong>13</strong> 03/08/20<strong>13</strong> 03/25/20<strong>13</strong> 361.73<br />
Northwest Ford<br />
flange, spacer, tube,<br />
seals<br />
# 329372<br />
1125 - Transchicago Truck Group & <strong>13</strong>18820 XX8245 Stud wheel Paid by Check<br />
03/06/20<strong>13</strong> 03/08/20<strong>13</strong> 03/08/20<strong>13</strong> 03/25/20<strong>13</strong> 57.40<br />
Northwest Ford<br />
# 329372<br />
1125 - Transchicago Truck Group & <strong>13</strong>18820-CR CREDIT #CR31660 Paid by Check<br />
03/07/20<strong>13</strong> 03/08/20<strong>13</strong> 03/08/20<strong>13</strong> 03/25/20<strong>13</strong> (57.40)<br />
Northwest Ford<br />
Stud wheel<br />
# 329372<br />
1125 - Transchicago Truck Group & <strong>13</strong>19594 XX8245 Pockets, Paid by Check<br />
03/11/20<strong>13</strong> 03/15/20<strong>13</strong> 03/15/20<strong>13</strong> 03/25/20<strong>13</strong> 52.01<br />
Northwest Ford<br />
connection<br />
# 329372<br />
Run by Finance Reports on 04/05/20<strong>13</strong> 09:09:19 AM Page 8 of 14
Vendor<br />
Fund 304 - Motor Fuel Local Option<br />
Department 520 - Transportation<br />
Invoice No. Invoice Description Status Held Reason Invoice Date Due Date G/L Date Received Date Payment Date Invoice Amount<br />
Sub-Department 524 - Motor Fuel Local Option<br />
Account 60330 - Vehicle Parts/Supplies<br />
1125 - Transchicago Truck Group & <strong>13</strong>20820 XX8245 Pipe sterling Paid by Check<br />
03/<strong>13</strong>/20<strong>13</strong> 03/15/20<strong>13</strong> 03/15/20<strong>13</strong> 03/25/20<strong>13</strong> 167.96<br />
Northwest Ford<br />
# 329372<br />
1125 - Transchicago Truck Group & <strong>13</strong>21<strong>13</strong>6 XX8245 Righ HD/LP Paid by Check<br />
03/14/20<strong>13</strong> 03/15/20<strong>13</strong> 03/15/20<strong>13</strong> 03/25/20<strong>13</strong> 10.91<br />
Northwest Ford<br />
# 329372<br />
1125 - Transchicago Truck Group & <strong>13</strong>19981 XX8245 Pocket Paid by Check<br />
03/<strong>13</strong>/20<strong>13</strong> 03/15/20<strong>13</strong> 03/15/20<strong>13</strong> 03/25/20<strong>13</strong> 39.68<br />
Northwest Ford<br />
2396 - Valley Hydraulic Service Inc 170698 K0351 Breather assy,<br />
stainless basket flange<br />
mount<br />
# 329372<br />
Paid by Check<br />
# 329377<br />
Transportation Accounts Payable by GL<br />
Distribution<br />
Payment Date Range 03/01/<strong>13</strong> - 03/31/<strong>13</strong><br />
03/11/20<strong>13</strong> 03/15/20<strong>13</strong> 03/15/20<strong>13</strong> 03/25/20<strong>13</strong> 26.26<br />
<strong>13</strong>70 - Zimmerman Ford Inc 50788 XXKI Wheel assy Paid by Check<br />
# 329398<br />
03/05/20<strong>13</strong> 03/08/20<strong>13</strong> 03/08/20<strong>13</strong> 03/25/20<strong>13</strong> 146.89<br />
Account 60330 - Vehicle Parts/Supplies Totals Invoice Transactions 35 $4,721.85<br />
Account 60360 - Equipment Parts/Supplies<br />
1665 - DeKalb Iron & Metal Company 178330 XX7000 Truct rect tube Paid by Check<br />
03/11/20<strong>13</strong> 03/15/20<strong>13</strong> 03/15/20<strong>13</strong> 03/25/20<strong>13</strong> 371.30<br />
(DIMCO)<br />
# 329170<br />
3583 - Elburn NAPA Inc 466016 XX1170 4707 Merit Q Paid by EFT #<br />
02/28/20<strong>13</strong> 03/08/20<strong>13</strong> 03/08/20<strong>13</strong> 03/25/20<strong>13</strong> 867.88<br />
23K HD, brake drum &<br />
drive wheel set<br />
17476<br />
6646 - Martin Implement Sales Inc A24390 KANE0004 Throttle Paid by Check<br />
03/04/20<strong>13</strong> 03/08/20<strong>13</strong> 03/08/20<strong>13</strong> 03/25/20<strong>13</strong> 8.75<br />
trigger<br />
# 329275<br />
6646 - Martin Implement Sales Inc A24391 KANE0004 Flat spring Paid by Check<br />
03/04/20<strong>13</strong> 03/08/20<strong>13</strong> 03/08/20<strong>13</strong> 03/25/20<strong>13</strong> 25.87<br />
& hand guard # 329275<br />
3719 - McCann Industries Inc 7156705 XX4117 Rigid tube Paid by Check<br />
# 329280<br />
03/07/20<strong>13</strong> 03/14/20<strong>13</strong> 03/14/20<strong>13</strong> 03/25/20<strong>13</strong> 287.17<br />
3719 - McCann Industries Inc 7155816 XX4117 Switch ignition Paid by Check<br />
# 329280<br />
02/04/20<strong>13</strong> 03/14/20<strong>13</strong> 03/14/20<strong>13</strong> 03/25/20<strong>13</strong> 40.93<br />
3719 - McCann Industries Inc 7155848 XX4117 Reman and Paid by Check<br />
02/05/20<strong>13</strong> 03/14/20<strong>13</strong> 03/14/20<strong>13</strong> 03/25/20<strong>13</strong> 548.46<br />
Core alternator # 329280<br />
3719 - McCann Industries Inc 7155581 XX4117 CREDIT Paid by Check<br />
01/29/20<strong>13</strong> 03/14/20<strong>13</strong> 03/14/20<strong>13</strong> 03/25/20<strong>13</strong> (661.37)<br />
Control original<br />
Inv#07154991<br />
# 329280<br />
3719 - McCann Industries Inc 7156685 XX4117 CREDIT Core Paid by Check<br />
03/07/20<strong>13</strong> 03/14/20<strong>13</strong> 03/14/20<strong>13</strong> 03/25/20<strong>13</strong> (117.00)<br />
Alternator<br />
# 329280<br />
<strong>13</strong>25 - Priority Products Inc 826017 XX64 Fiber disc, bulb, Paid by Check<br />
03/08/20<strong>13</strong> 03/15/20<strong>13</strong> 03/15/20<strong>13</strong> 03/25/20<strong>13</strong> 375.40<br />
cable ties, nipple, quick # 329330<br />
cnnct, washers<br />
<strong>13</strong>25 - Priority Products Inc 826174 XX64 Oring elbow Paid by Check<br />
# 329330<br />
03/12/20<strong>13</strong> 03/12/20<strong>13</strong> 03/15/20<strong>13</strong> 03/25/20<strong>13</strong> 37.01<br />
Account 60360 - Equipment Parts/Supplies Totals Invoice Transactions 11 $1,784.40<br />
Run by Finance Reports on 04/05/20<strong>13</strong> 09:09:19 AM Page 9 of 14
Vendor Invoice No. Invoice Description Status Held Reason Invoice Date Due Date G/L Date Received Date Payment Date Invoice Amount<br />
Fund 304 - Motor Fuel Local Option<br />
Department 520 - Transportation<br />
Sub-Department 524 - Motor Fuel Local Option<br />
Account 60370 - Tools<br />
4526 - Fifth Third Bank 0305<strong>13</strong>-<br />
LindsayJ<br />
4526 - Fifth Third Bank 0314<strong>13</strong>-<br />
LindsayJ<br />
0357-9<strong>13</strong>5; Northern<br />
Tool, P&G Keene,<br />
GoLight;<br />
Tools/VehPartsSup<br />
0357-9<strong>13</strong>5; Kimball,<br />
P&GKeene, S&SAuto,<br />
MyersTire<br />
Account 63020 - Utilities- Intersect Lighting<br />
1063 - Meade Electric Co Inc 658640/<strong>13</strong>382 12-00000-01-GM; 20<strong>13</strong><br />
Elec Maint Contract;<br />
Feb 20<strong>13</strong> Svcs<br />
Account 73000 - Road Construction<br />
1021 - State of <strong>IL</strong> Treasurer-IDOT 105747-1836 01-00266-00-<br />
BR;BgTmbrOvrTyler/Pi<br />
ngreeCrk 5/31/12-<br />
7/17/12<br />
Account 74010 - Highway Right of Way<br />
4949 - Lorenz and Associates Ltd 2332-FINAL 08-00377-00-CH;<br />
P.0001TE & 0002&TE,<br />
Appraisals,<br />
Kirk@Douglas<br />
8882 - Frederick E. Mills 0315<strong>13</strong>-002 11-00417-00-BR;<br />
LafxOvrMillCrk, Parcel<br />
002, 0.22 acres<br />
Paid by EFT #<br />
17480<br />
Paid by EFT #<br />
17480<br />
Paid by EFT #<br />
17527<br />
03/05/20<strong>13</strong> 03/05/20<strong>13</strong> 03/05/20<strong>13</strong> 03/25/20<strong>13</strong> 34.74<br />
03/14/20<strong>13</strong> 03/14/20<strong>13</strong> 03/14/20<strong>13</strong> 03/25/20<strong>13</strong> 225.43<br />
Account 60370 - Tools Totals Invoice Transactions 2 $260.17<br />
02/28/20<strong>13</strong> 03/<strong>13</strong>/20<strong>13</strong> 03/<strong>13</strong>/20<strong>13</strong> 03/25/20<strong>13</strong> 32,821.00<br />
Account 63020 - Utilities- Intersect Lighting Totals Invoice Transactions 1 $32,821.00<br />
Paid by Check<br />
# 329357<br />
Paid by EFT #<br />
17523<br />
Paid by Check<br />
# 329290<br />
Transportation Accounts Payable by GL<br />
Distribution<br />
Payment Date Range 03/01/<strong>13</strong> - 03/31/<strong>13</strong><br />
02/28/20<strong>13</strong> 03/18/20<strong>13</strong> 03/18/20<strong>13</strong> 03/25/20<strong>13</strong> 147,848.22<br />
Account 73000 - Road Construction Totals Invoice Transactions 1 $147,848.22<br />
03/12/20<strong>13</strong> 03/15/20<strong>13</strong> 03/15/20<strong>13</strong> 03/25/20<strong>13</strong> 3,000.00<br />
03/15/20<strong>13</strong> 03/15/20<strong>13</strong> 03/15/20<strong>13</strong> 03/25/20<strong>13</strong> 2,000.00<br />
Account 74010 - Highway Right of Way Totals Invoice Transactions 2 $5,000.00<br />
Sub-Department 524 - Motor Fuel Local Option Totals Invoice Transactions 62 $228,978.16<br />
Department 520 - Transportation Totals Invoice Transactions 62 $228,978.16<br />
Fund 304 - Motor Fuel Local Option Totals Invoice Transactions 62 $228,978.16<br />
Run by Finance Reports on 04/05/20<strong>13</strong> 09:09:19 AM Page 10 of 14
Vendor<br />
Fund 305 - Transportation Sales Tax<br />
Department 520 - Transportation<br />
Invoice No. Invoice Description Status Held Reason Invoice Date Due Date G/L Date Received Date Payment Date Invoice Amount<br />
Sub-Department 527 - Transportation Sales Tax<br />
Account 50140 - Engineering Services<br />
7397 - AMEC Environment & Infrastructure<br />
Inc<br />
7397 - AMEC Environment & Infrastructure<br />
Inc<br />
11-N28100564 06-00214-11-LS,[R]<br />
StearnsMcLeanFenAdap<br />
MgmtPlan,12/1/12-<br />
12/31/12<br />
12-N28100592 06-00214-11-LS,[R]<br />
StearnsMcLeanFenAdap<br />
MgmtPlan, 1/1/<strong>13</strong>-<br />
1/31/<strong>13</strong><br />
1<strong>13</strong>7 - Engineering Enterprises Inc 6-2012-7<strong>13</strong> 10-00404-00-CH; (r)<br />
FbynPkwy, Rt25 to<br />
NagelBlvd 1/21/<strong>13</strong>-<br />
5563 - Wills Burke Kelsey Associates,<br />
Limited (WBK)<br />
12705-2011-<br />
2652<br />
2/20/<strong>13</strong><br />
11-00<strong>13</strong>2-01-BR(R)<br />
AllenOvrHmpshCkStruc<br />
Repl, 1/27/<strong>13</strong>-2/23/<strong>13</strong><br />
Account 73000 - Road Construction<br />
1021 - State of <strong>IL</strong> Treasurer-IDOT 105765-32905 08-00389-00-<br />
TL,<strong>IL</strong>64/Brlngtn/TrafSig<br />
Intrcnt 6/8/12-8/14/12<br />
Paid by Check<br />
# 329078<br />
Paid by Check<br />
# 329078<br />
Paid by EFT #<br />
17477<br />
Paid by EFT #<br />
17583<br />
Paid by Check<br />
# 329357<br />
Transportation Accounts Payable by GL<br />
Distribution<br />
Payment Date Range 03/01/<strong>13</strong> - 03/31/<strong>13</strong><br />
01/25/20<strong>13</strong> 03/07/20<strong>13</strong> 03/07/20<strong>13</strong> 03/25/20<strong>13</strong> 10,094.56<br />
02/05/20<strong>13</strong> 03/07/20<strong>13</strong> 03/07/20<strong>13</strong> 03/25/20<strong>13</strong> 2,364.12<br />
03/08/20<strong>13</strong> 03/18/20<strong>13</strong> 03/18/20<strong>13</strong> 03/25/20<strong>13</strong> 11,321.01<br />
03/05/20<strong>13</strong> 03/<strong>13</strong>/20<strong>13</strong> 03/<strong>13</strong>/20<strong>13</strong> 03/25/20<strong>13</strong> 10,273.05<br />
Account 50140 - Engineering Services Totals Invoice Transactions 4 $34,052.74<br />
03/08/20<strong>13</strong> 03/18/20<strong>13</strong> 03/18/20<strong>13</strong> 03/25/20<strong>13</strong> 30,201.88<br />
Account 73000 - Road Construction Totals Invoice Transactions 1 $30,201.88<br />
Run by Finance Reports on 04/05/20<strong>13</strong> 09:09:19 AM Page 11 of 14
Vendor Invoice No. Invoice Description Status Held Reason Invoice Date Due Date G/L Date Received Date Payment Date Invoice Amount<br />
Fund 305 - Transportation Sales Tax<br />
Department 520 - Transportation<br />
Sub-Department 527 - Transportation Sales Tax<br />
Account 74010 - Highway Right of Way<br />
8870 - John W. Barnard 0305<strong>13</strong>-0003TE 10-00404-00-CH;<br />
Parcel 0003TE; 3 Year,<br />
0.002 Acres<br />
1287 - Civiltech Engineering Inc 40634 98-00214-02-BR;<br />
Parcel 1ST0241, R-91-<br />
083-01,<br />
CaseNo.12ED31<br />
3428 - Fox Valley Labor News 0214<strong>13</strong>-<strong>13</strong>ED4 98-00214-02-BR;<br />
Parcel 1ST0064,<br />
3528 - <strong>Kane</strong> <strong>County</strong> Treasurer 0318<strong>13</strong>-<br />
1ST0066<br />
3528 - <strong>Kane</strong> <strong>County</strong> Treasurer 0318<strong>13</strong>-<br />
1ST0241<br />
(Brewster) <strong>13</strong> ED 4<br />
98-00214-02-BR;<br />
1ST0066 & TE,<br />
Case#12ED23, 5yrTE<br />
98-00214-02-BR;<br />
Stearns, 1ST0241,<br />
Case#12ED31, 0.858<br />
Acres<br />
8871 - Petersen Health Care III, LLC 0305<strong>13</strong>-0005TE 10-00404-00-CH;<br />
Parcel 0005TE; 3 year,<br />
0.017 acres<br />
8885 - David & Marianne Snyder 0318<strong>13</strong>-0004TE 10-00404-00-CH;<br />
FbynPkw<strong>IL</strong>25Nagle,<br />
Parcel 0004TE, 3 Yr<br />
3184 - T Engineering Services Ltd 0318<strong>13</strong>-<br />
1ST0066<br />
0.017 Acre<br />
98-00214-02-BR; R-91-<br />
083-01; 1ST0066,<br />
Eminent Domain<br />
Paid by Check<br />
# 329095<br />
Paid by Check<br />
# 329<strong>13</strong>4<br />
Paid by Check<br />
# 329198<br />
Paid by Check<br />
# 329249<br />
Paid by Check<br />
# 329250<br />
Paid by Check<br />
# 329320<br />
Paid by Check<br />
# 329352<br />
Paid by Check<br />
# 329363<br />
Transportation Accounts Payable by GL<br />
Distribution<br />
Payment Date Range 03/01/<strong>13</strong> - 03/31/<strong>13</strong><br />
03/05/20<strong>13</strong> 03/06/20<strong>13</strong> 03/06/20<strong>13</strong> 03/25/20<strong>13</strong> 300.00<br />
02/08/20<strong>13</strong> 03/05/20<strong>13</strong> 03/05/20<strong>13</strong> 03/25/20<strong>13</strong> 3,000.00<br />
02/08/20<strong>13</strong> 03/05/20<strong>13</strong> 03/05/20<strong>13</strong> 03/25/20<strong>13</strong> 562.50<br />
03/18/20<strong>13</strong> 03/18/20<strong>13</strong> 03/18/20<strong>13</strong> 03/25/20<strong>13</strong> 75,300.00<br />
03/18/20<strong>13</strong> 03/18/20<strong>13</strong> 03/18/20<strong>13</strong> 03/25/20<strong>13</strong> 271,000.00<br />
03/05/20<strong>13</strong> 03/06/20<strong>13</strong> 03/06/20<strong>13</strong> 03/25/20<strong>13</strong> 1,200.00<br />
03/18/20<strong>13</strong> 03/18/20<strong>13</strong> 03/18/20<strong>13</strong> 03/25/20<strong>13</strong> 1,600.00<br />
02/22/20<strong>13</strong> 03/18/20<strong>13</strong> 03/18/20<strong>13</strong> 03/25/20<strong>13</strong> 1,000.00<br />
Account 74010 - Highway Right of Way Totals Invoice Transactions 8 $353,962.50<br />
Sub-Department 527 - Transportation Sales Tax Totals Invoice Transactions <strong>13</strong> $418,217.12<br />
Department 520 - Transportation Totals Invoice Transactions <strong>13</strong> $418,217.12<br />
Fund 305 - Transportation Sales Tax Totals Invoice Transactions <strong>13</strong> $418,217.12<br />
Run by Finance Reports on 04/05/20<strong>13</strong> 09:09:19 AM Page 12 of 14
Vendor Invoice No. Invoice Description Status Held Reason Invoice Date Due Date G/L Date Received Date Payment Date Invoice Amount<br />
Fund 540 - Transportation Capital<br />
Department 520 - Transportation<br />
Sub-Department 525 - Transportation Capital<br />
Account 50140 - Engineering Services<br />
1287 - Civiltech Engineering Inc 2476-22-2011-<br />
563<br />
5694 - Omega & Associates Inc 5109-18-2011-<br />
977<br />
5694 - Omega & Associates Inc 5109-19-2011-<br />
977<br />
4900 - STV Inc 20026040-12-<br />
2504<br />
99-00232-01-WR;<br />
Orchard/Jericho/Rt30<br />
2/1/<strong>13</strong>-2/28/<strong>13</strong><br />
06-00214-27-BR; (r)<br />
Stearns, Umbdenstock<br />
Brig Rpl,1/1/<strong>13</strong>-<br />
1/31/<strong>13</strong><br />
06-00214-27-BR; (r)<br />
Stearns, Umbdenstock<br />
Br Rplc 2/1/<strong>13</strong>-2/28/<strong>13</strong><br />
11-00202-03-BR;<br />
OrchardRdOvrI88Reha<br />
b, 11/3/12-2/1/<strong>13</strong><br />
Account 73000 - Road Construction<br />
1021 - State of <strong>IL</strong> Treasurer-IDOT 105769-32905 10-00403-00-TL;<br />
Kirk/Dnhm/TrffcSgnl/In<br />
trcnt 5/31/12-7/27/12<br />
Account 73010 - Bridge Construction<br />
1021 - State of <strong>IL</strong> Treasurer-IDOT 105555-FINAL 06-00214-08-BR;<br />
32905;<br />
StearnOvrNArmBrewste<br />
rCk, Stg1A<br />
Paid by Check<br />
# 329<strong>13</strong>3<br />
Paid by Check<br />
# 329311<br />
Paid by Check<br />
# 329311<br />
Paid by Check<br />
# 329359<br />
Paid by Check<br />
# 329357<br />
Paid by Check<br />
# 329357<br />
Transportation Accounts Payable by GL<br />
Distribution<br />
Payment Date Range 03/01/<strong>13</strong> - 03/31/<strong>13</strong><br />
03/08/20<strong>13</strong> 03/18/20<strong>13</strong> 03/18/20<strong>13</strong> 03/25/20<strong>13</strong> 30,840.88<br />
02/07/20<strong>13</strong> 03/06/20<strong>13</strong> 03/06/20<strong>13</strong> 03/25/20<strong>13</strong> 17,785.35<br />
03/07/20<strong>13</strong> 03/18/20<strong>13</strong> 03/18/20<strong>13</strong> 03/25/20<strong>13</strong> 15,192.70<br />
02/25/20<strong>13</strong> 03/06/20<strong>13</strong> 03/06/20<strong>13</strong> 03/25/20<strong>13</strong> 14,456.31<br />
Account 50140 - Engineering Services Totals Invoice Transactions 4 $78,275.24<br />
03/08/20<strong>13</strong> 03/18/20<strong>13</strong> 03/18/20<strong>13</strong> 03/25/20<strong>13</strong> 14,125.10<br />
Account 73000 - Road Construction Totals Invoice Transactions 1 $14,125.10<br />
12/14/2012 03/<strong>13</strong>/20<strong>13</strong> 03/<strong>13</strong>/20<strong>13</strong> 03/25/20<strong>13</strong> 170,172.57<br />
Account 73010 - Bridge Construction Totals Invoice Transactions 1 $170,172.57<br />
Sub-Department 525 - Transportation Capital Totals Invoice Transactions 6 $262,572.91<br />
Department 520 - Transportation Totals Invoice Transactions 6 $262,572.91<br />
Fund 540 - Transportation Capital Totals Invoice Transactions 6 $262,572.91<br />
Run by Finance Reports on 04/05/20<strong>13</strong> 09:09:19 AM Page <strong>13</strong> of 14
Vendor Invoice No. Invoice Description Status Held Reason Invoice Date Due Date G/L Date Received Date Payment Date Invoice Amount<br />
Fund 560 - South Impact Fees<br />
Department 520 - Transportation<br />
Sub-Department 560 - South Impact Fees<br />
Account 50140 - Engineering Services<br />
7579 - Thomas Engineering Group, LLC 1-12115-2012-<br />
781<br />
7579 - Thomas Engineering Group, LLC 2-<strong>13</strong>012-2012-<br />
781<br />
11-00201-04-CH; (r)<br />
FabyanPkwy@Kirk,<br />
P1Eng, 11/1/12-<br />
12/31/12<br />
11-00201-04-CH; (r)<br />
FabyanPkwy@Kirk,<br />
P1Eng, 1/1/<strong>13</strong>-1/31/<strong>13</strong><br />
Paid by Check<br />
# 329366<br />
Paid by Check<br />
# 329366<br />
Transportation Accounts Payable by GL<br />
Distribution<br />
Payment Date Range 03/01/<strong>13</strong> - 03/31/<strong>13</strong><br />
03/07/20<strong>13</strong> 03/14/20<strong>13</strong> 03/14/20<strong>13</strong> 03/25/20<strong>13</strong> 40,875.70<br />
03/07/20<strong>13</strong> 03/14/20<strong>13</strong> 03/14/20<strong>13</strong> 03/25/20<strong>13</strong> 32,111.16<br />
Account 50140 - Engineering Services Totals Invoice Transactions 2 $72,986.86<br />
Sub-Department 560 - South Impact Fees Totals Invoice Transactions 2 $72,986.86<br />
Department 520 - Transportation Totals Invoice Transactions 2 $72,986.86<br />
Fund 560 - South Impact Fees Totals Invoice Transactions 2 $72,986.86<br />
Grand Totals Invoice Transactions 140 $1,052,238.26<br />
Run by Finance Reports on 04/05/20<strong>13</strong> 09:09:19 AM Page 14 of 14
SUMMARY:<br />
Attachments:<br />
Detailed information<br />
available from :<br />
Staff Remarks /<br />
Recommendations:<br />
Committee Remarks:<br />
<strong>AG</strong>ENDA ITEM EXECUTIVE SUMMARY Agenda Item #<br />
Name:<br />
Assigned Committee:<br />
Staff Name:<br />
Transportation Financial Reports - thru March 31, 20<strong>13</strong><br />
4/11/20<strong>13</strong><br />
Presenter/Sponsor: Tom Rickert<br />
<strong>County</strong> transportation fund balances total $83,1<strong>13</strong>,784 with contractual/debt obligations at $72,466,809. Contractual/debt<br />
obligations only include current contracts. Contractual/debt obligations do not include all budgeted projects and required<br />
federal matching commitments for subsequent project phases within the 5-Year TIP.<br />
Fund outflows year-to-date were $16.3 million or 18.6% of budget. Debt service transfers comprise of $3.5 million for the<br />
MFT Bond and $8.4 million for the Transportation Sales Tax Bond.<br />
Collections for the month of March were $0.6 million.<br />
The receivables balance at the end of March was $0.4 million.<br />
Receivable Aging<br />
$0.4 million current<br />
$0.0 million 1-30 days<br />
$0.0 million 31-60 days<br />
$0.0 million 61-90 days<br />
$0.0 million over 90 days<br />
Please be advised - as we go forward into FY20<strong>13</strong>, budget adjustments may be required for projects in conjunction with<br />
IDOT let projects that have not closed out as planned from previous budget years (such as Stearns Road Bridge Corridor,<br />
Randall & <strong>IL</strong>64, McLean - Bowes to Hopps).<br />
Contractual Obligations, Fund Status Reports<br />
For information only.<br />
Transportation<br />
Gary Sirotzke, Chief of Finance Phone: (630) 845-7872<br />
4B
Fund<br />
Special Revenue Funds<br />
Beginning Fund<br />
Balance<br />
M-T-D<br />
Revenues<br />
Fund Status Report<br />
Report Date: 3/31/20<strong>13</strong> (unaudited)<br />
Y-T-D<br />
Revenues<br />
M-T-D<br />
Expenses<br />
Y-T-D<br />
Expenses Fund Balance<br />
Contractual<br />
Obligations<br />
Debt Service<br />
Obligations<br />
2-Apr-<strong>13</strong><br />
Fund Balance<br />
Less<br />
Obligations A/R<br />
300 - <strong>County</strong> Highway $9,973,<strong>13</strong>9 $24,494 $89,442 $276,572 $1,317,681 $8,741,444 $1,741,364 $7,000,080 $3,456<br />
301 - <strong>County</strong> Bridge $601,558 $112 $411 $0 $15,648 $582,745 $403,876 $178,868 $3,577<br />
302 - Motor Fuel Tax $11,210,952 $387,404 $843,586 $294,656 $4,526,050 $7,528,488 $1,771,025 $24,468,388 ($18,710,925) $0<br />
303 - <strong>County</strong> Highway Matching $67,837 $29 $87 $0 $63,175 $4,749 $2,387 $2,362 $0<br />
304 - Motor Fuel Local Option $21,774,811 $787,410 $1,478,008 $228,978 $615,822 $22,526,102 $<strong>13</strong>,970,769 $438,762 $8,116,570 $110,896<br />
Special Revenue Funds Subtotal: $43,628,298 $1,199,450 $2,411,534 $800,206 $6,538,376 $39,383,527 $17,889,422 $24,907,150 ($3,4<strong>13</strong>,044) $117,929<br />
Restricted Capital Funds<br />
305 - Transportation Sales Tax $24,510,926 $1,344,665 $2,386,154 $418,217 $9,001,424 $17,766,425 $7,629,350 $8,441,460 $1,695,616 $129,231<br />
540 - Transportation Capital $17,284,874 $123,544 $<strong>13</strong>4,750 $262,573 $646,969 $16,615,729 $9,003,415 $7,612,314 $156,926<br />
550 - Aurora Area Impact Fees $250,076 $4,692 $21,201 $0 $0 $271,276 $51,059 $220,217 $0<br />
551 - Campton Hills Impact Fees $480,236 $3,560 $59,246 $0 $2,233 $537,249 $0 $537,249 $0<br />
552 - Greater Elgin Impact Fees $2,626,005 $27,478 $49,735 $0 $0 $2,675,740 $1,980,497 $695,242 $0<br />
553 - Northwest Impact Fees $263,851 $7,636 $16,168 $0 $19,726 $260,293 $<strong>13</strong>2,066 $128,227 $0<br />
554 - Southwest Impact Fees $434,898 $5,790 $12,632 $0 $0 $447,529 $0 $447,529 $0<br />
555 - Tri-Cities Impact Fees $1,126,896 $9,708 $27,646 $0 $0 $1,154,542 $729,000 $425,542 $0<br />
556 - Upper Fox Impact Fees $2,020,064 $1,068 $156,<strong>13</strong>7 $0 $9,050 $2,167,151 $406,840 $1,760,311 $0<br />
557 - West Central Impact Fees $12,390 $0 $298 $0 $0 $12,688 $0 $12,688 $0<br />
558 - North Impact Fees $851,092 $0 $153 $0 $0 $851,245 $500,000 $351,245 $0<br />
559 - Central Impact Fees $600,932 $4,674 $4,823 $0 $0 $605,755 $504,537 $101,218 $0<br />
560 - South Impact Fees $433,866 $1,836 $3,755 $72,987 $72,987 $364,634 $292,0<strong>13</strong> $72,621 $0<br />
IF Subtotal $9,100,305 $66,442 $351,794 $72,987 $103,997 $9,348,102 $4,596,0<strong>13</strong> $0 $4,752,089 $0<br />
Restricted Capital Funds Subtotal: $50,896,104 $1,534,651 $2,872,698 $753,777 $9,752,389 $43,730,257 $21,228,777 $8,441,460 $14,060,019 $286,156<br />
Grand Total: $94,524,402 $2,734,101 $5,284,232 $1,553,983 $16,290,765 $83,1<strong>13</strong>,784 $39,118,199 $33,348,610 $10,646,975 $404,085<br />
Please note the Fund Balance is less Accounts Receivable.<br />
Additionally, please note during the fiscal year cutoff/audit period the beginning fund balance will be adjusted for late arriving invoices posted to FY2012.
Acct (All) K.C.D.O.T.<br />
ABF A 3/31/20<strong>13</strong><br />
Project Mgr (All) Contractual Obligations<br />
P.O. Status Open (unaudited)<br />
Row Labels<br />
Values<br />
Open Contract Contract Amount Funding Remaining A/R<br />
2010 Culvert Maintenance & Replacement $77,235.95 $ 4<strong>13</strong>,000.00 $ - $<br />
-<br />
Burlington over Trib. of Virgil Ditch No.1<br />
Homer L. Chastain & Associates, LLP<br />
2010-2197<br />
304 $5,<strong>13</strong>1.59 $ 40,350.00 $ - $<br />
-<br />
Burlington Over Virgil Ditch No.3<br />
Homer L. Chastain & Associates, LLP<br />
2010-2196<br />
304 $3,791.45 $ 42,000.00 $ - $<br />
-<br />
<strong>County</strong> Line Culvert s/o I88<br />
Homer L. Chastain & Associates, LLP<br />
2010-2195<br />
304 $3,759.53 $ 22,215.00 $ - $<br />
-<br />
Empire Rd. over Ferson Crk<br />
Homer L. Chastain & Associates, LLP<br />
2010-2174<br />
304 $6,470.51 $ 33,785.00 $ - $<br />
-<br />
Empire Rd. over Trib. of Ferson Crk<br />
Homer L. Chastain & Associates, LLP<br />
2010-2175<br />
304 $5,545.35 $ 36,235.00 $ - $<br />
-<br />
Empire Rd. Over Unnamed Stream<br />
Homer L. Chastain & Associates, LLP<br />
2010-2177<br />
304 $18,590.25 $ 51,400.00 $ - $<br />
-<br />
Harmony over Harmony Crk<br />
Homer L. Chastain & Associates, LLP<br />
2010-2181<br />
304 $7,307.15 $ 30,530.00 $ - $<br />
-<br />
Harmony over Trib. of Hampshire Crk<br />
Homer L. Chastain & Associates, LLP<br />
2010-2182<br />
304 $4,742.88 $ 37,205.00 $ - $<br />
-<br />
Plank Rd Ovr Burlington Creek<br />
Homer L. Chastain & Associates, LLP<br />
2010-2176<br />
304 $6,406.64 $ 44,515.00 $ - $<br />
-<br />
Randall Culvert n/o US 20<br />
Homer L. Chastain & Associates, LLP<br />
2010-2194<br />
304 $6,659.68 $ 40,830.00 $ - $<br />
-<br />
Silver Glen Drainage Ditch<br />
Homer L. Chastain & Associates, LLP<br />
2010-2173<br />
304 $8,830.92 $ 33,935.00 $ - $<br />
-<br />
2012 Traffic Safety Improvement Project $116,257.92 $ 259,996.12 $ (176,335.06) $ (18,649.21)<br />
(E2)<br />
ESI Consultants, LTD<br />
2012-796<br />
540 $116,257.92 $ 259,996.12 $ (176,335.06) $<br />
(18,649.21)<br />
Page 1 of 20
Acct (All) K.C.D.O.T.<br />
ABF A 3/31/20<strong>13</strong><br />
Project Mgr (All) Contractual Obligations<br />
P.O. Status Open (unaudited)<br />
Row Labels<br />
Values<br />
Open Contract Contract Amount Funding Remaining A/R<br />
20<strong>13</strong> Traffic Safety Improvement Project $249,996.87 $ 249,996.87 $ (224,997.18) $<br />
-<br />
(E2)<br />
Christopher B. Burke Engineering LTD.<br />
Pending<br />
540 $249,996.87 $ 249,996.87 $ (224,997.18) $<br />
-<br />
Allen Road Over Hampshire Creek (045-3035)<br />
(E1)<br />
(E1)<br />
Wills Burke Kelsey Associates, Limited (WBK)<br />
2011-2652<br />
$40,660.99 $ 159,968.22 $ (60,776.43) $ (20,029.21)<br />
305 $40,660.99 $ 159,968.22 $ (60,776.43) $ (20,029.21)<br />
Anderson Road Extension - <strong>IL</strong>38 to Keslinger(41)<br />
(CONST)<br />
(CONST)<br />
AT&T<br />
Pending<br />
$4,104,590.96 $ 5,460,027.81 $ (1,273,744.00) $<br />
-<br />
305 $225,000.00 $ 290,000.00 $ - $<br />
-<br />
(E2)<br />
HR Green (formerly SEC Group, Inc.)<br />
2009-1073<br />
305 $<strong>13</strong>6,275.48 $ 377,931.86 $ - $<br />
-<br />
5<strong>13</strong> $0.00 $ 888,780.47 $ - $<br />
-<br />
557 $0.00 $ 160,000.00 $ - $<br />
-<br />
(E3)<br />
(E3)<br />
HR Green (formerly SEC Group, Inc.)<br />
2012-2074<br />
302 $1,127,180.00 $ 1,127,180.00 $ (1,127,180.00) $<br />
-<br />
559 $465,000.40 $ 465,000.40 $ (146,564.00) $<br />
-<br />
(ROW)<br />
(ROW)<br />
Covington Court Partnership<br />
Pending<br />
304 $1,266,673.08 $ 1,266,673.08 $ - $<br />
-<br />
State Bank of Geneva as Trustee Trust DTD 12/22/97<br />
Pending<br />
304 $10,427.00 $ 10,427.00 $ - $<br />
-<br />
Elburn Station Property Company LLC<br />
Pending<br />
304 $34,300.00 $ 34,300.00 $ - $<br />
-<br />
540 $839,735.00 $ 839,735.00 $ - $<br />
-<br />
BigTimberEmbankmentStabilization<br />
(CONST)<br />
(CONST)<br />
Martam Construction<br />
2012-2184<br />
$<strong>13</strong>7,737.75 $ 968,021.00 $ - $<br />
-<br />
305 $<strong>13</strong>7,737.75 $ 968,021.00 $ - $<br />
-<br />
BigTimberOvrTyler&Pingree 045-3323<br />
(CONST)<br />
(CONST)<br />
State of <strong>IL</strong> Treasurer-IDOT<br />
2011-1675<br />
$327,811.08 $ 1,496,370.59 $ (66,995.04) $ (12,522.70)<br />
304 $<strong>13</strong>4,537.64 $ 378,486.66 $ - $<br />
-<br />
Page 2 of 20
Acct (All) K.C.D.O.T.<br />
ABF A 3/31/20<strong>13</strong><br />
Project Mgr (All) Contractual Obligations<br />
P.O. Status Open (unaudited)<br />
Row Labels<br />
Values<br />
Open Contract Contract Amount Funding Remaining A/R<br />
5<strong>13</strong> $0.00 $ <strong>13</strong>4,059.34 $ - $<br />
-<br />
(E2)<br />
Christopher B Burke Engineering LTD<br />
2007-388<br />
304 $23,106.93 $ 354,938.18 $ (27,780.35) $ (6,263.74)<br />
(E3)<br />
(E3)<br />
Cotter Consulting, Inc.<br />
2011-588<br />
304 $64,382.86 $ 483,312.00 $ (25,700.37) $ (4,546.68)<br />
(MONITORING)<br />
Cotter Consulting, Inc.<br />
2011-587<br />
304 $105,783.65 $ 145,574.41 $ (<strong>13</strong>,514.32) $ (1,712.28)<br />
Bliss Road over Blackberry Creek<br />
(E1)<br />
(E1)<br />
Wills Burke Kelsey Associates, Limited (WBK)<br />
2009-2637<br />
$25,245.03 $ 204,885.23 $ (20,196.02) $<br />
-<br />
304 $25,245.03 $ 204,885.23 $ (20,196.02) $<br />
-<br />
BowesRd Ovr Fitchie Creek<br />
(E3)<br />
Monitoring<br />
V3 Companies of Illinois Ltd<br />
2010-1845<br />
$8,560.00 $ 20,000.00 $ - $<br />
-<br />
304 $8,560.00 $ 20,000.00 $ - $<br />
-<br />
Bridge Inspections<br />
(E1)<br />
Bridge Inspections<br />
Collins Engineers, Inc.<br />
20<strong>13</strong>-963<br />
$403,876.41 $ 760,000.00 $ (3,576.63) $ (3,576.63)<br />
301 $400,000.00 $ 400,000.00 $ - $<br />
-<br />
Hampton Lenzini & Renwick, Inc. (HLR)<br />
2012-162<br />
301 $3,876.41 $ 360,000.00 $ - $<br />
-<br />
Virgil Township<br />
2009-104<br />
301 $0.00 $ (566.57) $ (566.57)<br />
2011-70<br />
301 $0.00 $ (2,502.00) $ (2,502.00)<br />
(blank)<br />
301 $0.00 $ (508.06) $ (508.06)<br />
Burlington @ <strong>IL</strong> Route 47 $253,577.50 $ 424,614.58 $ (247,526.48) $ (56,993.48)<br />
(E2)<br />
Burns & McDonnell Engineering Co<br />
2011-2656<br />
540 $38,633.14 $ 209,670.22 $ (56,993.48) $ (56,993.48)<br />
(E3)<br />
(E3)<br />
STV Inc<br />
Page 3 of 20
Acct (All) K.C.D.O.T.<br />
ABF A 3/31/20<strong>13</strong><br />
Project Mgr (All) Contractual Obligations<br />
P.O. Status Open (unaudited)<br />
Row Labels<br />
Pending<br />
Values<br />
Open Contract Contract Amount Funding Remaining A/R<br />
540 $214,944.36 $ 214,944.36 $ (190,533.00) $<br />
-<br />
Burlington Over VirgilDitch2 $4,492.37 $ 165,955.25 $ - $<br />
-<br />
(E2)<br />
Stantec Consulting Services (Entran) Inc.<br />
2009-1673<br />
304 $4,492.37 $ 165,955.25 $ - $<br />
-<br />
CrackSealing<br />
(CONST)<br />
Crack Filling/Crack Routing<br />
SKC Construction Inc.<br />
Pending<br />
$610,759.18 $ 610,759.16 $ - $<br />
-<br />
304 $610,759.18 $ 610,759.16 $ - $<br />
-<br />
Damisch Road over Tyler Creek<br />
(CONST)<br />
(CONST)<br />
State of <strong>IL</strong> Treasurer-IDOT<br />
2010-1421<br />
$44,305.24 $ 93,553.18 $ - $<br />
-<br />
5<strong>13</strong> $0.00 $ 49,247.94 $ - $<br />
-<br />
540 $44,305.24 $ 44,305.24 $ - $<br />
-<br />
Dauberman Over Welch Crk 045-3107 $95,228.04 $ 95,228.04 $ (76,182.43) $<br />
-<br />
(E2)<br />
exp U.S. Services, Inc.<br />
2012-2024<br />
304 $95,228.04 $ 95,228.04 $ (76,182.43) $<br />
-<br />
External Grants<br />
July 2012<br />
Ride in <strong>Kane</strong> Mobility Mgmt Services<br />
Association for Individual Development (AID)<br />
(blank)<br />
$0.00 $ (2,751.99) $ (2,751.99)<br />
300 $0.00 $ (514.27) $ (514.27)<br />
Aug 2012<br />
Ride in <strong>Kane</strong> Mobility Mgmt Services<br />
Association for Individual Development (AID)<br />
(blank)<br />
300 $0.00 $ (385.70) $ (385.70)<br />
Sept 2012<br />
Ride in <strong>Kane</strong> Mobility Mgmt Services<br />
Association for Individual Development (AID)<br />
(blank)<br />
300 $0.00 $ (385.70) $ (385.70)<br />
Oct 2012<br />
Ride in <strong>Kane</strong> Mobility Mgmt Services<br />
Association for Individual Development (AID)<br />
(blank)<br />
300 $0.00 $ (342.85) $ (342.85)<br />
Nov 2012<br />
Ride in <strong>Kane</strong> Mobility Mgmt Services<br />
Association for Individual Development (AID)<br />
(blank)<br />
300 $0.00 $ (385.70) $ (385.70)<br />
Dec 2012<br />
Page 4 of 20
Acct (All) K.C.D.O.T.<br />
ABF A 3/31/20<strong>13</strong><br />
Project Mgr (All) Contractual Obligations<br />
P.O. Status Open (unaudited)<br />
Row Labels<br />
Ride in <strong>Kane</strong> Mobility Mgmt Services<br />
Association for Individual Development (AID)<br />
(blank)<br />
Values<br />
Open Contract Contract Amount Funding Remaining A/R<br />
300 $0.00 $ (342.85) $ (342.85)<br />
Jan 20<strong>13</strong><br />
Ride in <strong>Kane</strong> Mobility Mgmt Services<br />
Association for Individual Development (AID)<br />
(blank)<br />
300 $0.00 $ (394.92) $ (394.92)<br />
Fabyan Pkwy - <strong>IL</strong>25 to Nagel Blvd<br />
(E1)<br />
(E1)<br />
Engineering Enterprises Inc<br />
2010-738<br />
$95,043.09 $ 301,074.00 $ (80,079.90) $ (33,320.36)<br />
305 $59,580.17 $ 172,914.67 $ (9,332.40) $<br />
-<br />
(E2)<br />
Engineering Enterprises Inc<br />
2012-7<strong>13</strong><br />
305 $35,462.92 $ 128,159.33 $ (70,747.50) $ (33,320.36)<br />
Fabyan Pkwy & <strong>Kane</strong>ville<br />
(E1)<br />
(E1)<br />
Burns & McDonnell<br />
2012-715<br />
$110,433.53 $ 127,700.25 $ (83,709.77) $<br />
-<br />
540 $5,796.32 $ 23,063.04 $ - $<br />
-<br />
2012-873<br />
540 $104,637.21 $ 104,637.21 $ (83,709.77) $<br />
-<br />
Fabyan Pkwy & Kirk Road<br />
(E1)<br />
(E1)<br />
Thomas Engineering Group, LLC<br />
2012-781<br />
$331,550.12 $ 404,536.98 $ (285,000.00) $<br />
-<br />
559 $39,536.98 $ 39,536.98 $ - $<br />
-<br />
560 $292,0<strong>13</strong>.14 $ 365,000.00 $ (285,000.00) $<br />
-<br />
Fabyan Pkwy & Van Nortwick<br />
(CONST)<br />
(CONST)<br />
State of <strong>IL</strong> Treasurer-IDOT<br />
2010-959<br />
$142,766.39 $ 245,294.00 $ - $<br />
-<br />
304 $142,766.39 $ 245,294.00 $ - $<br />
-<br />
Fabyan Pkwy Ovr Mill Creek<br />
(CONST)<br />
(CONST)<br />
State of <strong>IL</strong> Treasurer-IDOT<br />
2008-119<br />
$245,983.94 $ 367,641.28 $ - $<br />
-<br />
300 $245,983.94 $ 367,641.28 $ - $<br />
-<br />
French Road Bridge over Burlington Creek<br />
(CONST)<br />
(Permit Fees)<br />
<strong>Kane</strong>-DuPage Soil & Water Conservation District<br />
LRC-2010-363<br />
$143,832.45 $ 315,311.87 $ (142,403.79) $ (12,360.58)<br />
304 $0.00 $ 1,199.00 $ (959.20) $<br />
-<br />
(E1)<br />
Page 5 of 20
Acct (All) K.C.D.O.T.<br />
ABF A 3/31/20<strong>13</strong><br />
Project Mgr (All) Contractual Obligations<br />
P.O. Status Open (unaudited)<br />
Row Labels<br />
(E1)<br />
Wills Burke Kelsey Associates, Limited (WBK)<br />
2009-2635<br />
Values<br />
Open Contract Contract Amount Funding Remaining A/R<br />
304 $14,783.96 $ 152,091.14 $ (11,827.19) $<br />
-<br />
(E2)<br />
Wills Burke Kelsey Associates, Limited (WBK)<br />
2012-2021<br />
304 $129,048.49 $ 162,021.73 $ (129,617.40) $ (12,360.58)<br />
GIS-Technologies<br />
(blank)<br />
GIS Professional Services<br />
GIS Solutions, Inc.<br />
2012-2394<br />
$47,100.00 $ 57,000.00 $ - $<br />
-<br />
300 $47,100.00 $ 57,000.00 $ - $<br />
-<br />
Haegers Bend @ <strong>County</strong> Line Rd<br />
(CONST)<br />
(CONST)<br />
State of <strong>IL</strong> Treasurer-IDOT<br />
2011-2628<br />
$375.25 $ 1,437.50 $ - $<br />
-<br />
304 $375.25 $ 1,437.50 $ - $<br />
-<br />
HampshireCreekStreambankStabilization<br />
(CONST)<br />
(CONST)<br />
Earthworks Land Improvement<br />
2012-712<br />
$298,391.91 $ 969,544.97 $ - $<br />
-<br />
300 $194,286.51 $ 828,308.00 $ - $<br />
-<br />
(E3)<br />
(E3)<br />
Christopher B. Burke Engineering LTD<br />
2012-877<br />
300 $62,852.53 $ 99,984.10 $ - $<br />
-<br />
(MONITORING)<br />
Christopher B. Burke Engineering LTD<br />
2012-876<br />
300 $41,252.87 $ 41,252.87 $ - $<br />
-<br />
Highland - Randall to McLean<br />
(E1)<br />
(E1)<br />
City of Elgin<br />
2007-24<br />
$1<strong>13</strong>,292.50 $ 1<strong>13</strong>,292.50 $ - $<br />
-<br />
304 $1<strong>13</strong>,292.50 $ 1<strong>13</strong>,292.50 $ - $<br />
-<br />
Huntley - Square Barn to Sleepy Hollow Interconnect<br />
(CONST)<br />
(CONST)<br />
State of <strong>IL</strong> Treasurer-IDOT<br />
2011-597<br />
$83,564.72 $ 128,965.00 $ - $<br />
-<br />
540 $83,564.72 $ 128,965.00 $ - $<br />
-<br />
Huntley & Galligan Intersection Improvement $56,362.89 $ 169,948.90 $ (45,090.30) $<br />
-<br />
(E2)<br />
Crawford Murphy & Tilly Inc (CMT)<br />
2011-1858<br />
540 $56,362.89 $ 169,948.90 $ (45,090.30) $<br />
-<br />
Page 6 of 20
Acct (All) K.C.D.O.T.<br />
ABF A 3/31/20<strong>13</strong><br />
Project Mgr (All) Contractual Obligations<br />
P.O. Status Open (unaudited)<br />
Row Labels<br />
Values<br />
Open Contract Contract Amount Funding Remaining A/R<br />
I90 / <strong>IL</strong>47 Interchange<br />
(CONST)<br />
(CONST)<br />
Illinois State Toll Highway Authority<br />
2012-2286<br />
$3,981,758.45 $ 5,5<strong>13</strong>,204.00 $ - $<br />
-<br />
305 $1,992,204.00 $ 1,992,204.00 $ - $<br />
-<br />
540 $1,989,554.45 $ 3,521,000.00 $ - $<br />
-<br />
IceControl<br />
(blank)<br />
Rock Salt 9,834 tons @ $67.87<br />
North American Salt Company<br />
20<strong>13</strong>-60<br />
$646,231.67 $ 732,996.00 $ - $<br />
-<br />
302 $643,844.68 $ 667,433.58 $ - $<br />
-<br />
Rock Salt 966 tons @ $67.87<br />
North American Salt Company<br />
20<strong>13</strong>-61<br />
303 $2,386.99 $ 65,562.42 $ - $<br />
-<br />
<strong>IL</strong>64 Traffic Signal Interconnect - Randall to Burlington<br />
(CONST)<br />
(CONST)<br />
State of <strong>IL</strong> Treasurer-IDOT<br />
2011-2009<br />
$42,684.34 $ 415,211.91 $ (3,617.15) $ (704.00)<br />
305 $39,042.92 $ 119,470.63 $ - $<br />
-<br />
(E2)<br />
Delcan Corporation<br />
2009-2639<br />
300 $3,641.42 $ 295,741.28 $ (3,617.15) $ (704.00)<br />
<strong>IL</strong>72 & Tyrrell<br />
(CONST)<br />
(CONST)<br />
State of <strong>IL</strong> Treasurer-IDOT<br />
2012-820<br />
$526.70 $ 747.50 $ - $<br />
-<br />
304 $526.70 $ 747.50 $ - $<br />
-<br />
Impact Fee Program<br />
(blank)<br />
Impact Fee Ordinance Update<br />
CH2M Hill Inc.<br />
2011-1800<br />
$26,189.42 $ 180,760.00 $ - $<br />
-<br />
300 $26,189.42 $ 180,760.00 $ - $<br />
-<br />
Jericho Over Blackberry Crk<br />
(CONST)<br />
(Wetland Credits)<br />
V3 Wetland Restoration, LLC<br />
Pending<br />
$<strong>13</strong>2,346.00 $ 259,230.87 $ (123,955.41) $ (29,874.39)<br />
305 $35,200.00 $ 35,200.00 $ (<strong>13</strong>,000.00) $<br />
-<br />
(E2)<br />
Wills Burke Kelsey Associates, Limited (WBK)<br />
2012-544<br />
304 $97,146.00 $ 224,030.87 $ (110,955.41) $ (29,874.39)<br />
Jericho Over Drainage Ditch $7,503.80 $ 192,357.36 $ - $<br />
-<br />
(E2)<br />
Stantec Consulting Services (Entran) Inc.<br />
Page 7 of 20
Acct (All) K.C.D.O.T.<br />
ABF A 3/31/20<strong>13</strong><br />
Project Mgr (All) Contractual Obligations<br />
P.O. Status Open (unaudited)<br />
Row Labels<br />
2009-1672<br />
Values<br />
Open Contract Contract Amount Funding Remaining A/R<br />
304 $7,503.80 $ 192,357.36 $ - $<br />
-<br />
Keslinger Road over Mill Creek Trib (West) $17,171.09 $ 243,893.11 $ - $<br />
-<br />
(E2)<br />
Ciorba Group Inc.<br />
2009-2545<br />
540 $17,171.09 $ 243,893.11 $ - $<br />
-<br />
KeslingerOvrMillCrkBranch<br />
(CONST)<br />
(CONST)<br />
Plote Construction Inc. of Hoffman Estates, <strong>IL</strong><br />
2009-1295<br />
$50,000.00 $ 1,668,059.01 $ - $<br />
-<br />
5<strong>13</strong> $0.00 $ 1,618,059.01 $ - $<br />
-<br />
540 $50,000.00 $ 50,000.00 $ - $<br />
-<br />
KeslingerOvrWelchCrk<br />
(CONST)<br />
(CONST)<br />
State of <strong>IL</strong> Treasurer-IDOT<br />
2010-344<br />
$20,730.31 $ 178,000.00 $ - $<br />
-<br />
304 $20,730.31 $ 178,000.00 $ - $<br />
-<br />
Kirk & Douglas<br />
(E1)<br />
(E1)<br />
H.W. Lochner, Inc.<br />
2009-107<br />
$32,645.95 $ 288,564.21 $ - $<br />
-<br />
304 $14,741.61 $ <strong>13</strong>9,962.72 $ - $<br />
-<br />
(E2)<br />
H.W. Lochner, Inc.<br />
2011-121<br />
300 $16,904.34 $ 147,601.49 $ - $<br />
-<br />
(ROW)<br />
(ROW)<br />
Polach Appraisal Group, Inc.<br />
20<strong>13</strong>-806<br />
304 $1,000.00 $ 1,000.00 $ - $<br />
-<br />
Kirk Road & Rt.64<br />
(CONST)<br />
(CONST)<br />
State of <strong>IL</strong> Treasurer-IDOT<br />
2012-771<br />
$38,640.00 $ 38,640.00 $ - $<br />
-<br />
305 $38,640.00 $ 38,640.00 $ - $<br />
-<br />
Kirk Road at Illinois Prairie Path Crossing<br />
(CONST)<br />
(Warning Beacon)<br />
(Warning Beacon)<br />
Pending<br />
$14,042.50 $ 14,042.50 $ - $<br />
-<br />
305 $14,042.50 $ 14,042.50 $ - $<br />
-<br />
Kirk Road Median Improvements<br />
(CONST)<br />
(CONST)<br />
Acura, Inc. of Bensenville, Illinois<br />
2012-3230<br />
$11,811.06 $ 49,452.80 $ - $<br />
-<br />
304 $11,811.06 $ 49,452.80 $ - $<br />
-<br />
Page 8 of 20
Acct (All) K.C.D.O.T.<br />
ABF A 3/31/20<strong>13</strong><br />
Project Mgr (All) Contractual Obligations<br />
P.O. Status Open (unaudited)<br />
Values<br />
Row Labels Open Contract Contract Amount Funding Remaining A/R<br />
Kirk/Dunham Interconnect (Rt.56 to Stearns)<br />
(CONST)<br />
(CONST)<br />
State of <strong>IL</strong> Treasurer-IDOT<br />
2012-777<br />
$255,388.99 $ 537,056.98 $ (78,164.38) $ (11,729.62)<br />
540 $173,893.97 $ 237,241.56 $ - $<br />
-<br />
(E2)<br />
Jacobs Engineering<br />
2010-737<br />
305 $0.00 $ 150,193.29 $ (1,238.74) $<br />
-<br />
(E3)<br />
(E3)<br />
Ciorba Group Inc.<br />
2012-173<br />
540 $81,495.02 $ 149,622.<strong>13</strong> $ (76,925.64) $ (11,729.62)<br />
LaFox Road over Mill Creek 045-5557<br />
(CONST)<br />
(Wetland Credits)<br />
V3 Wetland Restoration, L.L.C.<br />
Pending<br />
$112,225.75 $ 470,182.16 $ - $<br />
-<br />
305 $55,280.00 $ 55,280.00 $ - $<br />
-<br />
(E2)<br />
Wills Burke Kelsey Associates, Limited (WBK)<br />
2011-2008<br />
304 $56,945.75 $ 414,902.16 $ - $<br />
-<br />
Land Survey Assistance<br />
(E1)<br />
Land Survey Assistance<br />
Trotter & Associates, Inc.<br />
2012-782<br />
$77,267.00 $ 84,000.00 $ - $<br />
-<br />
304 $77,267.00 $ 84,000.00 $ - $<br />
-<br />
LongMeadow Pkwy Bridge<br />
(ROW)<br />
(Plat of Survey)<br />
Engineering Enterprises Inc<br />
2010-1756<br />
$575,220.91 $ 710,879.38 $ - $<br />
-<br />
304 $168,380.91 $ 229,979.38 $ - $<br />
-<br />
(ROW)<br />
Federal IGA - ROW Local Match<br />
Pending<br />
556 $397,400.00 $ 397,400.00 $ - $<br />
-<br />
Polach Appraisal Group Inc<br />
2007-89<br />
556 $5,790.00 $ 20,200.00 $ - $<br />
-<br />
(ROW) Title, Insurance, Appraisals, etc.<br />
Civiltech Engineering Inc<br />
2007-34<br />
556 $3,650.00 $ 63,300.00 $ - $<br />
-<br />
Main St & Nelson Lake Rd<br />
(E1)<br />
(E1)<br />
$83,968.30 $ 239,872.00 $ (54,445.68) $<br />
-<br />
Page 9 of 20
Acct (All) K.C.D.O.T.<br />
ABF A 3/31/20<strong>13</strong><br />
Project Mgr (All) Contractual Obligations<br />
P.O. Status Open (unaudited)<br />
Row Labels<br />
H.W. Lochner, Inc.<br />
2009-108<br />
Values<br />
Open Contract Contract Amount Funding Remaining A/R<br />
304 $15,911.19 $ 171,814.89 $ - $<br />
-<br />
(E2)<br />
SE3, LLC<br />
2012-2376<br />
304 $68,057.11 $ 68,057.11 $ (54,445.68) $<br />
-<br />
Main St. over Blackberry Creek<br />
(E1)<br />
(E1)<br />
exp U.S. Services, Inc.<br />
2009-2022<br />
$16,657.53 $ 100,742.50 $ (<strong>13</strong>,548.81) $<br />
-<br />
304 $16,657.53 $ 100,742.50 $ (<strong>13</strong>,548.81) $<br />
-<br />
Mapping<br />
(blank)<br />
Mapping<br />
Northern Illinois University<br />
20<strong>13</strong>-59<br />
$2,900.00 $ 2,900.00 $ - $<br />
-<br />
300 $2,900.00 $ 2,900.00 $ - $<br />
-<br />
Material Testing<br />
(E3)<br />
Material Testing<br />
Rubino Engineering, Inc.<br />
2012-870<br />
$104,723.00 $ 150,000.00 $ - $<br />
-<br />
304 $104,723.00 $ 150,000.00 $ - $<br />
-<br />
McLean- Hopps to Bowes<br />
(CONST)<br />
(CONST)<br />
State of <strong>IL</strong> Treasurer-IDOT<br />
2007-127<br />
$1,543,682.34 $ 2,114,657.46 $ - $<br />
-<br />
300 $263,185.00 $ 263,185.00 $ - $<br />
-<br />
552 $1,280,497.34 $ 1,851,472.46 $ - $<br />
-<br />
McLean- Hopps to Bowes (Bikepath)<br />
(CONST)<br />
(CONST) Bikepath<br />
State of <strong>IL</strong> Treasurer-IDOT<br />
2010-345<br />
$11,352.84 $ 39,759.00 $ - $<br />
-<br />
304 $11,352.84 $ 39,759.00 $ - $<br />
-<br />
Meredith & <strong>IL</strong>38<br />
(CONST)<br />
(CONST)<br />
State of <strong>IL</strong> Treasurer-IDOT<br />
2011-1951<br />
$11,272.70 $ 17,250.00 $ - $<br />
-<br />
304 $11,272.70 $ 17,250.00 $ - $<br />
-<br />
Mooseheart Rd. & <strong>IL</strong>31<br />
(CONST)<br />
(CONST)<br />
State of <strong>IL</strong> Treasurer-IDOT<br />
Pending<br />
$215,051.00 $ 215,051.00 $ - $<br />
-<br />
305 $215,051.00 $ 215,051.00 $ - $<br />
-<br />
Orchard -Jericho to Rt.30<br />
(CONST)<br />
(CONST)<br />
State of <strong>IL</strong> Treasurer-IDOT<br />
$1,240,986.88 $ 7,128,<strong>13</strong>5.00 $ - $<br />
-<br />
Page 10 of 20
Acct (All) K.C.D.O.T.<br />
ABF A 3/31/20<strong>13</strong><br />
Project Mgr (All) Contractual Obligations<br />
P.O. Status Open (unaudited)<br />
Row Labels<br />
2011-1674<br />
Values<br />
Open Contract Contract Amount Funding Remaining A/R<br />
302 $0.00 $ 1,007,256.00 $ - $<br />
-<br />
304 $0.00 $ 1,065,919.53 $ - $<br />
-<br />
5<strong>13</strong> $0.00 $ 1,109,674.<strong>13</strong> $ - $<br />
-<br />
540 $1,145,899.91 $ 1,806,646.34 $ - $<br />
-<br />
550 $51,059.25 $ 324,000.00 $ - $<br />
-<br />
(E3)<br />
(E3)<br />
Civiltech Engineering Inc<br />
2011-563<br />
5<strong>13</strong> $0.00 $ 244,032.34 $ - $<br />
-<br />
540 $44,027.72 $ 1,020,606.66 $ - $<br />
-<br />
550 $0.00 $ 550,000.00 $ - $<br />
-<br />
Orchard Road over I-88<br />
(CONST)<br />
(CONST)<br />
Areatha Construction Company, Inc.<br />
Pending<br />
$1,008,000.11 $ 1,122,578.38 $ - $<br />
-<br />
540 $926,875.25 $ 926,875.25 $ - $<br />
-<br />
(E2)<br />
STV, Inc.<br />
2011-2504<br />
540 $81,124.86 $ 195,703.<strong>13</strong> $ - $<br />
-<br />
Orchard Traffic Signal Interconnect - Randall to Rochester<br />
(CONST)<br />
(CONST)<br />
State of <strong>IL</strong> Treasurer-IDOT<br />
2011-1076<br />
$36,352.17 $ <strong>13</strong>7,320.00 $ - $<br />
-<br />
304 $36,352.17 $ <strong>13</strong>7,320.00 $ - $<br />
-<br />
Pavement Marking<br />
(CONST)<br />
Pavement Striping - Paint<br />
Preform Traffic Control System<br />
Pending<br />
$920,2<strong>13</strong>.30 $ 1,180,549.39 $ - $<br />
-<br />
304 $450,287.57 $ 450,287.57 $ - $<br />
-<br />
Pavement Striping - Urethane<br />
AC Pavement Striping<br />
Pending<br />
304 $449,005.95 $ 449,005.95 $ - $<br />
-<br />
Roadsafe Traffic Systems, Inc.<br />
2012-948<br />
304 $20,919.78 $ 281,255.87 $ - $<br />
-<br />
Pavement Mgmt System $143,200.00 $ 143,200.00 $ - $<br />
-<br />
(E2)<br />
Applied Research Associates, Inc.<br />
2012-3226<br />
300 $143,200.00 $ 143,200.00 $ - $<br />
-<br />
Pavement Preservation<br />
(CONST)<br />
Pavement Preservation<br />
AC Pavement Striping<br />
Pending<br />
$665,014.61 $ 665,014.61 $ - $<br />
-<br />
304 $665,014.61 $ 665,014.61 $ - $<br />
-<br />
Page 11 of 20
Acct (All) K.C.D.O.T.<br />
ABF A 3/31/20<strong>13</strong><br />
Project Mgr (All) Contractual Obligations<br />
P.O. Status Open (unaudited)<br />
Values<br />
Row Labels Open Contract Contract Amount Funding Remaining A/R<br />
Pavement Resurfacing<br />
(CONST)<br />
Dugan Road Resurfacing<br />
Builders Paving, LLC D/B/A Hardin Paving<br />
2012-2374<br />
$6,398,346.35 $ 6,573,155.93 $ - $<br />
-<br />
304 $0.00 $ 169,449.24 $ - $<br />
-<br />
Preform Traffic Control System<br />
2012-3010<br />
304 $0.00 $ 2,717.48 $ - $<br />
-<br />
Rubino Engineering, Inc.<br />
(blank)<br />
304 $0.00 $ 1,116.00 $ - $<br />
-<br />
Traffic & Parking Control Company<br />
2012-3045<br />
300 $0.00 $ 1,526.86 $ - $<br />
-<br />
Resurfacing/Paved shoulders<br />
Curran Contracting Co<br />
20<strong>13</strong>-959<br />
304 $6,398,346.35 $ 6,398,346.35 $ - $<br />
-<br />
Penny Road - <strong>IL</strong>68 to Cook <strong>County</strong> Line<br />
(CONST)<br />
(CONST)<br />
Cook <strong>County</strong><br />
2010-736<br />
$200,000.00 $ 200,000.00 $ - $<br />
-<br />
304 $200,000.00 $ 200,000.00 $ - $<br />
-<br />
Plank Rd. & <strong>IL</strong>47<br />
(CONST)<br />
(CONST)<br />
Plote Construction Inc. of Hoffman Estates, <strong>IL</strong><br />
2012-875<br />
$286,818.32 $ 2,382,531.68 $ (82,262.05) $<br />
-<br />
540 $154,752.42 $ 1,467,440.94 $ - $<br />
-<br />
553 $0.00 $ 625,000.00 $ (82,262.05) $<br />
-<br />
(E3)<br />
(E3)<br />
Bollinger, Lach, and Associates<br />
2012-778<br />
553 $<strong>13</strong>2,065.90 $ 290,090.74 $ - $<br />
-<br />
Plank Rd. Realignment $47,959.25 $ 517,682.77 $ - $<br />
-<br />
(E2)<br />
Crawford Murphy & Tilly Inc (CMT)<br />
2010-1869<br />
305 $47,959.25 $ 96,859.61 $ - $<br />
-<br />
553 $0.00 $ 420,823.16 $ - $<br />
-<br />
Randall - <strong>County</strong> Line to Binnie Interconnect<br />
(CONST)<br />
(CONST)<br />
State of <strong>IL</strong> Treasurer-IDOT<br />
2011-597<br />
$26,990.38 $ 90,805.00 $ - $<br />
-<br />
540 $26,990.38 $ 90,805.00 $ - $<br />
-<br />
Randall & Big Timber<br />
(CONST)<br />
(CONST)<br />
$95,357.37 $ 180,051.81 $ - $<br />
-<br />
Page 12 of 20
Acct (All) K.C.D.O.T.<br />
ABF A 3/31/20<strong>13</strong><br />
Project Mgr (All) Contractual Obligations<br />
P.O. Status Open (unaudited)<br />
Row Labels<br />
State of <strong>IL</strong> Treasurer-IDOT<br />
20<strong>13</strong>-98<br />
Values<br />
Open Contract Contract Amount Funding Remaining A/R<br />
305 $92,327.56 $ 92,327.56 $ - $<br />
-<br />
(E2)<br />
Gewalt Hamilton Associates, Inc.<br />
2011-1676<br />
304 $1,029.81 $ 85,724.25 $ - $<br />
-<br />
(ROW)<br />
(ROW)<br />
T Engineering Services Ltd<br />
2012-316<br />
304 $2,000.00 $ 2,000.00 $ - $<br />
-<br />
Randall & Bolcum<br />
(CONST)<br />
(CONST)<br />
State of <strong>IL</strong> Treasurer-IDOT<br />
2011-1075<br />
($49,782.47) $ <strong>13</strong>3,733.00 $ - $<br />
-<br />
304 ($49,782.47) $ <strong>13</strong>3,733.00 $ - $<br />
-<br />
Randall & Fabyan<br />
(CONST)<br />
(CONST)<br />
State of <strong>IL</strong> Treasurer-IDOT<br />
2011-1074<br />
$160,274.80 $ 830,439.46 $ - $<br />
-<br />
5<strong>13</strong> $0.00 $ 366,167.29 $ - $<br />
-<br />
540 $159,838.03 $ 190,721.69 $ - $<br />
-<br />
(E3)<br />
(E3)<br />
Transystems, Inc.<br />
2011-598<br />
305 $436.77 $ 273,550.48 $ - $<br />
-<br />
Randall & Foothill<br />
(CONST)<br />
(CONST)<br />
State of <strong>IL</strong> Treasurer-IDOT<br />
2012-783<br />
$354,589.56 $ 660,865.57 $ (52,673.55) $ (19,267.42)<br />
304 $312,831.90 $ 458,632.00 $ - $<br />
-<br />
(E3)<br />
(E3)<br />
Homer L. Chastain & Associates, LLP<br />
2012-163<br />
304 $41,757.66 $ 202,233.57 $ (52,673.55) $ (19,267.42)<br />
Randall & Gyorr Permanent Traffic Signal<br />
(CONST)<br />
(CONST)<br />
H & H Electric<br />
2012-2027<br />
$222,091.62 $ 406,184.40 $ - $<br />
-<br />
305 $222,091.62 $ 406,184.40 $ - $<br />
-<br />
Randall & <strong>IL</strong> Rt64<br />
(CONST)<br />
(CONST)<br />
State of <strong>IL</strong> Treasurer-IDOT<br />
2007-123<br />
$1,371,636.00 $ 3,342,704.38 $ - $<br />
-<br />
540 $1,371,636.00 $ 3,342,704.38 $ - $<br />
-<br />
Page <strong>13</strong> of 20
Acct (All) K.C.D.O.T.<br />
ABF A 3/31/20<strong>13</strong><br />
Project Mgr (All) Contractual Obligations<br />
P.O. Status Open (unaudited)<br />
Row Labels<br />
Values<br />
Open Contract Contract Amount Funding Remaining A/R<br />
Randall & Rt. 72<br />
(CONST)<br />
(CONST)<br />
State of <strong>IL</strong> Treasurer-IDOT<br />
2011-2557<br />
$6,437.55 $ 27,600.00 $ - $<br />
-<br />
305 $6,437.55 $ 27,600.00 $ - $<br />
-<br />
Randall Over I-88<br />
(CONST)<br />
(CONST)<br />
Herlihy Mid-Continent Company<br />
2011-1010<br />
$0.00 $ 973,546.38 $ (34,345.10) $ (34,345.10)<br />
5<strong>13</strong> $0.00 $ 973,546.38 $ - $<br />
-<br />
540 $0.00 $ - $ (34,345.10) $ (34,345.10)<br />
Randall Traffic Signal Interconnect - Dean to Main<br />
(CONST)<br />
(CONST)<br />
State of <strong>IL</strong> Treasurer-IDOT<br />
2011-596<br />
$55,175.20 $ 205,400.00 $ - $<br />
-<br />
305 $55,175.20 $ 205,400.00 $ - $<br />
-<br />
Route 529 Bus Access Plan $16,762.26 $ 101,742.65 $ - $<br />
-<br />
Route 529 Bus Access Plan<br />
V3 Companies of Illinois Ltd<br />
2011-412<br />
305 $16,762.26 $ 101,742.65 $ - $<br />
-<br />
Rural Sign Upgrade Program<br />
Big Rock Township<br />
Rural Sign Upgrade Program<br />
Hall Signs, Inc.<br />
2012-23<strong>13</strong><br />
$0.00 $ 30,097.14 $ (30,097.14) $<br />
-<br />
300 $0.00 $ 8,556.52 $ (8,556.52) $<br />
-<br />
Burlington Township<br />
Rural Sign Upgrade Program<br />
Hall Signs, Inc.<br />
2012-23<strong>13</strong><br />
300 $0.00 $ 9,393.38 $ (9,393.38) $<br />
-<br />
Campton Township<br />
Rural Sign Upgrade Program<br />
Hall Signs, Inc.<br />
2012-23<strong>13</strong><br />
300 $0.00 $ 7,120.61 $ (7,120.61) $<br />
-<br />
Village of Big Rock<br />
Rural Sign Upgrade Program<br />
Hall Signs, Inc.<br />
2012-23<strong>13</strong><br />
300 $0.00 $ 2,166.01 $ (2,166.01) $<br />
-<br />
Village of Virgil<br />
Rural Sign Upgrade Program<br />
Hall Signs, Inc.<br />
2012-23<strong>13</strong><br />
300 $0.00 $ 1,339.03 $ (1,339.03) $<br />
-<br />
Virgil Township<br />
Rural Sign Upgrade Program<br />
Hall Signs, Inc.<br />
2012-23<strong>13</strong><br />
Page 14 of 20
Acct (All) K.C.D.O.T.<br />
ABF A 3/31/20<strong>13</strong><br />
Project Mgr (All) Contractual Obligations<br />
P.O. Status Open (unaudited)<br />
Row Labels<br />
Values<br />
Open Contract Contract Amount Funding Remaining A/R<br />
300 $0.00 $ 1,521.59 $ (1,521.59) $<br />
-<br />
Seavey Rd Resurfacing<br />
(CONST)<br />
(CONST)<br />
Geneva Construction Company<br />
2012-2375<br />
$0.00 $ 303,197.01 $ (67,839.49) $ (67,839.49)<br />
305 $0.00 $ 303,197.01 $ (67,839.49) $ (67,839.49)<br />
South St Bike Path Extension<br />
(CONST)<br />
(CONST)<br />
State of <strong>IL</strong> Treasurer-IDOT<br />
2012-3070<br />
$474,044.47 $ 731,050.60 $ (122,127.00) $ (26,014.80)<br />
540 $374,759.00 $ 374,759.00 $ - $<br />
-<br />
(E2)<br />
Wills Burke Kelsey Associates, Limited (WBK)<br />
2011-589<br />
305 $6,496.66 $ 176,718.60 $ (5,197.33) $<br />
-<br />
(E3)<br />
(E3)<br />
Civiltech Engineering Inc<br />
2012-1946<br />
540 $92,788.81 $ 179,573.00 $ (116,929.67) $ (26,014.80)<br />
Special Purpose Equipment<br />
(blank)<br />
Replace Fuel Island & Dispensers<br />
Integrity Environmental Services Inc.<br />
2012-3374<br />
$226,593.00 $ 226,593.00 $ - $<br />
-<br />
304 $<strong>13</strong>,950.00 $ <strong>13</strong>,950.00 $ - $<br />
-<br />
Stenstrom Petroleum Services Group<br />
Pending<br />
304 $212,643.00 $ 212,643.00 $ - $<br />
-<br />
Stearns Corridor Environmental Monitoring $2,179.99 $ 24,029.43 $ - $<br />
-<br />
Environmental Monitoring<br />
Wills Burke Kelsey Associates, Limited (WBK)<br />
2012-2278<br />
304 $2,179.99 $ 24,029.43 $ - $<br />
-<br />
Stearns Corridor Traffic System $160,144.27 $ 160,144.27 $ (128,115.40) $<br />
-<br />
(E2)<br />
Jacobs Engineering Group, Inc.<br />
2012-849<br />
540 $160,144.27 $ 160,144.27 $ (128,115.40) $<br />
-<br />
Stearns Rd Bridge - Stg 2 New Stearns at McLean Blvd and McLean & <strong>IL</strong>31<br />
(CONST)<br />
(CONST)<br />
State of <strong>IL</strong> Treasurer-IDOT<br />
2009-2021<br />
$649,669.00 $ 649,669.00 $ - $<br />
-<br />
305 $149,669.00 $ 149,669.00 $ - $<br />
-<br />
558 $500,000.00 $ 500,000.00 $ - $<br />
-<br />
Stearns Rd Bridge - Stg 2A McLean Fen Adaptive Mgmt Plan<br />
(CONST)<br />
(CONST)<br />
$149,528.45 $ 241,617.78 $ (53,050.80) $ (8,041.66)<br />
Page 15 of 20
Acct (All) K.C.D.O.T.<br />
ABF A 3/31/20<strong>13</strong><br />
Project Mgr (All) Contractual Obligations<br />
P.O. Status Open (unaudited)<br />
Row Labels<br />
State of <strong>IL</strong> Treasurer-IDOT<br />
2012-543<br />
Values<br />
Open Contract Contract Amount Funding Remaining A/R<br />
305 $114,628.31 $ 114,628.31 $ - $<br />
-<br />
(E3)<br />
(E3)<br />
AMEC Environmental & Infrastructure, Inc.<br />
2011-2036<br />
305 $34,900.14 $ 126,989.47 $ (53,050.80) $ (8,041.66)<br />
Stearns Rd Bridge - Stg 3 Stearns Road / Dunham / <strong>IL</strong> 25 Int.<br />
(CONST)<br />
(CONST)<br />
State of <strong>IL</strong> Treasurer-IDOT<br />
2009-2027<br />
$1,288,898.00 $ 1,288,898.00 $ (588,898.00) $<br />
-<br />
305 $588,898.00 $ 588,898.00 $ (588,898.00) $<br />
-<br />
552 $700,000.00 $ 700,000.00 $ - $<br />
-<br />
Stearns Rd Bridge - Stg 3A <strong>IL</strong>25 from Dunham to CC&P RR<br />
(CONST)<br />
(CONST)<br />
State of <strong>IL</strong> Treasurer-IDOT<br />
Pending<br />
$1,285,724.69 $ 2,985,609.48 $ (839,242.33) $ (33,685.25)<br />
555 $729,000.00 $ 729,000.00 $ - $<br />
-<br />
(E2)<br />
Alfred Benesch & Co.<br />
2010-<strong>13</strong>7<br />
304 $353,636.69 $ 811,587.11 $ (334,468.<strong>13</strong>) $ (33,685.25)<br />
5<strong>13</strong> $0.00 $ 875,709.37 $ - $<br />
-<br />
540 $0.00 $ - $<br />
-<br />
(ROW)<br />
(ROW)<br />
T Engineering Services Ltd<br />
2011-2318<br />
300 $0.00 $ 8,600.00 $ - $<br />
-<br />
(blank)<br />
305 $0.00 $ 1,000.00 $ - $<br />
-<br />
Gary Steinhofer and Kevin Coll<br />
1st0241<br />
305 $0.00 $ 271,000.00 $ (243,900.00) $<br />
-<br />
Salvador and Elvira Hernandez<br />
1st0066<br />
305 $0.00 $ 75,300.00 $ (67,770.00) $<br />
-<br />
H-B Unlimited, Inc.<br />
1st0243TE<br />
305 $0.00 $ 2,000.00 $ (2,000.00) $<br />
-<br />
White Gates Skeet Club (<strong>Kane</strong> <strong>County</strong> Treasurer)<br />
1st0252TE<br />
305 $0.00 $ 8,325.00 $ (8,325.00) $<br />
-<br />
Union Pacific Railroad (<strong>Kane</strong> <strong>County</strong> Treasurer)<br />
1st0244PE<br />
305 $60,641.00 $ 60,641.00 $ (54,576.90) $<br />
-<br />
1st0245PE<br />
305 $142,447.00 $ 142,447.00 $ (128,202.30) $<br />
-<br />
Page 16 of 20
Acct (All) K.C.D.O.T.<br />
ABF A 3/31/20<strong>13</strong><br />
Project Mgr (All) Contractual Obligations<br />
P.O. Status Open (unaudited)<br />
Values<br />
Row Labels Open Contract Contract Amount Funding Remaining A/R<br />
Stearns Rd Bridge - Stg 4 McLean to <strong>IL</strong>25<br />
(CONST)<br />
(CONST)<br />
State of <strong>IL</strong> Treasurer-IDOT<br />
2009-<strong>13</strong>16<br />
$1,602,510.81 $ 3,856,<strong>13</strong>0.00 $ 0.00 $ 0.00<br />
305 $589,531.81 $ 589,531.81 $ 0.00 $ 0.00<br />
5<strong>13</strong> $0.00 $ 2,223,984.19 $ - $<br />
-<br />
(CONST) Advance STP-C Payback<br />
Lake <strong>County</strong><br />
2010-<strong>13</strong>29<br />
305 $506,920.00 $ 536,555.00 $ - $<br />
-<br />
Will <strong>County</strong><br />
2010-<strong>13</strong>28<br />
305 $506,059.00 $ 506,059.00 $ - $<br />
-<br />
Stearns Rd Bridge - Stg 4A South Elgin Sedge Meadow Adaptive Mgmt Plan<br />
(E3)<br />
(MONITORING)<br />
Wills Burke Kelsey Associates, Limited (WBK)<br />
2009-152<br />
$25,776.76 $ 31,872.71 $ - $<br />
-<br />
540 $25,776.76 $ 31,872.71 $ - $<br />
-<br />
Stearns Rd Bridge - Stg 5 McLean Blvd to Randall<br />
(CONST)<br />
(CONST)<br />
State of <strong>IL</strong> Treasurer-IDOT<br />
2009-2026<br />
$308,497.49 $ 1,024,053.00 $ - $<br />
-<br />
305 $308,497.49 $ 503,835.65 $ - $<br />
-<br />
5<strong>13</strong> $0.00 $ 520,217.35 $ - $<br />
-<br />
Stearns Rd Bridge - Stg 5B Umbdenstock over CC&P RR<br />
(CONST)<br />
(CONST)<br />
ComEd<br />
2011-2007<br />
$942,487.53 $ 1,656,342.57 $ (630,429.48) $ (9,193.36)<br />
305 $632,000.00 $ 632,000.00 $ (568,800.00) $<br />
-<br />
State of <strong>IL</strong> Treasurer-IDOT<br />
2011-1946<br />
305 $285,203.22 $ 285,203.22 $ - $<br />
-<br />
(E2)<br />
Civiltech Engineering Inc<br />
2009-2774<br />
540 $117.73 $ 326,390.00 $ (105.96) $<br />
-<br />
(E3)<br />
(E3)<br />
Omega & Associates Inc.<br />
2011-977<br />
5<strong>13</strong> $0.00 $ 141,908.16 $ - $<br />
-<br />
540 $25,166.58 $ 270,841.19 $ (61,523.52) $ (9,193.36)<br />
Stearns Road Bridge<br />
(CONST)<br />
(CONST)<br />
Alfred Benesch & Co.<br />
2009-621<br />
$571,015.14 $ 846,484.05 $ (162,639.92) $<br />
-<br />
304 $4,712.56 $ 14,900.00 $ - $<br />
-<br />
Page 17 of 20
Acct (All) K.C.D.O.T.<br />
ABF A 3/31/20<strong>13</strong><br />
Project Mgr (All) Contractual Obligations<br />
P.O. Status Open (unaudited)<br />
Row Labels<br />
(Environmental Maintenance)<br />
(blank)<br />
Pending<br />
Values<br />
Open Contract Contract Amount Funding Remaining A/R<br />
305 $219,<strong>13</strong>3.55 $ 219,<strong>13</strong>3.55 $ - $<br />
-<br />
(CONST) - Landscaping<br />
(CONST) - Landscaping<br />
State of <strong>IL</strong> Treasurer-IDOT<br />
2011-1077<br />
540 $166,458.00 $ 166,458.00 $ - $<br />
-<br />
(E3) - Landscaping<br />
(E3) - Landscaping<br />
Hey and Associates, Inc.<br />
2010-2418<br />
5<strong>13</strong> $0.00 $ 265,281.47 $ - $<br />
-<br />
540 $180,711.03 $ 180,711.03 $ (162,639.92) $<br />
-<br />
StormWater Mgmt $21,679.60 $ 27,878.00 $ - $<br />
-<br />
Bolcum over Ferson Creek<br />
Hampton Lenzini & Renwick, Inc. (HLR)<br />
2011-732<br />
300 $1,334.84 $ 3,378.00 $ - $<br />
-<br />
Stormwater Mgmt<br />
Wills Burke Kelsey Associates, Limited (WBK)<br />
2011-1863<br />
300 $20,344.76 $ 24,500.00 $ - $<br />
-<br />
Tanner Over Lake Run Creek $11,745.14 $ 170,795.41 $ - $<br />
-<br />
(E2)<br />
Baxter & Woodman, Inc.<br />
2011-2019<br />
305 $7,745.14 $ 166,795.41 $ - $<br />
-<br />
(ROW)<br />
(ROW)<br />
T Engineering Services Ltd<br />
20<strong>13</strong>-439<br />
300 $4,000.00 $ 4,000.00 $ - $<br />
-<br />
Thatcher Over VirgilDitch1 $11,211.24 $ 191,632.59 $ - $<br />
-<br />
(E2)<br />
Baxter & Woodman, Inc.<br />
2011-2020<br />
305 $8,211.24 $ 188,632.59 $ - $<br />
-<br />
(ROW)<br />
(ROW)<br />
T Engineering Services Ltd<br />
20<strong>13</strong>-438<br />
305 $3,000.00 $ 3,000.00 $ - $<br />
-<br />
Traffic - Intersection Improvements<br />
(CONST)<br />
Burlington @ <strong>IL</strong>64<br />
State of <strong>IL</strong> Treasurer-IDOT<br />
2012-824<br />
$2,720.86 $ 4,082.50 $ - $<br />
-<br />
300 $0.00 $ 1,092.50 $ - $<br />
-<br />
Jericho @ US30/<strong>IL</strong>47<br />
Page 18 of 20
Acct (All) K.C.D.O.T.<br />
ABF A 3/31/20<strong>13</strong><br />
Project Mgr (All) Contractual Obligations<br />
P.O. Status Open (unaudited)<br />
Row Labels<br />
State of <strong>IL</strong> Treasurer-IDOT<br />
2012-824<br />
Values<br />
Open Contract Contract Amount Funding Remaining A/R<br />
300 $650.86 $ 920.00 $ - $<br />
-<br />
Keslinger @ <strong>IL</strong>47<br />
State of <strong>IL</strong> Treasurer-IDOT<br />
2012-824<br />
300 $1,322.50 $ 1,322.50 $ - $<br />
-<br />
LaFox @ <strong>IL</strong>38<br />
State of <strong>IL</strong> Treasurer-IDOT<br />
2012-824<br />
300 $747.50 $ 747.50 $ - $<br />
-<br />
Traffic Data Collection<br />
(E1)<br />
Traffic Data Collection<br />
Gewalt Hamilton Associates, Inc.<br />
2011-1895<br />
$56,587.22 $ 119,996.22 $ - $<br />
-<br />
304 $56,587.22 $ 119,996.22 $ - $<br />
-<br />
Traffic Design Engineering Assistance $108,182.48 $ 170,000.00 $ - $<br />
-<br />
Traffic Design Engineering Assistance<br />
Hanson Professional Services, Inc.<br />
2012-727<br />
304 $108,182.48 $ 170,000.00 $ - $<br />
-<br />
Traffic Operations Center $415,467.87 $ 449,306.90 $ (<strong>13</strong>9,299.26) $<br />
-<br />
Building Addition -Engineering<br />
Hampton Lenzini & Renwick, Inc. (HLR)<br />
20<strong>13</strong>-990<br />
300 $3,600.00 $ 3,600.00 $ - $<br />
-<br />
Wills Burke Kelsey Associates, Limited (WBK)<br />
2012-663<br />
300 $953.50 $ 19,600.00 $ - $<br />
-<br />
(E3)<br />
Building Addition -Engineering<br />
Knight E/A, Inc.<br />
2012-1678<br />
300 $174,124.07 $ 174,124.07 $ (<strong>13</strong>9,299.26) $<br />
-<br />
Traffic Management Software<br />
Transcore ITS, LLC.<br />
2012-1611<br />
300 $236,790.30 $ 251,982.83 $ - $<br />
-<br />
Traffic Signal /Lighting - Maint. & Repair<br />
(CONST)<br />
Traffic Signal /Lighting - Maint. & Repair<br />
Meade Electric Co Inc<br />
2012-3<br />
$469,314.33 $ 1,027,276.00 $ (1,309.80) $ (1,309.80)<br />
304 $469,314.33 $ 1,027,276.00 $ - $<br />
-<br />
4th Quarter 2012<br />
Meade Electric Co Inc<br />
2012-3<br />
304 $0.00 $ (1,309.80) $ (1,309.80)<br />
Traffic Signal Mgmt/Timing Assistance $451,784.56 $ 470,000.00 $ - $<br />
-<br />
Page 19 of 20
Acct (All) K.C.D.O.T.<br />
ABF A 3/31/20<strong>13</strong><br />
Project Mgr (All) Contractual Obligations<br />
P.O. Status Open (unaudited)<br />
Row Labels<br />
Traffic Signal Mgmt/Timing Assistance<br />
Hampton Lenzini & Renwick, Inc. (HLR)<br />
20<strong>13</strong>-681<br />
Values<br />
Open Contract Contract Amount Funding Remaining A/R<br />
304 $451,784.56 $ 470,000.00 $ - $<br />
-<br />
Walker Over Burlington Crk<br />
(E1)<br />
(E1)<br />
Wills Burke Kelsey Associates, Limited (WBK)<br />
2009-2636<br />
$12,217.15 $ 153,729.40 $ (12,222.27) $ (1,875.76)<br />
304 $12,217.15 $ 153,729.40 $ (12,222.27) $ (1,875.76)<br />
Wayside Horns on UPRR<br />
(CONST)<br />
(CONST)<br />
(CONST)<br />
Pending<br />
$250,000.00 $ 250,000.00 $ (187,500.00) $<br />
-<br />
300 $187,000.00 $ 187,000.00 $ (124,500.00) $<br />
-<br />
(E2)<br />
Hanson Professional Services, Inc.<br />
Pending<br />
300 $63,000.00 $ 63,000.00 $ (63,000.00) $<br />
-<br />
West <strong>County</strong> Line Rd Over Union Ditch #3 $212,772.21 $ 212,772.21 $ (175,196.63) $<br />
-<br />
(E2)<br />
Fehr-Graham & Associates, LLC<br />
2012-2218<br />
304 $212,772.21 $ 212,772.21 $ (175,196.63) $<br />
-<br />
Grand Total $39,118,199.25 $ 73,348,<strong>13</strong>0.73 $ (6,370,344.67) $<br />
(404,084.81)<br />
Page 20 of 20
If not budgeted,<br />
explain funding<br />
source<br />
<strong>AG</strong>ENDA ITEM EXECUTIVE SUMMARY Agenda Item #<br />
Presenter/Sponsor:<br />
Name<br />
Budget Information: Was this item budgeted?<br />
SUMMARY:<br />
Attachments:<br />
Detailed information available from :<br />
Resolution/Ordinance Tracking:<br />
Staff Name:<br />
Appropriation Amount:<br />
Mike Zakosek Phone: 1-630-406-7346<br />
Assigned Committee: Transportation Sent to: Executive<br />
on: 04/11/20<strong>13</strong><br />
If Other, specify:<br />
Committee Remarks:<br />
<strong>County</strong> Board Date:<br />
Resolution<br />
Ordinance<br />
Yes<br />
No N/A<br />
Next Committee: Executive Sent to: <strong>County</strong> Board on: 05/08/20<strong>13</strong><br />
If Other, specify:<br />
Committee Remarks:<br />
Next Committee: Sent to: on:<br />
Committee Remarks:<br />
Approving Disbursement of Township Bridge Program Funds (TBP) to Elgin Township<br />
Road District for Hopps Road over Otter Creek, Section No. 04-08107-00-BR<br />
Tom Rickert - Deputy Director of Transportation<br />
4C<br />
$215,000.00<br />
For several years, Elgin Township has been working to replace the Hopps Road over Otter Creek bridge. The new bridge was<br />
constructed in 2012. 80% was funded with Highway Bridge Program (HBP) funds. HBP is a Federal Highway Administration<br />
(FHWA) program administered by the Illinois Department of Transportation (IDOT).<br />
The Township Bridge Program (TBP) is a State of Illinois funding program that provides up to 80% of the cost of a bridge<br />
rehabilitation or replacement project for eligible township road districts. For the 16 Township Road Districts within <strong>Kane</strong><br />
<strong>County</strong>, the <strong>County</strong> administers the TBP funds on behalf of IDOT. Townships may use TBP funds as part of their local match<br />
for a HBP project. When using State TBP to match Federal HBP, a township road district pays 20% of 20%, or 4% with local<br />
funds.<br />
The Elgin Township Highway Commissioner is requesting approximately $215,000 of TBP funds for Hopps Road, which<br />
represents approximately 16% of the estimated project cost of $1,344,000. The <strong>County</strong> acts as administrator of these funds,<br />
wherein IDOT transfers these funds to the <strong>County</strong>, and the <strong>County</strong> transfers the funds to the Township.<br />
Staff requests authorization to disburse $215,000 of TBP funds, as available and received from the State, for this project.<br />
Resolution<br />
05/14/20<strong>13</strong>
STATE OF <strong>IL</strong>LINOIS<br />
COUNTY OF KANE<br />
RESOLUTION NO. <strong>13</strong> -<br />
APPROVING DISBURSEMENT OF TOWNSHIP BRIDGE PROGRAM FUNDS (TBP)<br />
TO ELGIN TOWNSHIP ROAD DISTRICT<br />
FOR HOPPS ROAD OVER OTTER CREEK<br />
SECTION NO. 04-08107-00-BR<br />
WHEREAS, the <strong>County</strong> Engineer through the <strong>Kane</strong> <strong>County</strong> Division of Transportation acts as<br />
administrator of Township Bridge Program Funds (TBP); and<br />
WHEREAS, Elgin Township Road District has previously solicited and received sealed bids for the<br />
work and/or construction described as:<br />
ELGIN TOWNSHIP ROAD DISTRICT SEC. NO. 04-08107-00-BR<br />
HOPPS ROAD OVER OTTER CREEK<br />
(hereinafter the “Project”); and<br />
WHEREAS, Project costs, in the amount of $215,000.00, are required to be paid from the<br />
Township Bridge Fund (706).<br />
NOW, THEREFORE, BE IT RESOLVED by the <strong>Kane</strong> <strong>County</strong> Board that the Township Bridge<br />
Program Funds in the amount of $215,000.00 is hereby authorized for disbursement to the Elgin Township<br />
Road District to partially fund the Project (Section No. 04-08107-00-BR).<br />
Passed by the <strong>Kane</strong> <strong>County</strong> Board on May 14, 20<strong>13</strong>.<br />
______________________________________ ___________________________________<br />
John A. Cunningham Christopher J. Lauzen<br />
Clerk, <strong>County</strong> Board Chairman, <strong>County</strong> Board<br />
<strong>Kane</strong> <strong>County</strong>, Illinois <strong>Kane</strong> <strong>County</strong>, Illinois<br />
Vote:<br />
Yes _____<br />
No _____<br />
Voice _____<br />
Abstentions _____<br />
5ELBTWPBR-HOPPS.4LH
If not budgeted,<br />
explain funding<br />
source<br />
<strong>AG</strong>ENDA ITEM EXECUTIVE SUMMARY Agenda Item #<br />
Presenter/Sponsor:<br />
Name<br />
Budget Information: Was this item budgeted?<br />
SUMMARY:<br />
Attachments:<br />
Detailed information available from :<br />
Resolution/Ordinance Tracking:<br />
Staff Name:<br />
Appropriation Amount:<br />
Mike Zakosek Phone: 1-630-406-7346<br />
Assigned Committee: Transportation Sent to: Executive<br />
on: 04/11/20<strong>13</strong><br />
If Other, specify:<br />
Committee Remarks:<br />
<strong>County</strong> Board Date:<br />
Resolution<br />
Ordinance<br />
Yes<br />
No N/A<br />
Next Committee: Executive Sent to: <strong>County</strong> Board on: 05/08/20<strong>13</strong><br />
If Other, specify:<br />
Committee Remarks:<br />
Next Committee: Sent to: on:<br />
Committee Remarks:<br />
Approving Disbursement of Township Bridge Program Funds (TBP) to St. Charles<br />
Township Road District for Burr Road over Otter Creek, Section No. 08-14117-00-BR<br />
Tom Rickert - Deputy Director of Transportation<br />
4D<br />
$220,000.00<br />
For several years, St. Charles Township has been working to replace the Burr Road over Otter Creek bridge. The new bridge<br />
was constructed in 2012. 80% was funded with Highway Bridge Program (HBP) funds. HBP is a Federal Highway<br />
Administration (FHWA) program administered by the Illinois Department of Transportation (IDOT).<br />
The Township Bridge Program (TBP) is a State of Illinois funding program that provides up to 80% of the cost of a bridge<br />
rehabilitation or replacement project for eligible township road districts. For the 16 Township Road Districts within <strong>Kane</strong><br />
<strong>County</strong>, the <strong>County</strong> administers the TBP funds on behalf of IDOT. Townships may use TBP funds as part of their local match<br />
for a HBP project. When using State TBP to match Federal HBP, a township road district pays 20% of 20%, or 4% with local<br />
funds.<br />
The St. Charles Township Highway Commissioner is requesting approximately $220,000 of TBP funds for Burr Road, which<br />
represents approximately 16% of the estimated project cost of $1,374, 000. The <strong>County</strong> acts as administrator of these funds,<br />
wherein IDOT transfers these funds to the <strong>County</strong>, and the <strong>County</strong> transfers the funds to the Township.<br />
Staff requests authorization to disburse $220,000 of TBP funds, as available and received from the State, for this project.<br />
Resolution<br />
05/14/20<strong>13</strong>
STATE OF <strong>IL</strong>LINOIS<br />
COUNTY OF KANE<br />
RESOLUTION NO. <strong>13</strong> -<br />
APPROVING DISBURSEMENT OF TOWNSHIP BRIDGE PROGRAM FUNDS (TBP)<br />
TO ST. CHARLES TOWNSHIP ROAD DISTRICT<br />
FOR BURR ROAD OVER OTTER CREEK<br />
SECTION NO. 08-14117-00-BR<br />
WHEREAS, the <strong>County</strong> Engineer through the <strong>Kane</strong> <strong>County</strong> Division of Transportation acts as<br />
administrator of Township Bridge Program Funds (TBP); and<br />
WHEREAS, St. Charles Township has previously solicited and received sealed bids for the work<br />
and/or construction described as:<br />
ST. CHARLES TOWNSHIP SEC. NO. 08-14117-00-BR<br />
BURR ROAD OVER OTTER CREEK<br />
(hereinafter the “Project”); and<br />
WHEREAS, Project costs, in the amount of $220,000.00, are required to be paid from the<br />
Township Bridge Fund (706).<br />
NOW, THEREFORE, BE IT RESOLVED by the <strong>Kane</strong> <strong>County</strong> Board that the Township Bridge<br />
Program Funds in the amount of $220,000.00 is hereby authorized for disbursement to the St. Charles<br />
Township Road District to partially fund the Project (Section No. 08-14117-00-BR).<br />
Passed by the <strong>Kane</strong> <strong>County</strong> Board on May 14, 20<strong>13</strong>.<br />
______________________________________ ___________________________________<br />
John A. Cunningham Christopher J. Lauzen<br />
Clerk, <strong>County</strong> Board Chairman, <strong>County</strong> Board<br />
<strong>Kane</strong> <strong>County</strong>, Illinois <strong>Kane</strong> <strong>County</strong>, Illinois<br />
Vote:<br />
Yes _____<br />
No _____<br />
Voice _____<br />
Abstentions _____<br />
5STCHTWPBR-BURR.4LH
SUMMARY:<br />
Attachments:<br />
Detailed information<br />
available from :<br />
Staff Remarks /<br />
Recommendations:<br />
Committee Remarks:<br />
<strong>AG</strong>ENDA ITEM EXECUTIVE SUMMARY Agenda Item #<br />
Name:<br />
Assigned Committee:<br />
Staff Name:<br />
Maintenance Report<br />
4/11/<strong>13</strong><br />
Presenter/Sponsor: Tom Rickert<br />
Maintenance Activities<br />
• Transitioning to summer routine and preparing equipment<br />
• Miscellaneous roadway repairs<br />
• Tree / brush trimming<br />
• Culvert replacement – will be replacing 20 cross culverts in coordination with with this year’s resurfacing contract<br />
FY2014 Rock Salt – Bulk Rock Salt requests were submitted to the State (CMS) for the <strong>County</strong> and Townships. The <strong>County</strong><br />
request was for 9,000 tons. The State contract will require us to purchase a minimum of 80% and a maximum of 120% of the<br />
projected quantity at the contract price.<br />
N/A<br />
For information only.<br />
Transportation<br />
Bill Edwards, Maintenance Superintendent Phone: 630/584-1172<br />
5A
If not budgeted,<br />
explain funding<br />
source<br />
<strong>AG</strong>ENDA ITEM EXECUTIVE SUMMARY Agenda Item #<br />
Presenter/Sponsor:<br />
Name<br />
Budget Information: Was this item budgeted?<br />
SUMMARY:<br />
Attachments:<br />
Detailed information available from :<br />
Resolution/Ordinance Tracking:<br />
Staff Name:<br />
Appropriation Amount:<br />
Chris Rossman Phone: 630-444-3186<br />
Assigned Committee: Transportation Sent to: Executive<br />
on: 04/11/20<strong>13</strong><br />
If Other, specify:<br />
Committee Remarks:<br />
<strong>County</strong> Board Date:<br />
Resolution<br />
Ordinance<br />
Yes<br />
No N/A<br />
Next Committee: Executive Sent to: <strong>County</strong> Board on: 05/08/20<strong>13</strong><br />
If Other, specify:<br />
Committee Remarks:<br />
Next Committee: Sent to: on:<br />
Committee Remarks:<br />
Fuel Delivery System Upgrade, <strong>Kane</strong> <strong>County</strong> Division of Transportation (Bid Number<br />
<strong>13</strong>-0<strong>13</strong>)<br />
Tom Rickert - Deputy Director of Transportation<br />
5B<br />
$223,275.00<br />
<strong>Kane</strong> <strong>County</strong> Purchasing Department publicly bid the replacement of the fuel delivery system for <strong>Kane</strong> <strong>County</strong> Division of<br />
Transportation. Advertised on the <strong>County</strong> Web from March 6th to 14th and with the <strong>Kane</strong> <strong>County</strong> Chronicle from March 6th<br />
to the 27th, with a bid opening on March 27th. Four (4) bids were submitted. Low bidder was Stenstrom Petroleum Services<br />
Group of Rockford, <strong>IL</strong> at $212, 643.00. Appropriation is $223,275.00 , which includes a 5% contingency.<br />
The current system is 22 years old and is in need of replacement and updating. We will be replacing underground piping,<br />
fueling dispensers and the concrete islands.<br />
Resolution, Bid Tab<br />
05/14/20<strong>13</strong>
STATE OF <strong>IL</strong>LINOIS<br />
COUNTY OF KANE<br />
RESOLUTION NO. <strong>13</strong> -<br />
FUEL DELIVERY SYSTEM UPGRADE<br />
KANE COUNTY DIVISION OF TRANSPORTATION<br />
(BID NUMBER <strong>13</strong>-0<strong>13</strong>)<br />
WHEREAS, bids were solicited and received by the <strong>Kane</strong> <strong>County</strong> Purchasing Department for the<br />
upgrade of the fuel delivery system (UST systems) for the <strong>Kane</strong> <strong>County</strong> Division of Transportation (<strong>KDOT</strong>)<br />
[hereinafter the “Project”]; and<br />
WHEREAS, the lowest qualified bid for the Project was $212,643.00 from Stenstrom Petroleum<br />
Services Group, 2422 Center Street, Rockford, Illinois 61108.<br />
NOW, THEREFORE, BE IT RESOLVED by the <strong>Kane</strong> <strong>County</strong> Board that a contract for the<br />
Project described hereinabove shall be awarded to the lowest responsible bidder in the amount as<br />
indicated hereinabove and that the <strong>County</strong> Board Chairman is hereby authorized and directed to<br />
execute a contract and contractor’s bond therefor.<br />
BE IT FURTHER RESOLVED by the <strong>Kane</strong> <strong>County</strong> Board to appropriates the not to exceed sum<br />
of Two Hundred Twenty Three Thousand Two Hundred Seventy Five Dollars ($223,275.00) [including a<br />
5% contingency] from Local Option Fund #304, Line Item #70120 (Special Purpose Equipment) to pay<br />
for said Project (fuel delivery system upgrade).<br />
Line Item Line Item Description Was<br />
personnel/item/service<br />
approved in original<br />
budget or a subsequent<br />
304.520.524.70120<br />
Special Purpose<br />
Equipment<br />
budget revision?<br />
Yes<br />
Passed by the <strong>Kane</strong> <strong>County</strong> Board on May 14, 20<strong>13</strong>.<br />
Are funds currently<br />
available for this<br />
personnel/item/service in<br />
the specific line item?<br />
Yes<br />
If funds are not<br />
currently available in<br />
the specified line item,<br />
where are the funds<br />
available?<br />
______________________________________ ___________________________________<br />
John A. Cunningham Christopher J. Lauzen<br />
Clerk, <strong>County</strong> Board Chairman, <strong>County</strong> Board<br />
<strong>Kane</strong> <strong>County</strong>, Illinois <strong>Kane</strong> <strong>County</strong>, Illinois<br />
Vote:<br />
Yes _____<br />
No _____<br />
Voice _____<br />
Abstentions _____<br />
5FUELSYSTEMUPGRADE.4LH
If not budgeted,<br />
explain funding<br />
source<br />
<strong>AG</strong>ENDA ITEM EXECUTIVE SUMMARY Agenda Item #<br />
Presenter/Sponsor:<br />
Name<br />
Budget Information: Was this item budgeted?<br />
SUMMARY:<br />
Attachments:<br />
Detailed information available from :<br />
Resolution/Ordinance Tracking:<br />
Staff Name:<br />
Appropriation Amount:<br />
Jerry Dickson Phone: 630/845-3798<br />
Assigned Committee: Transportation Sent to: Executive<br />
on: 04/11/20<strong>13</strong><br />
If Other, specify:<br />
Committee Remarks:<br />
<strong>County</strong> Board Date:<br />
Resolution<br />
Ordinance<br />
Yes<br />
No N/A<br />
Next Committee: Executive Sent to: <strong>County</strong> Board on: 05/08/20<strong>13</strong><br />
If Other, specify:<br />
Committee Remarks:<br />
Next Committee: Sent to: on:<br />
Committee Remarks:<br />
Approving a Local Agency Agreement for the Jurisdictional Transfer of a Portion of<br />
Plank Road from the <strong>County</strong> of <strong>Kane</strong> to the Road District of Elgin Township<br />
Tom Rickert - Deputy Director of Transportation<br />
The Illinois Department of Transportation (IDOT) realigned the Plank Road/US20 intersection several years ago which<br />
resulted in a cul-de-sac at the most easterly portion of existing Plank Road south of US 20. The result of this cul-de-sac<br />
created a maintenance problem for the <strong>County</strong> during snow removal and mowing seasons. <strong>KDOT</strong> approached the Elgin<br />
Township Road Commissioner concerning transfer of the jurisdiction and maintenance of this small section of roadway and<br />
the Commissioner agreed to take jurisdiction. The jurisdictional transfer will pass the ownership and maintenance of the<br />
cul-de-sac from the edge of right-of-way for existing Plank Road easterly to the dead-end in its entirety to the Elgin<br />
Township Road District.<br />
IDOT Local Agency Jurisdictional Transfer Agreement, Location M<br />
05/14/20<strong>13</strong><br />
N/A<br />
5C
STATE OF <strong>IL</strong>LINOIS<br />
COUNTY OF KANE<br />
RESOLUTION NO. <strong>13</strong> -<br />
APPROVING A LOCAL <strong>AG</strong>ENCY <strong>AG</strong>REEMENT<br />
FOR THE JURISDICTIONAL TRANSFER OF A PORTION OF PLANK ROAD<br />
FROM THE COUNTY OF KANE TO THE ROAD DISTRICT OF ELGIN TOWNSHIP<br />
WHEREAS, the Illinois Constitution of 1970, Article VII, Section 10 and the Illinois Compiled<br />
Statutes (5 <strong>IL</strong>CS 220/1 et seq.) authorizes the Road District of Elgin Township (hereinafter the “Road<br />
District”) and the <strong>County</strong> of <strong>Kane</strong> (<strong>County</strong>) to cooperate in the performance of their respective duties<br />
and responsibilities by contract and other agreements; and<br />
WHEREAS, the <strong>County</strong> has exclusive jurisdiction over <strong>County</strong> Highway No. 2 (also known as<br />
Plank Road) and desires to permanently delete from the county highway system and transfer exclusive<br />
jurisdiction of the most easterly portion thereof from its intersection with realigned Plank Road easterly<br />
to its dead end (hereinafter Old Plank Road) to the Road District under the terms and conditions as set<br />
forth in the Local Agency Agreement for Jurisdictional Transfer (a copy of which is on file with the <strong>Kane</strong><br />
<strong>County</strong> Clerk; and<br />
WHEREAS, the Road District desire to accept exclusive jurisdiction of Old Plank Road as<br />
aforesaid in its entirety pursuant to the aforementioned Local Agency Agreement for Jurisdictional<br />
Transfer.<br />
NOW, THEREFORE, BE IT RESOLVED by the <strong>Kane</strong> <strong>County</strong> Board that the <strong>County</strong> of <strong>Kane</strong><br />
transfer in its entirety, exclusive jurisdiction of the most easterly portion <strong>Kane</strong> <strong>County</strong> Highway No. 2,<br />
also known as Plank Road (referred to as Old Plank Road) from its intersection with realigned Plank<br />
Road easterly to its dead end to the Road District of Elgin Township and that the <strong>County</strong> Board<br />
Chairman is authorized to execute an agreement and any other documents necessary to accomplish<br />
the same; said jurisdictional transfer to be effective in accordance with the Local Agency Agreement for<br />
Jurisdictional Transfer executed by the <strong>County</strong> of <strong>Kane</strong>, the Road District of Elgin Township, and the<br />
Illinois Department of Transportation.<br />
BE IT FURTHER RESOLVED that with Illinois Department of Transportation approval, the<br />
above highway location, identified as <strong>County</strong> Highway No. 2 (Plank Road) from its intersection with<br />
realigned Plank Road easterly to its dead end, be permanently deleted from the highway system of<br />
<strong>Kane</strong> <strong>County</strong>.
Page 2 of 2, Res. #<strong>13</strong>-<br />
BE IT ALSO FURTHER RESOLVED that the <strong>County</strong> Clerk is hereby directed to transmit<br />
certified copies of this Resolution to the State of Illinois through the Illinois Department of<br />
Transportation’s Regional Engineer’s Office at Schaumburg, Illinois.<br />
Passed by the <strong>Kane</strong> <strong>County</strong> Board on May 14, 20<strong>13</strong>.<br />
______________________________________ ___________________________________<br />
John A. Cunningham Christopher J. Lauzen<br />
Clerk, <strong>County</strong> Board Chairman, <strong>County</strong> Board<br />
<strong>Kane</strong> <strong>County</strong>, Illinois <strong>Kane</strong> <strong>County</strong>, Illinois<br />
Vote:<br />
Yes _____<br />
No _____<br />
Voice _____<br />
Abstentions _____<br />
5PLNKJRSDCTNLTRNSFR.4LH
Local Agency Agreement for<br />
Jurisdictional Transfer<br />
Local Agency No. 1 (Conveyor) Local Agency No. 2 (Recipient)<br />
Municipality: Municipality:<br />
Township/Road District: Township/Road District: Elgin Township<br />
<strong>County</strong>: <strong>Kane</strong> <strong>County</strong>:<br />
In accordance with authority granted in Section 4-409 of the Illinois Highway Code, this agreement is made and entered<br />
into between the above Local Agency No. 1, hereinafter referred to as “Conveyor” and the above Local Agency No. 2,<br />
hereinafter referred to as “Recipient”, to transfer the jurisdiction of the designated location from the Conveyor to the<br />
Recipient.<br />
Location Description<br />
Name Old Plank Road Route Length<br />
Termini from Plank Road easterly on Old Plank Road to dead-end<br />
This transfer does does not include Structure No.<br />
, in its entirety.<br />
Include for Municipalities Only<br />
WHEREAS, the authority to make changes to the Municipal Street System is granted to the Municipality by Section 7-101 of<br />
the Illinois Highway Code.<br />
NOW THEREFORE IT IS <strong>AG</strong>REED that the corporate authority of said municipality will pass an ordinance providing for<br />
the transfer of the above location and shall attach hereto and make a part thereof a copy of the ordinance, and<br />
Include for Counties Only<br />
WHEREAS, the authority to make changes to the <strong>County</strong> Highway System is granted to the <strong>County</strong> by Section 5-105 of the<br />
Illinois Highway Code.<br />
NOW THEREFORE IT IS <strong>AG</strong>REED that the <strong>County</strong> Board of said <strong>County</strong> will pass a resolution providing for the transfer<br />
of the above location and shall attach hereto and make a part thereof a copy of the resolution, and<br />
Include for Township/Road Districts Only<br />
WHEREAS, the authority to make changes to the Township Road District System is granted to the Highway Commissioner<br />
under Section 6-201.3 of the Illinois Highway Code.<br />
The Conveyor Agrees to prepare a map of the above location and attach a copy of such location map hereto.<br />
IT IS MUTUALLY <strong>AG</strong>REED, that this jurisdictional transfer will become effective:<br />
upon IDOT approval calendar days after .<br />
Supplements<br />
Additional information and/or stipulations, if any, are hereby attached and identified below as being a part of this agreement.<br />
Supplement location map and resolution<br />
(Insert supplement numbers or letters and page numbers, if applicable)<br />
2<br />
IT IS FURTHER <strong>AG</strong>REED, that the provisions of this agreement shall be binding upon and inure to the benefit of the parties<br />
hereto, their successors and assigns.<br />
APPROVED BY CONVEYOR APPROVED BY RECIPIENT<br />
Name Chris Lauzen Name Rick Burnidge<br />
Title Chairman <strong>County</strong> Board Title Highway Commissioner<br />
Chairman <strong>County</strong> Board/Mayor/Village President/etc. Chairman <strong>County</strong> Board/Mayor/Village President/etc.<br />
Signature Signature<br />
APPROVED<br />
STATE OF <strong>IL</strong>LINOIS<br />
DEPARTMENT OF TRANSPORTATION By:<br />
Director of Highways Date<br />
Printed 4/3/20<strong>13</strong> BLR 05212 (Rev. 04/08/08)
. Jurisdictional Transfer<br />
Jurisdiction<br />
State<br />
<strong>County</strong><br />
! ! ! Municipality<br />
Township<br />
PLANK RD<br />
<strong>Kane</strong> <strong>County</strong> to Elgin Township<br />
Old Plank Road<br />
from Plank Road easterly to dead-end,<br />
in its entirety<br />
£¤ 20<br />
OLD PLANK RD
22<br />
0 500 1,000 2,000 3,000 4,000<br />
Feet<br />
Highland Ave.<br />
33<br />
0 1 Miles<br />
Plank Rd<br />
Coombs Rd.<br />
Nesler Rd.<br />
M:\dotserver2\USERS\Committee\20<strong>13</strong>04 <strong>April</strong>\Maintenance\JT of Plank Road cul-de-sac\Map Standard_Plank Rd at US <strong>IL</strong> 20 loc map.mxd<br />
47<br />
Jurisdiction<br />
Transfer<br />
Udina<br />
Water Rd.<br />
Plank Road Cul-De-Sac Jurisdiction Transfer<br />
Legend<br />
467 34<br />
§¨¦ 88<br />
£¤ 30<br />
!( 31<br />
Hampshire Rutland Dundee<br />
Burlington Plato<br />
Virgil<br />
Big Rock<br />
Campton<br />
Interstates<br />
Fox River<br />
Elgin<br />
Geneva<br />
<strong>Kane</strong>ville Blackberry<br />
Batavia<br />
Aurora<br />
20<br />
US Roads<br />
State Roads<br />
<strong>County</strong> Roads<br />
Other Roads<br />
Rail Roads<br />
<strong>County</strong> Boundry<br />
Township Boundry<br />
Forest Preserves<br />
Municipalities<br />
/
22<br />
0 500 1,000 2,000 3,000 4,000<br />
Feet<br />
Highland Ave.<br />
33<br />
0 1 Miles<br />
Plank Rd<br />
Coombs Rd.<br />
Nesler Rd.<br />
47<br />
Udina<br />
Water Rd.<br />
M:\dotserver2\USERS\Committee\20<strong>13</strong>04 <strong>April</strong>\Maintenance\JT of Plank Road cul-de-sac\Map Standard Aerial_Plank Rd at US <strong>IL</strong> 20 loc map.mxd<br />
Jurisdiction<br />
Transfer<br />
Plank Road Cul-De-Sac Jurisdiction Transfer<br />
Legend<br />
467 34<br />
§¨¦ 88<br />
£¤ 30<br />
!( 31<br />
Hampshire Rutland Dundee<br />
Burlington Plato<br />
Virgil<br />
Big Rock<br />
Campton<br />
Interstates<br />
Fox River<br />
Elgin<br />
Geneva<br />
<strong>Kane</strong>ville Blackberry<br />
Batavia<br />
Aurora<br />
20<br />
US Roads<br />
State Roads<br />
<strong>County</strong> Roads<br />
Other Roads<br />
Rail Roads<br />
<strong>County</strong> Boundry<br />
Township Boundry<br />
Forest Preserves<br />
Municipalities<br />
/
SUMMARY:<br />
Attachments:<br />
Detailed information<br />
available from :<br />
Staff Remarks /<br />
Recommendations:<br />
Committee Remarks:<br />
<strong>AG</strong>ENDA ITEM EXECUTIVE SUMMARY Agenda Item #<br />
Name:<br />
Assigned Committee:<br />
Staff Name:<br />
Adopt-A-Highway Approval(s)<br />
4/11/20<strong>13</strong><br />
Presenter/Sponsor: Tom Rickert<br />
The following attached requests have been received for <strong>Kane</strong> <strong>County</strong>'s Adopt-A-Highway Program:<br />
New:<br />
1. Bii Hair Salon-Huntley Road, Randall Road to Miller Road-both sides, .5 Miles<br />
Renewals:<br />
1. Batavia Robotics-Kirk Road, Fabyan Parkway to Wilson Street-east side, 1 Mile<br />
2. Boy Scout Troop No. 2-Big Timber Road, Coombs Road to Randall Road-both sides, 2.25 Miles<br />
3. Boy Scout Troop No. 7-Hughes Road, Bunker Road to Fabyan Parkway-both sides, 1.5 Miles<br />
4. Boy Scout Troop 25 & St. Charles Episcopal Church-Burlington Road, Corron Rd. to Route 64, both sides, 1.25 Miles<br />
5. Cornerstone Church Youth Group-Plato Road, Burlington Road to Route 47- both sides, 1.5 Miles<br />
6. Fox Valley Robotics-Randall Road, Fabyan Parkway to Mill Creek-east side, 2 Miles<br />
7. Friends of the Geneva Park District-<strong>Kane</strong>ville Road-Fabyan Parkway to Peck Road-both sides, 1 Mile<br />
8. Geneva School District 304 School Bus Drivers-Keslinger Road, Brundige Road to Peck Road, 1.5 Miles<br />
9. Hampshire High School Paws for a Cause-Big Timber Road, Widmayer Road to Route 20-both sides, 1.5 Miles<br />
10. Hintz Trucking-Bowes Road, Crawford Road to Muirhead Road-both sides, .5 Miles<br />
11. Iron Deer Farm-Ellithorpe Road, McGough Road to Peplow Road-both sides, 1.75 Miles<br />
12. John B. Sanfilippo & Son, Inc.-Randall Road, I90 to Big Timber Road-east side, 1 Mile<br />
<strong>13</strong>. Larson Farms-West <strong>County</strong> Line Road, Route 38 to Keslinger Road-both sides, 1.25 Miles<br />
14. Knights of Columbus #12497-Randall Road, Silver Glen Road to Red Gate Road-both sides-1.25 Miles<br />
15. Q Center of St. Charles-Dunham Road, Stearns Road to Army Trail Road-both sides-1.75 Miles<br />
16. St. Pat's Boy Scout Troop 10-Silver Glen Road, Burr Road to Randall Road-both sides, 1 Mile<br />
17. The Phillips Family-Peck Road, Keslinger Road to <strong>Kane</strong>ville Road-both sides, .75 Miles<br />
18. The Rizza Family-Huntley Road, Miller Road to Sleepy Hollow Road-both sides, .75 Miles<br />
19. WCC Business Club, Alpha Beta Gamma-Harter Road, Seavey Road to Scott Road-both sides, 1.75 Miles<br />
20. Women of the Moose Elgin Chapter-McLean Boulevard, Bowes Road to Spring Street-both sides, .75 Miles<br />
Groups, Participants and Road Miles<br />
New Groups for 20<strong>13</strong> = 4<br />
Total # of Adopt-A-Highway Groups = 110<br />
Number of Participants = 1,346<br />
Road miles adopted = 164.5<br />
See Adopt-A-Highway updated Map on our Web Site at: http://www.co.kane.il.us/dot/maintenance/adoptHiway.aspx<br />
Agreement(s), Adopt-A-Highway map<br />
Transportation<br />
Glenda Starcevich Phone: (630) 584-1171<br />
Staff has reviewed the applications and recommends that the Transportation Committee authorize the <strong>County</strong><br />
Engineer to execute the agreements for the above groups.<br />
5D
W. <strong>County</strong> Line<br />
West <strong>County</strong> Line<br />
41<br />
West <strong>County</strong> Line<br />
KANE COUNTY ADOPT-A-HIGHWAY<br />
Perry Rd.<br />
Swan Rd.<br />
Hinckley Rd<br />
Allen Rd.<br />
Plank Rd.<br />
Marcy Rd.<br />
McGough Rd.<br />
Walker Rd.<br />
Thatcher Rd.<br />
Schrader Rd.<br />
Harter Rd.<br />
Owens Rd.<br />
Rd.<br />
McGough Rd.<br />
Winters Rd.<br />
Root Ln.<br />
28<br />
Peterson Rd.<br />
Ellithorpe Rd.<br />
Keslinger Rd.<br />
Main St<br />
Jericho Rd.<br />
Rd.<br />
Nelson<br />
McDermott Rd.<br />
Engel Rd.<br />
Bushnell Rd.<br />
Rd.<br />
Percy Rd.<br />
Snyder Rd.<br />
Maple Park<br />
Troxel<br />
Shaw<br />
30<br />
44<br />
Fabris Rd.<br />
Miner Rd.<br />
Walker Rd.<br />
38<br />
28<br />
Howard Rd.<br />
46<br />
Lawrence<br />
Burlington<br />
McGough Rd.<br />
4<br />
Barron Rd.<br />
24<br />
Watson Rd.<br />
Waughon Rd<br />
23<br />
Lasher Rd.<br />
Granart Rd.<br />
0 1 2 Miles<br />
Davis Rd.<br />
1<br />
Peplow Rd.<br />
French Rd.<br />
Florence Rd.<br />
Meredith Rd.<br />
St.<br />
Harmony Rd.<br />
I.C. Tr<br />
Base Line Rd.<br />
Getty Rd.<br />
Big Timber Rd.<br />
Burlington Rd<br />
Sauber Rd<br />
Jones<br />
State<br />
Getzelman Rd.<br />
Dauberman Rd.<br />
Granart<br />
Rd.<br />
Kelley Rd.<br />
Lenschow Rd.<br />
Burlington<br />
Virgil<br />
<strong>Kane</strong>ville<br />
35<br />
10<br />
44<br />
45<br />
11<br />
Middleton Rd.<br />
Rhodes<br />
Higgins Rd.<br />
Chapman Rd.<br />
Virgil<br />
Allen Rd.<br />
Ramm Rd.<br />
Beith Rd.<br />
Scott Rd.<br />
Rd.<br />
Francis Rd.<br />
Thomas Rd.<br />
Widmayer Rd.<br />
Freeland Rd.<br />
Gast Rd.<br />
Hampshire<br />
Wheeler Rd.<br />
Clark Rd.<br />
Romke Rd.<br />
Welter Rd.<br />
Bateman<br />
Big Rock<br />
Dietrich Rd.<br />
Lees Rd.<br />
Reed Rd.<br />
Seavey Rd<br />
Jetter<br />
Ketchum Rd.<br />
Berner Rd.<br />
Bahr Rd.<br />
McDonald Rd.<br />
Harter Rd.<br />
Ashe Rd.<br />
Brier Hill Rd.<br />
Rohrsen Rd.<br />
Rowe<br />
Dugan Rd.<br />
Schneider Rd.<br />
Lorang Rd.<br />
Tower Rd.<br />
Thurnau<br />
Rd.<br />
Plato Rd.<br />
Rd.<br />
Main St.<br />
Prairie St.<br />
Mighell Rd.<br />
Hennig Rd.<br />
Lily<br />
Lake<br />
Hanson Rd.<br />
Plank Rd.<br />
Burlington<br />
Elburn<br />
Scott Rd.<br />
Anderson Rd.<br />
Sanwald Rd.<br />
Huntley<br />
Kendall Rd.<br />
Smith Rd.<br />
Green<br />
Merill Rd.<br />
Sugar Grove<br />
Pouley Rd.<br />
Jericho Rd.<br />
Swanberg Rd.<br />
Reinking Rd.<br />
Rd.<br />
Pingree Grove<br />
Dittman Rd.<br />
Beith Rd.<br />
Rippburger Rd.<br />
Marshall Rd.<br />
Manning<br />
Rd.<br />
Lenz Rd.<br />
Hughes Rd<br />
Bliss Rd.<br />
Bowes Rd<br />
Silver Glen Rd.<br />
Empire Rd.<br />
Town Hall Rd.<br />
Campton Hills Rd.<br />
Harley Rd.<br />
Muirhead Rd.<br />
Kreutzer Rd.<br />
Russell Rd.<br />
Bunker Rd.<br />
Rd.<br />
Norris<br />
Corron Rd.<br />
Lafox Rd.<br />
Powers Rd.<br />
Freeman Rd.<br />
Crawford<br />
Damisch Rd.<br />
Healy Rd<br />
Denny Rd.<br />
Keslinger Rd.<br />
Fabyan<br />
Seavey Rd.<br />
Hankes<br />
Elgin<br />
Big Timber Rd.<br />
Rd.<br />
Main St<br />
Deerpath<br />
Orchard Rd.<br />
Galligan Rd.<br />
Coombs Rd.<br />
McDonald Rd.<br />
Campton<br />
Hills<br />
Rd.<br />
Galena Blvd.<br />
Barnes<br />
Bolcum Rd.<br />
Brundige Rd.<br />
Nesler Rd.<br />
Peck Rd.<br />
<strong>Kane</strong>ville Rd.<br />
Tanner Rd.<br />
Rd.<br />
Burr Rd<br />
Stevens Rd.<br />
Huntley Rd.<br />
Gilberts<br />
Nelson Lake Rd.<br />
Water Rd.<br />
Tyrrell Rd.<br />
Orchard Rd.<br />
Aucutt Rd.<br />
Mason Rd.<br />
Randall Rd.<br />
Highland Ave.<br />
Bowes Rd.<br />
Crane Rd.<br />
Randall Rd.<br />
Boyer Rd.<br />
Binnie Rd.<br />
Hopps Rd.<br />
Oak St.<br />
Aurora<br />
Edgelawn Dr.<br />
Montgomery<br />
Dean St.<br />
Bricher Rd.<br />
Randall Rd.<br />
Fox<br />
Randall Rd.<br />
Red<br />
Ln.<br />
Crane Rd.<br />
Sullivan Rd.<br />
Prairie St.<br />
South St.<br />
Fabyan<br />
Wilson St.<br />
North Aurora<br />
Indian Trail Rd.<br />
N. <strong>County</strong> Line Rd.<br />
Algonquin<br />
Sleepy Hollow Rd.<br />
McLean Blvd<br />
South St.<br />
Illinois Ave.<br />
Larkin Ave.<br />
Gate Rd.<br />
Miller Rd.<br />
Hampshire Rutland<br />
Dundee<br />
11<br />
49<br />
14<br />
36<br />
S<br />
Big Rock<br />
0 4,900 9,800 14,700 19,600<br />
Feet<br />
56<br />
62<br />
88<br />
2<br />
72<br />
27<br />
<strong>Kane</strong>ville<br />
48<br />
3<br />
90<br />
22<br />
23<br />
20<br />
Routes in Use<br />
4<br />
47<br />
21<br />
30<br />
47<br />
69<br />
5<br />
Plato<br />
Plato Center<br />
33<br />
Campton<br />
Blackberry<br />
30<br />
47<br />
51<br />
26<br />
47<br />
52<br />
38<br />
2<br />
Sugar<br />
Grove<br />
Wasco<br />
64<br />
78<br />
16<br />
56<br />
24<br />
22<br />
80<br />
81<br />
La Fox<br />
41<br />
E<br />
15<br />
33<br />
8<br />
6<br />
83<br />
Udina<br />
83<br />
47<br />
10<br />
17<br />
8<br />
59<br />
84<br />
5<br />
30<br />
72<br />
21<br />
21<br />
20<br />
W<br />
34<br />
71<br />
34<br />
34<br />
90<br />
E<br />
E<br />
W E<br />
Mooseheart<br />
Elgin<br />
St.<br />
Charles<br />
Geneva<br />
Mooseheart Rd.<br />
Aurora<br />
25<br />
31<br />
31<br />
18<br />
Sleepy<br />
Hollow<br />
Boncosky Rd.<br />
Elgin<br />
Wing St.<br />
Spring St.<br />
South<br />
Elgin<br />
Batavia<br />
88<br />
31<br />
Montgomery Rd.<br />
Army Trail Rd.<br />
CountryClub Rd.<br />
Members list http://www.co.kane.il.us/dot/maintenance/adoptHiway/adoptHiwayMemberList.<strong>pdf</strong><br />
W<br />
Text<br />
W<br />
E<br />
E<br />
E<br />
N<br />
W<br />
W<br />
W<br />
W<br />
E<br />
E<br />
E<br />
E<br />
Longmeadow Pkwy<br />
S<br />
Stearns Rd<br />
Stearns Rd<br />
St. Charles<br />
New Members will be restricted to one side of 4 Lane Routes<br />
Renewing Members will have to choose a side of 4 Lane Routes<br />
N<br />
N<br />
N<br />
29<br />
Tyler<br />
Batavia<br />
Church Rd.<br />
Hill Ave.<br />
Gilbert St.<br />
Kirk Rd.<br />
Cherry<br />
Wilson St.<br />
Pine St.<br />
56<br />
Raddant Rd.<br />
Sheffer<br />
Farnsworth Ave.<br />
Algonquin Rd.<br />
Dunham Rd.<br />
Fabyan<br />
Kirk Rd.<br />
Bilter Rd.<br />
Rd.<br />
5th Ave.<br />
Bolz Rd.<br />
LakeMarianRd.<br />
Summit St.<br />
Villa St.<br />
Middle St.<br />
Rd.<br />
Geneva<br />
Carpentersville<br />
West<br />
Dundee<br />
N<br />
Stearns Rd<br />
8<br />
64<br />
W<br />
W<br />
W<br />
25<br />
Wayne 19<br />
77<br />
77<br />
E<br />
E<br />
38<br />
Molitor Rd.<br />
New York St.<br />
34<br />
Bartlett<br />
Lake - Cook Rd.<br />
West<br />
Bartlett<br />
Rd.<br />
61<br />
20<br />
Stearns<br />
Rd.<br />
37<br />
Kautz Rd.<br />
25<br />
62<br />
Helm Rd.<br />
68<br />
East<br />
Dundee<br />
72<br />
Barrington<br />
Hills<br />
Penny<br />
Rd.<br />
40<br />
Burlington<br />
Virgil<br />
<strong>Kane</strong>ville<br />
Big Rock<br />
Hoffman<br />
Estates<br />
Legend<br />
Hampshire<br />
467 34<br />
§¨¦ 88<br />
£¤ 30<br />
!( 31<br />
/<br />
Requested Route<br />
ADOPTED SECTIONS<br />
Both Sides<br />
121.75 Miles-BLUE<br />
One Side<br />
45.5 Miles-GREEN<br />
N,S.E.W - denotes<br />
side of highway adopted<br />
Interstates<br />
US Roads<br />
State Roads<br />
<strong>County</strong> Roads<br />
Other Roads<br />
Rail Roads<br />
<strong>County</strong> Boundry<br />
Township Boundry<br />
Fox River<br />
Forest Preserves<br />
Municipalities<br />
Plato<br />
Campton<br />
Blackberry<br />
Sugar Grove<br />
Rutland Dundee<br />
Elgin<br />
Saint Charles<br />
Geneva<br />
Batavia<br />
112 ACTIVE GROUPS<br />
<strong>13</strong>72 ACTIVE MEMBERS<br />
Aurora<br />
Upated 3-18-20<strong>13</strong><br />
See Members<br />
List for Routes
SUMMARY:<br />
Attachments:<br />
Detailed information<br />
available from :<br />
Staff Remarks /<br />
Recommendations:<br />
Committee Remarks:<br />
<strong>AG</strong>ENDA ITEM EXECUTIVE SUMMARY Agenda Item #<br />
Name:<br />
Assigned Committee:<br />
Staff Name:<br />
Planning and Programming Report<br />
4/11/20<strong>13</strong><br />
Presenter/Sponsor: Tom Rickert<br />
20<strong>13</strong>-2014 <strong>Kane</strong> <strong>County</strong> Highway Map and <strong>Kane</strong> & Northern Kendall Counties Bicycle Map - Publication of the updated map<br />
is anticipated in <strong>April</strong> 20<strong>13</strong>.<br />
Transit - CMAP is providing assistance to help identify a Primary Transit Network (PTN) within <strong>Kane</strong> <strong>County</strong>. A PTN is a<br />
network of transit corridors planned and developed for the greatest transit ridership and community benefit. Based on<br />
input from the KKCOM Transit Committee, Pace, and local stakeholders, CMAP has performed a roadway corridor analysis<br />
and has identified a preliminary PTN. An Oversight Steering Committee meeting will be held at the end of <strong>April</strong> to discuss<br />
the findings and to obtain input and comments.<br />
Randall Road Route 529 Transit Passenger Amenities - Construction of the remaining Pace bus passenger pads/shelters and<br />
sidewalk segments will begin this month. Installation of pedestrian crossing signals and crosswalks at sites along Randall<br />
Road is expected to begin this summer.<br />
Highway Safety Project Program - The federal Highway Safety Improvement Program (HSIP) has a goal of achieving a<br />
significant reduction in traffic fatalities and serious injuries on all public roads. Highway safety improvement projects correct<br />
or improve a location, feature, or safety problem that is contributing to severe crashes on the roadway. A call for projects<br />
has been released and the application deadline is <strong>April</strong> 15 , 20<strong>13</strong>. <strong>KDOT</strong> staff are reviewing crash data within <strong>Kane</strong> <strong>County</strong><br />
and identifying project locations for potential funding. Additional information on this program is available at:<br />
www.trafficsafetygrantsillinois.org/default.asp.<br />
KKCOM Transportation Policy Committee - The next scheduled meeting is on <strong>April</strong> 18th at 1:00pm.<br />
<strong>Kane</strong> <strong>County</strong> Impact Fee Program - The attached monthly report shows total fees collected as of March 31, 20<strong>13</strong>.<br />
Impact Fee Monthly Report<br />
For information only<br />
Transportation<br />
Jan Ward, Chief of Planning & Programming Phone: (630) 444-3143<br />
6A
Service Area FY04 FY05 FY06 FY07 FY08 FY09 FY10 FY11 FY12 FY<strong>13</strong> TOTAL<br />
Aurora Area $261,925.98 $300,592.56 $718,9<strong>13</strong>.31 $478,080.47 $256,911.24 $17,193.97 $18,854.63 $11,789.12 $112,427.90 $21,201.00 $2,197,890.18<br />
Campton Hills $272,437.27 $688,163.10 $546,802.47 $439,982.39 $<strong>13</strong>4,868.41 $53,097.80 $72,439.31 $<strong>13</strong>9,712.82 $1<strong>13</strong>,940.50 $59,246.00 $2,520,690.07<br />
Greater Elgin*** $358,840.40 $964,601.20 $1,235,871.43 $808,002.53 $766,560.27 $110,533.57 ($259,096.92) $65,097.83 $158,885.64 $49,735.00 $4,259,030.95<br />
Northwest** $119,995.42 $338,821.27 $562,387.09 $275,978.04 $95,606.84 $35,016.80 $644,873.64 $36,585.40 $51,484.80 $16,168.00 $2,176,917.30<br />
Southwest $253,934.24 $502,460.39 $483,849.59 $221,680.64 $129,001.53 $69,198.43 $31,784.96 $35,402.09 $6,755.00 $12,632.00 $1,746,698.87<br />
Tri-Cities $435,020.02 $1,579,205.20 $1,467,232.28 $1,483,214.49 $384,381.54 $148,285.54 $185,904.19 $60,811.64 $186,373.54 $27,646.00 $5,958,074.44<br />
Upper Fox** $378,268.28 $491,892.18 $276,569.20 $395,220.61 $216,563.73 $42,562.23 $140,889.21 $66,374.57 $94,483.02 $156,<strong>13</strong>7.00 $2,258,960.03<br />
West Central $51,970.10 $70,097.57 $103,211.05 $45,757.33 $21,862.81 $2,994.64 $3,978.43 $3,174.60 $4,555.02 $298.00 $307,899.55<br />
North $283,924.07 $357,826.05 $14,587.21 $52,728.00 $243,239.33 $153.00 $952,457.66<br />
Central $39,086.16 $335,728.28 $77,085.60 $26,787.70 $146,152.50 $4,823.00 $629,663.24<br />
South $143,148.54 $1,891.68 $126,936.23 $92,618.00 $67,701.39 $3,755.00 $436,050.84<br />
Grand Total $2,<strong>13</strong>2,391.71 $4,935,833.47 $5,394,836.42 $4,147,916.50 $2,471,915.14 $1,174,328.99 $1,058,236.49 $591,081.77 $1,185,998.64 $351,794.00 $23,444,333.<strong>13</strong><br />
* Includes any late fees; <strong>County</strong> fiscal year begins December 1st of every year<br />
** Includes prepayments<br />
*** Includes refunds<br />
ROADWAY IMPACT FEE COLLECTIONS BY FISCAL YEAR as of March 31, 20<strong>13</strong>*
SUMMARY:<br />
Attachments:<br />
Detailed information<br />
available from :<br />
Staff Remarks /<br />
Recommendations:<br />
Committee Remarks:<br />
<strong>AG</strong>ENDA ITEM EXECUTIVE SUMMARY Agenda Item #<br />
Name:<br />
Assigned Committee:<br />
Staff Name:<br />
FY20<strong>13</strong>-2017 Transportation Improvement Program (TIP)<br />
4/11/20<strong>13</strong><br />
Presenter/Sponsor: Tom Rickert<br />
Staff will provide the Transportation Committee with copies of the most current FY20<strong>13</strong>-2017 Transportation Improvement<br />
Program (TIP). The TIP is a working document that represents the Division's 5-Year Financial Plan.<br />
The 5-Year TIP shows the anticipated transportation improvements and outlines estimates of revenues and expenditures.<br />
This document is updated from time to time as project scopes, years, funding sources, and cost estimates change. The<br />
current FY20<strong>13</strong>-2017 TIP contains over a hundred primary projects, estimated to cost $272 million, while the annual FY20<strong>13</strong><br />
Budget & TIP contains eighty-three (83) primary projects estimated to cost $87.7 million.<br />
This document is being provided to the Committee as a basis to begin budget discussions for the FY2014 Budget & TIP.<br />
FY20<strong>13</strong>-2017 Transportation Improvement Program Report<br />
For information only<br />
Transportation<br />
Jan Ward, Chief of Planning & Programming Phone: (630) 444-3143<br />
6B
SUMMARY:<br />
Attachments:<br />
Detailed information<br />
available from :<br />
Staff Remarks /<br />
Recommendations:<br />
Committee Remarks:<br />
<strong>AG</strong>ENDA ITEM EXECUTIVE SUMMARY Agenda Item #<br />
Name:<br />
Assigned Committee:<br />
Staff Name:<br />
Traffic & Permitting Report<br />
4/11/20<strong>13</strong><br />
Presenter/Sponsor: Tom Rickert<br />
TRAFFIC<br />
1. Arterial Operations Center (AOC) - Building design is near completion for addition to Building A with construction<br />
anticipated to begin in Spring/Summer 20<strong>13</strong> and completed in late 20<strong>13</strong> or early 2014. ATMS Software Development &<br />
Integration is underway. These projects are primarily funded with federal CMAQ & EECBG funds.<br />
2. Stearns Corridor Traffic System Project – Engineering underway for $1,800,000 in CMAQ funds to deploy various ITS<br />
(Intelligent Transportation System) technologies and improvements along the Stearns Road Corridor. Construction<br />
planned for 2014.<br />
3. 2012 HSIP Funded Safety Projects – Engineering underway for $2,340,000 in federal safety funds to implement various<br />
safety improvements on sections of Burlington, Randall and Huntley Roads. Construction planned for 20<strong>13</strong>/2014.<br />
4. 20<strong>13</strong> HSIP Funded Safety Projects – QBS Consultant selection for Phase II design completed for $2,443,500 in federal<br />
safety funds to implement various safety improvements on sections of Fabyan Parkway, Hughes, Orchard and Randall<br />
Roads. Construction planned for 2014.<br />
6. Corron Road & McDonald Road New Multi-way Stop - Engineering underway; implementation targeted for Spring 20<strong>13</strong>.<br />
7. <strong>IL</strong> Route 38 & Kautz Road (IDOT) -- Grade-separated intersection/overpass project with construction traffic control delays.<br />
PERMITTING<br />
Attached are spreadsheets showing issued permits for the past year and all open projects (listed by road name) currently in<br />
the review or construction stage. Also attached are the comparison graphs for access, utility and moving permits showing<br />
the number of permits issued for FY20<strong>13</strong> versus FY2012. On-going permit projects:<br />
1. Keslinger Road at Bartelt Road (Autumn Green Animal Hospital) -- Installation of left and right turn lanes on Keslinger<br />
Road at Bartelt Road. Construction expected to begin in Spring, 20<strong>13</strong>.<br />
2. Plank Road east of Burlington Road (Elgin Community College Public Safety & Sustainability Center) -- Installation of left<br />
and right turn lanes on Plank Road at the proposed access. Construction expected to begin in Summer, 20<strong>13</strong>.<br />
3. Randall Road at Recreation Drive, east side (Randall Apartment Complex) -- Installation of left and right turn lanes on<br />
Randall Road at the proposed access, along with traffic signal modifications. Access approval is subject to<br />
intergovernmental agreement.<br />
ACCESS <strong>AG</strong>REEMENTS<br />
On-going development of intergovernmental agreements:<br />
1. Randall Road - <strong>IL</strong> Route 72 to Binnie Road with the Village of West Dundee and Dundee Township Park District.<br />
2. Plank Road Realignment - with the Village of Burlington possibly including planning elements for other roadways in the<br />
general area.<br />
Permitting spreadsheets and charts<br />
For information only.<br />
Transportation<br />
Kurt Nika - Traffic & Permitting Chief / Tom Szabo - Traffic Phone: (630)406-7372 / 208-3<strong>13</strong>9<br />
7A
Current Issued Permits Comparison<br />
FY 2012 (Dec. 2011 to Nov. 2012) FY 20<strong>13</strong> (Dec. 2012 to Nov. 20<strong>13</strong>)<br />
Months Access Utility Moving Months Access Utility Moving<br />
December 2011 12 7 120 December 2 12 101<br />
January 2 9 86 January 4 12 53<br />
February 3 10 <strong>13</strong>9 February 1 10 66<br />
March 6 9 117 March 3 <strong>13</strong> 86<br />
<strong>April</strong> 5 7 173 <strong>April</strong><br />
May 9 6 180 May<br />
June 6 5 231 June<br />
July 5 <strong>13</strong> 177 July<br />
August 7 11 210 August<br />
September 2 10 189 September<br />
October 0 8 276 October<br />
November 4 14 211 November<br />
Total thru Mar. 2012 23 35 462 Total thru Mar. 20<strong>13</strong> 10 47 306<br />
Change % - 57 % + 34 % - 34 %
Issued Permits<br />
Permit Department Fiscal Year Comparisons<br />
Fiscal Year 2012 2012 PERMITS ISSUED<br />
2012 REVENUE $ COLLECTED<br />
Month Utility Temp Major Minimum Detour Events Ag R.O.W. Subdivison Water Draw Stormwater Moving Moving $ Access $<br />
DEC. 2011 7 1 1 0 0 0 0 1 0 0 0 120 $4,625.00 $3,050.00<br />
Jan. 2012 9 1 0 0 0 0 0 1 0 0 0 86 $15,195.00 $5,050.00<br />
Feb 10 1 0 0 0 0 0 1 0 1 0 <strong>13</strong>9 $5,665.00 $3,500.00<br />
Mar 9 0 0 0 2 1 0 2 0 0 1 117 $11,603.00 $5,950.00<br />
Apr 7 2 0 1 0 1 0 1 0 0 0 173 $6,855.00 $4,100.00<br />
May 6 0 0 1 2 2 0 0 0 2 2 180 $11,275.00 $1,050.00<br />
June 5 0 1 0 1 1 0 2 0 1 0 231 $18,110.00 $4,864.00<br />
July <strong>13</strong> 0 0 0 1 3 0 0 0 1 0 177 $19,080.00 $6,900.00<br />
Aug 11 0 0 0 0 3 0 1 0 3 0 210 $<strong>13</strong>,895.00 $5,850.00<br />
Sept 10 0 0 0 0 1 0 1 0 0 0 189 $18,035.00 $<strong>13</strong>,450.00<br />
Oct 8 0 0 0 0 0 0 0 0 0 0 276 $17,830.00 $6,850.00<br />
Nov 0 1 0 0 1 0 0 1 0 1 0 211 $22,495.00 $10,450.00<br />
Total thru Mar. 2012 35 3 1 0 2 1 0 5 0 1 1 462 $37,088.00 $17,550.00<br />
DECEMBER 2011 THRU NOVEMBER 2012- Fiscal Year<br />
Fiscal Year 20<strong>13</strong> 20<strong>13</strong> PERMITS ISSUED<br />
20<strong>13</strong> REVENUE $ COLLECTED<br />
Month Utility Temp Major Minimum Detour Events Ag R.O.W. Subdivison Water Draw Stormwater Moving Moving $ Access $<br />
DEC. 2012 12 0 0 0 0 0 0 2 0 0 0 101 $<strong>13</strong>,940.00 $10,250.00<br />
Jan. 20<strong>13</strong> 12 1 0 0 1 0 0 1 0 1 0 53 $7,620.00 $4,000.00<br />
Feb 10 1 0 0 0 0 0 0 0 0 0 66 $8,575.00 $6,550.00<br />
Mar<br />
Apr<br />
May<br />
June<br />
July<br />
Aug<br />
Sept<br />
Oct<br />
Nov<br />
<strong>13</strong> 0 0 1 0 0 0 2 0 0 0 86 $5,215.00 $11,350.00<br />
Total thru Mar. 20<strong>13</strong> 47 2 0 1 1 0 0 5 0 1 0 306 $35,350.00 $32,150.00<br />
DECEMBER 2012 THRU NOVEMBER 20<strong>13</strong>- Fiscal Year
N<br />
u<br />
m<br />
b<br />
e<br />
r<br />
o<br />
f<br />
P<br />
e<br />
r<br />
m<br />
i<br />
t<br />
s<br />
I<br />
s<br />
s<br />
u<br />
e<br />
d<br />
14<br />
12<br />
10<br />
8<br />
6<br />
4<br />
2<br />
0<br />
12<br />
2<br />
2<br />
4<br />
March 2012 Total = 6 Issued<br />
3<br />
1<br />
Access Permit Comparison Chart<br />
6<br />
3<br />
5<br />
9<br />
6<br />
5<br />
FY 2012 FY 20<strong>13</strong> March 20<strong>13</strong> Total = 3 Issued<br />
7<br />
2<br />
0<br />
4
N<br />
u<br />
m<br />
b<br />
e<br />
r<br />
o<br />
f<br />
P<br />
e<br />
r<br />
m<br />
i<br />
t<br />
s<br />
I<br />
s<br />
s<br />
u<br />
e<br />
d<br />
16<br />
14<br />
12<br />
10<br />
8<br />
6<br />
4<br />
2<br />
0<br />
7<br />
12 12<br />
9<br />
10 10<br />
Utility Permit Comparison Chart<br />
9<br />
<strong>13</strong><br />
7<br />
6<br />
March 2012 Total = 9 Issued *** *** March 20<strong>13</strong> Total = <strong>13</strong> Issued<br />
5<br />
<strong>13</strong><br />
FY 2012 FY 20<strong>13</strong><br />
11<br />
10<br />
8<br />
14
N<br />
u<br />
m<br />
b<br />
e<br />
r<br />
o<br />
f<br />
P<br />
e<br />
r<br />
m<br />
i<br />
t<br />
s<br />
I<br />
s<br />
s<br />
u<br />
e<br />
d<br />
300<br />
250<br />
200<br />
150<br />
100<br />
50<br />
0<br />
120<br />
101<br />
86<br />
53<br />
<strong>13</strong>9<br />
Moving Permit Comparison Chart<br />
66<br />
117<br />
86<br />
173<br />
180<br />
231<br />
177<br />
March 2012 Total = 117 Issued<br />
March 20<strong>13</strong> Total = 86 Issued<br />
210<br />
189<br />
276<br />
211<br />
FY 2012<br />
FY 20<strong>13</strong>
If not budgeted,<br />
explain funding<br />
source<br />
<strong>AG</strong>ENDA ITEM EXECUTIVE SUMMARY Agenda Item #<br />
Presenter/Sponsor:<br />
Name<br />
Budget Information: Was this item budgeted?<br />
SUMMARY:<br />
Attachments:<br />
Detailed information available from :<br />
Resolution/Ordinance Tracking:<br />
Staff Name:<br />
Appropriation Amount:<br />
Ray Johnson, Traffic / Utility Coordinator Phone: 630/406-7356<br />
Assigned Committee: Transportation Sent to: Executive<br />
on: 04/10/20<strong>13</strong><br />
If Other, specify:<br />
Committee Remarks:<br />
<strong>County</strong> Board Date:<br />
Resolution<br />
Ordinance<br />
Yes<br />
No N/A<br />
Next Committee: Executive Sent to: <strong>County</strong> Board on: 05/08/20<strong>13</strong><br />
If Other, specify:<br />
Committee Remarks:<br />
Next Committee: Sent to: on:<br />
Committee Remarks:<br />
7B-a<br />
Approving Contract for 20<strong>13</strong> Urethane Pavement Marking, <strong>Kane</strong> <strong>County</strong> Section No.<br />
<strong>13</strong>-00000-04-GM<br />
Tom Rickert - Deputy Director of Transportation<br />
$449,005.95<br />
On March 27, 20<strong>13</strong>, construction bids were opened at the Division of Transportation office for the 20<strong>13</strong> <strong>County</strong> Urethane<br />
Pavement Marking Program. The scope of this project involves the striping of approximately 46 miles of roads in the <strong>County</strong><br />
including portions of Kirk Road, Randall Road, Orchard Road, McLean Boulevard, Bowes Road, Burlington Road, Keslinger<br />
Road, La Fox Road, Plank Road, Silver Glen Road & West Bartlett Road. Past performance of urethane markings demonstrate<br />
that this material will last for at least 3 years after initial placement without need for touch up or maintenance. The high<br />
performance characteristic of urethane compared to that of paint makes it an ideal choice for higher volume highways,<br />
requiring less maintenance which translates to less disruption to traffic and better visibility, especially during the winter<br />
months.<br />
The low bidder is A.C. Pavement Striping Company, of Elgin, Illinois and the proposed contract amount for the project is<br />
$449,005.95. The low bid amount is approximately 23% below the engineer’s estimate of $583,967.75.<br />
Resolution, Bid Tabulation, Location Map<br />
05/14/20<strong>13</strong>
STATE OF <strong>IL</strong>LINOIS<br />
COUNTY OF KANE<br />
RESOLUTION NO. <strong>13</strong> -<br />
APPROVING CONTRACT FOR<br />
20<strong>13</strong> URETHANE PAVEMENT MARKING<br />
KANE COUNTY SECTION NO. <strong>13</strong>-00000-04-GM<br />
WHEREAS, the <strong>Kane</strong> <strong>County</strong> Division of Transportation has solicited and received bids for the<br />
work and/or construction described as:<br />
KANE COUNTY SECTION NO. <strong>13</strong>-00000-04-GM<br />
20<strong>13</strong> URETHANE PAVEMENT MARKING<br />
(hereinafter the “Project”)<br />
WHEREAS, the lowest responsible bidder for the Project is:<br />
A.C. PAVEMENT STRIPING COMPANY OF ELGIN, <strong>IL</strong>LINOIS<br />
with a low bid of<br />
$449,005.95<br />
NOW, THEREFORE, BE IT RESOLVED by the <strong>Kane</strong> <strong>County</strong> Board that a contract for the<br />
Project described hereinabove shall be awarded to the lowest responsible bidder in the amount as<br />
indicated hereinabove and that the <strong>County</strong> Board Chairman is hereby authorized and directed to<br />
execute a contract and contractor’s bond therefor.<br />
BE IT FURTHER RESOLVED that there is hereby appropriated the sum of Four Hundred Fifty<br />
Eight Thousand Dollars ($458,000.00) [including a 2% contingency] from Local Option Fund #304, Line<br />
Item #52070 (Repair / Maintenance – Pavement Marking) to pay for the Project.<br />
Line Item Line Item Description Was<br />
personnel/item/service<br />
approved in original<br />
budget or a subsequent<br />
304.520.524.52070<br />
Repair / Maintenance –<br />
Pavement Marking<br />
budget revision?<br />
Yes<br />
Are funds currently<br />
available for this<br />
personnel/item/service in<br />
the specific line item?<br />
Yes<br />
If funds are not<br />
currently available in<br />
the specified line item,<br />
where are the funds<br />
available?
Passed by the <strong>Kane</strong> <strong>County</strong> Board on May 14, 20<strong>13</strong>.<br />
Page 2 of 2, Res. #<strong>13</strong>-<br />
______________________________________ ___________________________________<br />
John A. Cunningham Christopher J. Lauzen<br />
Clerk, <strong>County</strong> Board Chairman, <strong>County</strong> Board<br />
<strong>Kane</strong> <strong>County</strong>, Illinois <strong>Kane</strong> <strong>County</strong>, Illinois<br />
Vote:<br />
Yes _____<br />
No _____<br />
Voice _____<br />
Abstentions _____<br />
5APCNURETHNEPVMNTMRKNG.4LH
TOWNSHIP<br />
KANE COUNTY DIVISION OF TRANSPORTATION COUNTY KANE<br />
BID TAB SECTION <strong>13</strong>-00000-04-GM<br />
20<strong>13</strong> <strong>Kane</strong> <strong>County</strong> Urethane Pavement Marking"<br />
Non-MFT<br />
ENGINEERS ESTIMATE AC Pavement Striping<br />
RoadSafe Traffic Systems<br />
Marking Specialist<br />
DATE: March 27, 20<strong>13</strong><br />
Company<br />
ITEM # ITEMS UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL<br />
1 URETHANE PAVEMENT MARKING - LINE, 4" FOOT 1034305 0.35 $362,006.75 $0.290 $299,948.45 $0.35 $362,006.75 $0.41 $424,065.05<br />
2 URETHANE PAVEMENT MARKING - LINE, 6" FOOT 32670 0.75 $24,502.50 $0.45 $14,701.50 $0.75 $24,502.50 $0.80 $26,<strong>13</strong>6.00<br />
3 URETHANE PAVEMENT MARKING - LINE, 8" FOOT 40020 1.00 $40,020.00 $0.74 $29,614.80 $1.25 $50,025.00 $1.07 $42,821.40<br />
4 URETHANE PAVEMENT MARKING - LINE, 12" FOOT 17765 1.60 $28,424.00 $1.20 $21,318.00 $2.00 $35,530.00 $3.00 $53,295.00<br />
5 URETHANE PAVEMENT MARKING - LINE, 24" FOOT 6235 3.50 $21,822.50 $3.00 $18,705.00 $3.00 $18,705.00 $6.00 $37,410.00<br />
6 URETHANE PAVEMENT MARKING - LETTER & SYMBOLS SQ FT 6963 4.00 $27,852.00 $3.00 $20,889.00 $3.00 $20,889.00 $3.50 $24,370.50<br />
7 URETHANE PAVEMENT MARKING - MEDIAN SQ FT 1960 4.00 $7,840.00 1.42 $2,783.20 2.00 $3,920.00 3.25 $6,370.00<br />
8 TRAFFIC CONTROL & PROTECTION (SPECIAL) FOOT 1 15,000.00 $15,000.00 1.00 $1.00 1.00 $1.00 12,500.00 $12,500.00<br />
9 PAVEMENT MARKING REMOVAL FOOT 19500 1.00 $19,500.00 0.31 $6,045.00 1.00 $19,500.00 0.90 $17,550.00<br />
10 ITEMS AS ORDERED BY THE ENGINEER FOOT 30000 1.00 $30,000.00 1.00 $30,000.00 1.00 $30,000.00 1.00 $30,000.00<br />
11 RA<strong>IL</strong>ROAD PROTECTIVE LIAB<strong>IL</strong>ITY INSURANCE FOOT 1 7,000.00 $7,000.00 5,000.00 $5,000.00 4,900.00 $4,900.00 15,000.00 $15,000.00<br />
AS READ $583,967.75 $449,005.95 $569,979.25 $689,517.95<br />
AS CORRECTED<br />
% +/- ESTIMATE -23.11% -2.40% 18.07%
W. <strong>County</strong> Line<br />
West <strong>County</strong> Line<br />
41<br />
20<strong>13</strong> <strong>Kane</strong> <strong>County</strong> Urethane Pavement Marking<br />
(<br />
West <strong>County</strong><br />
Plank Rd.<br />
Marcy Rd.<br />
McGough Rd.<br />
Hinckley<br />
Schrader Rd.<br />
Harter Rd.<br />
Perry Rd.<br />
Owens Rd.<br />
Rd.<br />
Allen Rd.<br />
McGough Rd.<br />
Winters Rd.<br />
Root Ln.<br />
28<br />
Peterson Rd.<br />
Main<br />
Swan Rd.<br />
Walker Rd.<br />
Thatcher Rd.<br />
Keslinger Rd.<br />
Jericho Rd.<br />
Rd.<br />
Nelson<br />
McDermott Rd.<br />
Engel Rd.<br />
Bushnell Rd.<br />
Rd.<br />
Percy Rd.<br />
Snyder Rd.<br />
Maple Park<br />
Troxel<br />
Shaw<br />
30<br />
44<br />
Fabris Rd.<br />
Miner Rd.<br />
Walker Rd.<br />
38<br />
28<br />
Howard Rd.<br />
46<br />
Lawrence<br />
Ellithorpe Rd.<br />
Granart Rd.<br />
Burlington<br />
Burlington<br />
McGough Rd.<br />
Barron Rd.<br />
4<br />
24<br />
Watson Rd.<br />
23<br />
1<br />
Lasher Rd.<br />
Davis Rd.<br />
Peplow Rd.<br />
35<br />
10<br />
44<br />
45<br />
French Rd.<br />
11<br />
11<br />
Base Line Rd.<br />
St.<br />
Harmony Rd.<br />
I.C.<br />
Meredith Rd.<br />
Sauber<br />
Dauberman Rd.<br />
Getty Rd.<br />
Big Timber Rd.<br />
State<br />
Godfrey Rd.<br />
Florence Rd. Middleton Rd.<br />
Rhodes<br />
Jones<br />
Granart<br />
Rd.<br />
Kelley Rd.<br />
Lenschow Rd.<br />
49<br />
14<br />
36<br />
Getzelman Rd.<br />
56<br />
Virgil<br />
Big Rock<br />
Higgins Rd.<br />
Chapman Rd.<br />
62<br />
Ramm Rd.<br />
Beith Rd.<br />
(<br />
Allen Rd.<br />
Scott Rd.<br />
Rd.<br />
Francis Rd.<br />
Thomas Rd.<br />
Harter Rd.<br />
Wheeler Rd.<br />
Clark Rd.<br />
Romke Rd.<br />
Welter Rd.<br />
88<br />
Widmayer Rd.<br />
Freeland Rd.<br />
Gast Rd.<br />
Hampshire<br />
2<br />
72<br />
Bateman<br />
27<br />
<strong>Kane</strong>ville<br />
48<br />
Dietrich Rd.<br />
3<br />
Lees Rd.<br />
Reed Rd.<br />
Seavey Rd<br />
Jetter<br />
Ketchum Rd.<br />
Berner Rd.<br />
Bahr Rd.<br />
McDonald Rd.<br />
Ashe Rd.<br />
Brier Hill Rd.<br />
Rohrsen Rd.<br />
Rowe<br />
Dugan Rd.<br />
Schneider Rd.<br />
Lorang Rd.<br />
Tower Rd.<br />
Main<br />
Thurnau<br />
Rd.<br />
Plato Rd.<br />
Rd.<br />
Prairie St.<br />
Mighell Rd.<br />
Hennig Rd.<br />
Lily<br />
Lake<br />
Hanson Rd.<br />
Scott Rd.<br />
Plank Rd.<br />
Burlington<br />
Anderson Rd.<br />
Sanwald Rd.<br />
Jericho Rd.<br />
Huntley<br />
Kendall Rd.<br />
Elburn<br />
Smith Rd.<br />
Green<br />
Merill Rd.<br />
Swanberg Rd.<br />
Reinking Rd.<br />
Rd.<br />
Pingree Grove<br />
Pouley Rd.<br />
Dittman Rd.<br />
Beith Rd.<br />
Rippburger Rd.<br />
Marshall Rd.<br />
(<br />
Empire Rd.<br />
Town Hall Rd.<br />
Hughes<br />
Manning<br />
Rd.<br />
Lenz Rd.<br />
Harley Rd.<br />
Bliss Rd.<br />
Muirhead Rd.<br />
Kreutzer Rd.<br />
Russell Rd.<br />
Bowes<br />
Bunker Rd.<br />
Norris<br />
(<br />
Healy Rd<br />
Rd.<br />
Powers Rd.<br />
Freeman Rd.<br />
Plato Center<br />
33<br />
Campton Hills Rd.<br />
Denny Rd.<br />
Sugar Grove<br />
Crawford<br />
Damisch Rd.<br />
Corron Rd.<br />
Wasco<br />
64<br />
M:\dotserver2\USERS\Committee\20<strong>13</strong>04 <strong>April</strong>\Traffic & Permitting\Traffic\Urethane Pavement Marking\20<strong>13</strong> Urethane Pavement Striping.mxd<br />
90<br />
22<br />
23<br />
20<br />
4<br />
47<br />
21<br />
30<br />
47<br />
69<br />
5<br />
30<br />
47<br />
51<br />
26<br />
47<br />
52<br />
38<br />
2<br />
78<br />
16<br />
Lafox Rd.<br />
(<br />
Silver<br />
Fabyan<br />
Seavey Rd.<br />
56<br />
24<br />
22<br />
80<br />
Hankes<br />
Big Timber Rd.<br />
Highland Ave.<br />
Galena Blvd.<br />
Barnes<br />
Rd.<br />
Deerpath<br />
Coombs Rd.<br />
McDonald Rd.<br />
Campton<br />
Hills<br />
81<br />
Elgin<br />
La Fox<br />
41<br />
15<br />
Rd.<br />
33<br />
Bolcum Rd.<br />
Brundige Rd.<br />
8<br />
Orchard Rd.<br />
Galligan Rd.<br />
(<br />
Nesler Rd.<br />
Main St.<br />
Huntley Rd.<br />
Peck Rd.<br />
<strong>Kane</strong>ville Rd.<br />
Tanner Rd. 83<br />
Rd.<br />
6<br />
83<br />
Gilberts<br />
Nelson Lake Rd.<br />
Water Rd.<br />
Stevens Rd.<br />
Burr Rd<br />
47<br />
Udina<br />
Tyrrell Rd.<br />
Bowes Rd.<br />
Keslinger Rd.<br />
Fabyan<br />
Orchard Rd.<br />
Aucutt Rd.<br />
Mason Rd.<br />
Randall Rd.<br />
Crane Rd.<br />
Boyer Rd.<br />
Binnie Rd.<br />
Hopps Rd.<br />
10<br />
17<br />
Oak St.<br />
Edgelawn Dr.<br />
8<br />
59<br />
84<br />
5<br />
Randall Rd.<br />
Dean St.<br />
Bricher Rd.<br />
McKee St.<br />
Montgomery<br />
30<br />
72<br />
21<br />
21<br />
20<br />
Randall Rd.<br />
Fox<br />
34<br />
71<br />
Randall Rd.<br />
Red<br />
(<br />
Ln.<br />
Crane Rd.<br />
Sullivan Rd.<br />
Prairie St.<br />
South St.<br />
34<br />
34<br />
Wilson St.<br />
Mooseheart Rd.<br />
North Aurora<br />
Indian Trail Rd.<br />
Aurora<br />
N. <strong>County</strong> Line Rd.<br />
Algonquin<br />
90<br />
Sleepy Hollow Rd.<br />
McLean<br />
South St.<br />
Illinois Ave.<br />
Larkin Ave.<br />
Gate Rd.<br />
Geneva<br />
Mooseheart<br />
25<br />
31<br />
Batavia<br />
31<br />
18<br />
Miller Rd.<br />
Montgomery Rd.<br />
Sleepy<br />
Hollow<br />
Boncosky Rd.<br />
Wing St.<br />
Elgin<br />
Spring St.<br />
88<br />
South<br />
Elgin<br />
31<br />
Army Trail Rd.<br />
Tyler<br />
Church Rd.<br />
Hill Ave.<br />
Gilbert St.<br />
CountryClubRd.<br />
St. Charles<br />
29<br />
Cherry<br />
Kirk Rd.<br />
Farnsworth Ave.<br />
Algonquin Rd.<br />
Kirk Rd.<br />
Wilson St.<br />
Pine St.<br />
56<br />
Raddant Rd.<br />
Sheffer<br />
Dunham Rd.<br />
Fabyan<br />
Bilter Rd.<br />
Rd.<br />
5th Ave.<br />
Bolz Rd.<br />
LakeMarianRd.<br />
Summit St.<br />
Villa St.<br />
Middle St.<br />
Rd.<br />
Carpentersville<br />
West<br />
Dundee<br />
8<br />
64<br />
Wayne<br />
19<br />
77<br />
77<br />
Molitor Rd.<br />
New York St.<br />
25<br />
Bartlett<br />
38<br />
61<br />
20<br />
34<br />
Kautz Rd.<br />
25<br />
Lake - Cook Rd.<br />
West<br />
Bartlett<br />
Rd.<br />
37<br />
62<br />
Helm Rd.<br />
68<br />
East<br />
Dundee<br />
72<br />
Stearns<br />
Rd.<br />
Barrington<br />
Hills<br />
40<br />
Penny<br />
Rd.<br />
Hoffman<br />
Estates<br />
Legend<br />
§¨¦ 88<br />
£¤ 30<br />
!( 31<br />
467 34<br />
/<br />
Hampshire<br />
Burlington<br />
0 1 2 Miles<br />
Virgil<br />
Rutland Dundee<br />
Plato<br />
Elgin<br />
Campton Saint Charles<br />
Geneva<br />
<strong>Kane</strong>ville Blackberry<br />
Batavia<br />
Big Rock Sugar Grove Aurora<br />
Interstates<br />
US Roads<br />
State Roads<br />
<strong>County</strong> Roads<br />
Other Roads<br />
Rail Roads<br />
<strong>County</strong> Boundry<br />
Township Boundry<br />
Fox River<br />
Forest Preserves<br />
Municipalities<br />
Urethane<br />
0 3,800 7,600 11,400 15,200<br />
Feet
If not budgeted,<br />
explain funding<br />
source<br />
<strong>AG</strong>ENDA ITEM EXECUTIVE SUMMARY Agenda Item #<br />
Presenter/Sponsor:<br />
Name<br />
Budget Information: Was this item budgeted?<br />
SUMMARY:<br />
Attachments:<br />
Detailed information available from :<br />
Resolution/Ordinance Tracking:<br />
Staff Name:<br />
Appropriation Amount:<br />
Ray Johnson, Traffic / Utility Coordinator Phone: 630/406-7356<br />
Assigned Committee: Transportation Sent to: Executive<br />
on: 04/10/20<strong>13</strong><br />
If Other, specify:<br />
Committee Remarks:<br />
<strong>County</strong> Board Date:<br />
Resolution<br />
Ordinance<br />
Yes<br />
No N/A<br />
Next Committee: Executive Sent to: <strong>County</strong> Board on: 05/08/20<strong>13</strong><br />
If Other, specify:<br />
Committee Remarks:<br />
Next Committee: Sent to: on:<br />
Committee Remarks:<br />
7B-b<br />
Approving Contract for 20<strong>13</strong> Paint Pavement Marking, <strong>Kane</strong> <strong>County</strong> Section No.<br />
<strong>13</strong>-00000-05-GM<br />
Tom Rickert - Deputy Director of Transportation<br />
$450,287.57<br />
On March 27, 20<strong>13</strong>, construction bids were opened at the Division of Transportation office for the 20<strong>13</strong> <strong>County</strong> Paint<br />
Pavement Marking Program. The scope of this project involves the striping of 208 miles of roads in the <strong>County</strong> including<br />
various lower volume rural <strong>County</strong> Highways.<br />
The low bidder is Preform Traffic Control, LTD. of Elk Grove Village, Illinois for the proposed amount of $450,287.57. The low<br />
bid amount is approximately 17% below the engineer's estimate of $540,265.70.<br />
Resolution, Bid Tabulation, Location Map<br />
05/14/20<strong>13</strong>
STATE OF <strong>IL</strong>LINOIS<br />
COUNTY OF KANE<br />
RESOLUTION NO. <strong>13</strong> -<br />
APPROVING CONTRACT FOR<br />
20<strong>13</strong> PAINT PAVEMENT MARKING<br />
KANE COUNTY SECTION NO. <strong>13</strong>-00000-05-GM<br />
WHEREAS, the <strong>Kane</strong> <strong>County</strong> Division of Transportation has solicited and received bids for the<br />
work and/or construction described as:<br />
KANE COUNTY SECTION NO. <strong>13</strong>-00000-05-GM<br />
20<strong>13</strong> PAINT PAVEMENT MARKING<br />
(hereinafter the “Project”)<br />
WHEREAS, the lowest responsible bidder for the Project is:<br />
PREFORM TRAFFIC CONTROL SYSTEMS, LTD. OF ELK GROVE V<strong>IL</strong>L<strong>AG</strong>E, <strong>IL</strong>LINOIS<br />
with a low bid of<br />
$450,287.57<br />
NOW, THEREFORE, BE IT RESOLVED by the <strong>Kane</strong> <strong>County</strong> Board that a contract for the<br />
Project described hereinabove shall be awarded to the lowest responsible bidder in the amount as<br />
indicated hereinabove and that the <strong>County</strong> Board Chairman is hereby authorized and directed to<br />
execute a contract and contractor’s bond therefor.<br />
BE IT FURTHER RESOLVED that there is hereby appropriated the sum of Four Hundred Fifty<br />
Nine Thousand Three Hundred Dollars ($459,300.00) [including a 2% contingency] from Local Option<br />
Fund #304, Line Item #52070 (Repair / Maintenance – Pavement Marking) to pay for the Project.<br />
Line Item Line Item Description Was<br />
personnel/item/service<br />
approved in original<br />
budget or a subsequent<br />
304.520.524.52070<br />
Repair / Maintenance –<br />
Pavement Marking<br />
budget revision?<br />
Yes<br />
Are funds currently<br />
available for this<br />
personnel/item/service in<br />
the specific line item?<br />
Yes<br />
If funds are not<br />
currently available in<br />
the specified line item,<br />
where are the funds<br />
available?
Passed by the <strong>Kane</strong> <strong>County</strong> Board on May 14, 20<strong>13</strong>.<br />
Page 2 of 2, Res. #<strong>13</strong>-<br />
______________________________________ ___________________________________<br />
John A. Cunningham Christopher J. Lauzen<br />
Clerk, <strong>County</strong> Board Chairman, <strong>County</strong> Board<br />
<strong>Kane</strong> <strong>County</strong>, Illinois <strong>Kane</strong> <strong>County</strong>, Illinois<br />
Vote:<br />
Yes _____<br />
No _____<br />
Voice _____<br />
Abstentions _____<br />
5APCNPAINTPVMNTMRKNG.4LH
TOWNSHIP<br />
KANE COUNTY DIVISION OF TRANSPORTATION COUNTY KANE<br />
BID TAB SECTION <strong>13</strong>-00000-05-GM<br />
20<strong>13</strong> <strong>Kane</strong> <strong>County</strong> Paint Pavement Marking"<br />
Non-MFT ENGINEERS ESTIMATE<br />
AC Pavement Marking<br />
Preform Traffic Control Systems<br />
DATE: March 27,20<strong>13</strong> Ltd.<br />
ITEM # ITEMS UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL<br />
1 PAINT PAVEMENT MARKING - LINE, 4" FOOT 3,410,798 0.10 341,079.80 $0.10 $341,079.80 0.087 $296,739.43<br />
2 PAINT PAVEMENT MARKING - LINE, 6" FOOT 36,682 0.50 18,341.00 $0.46 $16,873.72 $0.40 $14,672.80<br />
3 PAINT PAVEMENT MARKING - LINE, 8" FOOT 225,100 0.25 56,275.00 $0.19 $42,769.00 $0.16 $36,016.00<br />
4 PAINT PAVEMENT MARKING - LINE, 12" FOOT 19,621 1.50 29,431.50 $1.30 $25,507.30 $1.27 $24,918.67<br />
5 PAINT PAVEMENT MARKING - LINE, 24" FOOT 7,871 2.00 15,742.00 $1.85 $14,561.35 $1.79 $14,089.09<br />
6 PAINT PAVEMENT MARKING - LETTER & SYMBOLS SQ FT 14,888 2.00 29,776.40 $1.90 $28,287.58 $1.79 $26,649.88<br />
7 PAINT PAVEMENT MARKING - MEDIAN SQ FT 3,810 2.00 7,620.00 1.35 $5,143.50 1.27 $4,838.70<br />
8 TRAFFIC CONTROL & PROTECTION (SPECIAL) LUMP SUM 1 15,000.00 15,000.00 10,000.00 $10,000.00 7,500.00 $7,500.00<br />
9 ITEMS AS ORDERED BY THE ENGINEER UNIT 20,000 1.00 20,000.00 1.00 $20,000.00 1.00 $20,000.00<br />
10 RA<strong>IL</strong>ROAD PROTECTIVE LIAB<strong>IL</strong>ITY INSURANCE UNIT 1 7,000.00 7,000.00 10,000.00 $10,000.00 4,863.00 $4,863.00<br />
AS READ $540,265.70 $514,222.25 $450,287.57<br />
AS CORRECTED<br />
% +/- ESTIMATE -4.82% -16.65%
W. <strong>County</strong> Line<br />
West <strong>County</strong> Line<br />
41<br />
(<br />
West <strong>County</strong><br />
Plank Rd.<br />
Marcy Rd.<br />
McGough Rd.<br />
Hinckley<br />
Schrader Rd.<br />
Harter Rd.<br />
Perry Rd.<br />
Owens Rd.<br />
Rd.<br />
Allen Rd.<br />
McGough Rd.<br />
Winters Rd.<br />
Root Ln.<br />
28<br />
Peterson Rd.<br />
Main<br />
Swan Rd.<br />
Walker Rd.<br />
Thatcher Rd.<br />
Keslinger Rd.<br />
Jericho Rd.<br />
Rd.<br />
McDermott Rd.<br />
20<strong>13</strong> <strong>Kane</strong> <strong>County</strong> Paint Pavement Marking<br />
Nelson<br />
Engel Rd.<br />
Bushnell Rd.<br />
Rd.<br />
Percy Rd.<br />
Snyder Rd.<br />
Maple Park<br />
Troxel<br />
Shaw<br />
30<br />
44<br />
Fabris Rd.<br />
Miner Rd.<br />
Walker Rd.<br />
38<br />
28<br />
Howard Rd.<br />
46<br />
Lawrence<br />
Ellithorpe Rd.<br />
Granart Rd.<br />
Burlington<br />
Burlington<br />
McGough Rd.<br />
Barron Rd.<br />
4<br />
24<br />
Watson Rd.<br />
23<br />
1<br />
Lasher Rd.<br />
Davis Rd.<br />
Peplow Rd.<br />
35<br />
10<br />
44<br />
45<br />
French Rd.<br />
11<br />
11<br />
Base Line Rd.<br />
St.<br />
Harmony Rd.<br />
I.C.<br />
Meredith Rd.<br />
Sauber<br />
Dauberman Rd.<br />
Getty Rd.<br />
Big Timber Rd.<br />
State<br />
Godfrey Rd.<br />
Florence Rd. Middleton Rd.<br />
Rhodes<br />
Jones<br />
Granart<br />
Rd.<br />
Kelley Rd.<br />
Lenschow Rd.<br />
49<br />
14<br />
36<br />
Getzelman Rd.<br />
56<br />
Virgil<br />
Big Rock<br />
Higgins Rd.<br />
Chapman Rd.<br />
62<br />
Ramm Rd.<br />
Beith Rd.<br />
(<br />
Allen Rd.<br />
Scott Rd.<br />
Rd.<br />
Francis Rd.<br />
Thomas Rd.<br />
Harter Rd.<br />
Wheeler Rd.<br />
Clark Rd.<br />
Romke Rd.<br />
Welter Rd.<br />
88<br />
Widmayer Rd.<br />
Freeland Rd.<br />
Gast Rd.<br />
Hampshire<br />
2<br />
Bateman<br />
<strong>Kane</strong>ville<br />
Dietrich Rd.<br />
Lees Rd.<br />
Reed Rd.<br />
Seavey Rd<br />
Jetter<br />
Ketchum Rd.<br />
Berner Rd.<br />
McDonald Rd.<br />
Ashe Rd.<br />
Brier Hill Rd.<br />
Rohrsen Rd.<br />
Rowe<br />
Bahr Rd.<br />
Dugan Rd.<br />
Schneider Rd.<br />
Lorang Rd.<br />
Tower Rd.<br />
Main<br />
Thurnau<br />
Rd.<br />
Plato Rd.<br />
Rd.<br />
Prairie St.<br />
Mighell Rd.<br />
Hennig Rd.<br />
Lily<br />
Lake<br />
Hanson Rd.<br />
Scott Rd.<br />
Plank Rd.<br />
Burlington<br />
Anderson Rd.<br />
Sanwald Rd.<br />
Jericho Rd.<br />
Huntley<br />
Kendall Rd.<br />
Elburn<br />
Smith Rd.<br />
Green<br />
Merill Rd.<br />
Swanberg Rd.<br />
Reinking Rd.<br />
Rd.<br />
Pingree Grove<br />
Pouley Rd.<br />
Dittman Rd.<br />
Beith Rd.<br />
Rippburger Rd.<br />
Marshall Rd.<br />
(<br />
Empire Rd.<br />
Town Hall Rd.<br />
Hughes<br />
Manning<br />
Rd.<br />
Lenz Rd.<br />
Campton Hills Rd.<br />
Harley Rd.<br />
Bliss Rd.<br />
Muirhead Rd.<br />
Kreutzer Rd.<br />
Russell Rd.<br />
Bowes<br />
Bunker Rd.<br />
Norris<br />
(<br />
Healy Rd<br />
Rd.<br />
Powers Rd.<br />
Freeman Rd.<br />
Denny Rd.<br />
Sugar Grove<br />
M:\dotserver2\USERS\Committee\20<strong>13</strong>04 <strong>April</strong>\Traffic & Permitting\Traffic\Paint Pavement Marking\20<strong>13</strong> Paint Pavement Striping<br />
72<br />
27<br />
48<br />
3<br />
90<br />
22<br />
23<br />
20<br />
4<br />
47<br />
21<br />
30<br />
47<br />
69<br />
5<br />
30<br />
47<br />
51<br />
26<br />
47<br />
52<br />
38<br />
Plato Center<br />
33<br />
2<br />
Crawford<br />
Damisch Rd.<br />
Corron Rd.<br />
Wasco<br />
64<br />
78<br />
16<br />
Lafox Rd.<br />
(<br />
Silver<br />
Fabyan<br />
Seavey Rd.<br />
56<br />
24<br />
22<br />
80<br />
Hankes<br />
Big Timber Rd.<br />
Highland Ave.<br />
Galena Blvd.<br />
Barnes<br />
Rd.<br />
Deerpath<br />
Coombs Rd.<br />
McDonald Rd.<br />
Campton<br />
Hills<br />
81<br />
Elgin<br />
La Fox<br />
41<br />
15<br />
Rd.<br />
33<br />
Bolcum Rd.<br />
Brundige Rd.<br />
8<br />
Orchard Rd.<br />
Galligan Rd.<br />
(<br />
Nesler Rd.<br />
Main St.<br />
Huntley Rd.<br />
Peck Rd.<br />
<strong>Kane</strong>ville Rd.<br />
Tanner Rd. 83<br />
Rd.<br />
6<br />
83<br />
Gilberts<br />
Nelson Lake Rd.<br />
Water Rd.<br />
Stevens Rd.<br />
Burr Rd<br />
47<br />
Udina<br />
Tyrrell Rd.<br />
Bowes Rd.<br />
Keslinger Rd.<br />
Fabyan<br />
Orchard Rd.<br />
Aucutt Rd.<br />
Mason Rd.<br />
Randall Rd.<br />
Crane Rd.<br />
Boyer Rd.<br />
Binnie Rd.<br />
Hopps Rd.<br />
10<br />
17<br />
Oak St.<br />
Edgelawn Dr.<br />
8<br />
59<br />
84<br />
5<br />
Randall Rd.<br />
Dean St.<br />
Bricher Rd.<br />
McKee St.<br />
Montgomery<br />
30<br />
72<br />
21<br />
21<br />
20<br />
Randall Rd.<br />
Fox<br />
34<br />
71<br />
Randall Rd.<br />
Red<br />
(<br />
Ln.<br />
Crane Rd.<br />
Sullivan Rd.<br />
Prairie St.<br />
South St.<br />
34<br />
34<br />
Wilson St.<br />
Mooseheart Rd.<br />
North Aurora<br />
Indian Trail Rd.<br />
Aurora<br />
N. <strong>County</strong> Line Rd.<br />
Algonquin<br />
90<br />
Sleepy Hollow Rd.<br />
McLean<br />
South St.<br />
Illinois Ave.<br />
Larkin Ave.<br />
Gate Rd.<br />
Geneva<br />
Mooseheart<br />
25<br />
31<br />
Batavia<br />
31<br />
18<br />
Miller Rd.<br />
Montgomery Rd.<br />
Sleepy<br />
Hollow<br />
Boncosky Rd.<br />
Wing St.<br />
Elgin<br />
Spring St.<br />
88<br />
South<br />
Elgin<br />
31<br />
Army Trail Rd.<br />
Tyler<br />
Church Rd.<br />
Hill Ave.<br />
Gilbert St.<br />
CountryClubRd.<br />
St. Charles<br />
29<br />
Cherry<br />
Kirk Rd.<br />
Farnsworth Ave.<br />
Algonquin Rd.<br />
Kirk Rd.<br />
Wilson St.<br />
Pine St.<br />
56<br />
Raddant Rd.<br />
Sheffer<br />
Dunham Rd.<br />
Fabyan<br />
Bilter Rd.<br />
Rd.<br />
5th Ave.<br />
Bolz Rd.<br />
LakeMarianRd.<br />
Summit St.<br />
Villa St.<br />
Middle St.<br />
Rd.<br />
Carpentersville<br />
West<br />
Dundee<br />
8<br />
64<br />
Wayne<br />
19<br />
77<br />
77<br />
Molitor Rd.<br />
New York St.<br />
25<br />
Bartlett<br />
38<br />
61<br />
20<br />
34<br />
Kautz Rd.<br />
25<br />
Lake - Cook Rd.<br />
West<br />
Bartlett<br />
Rd.<br />
37<br />
62<br />
Helm Rd.<br />
68<br />
East<br />
Dundee<br />
72<br />
Stearns<br />
Rd.<br />
Barrington<br />
Hills<br />
40<br />
Penny<br />
Rd.<br />
Hoffman<br />
Estates<br />
Legend<br />
§¨¦ 88<br />
£¤ 30<br />
!( 31<br />
467 34<br />
/<br />
Hampshire<br />
Burlington<br />
0 1 2 Miles<br />
Virgil<br />
Rutland Dundee<br />
Plato<br />
Elgin<br />
Campton Saint Charles<br />
Geneva<br />
<strong>Kane</strong>ville Blackberry<br />
Batavia<br />
Big Rock Sugar Grove Aurora<br />
Interstates<br />
US Roads<br />
State Roads<br />
<strong>County</strong> Roads<br />
Other Roads<br />
Rail Roads<br />
<strong>County</strong> Boundry<br />
Township Boundry<br />
Fox River<br />
Forest Preserves<br />
Municipalities<br />
Paint<br />
0 3,800 7,600 11,400 15,200<br />
Feet
If not budgeted,<br />
explain funding<br />
source<br />
<strong>AG</strong>ENDA ITEM EXECUTIVE SUMMARY Agenda Item #<br />
Presenter/Sponsor:<br />
Name<br />
Budget Information: Was this item budgeted?<br />
SUMMARY:<br />
Attachments:<br />
Detailed information available from :<br />
Resolution/Ordinance Tracking:<br />
Staff Name:<br />
Appropriation Amount:<br />
Kurt Nika, Chief of Traffic & Permitting Phone: 630/406-7372<br />
Assigned Committee: Transportation Sent to: Executive<br />
on: 04/10/20<strong>13</strong><br />
If Other, specify:<br />
Committee Remarks:<br />
<strong>County</strong> Board Date:<br />
Resolution<br />
Ordinance<br />
Yes<br />
No N/A<br />
Next Committee: Executive Sent to: <strong>County</strong> Board on: 05/08/20<strong>13</strong><br />
If Other, specify:<br />
Committee Remarks:<br />
Next Committee: Sent to: on:<br />
Committee Remarks:<br />
Approving Alteration of Speed Limits, St. Charles Township<br />
Tom Rickert - Deputy Director of Transportation<br />
The following proposed speed limit alteration has been determined in accordance with <strong>Kane</strong> <strong>County</strong> Resolution No. 01-419<br />
(Policy for the Establishment and Posting of Altered Speed Limits on <strong>County</strong> and Township Roads) and is being submitted<br />
for approval in accordance with 625 5/11-604 of the Illinois Compiled Statutes.<br />
At the request of the St. Charles Township Road District, an engineering investigation was performed for Ronsu Lane, Leola<br />
Lane, and Deer Pond Drive, which has a current (unposted) statutory speed limit of 55 mph. Staff is recommending the<br />
speed limit on these roads be reduced to 25 mph based on the following factors:<br />
-- The roads are subdivision roads used exclusively for residential use<br />
-- The winding curvature of the road geometry, which result in prevailing speeds lower than statutory speeds limit<br />
-- Township Road District support<br />
Ordinance, Location Map<br />
05/14/20<strong>13</strong><br />
N/A<br />
7C-a
STATE OF <strong>IL</strong>LINOIS<br />
COUNTY OF KANE<br />
ORDINANCE NO. <strong>13</strong> -<br />
APPROVING ALTERATION OF SPEED LIMITS<br />
ST. CHARLES TOWNSHIP<br />
WHEREAS, <strong>County</strong> of <strong>Kane</strong> through its Division of Transportation has caused an engineering and<br />
traffic investigation to be conducted on Ronsu Lane, Leola Lane and Deer Pond Drive, each of which is a<br />
highway not otherwise under the jurisdiction of the Illinois Department of Transportation; and<br />
WHEREAS, the Transportation Committee of the <strong>Kane</strong> <strong>County</strong> Board has reviewed the results of<br />
said investigation and has recommended the alteration of the existing maximum speed limit of fifty five (55)<br />
miles per hour as set forth in the Illinois Vehicle Code, (625 <strong>IL</strong>CS 5/11-604), so as to be both reasonable,<br />
safe and proper.<br />
NOW, THEREFORE, BE IT ORDAINED by the <strong>Kane</strong> <strong>County</strong> Board, that pursuant to the Illinois<br />
Vehicle Code, (625 <strong>IL</strong>CS 5/11-604), the maximum speed limit on Ronsu Lane, Leola Lane, and Deer Pond<br />
Drive in St. Charles Township as described hereunder shall be twenty five (25) miles per hour as indicated<br />
in the schedule as set forth below.<br />
BE IT FURTHER ORDAINED that this Ordinance shall be effective upon the approval of the <strong>Kane</strong><br />
<strong>County</strong> Board as provided by statute and the posting of signs giving notice of said twenty five (25) miles<br />
per hour maximum speed limit.<br />
LIMITS<br />
(IF NOT ENTIRE LENGTH)<br />
STREET<br />
FROM TO<br />
Ronsu Lane Crane Road<br />
Deer Pond<br />
Drive<br />
Leola Lane<br />
Red Gate<br />
Road<br />
Deer Pond Drive Leola Lane<br />
*miles per hour<br />
Ronsu Lane<br />
Deer Pond<br />
Court<br />
ST. CHARLES TOWNSHIP<br />
SUBDIVISION<br />
Baker Acres Units #1 & #2,<br />
Deer Pond Woods<br />
Baker Acres Unit #3 & #4<br />
Deer Pond Woods, Deer Pond<br />
Estates<br />
EXISTING<br />
SPEED LIMIT<br />
(MPH)*<br />
REPEALED<br />
MAXIMUM<br />
SPEED LIMIT<br />
(MPH)*<br />
55 25<br />
55 25<br />
55 25
Passed by the <strong>Kane</strong> <strong>County</strong> Board on May 14, 20<strong>13</strong>.<br />
Page 2 of 2, Res. #<strong>13</strong>-<br />
______________________________________ ___________________________________<br />
John A. Cunningham Christopher J. Lauzen<br />
Clerk, <strong>County</strong> Board Chairman, <strong>County</strong> Board<br />
<strong>Kane</strong> <strong>County</strong>, Illinois <strong>Kane</strong> <strong>County</strong>, Illinois<br />
Vote:<br />
Yes _____<br />
No _____<br />
Voice _____<br />
Abstentions _____<br />
5ORDSTCHASTWP.4LH
Burr Rd<br />
5<br />
Speed Limit<br />
Alteration<br />
Crane Rd.<br />
Randall Rd.<br />
Dean St.<br />
34<br />
Red<br />
Gate Rd.<br />
Crane Rd.<br />
31<br />
Speed Limit Alteration<br />
Leola Lane, Ronsu Lane and Deer Pond Drive<br />
0 485 970 1,940 2,910 3,880<br />
Feet<br />
0 1 Miles<br />
Legend<br />
Hampshire Rutland Dundee<br />
M:\dotserver2\USERS\Committee\20<strong>13</strong>04 <strong>April</strong>\Traffic & Permitting\Traffic\Ronsu Leola Deer Pond Speed Limit Reduction\Map Standard_Speed Limit Alteration - Leola Ln loc map<br />
467 34<br />
§¨¦ 88<br />
£¤ 30<br />
!( 31<br />
Burlington<br />
Virgil<br />
Plato<br />
Campton<br />
Elgin<br />
Geneva<br />
<strong>Kane</strong>ville Blackberry<br />
Batavia<br />
Big Rock Sugar Grove Aurora<br />
Interstates<br />
US Roads<br />
State Roads<br />
<strong>County</strong> Roads<br />
Other Roads<br />
Rail Roads<br />
<strong>County</strong> Boundry<br />
Township Boundry<br />
Fox River<br />
Forest Preserves<br />
Municipalities<br />
/<br />
Co<br />
S
Burr Rd<br />
5<br />
Speed Limit<br />
Alteration<br />
Crane Rd.<br />
Randall Rd.<br />
Dean St.<br />
34<br />
Red<br />
Gate Rd.<br />
Crane Rd.<br />
Speed Limit Alteration<br />
Leola Lane, Ronsu Lane and Deer Pond Drive<br />
0 485 970 1,940 2,910 3,880<br />
Feet<br />
0 1 Miles<br />
31<br />
Legend<br />
M:\dotserver2\USERS\Committee\20<strong>13</strong>04 <strong>April</strong>\Traffic & Permitting\Traffic\Ronsu Leola Deer Pond Speed Limit Reduction\Map Standard Aerial_Speed Limit Alteration - Ronsu Leola Ln loc map<br />
467 34<br />
§¨¦ 88<br />
£¤ 30<br />
!( 31<br />
Hampshire Rutland Dundee<br />
Burlington<br />
Virgil<br />
Plato<br />
Campton<br />
Elgin<br />
Geneva<br />
<strong>Kane</strong>ville Blackberry<br />
Batavia<br />
Big Rock Sugar Grove Aurora<br />
Interstates<br />
US Roads<br />
State Roads<br />
<strong>County</strong> Roads<br />
Other Roads<br />
Rail Roads<br />
<strong>County</strong> Boundry<br />
Township Boundry<br />
Fox River<br />
Forest Preserves<br />
Municipalities<br />
/<br />
Co
SUMMARY:<br />
Attachments:<br />
Detailed information<br />
available from :<br />
Staff Remarks /<br />
Recommendations:<br />
Committee Remarks:<br />
<strong>AG</strong>ENDA ITEM EXECUTIVE SUMMARY Agenda Item #<br />
Name:<br />
Assigned Committee:<br />
Current Construction Projects:<br />
Staff Name:<br />
Implementation Report<br />
4/11/20<strong>13</strong><br />
Presenter/Sponsor: Steve Coffinbargar<br />
~ Stearns Road Corridor Landscaping – Contract is substantially complete. Contractor is working on final quantities and<br />
paperwork. Replacement of dead trees and shrub under contract warranty will occur in spring 20<strong>13</strong>.<br />
~ McLean Blvd Fen Adaptive Management Program – Crews have completed the foot bridge and will resume work on the<br />
project once the weather breaks in the spring. Project is scheduled for completion June 20<strong>13</strong>.<br />
~ Kirk/Dunham Road - <strong>IL</strong> 56 to Stearns Road Interconnect and ITS Upgrade – Signal equipment work continues. Project is<br />
scheduled for substantial completion <strong>April</strong> 20<strong>13</strong> and contract completion June 20<strong>13</strong>.<br />
~ Randall Road at US 20/Foothill Road Intersection Channelization – Project is substantially complete and contractor is<br />
working on punch list items which have been affected by weather. Some minor site grading may be required this spring.<br />
~ Plank Road at <strong>IL</strong> 47 Intersection Channelization – Contractor is substantially complete with the traffic signal and street<br />
lighting improvements on the project. Seeding and minor landscaping restoration will occur spring 20<strong>13</strong>.<br />
~Hampshire Creek Stream Bank Stabilization – Construction is substantially complete. Contract will remain open to monitor<br />
vegetation growth and compliance to plans and specifications in the spring.<br />
~ 2012 Urethane Striping – Project is substantially complete. Crews are working on punch list items which has been affected<br />
by inclement weather. Project completion is anticipated for spring 20<strong>13</strong>.<br />
~ Randall Road at Gyorr Road Traffic Signal Modernization – Concrete and underground work is complete; traffic signal work<br />
will occur during 20<strong>13</strong>. Project completion anticipated for spring 20<strong>13</strong>, weather permitting.<br />
~South Street Trail Underpass at Randall/Keslinger Roads – Contractor continues to work on construction submittals for<br />
tunnel work. Thrust block wall and tunneling platform installation on the west side of the project is expected to begin<br />
within the next two weeks, weather permitting. Project completion is anticipated for fall 20<strong>13</strong>.<br />
~Randall Road at Big Timber Road Intersection Improvement – Installation of temporary traffic signals has begun and will<br />
continue for the next 9 weeks, weather permitting. Project completion is anticipated for fall 20<strong>13</strong>.<br />
~Mooseheart Road at <strong>IL</strong> 31 Intersection Channelization (Const. by IDOT) – Project was recently let for construction. Project<br />
completion anticipated for fall 20<strong>13</strong>, weather permitting.<br />
Design Highlights:<br />
~ Anderson Road Extension – <strong>IL</strong> 38 to Keslinger Road – Land acquisition continues & engineering plans nearly complete. The<br />
goal is to have project under construction during 20<strong>13</strong> and 2014.<br />
~ Longmeadow Parkway – Coordination with IDOT continues regarding final elements of Phase I Engineering. Plat of<br />
highways, appraisals and right of way acquisition continues at locations where requirements have been defined. Phase II<br />
Engineering to start during 20<strong>13</strong>.<br />
~ Burlington Road at <strong>IL</strong> 47 – Project scope includes construction of a single lane roundabout primarily funded with Federal<br />
CMAQ funds. Phase II Engineering and right of way acquisition are ongoing.<br />
~ Stearns Road, Stage 3A, <strong>IL</strong> 25 – Dunham Road to South of Stearns Road (Const. by IDOT) – Phase II Engineering & right of<br />
way acquisition are nearly complete. Construction is targeting a spring 20<strong>13</strong> IDOT letting; construction during<br />
20<strong>13</strong>/2014/2015.<br />
~ Various Engineering Projects – there are dozens of other projects underway. Please contact our office if you have any<br />
questions on the status of any other project.<br />
Project Update Photos<br />
For information only.<br />
Transportation<br />
Steve Coffinbargar, Assistant Director Phone: (630) 406-7170<br />
8A
If not budgeted,<br />
explain funding<br />
source<br />
<strong>AG</strong>ENDA ITEM EXECUTIVE SUMMARY Agenda Item #<br />
Presenter/Sponsor:<br />
Name<br />
Budget Information: Was this item budgeted?<br />
SUMMARY:<br />
Attachments:<br />
Detailed information available from :<br />
Resolution/Ordinance Tracking:<br />
Staff Name:<br />
Appropriation Amount:<br />
Steve Coffinbargar Phone: 630-406-7170<br />
Assigned Committee: Transportation Sent to: Executive<br />
on: 04/11/20<strong>13</strong><br />
If Other, specify:<br />
Committee Remarks:<br />
<strong>County</strong> Board Date:<br />
Resolution<br />
Ordinance<br />
Yes<br />
No N/A<br />
Next Committee: Executive Sent to: <strong>County</strong> Board on: 05/08/20<strong>13</strong><br />
If Other, specify:<br />
Committee Remarks:<br />
Next Committee: Sent to: on:<br />
Committee Remarks:<br />
8B-1a<br />
Approving a Phase I Engineering Services Agreement with HDR Engineering, Inc. for<br />
Montgomery Road from Illinois Route 25 to Hill Avenue, <strong>Kane</strong> <strong>County</strong> Section No.<br />
<strong>13</strong>-00127-00-WR<br />
Steve Coffinbargar - Assistant Director of Transportation<br />
$961,633.48<br />
Staff has completed the qualifications based consultant selection process and has negotiated a contract with HDR, Inc. for<br />
Phase One Engineering services for a corridor improvement project on Montgomery Road. The limits are from Illinois Route<br />
25 easterly to Hill Avenue. The improvement will generally consist of the addition of a continuous center turn lane along<br />
with other drainage and pedestrian enhancements. Phase One services will include, but not be limited to, the following:<br />
•Providing detailed surveys as necessary for planning and design of the project<br />
•Environmental planning documents as necessary<br />
•Intersection Design Studies<br />
•Prepare traffic studies and counts, analyze accident date, and any other special intersection studies that may be required<br />
•Project Development Report (PDR)<br />
•Engineers opinion of probable construction costs<br />
•Obtaining design approval from IDOT<br />
•Coordinate with IDOT and other involved parties/agencies as necessary.<br />
The negotiated contract is for an amount not to exceed $961,633.48. Information on the QBS process and selection details<br />
can be found on the <strong>KDOT</strong> website.<br />
Resolution, Engineering Agreement, Location Map<br />
05/14/20<strong>13</strong>
STATE OF <strong>IL</strong>LINOIS<br />
COUNTY OF KANE<br />
RESOLUTION NO. <strong>13</strong> -<br />
APPROVING A PHASE I ENGINEERING SERVICES <strong>AG</strong>REEMENT<br />
WITH HDR ENGINEERING, INC. FOR<br />
MONTGOMERY ROAD FROM <strong>IL</strong>LINOIS ROUTE 25 TO H<strong>IL</strong>L AVENUE<br />
KANE COUNTY SECTION NO. <strong>13</strong>-00127-00-WR<br />
WHEREAS, Phase I Engineering services are required for the proposed improvement of <strong>Kane</strong><br />
<strong>County</strong> Highway No. 29 (also known as Montgomery Road) from Illinois Route 25 to Hill Avenue<br />
(herein referred to as the “Improvement”); and<br />
WHEREAS, in order to accomplish the Improvement, it is necessary to retain the services of a<br />
professional engineering firm to provide Phase I Engineering services therefor; and<br />
WHEREAS, HDR Engineering, Inc., 8550 Bryn Mawr Avenue, Suite 900, Chicago, <strong>IL</strong> 60631-<br />
3223 has experience and professional expertise in Phase I Engineering and is willing to perform the<br />
required services for an amount not to exceed Nine Hundred Sixty One Thousand Six Hundred Thirty<br />
Three and 48/100 Dollars ($961,633.48) as set forth in the Phase I Engineering services agreement (a<br />
copy of which is on file with the <strong>County</strong> Clerk’s Office).<br />
NOW, THEREFORE, BE IT RESOLVED by the <strong>Kane</strong> <strong>County</strong> Board that the Chairman thereof<br />
is hereby authorized to execute a Phase I Engineering services agreement with HDR Engineering, Inc..<br />
BE IT FURTHER RESOLVED that the <strong>Kane</strong> <strong>County</strong> Board appropriates the not to exceed sum<br />
of Nine Hundred Sixty One Thousand Six Hundred Thirty Three and 48/100 Dollars ($961,633.48) from<br />
Transportation Sales Tax Fund #305, Line Item #50140 (Engineering Services) to pay for said Phase I<br />
Engineering services for the Improvement.<br />
Line Item Line Item Description Was<br />
personnel/item/service<br />
approved in original<br />
budget or a subsequent<br />
budget revision?<br />
Are funds currently<br />
available for this<br />
personnel/item/service in<br />
the specific line item?<br />
305.520.527.50140 Engineering Services Yes Yes<br />
If funds are not<br />
currently available in<br />
the specified line item,<br />
where are the funds<br />
available?
Passed by the <strong>Kane</strong> <strong>County</strong> Board on May 14, 20<strong>13</strong>.<br />
Page 2 of 2, Res. #<strong>13</strong>-<br />
______________________________________ ___________________________________<br />
John A. Cunningham Christopher J. Lauzen<br />
Clerk, <strong>County</strong> Board Chairman, <strong>County</strong> Board<br />
<strong>Kane</strong> <strong>County</strong>, Illinois <strong>Kane</strong> <strong>County</strong>, Illinois<br />
Vote:<br />
Yes _____<br />
No _____<br />
Voice _____<br />
Abstentions _____<br />
5MNTGMRYPHI HDR.4LH
AN <strong>AG</strong>REEMENT BETWEEN THE COUNTY OF KANE AND<br />
HDR INC. FOR PHASE I ENGINEERING FOR<br />
MONTGOMERY ROAD C.H 29<br />
KANE COUNTY SECTION NO. <strong>13</strong>-00127-00-WR<br />
PURCHASE ORDER #___________________<br />
This <strong>AG</strong>REEMENT, made this 19th day of February 20<strong>13</strong> between COUNTY OF KANE, a<br />
body corporate and politic of the State of Illinois (hereinafter referred to as the “COUNTY”), of<br />
719 South Batavia Avenue, Geneva, Illinois 60<strong>13</strong>4 and HDR ENGINEERING, INC, a Nebraska<br />
corporation authorized to do business in the State of Illinois and an Illinois licensed professional<br />
engineering firm, with offices at 8550 West Bryn Mawr Avenue, Suite 900 Chicago, Illinois<br />
60631(hereinafter referred to as the “CONSULTANT”). The COUNTY and the CONSULTANT<br />
are sometimes hereinafter collectively referred to as the “PARTIES” and individually as a<br />
“PARTY”.<br />
WITNESSETH<br />
WHEREAS, it is deemed to be in the best interest of the COUNTY and the motoring<br />
public to improve and maintain the various highways throughout <strong>Kane</strong> <strong>County</strong>; and,<br />
WHEREAS, the COUNTY desires to improve <strong>Kane</strong> <strong>County</strong> Highway No. 29,<br />
(Montgomery Road) (hereinafter referred to as the “PROJECT”); and,<br />
WHEREAS, in order to accomplish the PROJECT it is necessary to retain the services of<br />
a professional engineering firm to perform Phase I Engineering services for the PROJECT; and,<br />
WHEREAS, the CONSULTANT has experience and professional expertise in Phase I<br />
services and is willing to perform said services for the PROJECT for an amount not to exceed<br />
Nine Hundred Sixty-One Thousand, Six Hundred Thirty-Three Dollars and Forty-Eight Cents.<br />
($961,633.48),<br />
WHEREAS, the COUNTY has determined that it is in the COUNTY’S best interest to<br />
enter into this <strong>AG</strong>REEMENT with the CONSULTANT.<br />
NOW, THEREFORE, in consideration of the above stated preambles, the mutual<br />
covenants and agreements herein set forth, the PARTIES do hereby mutually covenant, promise,<br />
agree and bind themselves as follows:<br />
1.0 INCORPORATION<br />
1.1 All of the preambles set forth hereinabove are incorporated into and made part of<br />
this <strong>AG</strong>REEMENT.<br />
2.0 SCOPE OF SERVICES<br />
2.1 Services for the PROJECT are to be provided by the CONSULTANT according<br />
to the specifications set forth in Exhibit “A” which is attached hereto and<br />
1
incorporated herein. The services are sometimes hereinafter also referred to as the<br />
“work”.<br />
3.0 NOTICE TO PROCEED<br />
3.1 Authorization to proceed with the work described and as otherwise set forth in<br />
Exhibit “A” shall be given on behalf of the COUNTY by the <strong>Kane</strong> <strong>County</strong><br />
Engineer, in the form of a written notice to proceed (hereinafter “Notice to<br />
Proceed”), following execution of this <strong>AG</strong>REEMENT by the <strong>County</strong> Board<br />
Chairman of the COUNTY.<br />
4.0 TECHNICAL SUB-CONSULTANTS<br />
4.1 The prior written approval of the <strong>Kane</strong> <strong>County</strong> Engineer shall be required before<br />
any sub-consultants are hired by the CONSULTANT to perform any of the work.<br />
4.2 Any such sub-consultants shall be hired and supervised by the CONSULTANT<br />
and the CONSULTANT shall be solely responsible for any and all work<br />
performed by said sub-consultants in the same manner and with the same liability<br />
as if performed by the CONSULTANT.<br />
5.0 TIME FOR PERFORMANCE<br />
5.1 The CONSULTANT shall commence work on the PROJECT as directed in the<br />
Notice to Proceed. The COUNTY is not liable and will not pay the<br />
CONSULTANT for any work performed prior to the date of the Notice to<br />
Proceed or after termination of this <strong>AG</strong>REEMENT.<br />
5.2 Within ten (10) days after the Notice to Proceed is mailed or otherwise<br />
transmitted to the CONSULTANT, the CONSULTANT shall submit a schedule<br />
for completion of the PROJECT. The schedule is subject to approval by the <strong>Kane</strong><br />
<strong>County</strong> Engineer.<br />
6.0 COMPENSATION<br />
6.1 The COUNTY shall only pay the CONSULTANT for work performed and shall<br />
pay only in accordance with the provisions of this <strong>AG</strong>REEMENT.<br />
6.2 For work performed, the COUNTY shall pay the CONSULTANT based upon the<br />
hourly rates set forth in Exhibit “B”, which is attached hereto and incorporated<br />
herein and which rates includes overhead and profit.<br />
6.3 For direct expenses, the COUNTY shall pay the CONSULTANT for supplies and<br />
materials required for the completion of all work defined in the Exhibit “A”<br />
which is attached hereto.<br />
2
6.4 For direct expenses, the CONSULTANT shall include copies of receipts from<br />
suppliers for expendable materials with its invoice to the COUNTY. Computer<br />
charges will not be allowed as direct expenses.<br />
6.5 Within 45 days of receipt, review and approval of properly documented invoices,<br />
the COUNTY shall pay or cause to be paid to the CONSULTANT partial<br />
payments of the compensation specified in this <strong>AG</strong>REEMENT. Payment will be<br />
made in the amount of sums earned less previous partial payments. However, the<br />
COUNTY reserves the right to hold back a sum equal to five percent (5%) of the<br />
total <strong>AG</strong>REEMENT sum to ensure performance satisfactory to the <strong>Kane</strong> <strong>County</strong><br />
Engineer.<br />
6.6 All invoices shall be submitted on the most current Illinois Department of<br />
Transportation Bureau of Design and Environment invoicing form appropriate for<br />
the PROJECT.<br />
6.7 The CONSULTANT agrees to receive all payment for work performed under this<br />
<strong>AG</strong>REEMENT via the COUNTY’s automatic clearing house program.<br />
6.8 All invoicing will be based upon calendar months solely.<br />
6.9 Total payments to the CONSULTANT under the terms of this <strong>AG</strong>REEMENT<br />
shall not exceed Nine Hundred Sixty-One Thousand, Six Hundred Thirty-Three<br />
Dollars and Forty-Eight Cents. ($961,633.48).<br />
7.0 DELIVERABLES.<br />
7.1 The CONSULTANT shall provide the COUNTY, prior to the termination of this<br />
<strong>AG</strong>REEMENT, or at such time as the <strong>Kane</strong> <strong>County</strong> Engineer directs, any required<br />
deliverables related to work performed under this <strong>AG</strong>REEMENT.<br />
7.2 Upon receipt, review and acceptance of all deliverables by the COUNTY (if<br />
required), final payment will be made to the CONSULTANT by the COUNTY.<br />
8.0 CONSULTANT'S INSURANCE<br />
8.1 The CONSULTANT shall, during the term of this <strong>AG</strong>REEMENT and as may be<br />
required thereafter, maintain, at its sole expense, insurance coverage including:<br />
A. Worker's Compensation Insurance in the statutory amounts.<br />
B. Employer's Liability Insurance in an amount not less than Five<br />
Hundred Thousand Dollars ($500,000) each accident/injury and Five<br />
Hundred Thousand Dollars ($500,000) each employee/disease.<br />
C. Commercial General Liability Insurance, (including contractual<br />
liability) with limits of not less than One Million Dollars ($1,000,000)<br />
per occurrence bodily injury/property damage combined single limit;<br />
3
Two Million Dollars ($2,000,000) excess liability coverage in the<br />
aggregate for injury/property damage combined single limit and Two<br />
Million Dollars ($2,000,000) in the aggregate for products-completed<br />
operations.<br />
D. Commercial Automobile Liability Insurance with minimum limits of<br />
at least One Million Dollars ($1,000,000) for any one person and One<br />
Million Dollars ($1,000,000) for any one occurrence of bodily injury<br />
or property damage.<br />
E. Professional Errors and Omissions Insurance with a minimum limit of<br />
One Million Dollars ($1,000,000.00).<br />
8.2 It shall be the duty of the CONSULTANT to provide to the COUNTY copies of<br />
the CONSULTANT'S certificates of insurance before issuance of the Notice to<br />
Proceed. The certificates of insurance shall include the name of the <strong>Kane</strong> <strong>County</strong><br />
PROJECT, as well as the section number. The CONSULTANT shall provide the<br />
COUNTY and maintain a certificate of insurance for its General Liability,<br />
Automobile, Professional Errors and Omissions, and Umbrella Insurance Policies,<br />
if applicable, which certificate, with the exception of the Professional Errors and<br />
Omissions, shall include the COUNTY as additional named insured, and the<br />
certificate holder as the COUNTY, 719 S. Batavia Ave., Geneva, <strong>IL</strong> 60<strong>13</strong>4. The<br />
additional named insured endorsement included on the CONSULTANT’S<br />
Commercial General Liability, Automobile and Umbrella Policies shall provide<br />
the following:<br />
A. That the coverage afforded the additional named insured will be primary<br />
insurance for the additional named insured with respect to claims arising out<br />
of operations performed by or on behalf of the CONSULTANT;<br />
B. That if the additional named insured has other insurance which is applicable to<br />
the loss, such other insurance will be only on an excess or contingent basis;<br />
C. That the amount of the CONSULTANT’S liability under the insurance policy<br />
will not be reduced by the existence of such other insurance; and,<br />
D. That the certificate of insurance shall contain a provision or endorsement that<br />
the coverage afforded will not be canceled until at least thirty (30) days prior<br />
written notice has been given to COUNTY.<br />
8.3 The insurance required to be purchased and maintained by CONSULTANT shall<br />
be provided by an insurance company acceptable to the COUNTY with an AM<br />
Best rating of A- or better, and licensed to do business in the State of Illinois; and<br />
shall include at least the specified coverage and be written for not less than the<br />
limits of the liability specified herein or required by law or regulation whichever<br />
is greater. In no event shall any failure of the COUNTY to receive policies or<br />
certificates of insurance or to demand receipt of the same be construed as a waiver<br />
4
of the CONSULTANT’S obligation to obtain and keep in force the required<br />
insurance.<br />
9.0 INDEMNIFICATION.<br />
9.1 To the fullest extent permitted by law, the CONSULTANT shall indemnify and<br />
hold harmless the COUNTY, and its officials, directors, officers, agents, and<br />
employees from and against any and all claims, damages, losses, and expenses,<br />
including but not limited to reasonable court costs and attorney's fees, arising out<br />
of or resulting from performance of the work, provided that such claim, loss or<br />
expense is attributable to bodily injury, sickness, disease or death, or to injury to<br />
or destruction of property, including loss of use resulting therefrom, but only to<br />
the extent caused in whole or in part by negligent acts or omissions of the<br />
CONSULTANT, a sub-consultant, anyone directly or indirectly employed by<br />
them or anyone for whose acts they may be liable, excluding any proportionate<br />
amount of any claim, damage, loss or expense which is caused by the negligence<br />
of the COUNTY. Such obligation shall not be construed to negate, abridge or<br />
reduce other rights or obligations of indemnity, which would otherwise exist as to<br />
a PARTY or person described in this paragraph. In claims against the COUNTY<br />
and its officials, directors, officers, agents, and employees by an employee of the<br />
CONSULTANT, a sub-consultant, anyone directly or indirectly employed by<br />
them or anyone for whose acts they may be liable, the indemnification obligation<br />
under this paragraph shall not be limited by a limitation on the amount or type of<br />
damages, compensation or benefits payable by or for the CONSULTANT or a<br />
sub-consultant under workmen's compensation acts, disability benefit acts or<br />
other employee benefit acts.<br />
9.2 Nothing contained herein shall be construed as prohibiting the COUNTY, its<br />
officials, directors, officers, agents, and employees, from defending through the<br />
selection and use of their own agents, attorneys and experts, to defend any claims,<br />
actions or suits brought against them.<br />
9.3 If any errors, omissions, intentional or negligent acts are made by the<br />
CONSULTANT or sub-consultant in any phase of the work, the correction of<br />
which requires additional field or office work, the CONSULTANT shall be<br />
required to perform such additional work as may be necessary to remedy same<br />
without undue delay and without charge to the COUNTY.<br />
9.4 Acceptance of the work by the COUNTY will not relieve the CONSULTANT of<br />
the responsibility for the quality of the work, nor of the CONSULTANT’S<br />
liability for loss or damage to property or persons resulting therefrom.<br />
10.0 SATISFACTORY PERFORMANCE.<br />
10.1 The CONSULTANT'S and sub-consultant's standard of performance under the<br />
terms of this <strong>AG</strong>REEMENT shall be that which the Consultant shall perform in a<br />
manner consistent with that degree of care and skill ordinarily exercised by<br />
5
members of the same profession currently practicing under similar circumstances<br />
commonly accepted in the industry in the Chicago metropolitan area.<br />
11.0 CONFLICT OF INTEREST.<br />
11.1 The CONSULTANT covenants that it has no conflicting public or private interest<br />
and shall not acquire directly or indirectly any such interest which would conflict<br />
in any manner with the performance of CONSULTANT'S services under this<br />
<strong>AG</strong>REEMENT.<br />
11.2 The CONSULTANT, by its signature on this <strong>AG</strong>REEMENT, certifies that it has<br />
not been barred from being awarded a contract or subcontract under the Illinois<br />
Purchasing Act; and further certifies that it has not been barred from contracting<br />
with a unit of State or Local government as a result of a violation of Section 33E-<br />
3 or 33E-4 of the Illinois Criminal Code (Illinois Compiled Statutes, 1992,<br />
Chapter 720, paragraph 5/33E-3).<br />
12.0 OWNERSHIP OF DOCUMENTS.<br />
12.1 The CONSULTANT agrees that all survey data, reports, drafting, studies,<br />
specifications, estimates, maps, documents and computations prepared by the<br />
CONSULTANT under the terms of this <strong>AG</strong>REEMENT shall be properly<br />
arranged, indexed and delivered to the COUNTY within ninety (90) days of<br />
written request therefor. The CONSULTANT’s obligation hereunder shall survive<br />
the termination of this <strong>AG</strong>REEMENT.<br />
12.2 The documents and materials made or maintained under this <strong>AG</strong>REEMENT shall<br />
be and will remain the property of the COUNTY. The COUNTY shall not reuse<br />
or make any modification to the construction documents without the prior written<br />
authorization of the CONSULTANT. The COUNTY agrees, to the fullest extent<br />
permitted by law, to defend, indemnify and hold harmless the CONSULTANT, its<br />
officers, directors, employees and subconsultants (collectively, CONSULTANT)<br />
against any damages, liabilities or costs, including reasonable attorneys' fees and<br />
defense costs, arising from or allegedly arising from or in any way connected with<br />
the unauthorized reuse or modification of the construction documents by the<br />
COUNTY or any person or entity that acquires or obtains the construction<br />
documents from or through the COUNTY without the written authorization of the<br />
CONSULTANT..<br />
<strong>13</strong>.0 COMPLIANCE WITH STATE AND OTHER LAWS – PREVA<strong>IL</strong>ING W<strong>AG</strong>E ACT.<br />
<strong>13</strong>.1 The CONSULTANT and any sub-consultants will comply with all State, Federal<br />
and Local statutes, ordinances and regulations; and will obtain all permits as are<br />
applicable.<br />
6
<strong>13</strong>.2 The CONSULTANT and any sub-consultants shall not discriminate against any<br />
worker, job applicant, employee or any member of the public, because of race,<br />
creed, color, sex, age, handicap, or national origin, or otherwise commit an unfair<br />
employment practice.<br />
<strong>13</strong>.3 The CONSULTANT and any sub-consultant(s) shall comply with all applicable<br />
State and Federal Prevailing Rate of Wage Laws, and shall take all steps<br />
necessary to remain in compliance therewith. (See Exhibit “C”)<br />
<strong>13</strong>.4 The CONSULTANT and any subconsultants shall comply with the <strong>Kane</strong> <strong>County</strong><br />
Ethics Ordinance (Article II, Division 3, Section 2-211), (See Exhibit “D”).<br />
14.0 MODIFICATION OR AMENDMENT.<br />
14.1 The terms of this <strong>AG</strong>REEMENT may only be modified or amended by a written<br />
document duly executed by both PARTIES.<br />
15.0 TERM OF THIS <strong>AG</strong>REEMENT.<br />
15.1 The term of this <strong>AG</strong>REEMENT shall begin on the date this <strong>AG</strong>REEMENT is<br />
fully executed and shall continue in full force and effect until the earlier of the<br />
following occurs:<br />
A. The PARTY’S termination of this <strong>AG</strong>REEMENT in accordance with the<br />
terms of Section 16.0; or,<br />
B. Upon the 548 th day after receipt by the CONSULTANT of the Notice to<br />
Proceed from the <strong>Kane</strong> <strong>County</strong> Engineer on behalf of the COUNTY. (The<br />
fee payable to the CONSULTANT for services rendered shall be for 548<br />
calendar days during the periods from June 20<strong>13</strong> to November 2014 as set<br />
forth on Exhibit A attached hereto).<br />
15.2 In the event the required calendar days as stated in Section 15.1 B above are<br />
exceeded and/or anticipated personnel requirements are not adequate and<br />
remaining funds are not sufficient to complete the PROJECT, adjustments in total<br />
compensation to the CONSULTANT may, at the sole option of the COUNTY be<br />
determined through negotiation between the COUNTY and the CONSULTANT.<br />
The COUNTY shall however, have no obligation to agree to any adjustment in<br />
total compensation or in the term of this <strong>AG</strong>REEMENT.<br />
15.3 The date of the first calendar day for this <strong>AG</strong>REEMENT shall be the date of<br />
receipt of the Notice to Proceed by the CONSULTANT from the COUNTY. In<br />
the event the PROJECT work is suspended by the COUNTY as recorded on the<br />
"Report of Starting and Completion Date," the calendar days for this<br />
<strong>AG</strong>REEMENT will also be suspended for a like amount of time.<br />
15.4 Notwithstanding anything in Section 15.0 to the contrary, the <strong>Kane</strong> <strong>County</strong><br />
Engineer may at his sole option, upon the request of the CONSULTANT, extend<br />
7
the term of this <strong>AG</strong>REEMENT for a period of time up to but not exceeding two,<br />
one-year periods.<br />
16.0 TERMINATION ON WRITTEN NOTICE.<br />
16.1 Except as otherwise set forth in this <strong>AG</strong>REEMENT, the CONSULTANT shall<br />
have the right to terminate this <strong>AG</strong>REEMENT for cause upon serving sixty (60)<br />
days written notice upon the COUNTY.<br />
16.2 The COUNTY may terminate this <strong>AG</strong>REEMENT at any time for any reason upon<br />
written notice to the CONSULTANT.<br />
16.3 Upon termination of this <strong>AG</strong>REEMENT, the obligations of the PARTIES to this<br />
<strong>AG</strong>REEMENT shall cease, but they shall not be relieved of the duty to perform<br />
their obligations up to the date of termination. Notwithstanding anything in this<br />
<strong>AG</strong>REEMENT to the contrary however, the obligations of the CONSULTANT to<br />
indemnify and hold harmless the COUNTY as provided for in Section 9.0 of the<br />
<strong>AG</strong>REEMENT shall survive the termination of this <strong>AG</strong>REEMENT.<br />
16.4 Upon termination of this <strong>AG</strong>REEMENT, all data, work products, reports and<br />
documents produced, as a result of this <strong>AG</strong>REEMENT shall become the property<br />
of the COUNTY.<br />
17.0 ENTIRE <strong>AG</strong>REEMENT.<br />
17.1 This <strong>AG</strong>REEMENT contains the entire agreement and understandings between<br />
the PARTIES.<br />
17.2 There are no other covenants, promises, conditions or understandings, either oral<br />
or written, other than those contained herein.<br />
18.0 NON-ASSIGNMENT.<br />
18.1 This <strong>AG</strong>REEMENT shall not be assigned by a PARTY without prior written<br />
approval of the other PARTY.<br />
19.0 SEVERAB<strong>IL</strong>ITY.<br />
19.1 In the event any provision of this <strong>AG</strong>REEMENT is held to be unenforceable for<br />
any reason, the enforceability thereof shall not affect the remainder of the<br />
<strong>AG</strong>REEMENT, which will remain in full force and effect and enforceability in<br />
accordance with its terms.<br />
20.0 GOVERNING LAW.<br />
20.1 This <strong>AG</strong>REEMENT shall be governed by the laws of the State of Illinois both as<br />
to interpretation and performance.<br />
8
20.2 Venue for any dispute arising hereunder shall be in the Circuit Court of the<br />
Sixteenth Judicial Circuit, <strong>Kane</strong> <strong>County</strong>, Illinois.<br />
21.0 NOTICE.<br />
Any required notice shall be sent to the following addresses and party:<br />
KANE COUNTY DIVISION OF TRANSPORTATION<br />
41W011 Burlington Road<br />
Saint Charles, <strong>IL</strong> 60175<br />
Attn.: Carl Schoedel, P.E., <strong>Kane</strong> <strong>County</strong> Engineer<br />
HDR ENGINEERING, INC.<br />
8550 West Bryn Mawr Avenue Suite 900<br />
Chicago, Illinois 60631<br />
Attn.: Patrick J. Pechnick<br />
IN WITNESS WHEREOF, the parties set their hands and seals as of the date first written above.<br />
COUNTY OF KANE<br />
_____________________________<br />
Christopher J. Lauzen<br />
CHAIRMAN, KANE COUNTY BOARD<br />
ATTEST:<br />
_____________________________<br />
JOHN A. CUNNINGHAM<br />
KANE COUNTY CLERK<br />
(Seal)<br />
9<br />
HDR ENGINEERING, INC.<br />
_______________________________<br />
By: Patrick J. Pechnick<br />
VICE PRESIDENT<br />
ATTEST:<br />
________________________________<br />
By: Aniko Filo<br />
PROJECT CONTROLLER
EXHIBIT “C”<br />
PREVA<strong>IL</strong>ING W<strong>AG</strong>E RATES<br />
It is the policy of the State of Illinois as declared in the Illinois Prevailing Wage Act (820 <strong>IL</strong>CS<br />
<strong>13</strong>0/1 et seq.) “that a wage of no less than the general prevailing hourly rate as paid for work of a<br />
similar character in the locality in which the work is performed, shall be paid to all laborers,<br />
workers and mechanics employed by or on behalf of any and all public bodies engaged in public<br />
works”.<br />
The CONSULTANT agrees to pay, when applicable, the current Illinois Department of Labor<br />
Prevailing Wage Rates for all <strong>County</strong> of <strong>Kane</strong> projects. Current prevailing wage rates are<br />
available from the Illinois Department of Labor at their website:<br />
http://www.state.il.us/agency/idol/rates/rates.HTM.<br />
Prevailing wage rates are subject to revision monthly. The CONSULTANT acknowledges its<br />
responsibility, for payment of any applicable future adjustment thereof.<br />
The CONSULTANT further acknowledges its responsibility to notify any sub-consultant of the<br />
applicability of the Prevailing Wage Act.<br />
When applicable, the CONSULTANT agrees to provide the <strong>Kane</strong> <strong>County</strong> Division of<br />
Transportation “certified payrolls” as required by the Prevailing Wage Act.<br />
12<br />
______________________________<br />
Company Name<br />
______________________________<br />
Signature of Officer of Company<br />
______________________________<br />
Title<br />
_____________________________<br />
Date
EXHIBIT “D”<br />
CONTRACTOR DISCLOSURE ACKNOWLEDGEMENT<br />
KANE COUNTY CODE, ARTICLE III, DIVISION 3, SECTION 2-211<br />
1. Prior to award, every contractor or vendor who is seeking or who has obtained contracts<br />
or change orders to contracts or two (2) or more individual contracts with <strong>Kane</strong> <strong>County</strong><br />
resulting in an amount greater than Fifteen Thousand Dollars ($15,000) shall disclose to<br />
the <strong>Kane</strong> <strong>County</strong> Purchasing Department, in writing all cumulative campaign<br />
contributions, (which includes multiple candidates) made within the previous twelve (12)<br />
months of awarding of the contract made by that contractor, union, or vendor to any<br />
current officer or countywide elected officer whose office the contract to be awarded will<br />
benefit. Disclosure shall be updated annually during the term of a multi-year contract and<br />
prior to any change order or renewal requiring Board level approval. For purposes of this<br />
disclosure requirement, “contractor or vendor” shall include owners, officers, managers,<br />
insurance brokers, lobbyists, agents, consultants, bond counsel and underwriters counsel,<br />
subcontractors, corporations, partnerships, associations, business trusts, estates, trustees,<br />
and/or beneficiaries under the control of the contracting person, and political action<br />
committees to which the contracting person has made contributions.<br />
2. All contractors and vendors who have obtained or are seeking contracts with <strong>Kane</strong><br />
<strong>County</strong> must disclose the following information which shall be certified and attached to<br />
the application or document. Penalties for knowingly violating disclosure requirements<br />
will potentially result in immediate cancellation of the contract, and possible disbarment<br />
from future <strong>County</strong> contracts:<br />
A. Name, address and percentage of ownership interest of each individual or entity<br />
having a legal or a beneficial interest of more than five percent (5%) in the<br />
applicant. Any entity required by law to file a statement providing substantially<br />
the information required by this paragraph with any other government agency<br />
may file a duplicate of such statement;<br />
B. Names and contact information of their lobbyists, agents and representatives and<br />
all individuals who are or will be having contact with <strong>County</strong> employees or<br />
officials in relation to the contract or bid. This information disclosure must be<br />
updated when any changes to the information occurs.<br />
C. Whenever any interest required to be disclosed in paragraph (a) above is held by<br />
an agent or agents, or a nominee or nominees, the principals for whom such<br />
agents or nominees hold such interest shall also be disclosed. The application of a<br />
spouse or any other party, if constructively controlled by another person, or legal<br />
entity as set forth above, shall state the name and address and percentage of<br />
beneficial interest of such person or entity possessing such constructive control<br />
and the relationship under which such control is being or may be exercised.<br />
Whenever a stock or beneficial interest is held by a corporation or other legal<br />
entity, such shareholder or beneficiary shall also make disclosure as required by<br />
paragraph (a) above.<br />
<strong>13</strong>
D. A statement under oath that the applicant has withheld no disclosures as to<br />
economic interests in the undertaking nor reserved any information, data or plan<br />
as to the intended use or purpose for which it seeks <strong>County</strong> Board or other county<br />
agency action.<br />
3. All disclosures and information shall be current as of the date upon which the application<br />
is presented and shall be maintained current until such time as <strong>Kane</strong> <strong>County</strong> shall take<br />
action on the application. Furthermore, this information shall be maintained in a database<br />
by the Purchasing Department, and made available for public viewing.<br />
4. Notwithstanding any of the above provisions, the <strong>County</strong> Purchasing Department with<br />
respect to contracts awarded may require any such additional information from any<br />
applicant which is reasonably intended to achieve full disclosure relevant to the<br />
application for action by the <strong>County</strong> Board or any other <strong>County</strong> agency.<br />
5. Any failure to comply with the provisions of this section shall render any ordinance,<br />
ordinance amendment, <strong>County</strong> Board approval or other <strong>County</strong> action in behalf of the<br />
applicant failing to comply voidable at the option of the <strong>County</strong> Board or other <strong>County</strong><br />
agency involved upon the recommendation of the <strong>County</strong> Board Chairman or the<br />
majority of the <strong>County</strong> Board.<br />
6. Contractor Disclosure information shall be sent to the <strong>Kane</strong> <strong>County</strong> Purchasing<br />
Department and the <strong>Kane</strong> <strong>County</strong> Division of Transportation at the following address, or<br />
via email, prior to Transportation Committee of the <strong>Kane</strong> <strong>County</strong> Board:<br />
<strong>Kane</strong> <strong>County</strong> Government Center<br />
Purchasing Department, Bldg A<br />
719 S. Batavia Ave. Geneva, <strong>IL</strong> 60<strong>13</strong>4<br />
purchasing@countyofkane.org<br />
<strong>Kane</strong> <strong>County</strong> Division of Transportation<br />
Linda Haines<br />
41W011 Burlington Road<br />
St. Charles, <strong>IL</strong> 60175<br />
haineslinda@countyofkane.org<br />
Company Name: HDR ENGINEERING, INC.<br />
Contact Person: Patrick J. Pechnick<br />
Address: 8550 West Bryn Mawr Avenue, Suite 900<br />
City: Chicago<br />
State: Illinois<br />
Zip Code: 60631<br />
Phone: 773-380-7900<br />
14
.<br />
31<br />
!( 25<br />
0 485 970 1,940 2,910 3,880<br />
Feet<br />
Montgomery Rd.<br />
0 1 Miles<br />
Road Improvements<br />
Section Number <strong>13</strong>-00127-00-WR<br />
Montgomery Road Corridor<br />
29 4Û<br />
M:\dotserver2\USERS\Committee\20<strong>13</strong>02 February\Implementation\Design\Montgomery Road\Map Standard_Montgomery Rd loc map<br />
Hill Ave.<br />
New Y<br />
Legend<br />
467 34<br />
§¨¦ 88<br />
£¤ 30<br />
!( 31<br />
Hampshire Rutland Dundee<br />
Burlington<br />
Virgil<br />
Plato<br />
Elgin<br />
Campton Saint Charles<br />
Geneva<br />
<strong>Kane</strong>ville Blackberry<br />
Batavia<br />
Big Rock Sugar Grove Aurora<br />
Interstates<br />
US Roads<br />
State Roads<br />
<strong>County</strong> Roads<br />
Other Roads<br />
Rail Roads<br />
<strong>County</strong> Boundry<br />
Township Boundry<br />
Fox River<br />
Forest Preserves<br />
Municipalities<br />
/<br />
5t
.<br />
31<br />
!( 25<br />
0 485 970 1,940 2,910 3,880<br />
Feet<br />
Montgomery Rd.<br />
0 1 Miles<br />
Road Improvements<br />
Section Number <strong>13</strong>-00127-00-WR<br />
Montgomery Road Corridor<br />
4Û 29<br />
M:\dotserver2\USERS\Committee\20<strong>13</strong>02 February\Implementation\Design\Montgomery Road\Map Standard Aerial_Montgomery Rd loc map<br />
Hill Ave.<br />
New Y<br />
Legend<br />
467 34<br />
§¨¦ 88<br />
£¤ 30<br />
!( 31<br />
Hampshire Rutland Dundee<br />
Burlington<br />
Virgil<br />
Plato<br />
Elgin<br />
Campton Saint Charles<br />
Geneva<br />
<strong>Kane</strong>ville Blackberry<br />
Batavia<br />
Big Rock Sugar Grove Aurora<br />
Interstates<br />
US Roads<br />
State Roads<br />
<strong>County</strong> Roads<br />
Other Roads<br />
Rail Roads<br />
<strong>County</strong> Boundry<br />
Township Boundry<br />
Fox River<br />
Forest Preserves<br />
Municipalities<br />
/<br />
5t
If not budgeted,<br />
explain funding<br />
source<br />
<strong>AG</strong>ENDA ITEM EXECUTIVE SUMMARY Agenda Item #<br />
Presenter/Sponsor:<br />
Name<br />
Budget Information: Was this item budgeted?<br />
SUMMARY:<br />
Attachments:<br />
Detailed information available from :<br />
Resolution/Ordinance Tracking:<br />
Staff Name:<br />
Appropriation Amount:<br />
Steve Coffinbargar, Assistant Director Phone: 630-406-7170<br />
Assigned Committee: Transportation Sent to: Executive<br />
on: 04/11/20<strong>13</strong><br />
If Other, specify:<br />
Committee Remarks:<br />
<strong>County</strong> Board Date:<br />
Resolution<br />
Ordinance<br />
Yes<br />
No N/A<br />
Next Committee: Executive Sent to: <strong>County</strong> Board on: 05/08/20<strong>13</strong><br />
If Other, specify:<br />
Committee Remarks:<br />
Next Committee: Sent to: on:<br />
Committee Remarks:<br />
8B-2a<br />
Approving a Phase I Engineering Services Agreement with Strand Associates, Inc. for<br />
Kirk Road over the Union Pacific Railroad, <strong>Kane</strong> <strong>County</strong> Section No. 12-00192-04-BR<br />
Steve Coffinbargar - Assistant Director of Transportation<br />
$838,967.46<br />
The Kirk Road over the Union Pacific Railroad bridge was constructed in 1973. The bridge has a total length of nearly 1,400';<br />
comprised of 18 spans. The bridge is a concrete deck constructed on steel beams. It received a new wearing surface in 1987<br />
and new expansion joints plus various other repairs in 2003. Recent inspections have determined that the bridge is eligible<br />
for federal funds (STP-Bridge) for rehabilitation. Work will consist of removal and replacement of the bridge deck and<br />
related repairs.<br />
The phase I engineering process will consider maintaining the structure in its current configuration, widening on the<br />
existing substructure, widening the substructure and deck, and finally widening and shortening the overall bridge length.<br />
Any widening would be considered to meet projected future traffic needs within the Kirk Road corridor.<br />
Staff utilized the qualifications based consultant selection process in order to select Strand Associates, Inc. The negotiated<br />
contract is for an amount to not exceed $838,967.46. Information on the QBS process and selection details can be found on<br />
the <strong>KDOT</strong> website.<br />
Resolution, Engineering Agreement, Location Maps<br />
05/14/20<strong>13</strong>
STATE OF <strong>IL</strong>LINOIS<br />
COUNTY OF KANE<br />
RESOLUTION NO. <strong>13</strong> -<br />
APPROVING A PHASE I ENGINEERING SERVICES <strong>AG</strong>REEMENT<br />
WITH STRAND ASSOCIATES, INC. FOR<br />
KIRK ROAD OVER THE UNION PACIFIC RA<strong>IL</strong>ROAD<br />
KANE COUNTY SECTION NO. 12-00192-04-BR<br />
WHEREAS, Phase I Engineering services are needed for the proposed improvement of <strong>Kane</strong><br />
<strong>County</strong> Highway No. 77 (also known as Kirk Road) Bridge over the Union Pacific Railroad tracks<br />
(herein referred to as the “Improvement”); and<br />
WHEREAS, in order to accomplish the Improvement, it is necessary to retain the services of a<br />
professional engineering firm to provide Phase I Engineering services therefor; and<br />
WHEREAS, Strand Associates, Inc., 1170 South Houbolt Road, Joliet, <strong>IL</strong> 60431 has experience<br />
and professional expertise in Phase I Engineering and is willing to perform the required services for an<br />
amount not to exceed Eight Hundred Thirty Eight Thousand Nine Hundred Sixty Seven and 46/100<br />
Dollars ($838,967.46) as set forth in the Phase I Engineering services agreement (a copy of which is on<br />
file with the <strong>County</strong> Clerk’s Office).<br />
NOW, THEREFORE, BE IT RESOLVED by the <strong>Kane</strong> <strong>County</strong> Board that the Chairman thereof<br />
is hereby authorized to execute a Phase I Engineering services agreement with Strand Associates.<br />
BE IT FURTHER RESOLVED that the <strong>Kane</strong> <strong>County</strong> Board appropriates the not to exceed sum<br />
of Eight Hundred Thirty Eight Thousand Nine Hundred Sixty Seven and 46/100 Dollars ($838,967.46)<br />
from Transportation Sales Tax Fund #305, Line Item #50140 (Engineering) to pay for said Phase I<br />
Engineering services for the Improvement with approximately eighty percent (80%) thereof to be<br />
reimbursed to the <strong>County</strong> from federal funds.<br />
Line Item Line Item Description Was<br />
personnel/item/service<br />
approved in original<br />
budget or a subsequent<br />
budget revision?<br />
Are funds currently<br />
available for this<br />
personnel/item/service in<br />
the specific line item?<br />
305.520.527.50140 Engineering Services Yes Yes<br />
If funds are not<br />
currently available in<br />
the specified line item,<br />
where are the funds<br />
available?
Passed by the <strong>Kane</strong> <strong>County</strong> Board on May 14, 20<strong>13</strong>.<br />
Page 2 of 2, Res. #<strong>13</strong>-<br />
______________________________________ ___________________________________<br />
John A. Cunningham Christopher J. Lauzen<br />
Clerk, <strong>County</strong> Board Chairman, <strong>County</strong> Board<br />
<strong>Kane</strong> <strong>County</strong>, Illinois <strong>Kane</strong> <strong>County</strong>, Illinois<br />
Vote:<br />
Yes _____<br />
No _____<br />
Voice _____<br />
Abstentions _____<br />
5KRKOVERUPRRPHI-STRAND.4LH
Local Agency<br />
<strong>Kane</strong> <strong>County</strong><br />
<strong>County</strong><br />
<strong>Kane</strong><br />
Section<br />
12-00192-04-BR<br />
Project No.<br />
BROS-4003(164)<br />
Job No.<br />
TBD<br />
Contact Name/Phone/E-mail Address<br />
Michael Zakosek, P.E.<br />
630/406-7346<br />
zakosekmike@co.kane.il.us<br />
L<br />
O<br />
C<br />
A<br />
L<br />
A<br />
G<br />
E<br />
N<br />
C<br />
Y<br />
Preliminary Engineering<br />
Services Agreement<br />
For<br />
Federal Participation<br />
Page 1 of 5 BLR 05610 (Rev. 9/06)<br />
Printed on 3/31/20<strong>13</strong> 11:04:06 AM<br />
C<br />
O<br />
N<br />
S<br />
U<br />
L<br />
T<br />
A<br />
N<br />
T<br />
Consultant<br />
Strand Associates, Inc.<br />
Address<br />
1170 Houbolt Road<br />
City<br />
Joliet<br />
State<br />
<strong>IL</strong><br />
Zip Code<br />
60431<br />
Contact Name/Phone/E-mail Address<br />
Anthony Standish, P.E., S.E.<br />
815/744-4200<br />
tony.standish@strand.com<br />
THIS <strong>AG</strong>REEMENT is made and entered into this day of , between the above<br />
Local Agency (LA) and Consultant (ENGINEER) and covers certain professional engineering services in connection with the PROJECT.<br />
Federal-aid funds allotted to the LA by the state of Illinois under the general supervision of the Illinois Department of Transportation<br />
(STATE) will be used entirely or in part to finance engineering services as described under <strong>AG</strong>REEMENT PROVISIONS.<br />
Project Description<br />
Name Kirk Road Route CH 77 Length 0.50 mi. Structure No. 045-3096<br />
Termini Over the Union Pacific RR<br />
Description Phase I Engineering for bridge rehabilitation project<br />
I. THE ENGINEER <strong>AG</strong>REES,<br />
1.<br />
2.<br />
Agreement Provisions<br />
To perform or be responsible for the performance, in accordance with STATE approved design standards and policies, of<br />
engineering services for the LA for the proposed improvement herein described.<br />
To attend any and all meetings and visit the site of the proposed improvement at any reasonable time when requested by<br />
representatives of the LA or STATE.<br />
3. To complete the services herein described within 730 calendar days from the date of the Notice to Proceed from the<br />
LA, excluding from consideration periods of delay caused by circumstances beyond the control of the ENGINEER. (See Exhibit C)<br />
4. The classifications of the employees used in the work should be consistent with the employee classifications and estimated manhours<br />
shown in EXHIBIT A. If higher-salaried personnel of the firm, including the Principal Engineer, perform services that are<br />
indicated in Exhibit A to be performed by lesser-salaried personnel, the wage rate billed for such services shall be commensurate<br />
with the payroll rate for the work performed.<br />
5. That the ENGINEER is qualified technically and is entirely conversant with the design standards and policies applicable for the<br />
PROJECT; and that the ENGINEER has sufficient properly trained, organized and experienced personnel to perform the services<br />
enumerated herein.<br />
6. That the ENGINEER shall be responsible for the accuracy of the work and shall promptly make necessary revisions or corrections<br />
resulting from the ENGINEER’s errors, omissions or negligent acts without additional compensation. Acceptance of work by the<br />
STATE will not relieve the ENGINEER of the responsibility to make subsequent correction of any such errors or omissions or for<br />
clarification of any ambiguities.<br />
7. That all plans and other documents furnished by the ENGINEER pursuant to this <strong>AG</strong>REEMENT will be endorsed by the ENGINEER<br />
and will affix the ENGINEER’s professional seal when such seal is required by law. Plans for structures to be built as a part of the<br />
improvement will be prepared under the supervision of a registered structural engineer and will affix structural engineer seal when<br />
such seal is required by law. It will be the ENGINEER’s responsibility to affix the proper seal as required by the Bureau of Local<br />
Roads and Streets manual published by the STATE.<br />
8. That the ENGINEER will comply with applicable federal statutes, state of Illinois statutes, and local laws or ordinances of the LA.
9. The undersigned certifies neither the ENGINEER nor I have:<br />
a. employed or retained for commission, percentage, brokerage, contingent fee or other considerations, any firm or person (other<br />
than a bona fide employee working solely for me or the above ENGINEER) to solicit or secure this <strong>AG</strong>REEMENT,<br />
b. agreed, as an express or implied condition for obtaining this <strong>AG</strong>REEMENT, to employ or retain the services of any firm or<br />
person in connection with carrying out the <strong>AG</strong>REEMENT or<br />
c. paid, or agreed to pay any firm, organization or person (other than a bona fide employee working solely for me or the above<br />
ENGINEER) any fee, contribution, donation or consideration of any kind for, or in connection with, procuring or carrying out the<br />
<strong>AG</strong>REEMENT.<br />
d. are not presently debarred, suspended, proposed for debarment, declared ineligible or voluntarily excluded from covered<br />
transactions by any Federal department or agency,<br />
e. have not within a three-year period preceding the <strong>AG</strong>REEMENT been convicted of or had a civil judgment rendered against<br />
them for commission of fraud or criminal offense in connection with obtaining, attempting to obtain or performing a public<br />
(Federal, State or local) transaction; violation of Federal or State antitrust statutes or commission of embezzlement, theft,<br />
forgery, bribery, falsification or destruction of records, making false statements or receiving stolen property,<br />
f. are not presently indicted for or otherwise criminally or civilly charged by a government entity (Federal, State or local) with<br />
commission of any of the offenses enumerated in paragraph (e) and<br />
g. have not within a three-year period preceding this <strong>AG</strong>REEMENT had one or more public transactions (Federal, State or local)<br />
terminated for cause or default.<br />
10. To pay its subconsultants for satisfactory performance no later than 30 days from receipt of each payment from the LA.<br />
11. To submit all invoices to the LA within one year of the completion of the work called for in this <strong>AG</strong>REEMENT or any subsequent<br />
Amendment or Supplement.<br />
12. To submit BLR 056<strong>13</strong>, Engineering Payment Report, to the STATE upon completion of the project (Exhibit B).<br />
<strong>13</strong>. Scope of Services to be provided by the ENGINEER: See Exhibit D for Scope clarification.<br />
Make such detailed surveys as are necessary for the planning and design of the PROJECT.<br />
Make stream and flood plain hydraulic surveys and gather both existing bridge upstream and downstream high water data and<br />
flood flow histories.<br />
Prepare applications for U.S. Army Corps of Engineers Permit, Illinois Department of Natural Resources Office of Water<br />
Resources Permit and Illinois Environmental Protection Agency Section 404 Water Quality Certification.<br />
Design and/or approve cofferdams and superstructure shop drawings.<br />
Prepare Bridge Condition Report and Preliminary Bridge Design and Hydraulic Report, (including economic analysis of bridge or<br />
culvert types and high water effects on roadway overflows and bridge approaches).<br />
Prepare the necessary environmental and planning documents including the Project Development Report, Environmental Class of<br />
Action Determination or Environmental Assessment, State Clearinghouse, Substate Clearinghouse and all necessary<br />
environmental clearances.<br />
Make such soil surveys or subsurface investigations including borings and soil profiles as may be required to furnish sufficient data<br />
for the design of the proposed improvement. Such investigations to be made in accordance with the current Standard<br />
Specifications for Road and Bridge Construction, Bureau of Local Roads and Streets Administrative Policies, Federal-Aid<br />
Procedures for Local Highway Improvements or any other applicable requirements of the STATE.<br />
Analyze and evaluate the soil surveys and structure borings to determine the roadway structural design and bridge foundation.<br />
Prepare preliminary roadway and drainage structure plans and meet with representatives of the LA and STATE at the site of the<br />
improvement for review of plans prior to the establishment of final vertical and horizontal alignment, location and size of drainage<br />
structures, and compliance with applicable design requirements and policies.<br />
Make or cause to be made such traffic studies and counts and special intersection studies as may be required to furnish sufficient<br />
data for the design of the proposed improvement.<br />
Complete the general and detailed plans, special provisions and estimate of cost. Contract plans shall be prepared in accordance<br />
with the guidelines contained in the Bureau of Local Roads and Streets manual. The special provisions and detailed estimate of<br />
cost shall be furnished in quadruplicate.<br />
Furnish the LA with survey and drafts in quadruplicate all necessary right-of-way dedications, construction easements and borrow<br />
pit and channel change agreements including prints of the corresponding plats and staking as required.<br />
Page 2 of 5 BLR 05610 (Rev. 9/06)<br />
Printed on 3/31/20<strong>13</strong> 11:04:06 AM
II. THE LA <strong>AG</strong>REES,<br />
1. To furnish the ENGINEER all presently available survey data and information<br />
2. To pay the ENGINEER as compensation for all services rendered in accordance with this <strong>AG</strong>REEMENT, on the basis of the<br />
following compensation formulas:<br />
Cost Plus Fixed Fee CPFF = 14.5%[DL + R(DL) + OH(DL) + IHDC], or<br />
CPFF = 14.5%[DL + R(DL) + 1.4(DL) + IHDC], or<br />
CPFF = 14.5%[(2.3 + R)DL + IHDC]<br />
Specific Rate (Pay per element)<br />
Lump Sum<br />
Where: DL = Direct Labor<br />
IHDC = In House Direct Costs<br />
OH = Consultant Firm’s Actual Overhead Factor<br />
R = Complexity Factor<br />
3. To pay the ENGINEER using one of the following methods as required by 49 CFR part 26 and 605 <strong>IL</strong>CS 5/5-409:<br />
With Retainage<br />
a) For the first 50% of completed work, and upon receipt of monthly invoices from the ENGINEER and the approval thereof by<br />
the LA, monthly payments for the work performed shall be due and payable to the ENGINEER, such payments to be equal to<br />
90% of the value of the partially completed work minus all previous partial payments made to the ENGINEER.<br />
b) After 50% of the work are completed, and upon receipt of monthly invoices from the ENGINEER and the approval thereof by<br />
the LA, monthly payments covering work performed shall be due and payable to the ENGINEER, such payments to be equal to<br />
95% of the value of the partially completed work minus all previous partial payments made to the ENGINEER.<br />
c) Final Payment – Upon approval of the work by the LA but not later than 60 days after the work is completed and reports have<br />
been made and accepted by the LA and the STATE, a sum of money equal to the basic fee as determined in this<br />
<strong>AG</strong>REEMENT less the total of the amounts of partial payments previously paid to the ENGINEER shall be due and payable to<br />
the ENGINEER.<br />
Without Retainage<br />
a) For progressive payments – Upon receipt of monthly invoices from the ENGINEER and the approval thereof by the LA,<br />
monthly payments for the work performed shall be due and payable to the ENGINEER, such payments to be equal to the value<br />
of the partially completed work minus all previous partial payments made to the ENGINEER.<br />
b) Final Payment – Upon approval of the workby the LA but not later than 60 days after the work is completed and reports have<br />
been made and accepted by the LA and STATE, a sum o money equal to the basic fee as determined in this <strong>AG</strong>REEMENT<br />
less the total of the amounts of partial payments previously paid to the ENGINEER shall be due and payable to the ENGINEER.<br />
4. The recipient shall not discriminate on the basis of race, color, national origin or sex in the award and performance of any DOTassisted<br />
contract or in the administration of its DBE program or the requirements of 49 CFR part 26. The recipient shall take all<br />
necessary and reasonable steps under 49 CFR part 26 to ensure nondiscrimination in the award and administration of DOT-assisted<br />
contracts. The recipient’s DBE program, as required by 49 CFR part 26 and as approved by DOT, is incorporated by reference in<br />
this agreement. Implementation of this program is a legal obligation and failure to carry out its terms shall be treated as violation of<br />
this agreement. Upon notification to the recipient of its failure to carry out its approved program, the Department may impose<br />
sanctions as provided for under part 26 and may, in appropriate cases, refer the matter for enforcement under 18 U.S.C. 1001 and/or<br />
the Program Fraud Civil Remedies Act of 1986 (31U.S.C. 3801 et seq.).<br />
III. IT IS MUTALLY <strong>AG</strong>REED,<br />
1. That no work shall be commenced by the ENGINEER prior to issuance by the LA of a written Notice to Proceed.<br />
2. That tracings, plans, specifications, estimates, maps and other documents prepared by the ENGINEER in accordance with this<br />
<strong>AG</strong>REEMENT shall be delivered to and become the property of the LA and that basic survey notes, sketches, charts and other data<br />
prepared or obtained in accordance with this <strong>AG</strong>REEMENT shall be made available, upon request, to the LA or to the STATE,<br />
without restriction or limitation as to their use.<br />
Page 3 of 5 BLR 05610 (Rev. 9/06)<br />
Printed on 3/31/20<strong>13</strong> 11:04:06 AM
3. That all reports, plans, estimates and special provisions furnished by the ENGINEER shall be in accordance with the current<br />
Standard Specifications for Road and Bridge Construction, Bureau of Local Roads and Streets Administrative Policies, Federal-Aid<br />
Procedures for Local Highway Improvements or any other applicable requirements of the STATE, it being understood that all such<br />
furnished documents shall be approved by the LA and the STATE before final acceptance. During the performance of the<br />
engineering services herein provided for, the ENGINEER shall be responsible for any loss or damage to the documents herein<br />
enumerated while they are in the ENGINEER’s possession and any such loss or damage shall be restored at the ENGINEER’s<br />
expense.<br />
4. That none of the services to be furnished by the ENGINEER shall be sublet, assigned or transferred to any other party or parties<br />
without written consent of the LA. The consent to sublet, assign or otherwise transfer any portion of the services to be furnished by<br />
the ENGINEER shall not be construed to relieve the ENGINEER of any responsibility for the fulfillment of this agreement.<br />
5. To maintain, for a minimum of 3 years after the completion of the contract, adequate books, records and supporting documents to<br />
verify the amounts, recipients and uses of all disbursements of funds passing in conjunction with the contract; the contract and all<br />
books, records and supporting documents related to the contract shall be available for review and audit by the Auditor General and<br />
the STATE; and to provide full access to all relevant materials. Failure to maintain the books, records and supporting documents<br />
required by this section shall establish a presumption in favor of the STATE for the recovery of any funds paid by the STATE under<br />
the contract for which adequate books, records and supporting documentation are not available to support their purported<br />
disbursement.<br />
6. The payment by the LA in accordance with numbered paragraph 3 of Section II will be considered payment in full for all services<br />
rendered in accordance with this <strong>AG</strong>REEMENT whether or not they be actually enumerated in this <strong>AG</strong>REEMENT.<br />
7. That the ENGINEER shall be responsible for any and all damages to property or persons arising out of an error, omission and/or<br />
negligent act in the prosecution of the ENGINEER’s work and shall indemnify and save harmless the LA, the STATE, and their<br />
officers, agents and employees from all suits, claims, actions or damages of any nature whatsoever resulting there from. These<br />
indemnities shall not be limited by the listing of any insurance policy.<br />
8. This <strong>AG</strong>REEMENT may be terminated by the LA upon giving notice in writing to the ENGINEER at the ENGINEER’s last known post<br />
office address. Upon such termination, the ENGINEER shall cause to be delivered to the LA all drawings, plats, surveys, reports,<br />
permits, agreements, soils and foundation analysis, provisions, specifications, partial and completed estimates and data, if any from<br />
soil survey and subsurface investigation with the understanding that all such material becomes the property of the LA. The LA will be<br />
responsible for reimbursement of all eligible expenses to date of the written notice of termination.<br />
9. This certification is required by the Drug Free Workplace Act (30<strong>IL</strong>CS 580). The Drug Free Workplace Act requires that no grantee<br />
or contractor shall receive a grant or be considered for the purpose of being awarded a contract for the procurement of any property<br />
or service from the State unless that grantee or contractor will provide a drug free workplace. False certification or violation of the<br />
certification may result in sanctions including, but not limited to, suspension of contract or grant payments, termination of a contract or<br />
grant and debarment of the contracting or grant opportunities with the State for at least one (1) year but no more than five (5) years.<br />
For the purpose of this certification, “grantee” or “contractor” means a corporation, partnership or other entity with twenty-five (25) or<br />
more employees at the time of issuing the grant, or a department, division or other unit thereof, directly responsible for the specific<br />
performance under a contract or grant of $5,000 or more from the State, as defined in the Act.<br />
The contractor/grantee certifies and agrees that it will provide a drug free workplace by:<br />
a. Publishing a statement:<br />
(1) Notifying employees that the unlawful manufacture, distribution, dispensing, possession or use of a controlled substance,<br />
including cannabis, is prohibited in the grantee’s or contractor’s workplace.<br />
(2) Specifying the actions that will be taken against employees for violations of such prohibition.<br />
(3) Notifying the employee that, as a condition of employment on such contract or grant, the employee will:<br />
(a) abide by the terms of the statement; and<br />
(b) notify the employer of any criminal drug statute conviction for a violation occurring in the workplace no later than five (5)<br />
days after such conviction.<br />
b. Establishing a drug free awareness program to inform employees about:<br />
(1) The dangers of drug abuse in the workplace;<br />
(2) The grantee’s or contractor’s policy of maintaining a drug free workplace;<br />
(3) Any available drug counseling, rehabilitation and employee assistance program; and<br />
(4) The penalties that may be imposed upon an employee for drug violations.<br />
c. Providing a copy of the statement required by subparagraph (a) to each employee engaged in the performance of the contract or<br />
grant and to post the statement in a prominent place in the workplace.<br />
d. Notifying the contracting or granting agency within ten (10) days after receiving notice under part (B) of paragraph (3) of<br />
subsection (a) above from an employee or otherwise receiving actual notice of such conviction.<br />
e. Imposing a sanction on, or requiring the satisfactory participation in a drug abuse assistance or rehabilitation program by,<br />
f. Assisting employees in selecting a course of action in the event drug counseling, treatment and rehabilitation is required and<br />
indicating that a trained referral team is in place.<br />
g. Making a good faith effort to continue to maintain a drug free workplace through implementation of the Drug Free Workplace Act.<br />
Page 4 of 5 BLR 05610 (Rev. 9/06)<br />
Printed on 3/31/20<strong>13</strong> 11:04:06 AM
10. The ENGINEER or subconsultant shall not discriminate on the basis of race, color, national origin or sex in the performance of this<br />
<strong>AG</strong>REEMENT. The ENGINEER shall carry out applicable requirements of 49 CFR part 26 in the administration of DOT assisted<br />
contracts. Failure by the ENGINEER to carry out these requirements is a material breach of this <strong>AG</strong>REEMENT, which may result in<br />
the termination of this <strong>AG</strong>REEMENT or such other remedy as the LA deems appropriate.<br />
Agreement Summary<br />
Prime Consultant: TIN Number Agreement Amount<br />
Strand Associates, Inc. 39-1020418 $595,520.06<br />
Sub-Consultants: TIN Number Agreement Amount<br />
Images, Inc. 45-0482737 $23,510.72<br />
Hampton, Lenzini, and Renwick 36-2555986 $91,936.68<br />
Testing Service Corporation 35-0937582 $128,000.00<br />
Executed by the LA: <strong>Kane</strong> <strong>County</strong><br />
ATTEST:<br />
By: By:<br />
Sub-Consultant Total: $243,447.40<br />
Prime Consultant Total: $595,520.06<br />
Total for all work: $838,967.46<br />
(Municipality/Township/<strong>County</strong>)<br />
<strong>Kane</strong> <strong>County</strong> Clerk Title: <strong>Kane</strong> <strong>County</strong> Board Chairman<br />
(SEAL)<br />
Executed by the ENGINEER:<br />
ATTEST: Strand Associates, Inc. ®<br />
By: By:<br />
Title: Title: Corporate Secretary<br />
Page 5 of 5 BLR 05610 (Rev. 9/06)<br />
Printed on 3/31/20<strong>13</strong> 11:04:06 AM
Exhibit A - Preliminary Engineering<br />
Route:<br />
Local Agency: *Firm’s approved rates on file with IDOT’S<br />
(Municipality/Township/<strong>County</strong>) Bureau of Accounting and Auditing:<br />
Section:<br />
Project: Overhead Rate (OH) 0.00 %<br />
Job No.: Complexity Factor (R) 0.00<br />
Calendar Days<br />
Method of Compensation:<br />
Cost Plus Fixed Fee 1 14.5%[DL + R(DL) + OH(DL) + IHDC]<br />
Cost Plus Fixed Fee 2 14.5%[DL + R(DL) + 1.4(DL) + IHDC]<br />
Cost Plus Fixed Fee 3 14.5%[(2.3 + R)DL + IHDC]<br />
Specific Rate<br />
Lump Sum<br />
Element of Work<br />
Employee<br />
Classification<br />
Man-<br />
Hours<br />
Totals 0.00<br />
Cost Estimate of Consultant’s Services in Dollars<br />
Payroll<br />
Rate<br />
Payroll<br />
Costs (DL)<br />
Overhead*<br />
SEE ATTACHED EXHIBIT A<br />
Services by<br />
Others<br />
In-House<br />
Direct Costs<br />
(IHDC)<br />
Profit Total<br />
Page 6 of 7 BLR 05610 (Rev. 9/06)<br />
Printed on 3/28/20<strong>13</strong> 9:35:21 AM
Prime Consultant<br />
Name Strand Associates, Inc. ®<br />
Address 1170 Houbolt Road, Joliet, <strong>IL</strong> 60431<br />
Telephone (815) 744-4200<br />
TIN Number 39-1020418<br />
Project Information<br />
Local Agency <strong>Kane</strong> <strong>County</strong><br />
Section Number 12-00192-04-BR<br />
Project Number BROS-4003(164)<br />
Job Number TBD<br />
Exhibit B<br />
Engineering Payment Report<br />
This form is to verify the amount paid to the Sub-consultant on the above captioned contract. Under penalty of law for<br />
perjury or falsification, the undersigned certifies that work was executed by the Sub-consultant for the amount listed below.<br />
Sub-Consultant Name<br />
TIN Number Actual Payment<br />
from Prime<br />
Hampton, Lenzini, and Renwick 36-2555986<br />
Images, Inc. 45-0482737<br />
Testing Service Corporation 35-0937582<br />
Sub-Consultant Total:<br />
Prime Consultant Total:<br />
Total for all Work<br />
Services Completed:<br />
Signature and title of Prime Consultant Date<br />
Note: The Department of Transportation is requesting disclosure of information that is necessary to accomplish the statutory<br />
purpose as outlined under state and federal law. Disclosure of this information is REQUIRED and shall be deemed as<br />
concurring with the payment amount specified above.<br />
Page 7 of 7 BLR 05610 (Rev. 9/06)<br />
Printed on 3/28/20<strong>13</strong> 9:35:21 AM
EXHIBIT “E”<br />
PREVA<strong>IL</strong>ING W<strong>AG</strong>E RATES<br />
It is the policy of the State of Illinois as declared in the Illinois Prevailing Wage Act (820 <strong>IL</strong>CS<br />
<strong>13</strong>0/1 et seq.) “that a wage of no less than the general prevailing hourly rate as paid for work of a<br />
similar character in the locality in which the work is performed, shall be paid to all laborers,<br />
workers and mechanics employed by or on behalf of any and all public bodies engaged in public<br />
works”.<br />
The CONSULTANT agrees to pay, when applicable, the current Illinois Department of Labor<br />
Prevailing Wage Rates for all <strong>County</strong> of <strong>Kane</strong> projects. Current prevailing wage rates are<br />
available from the Illinois Department of Labor at their website:<br />
http://www.state.il.us/agency/idol/rates/rates.HTM.<br />
Prevailing wage rates are subject to revision monthly. The CONSULTANT acknowledges its<br />
responsibility, for payment of any applicable future adjustment thereof.<br />
The CONSULTANT further acknowledges its responsibility to notify any sub-consultant of the<br />
applicability of the Prevailing Wage Act.<br />
When applicable, the CONSULTANT agrees to provide the <strong>Kane</strong> <strong>County</strong> Division of<br />
Transportation “certified payrolls” as required by the Prevailing Wage Act.<br />
______________________________<br />
Company Name<br />
______________________________<br />
Signature of Officer of Company<br />
______________________________<br />
Title<br />
_____________________________<br />
Date
EXHIBIT “F”<br />
CONTRACTOR DISCLOSURE ACKNOWLEDGEMENT<br />
KANE COUNTY CODE, ARTICLE III, DIVISION 3, SECTION 2-211<br />
1. Prior to award, every contractor or vendor who is seeking or who has obtained contracts<br />
or change orders to contracts or two (2) or more individual contracts with <strong>Kane</strong> <strong>County</strong><br />
resulting in an amount greater than Fifteen Thousand Dollars ($15,000) shall disclose to<br />
the <strong>Kane</strong> <strong>County</strong> Purchasing Department, in writing all cumulative campaign<br />
contributions, (which includes multiple candidates) made within the previous twelve (12)<br />
months of awarding of the contract made by that contractor, union, or vendor to any<br />
current officer or countywide elected officer whose office the contract to be awarded will<br />
benefit. Disclosure shall be updated annually during the term of a multi-year contract and<br />
prior to any change order or renewal requiring Board level approval. For purposes of this<br />
disclosure requirement, “contractor or vendor” shall include owners, officers, managers,<br />
insurance brokers, lobbyists, agents, consultants, bond counsel and underwriters counsel,<br />
subcontractors, corporations, partnerships, associations, business trusts, estates, trustees,<br />
and/or beneficiaries under the control of the contracting person, and political action<br />
committees to which the contracting person has made contributions.<br />
2. All contractors and vendors who have obtained or are seeking contracts with <strong>Kane</strong><br />
<strong>County</strong> must disclose the following information which shall be certified and attached to<br />
the application or document. Penalties for knowingly violating disclosure requirements<br />
will potentially result in immediate cancellation of the contract, and possible disbarment<br />
from future <strong>County</strong> contracts:<br />
A. Name, address and percentage of ownership interest of each individual or entity<br />
having a legal or a beneficial interest of more than five percent (5%) in the<br />
applicant. Any entity required by law to file a statement providing substantially<br />
the information required by this paragraph with any other government agency<br />
may file a duplicate of such statement;<br />
B. Names and contact information of their lobbyists, agents and representatives and<br />
all individuals who are or will be having contact with <strong>County</strong> employees or<br />
officials in relation to the contract or bid. This information disclosure must be<br />
updated when any changes to the information occurs.<br />
C. Whenever any interest required to be disclosed in paragraph (a) above is held by<br />
an agent or agents, or a nominee or nominees, the principals for whom such<br />
agents or nominees hold such interest shall also be disclosed. The application of a<br />
spouse or any other party, if constructively controlled by another person, or legal<br />
entity as set forth above, shall state the name and address and percentage of<br />
beneficial interest of such person or entity possessing such constructive control<br />
and the relationship under which such control is being or may be exercised.<br />
Whenever a stock or beneficial interest is held by a corporation or other legal<br />
entity, such shareholder or beneficiary shall also make disclosure as required by<br />
paragraph (a) above.
D. A statement under oath that the applicant has withheld no disclosures as to<br />
economic interests in the undertaking nor reserved any information, data or plan<br />
as to the intended use or purpose for which it seeks <strong>County</strong> Board or other county<br />
agency action.<br />
3. All disclosures and information shall be current as of the date upon which the application<br />
is presented and shall be maintained current until such time as <strong>Kane</strong> <strong>County</strong> shall take<br />
action on the application. Furthermore, this information shall be maintained in a database<br />
by the Purchasing Department, and made available for public viewing.<br />
4. Notwithstanding any of the above provisions, the <strong>County</strong> Purchasing Department with<br />
respect to contracts awarded may require any such additional information from any<br />
applicant which is reasonably intended to achieve full disclosure relevant to the<br />
application for action by the <strong>County</strong> Board or any other <strong>County</strong> agency.<br />
5. Any failure to comply with the provisions of this section shall render any ordinance,<br />
ordinance amendment, <strong>County</strong> Board approval or other <strong>County</strong> action in behalf of the<br />
applicant failing to comply voidable at the option of the <strong>County</strong> Board or other <strong>County</strong><br />
agency involved upon the recommendation of the <strong>County</strong> Board Chairman or the<br />
majority of the <strong>County</strong> Board.<br />
6. Contractor Disclosure information shall be sent to the <strong>Kane</strong> <strong>County</strong> Purchasing<br />
Department and the <strong>Kane</strong> <strong>County</strong> Division of Transportation at the following address, or<br />
via email, prior to Transportation Committee of the <strong>Kane</strong> <strong>County</strong> Board:<br />
Company Name:<br />
Contact Person:<br />
Address:<br />
City:<br />
State:<br />
Zip Code:<br />
Phone:<br />
<strong>Kane</strong> <strong>County</strong> Government Center<br />
Purchasing Department, Bldg A<br />
719 S. Batavia Ave. Geneva, <strong>IL</strong> 60<strong>13</strong>4<br />
purchasing@countyofkane.org<br />
<strong>Kane</strong> <strong>County</strong> Division of Transportation<br />
Linda Haines<br />
41W011 Burlington Road<br />
St. Charles, <strong>IL</strong> 60175<br />
haineslinda@countyofkane.org
If not budgeted,<br />
explain funding<br />
source<br />
<strong>AG</strong>ENDA ITEM EXECUTIVE SUMMARY Agenda Item #<br />
Presenter/Sponsor:<br />
Name<br />
Budget Information: Was this item budgeted?<br />
SUMMARY:<br />
Attachments:<br />
Detailed information available from :<br />
Resolution/Ordinance Tracking:<br />
Staff Name:<br />
Appropriation Amount:<br />
Jan Ward, Chief of Planning/Programming Phone: 630-444-3143<br />
Assigned Committee: Transportation Sent to: Executive<br />
on: 04/11/20<strong>13</strong><br />
If Other, specify:<br />
Committee Remarks:<br />
<strong>County</strong> Board Date:<br />
Resolution<br />
Ordinance<br />
Yes<br />
No N/A<br />
Next Committee: Executive Sent to: <strong>County</strong> Board on: 05/08/20<strong>13</strong><br />
If Other, specify:<br />
Committee Remarks:<br />
Next Committee: Sent to: on:<br />
Committee Remarks:<br />
8B-2b<br />
Approving an Intergovernmental Agreement with the State of Illinois for Phase I<br />
Engineering Services for Kirk Road over the Union Pacific Railroad, <strong>Kane</strong> <strong>County</strong><br />
Section No. 12-00192-04-BR<br />
Steve Coffinbargar - Assistant Director of Transportation<br />
Attached is the draft intergovernmental agreement with IDOT that will provide for Federal reimbursement of a portion of<br />
Phase I Engineering for the Kirk Road over Union Pacific Railroad improvement. The anticipated funding split is as follows:<br />
Federal HBP funds of $671,174 (80%), and the <strong>County</strong> local match of $167,793 (20%) of the estimated cost of $838,967.<br />
05/14/20<strong>13</strong><br />
N/A
STATE OF <strong>IL</strong>LINOIS<br />
COUNTY OF KANE<br />
RESOLUTION NO. <strong>13</strong> -<br />
APPROVING AN INTERGOVERNMENTAL <strong>AG</strong>REEMENT WITH THE STATE OF <strong>IL</strong>LINOIS<br />
FOR PHASE I ENGINEERING SERVICES FOR<br />
KIRK ROAD OVER THE UNION PACIFIC RA<strong>IL</strong>ROAD<br />
KANE COUNTY SECTION NO. 12-00192-04-BR<br />
WHEREAS, the Illinois Constitution of 1970, Article VII, Section 10 and the Illinois Compiled<br />
Statutes, (5 <strong>IL</strong>CS 220/1, et seq.) authorizes the <strong>County</strong> of <strong>Kane</strong> (<strong>County</strong>) and the State of Illinois (State)<br />
to cooperate in the performance of their respective duties and responsibilities by contract and other<br />
agreements; and<br />
WHEREAS, the <strong>County</strong> and the State (through its Illinois Department of Transportation) desire<br />
to cooperate among themselves to accomplish the improvement of <strong>Kane</strong> <strong>County</strong> Highway No. 77 (also<br />
known as Kirk Road) over the Union Pacific Railroad (hereinafter referred to as the “Improvement”);<br />
and<br />
WHEREAS, the <strong>County</strong> and the State desire to undertake Phase I Engineering services for the<br />
Improvement at an estimated cost of Eight Hundred Thirty Eight Thousand Nine Hundred Sixty Seven<br />
Dollars ($838,967.00); and<br />
WHEREAS, the Improvement is deemed by the <strong>County</strong> and the State to be of immediate benefit<br />
to the residents of the <strong>County</strong> of <strong>Kane</strong> and the State of Illinois in that it shall facilitate the safe and<br />
efficient movement of traffic, provide for the safety of the motoring public, and preserve and protect<br />
sensitive environmental features from adjacent highway improvements; and<br />
WHEREAS, the <strong>County</strong> and the State have determined a mutually satisfactory allocation of<br />
responsibilities and costs for said Improvement as set forth in an intergovernmental agreement with the<br />
State (a copy of which is on file with the <strong>County</strong> Clerk's Office), with the <strong>County</strong>’s share of the Phase I<br />
Engineering estimated to be $167,793.00.<br />
NOW, THEREFORE, BE IT RESOLVED by the <strong>Kane</strong> <strong>County</strong> Board that the Chairman thereof<br />
is hereby authorized to execute an intergovernmental agreement(s) with the State of Illinois acting<br />
through the Illinois Department of Transportation for Phase I Engineering for the Improvement.
Passed by the <strong>Kane</strong> <strong>County</strong> Board on May 14, 20<strong>13</strong>.<br />
Page 2 of 2, Res. #<strong>13</strong>-<br />
______________________________________ ___________________________________<br />
John A. Cunningham Christopher J. Lauzen<br />
Clerk, <strong>County</strong> Board Chairman, <strong>County</strong> Board<br />
<strong>Kane</strong> <strong>County</strong>, Illinois <strong>Kane</strong> <strong>County</strong>, Illinois<br />
Vote:<br />
Yes _____<br />
No _____<br />
Voice _____<br />
Abstentions _____<br />
5KRKOVERUPRRPHI-IDOT.4LH
Local Agency Agreement<br />
for Federal Participation<br />
Local Agency<br />
<strong>County</strong> of <strong>Kane</strong><br />
Section<br />
12-00192-04-BR<br />
State Contract<br />
Fund Type<br />
Day Labor<br />
Local Contract<br />
Printed on 3/31/20<strong>13</strong> Page 1 of 5 BLR 05310 (Rev. 01/10/<strong>13</strong>)<br />
HBP<br />
X<br />
RR Force Account<br />
ITEP and/or SRTS Number<br />
Construction Engineering Right-of-Way<br />
Job Number Project Number Job Number Project Number Job Number Project Number<br />
P-91-221-<strong>13</strong> BROS-4003(164)<br />
This Agreement is made and entered into between the above local agency hereinafter referred to as the “LA” and the state of Illinois, acting<br />
by and through its Department of Transportation, hereinafter referred to as “STATE”. The STATE and LA jointly propose to improve the<br />
designated location as described below. The improvement shall be constructed in accordance with plans approved by the STATE and the<br />
STATE’s policies and procedures approved and/or required by the Federal Highway Administration hereinafter referred to as “FHWA”.<br />
Location<br />
Local Name Kirk Rd Route CH 77 Length 0.66 miles<br />
Termini<br />
over U.P. Railroad<br />
Current Jurisdiction LA Existing Structure No 045-3096<br />
Phase I Engineering for bridge rehabilitation project<br />
Project Description<br />
Division of Cost<br />
Type of Work FHWA % STATE % LA % Total<br />
Participating Construction ( ) ( ) ( )<br />
Non-Participating Construction ( ) ( ) ( )<br />
Preliminary Engineering 671,174 ( * ) ( ) 167,793 ( Bal ) 838,967<br />
Construction Engineering ( ) ( ) ( )<br />
Right of Way ( ) ( ) ( )<br />
Railroads ( ) ( ) ( )<br />
Utilities ( ) ( ) ( )<br />
Materials<br />
TOTAL $ 671,174 $ $ 167,793 $ 838,967<br />
NOTE:<br />
*Maximum FHWA (HBP) participation 80% not to exceed $671,174.<br />
The costs shown in the Division of Cost table are approximate and subject to change. The final LA share is dependent on the final Federal and<br />
State participation. The actual costs will be used in the final division of cost for billing and reimbursment.<br />
If funding is not a percentage of the total, place an asterisk in the space provided for the percentage and explain above.<br />
Local Agency Appropriation<br />
By execution of this Agreement, the LA is indicating sufficient funds have been set aside to cover the local share of the project cost and<br />
additional funds will be appropriated, if required, to cover the LA’s total cost.<br />
Method of Financing (State Contract Work)<br />
METHOD A---Lump Sum (80% of LA Obligation)<br />
METHOD B--- Monthly Payments of<br />
METHOD C---LA’s Share divided by estimated total cost multiplied by actual progress payment.<br />
(See page two for details of the above methods and the financing of Day Labor and Local Contracts)
THE LA <strong>AG</strong>REES:<br />
Agreement Provisions<br />
(1) To acquire in its name, or in the name of the state if on the state highway system, all right-of-way necessary for this project in<br />
accordance with the requirements of Titles II and III of the Uniform Relocation Assistance and Real Property Acquisition Policies<br />
Act of 1970, and established state policies and procedures. Prior to advertising for bids, the LA shall certify to the STATE that all<br />
requirements of Titles II and III of said Uniform Act have been satisfied. The disposition of encroachments, if any, will be<br />
cooperatively determined by representatives of the LA, and STATE and the FHWA, if required.<br />
(2) To provide for all utility adjustments, and to regulate the use of the right-of-way of this improvement by utilities, public and private,<br />
in accordance with the current Utility Accommodation Policy for Local Agency Highway and Street Systems.<br />
(3) To provide for surveys and the preparation of plans for the proposed improvement and engineering supervision during construction<br />
of the proposed improvement.<br />
(4) To retain jurisdiction of the completed improvement unless specified otherwise by addendum (addendum should be accompanied<br />
by a location map). If the improvement location is currently under road district jurisdiction, an addendum is required.<br />
(5) To maintain or cause to be maintained, in a manner satisfactory to the STATE and FHWA, the completed improvement, or that<br />
portion of the completed improvement within its jurisdiction as established by addendum referred to in item 4 above.<br />
(6) To comply with all applicable Executive Orders and Federal Highway Acts pursuant to the Equal Employment Opportunity and<br />
Nondiscrimination Regulations required by the U.S. Department of Transportation.<br />
(7) To maintain, for a minimum of 3 years after the completion of the contract, adequate books, records and supporting documents to<br />
verify the amounts, recipients and uses of all disbursements of funds passing in conjunction with the contract; the contract and all<br />
books, records and supporting documents related to the contract shall be available for review and audit by the Auditor General and<br />
the department; and the LA agrees to cooperate fully with any audit conducted by the Auditor General and the department; and to<br />
provide full access to all relevant materials. Failure to maintain the books, records and supporting documents required by this<br />
section shall establish a presumption in favor of the STATE for the recovery of any funds paid by the STATE under the contract for<br />
which adequate books, records and supporting documentation are not available to support their purported disbursement.<br />
(8) To provide if required, for the improvement of any railroad-highway grade crossing and rail crossing protection within the limits of<br />
the proposed improvement.<br />
(9) To comply with Federal requirements or possibly lose (partial or total) Federal participation as determined by the FHWA.<br />
(10) (State Contracts Only) That the method of payment designated on page one will be as follows:<br />
Method A - Lump Sum Payment. Upon award of the contract for this improvement, the LA will pay to the STATE, in lump sum,<br />
an amount equal to 80% of the LA’s estimated obligation incurred under this Agreement, and will pay to the STATE<br />
the remainder of the LA’s obligation (including any nonparticipating costs) in a lump sum, upon completion of the<br />
project based upon final costs.<br />
Method B - Monthly Payments. Upon award of the contract for this improvement, the LA will pay to the STATE, a specified<br />
amount each month for an estimated period of months, or until 80% of the LA’s estimated obligation under the<br />
provisions of the Agreement has been paid, and will pay to the STATE the remainder of the LA’s obligation (including<br />
any nonparticipating costs) in a lump sum, upon completion of the project based upon final costs.<br />
Method C - Progress Payments. Upon receipt of the contractor’s first and subsequent progressive bills for this improvement, the<br />
LA will pay to the STATE, an amount equal to the LA’s share of the construction cost divided by the estimated total<br />
cost, multiplied by the actual payment (appropriately adjusted for nonparticipating costs) made to the contractor until<br />
the entire obligation incurred under this Agreement has been paid.<br />
(11) (Day Labor or Local Contracts) To provide or cause to be provided all of the initial funding, equipment, labor, material and services<br />
necessary to construct the complete project.<br />
(12) (Preliminary Engineering) In the event that right-of-way acquisition for, or actual construction of the project for which this<br />
preliminary engineering is undertaken with Federal participation is not started by the close of the tenth fiscal year following the<br />
fiscal year in which this agreement is executed, the LA will repay the STATE any Federal funds received under the terms of this<br />
Agreement.<br />
(<strong>13</strong>) (Right-of-Way Acquisition) In the event that the actual construction of the project on this right-of-way is not undertaken by the<br />
close of the twentieth fiscal year following the fiscal year in which this Agreement is executed, the LA will repay the STATE any<br />
Federal Funds received under the terms of this Agreement.<br />
Printed on 3/31/20<strong>13</strong> Page 2 of 5 BLR 05310 (Rev. 01/10/<strong>13</strong>)
(14) (Railroad Related Work Only) The estimates and general layout plans for at-grade crossing improvements should be forwarded to<br />
the Rail Safety and Project Engineer, Room 204, Illinois Department of Transportation, 2300 South Dirksen Parkway, Springfield,<br />
Illinois, 62764. Approval of the estimates and general layout plans should be obtained prior to the commencement of railroad<br />
related work. All railroad related work is also subject to approval be the Illinois Commerce Commission (ICC). Final inspection for<br />
railroad related work should be coordinated through appropriate IDOT District Bureau of Local Roads and Streets office.<br />
Plans and preemption times for signal related work that will be interconnected with traffic signals shall be submitted to the ICC for<br />
review and approval prior to the commencement of work. Signal related work involving interconnects with state maintained traffic<br />
signals should also be coordinated with the IDOT’s District Bureau of Operations.<br />
The LA is responsible for the payment of the railroad related expenses in accordance with the LA/railroad agreement prior to<br />
requesting reimbursement from IDOT. Requests for reimbursement should be sent to the appropriate IDOT District Bureau of<br />
Local Roads and Streets office.<br />
Engineer’s Payment Estimates in accordance with the Division of Cost on page one.<br />
(15) And certifies to the best of its knowledge and belief its officials:<br />
(a) are not presently debarred, suspended, proposed for debarment, declared ineligible or voluntarily excluded from covered<br />
transactions by any Federal department or agency;<br />
(b) have not within a three-year period preceding this Agreement been convicted of or had a civil judgment rendered against them<br />
for commission of fraud or a criminal offense in connection with obtaining, attempting to obtain or performing a public (Federal,<br />
State or local) transaction or contract under a public transaction; violation of Federal or State antitrust statutes or commission<br />
of embezzlement, theft, forgery, bribery, falsification or destruction of records, making false statements receiving stolen<br />
property;<br />
(c) are not presently indicted for or otherwise criminally or civilly charged by a governmental entity (Federal, State, local) with<br />
commission of any of the offenses enumerated in item (b) of this certification; and<br />
(d) have not within a three-year period preceding the Agreement had one or more public transactions (Federal, State, local)<br />
terminated for cause or default.<br />
(16) To include the certifications, listed in item 15 above and all other certifications required by State statutes, in every contract,<br />
including procurement of materials and leases of equipment.<br />
(17) (State Contracts) That execution of this agreement constitutes the LA’s concurrence in the award of the construction contract to<br />
the responsible low bidder as determined by the STATE.<br />
(18) That for agreements exceeding $100,000 in federal funds, execution of this Agreement constitutes the LA’s certification that:<br />
(a) No Federal appropriated funds have been paid or will be paid, by or on behalf of the undersigned, to any person for<br />
influencing or attempting to influence an officer or employee of any agency, a Member of Congress, an officer or employee of<br />
Congress or any employee of a Member of Congress in connection with the awarding of any Federal contract, the making of<br />
any cooperative agreement, and the extension, continuation, renewal, amendment or modification of any Federal contract,<br />
grant, loan or cooperative agreement;<br />
(b) If any funds other than Federal appropriated funds have been paid or will be paid to any person for influencing or attempting to<br />
influence an officer or employee of any agency, a Member of Congress, an officer or employee of Congress or an employee of<br />
a Member of Congress, in connection with this Federal contract, grant, loan or cooperative agreement, the undersigned shall<br />
complete and submit Standard Form-LLL, “Disclosure Form to Report Lobbying”, in accordance with its instructions;<br />
(c) The LA shall require that the language of this certification be included in the award documents for all subawards at all ties<br />
(including subcontracts, subgrants and contracts under grants, loans and cooperative agreements) and that all subrecipients<br />
shall certify and disclose accordingly.<br />
(19) To regulate parking and traffic in accordance with the approved project report.<br />
(20) To regulate encroachments on public right-of-way in accordance with current Illinois Compiled Statutes.<br />
(21) To regulate the discharge of sanitary sewage into any storm water drainage system constructed with this improvement in<br />
accordance with current Illinois Compiled Statutes.<br />
(22) That the LA may invoice the STATE monthly for the FHWA and/or STATE share of the costs incurred for this phase of the<br />
improvement. The LA will submit supporting documentation with each request for reimbursement from the STATE. Supporting<br />
documentation is defined as verification of payment, certified time sheets, vendor invoices, vendor receipts, and other<br />
documentation supporting the requested reimbursement amount.<br />
(23) To complete this phase of the project within three years from the date this agreement is approved by the STATE if this portion of<br />
the project described in the Project Description does not exceed $1,000,000 (five years if the project costs exceed $1,000,000).<br />
(24) Upon completion of this phase of the improvement, the LA will submit to the STATE a complete and detailed final invoice with all<br />
applicable supporting supporting documentation of all incurred costs, less previous payments, no later than one year from the date<br />
of completion of this phase of the improvement. If a final invoice is not received within one year of completion of this phase of the<br />
improvement, the most recent invoice may be considered the final invoice and the obligation of the funds closed.<br />
Printed on 3/31/20<strong>13</strong> Page 3 of 5 BLR 05310 (Rev. 01/10/<strong>13</strong>)
(25) (Single Audit Requirements) That if the LA expends $500,000 or more a year in federal financial assistance they shall have an<br />
audit made in accordance with the Office of Management and Budget (OMB) Circular No. A-<strong>13</strong>3. LA’s that expend less than<br />
$500,000 a year shall be exempt from compliance. A copy of the audit report must be submitted to the STATE with 30 days after<br />
the completion of the audit, but no later than one year after the end of the LA’s fiscal year. The CFDA number for all highway<br />
planning and construction activities is 20.205.<br />
(26) That the LA is required to register with the Central Contractor Registration (CCR), which is a web-enabled government-wide<br />
application that collects, validates, stores, and disseminates business information about the federal government’s trading partners<br />
in support of the contract award and the electronic payment processes. If you do not have a CCR number, you must register at<br />
https://www.uscontractorregistration.com. If the LA, as a sub-recipient of a federal funding, receives an amount equal to or greater<br />
than $25,000 (or which equals or exceeds that amount by addition of subsequent funds), this agreement is subject to the following<br />
award terms: http://edocket.access.gpo.gov/2010/<strong>pdf</strong>/2010-22705.<strong>pdf</strong> and http://edocket.access.gpo.gov/2010/<strong>pdf</strong>/2010-<br />
22706.<strong>pdf</strong>.<br />
THE STATE <strong>AG</strong>REES:<br />
(1) To provide such guidance, assistance and supervision and to monitor and perform audits to the extent necessary to assure validity<br />
of the LA’s certification of compliance with Titles II and III requirements.<br />
(2) (State Contracts) To receive bids for the construction of the proposed improvement when the plans have been approved by the<br />
STATE (and FHWA, if required) and to award a contract for construction of the proposed improvement, after receipt of a<br />
satisfactory bid.<br />
(3) (Day Labor) To authorize the LA to proceed with the construction of the improvement when Agreed Unit Prices are approved and<br />
to reimburse the LA for that portion of the cost payable from Federal and/or State funds based on the Agreed Unit Prices and<br />
Engineer’s Payment Estimates in accordance with the Division of Cost on page one.<br />
(4) (Local Contracts) That for agreements with Federal and/or State funds in engineering, right-of-way, utility work and/or construction<br />
work:<br />
(a) To reimburse the LA for the Federal and/or State share on the basis of periodic billings, provided said billings contain sufficient<br />
cost information and show evidence of payment by the LA;<br />
(b) To provide independent assurance sampling, to furnish off-site material inspection and testing at sources normally visited by<br />
STATE inspectors of steel, cement, aggregate, structural steel and other materials customarily tested by the STATE.<br />
IT IS MUTUALLY <strong>AG</strong>REED:<br />
(1) Construction of the project will utilize domestic steel as required by Section 106.01 of the current edition of the Standard<br />
Specifications for Road and Bridge Construction.<br />
(2) That this Agreement and the covenants contained herein shall become null and void in the event that the FHWA does not approve<br />
the proposed improvement for Federal-aid participation or the contract covering the construction work contemplated herein is not<br />
awarded within three years of the date of execution of this Agreement.<br />
(3) This Agreement shall be binding upon the parties, their successors and assigns.<br />
(4) For contracts awarded by the LA, the LA shall not discriminate on the basis of race, color, national origin or sex in the award and<br />
performance of any USDOT – assisted contract or in the administration of its DBE program or the requirements of 49 CFR part 26.<br />
The LA shall take all necessary and reasonable steps under 49 CFR part 26 to ensure nondiscrimination in the award and<br />
administration of USDOT – assisted contracts. The LA’s DBE program, as required by 49 CFR part 26 and as approved by<br />
USDOT, is incorporated by reference in this Agreement. Upon notification to the recipient of its failure to carry out its approved<br />
program, the department may impose sanctions as provided for under part 26 and may, in appropriate cases, refer the matter for<br />
enforcement under 18 U.S.C. 1001 and/or the Program Fraud Civil Remedies Act of 1986 (31U.S.C. 3801 et seq.). In the absence<br />
of a USDOT – approved LA DBE Program or on State awarded contracts, this Agreement shall be administered under the<br />
provisions of the STATE’s USDOT approved Disadvantaged Business Enterprise Program.<br />
(5) In cases where the STATE is reimbursing the LA, obligations of the STATE shall cease immediately without penalty or further<br />
payment being required if, in any fiscal year, the Illinois General Assembly or applicable Federal Funding source fails to<br />
appropriate or otherwise make available funds for the work contemplated herein.<br />
(6) All projects for the construction of fixed works which are financed in whole or in part with funds provided by this Agreement and/or<br />
amendment shall be subject to the Prevailing Wage Act (820 <strong>IL</strong>CS <strong>13</strong>0/0.01 et seq.) unless the provisions of that Act exempt its<br />
application<br />
Printed on 3/31/20<strong>13</strong> Page 4 of 5 BLR 05310 (Rev. 01/10/<strong>13</strong>)
ADDENDA<br />
Additional information and/or stipulations are hereby attached and identified below as being a part of this Agreement.<br />
Number 1 Location Map<br />
(Insert addendum numbers and titles as applicable)<br />
The LA further agrees, as a condition of payment, that it accepts and will comply with the applicable provisions set forth in this<br />
Agreement and all exhibits indicated above.<br />
APPROVED APPROVED<br />
Local Agency State of Illinois<br />
Department of Transportation<br />
Christopher J. Lauzen<br />
Name of Official (Print or Type Name) Ann L. Schneider, Secretary of Transportation Date<br />
<strong>County</strong> Board Chairman By:<br />
Title (<strong>County</strong> Board Chairperson/Mayor/Village President/etc.) Aaron A. Weatherholt, Deputy Director of Highways Date<br />
(Signature) Date<br />
Omer Osman, Director of Highways/Chief Engineer Date<br />
The above signature certifies the agency’s TIN number is Michael A. Forti, Chief Counsel Date<br />
36-6006585 conducting business as a Governmental<br />
Entity.<br />
DUNS Number 945248565 Matthew R. Hughes, Director of Finance and Administration Date<br />
NOTE: If signature is by an APPOINTED official, a resolution<br />
authorizing said appointed official to execute this agreement is<br />
required.<br />
Printed on 3/31/20<strong>13</strong> Page 5 of 5 BLR 05310 (Rev. 01/10/<strong>13</strong>)
31<br />
25<br />
0 485 970 1,940 2,910 3,880<br />
Feet<br />
Cherry<br />
8<br />
Wilson St.<br />
0 1 Miles<br />
Kirk Rd<br />
77<br />
38<br />
Fabyan<br />
Section Number 12-00192-04-BR<br />
Kirk Road over Union Pacific Railroad<br />
M:\DotserverD\USERS\Shared File System\GIS\Projects\Press Releases\Kirk Rd\Map Standard_Kirk Rd over UP RR loc map.mxd<br />
K<br />
Kirk Rd. over<br />
Union Pacific RR<br />
Legend<br />
467 34<br />
§¨¦ 88<br />
£¤ 30<br />
!( 31<br />
Hampshire Rutland Dundee<br />
Burlington Plato<br />
Virgil Campton<br />
<strong>Kane</strong>ville<br />
Big Rock<br />
Elgin<br />
Geneva<br />
Blackberry<br />
Batavia<br />
Interstates<br />
US Roads<br />
State Roads<br />
<strong>County</strong> Roads<br />
Other Roads<br />
Rail Roads<br />
<strong>County</strong> Boundry<br />
Township Boundry<br />
Fox River<br />
Forest Preserves<br />
Municipalities<br />
Aurora<br />
/
31<br />
25<br />
0 485 970 1,940 2,910 3,880<br />
Feet<br />
Cherry<br />
8<br />
Wilson St.<br />
0 1 Miles<br />
Kirk Rd<br />
77<br />
38<br />
Fabyan<br />
Section Number 12-00192-04-BR<br />
Kirk Road over Union Pacific Railroad<br />
M:\DotserverD\USERS\Shared File System\GIS\Projects\Press Releases\Kirk Rd\Map Standard Aerial_Kirk Rd over UP RR loc map.mxd<br />
K<br />
Kirk Rd. over<br />
Union Pacific RR<br />
Legend<br />
467 34<br />
§¨¦ 88<br />
£¤ 30<br />
!( 31<br />
Hampshire Rutland Dundee<br />
Burlington Plato<br />
Virgil Campton<br />
<strong>Kane</strong>ville<br />
Big Rock<br />
Elgin<br />
Geneva<br />
Blackberry<br />
Batavia<br />
Interstates<br />
US Roads<br />
State Roads<br />
<strong>County</strong> Roads<br />
Other Roads<br />
Rail Roads<br />
<strong>County</strong> Boundry<br />
Township Boundry<br />
Fox River<br />
Forest Preserves<br />
Municipalities<br />
Aurora<br />
/
If not budgeted,<br />
explain funding<br />
source<br />
<strong>AG</strong>ENDA ITEM EXECUTIVE SUMMARY Agenda Item #<br />
Presenter/Sponsor:<br />
Name<br />
Budget Information: Was this item budgeted?<br />
SUMMARY:<br />
Attachments:<br />
Detailed information available from :<br />
Resolution/Ordinance Tracking:<br />
Staff Name:<br />
Appropriation Amount:<br />
Jan Ward, Chief of Planning/Programming Phone: 630.444.3143<br />
Assigned Committee: Transportation Sent to: Executive<br />
on: 04/11/20<strong>13</strong><br />
If Other, specify:<br />
Committee Remarks:<br />
<strong>County</strong> Board Date:<br />
Resolution<br />
Ordinance<br />
Yes<br />
No N/A<br />
Next Committee: Executive Sent to: <strong>County</strong> Board on: 05/08/20<strong>13</strong><br />
If Other, specify:<br />
Committee Remarks:<br />
Next Committee: Sent to: on:<br />
Committee Remarks:<br />
8C-1a<br />
Approving an Intergovernmental Agreement with the State of Illinois Regarding<br />
Construction of Fabyan Parkway from East of Illinois Route 25 to Nagel Boulevard,<br />
<strong>Kane</strong> <strong>County</strong> Section No. 10-00404-00-CH<br />
Steve Coffinbargar - Assistant Director of Transportation<br />
Attached is the draft intergovernmental agreement with IDOT that will provide for Federal reimbursement of a portion of<br />
the Construction cost of the Fabyan Parkway, east of <strong>IL</strong> Route 25 to Nagel Boulevard improvement. The anticipated funding<br />
split is as follows: Federal CMAQ funds of $1,026,319 (80%), and the <strong>County</strong> local match of $256,580 (20%) of the estimated<br />
cost of $1,282,899.<br />
This improvement will improve safety and and address congestion by providing a median and center left turn lane along<br />
this segment of Fabyan Parkway.<br />
Resolution, Draft Funding Agreement<br />
05/14/20<strong>13</strong><br />
N/A
STATE OF <strong>IL</strong>LINOIS<br />
COUNTY OF KANE<br />
RESOLUTION NO. <strong>13</strong> –<br />
APPROVING AN INTERGOVERNMENTAL <strong>AG</strong>REEMENT WITH THE STATE OF <strong>IL</strong>LINOIS<br />
REGARDING CONSTRUCTION OF FABYAN PARKWAY<br />
FROM EAST OF <strong>IL</strong>LINOIS ROUTE 25 TO N<strong>AG</strong>EL BOULEVARD<br />
KANE COUNTY SECTION NO. 10-00404-00-CH<br />
WHEREAS, the Illinois Constitution of 1970, Article VII, Section 10 and 5 <strong>IL</strong>CS 220/1, et seq.<br />
authorizes the <strong>County</strong> of <strong>Kane</strong> (<strong>County</strong>) and the State of Illinois (State) to cooperate in the performance<br />
of their respective duties and responsibilities by contract and other agreements; and<br />
WHEREAS, the <strong>County</strong> and the State (acting through its Department of Transportation) desire<br />
to cooperate among themselves to accomplish the improvement of Fabyan Parkway from east of Illinois<br />
Route 25 to Nagel Boulevard (hereinafter referred to as the “Improvement”); and<br />
WHEREAS, the <strong>County</strong> and the State desire to undertake Phase III Construction for the<br />
Improvement at an estimated cost of $1,282,899.00; and<br />
WHEREAS, the Improvement is deemed by the <strong>County</strong> and the State to be of immediate benefit<br />
to the residents of the <strong>County</strong> of <strong>Kane</strong> and the State of Illinois in that it shall facilitate the safe and<br />
efficient movement of traffic and shall provide for the safety of the motoring public; and<br />
WHEREAS, the <strong>County</strong> and the State have determined a mutually satisfactory allocation of<br />
responsibilities and costs for said Improvement as set forth in an agreement with the State (a copy of<br />
which is on file with the <strong>County</strong> Clerk's Office), with the <strong>County</strong>’s share of the Phase III Construction<br />
estimated to be Two Hundred Fifty Six Thousand Five Hundred Eighty Dollars ($256,580.00).<br />
NOW, THEREFORE, BE IT RESOLVED by the <strong>Kane</strong> <strong>County</strong> Board that the Chairman thereof<br />
is hereby authorized to execute an intergovernmental agreement with the State of Illinois acting through<br />
the Illinois Department of Transportation for Phase III Construction for the Improvement.
Passed by the <strong>Kane</strong> <strong>County</strong> Board on May 14, 20<strong>13</strong>.<br />
Page 2 of 2, Res. #<strong>13</strong>-<br />
______________________________________ ___________________________________<br />
John A. Cunningham Christopher J. Lauzen<br />
Clerk, <strong>County</strong> Board Chairman, <strong>County</strong> Board<br />
<strong>Kane</strong> <strong>County</strong>, Illinois <strong>Kane</strong> <strong>County</strong>, Illinois<br />
Vote:<br />
Yes _____<br />
No _____<br />
Voice _____<br />
Abstentions _____<br />
5FBYN-N<strong>AG</strong>LTO<strong>IL</strong>25 PHIII-IDOT.4LH
Local Agency Agreement<br />
for Federal Participation<br />
Local Agency<br />
<strong>County</strong> of <strong>Kane</strong><br />
Section<br />
10-00404-00-CH<br />
State Contract<br />
Fund Type<br />
Day Labor<br />
Local Contract<br />
Printed on 3/31/20<strong>13</strong> Page 1 of 5 BLR 05310 (Rev. 01/10/<strong>13</strong>)<br />
STA<br />
X<br />
RR Force Account<br />
ITEP and/or SRTS Number<br />
Construction Engineering Right-of-Way<br />
Job Number Project Number Job Number Project Number Job Number Project Number<br />
C-91-274-<strong>13</strong> CMM-9003(627)<br />
This Agreement is made and entered into between the above local agency hereinafter referred to as the “LA” and the state of Illinois, acting<br />
by and through its Department of Transportation, hereinafter referred to as “STATE”. The STATE and LA jointly propose to improve the<br />
designated location as described below. The improvement shall be constructed in accordance with plans approved by the STATE and the<br />
STATE’s policies and procedures approved and/or required by the Federal Highway Administration hereinafter referred to as “FHWA”.<br />
Location<br />
Local Name Fabyan Parkway Route FAP 0363 Length 0.40 mile<br />
Termini<br />
East of <strong>IL</strong> Route 25 to Nagel Blvd<br />
Current Jurisdiction LA Existing Structure No<br />
Construction to widen/install bi-directional left turn lanes<br />
Project Description<br />
Division of Cost<br />
Type of Work FHWA % STATE % LA % Total<br />
Participating Construction 1,026,319 ( * ) ( ) 256,580 ( BAL ) 1,282,899<br />
Non-Participating Construction ( ) ( ) ( )<br />
Preliminary Engineering ( ) ( ) ( )<br />
Construction Engineering ( ) ( ) ( )<br />
Right of Way ( ) ( ) ( )<br />
Railroads ( ) ( ) ( )<br />
Utilities ( ) ( ) ( )<br />
Materials<br />
TOTAL $ 1,026,319 $ $ 256,580 $ 1,282,899<br />
NOTE:<br />
*Maximum FHWA (STA) participation 80%, not to exceed $1,026,319<br />
The costs shown in the Division of Cost table are approximate and subject to change. The final LA share is dependent on the final Federal and<br />
State participation. The actual costs will be used in the final division of cost for billing and reimbursment.<br />
If funding is not a percentage of the total, place an asterisk in the space provided for the percentage and explain above.<br />
Local Agency Appropriation<br />
By execution of this Agreement, the LA is indicating sufficient funds have been set aside to cover the local share of the project cost and<br />
additional funds will be appropriated, if required, to cover the LA’s total cost.<br />
Method of Financing (State Contract Work)<br />
METHOD A---Lump Sum (80% of LA Obligation)<br />
METHOD B--- Monthly Payments of<br />
METHOD C---LA’s Share divided by estimated total cost multiplied by actual progress payment.<br />
(See page two for details of the above methods and the financing of Day Labor and Local Contracts)
THE LA <strong>AG</strong>REES:<br />
Agreement Provisions<br />
(1) To acquire in its name, or in the name of the state if on the state highway system, all right-of-way necessary for this project in<br />
accordance with the requirements of Titles II and III of the Uniform Relocation Assistance and Real Property Acquisition Policies<br />
Act of 1970, and established state policies and procedures. Prior to advertising for bids, the LA shall certify to the STATE that all<br />
requirements of Titles II and III of said Uniform Act have been satisfied. The disposition of encroachments, if any, will be<br />
cooperatively determined by representatives of the LA, and STATE and the FHWA, if required.<br />
(2) To provide for all utility adjustments, and to regulate the use of the right-of-way of this improvement by utilities, public and private,<br />
in accordance with the current Utility Accommodation Policy for Local Agency Highway and Street Systems.<br />
(3) To provide for surveys and the preparation of plans for the proposed improvement and engineering supervision during construction<br />
of the proposed improvement.<br />
(4) To retain jurisdiction of the completed improvement unless specified otherwise by addendum (addendum should be accompanied<br />
by a location map). If the improvement location is currently under road district jurisdiction, an addendum is required.<br />
(5) To maintain or cause to be maintained, in a manner satisfactory to the STATE and FHWA, the completed improvement, or that<br />
portion of the completed improvement within its jurisdiction as established by addendum referred to in item 4 above.<br />
(6) To comply with all applicable Executive Orders and Federal Highway Acts pursuant to the Equal Employment Opportunity and<br />
Nondiscrimination Regulations required by the U.S. Department of Transportation.<br />
(7) To maintain, for a minimum of 3 years after the completion of the contract, adequate books, records and supporting documents to<br />
verify the amounts, recipients and uses of all disbursements of funds passing in conjunction with the contract; the contract and all<br />
books, records and supporting documents related to the contract shall be available for review and audit by the Auditor General and<br />
the department; and the LA agrees to cooperate fully with any audit conducted by the Auditor General and the department; and to<br />
provide full access to all relevant materials. Failure to maintain the books, records and supporting documents required by this<br />
section shall establish a presumption in favor of the STATE for the recovery of any funds paid by the STATE under the contract for<br />
which adequate books, records and supporting documentation are not available to support their purported disbursement.<br />
(8) To provide if required, for the improvement of any railroad-highway grade crossing and rail crossing protection within the limits of<br />
the proposed improvement.<br />
(9) To comply with Federal requirements or possibly lose (partial or total) Federal participation as determined by the FHWA.<br />
(10) (State Contracts Only) That the method of payment designated on page one will be as follows:<br />
Method A - Lump Sum Payment. Upon award of the contract for this improvement, the LA will pay to the STATE, in lump sum,<br />
an amount equal to 80% of the LA’s estimated obligation incurred under this Agreement, and will pay to the STATE<br />
the remainder of the LA’s obligation (including any nonparticipating costs) in a lump sum, upon completion of the<br />
project based upon final costs.<br />
Method B - Monthly Payments. Upon award of the contract for this improvement, the LA will pay to the STATE, a specified<br />
amount each month for an estimated period of months, or until 80% of the LA’s estimated obligation under the<br />
provisions of the Agreement has been paid, and will pay to the STATE the remainder of the LA’s obligation (including<br />
any nonparticipating costs) in a lump sum, upon completion of the project based upon final costs.<br />
Method C - Progress Payments. Upon receipt of the contractor’s first and subsequent progressive bills for this improvement, the<br />
LA will pay to the STATE, an amount equal to the LA’s share of the construction cost divided by the estimated total<br />
cost, multiplied by the actual payment (appropriately adjusted for nonparticipating costs) made to the contractor until<br />
the entire obligation incurred under this Agreement has been paid.<br />
(11) (Day Labor or Local Contracts) To provide or cause to be provided all of the initial funding, equipment, labor, material and services<br />
necessary to construct the complete project.<br />
(12) (Preliminary Engineering) In the event that right-of-way acquisition for, or actual construction of the project for which this<br />
preliminary engineering is undertaken with Federal participation is not started by the close of the tenth fiscal year following the<br />
fiscal year in which this agreement is executed, the LA will repay the STATE any Federal funds received under the terms of this<br />
Agreement.<br />
(<strong>13</strong>) (Right-of-Way Acquisition) In the event that the actual construction of the project on this right-of-way is not undertaken by the<br />
close of the twentieth fiscal year following the fiscal year in which this Agreement is executed, the LA will repay the STATE any<br />
Federal Funds received under the terms of this Agreement.<br />
Printed on 3/31/20<strong>13</strong> Page 2 of 5 BLR 05310 (Rev. 01/10/<strong>13</strong>)
(14) (Railroad Related Work Only) The estimates and general layout plans for at-grade crossing improvements should be forwarded to<br />
the Rail Safety and Project Engineer, Room 204, Illinois Department of Transportation, 2300 South Dirksen Parkway, Springfield,<br />
Illinois, 62764. Approval of the estimates and general layout plans should be obtained prior to the commencement of railroad<br />
related work. All railroad related work is also subject to approval be the Illinois Commerce Commission (ICC). Final inspection for<br />
railroad related work should be coordinated through appropriate IDOT District Bureau of Local Roads and Streets office.<br />
Plans and preemption times for signal related work that will be interconnected with traffic signals shall be submitted to the ICC for<br />
review and approval prior to the commencement of work. Signal related work involving interconnects with state maintained traffic<br />
signals should also be coordinated with the IDOT’s District Bureau of Operations.<br />
The LA is responsible for the payment of the railroad related expenses in accordance with the LA/railroad agreement prior to<br />
requesting reimbursement from IDOT. Requests for reimbursement should be sent to the appropriate IDOT District Bureau of<br />
Local Roads and Streets office.<br />
Engineer’s Payment Estimates in accordance with the Division of Cost on page one.<br />
(15) And certifies to the best of its knowledge and belief its officials:<br />
(a) are not presently debarred, suspended, proposed for debarment, declared ineligible or voluntarily excluded from covered<br />
transactions by any Federal department or agency;<br />
(b) have not within a three-year period preceding this Agreement been convicted of or had a civil judgment rendered against them<br />
for commission of fraud or a criminal offense in connection with obtaining, attempting to obtain or performing a public (Federal,<br />
State or local) transaction or contract under a public transaction; violation of Federal or State antitrust statutes or commission<br />
of embezzlement, theft, forgery, bribery, falsification or destruction of records, making false statements receiving stolen<br />
property;<br />
(c) are not presently indicted for or otherwise criminally or civilly charged by a governmental entity (Federal, State, local) with<br />
commission of any of the offenses enumerated in item (b) of this certification; and<br />
(d) have not within a three-year period preceding the Agreement had one or more public transactions (Federal, State, local)<br />
terminated for cause or default.<br />
(16) To include the certifications, listed in item 15 above and all other certifications required by State statutes, in every contract,<br />
including procurement of materials and leases of equipment.<br />
(17) (State Contracts) That execution of this agreement constitutes the LA’s concurrence in the award of the construction contract to<br />
the responsible low bidder as determined by the STATE.<br />
(18) That for agreements exceeding $100,000 in federal funds, execution of this Agreement constitutes the LA’s certification that:<br />
(a) No Federal appropriated funds have been paid or will be paid, by or on behalf of the undersigned, to any person for<br />
influencing or attempting to influence an officer or employee of any agency, a Member of Congress, an officer or employee of<br />
Congress or any employee of a Member of Congress in connection with the awarding of any Federal contract, the making of<br />
any cooperative agreement, and the extension, continuation, renewal, amendment or modification of any Federal contract,<br />
grant, loan or cooperative agreement;<br />
(b) If any funds other than Federal appropriated funds have been paid or will be paid to any person for influencing or attempting to<br />
influence an officer or employee of any agency, a Member of Congress, an officer or employee of Congress or an employee of<br />
a Member of Congress, in connection with this Federal contract, grant, loan or cooperative agreement, the undersigned shall<br />
complete and submit Standard Form-LLL, “Disclosure Form to Report Lobbying”, in accordance with its instructions;<br />
(c) The LA shall require that the language of this certification be included in the award documents for all subawards at all ties<br />
(including subcontracts, subgrants and contracts under grants, loans and cooperative agreements) and that all subrecipients<br />
shall certify and disclose accordingly.<br />
(19) To regulate parking and traffic in accordance with the approved project report.<br />
(20) To regulate encroachments on public right-of-way in accordance with current Illinois Compiled Statutes.<br />
(21) To regulate the discharge of sanitary sewage into any storm water drainage system constructed with this improvement in<br />
accordance with current Illinois Compiled Statutes.<br />
(22) That the LA may invoice the STATE monthly for the FHWA and/or STATE share of the costs incurred for this phase of the<br />
improvement. The LA will submit supporting documentation with each request for reimbursement from the STATE. Supporting<br />
documentation is defined as verification of payment, certified time sheets, vendor invoices, vendor receipts, and other<br />
documentation supporting the requested reimbursement amount.<br />
(23) To complete this phase of the project within three years from the date this agreement is approved by the STATE if this portion of<br />
the project described in the Project Description does not exceed $1,000,000 (five years if the project costs exceed $1,000,000).<br />
(24) Upon completion of this phase of the improvement, the LA will submit to the STATE a complete and detailed final invoice with all<br />
applicable supporting supporting documentation of all incurred costs, less previous payments, no later than one year from the date<br />
of completion of this phase of the improvement. If a final invoice is not received within one year of completion of this phase of the<br />
improvement, the most recent invoice may be considered the final invoice and the obligation of the funds closed.<br />
Printed on 3/31/20<strong>13</strong> Page 3 of 5 BLR 05310 (Rev. 01/10/<strong>13</strong>)
(25) (Single Audit Requirements) That if the LA expends $500,000 or more a year in federal financial assistance they shall have an<br />
audit made in accordance with the Office of Management and Budget (OMB) Circular No. A-<strong>13</strong>3. LA’s that expend less than<br />
$500,000 a year shall be exempt from compliance. A copy of the audit report must be submitted to the STATE with 30 days after<br />
the completion of the audit, but no later than one year after the end of the LA’s fiscal year. The CFDA number for all highway<br />
planning and construction activities is 20.205.<br />
(26) That the LA is required to register with the Central Contractor Registration (CCR), which is a web-enabled government-wide<br />
application that collects, validates, stores, and disseminates business information about the federal government’s trading partners<br />
in support of the contract award and the electronic payment processes. If you do not have a CCR number, you must register at<br />
https://www.uscontractorregistration.com. If the LA, as a sub-recipient of a federal funding, receives an amount equal to or greater<br />
than $25,000 (or which equals or exceeds that amount by addition of subsequent funds), this agreement is subject to the following<br />
award terms: http://edocket.access.gpo.gov/2010/<strong>pdf</strong>/2010-22705.<strong>pdf</strong> and http://edocket.access.gpo.gov/2010/<strong>pdf</strong>/2010-<br />
22706.<strong>pdf</strong>.<br />
THE STATE <strong>AG</strong>REES:<br />
(1) To provide such guidance, assistance and supervision and to monitor and perform audits to the extent necessary to assure validity<br />
of the LA’s certification of compliance with Titles II and III requirements.<br />
(2) (State Contracts) To receive bids for the construction of the proposed improvement when the plans have been approved by the<br />
STATE (and FHWA, if required) and to award a contract for construction of the proposed improvement, after receipt of a<br />
satisfactory bid.<br />
(3) (Day Labor) To authorize the LA to proceed with the construction of the improvement when Agreed Unit Prices are approved and<br />
to reimburse the LA for that portion of the cost payable from Federal and/or State funds based on the Agreed Unit Prices and<br />
Engineer’s Payment Estimates in accordance with the Division of Cost on page one.<br />
(4) (Local Contracts) That for agreements with Federal and/or State funds in engineering, right-of-way, utility work and/or construction<br />
work:<br />
(a) To reimburse the LA for the Federal and/or State share on the basis of periodic billings, provided said billings contain sufficient<br />
cost information and show evidence of payment by the LA;<br />
(b) To provide independent assurance sampling, to furnish off-site material inspection and testing at sources normally visited by<br />
STATE inspectors of steel, cement, aggregate, structural steel and other materials customarily tested by the STATE.<br />
IT IS MUTUALLY <strong>AG</strong>REED:<br />
(1) Construction of the project will utilize domestic steel as required by Section 106.01 of the current edition of the Standard<br />
Specifications for Road and Bridge Construction.<br />
(2) That this Agreement and the covenants contained herein shall become null and void in the event that the FHWA does not approve<br />
the proposed improvement for Federal-aid participation or the contract covering the construction work contemplated herein is not<br />
awarded within three years of the date of execution of this Agreement.<br />
(3) This Agreement shall be binding upon the parties, their successors and assigns.<br />
(4) For contracts awarded by the LA, the LA shall not discriminate on the basis of race, color, national origin or sex in the award and<br />
performance of any USDOT – assisted contract or in the administration of its DBE program or the requirements of 49 CFR part 26.<br />
The LA shall take all necessary and reasonable steps under 49 CFR part 26 to ensure nondiscrimination in the award and<br />
administration of USDOT – assisted contracts. The LA’s DBE program, as required by 49 CFR part 26 and as approved by<br />
USDOT, is incorporated by reference in this Agreement. Upon notification to the recipient of its failure to carry out its approved<br />
program, the department may impose sanctions as provided for under part 26 and may, in appropriate cases, refer the matter for<br />
enforcement under 18 U.S.C. 1001 and/or the Program Fraud Civil Remedies Act of 1986 (31U.S.C. 3801 et seq.). In the absence<br />
of a USDOT – approved LA DBE Program or on State awarded contracts, this Agreement shall be administered under the<br />
provisions of the STATE’s USDOT approved Disadvantaged Business Enterprise Program.<br />
(5) In cases where the STATE is reimbursing the LA, obligations of the STATE shall cease immediately without penalty or further<br />
payment being required if, in any fiscal year, the Illinois General Assembly or applicable Federal Funding source fails to<br />
appropriate or otherwise make available funds for the work contemplated herein.<br />
(6) All projects for the construction of fixed works which are financed in whole or in part with funds provided by this Agreement and/or<br />
amendment shall be subject to the Prevailing Wage Act (820 <strong>IL</strong>CS <strong>13</strong>0/0.01 et seq.) unless the provisions of that Act exempt its<br />
application<br />
Printed on 3/31/20<strong>13</strong> Page 4 of 5 BLR 05310 (Rev. 01/10/<strong>13</strong>)
ADDENDA<br />
Additional information and/or stipulations are hereby attached and identified below as being a part of this Agreement.<br />
Number 1 Location Map<br />
(Insert addendum numbers and titles as applicable)<br />
The LA further agrees, as a condition of payment, that it accepts and will comply with the applicable provisions set forth in this<br />
Agreement and all exhibits indicated above.<br />
APPROVED APPROVED<br />
Local Agency State of Illinois<br />
Department of Transportation<br />
Christopher J. Lauzen<br />
Name of Official (Print or Type Name) Ann L. Schneider, Secretary of Transportation Date<br />
<strong>County</strong> Board Chairman<br />
By:<br />
Title (<strong>County</strong> Board Chairperson/Mayor/Village President/etc.) Aaron A. Weatherholt, Deputy Director of Highways Date<br />
(Signature) Date<br />
Omer Osman, Director of Highways/Chief Engineer Date<br />
The above signature certifies the agency’s TIN number is Michael A. Forti, Chief Counsel Date<br />
36-6006585 conducting business as a Governmental<br />
Entity.<br />
DUNS Number 945248565 Matthew R. Hughes, Director of Finance and Administration Date<br />
NOTE: If signature is by an APPOINTED official, a resolution<br />
authorizing said appointed official to execute this agreement is<br />
required.<br />
Printed on 3/31/20<strong>13</strong> Page 5 of 5 BLR 05310 (Rev. 01/10/<strong>13</strong>)
South St.<br />
Geneva<br />
Batavia<br />
n St.<br />
31<br />
0 500 1,000 2,000 3,000 4,000<br />
Feet<br />
0 1 Miles<br />
25<br />
Cherry<br />
Road Improvements<br />
Wilson St.<br />
Pine St.<br />
Section Number: 10-00404-00-CH<br />
Fabyan Parkway - <strong>IL</strong> Route 25 to Nagel Boulevard<br />
Roadway Improvements<br />
M:\dotserver2\USERS\Committee\201112 December\Implementation\Design\Fabyan_<strong>IL</strong>25 to Nagel\Map Standard_Fabyan Pkwy - <strong>IL</strong> Rte 25 to Nagel Blvd loc map.mxd<br />
Rd.<br />
8<br />
Kirk Rd<br />
77<br />
38<br />
Fabyan<br />
Legend<br />
Hampshire Rutland Dundee<br />
Burlington Plato<br />
Elgin<br />
Virgil Campton St. Charles<br />
Geneva<br />
<strong>Kane</strong>ville Blackberry<br />
Batavia<br />
Big Rock<br />
467 34<br />
§¨¦ 88<br />
tu 30<br />
!( 31<br />
Aurora<br />
Interstates<br />
US Roads<br />
State Roads<br />
<strong>County</strong> Roads<br />
Other Roads<br />
Rail Roads<br />
<strong>County</strong> Boundry<br />
Township Boundry<br />
Fox River<br />
Forest Preserves<br />
Municipalities<br />
/
uth St.<br />
t.<br />
31<br />
Cherry<br />
Wilson St.<br />
Pine St.<br />
Rd.<br />
8<br />
77<br />
Section Number 10-00404-00-CH<br />
Fabyan Parkway - Illinois Route 25 to Nagel Boulevard<br />
Roadway Improvements<br />
0 485 970 1,940 2,910 3,880<br />
Feet<br />
25<br />
0 1 Miles<br />
Road Improvements<br />
Kirk Rd<br />
38<br />
Fabyan<br />
Legend<br />
M:\dotserver2\USERS\Committee\20<strong>13</strong>04 <strong>April</strong>\Implementation\Construction\Fabyan Pkwy-Nagel to <strong>IL</strong> 25\Map Standard Aerial_Fabyan Pkwy - <strong>IL</strong> 25 to Nagel loc map<br />
467 34<br />
§¨¦ 88<br />
£¤ 30<br />
!( 31<br />
Hampshire Rutland Dundee<br />
Burlington Plato<br />
Virgil Campton<br />
<strong>Kane</strong>ville<br />
Big Rock<br />
Elgin<br />
Geneva<br />
Blackberry<br />
Batavia<br />
Interstates<br />
US Roads<br />
State Roads<br />
<strong>County</strong> Roads<br />
Other Roads<br />
Rail Roads<br />
<strong>County</strong> Boundry<br />
Township Boundry<br />
Fox River<br />
Forest Preserves<br />
Municipalities<br />
Aurora<br />
/
If not budgeted,<br />
explain funding<br />
source<br />
<strong>AG</strong>ENDA ITEM EXECUTIVE SUMMARY Agenda Item #<br />
Presenter/Sponsor:<br />
Name<br />
Budget Information: Was this item budgeted?<br />
SUMMARY:<br />
Attachments:<br />
Detailed information available from :<br />
Resolution/Ordinance Tracking:<br />
Staff Name:<br />
Appropriation Amount:<br />
Steve Coffinbargar, Assistant Director Phone: 630.406.7170<br />
Assigned Committee: Transportation Sent to: Executive<br />
on: 04/11/20<strong>13</strong><br />
If Other, specify:<br />
Committee Remarks:<br />
<strong>County</strong> Board Date:<br />
Resolution<br />
Ordinance<br />
Yes<br />
No N/A<br />
Next Committee: Executive Sent to: <strong>County</strong> Board on: 05/08/20<strong>13</strong><br />
If Other, specify:<br />
Committee Remarks:<br />
Next Committee: Sent to: on:<br />
Committee Remarks:<br />
8C-2a<br />
Approving a Phase III Construction Engineering Services Agreement with Omega<br />
Associates, Inc. for Orchard Road over I-88, <strong>Kane</strong> <strong>County</strong> Section No. 11-00202-03-BR<br />
Steve Coffinbargar - Assistant Director of Transportation<br />
$<strong>13</strong>9,996.45<br />
This improvement will replace the old wearing surface on the existing Orchard Road bridge over I88 with a new latex<br />
modified deck. Other project features include parapet repairs, expansion joint replacement and HMA resurfacing. <strong>Kane</strong><br />
<strong>County</strong> requires engineering assistance for Phase III Engineering Services (Construction Engineering). To initiate Phase III<br />
Engineering, staff completed the consultant selection process using current QBS Procedures.<br />
The QBS Process entailed notification of the122 consulting firms within Transportation’s Consultant Database by email of<br />
the <strong>County</strong>’s need for engineering services. Twenty one (21) consulting firms responded and submitted a Statement of<br />
Interest (SOI). Three (3) pre-qualified consulting firms were short-listed and requested to submit a proposal. Staff conducted<br />
face to face interviews, which along with the proposal, were used to develop an overall score for each firm. The overall score<br />
of each firm is as follows: Wight and Co. - 74.0, AMEC - 82.0, Omega and Assoc., Inc. - 85.0.<br />
Omega was selected and a contract was negotiated to provide Phase III Engineering Services. The negotiated contract is for<br />
a not to exceed amount of $<strong>13</strong>9,996.45. Information on the QBS process and selection details can be found on the <strong>KDOT</strong><br />
website.<br />
Resolution, Engineering Agreement<br />
05/14/20<strong>13</strong>
STATE OF <strong>IL</strong>LINOIS<br />
COUNTY OF KANE<br />
RESOLUTION NO. <strong>13</strong> -<br />
APPROVING A PHASE III CONSTRUCTION ENGINEERING SERVICES <strong>AG</strong>REEMENT<br />
WITH OMEGA ASSOCIATES, INC. FOR<br />
ORCHARD ROAD BRIDGE OVER I-88<br />
KANE COUNTY SECTION NO. 11-00202-03-BR<br />
WHEREAS, Phase III Engineering services are needed for the Orchard Road Bridge over I-88<br />
improvement (herein referred to as the “Improvement”); and<br />
WHEREAS, in order to accomplish the Improvement, it is necessary to retain the services of a<br />
professional engineering firm to provide Phase III Engineering services therefor; and<br />
WHEREAS, Omega Associates, Inc., 333 Warrenville Road, Suite <strong>13</strong>0, Lisle, <strong>IL</strong> 60532 has<br />
experience and professional expertise in Phase III Engineering and is willing to perform the required<br />
services for an amount not to exceed One Hundred Thirty Nine Thousand Nine Hundred Ninety Six and<br />
45/100 ($<strong>13</strong>9,996.45) as set forth in the Phase III Engineering Services agreement (a copy of which is<br />
on file with the <strong>County</strong> Clerk’s Office).<br />
NOW, THEREFORE, BE IT RESOLVED by the <strong>Kane</strong> <strong>County</strong> Board that the Chairman thereof<br />
is hereby authorized to execute a Phase III Engineering services agreement with Omega Associates,<br />
Inc.<br />
BE IT FURTHER RESOLVED that the <strong>Kane</strong> <strong>County</strong> Board appropriates the not to exceed sum<br />
of One Hundred Thirty Nine Thousand Nine Hundred Ninety Six and 45/100 ($<strong>13</strong>9,996.45) from<br />
Transportation Capital Fund #540, Line Item #50140 (Engineering) to pay for said Phase III<br />
Engineering services for the Improvement.<br />
Line Item Line Item Description Was<br />
personnel/item/service<br />
approved in original<br />
budget or a subsequent<br />
budget revision?<br />
Are funds currently<br />
available for this<br />
personnel/item/service in<br />
the specific line item?<br />
540.520.525.50140 Engineering Yes Yes<br />
If funds are not<br />
currently available in<br />
the specified line item,<br />
where are the funds<br />
available?
Passed by the <strong>Kane</strong> <strong>County</strong> Board on May 14, 20<strong>13</strong>.<br />
Page 2 of 2, Res. #<strong>13</strong>-<br />
______________________________________ ___________________________________<br />
John A. Cunningham Christopher J. Lauzen<br />
Clerk, <strong>County</strong> Board Chairman, <strong>County</strong> Board<br />
<strong>Kane</strong> <strong>County</strong>, Illinois <strong>Kane</strong> <strong>County</strong>, Illinois<br />
Vote:<br />
Yes _____<br />
No _____<br />
Voice _____<br />
Abstentions _____<br />
5ORCHRD OVER I-88 PHIII- OMEGA.4LH
Tanner Rd.<br />
Deerpath<br />
83 Feet<br />
83<br />
Orchard Rd.<br />
Section Number 11-00202-03-BR<br />
Orchard Road at I-88 Tollway Improvements<br />
0 500 1,000 2,000 3,000 4,000<br />
0 1 Miles<br />
Tollway Improvements<br />
Indian Trail Rd<br />
M:\dotserver2\USERS\Committee\20<strong>13</strong>04 <strong>April</strong>\Implementation\Construction\Orchard over I88 award\Map Standard_Orchard Rd at I88 loc map<br />
Mooseheart Rd.<br />
North Aurora<br />
88<br />
71<br />
Legend<br />
Aurora<br />
Virgil<br />
Hampshire Rutland Dundee<br />
Burlington<br />
467 34<br />
§¨¦ 88<br />
£¤ 30<br />
!( 31<br />
Plato<br />
Elgin<br />
Campton St. Charles<br />
Geneva<br />
<strong>Kane</strong>ville Blackberry<br />
Batavia<br />
Big Rock Sugar Grove Aurora<br />
Interstates<br />
US Roads<br />
State Roads<br />
<strong>County</strong> Roads<br />
Other Roads<br />
Rail Roads<br />
<strong>County</strong> Boundry<br />
Township Boundry<br />
Fox River<br />
Forest Preserves<br />
Municipalities<br />
/
Tanner Rd.<br />
Deerpath<br />
83 Feet<br />
83<br />
Orchard Rd.<br />
Section Number 11-00202-03-BR<br />
Orchard Road at I-88 Tollway Improvements<br />
0 500 1,000 2,000 3,000 4,000<br />
0 1<br />
Miles<br />
Tollway Improvements<br />
Indian Trail Rd<br />
88<br />
M:\dotserver2\USERS\Committee\20<strong>13</strong>04 <strong>April</strong>\Implementation\Construction\Orchard over I88 award\Map Standard Aerial_Orchard Rd at I88 loc map<br />
71<br />
Legend<br />
Hampshire Rutland Dundee<br />
Burlington<br />
Virgil<br />
§¨¦ 88<br />
£¤ 30<br />
467 34<br />
!( 31<br />
Plato<br />
Elgin<br />
Campton St. Charles<br />
Geneva<br />
<strong>Kane</strong>ville Blackberry<br />
Batavia<br />
Big Roc k Sugar Grove Aurora<br />
Interstates<br />
US Roads<br />
State Roads<br />
<strong>County</strong> Roads<br />
Other Roads<br />
Rail Roads<br />
<strong>County</strong> Boundry<br />
Township Boundry<br />
Fox River<br />
Forest Preserves<br />
Municipalities<br />
/
If not budgeted,<br />
explain funding<br />
source<br />
<strong>AG</strong>ENDA ITEM EXECUTIVE SUMMARY Agenda Item #<br />
Presenter/Sponsor:<br />
Name<br />
Budget Information: Was this item budgeted?<br />
SUMMARY:<br />
Attachments:<br />
Detailed information available from :<br />
Resolution/Ordinance Tracking:<br />
Staff Name:<br />
Appropriation Amount:<br />
Steve Coffinbargar, Assistant Director Phone: 630/406-7170<br />
Assigned Committee: Transportation Sent to: Executive<br />
on: 04/11/20<strong>13</strong><br />
If Other, specify:<br />
Committee Remarks:<br />
<strong>County</strong> Board Date:<br />
Resolution<br />
Ordinance<br />
Yes<br />
No N/A<br />
Next Committee: Executive Sent to: <strong>County</strong> Board on: 05/08/20<strong>13</strong><br />
If Other, specify:<br />
Committee Remarks:<br />
Next Committee: Sent to: on:<br />
Committee Remarks:<br />
8C-2b<br />
Approving Contract for Construction, Orchard Road over I-88 Bridge Deck<br />
Rehabilitation, <strong>Kane</strong> <strong>County</strong> Section No. 11-00202-03-BR<br />
Steve Coffinbargar - Assistant Director of Transportation<br />
$926,875.25<br />
On March 26, 20<strong>13</strong>, construction bids were opened at the Division of Transportation office for the Orchard over I-88<br />
Improvement project. This project involves removal and replacement of the existing deck wearing surface with a new latex<br />
modified concrete deck. Other features of the project will be parapet repairs, expansion joint replacement, partial deck<br />
repairs and approach slab resurfacing. The project will involve coordination with the local agencies and the Illinois Toll<br />
Highway as the project limits are located in between the eastbound and westbound ramps to the I-88 Toll way.<br />
Construction is anticipated to start in June, with an anticipated duration of approximately 4-5 months, and completion by<br />
the end of 20<strong>13</strong>.<br />
The apparent low bidder is Areatha Construction Company, Inc. of Streamwood, Illinois with a proposed contract amount<br />
of $926,875.25. The low bid amount is approximately 36.53% below the engineer’s estimate of $1,460,322.77 dollars.<br />
Resolution, Bid Tabulation, Location Map<br />
05/14/20<strong>13</strong>
STATE OF <strong>IL</strong>LINOIS<br />
COUNTY OF KANE<br />
RESOLUTION NO. <strong>13</strong> -<br />
APPROVING CONTRACT FOR CONSTRUCTION<br />
ORCHARD ROAD OVER I-88 BRIDGE DECK REHAB<strong>IL</strong>ITATION<br />
KANE COUNTY SECTION NO. 11-00202-03-BR<br />
WHEREAS, the <strong>Kane</strong> <strong>County</strong> Division of Transportation has solicited and received bids for the<br />
work and/or construction described as:<br />
KANE COUNTY SEC. NO. 11-00202-03-BR<br />
ORCHARD ROAD BRIDGE OVER I-88<br />
(hereinafter the “Project”)<br />
WHEREAS, the lowest responsible bidder for the Project is:<br />
AREATHA CONSTRUCTION COMPANY, INC. OF STREAMWOOD, <strong>IL</strong>LINOIS<br />
with a low bid of<br />
$926,875.25<br />
NOW, THEREFORE, BE IT RESOLVED by the <strong>Kane</strong> <strong>County</strong> Board that a contract for the<br />
Project described hereinabove shall be awarded to the lowest responsible bidder in the amount as<br />
indicated hereinabove and that the <strong>County</strong> Board Chairman is hereby authorized and directed to<br />
execute a contract and contractor’s bond therefor.<br />
BE IT FURTHER RESOLVED that there is hereby appropriated the sum of Nine Hundred<br />
Twenty Six Thousand Eight Hundred Seventy Five and 25/100 Dollars ($926,875.25) from<br />
Transportation Capital Fund #540, Line Item #73010 (Bridge Construction) to pay for the Project.<br />
Line Item Line Item Description Was<br />
personnel/item/service<br />
approved in original<br />
budget or a subsequent<br />
budget revision?<br />
540.520.525.73010<br />
Bridge Construction<br />
Yes<br />
Are funds currently<br />
available for this<br />
personnel/item/service in<br />
the specific line item?<br />
Yes<br />
If funds are not<br />
currently available in<br />
the specified line item,<br />
where are the funds<br />
available?
Passed by the <strong>Kane</strong> <strong>County</strong> Board on May 14, 20<strong>13</strong>.<br />
Page 2 of 2, Res. #<strong>13</strong>-<br />
______________________________________ ___________________________________<br />
John A. Cunningham Christopher J. Lauzen<br />
Clerk, <strong>County</strong> Board Chairman, <strong>County</strong> Board<br />
<strong>Kane</strong> <strong>County</strong>, Illinois <strong>Kane</strong> <strong>County</strong>, Illinois<br />
Vote:<br />
Yes _____<br />
No _____<br />
Voice _____<br />
Abstentions _____<br />
5APCNORCHOVERI-88.4LH
KANE COUNTY DIVISION OF TRANSPORTATION<br />
TOWNSHIP<br />
COUNTY KANE<br />
BID TAB SECTION 11-00202-03-BR<br />
1 2 3 4 5 6<br />
7<br />
Orchard Rd over I 88 Tollway Improvement Bidders 7<br />
Apparent low bidder<br />
ENGINEERS ESTIMATE Areatha Constr. Co., Inc<br />
Herlihy Mid-Continent Co. Albin Carlson and Co. Sjostrom and Sons, Inc. Martam Construction, Inc. D Construction, Inc Alliance Contractors, Inc<br />
DATE: March 26, 20<strong>13</strong><br />
Streamwood, Illinois Romeoville, Illinois<br />
Lisle, Illinois<br />
Rockford, Illinois<br />
Elgin, Illinois<br />
Coal City, Illinois<br />
Woodstock, Illinois<br />
ITEM # ITEMS UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL<br />
1 TOPSO<strong>IL</strong> FURNISH AND PLACE, 6" SQ YD 421 7.50 3,157.50 5.00 2,105.00 4.80 2,020.80 10.00 4,210.00 12.00 5,052.00 8.00 3,368.00 7.00 2,947.00 4.80 2,021<br />
2 SEEDING, CLASS 2A ACRE 0.09 3,000.00 270.00 10000.00 900.00 10,000.00 900.00 15000.00 1,350.00 <strong>13</strong>000.00 1,170.00 20,000.00 1,800.00 10,000.00 900.00 10,000.00 900<br />
3 BITUMINOUS MATERIALS (PRIME COAT) GALLON 82 2.00 164.00 6.00 492.00 6.00 492.00 6.00 492.00 12.00 984.00 6.00 492.00 0.01 0.82 6.00 492<br />
4 <strong>AG</strong>GREGATE (PRIME COAT) TON 4 27.00 108.00 1.00 4.00 1.00 4.00 1.00 4.00 50.00 200.00 1.00 4.00 0.01 0.04 1.00 4<br />
5 POLYMERIZED HOT-MIX ASPHALT SURFACE COURSE, TON 98 110.00<br />
MIX "F", N90<br />
10,780.00 185.00 18,<strong>13</strong>0.00 185.00 18,<strong>13</strong>0.00 185.00 18,<strong>13</strong>0.00 290.00 28,420.00 200.00 19,600.00 95.00 9,310.00 185.00 18,<strong>13</strong>0<br />
6 PAVED SHOULDER REMOVAL SQ YD 815 15.00 12,225.00 8.00 6,520.00 8.00 6,520.00 12.00 9,780.00 9.00 7,335.00 8.00 6,520.00 10.00 8,150.00 8.00 6,520<br />
7 HOT-MIX ASPHALT SHOULDERS, 6" SQ YD 815 30.00 24,450.00 27.50 22,412.50 27.50 22,412.50 27.50 22,412.50 50.00 40,750.00 28.00 22,820.00 36.00 29,340.00 27.50 22,4<strong>13</strong><br />
8 CONCRETE REMOVAL CU YD 16 1,400.00 22,400.00 736.25 11,780.00 2,692.33 43,077.28 1650.00 26,400.00 3073.50 49,176.00 1,200.00 19,200.00 700.00 11,200.00 5,200.00 83,200<br />
9 PROTECTIVE SHIELD SQ YD 146 60.00 8,760.00 10.00 1,460.00 0.10 14.60 85.00 12,410.00 87.20 12,731.20 85.00 12,410.00 75.00 10,950.00 150.00 21,900<br />
10 CONCRETE SUPERSTRUCTURE CU YD 16 1,200.00 19,200.00 2634.00 42,144.00 2,246.83 35,949.28 1690.00 27,040.00 2777.90 44,446.40 2,600.00 41,600.00 1,800.00 28,800.00 5,840.00 93,440<br />
11 BRIDGE DECK GROOVING SQ YD 2543 8.00 20,344.00 5.75 14,622.25 4.55 11,570.65 5.75 14,622.25 6.70 17,038.10 6.00 15,258.00 8.00 20,344.00 5.65 14,368<br />
12 REINFORCEMENT BARS, EPOXY COATED POUND 2260 1.50 3,390.00 2.35 5,311.00 3.41 7,706.60 3.00 6,780.00 2.50 5,650.00 2.00 4,520.00 1.75 3,955.00 1.60 3,616<br />
<strong>13</strong> BAR SPLICERS EACH 36 40.00 1,440.00 34.40 1,238.40 37.54 1,351.44 32.00 1,152.00 28.70 1,033.20 30.00 1,080.00 25.00 900.00 40.00 1,440<br />
14 PREFORMED JOINT STRIP SEAL FOOT 172 300.00 51,600.00 161.30 27,743.60 167.32 28,779.04 190.00 32,680.00 <strong>13</strong>0.70 22,480.40 185.00 31,820.00 125.00 21,500.00 <strong>13</strong>6.00 23,392<br />
15 CONCRETE SEALER SQ FT 454 2.00 908.00 2.30 1,044.20 0.69 3<strong>13</strong>.26 1.35 612.90 2.60 1,180.40 5.00 2,270.00 1.75 794.50 1.00 454<br />
16 EPOXY CRACK INJECTION FOOT 438 50.00 21,900.00 30.00 <strong>13</strong>,140.00 28.00 12,264.00 28.00 12,264.00 28.00 12,264.00 32.00 14,016.00 28.00 12,264.00 28.00 12,264<br />
17 CONTROLLED LOW-STRENGTH MATERIAL CU YD 5 1,200.00 6,000.00 80.00 400.00 163.00 815.00 1200.00 6,000.00 200.00 1,000.00 180.00 900.00 225.00 1,125.00 78.00 390<br />
18 REMOVE AND REERECT RA<strong>IL</strong> ELEMENT OF EXISTING FOOT 37.5 100.00<br />
GUARDRA<strong>IL</strong><br />
3,750.00 21.00 787.50 21.00 787.50 21.00 787.50 21.00 787.50 20.00 750.00 15.00 562.50 36.50 1,369<br />
19 MOB<strong>IL</strong>IZATION L SUM 1 78,000.00 78,000.00 50000.00 50,000.00 57,000.00 57,000.00 14500.00 14,500.00 65000.00 65,000.00 72,000.00 72,000.00 45,000.00 45,000.00 25,390.00 25,390<br />
20 TRAFFIC CONTROL AND PROTECTION, STANDARD L SUM 1 30,000.00<br />
701606<br />
30,000.00 17500.00 17,500.00 16,800.00 16,800.00 17500.00 17,500.00 27400.00 27,400.00 70,000.00 70,000.00 10,000.00 10,000.00 17,500.00 17,500<br />
21 TRAFFIC CONTROL AND PROTECTION, STANDARD L SUM 1 3,000.00<br />
701701<br />
3,000.00 1000.00 1,000.00 1,000.00 1,000.00 1000.00 1,000.00 1.00 1.00 1.00 1.00 10,000.00 10,000.00 1,000.00 1,000<br />
22 CHANGEABLE MESS<strong>AG</strong>E SIGN CAL MO 8 2,500.00 20,000.00 850.00 6,800.00 850.00 6,800.00 850.00 6,800.00 400.00 3,200.00 500.00 4,000.00 1,350.00 10,800.00 850.00 6,800<br />
23 SHORT TERM PAVEMENT MARKING FOOT 1500 0.50 750.00 0.01 15.00 1.00 1,500.00 2.00 3,000.00 2.00 3,000.00 1.00 1,500.00 1.00 1,500.00 1.00 1,500<br />
24 PAVEMENT MARKING TAPE, TYPE III - LETTERS AND SQ FT 835 3.50<br />
SYMBOLS<br />
2,922.50 3.00 2,505.00 3.00 2,505.00 3.00 2,505.00 4.00 3,340.00 4.00 3,340.00 4.00 3,340.00 3.00 2,505<br />
25 PAVEMENT MARKING TAPE, TYPE III 4" FOOT 39043 0.65 25,377.95 0.85 33,186.55 0.85 33,186.55 0.85 33,186.55 1.00 39,043.00 1.00 39,043.00 1.20 46,851.60 0.85 33,187<br />
26 PAVEMENT MARKING TAPE, TYPE III 6" FOOT 5035 1.25 6,293.75 1.20 6,042.00 1.20 6,042.00 1.20 6,042.00 1.40 7,049.00 1.50 7,552.50 1.40 7,049.00 1.20 6,042<br />
27 PAVEMENT MARKING TAPE, TYPE III 12" FOOT 1711 3.00 5,<strong>13</strong>3.00 2.80 4,790.80 2.80 4,790.80 2.80 4,790.80 3.00 5,<strong>13</strong>3.00 3.00 5,<strong>13</strong>3.00 3.00 5,<strong>13</strong>3.00 2.80 4,791<br />
28 PAVEMENT MARKING TAPE, TYPE III 24" FOOT 470 6.00 2,820.00 5.00 2,350.00 5.00 2,350.00 5.00 2,350.00 6.00 2,820.00 7.00 3,290.00 6.00 2,820.00 5.00 2,350<br />
29 WORK ZONE PAVEMENT MARKING REMOVAL SQ FT 19018 0.50 9,509.00 0.30 5,705.40 0.30 5,705.40 0.30 5,705.40 0.01 190.18 0.01 190.18 1.50 28,527.00 0.30 5,705<br />
30 TEMPORARY CONCRETE BARRIER FOOT 1012.5 40.00 40,500.00 25.70 26,021.25 16.00 16,200.00 17.00 17,212.50 22.70 22,983.75 18.00 18,225.00 23.00 23,287.50 21.25 21,516<br />
31 RELOCATE TEMPORARY CONCRETE BARRIER FOOT 1050 10.00 10,500.00 3.60 3,780.00 3.70 3,885.00 7.00 7,350.00 5.20 5,460.00 6.00 6,300.00 12.00 12,600.00 8.75 9,188<br />
32 MODIFIED URETHANE PAVEMENT MARKING - LETTERS SQ FT 292 4.00<br />
AND SYMBOLS<br />
1,168.00 5.00 1,460.00 5.00 1,460.00 5.00 1,460.00 1.00 292.00 4.00 1,168.00 5.50 1,606.00 5.00 1,460<br />
33 MODIFIED URETHANE PAVEMENT MARKING - LINE 4" FOOT <strong>13</strong>000 1.00 <strong>13</strong>,000.00 0.55 7,150.00 0.55 7,150.00 0.55 7,150.00 0.70 9,100.00 1.10 14,300.00 0.72 9,360.00 0.55 7,150<br />
34 MODIFIED URETHANE PAVEMENT MARKING - LINE 6" FOOT 1589 1.25 1,986.25 1.00 1,589.00 1.00 1,589.00 1.00 1,589.00 1.10 1,747.90 1.80 2,860.20 1.10 1,747.90 1.00 1,589<br />
35 MODIFIED URETHANE PAVEMENT MARKING - LINE 12" FOOT 563 2.25 1,266.75 2.00 1,126.00 2.00 1,126.00 2.00 1,126.00 2.10 1,182.30 3.60 2,026.80 2.75 1,548.25 2.00 1,126<br />
36 MODIFIED URETHANE PAVEMENT MARKING - LINE 24" FOOT 162 6.00 972.00 5.00 810.00 5.00 810.00 5.00 810.00 4.10 664.20 7.20 1,166.40 5.50 891.00 5.00 810<br />
37 PAVEMENT MARKING REMOVAL SQ FT 6307 2.01 12,677.07 1.15 7,253.05 1.05 6,622.35 1.00 6,307.00 0.01 63.07 0.01 63.07 1.65 10,406.55 1.00 6,307<br />
38 MAINTENANCE OF EXISTING TRAFFIC SIGNAL<br />
EACH 1 4,000.00<br />
INSTALLATION<br />
4,000.00 3800.00 3,800.00 1,500.00 1,500.00 1400.00 1,400.00 1400.00 1,400.00 3,900.00 3,900.00 1,650.00 1,650.00 1,400.00 1,400<br />
39 MODIFY EXISTING CONTROLLER EACH 1 4,000.00 4,000.00 4395.00 4,395.00 3,000.00 3,000.00 3720.00 3,720.00 3720.00 3,720.00 3,600.00 3,600.00 3,300.00 3,300.00 3,720.00 3,720<br />
40 BRIDGE DECK SCARIFICATION 1 1/2" SQ YD 2765 50.00 <strong>13</strong>8,250.00 35.20 97,328.00 32.00 88,480.00 62.00 171,430.00 46.10 127,466.50 42.00 116,<strong>13</strong>0.00 45.00 124,425.00 83.40 230,601<br />
41 STRUCTURAL REPAIR OF CONCRETE (DEPTH EQUAL SQ FT 10 200.00<br />
TO OR LESS THAN 5 INCHES)<br />
2,000.00 165.00 1,650.00 200.00 2,000.00 150.00 1,500.00 280.50 2,805.00 360.00 3,600.00 150.00 1,500.00 610.00 6,100<br />
42 CONSTRUCTION LAYOUT EACH 1 8,000.00 8,000.00 2800.00 2,800.00 700.00 700.00 2000.00 2,000.00 5000.00 5,000.00 0.00 0.00 6,000.00 6,000.00 1,800.00 1,800<br />
43 DECK SLAB REPAIR (PARTIAL) SQ YD 216 300.00 64,800.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0<br />
44 IMPACT ATTENUATORS, TEMPORARY (FULLY<br />
EACH 2 6,500.00<br />
REDIRECTIVE, NARROW), TEST LEVEL 3<br />
<strong>13</strong>,000.00 4400.00 8,800.00 4,400.00 8,800.00 4400.00 8,800.00 4400.00 8,800.00 5,000.00 10,000.00 3,200.00 6,400.00 4,400.00 8,800<br />
45 IMPACT ATTENUATORS, RELOCATE<br />
EACH 2 2,400.00<br />
(FULLYREDIRECTIVE, NARROW), TEST LEVEL 3<br />
4,800.00 2340.00 4,680.00 2,340.00 4,680.00 2340.00 4,680.00 2340.00 4,680.00 2,500.00 5,000.00 1,250.00 2,500.00 2,340.00 4,680<br />
46 VIDEO VEHICLE DETECTION SYSTEM EACH 1 30,000.00 30,000.00 <strong>13</strong>780.00 <strong>13</strong>,780.00 15,000.00 15,000.00 12220.00 12,220.00 12220.00 12,220.00 15,000.00 15,000.00 16,500.00 16,500.00 12,220.00 12,220<br />
47 BRIDGE DECK LATEX CONCRETE OVERLAY 1 1/2 SQ YD 2765 150.00<br />
INCHES<br />
414,750.00 50.75 140,323.75 57.17 158,075.05 78.00 215,670.00 80.50 222,582.50 63.00 174,195.00 80.00 221,200.00 85.80 237,237<br />
48 ITEMS AS ORDERED BY ENGINEER DOLLAR 300000 1.00<br />
S<br />
300,000.00 1.00 300,000.00 1.00 300,000.00 1.00 300,000.00 1.00 300,000.00 1.00 300,000.00 1.00 300,000.00 1.00 300,000<br />
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0<br />
AS READ $1,460,322.77 $926,875.25 $951,865.10 $1,058,931.40 $1,<strong>13</strong>7,981.00 $1,087,012.15 $1,078,985.66 $1,268,784.88<br />
AS CORRECTED $1,<strong>13</strong>8,041.60 $1,078,644.15<br />
% +/- ESTIMATE -36.53 -34.82 -27.49 -22.07 -26.14 -26.1<strong>13</strong>20715 -<strong>13</strong>.116<strong>13</strong>425
Tanner Rd.<br />
Deerpath<br />
83 Feet<br />
83<br />
Orchard Rd.<br />
Section Number 11-00202-03-BR<br />
Orchard Road at I-88 Tollway Improvements<br />
0 500 1,000 2,000 3,000 4,000<br />
0 1 Miles<br />
Tollway Improvements<br />
Indian Trail Rd<br />
M:\dotserver2\USERS\Committee\20<strong>13</strong>04 <strong>April</strong>\Implementation\Construction\Orchard over I88 award\Map Standard_Orchard Rd at I88 loc map<br />
Mooseheart Rd.<br />
North Aurora<br />
88<br />
71<br />
Legend<br />
Aurora<br />
Virgil<br />
Hampshire Rutland Dundee<br />
Burlington<br />
467 34<br />
§¨¦ 88<br />
£¤ 30<br />
!( 31<br />
Plato<br />
Elgin<br />
Campton St. Charles<br />
Geneva<br />
<strong>Kane</strong>ville Blackberry<br />
Batavia<br />
Big Rock Sugar Grove Aurora<br />
Interstates<br />
US Roads<br />
State Roads<br />
<strong>County</strong> Roads<br />
Other Roads<br />
Rail Roads<br />
<strong>County</strong> Boundry<br />
Township Boundry<br />
Fox River<br />
Forest Preserves<br />
Municipalities<br />
/
Tanner Rd.<br />
Deerpath<br />
83 Feet<br />
83<br />
Orchard Rd.<br />
Section Number 11-00202-03-BR<br />
Orchard Road at I-88 Tollway Improvements<br />
0 500 1,000 2,000 3,000 4,000<br />
0 1<br />
Miles<br />
Tollway Improvements<br />
Indian Trail Rd<br />
88<br />
M:\dotserver2\USERS\Committee\20<strong>13</strong>04 <strong>April</strong>\Implementation\Construction\Orchard over I88 award\Map Standard Aerial_Orchard Rd at I88 loc map<br />
71<br />
Legend<br />
Hampshire Rutland Dundee<br />
Burlington<br />
Virgil<br />
§¨¦ 88<br />
£¤ 30<br />
467 34<br />
!( 31<br />
Plato<br />
Elgin<br />
Campton St. Charles<br />
Geneva<br />
<strong>Kane</strong>ville Blackberry<br />
Batavia<br />
Big Roc k Sugar Grove Aurora<br />
Interstates<br />
US Roads<br />
State Roads<br />
<strong>County</strong> Roads<br />
Other Roads<br />
Rail Roads<br />
<strong>County</strong> Boundry<br />
Township Boundry<br />
Fox River<br />
Forest Preserves<br />
Municipalities<br />
/
If not budgeted,<br />
explain funding<br />
source<br />
<strong>AG</strong>ENDA ITEM EXECUTIVE SUMMARY Agenda Item #<br />
Presenter/Sponsor:<br />
Name<br />
Budget Information: Was this item budgeted?<br />
SUMMARY:<br />
Attachments:<br />
Detailed information available from :<br />
Resolution/Ordinance Tracking:<br />
Staff Name:<br />
Appropriation Amount:<br />
Steve Coffinbargar, Assistant Director Phone: 630.406.7170<br />
Assigned Committee: Transportation Sent to: Executive<br />
on: 04/11/20<strong>13</strong><br />
If Other, specify:<br />
Committee Remarks:<br />
<strong>County</strong> Board Date:<br />
Resolution<br />
Ordinance<br />
Yes<br />
No N/A<br />
Next Committee: Executive Sent to: <strong>County</strong> Board on: 05/08/20<strong>13</strong><br />
If Other, specify:<br />
Committee Remarks:<br />
Next Committee: Sent to: on:<br />
Committee Remarks:<br />
8C-3a<br />
Approving a Phase III Construction Engineering Services Agreement with Christopher<br />
B. Burke Engineering, Ltd. for Stearns Road Corridor Monitoring and Maintenance,<br />
<strong>Kane</strong> <strong>County</strong> Section No. <strong>13</strong>-00214-02-SM<br />
Steve Coffinbargar - Assistant Director of Transportation<br />
$49,848.10<br />
<strong>Kane</strong> <strong>County</strong> requires Phase III Engineering Services (Construction Engineering) to oversee this improvement to eliminate<br />
invasive species and keep the existing site in compliance with the environmental permit for the Stearns Corridor. To initiate<br />
Phase III Engineering, staff completed the consultant selection process using current QBS Procedures.<br />
The QBS Process entailed notification of the122 consulting firms within Transportation’s Consultant Database by email of<br />
the <strong>County</strong>’s need for engineering services. Seven (7) consulting firms responded and submitted a Statement of Interest.<br />
Three (3) prequalified consulting firms were short-listed and requested to submit a proposal. Staff conducted face to face<br />
interviews, which along with the proposal, were used to develop an overall score for each firm. The overall score of each<br />
firm is as follows: Christopher B. Burke Engineering, Ltd - 86, WBK - 81, James J. Benes and Assoc., Inc. - 70.<br />
Christopher B. Burke Engineering, Inc. was selected and a contract was negotiated to provide Phase III Engineering Services.<br />
The negotiated contract is for a not to exceed amount of $49,848.10.<br />
Resolution, Engineering Agreement, Maps<br />
05/14/20<strong>13</strong>
STATE OF <strong>IL</strong>LINOIS<br />
COUNTY OF KANE<br />
RESOLUTION NO. <strong>13</strong> -<br />
APPROVING A PHASE III CONSTRUCTION ENGINEERING SERVICES <strong>AG</strong>REEMENT<br />
WITH CHRISTOPHER B. BURKE ENGINEERING, LTD. FOR<br />
STEARNS ROAD CORRIDOR MONITORING AND MAINTENANCE<br />
KANE COUNTY SECTION NO. <strong>13</strong>-00214-02-SM<br />
WHEREAS, Phase III Engineering services are needed for the Stearns Road Corridor<br />
Monitoring and Maintenance project (herein referred to as the “Project”); and<br />
WHEREAS, in order to accomplish the Project, it is necessary to retain the services of a<br />
professional engineering firm to provide Phase III Engineering services therefor; and<br />
WHEREAS, Christopher B. Burke Engineering, Ltd., 9575 West Higgins Road, Suite 600,<br />
Rosemont, <strong>IL</strong> 60018 has experience and professional expertise in Phase III Engineering and is willing<br />
to perform the required services for an amount not to exceed Forty Nine Thousand Eight Hundred Forty<br />
Eight and 10/100 ($49,848.10) as set forth in the Phase III Engineering Services agreement (a copy of<br />
which is on file with the <strong>County</strong> Clerk’s Office).<br />
NOW, THEREFORE, BE IT RESOLVED by the <strong>Kane</strong> <strong>County</strong> Board that the Chairman thereof<br />
is hereby authorized to execute a Phase III Engineering services agreement with Christopher B. Burke<br />
Engineering, Ltd..<br />
BE IT FURTHER RESOLVED that the <strong>Kane</strong> <strong>County</strong> Board appropriates the not to exceed sum<br />
of Forty Nine Thousand Eight Hundred Forty Eight and 10/100 ($49,848.10) from Transportation Sales<br />
Tax Fund #305, Line Item #50140 (Engineering) to pay for said Phase III Engineering services for the<br />
Improvement.<br />
Line Item Line Item Description Was<br />
personnel/item/service<br />
approved in original<br />
budget or a subsequent<br />
budget revision?<br />
Are funds currently<br />
available for this<br />
personnel/item/service in<br />
the specific line item?<br />
305.520.527.50140 Engineering Yes Yes<br />
If funds are not<br />
currently available in<br />
the specified line item,<br />
where are the funds<br />
available?
Passed by the <strong>Kane</strong> <strong>County</strong> Board on May 14, 20<strong>13</strong>.<br />
Page 2 of 2, Res. #<strong>13</strong>-<br />
______________________________________ ___________________________________<br />
John A. Cunningham Christopher J. Lauzen<br />
Clerk, <strong>County</strong> Board Chairman, <strong>County</strong> Board<br />
<strong>Kane</strong> <strong>County</strong>, Illinois <strong>Kane</strong> <strong>County</strong>, Illinois<br />
Vote:<br />
Yes _____<br />
No _____<br />
Voice _____<br />
Abstentions _____<br />
5STRNSCRRDRMNT-PHIII-BURKE .4LH
Legend<br />
467 34<br />
§¨¦ 88<br />
tu 30<br />
!( 31<br />
Randall Rd.<br />
Interstates<br />
US Roads<br />
State Roads<br />
<strong>County</strong> Roads<br />
Other Roads<br />
Rail Roads<br />
<strong>County</strong> Boundry<br />
Township Boundry<br />
Fox River<br />
Forest Preserves<br />
Municipalities<br />
McLean<br />
31<br />
Stearns Road Corridor<br />
8<br />
South<br />
Elgin<br />
0 1<br />
Miles<br />
M:\dotserver2\USERS\Committee\1003 34March<br />
2010\Implementation\Design\Stearns, Corridor Maintenance\MapStandard_Stearns Road Corridor Loc Map.mxd<br />
Stearns Road Corridor<br />
Army Trail Rd.<br />
Wayne<br />
m Rd.<br />
Burlington Plato<br />
Virgil Campton<br />
Big Rock<br />
Bartlet<br />
19<br />
61<br />
Elgin<br />
20<br />
St.<br />
Charles<br />
Hampshire Rutland Dundee<br />
Geneva<br />
<strong>Kane</strong>ville<br />
Blackberry<br />
Batavia<br />
Sugar<br />
Grove<br />
Aurora<br />
37<br />
/
Legend<br />
467 34<br />
§¨¦ 88<br />
tu 30<br />
!( 31<br />
Randall Rd.<br />
Interstates<br />
US Roads<br />
State Roads<br />
<strong>County</strong> Roads<br />
Other Roads<br />
Rail Roads<br />
<strong>County</strong> Boundry<br />
Township Boundry<br />
Fox River<br />
Forest Preserves<br />
Municipalities<br />
McLean<br />
31<br />
Stearns Road Corridor<br />
0 1<br />
Miles<br />
M:\dotserver2\USERS\Committee\1003 34March<br />
2010\Implementation\Design\Stearns, Corridor Maintenance\MapStandard_Stearns Road Corridor Loc Map.mxd<br />
8<br />
Stearns Road Corridor<br />
Army Trail Rd.<br />
m Rd.<br />
Burlington Plato<br />
Virgil Campton<br />
Big Rock<br />
19<br />
61<br />
Elgin<br />
20<br />
St.<br />
Charles<br />
Hampshire Rutland Dundee<br />
Geneva<br />
<strong>Kane</strong>ville<br />
Blackberry<br />
Batavia<br />
Sugar<br />
Grove<br />
Aurora<br />
37<br />
/
If not budgeted,<br />
explain funding<br />
source<br />
<strong>AG</strong>ENDA ITEM EXECUTIVE SUMMARY Agenda Item #<br />
Presenter/Sponsor:<br />
Name<br />
Budget Information: Was this item budgeted?<br />
SUMMARY:<br />
Attachments:<br />
Detailed information available from :<br />
Resolution/Ordinance Tracking:<br />
Staff Name:<br />
Appropriation Amount:<br />
Steve Coffinbargar, Assistant Director Phone: 630-406-7170<br />
Assigned Committee: Transportation Sent to: Executive<br />
on: 04/11/20<strong>13</strong><br />
If Other, specify:<br />
Committee Remarks:<br />
<strong>County</strong> Board Date:<br />
Resolution<br />
Ordinance<br />
Yes<br />
No N/A<br />
Next Committee: Executive Sent to: <strong>County</strong> Board on: 05/08/20<strong>13</strong><br />
If Other, specify:<br />
Committee Remarks:<br />
Next Committee: Sent to: on:<br />
Committee Remarks:<br />
8C-3b<br />
Approving Contract for Construction, Stearns Road Environmental Maintenance,<br />
<strong>Kane</strong> <strong>County</strong> Section No. <strong>13</strong>-00214-02-SM<br />
Steve Coffinbargar - Assistant Director of Transportation<br />
$179,782.00<br />
On March 28, 20<strong>13</strong>, construction bids were opened at the Division of Transportation office for the Stearns Road Corridor<br />
Environmental Maintenance project. The scope of this project involves controlled burning, weed control and seeding at<br />
various locations along the Stearns Road Corridor to control invasive species and keep the corridor environmental sites in<br />
compliance with the USACOE permit. Construction is anticipated to take approximately 6-7 months and the work will be<br />
conducted within the corridor with little impact to daily traffic. The project is scheduled to be completed by the end of 20<strong>13</strong>.<br />
The apparent low bidder is Nettle Creek Nursery, Inc. of Morris, Illinois with a proposed contract amount of $179,782.00. The<br />
low bid amount is approximately 18.28% below the engineer’s estimate of $220,000.00.<br />
Resolution, Bid Tabulation, Location Map<br />
05/14/20<strong>13</strong>
STATE OF <strong>IL</strong>LINOIS<br />
COUNTY OF KANE<br />
RESOLUTION NO. <strong>13</strong> -<br />
APPROVING CONTRACT FOR CONSTRUCTION<br />
STEARNS ROAD ENVIRONMENTAL MAINTENANCE<br />
KANE COUNTY SECTION NO. <strong>13</strong>-00214-02-SM<br />
WHEREAS, the <strong>Kane</strong> <strong>County</strong> Division of Transportation has solicited and received bids for the<br />
work and/or construction described as:<br />
KANE COUNTY SEC. NO. <strong>13</strong>-00214-02-SM<br />
STEARNS ROAD ENVIRONMENTAL MAINTENANCE<br />
(hereinafter the “Project”)<br />
WHEREAS, the lowest responsible bidder for the Project is:<br />
NETTLE CREEK NURSERY, INC. OF MORRIS, <strong>IL</strong>LINOIS<br />
with a low bid of<br />
$179,782.00<br />
NOW, THEREFORE, BE IT RESOLVED by the <strong>Kane</strong> <strong>County</strong> Board that a contract for the<br />
Project described hereinabove shall be awarded to the lowest responsible bidder in the amount as<br />
indicated hereinabove and that the <strong>County</strong> Board Chairman is hereby authorized and directed to<br />
execute a contract and contractor’s bond therefor.<br />
BE IT FURTHER RESOLVED that there is hereby appropriated the sum of One Hundred<br />
Seventy Nine Thousand Seventy Hundred Eighty Two Dollars ($179,782.00) from Transportation Sales<br />
Tax Fund #305, Line Item #73000 (Road Construction) to pay for the Project.<br />
Line Item Line Item Description Was<br />
personnel/item/service<br />
approved in original<br />
budget or a subsequent<br />
budget revision?<br />
305.520.527.73000<br />
Road Construction<br />
Yes<br />
Are funds currently<br />
available for this<br />
personnel/item/service in<br />
the specific line item?<br />
Yes<br />
If funds are not<br />
currently available in<br />
the specified line item,<br />
where are the funds<br />
available?
Passed by the <strong>Kane</strong> <strong>County</strong> Board on May 14, 20<strong>13</strong>.<br />
Page 2 of 2, Res. #<strong>13</strong>-<br />
______________________________________ ___________________________________<br />
John A. Cunningham Christopher J. Lauzen<br />
Clerk, <strong>County</strong> Board Chairman, <strong>County</strong> Board<br />
<strong>Kane</strong> <strong>County</strong>, Illinois <strong>Kane</strong> <strong>County</strong>, Illinois<br />
Vote:<br />
Yes _____<br />
No _____<br />
Voice _____<br />
Abstentions _____<br />
5APCNSTRNSCRRDRMNT.4LH
TOWNSHIP<br />
KANE COUNTY DIVISION OF TRANSPORTATION COUNTY KANE<br />
BID TAB SECTION <strong>13</strong>-00214-02-SM<br />
Environmental Maintenance Stearns Road Corridor<br />
ENGINEERS ESTIMATE Nettle Creek Nursery, Inc. McGinty Bros. Inc Encap, Inc.<br />
DATE: Mar 28, 20<strong>13</strong><br />
APPARENT LOW BID<br />
ITEM # ITEMS UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL<br />
8 TRAFFIC CONTROL AND PROTECTION L SUM 1.00 $5,000.00 5,000.00 778.00 778.00 6,500.00 6,500.00 2500.00 2,500.00<br />
9 WEED CONTROL, NON-SELECTIVE AND NON-<br />
RESIDUAL WEED CONTROL, (UPLAND) NON-SELECTIVE AND NON-<br />
ACRE 1.84 $1,200.00 2,208.00 400.00 736.00 500.00 920.00 1700.00 3,128.00<br />
11 RESIDUAL (WETLAND) ACRE 2.96 $1,500.00 4,440.00 400.00 1,184.00 500.00 1,480.00 1860.00 5,505.60<br />
12 WEED CONTROL, NON-SELECTIVE AND NON-<br />
RESIDUAL (UPLAND) & WEED CONTROL, TEASEL ACRE 7.50 $1,300.00 9,750.00 450.00 3,375.00 700.00 5,250.00 1575.00 11,812.50<br />
<strong>13</strong> WEED CONTROL, NON-SELECTIVE AND NON-<br />
RESIDUAL (WETLAND) ACRE 6.68 $1,400.00 9,352.00 400.00 2,672.00 500.00 3,340.00 1400.00 9,352.00<br />
14 WEED CONTROL, NON-SELECTIVE AND NON-<br />
RESIDUAL (UPLAND) & WEED CONTROL, TEASEL ACRE 27.85 $600.00 16,710.00 450.00 12,532.50 500.00 <strong>13</strong>,925.00 1550.00 43,167.50<br />
18 CONTROL BURN ACRE 11.84 $500.00 5,920.00 250.00 2,960.00 440.00 5,209.60 400.00 4,736.00<br />
19 CONTROL BURN ACRE 30.00 $500.00 15,000.00 250.00 7,500.00 440.00 <strong>13</strong>,200.00 365.00 10,950.00<br />
20 CONTROL BURN ACRE 8.91 $500.00 4,455.00 250.00 2,227.50 440.00 3,920.40 350.00 3,118.50<br />
21 CONTROL BURN ACRE 37.14 $500.00 18,570.00 250.00 9,285.00 440.00 16,341.60 345.00 12,8<strong>13</strong>.30<br />
25 WEED CONTROL, HAND REMOVAL ACRE 0.28 $4,000.00 1,120.00 1500.00 420.00 11,250.00 3,150.00 4000.00 1,120.00<br />
34 SEEDING, CLASS 4 (MODIFIED) DETENTION BASIN ACRE 2.96 1,800.00 5,328.00 2400.00 7,104.00 1,475.00 4,366.00 1825.00 5,402.00<br />
35 SEEDING, CLASS 4 (MODIFIED) MESIC PRAIRIE &<br />
SEEDING, CLASS 5 (MODIFIED) MESIC PRAIRIE ACRE 7.50 1,800.00 <strong>13</strong>,500.00 1900.00 14,250.00 1,860.00 <strong>13</strong>,950.00 1225.00 9,187.50<br />
36 SEEDING, CLASS 4 (MODIFIED) DETENTION BASIN ACRE 6.68 1,700.00 11,356.00 2,400.00 16,032.00 1,475.00 9,853.00 1,650.00 11,022.00<br />
37 SEEDING, CLASS 4 (MODIFIED) MESIC PRAIRIE &<br />
SEEDING, CLASS 5 (MODIFIED) MESIC PRAIRIE ACRE 27.85 1,600.00 44,560.00 1,900.00 52,915.00 1,860.00 51,801.00 1,100.00 30,635.00<br />
40 SELECTIVE CLEARING ACRE 1.50 2,000.00 3,000.00 600.00 900.00 6,700.00 10,050.00 1,925.00 2,887.50<br />
55 WEED CONTROL, HAND REMOVAL ACRE 9.64 2,000.00 19,280.00 1,500.00 14,460.00 900.00 8,676.00 1,500.00 14,460.00<br />
56 ITEMS AS ORDERED BY ENGINEER DOLLAR 30451.00 1.00 30,451.00 1.00 30,451.00 1.00 30,451.00 1.00 30,451.00<br />
AS READ $220,000.00 $179,782.00 $202,383.60 $212,248.40<br />
AS CORRECTED<br />
% +/- ESTIMATE -18.28 -8.01 -3.52
Legend<br />
467 34<br />
§¨¦ 88<br />
tu 30<br />
!( 31<br />
Randall Rd.<br />
Interstates<br />
US Roads<br />
State Roads<br />
<strong>County</strong> Roads<br />
Other Roads<br />
Rail Roads<br />
<strong>County</strong> Boundry<br />
Township Boundry<br />
Fox River<br />
Forest Preserves<br />
Municipalities<br />
McLean<br />
31<br />
Stearns Road Corridor<br />
8<br />
South<br />
Elgin<br />
0 1<br />
Miles<br />
M:\dotserver2\USERS\Committee\1003 34March<br />
2010\Implementation\Design\Stearns, Corridor Maintenance\MapStandard_Stearns Road Corridor Loc Map.mxd<br />
Stearns Road Corridor<br />
Army Trail Rd.<br />
Wayne<br />
m Rd.<br />
Burlington Plato<br />
Virgil Campton<br />
Big Rock<br />
Bartlet<br />
19<br />
61<br />
Elgin<br />
20<br />
St.<br />
Charles<br />
Hampshire Rutland Dundee<br />
Geneva<br />
<strong>Kane</strong>ville<br />
Blackberry<br />
Batavia<br />
Sugar<br />
Grove<br />
Aurora<br />
37<br />
/
Legend<br />
467 34<br />
§¨¦ 88<br />
tu 30<br />
!( 31<br />
Randall Rd.<br />
Interstates<br />
US Roads<br />
State Roads<br />
<strong>County</strong> Roads<br />
Other Roads<br />
Rail Roads<br />
<strong>County</strong> Boundry<br />
Township Boundry<br />
Fox River<br />
Forest Preserves<br />
Municipalities<br />
McLean<br />
31<br />
Stearns Road Corridor<br />
0 1<br />
Miles<br />
M:\dotserver2\USERS\Committee\1003 34March<br />
2010\Implementation\Design\Stearns, Corridor Maintenance\MapStandard_Stearns Road Corridor Loc Map.mxd<br />
8<br />
Stearns Road Corridor<br />
Army Trail Rd.<br />
m Rd.<br />
Burlington Plato<br />
Virgil Campton<br />
Big Rock<br />
19<br />
61<br />
Elgin<br />
20<br />
St.<br />
Charles<br />
Hampshire Rutland Dundee<br />
Geneva<br />
<strong>Kane</strong>ville<br />
Blackberry<br />
Batavia<br />
Sugar<br />
Grove<br />
Aurora<br />
37<br />
/
If not budgeted,<br />
explain funding<br />
source<br />
<strong>AG</strong>ENDA ITEM EXECUTIVE SUMMARY Agenda Item #<br />
Presenter/Sponsor:<br />
Name<br />
Budget Information: Was this item budgeted?<br />
SUMMARY:<br />
Attachments:<br />
Detailed information available from :<br />
Resolution/Ordinance Tracking:<br />
Staff Name:<br />
Appropriation Amount:<br />
Steve Coffinbargar, Assistant Director Phone: 630-406-7170<br />
Assigned Committee: Transportation Sent to: Executive<br />
on: 04/11/20<strong>13</strong><br />
If Other, specify:<br />
Committee Remarks:<br />
<strong>County</strong> Board Date:<br />
Resolution<br />
Ordinance<br />
Yes<br />
No N/A<br />
Next Committee: Executive Sent to: <strong>County</strong> Board on: 05/08/20<strong>13</strong><br />
If Other, specify:<br />
Committee Remarks:<br />
Next Committee: Sent to: on:<br />
Committee Remarks:<br />
8C-4a<br />
Approving an Intergovernmental Agreement Between the Illinois State Toll Highway<br />
Authority and the <strong>County</strong> of <strong>Kane</strong> for the Improvement of the Randall Road (C.H. No.<br />
34) Bridge Over I-90<br />
Steve Coffinbargar, Assistant Director of Transportation<br />
$47,916.00<br />
The Illinois Tollway's proposed Jane Addams Tollway (I-90) add lanes/reconstruction improvement from U.S. Route 20 to the<br />
Elgin Toll Plaza is targeting construction during 20<strong>13</strong> and 2014. The Illinois Tollway approached <strong>Kane</strong> <strong>County</strong> asking if we<br />
would like to include the minor bridge superstructure repairs to replace the bridge joints in their overall I-90 mainline<br />
construction contract. <strong>KDOT</strong> had previously programmed dollars towards engineering and construction in future fiscal<br />
years for a stand-alone contract for miscellaneous repairs to the Randall Road over I-90 bridge superstructure. By combining<br />
our proposed bridge joint replacement work with their overall corridor improvement will likely result in a cost savings<br />
compared to <strong>KDOT</strong> engineering and letting a stand-alone contract.<br />
<strong>Kane</strong> <strong>County</strong>'s share of towards engineering and construction is estimated at $39,930.00, plus 20% contingency, totals<br />
$47,916.00.<br />
Location Maps<br />
05/14/20<strong>13</strong>
STATE OF <strong>IL</strong>LINOIS<br />
COUNTY OF KANE<br />
RESOLUTION NO. <strong>13</strong> -<br />
APPROVING AN INTERGOVERNMENTAL <strong>AG</strong>REEMENT BETWEEN<br />
THE <strong>IL</strong>LINOIS STATE TOLL HIGHWAY AUTHORITY AND THE COUNTY OF KANE<br />
FOR THE IMPROVEMENT OF THE<br />
RANDALL ROAD (C.H. NO. 34) BRIDGE OVER I-90<br />
WHEREAS, the Illinois Constitution of 1970, Article VII, Section 10 and 5 <strong>IL</strong>CS 220/1 et seq.<br />
authorizes the <strong>County</strong> of <strong>Kane</strong> (hereinafter “<strong>Kane</strong>”) and the Illinois State Toll Highway Authority<br />
(hereinafter “ISTHA”) to cooperate in the performance of their respective duties and responsibilities by<br />
contract and the other agreements; and<br />
WHEREAS, <strong>Kane</strong> and ISTHA, in order to facilitate the free flow of traffic and ensure safety to<br />
the motoring public, desire to improve the bridge superstructure of the <strong>Kane</strong> <strong>County</strong> Highway No. 34<br />
(also known as “Randall Road”) Bridge over I-90 (hereinafter the “Project”); and<br />
WHEREAS, <strong>Kane</strong> and ISTHA desire to enter into an intergovernmental agreement (a copy of<br />
which is on file with the <strong>County</strong> Clerk's Office) for the Phase III Construction of the Project; and<br />
WHEREAS, <strong>Kane</strong> and ISTHA have determined a mutually satisfactory allocation of<br />
responsibilities and all costs for the Project as set forth in the intergovernmental agreement; and<br />
WHEREAS, <strong>Kane</strong> <strong>County</strong>’s financial participation in the Phase III Construction is estimated to<br />
be $47,916.00 which represents the <strong>County</strong>’s estimated share of the Project cost plus a 20%<br />
contingency.<br />
NOW, THEREFORE, BE IT RESOLVED that the <strong>Kane</strong> <strong>County</strong> Board hereby approve an<br />
intergovernmental agreement between the <strong>County</strong> of <strong>Kane</strong> and the Illinois State Toll Highway Authority<br />
and that the <strong>Kane</strong> <strong>County</strong> Board Chairman is hereby authorized to execute an intergovernmental<br />
agreement for the Phase III Construction of the Project.<br />
BE IT FURTHER RESOLVED that the <strong>Kane</strong> <strong>County</strong> Board hereby appropriates the sum of<br />
Forty Seven Thousand Nine Hundred Sixteen Dollars ($47,916.00) from Transportation Sales Tax Fund<br />
#305, Line Item #73010 (Bridge Construction) for the <strong>County</strong>’s share of the cost of the Project.<br />
Line Item Line Item Description Was<br />
personnel/item/service<br />
approved in original<br />
budget or a subsequent<br />
budget revision?<br />
Are funds currently<br />
available for this<br />
personnel/item/service in<br />
the specific line item?<br />
305.520.527.73010 Bridge Construction Yes Yes<br />
If funds are not<br />
currently available in<br />
the specified line item,<br />
where are the funds<br />
available?
Passed by the <strong>Kane</strong> <strong>County</strong> Board on May 14, 20<strong>13</strong><br />
Page 2 of 2, Res. #<strong>13</strong>-<br />
______________________________________ ___________________________________<br />
John A. Cunningham Christopher J. Lauzen<br />
Clerk, <strong>County</strong> Board Chairman, <strong>County</strong> Board<br />
<strong>Kane</strong> <strong>County</strong>, Illinois <strong>Kane</strong> <strong>County</strong>, Illinois<br />
Vote:<br />
Yes _____<br />
No _____<br />
Voice _____<br />
Abstentions _____<br />
5RND I-90 ISTHA IGA.4LH
INTERGOVERNMENTAL <strong>AG</strong>REEMENT BETWEEN<br />
THE <strong>IL</strong>LINOIS STATE TOLL HIGHWAY AUTHORITY<br />
AND<br />
THE COUNTY OF KANE<br />
This INTERGOVERNMENTAL <strong>AG</strong>REEMENT (hereinafter referred to as the<br />
“<strong>AG</strong>REEMENT”) is entered into this ______ day of May , 20<strong>13</strong>, by and between the<br />
<strong>IL</strong>LINOIS STATE TOLL HIGHWAY AUTHORITY, an instrumentality and<br />
administrative agency of the State of Illinois, hereinafter called the "TOLLWAY", and<br />
the COUNTY OF KANE, a body corporate and politic of the State of Illinois, hereinafter<br />
called the "COUNTY". The COUNTY and the TOLLWAY are each hereinafter<br />
individually referred to as a “PARTY”, and collectively referred to as the “PARTIES”.<br />
WITNESSETH:<br />
WHEREAS, the TOLLWAY in order to facilitate the free flow of traffic and<br />
ensure the safety of the motoring public, is desirous of improving the Jane Addams<br />
Tollway (I-90) from U.S. Route 20 to the Elgin Plaza (hereinafter sometimes referred to<br />
as the "Toll Highway"). The desired improvements include work on the <strong>Kane</strong> <strong>County</strong><br />
Highway No 34 (also known as Randall Road) Bridge over the Toll Highway (hereinafter<br />
the “Bridge”) which improvements are part of TOLLWAY construction contract(s)<br />
including but not limited to Contract __________ (hereinafter referred to as the<br />
"PROJECT"). The improvements include the following:<br />
Minor structural repairs including epoxy crack injections at piers and abutments.<br />
Performing formed concrete repairs at piers and abutments with crash wall modification<br />
at the piers. Encase the “Raymond Piles” columns with a 6 inch thick concrete jacket.<br />
Clean and paint the bearings. Clean the bearing seats, and by performing any other work<br />
in accordance with the approved plans and specifications; and<br />
WHEREAS, the COUNTY requests that the TOLLWAY include in the<br />
PROJECT the replacement of the expansion joint strip seals on the Bridge’s abutments;<br />
and<br />
WHEREAS, the TOLLWAY agrees to the COUNTY's request to replace the<br />
expansion joint strip seals as aforesaid; and<br />
WHEREAS, the TOLLWAY and the COUNTY by this instrument, desire to<br />
determine and establish their respective responsibilities toward engineering, right of way<br />
acquisition, utility relocation, construction, funding and maintenance of the PROJECT as<br />
proposed; and<br />
WHEREAS, the TOLLWAY by virtue of its powers as set forth in the "Toll<br />
Highway Act," 605 <strong>IL</strong>CS 10/1 et seq. is authorized to enter into this <strong>AG</strong>REEMENT; and<br />
1
WHEREAS, the COUNTY by virtue of its powers as set forth in the Counties<br />
Code 55 <strong>IL</strong>CS 5/1-1001 et seq. is authorized to enter into this <strong>AG</strong>REEMENT; and<br />
WHEREAS, a cooperative Intergovernmental Agreement is appropriate and such<br />
an Agreement is authorized by Article VII, Section 10 of the Illinois Constitution and the<br />
“Intergovernmental Cooperation Act”, 5 <strong>IL</strong>CS 220/1 et seq.<br />
NOW, THEREFORE, in consideration of the aforementioned recitals and the<br />
mutual covenants contained herein, the PARTIES hereto agree as follows:<br />
I. ENGINEERING<br />
A. The TOLLWAY agrees to perform preliminary and final design engineering,<br />
obtain necessary surveys, and prepare the final plans and specifications for the<br />
PROJECT, subject to reimbursement by the COUNTY as hereinafter stipulated.<br />
B. The COUNTY shall review the plans and specifications which impact the<br />
COUNTY's maintained highway (Randall Road) within fifteen (15) calendar days<br />
of receipt thereof. If the TOLLWAY does not receive comments or objections<br />
from the COUNTY within this time period, the lack of response shall be deemed<br />
approval of the plans and specifications. Approval by the COUNTY shall mean<br />
the COUNTY agrees with all specifications in the plans, including alignment and<br />
location of the PROJECT improvements which impact the COUNTY's<br />
maintained highways. In the event of disapproval, the COUNTY will detail in<br />
writing its objections to the proposed plans and specifications for review and<br />
consideration by the TOLLWAY. Notwithstanding, any disapproval by the<br />
COUNTY, the TOLLWAY after considering the COUNTY's objections shall<br />
proceed as the Chief Engineer of the TOLLWAY deems appropriate.<br />
C. Any dispute concerning the plans and specifications shall be resolved in<br />
accordance with Section IX of this <strong>AG</strong>REEMENT.<br />
D. The final approved plans and specifications for the PROJECT shall be promptly<br />
delivered to the COUNTY by the TOLLWAY.<br />
E. The TOLLWAY agrees to assume the overall PROJECT responsibility, including<br />
assuring that all permits (U.S. Army Corps of Engineers, Illinois Department of<br />
Natural Resources, Metropolitan Water Reclamation District of Greater Chicago,<br />
Environmental Protection Agency, etc.) and joint participation and/or force<br />
account agreements (<strong>County</strong>, Township, Municipal, Railroad, Utility, etc.), as<br />
may be required by the PROJECT, are secured by the PARTIES hereto in support<br />
of general project schedules and deadlines. All PARTIES hereto agree to<br />
cooperate, insofar as their individual jurisdictional authorities allow, with the<br />
timely acquisition and clearance of said permits and agreements and in complying<br />
with all applicable Federal, State, and local regulations and requirements<br />
pertaining to work proposed for the PROJECT.<br />
2
F. The COUNTY shall grant and consent to any and all permits, rights of access<br />
(ingress and egress), temporary use to the TOLLWAY, without charge to the<br />
TOLLWAY. Any permit for right of access, temporary use shall not be<br />
unreasonably withheld by the COUNTY.<br />
II. RIGHT OF WAY<br />
A. The acquisition or transfer of right of way is not required for the construction of<br />
the PROJECT pursuant to the approved plans and specifications. Therefore, it is<br />
understood by the PARTIES hereto that there will be no exchange of any interest<br />
in the COUNTY’s right of way or of the TOLLWAY’s right of way.<br />
B. In the event, the TOLLWAY identifies areas of the COUNTY’s right of way<br />
needed for the TOLLWAY to enter, access and use to allow the TOLLWAY<br />
and/or its contractor(s) to complete the PROJECT, the COUNTY shall allow the<br />
TOLLWAY and its contractors to utilize said right of way. In addition, the<br />
COUNTY shall waive the contractor’s surety bonding requirement. The<br />
TOLLWAY agrees upon completion of the PROJECT, that those areas of the<br />
COUNTY’s right of way used are to be restored to an “as good as – or – better”<br />
than pre-construction condition.<br />
III. UT<strong>IL</strong>ITY RELOCATION<br />
A. The TOLLWAY agrees to provide the COUNTY, as soon as they are identified,<br />
the locations (existing and proposed) of public and/or private utility facilities<br />
within existing COUNTY rights of way which require adjustment as part of the<br />
PROJECT. As part of its PROJECT engineering responsibilities, the TOLLWAY<br />
shall identify adjustments to the aforementioned existing utilities.<br />
B. The TOLLWAY agrees to make all reasonable efforts to minimize the number of<br />
utility adjustments in the design of improvements: 1) to TOLLWAY facilities<br />
where they cross COUNTY highway rights of way; and 2) to COUNTY facilities<br />
improved as part of the PROJECT.<br />
C. The COUNTY agrees to make arrangements for and issue all utility permits for<br />
COUNTY rights of way for the PROJECT and cooperate with necessary<br />
adjustments to existing utilities located within existing COUNTY rights of way<br />
where improvements to COUNTY highways are proposed by the COUNTY to be<br />
done in conjunction with the PROJECT, at no expense to the TOLLWAY.<br />
D. The TOLLWAY agrees to make arrangements for and issue all utility permits for<br />
PROJECT required adjustments to utility facilities located on existing<br />
TOLLWAY rights of way, and on proposed TOLLWAY rights of way which are<br />
outside areas of COUNTY jurisdiction, where improvements to TOLLWAY<br />
3
facilities are proposed to be done as part of the PROJECT, at no expense to the<br />
COUNTY.<br />
E. At all locations where utilities are located on COUNTY rights of way and must be<br />
adjusted due to work proposed by the TOLLWAY, the COUNTY agrees to<br />
cooperate with the TOLLWAY in making arrangements with the applicable utility<br />
and issue all permits for the requisite adjustment(s) at no cost to the TOLLWAY.<br />
The TOLLWAY agrees to reimburse and/or credit the COUNTY for any and all<br />
out of pocket costs the COUNTY may incur in causing the aforementioned utility<br />
or utilities to be adjusted.<br />
F. At all locations where utilities are located on TOLLWAY rights of way and must<br />
be adjusted due to work proposed by the COUNTY, the TOLLWAY agrees to<br />
make arrangements with the applicable utility and issue all permits for the<br />
requisite adjustment(s). At all locations where the COUNTY's utilities are<br />
located on TOLLWAY rights of way and must be adjusted due to work proposed<br />
by the COUNTY or due to work proposed by the TOLLWAY, the COUNTY<br />
agrees to obtain from the TOLLWAY an approved permit for the facility, and to<br />
abide by all conditions set forth therein. The COUNTY agrees to reimburse the<br />
TOLLWAY for any and all out of pocket costs the TOLLWAY may incur in<br />
causing the aforementioned utility or utilities to be adjusted.<br />
G. In the event that the work proposed by the COUNTY results in a conflict with the<br />
TOLLWAY's fiber optic cable system, the COUNTY shall reimburse the<br />
TOLLWAY for the cost to locate, mark, design, protect, adjust and/or relocate the<br />
system.<br />
H. At all locations where the TOLLWAY's infrastructure (remote traffic microwave<br />
sensors, message signs, weather stations, weigh-in-motion sites, signs, roadway<br />
lighting controllers, electrical services and data connections) that are currently in<br />
place within the PROJECT limits and must be adjusted due to work proposed by<br />
the COUNTY, the COUNTY agrees to reimburse the TOLLWAY for any and all<br />
out of pocket costs the TOLLWAY may incur in causing the aforementioned<br />
infrastructure to be adjusted.<br />
IV. CONSTRUCTION<br />
A. The TOLLWAY shall advertise and receive bids, obtain COUNTY concurrence<br />
as to the amount of bids (for work to be funded wholly or partially by the<br />
COUNTY before award), award the contract(s), provide construction engineering<br />
inspections and cause the PROJECT to be constructed in accordance with the<br />
PROJECT plans and specifications, subject to reimbursement by the COUNTY as<br />
hereinafter stipulated.<br />
B. After award of the construction contract(s), any proposed deviations from the<br />
plans and specifications that affect the COUNTY shall be submitted to the<br />
4
COUNTY for approval prior to commencing such work. The COUNTY shall<br />
review the proposed deviations and indicate its approval or disapproval thereof in<br />
writing. If the proposed deviation to the plans and specifications are not<br />
acceptable, the COUNTY shall detail in writing its specific objections. If the<br />
TOLLWAY receives no written response from the COUNTY within fifteen (15)<br />
calendar days after delivery to the COUNTY of the proposed deviation, the<br />
proposed deviation shall be deemed approved by the COUNTY. Notwithstanding<br />
any disapproval by the COUNTY, the TOLLWAY may, after considering the<br />
COUNTY's objections, proceed as the Chief Engineer of the TOLLWAY deems<br />
appropriate.<br />
C. After award of the construction contract(s), assuming there are no proposed<br />
deviations from the plans and specifications that affect the COUNTY, the<br />
TOLLWAY shall provide no less than five (5) calendar days’ written notice to the<br />
COUNTY prior to commencement of work on the PROJECT.<br />
D. The COUNTY and its authorized agents shall have all reasonable rights of<br />
inspection (including pre-final and final inspection) during the progress of work<br />
included in the PROJECT that affects the COUNTY's system. The COUNTY<br />
shall assign personnel to perform inspections on behalf of the COUNTY of all<br />
work included in the PROJECT that affects the COUNTY's system, and will<br />
deliver written notices to the Chief Engineer of the TOLLWAY advising the<br />
TOLLWAY as to the identity of the individual(s) assigned to perform said<br />
inspections.<br />
E. Notices required to be delivered by either PARTY pursuant to this <strong>AG</strong>REEMENT<br />
shall be delivered as indicated in Section IX of this <strong>AG</strong>REEMENT.<br />
F. The TOLLWAY shall give notice to the COUNTY upon completion of 70% and<br />
100% of all PROJECT construction contracts to be subsequently maintained by<br />
the COUNTY, and the COUNTY shall make an inspection thereof not later than<br />
seven (7) calendar days after notice thereof. If the COUNTY does not perform a<br />
final inspection within seven (7) calendar days after receiving notice of<br />
completion of 100% of all PROJECT construction contracts or other inspection<br />
arrangements are not agreed to by the parties hereto, the PROJECT shall be<br />
deemed accepted by the COUNTY. At the request of the COUNTY, the<br />
TOLLWAY's representative shall join in on such inspection. In the event said<br />
inspections disclose work that does not conform to the approved final plans and<br />
specifications, the COUNTY's representative shall give immediate verbal notice<br />
to the TOLLWAY's representative of any deficiency, and shall thereafter deliver<br />
within five (5) calendar days a written list identifying such deficiencies to the<br />
Chief Engineer of the TOLLWAY. Deficiencies thus identified shall be subject<br />
to joint re-inspection upon completion of the corrective work. The COUNTY<br />
shall perform such joint re-inspections within seven (7) calendar days after<br />
receiving notice from the TOLLWAY that the deficiencies have been remedied.<br />
5
G. The TOLLWAY shall have the right, in its sole judgment and discretion, to cancel<br />
or alter any or all portions of the work due to circumstances either known or<br />
unknown at the time of bidding or arising after the Contract(s) was entered into,<br />
in accordance with the TOLLWAY Supplemental Specifications for construction,<br />
issued on February 7, 2012 or the Canceled Items provision in the applicable<br />
version of the Illinois State Toll Highway Authority's Standard or Supplemental<br />
Specifications.<br />
V. FINANCIAL<br />
A. Except as otherwise identified herein, the TOLLWAY agrees to pay all PROJECT<br />
related engineering, right of way, construction engineering and construction costs<br />
subject to reimbursement by the COUNTY as hereinafter stipulated.<br />
B. It is mutually agreed by the PARTIES hereto that preliminary and design<br />
engineering costs shall be computed as 5% of the actual construction costs. It is<br />
further agreed that construction engineering shall be computed as 10% of actual<br />
construction costs and mobilization shall be 6% of actual final construction costs.<br />
C. It is mutually agreed by the PARTIES hereto that the estimated cost to the<br />
COUNTY is $33,000 for construction costs, $1,650 (5% of construction costs) for<br />
preliminary and design engineering, $3,300 (10% of construction costs) for<br />
construction engineering and $1,980 (6% of construction costs) for mobilization,<br />
for a total estimated cost of $39,930.<br />
D. It is further agreed that notwithstanding the estimated cost, the COUNTY shall be<br />
responsible for the actual costs associated with the requested expansion joint strip<br />
seal replacement described in the preambles of this <strong>AG</strong>REEMENT.<br />
E. The COUNTY agrees that upon award of the contract for this improvement and<br />
receipt of an invoice from the TOLLWAY, the COUNTY will pay to the<br />
TOLLWAY, an amount equal to 80% of its obligation incurred under this<br />
<strong>AG</strong>REEMENT, based upon actual bid prices, and will pay to said TOLLWAY the<br />
remainder of its obligation in a lump sum, upon completion of the PROJECT,<br />
based on final costs.<br />
F. Either the COUNTY or the TOLLWAY may request, after the construction<br />
contract(s) are let by the TOLLWAY, that supplemental work that increases the<br />
total costs of the PROJECT or more costly substitute work be added to the<br />
construction contract(s). The TOLLWAY will cause said supplemental work or<br />
such substitute work to be added to the construction contract(s), provided that said<br />
work will not delay construction of the PROJECT. The PARTY requesting or<br />
causing said supplemental work or more costly substitute work shall pay for the<br />
cost increases of said work in full.<br />
VI. MAINTENANCE - DEFINITIONS<br />
6
A. The term "local" means any PARTY to this <strong>AG</strong>REEMENT other than the<br />
TOLLWAY. With respect to this <strong>AG</strong>REEMENT, it means the COUNTY.<br />
B. The term "local road" refers to any highway, road or street under the jurisdiction<br />
of the COUNTY.<br />
C. As used herein, the terms "maintenance" or "maintain" mean keeping the facility<br />
being maintained in good and sufficient repair and appearance. Such maintenance<br />
includes the full responsibility for the construction, removal, replacement of the<br />
maintained facility when needed, and unless specifically excluded in Section VII,<br />
MAINTENANCE - RESPONSIB<strong>IL</strong>ITIES, other activities as more specifically set<br />
forth in the following subparts of this Section VI. Maintenance includes but is not<br />
limited to:<br />
D. "Routine maintenance" refers to the day to day pavement maintenance, pothole<br />
repair, anti-icing and de-icing, snow removal, sweeping, pavement marking,<br />
mowing, litter and debris removal, and grate and scupper cleaning and repair,<br />
including compliance with state laws and local ordinances.<br />
E. "Structural maintenance" refers to the integrity of the grade separation structure,<br />
including abutments, bridge deck beams, bridge deck (except wearing surface),<br />
expansion joints, parapet walls and drainage structures.<br />
F. "Signal maintenance" refers to all aspects of installation, repair, replacement,<br />
timing, and operation of traffic signals, including signal loops, signal supports or<br />
bases, interconnects to Ramp Queue Detection Warning Systems and power, but<br />
shall not include permanently installed variable message signs or temporary<br />
signals or signs relating to construction or repair projects.<br />
G. "Lighting maintenance" refers to all aspects of installation, repair, replacement<br />
and operation of roadway lighting including power, but shall not include<br />
temporary lighting relating to construction or repair projects.<br />
H. “Emergency maintenance" refers to any maintenance activity which must be<br />
performed immediately in order to avoid or to repair a condition on the roadway<br />
or right of way which causes or threatens imminent danger or destruction to<br />
roadway facilities or rights of way of the PARTIES hereto, to the motoring<br />
public, to public health, safety or welfare, including but not limited to accident<br />
restoration, chemical or biological removal or remediation, or response to acts of<br />
God or terrorism.<br />
I. The term "drainage facilities" refers to both open and enclosed systems. The term<br />
"drainage structures" refers to enclosed systems only, and includes those elements<br />
of the drainage facility affixed to the bridge superstructures downstream from the<br />
scupper.<br />
7
J. The terms "notify", "give notice" and "notification" refer to written, verbal or<br />
digital communication from one PARTY to another concerning a matter covered<br />
by this <strong>AG</strong>REEMENT, for which the PARTY transmitting the communication<br />
produces and retains a record which substantiates the content, date, time, manner<br />
of communication, identification of sender and recipient, and manner in which the<br />
recipient may respond to the sender, as to the communication.<br />
K. The terms "be responsible for" or "responsibility" refer to the obligation to ensure<br />
performance of a duty or provision of a service under this <strong>AG</strong>REEMENT,<br />
provided, that a PARTY may arrange for actual performance of the duty or<br />
provision of the service by another competent entity if the other PARTY to this<br />
<strong>AG</strong>REEMENT is notified of such arrangement, but in no case shall the entity<br />
with the duty be relieved of ultimate responsibility for performance of the duty or<br />
provision of the service.<br />
L. The terms "consultation" or "consult with" refer to the duty of a PARTY to give<br />
notice to the other PARTY of a proposed action, with reasonable time for that<br />
PARTY to respond, but the PARTY with the duty to consult may proceed with<br />
the proposed action if the other PARTY does not respond within the time frame<br />
set forth in the notice provided, or in the case of the TOLLWAY, it may proceed<br />
with the proposed action if deemed necessary by the Chief Engineer.<br />
M. The term "approve" refers to the duty of a PARTY not only to consult with the<br />
other PARTY but also to provide consent for the proposed action and to retain a<br />
record which documents such consent.<br />
N. The term "grade separation structure" refers to all structural elements between the<br />
abutments and below the wearing surface of a bridge carrying one roadway over<br />
another, unless otherwise specified.<br />
O. These are three types of bridge structures that intersect the TOLLWAY rights of<br />
way:<br />
Type 1. An intersection where a grade separation structure has been constructed<br />
to carry the toll highway over the local road.<br />
Type 2. An intersection where a grade separation structure has been constructed<br />
to carry the local road over the toll highway.<br />
Type 3. An intersection where a partial or complete ramp interchange system, as<br />
well as a grade separation structure, has been constructed between the local road<br />
and the toll highway.<br />
VII. MAINTENANCE - RESPONSIB<strong>IL</strong>ITIES<br />
8
A. It is understood and agreed by the PARTIES that the TOLLWAY shall retain<br />
jurisdiction and maintenance responsibilities for I-90 in its entirety and the<br />
COUNTY shall retain jurisdiction and maintenance responsibilities for Randall<br />
Road in its entirety. The PARTIES maintenance responsibilities are further<br />
detailed in the Intergovernmental Agreements executed on June 29, 1989 and<br />
November 14, 1995, which are referred hereto by reference.<br />
B. The bridge improvements being constructed under this <strong>AG</strong>REEMENT are of the<br />
following types as described in Section VI, Paragraph O above and involve the<br />
following roadway(s):<br />
Type of Bridge Structure Affected Roadway<br />
Type 3 Randall Road<br />
C. The PARTIES agree that the TOLLWAY reserves the exclusive right to approve<br />
the following:<br />
i. Any and all signage affixed to the grade separation structure or placed on<br />
TOLLWAY right of way;<br />
ii. The permitting of any and all loads traversing the grade separation<br />
structure which exceed the limits set forth in Title 92 Chapter 4 Part 2520<br />
Appendix A of the Illinois Administrative Code;<br />
iii. Pavement markings, including embedded reflectors on the Toll Highway;<br />
iv. Standards governing right of way maintenance for the TOLLWAY’s right<br />
of way.<br />
D. The PARTIES agree that each PARTY has the duty to perform such regular<br />
inspections, surveys and reviews as are reasonably necessary to fulfill their<br />
respective obligations under this <strong>AG</strong>REEMENT.<br />
VIII. ADDITIONAL MAINTENANCE PROVISIONS<br />
A. During construction, the COUNTY shall continue to maintain all portions of the<br />
PROJECT within the COUNTY's right of way that are not to be improved or<br />
maintained by the construction contractor(s) pursuant to the approved plans and<br />
specifications, and the TOLLWAY shall continue to maintain all portions of the<br />
Toll Highway that are not required to be maintained by the construction<br />
contractor(s).<br />
B. The COUNTY and the TOLLWAY agree to remove all snow and ice from the<br />
roadways under their respective jurisdiction, and such removal shall be<br />
9
accomplished in such a manner as not to block or obstruct any roadway of the<br />
other party.<br />
C. Nothing herein is intended to prevent or preclude the COUNTY and the<br />
TOLLWAY from entering into reciprocal agreements in the future for any<br />
particular interchange for the efficient removal of snow, ice, and debris or for<br />
incident management.<br />
IX. GENERAL PROVISIONS<br />
A. It is understood and agreed that this is an <strong>AG</strong>REEMENT between the <strong>County</strong> of<br />
<strong>Kane</strong> and the Illinois State Toll Highway Authority.<br />
B. It is understood and agreed by the PARTIES hereto, that the TOLLWAY shall<br />
have jurisdiction of I-90. The COUNTY shall retain jurisdiction of Randall Road<br />
traversed or affected by I-90. For the purpose of this <strong>AG</strong>REEMENT, jurisdiction<br />
shall mean the authority and obligation to administer, control, construct, maintain,<br />
and operate.<br />
C. It is understood and agreed that this <strong>AG</strong>REEMENT constitutes the complete and<br />
exclusive statement of the agreement of the PARTIES relative to the subject<br />
matter hereof and supersedes all previous oral and written proposals, negotiations,<br />
representations or understandings concerning such subject matter.<br />
D. Wherever in this <strong>AG</strong>REEMENT approval or review by either the COUNTY or<br />
the TOLLWAY is provided for, said approval or review shall not be unreasonably<br />
delayed or withheld.<br />
E. Not later than fourteen (14) calendar days after execution of this <strong>AG</strong>REEMENT<br />
each PARTY shall designate in writing a representative who shall serve as the full<br />
time representative of the said PARTY during the carrying out of the execution of<br />
this <strong>AG</strong>REEMENT. Each representative shall have authority, on behalf of such<br />
PARTY, to make decisions relating to the work covered by this <strong>AG</strong>REEMENT.<br />
Representatives may be changed, from time to time, by subsequent written notice.<br />
Each representative shall be readily available to the other PARTY.<br />
F. In the event of a dispute between the COUNTY and the TOLLWAY in the<br />
carrying out of the terms of this <strong>AG</strong>REEMENT, the Chief Engineer of the<br />
TOLLWAY and the Director of Transportation/<strong>County</strong> Engineer of the COUNTY<br />
shall meet and resolve the issue. In the event that they cannot mutually agree on<br />
the resolution of a dispute concerning the plans and specifications or in the<br />
carrying out of the terms of this <strong>AG</strong>REEMENT, the decision of the Chief<br />
Engineer of the TOLLWAY shall be final.<br />
10
G. This <strong>AG</strong>REEMENT may be executed in two (2) or more counterparts, each of<br />
which shall be deemed an original and all of which shall be deemed one and the<br />
same instrument.<br />
H. Under penalties of perjury, the COUNTY certifies that its correct Federal Tax<br />
Identification number is 36-6006585 and it is doing business as a governmental<br />
entity, whose mailing address is <strong>Kane</strong> <strong>County</strong> Division of Transportation,<br />
41W011 Burlington Road, St. Charles, Illinois 60175.<br />
I. This <strong>AG</strong>REEMENT may only be modified by written modification executed by<br />
duly authorized representatives of the PARTIES hereto.<br />
J. This <strong>AG</strong>REEMENT and the covenants contained herein shall become null and<br />
void in the event the contract covering the construction work contemplated herein<br />
is not awarded within three (3) years subsequent to the date of execution of this<br />
<strong>AG</strong>REEMENT.<br />
K. This <strong>AG</strong>REEMENT shall be binding upon and inure to the benefit of the<br />
PARTIES hereto and their respective successors and approved assigns.<br />
L. The failure by the TOLLWAY or the COUNTY to seek redress for violation of or<br />
to insist upon the strict performance of any condition or covenant of this<br />
<strong>AG</strong>REEMENT shall not constitute a waiver of any such breach or subsequent<br />
breach of such covenants, terms, conditions, rights and remedies. No provision of<br />
this <strong>AG</strong>REEMENT shall be deemed waived by the TOLLWAY or the COUNTY<br />
unless such provision is waived in writing.<br />
M. It is agreed that the laws of the State of Illinois shall apply to this <strong>AG</strong>REEMENT<br />
and that, in the event of litigation, venue shall lie in DuPage <strong>County</strong>, Illinois.<br />
N. All written reports, notices and other communications related to this<br />
<strong>AG</strong>REEMENT shall be in writing and shall be personally delivered, mailed via<br />
certified mail, overnight mail delivery, or electronic mail delivery to the following<br />
persons at the following addresses:<br />
To the TOLLWAY: The Illinois Toll Highway Authority<br />
2700 Ogden Avenue<br />
Downers Grove, Illinois 60515<br />
Attn: Chief Engineer<br />
To the COUNTY: <strong>Kane</strong> <strong>County</strong> Division of Transportation<br />
41W011 Burlington Road<br />
St. Charles, Illinois 60175<br />
Attn: Director of Transportation/<strong>County</strong> Engineer<br />
11
O. The COUNTY agrees to maintain books and records related to the performance of<br />
this <strong>AG</strong>REEMENT and necessary to support amounts charged to the TOLLWAY<br />
and/or the COUNTY under the <strong>AG</strong>REEMENT for a minimum of three (3) years<br />
from the last action on the <strong>AG</strong>REEMENT. The COUNTY further agree to<br />
cooperate fully with any audit and to make its books and records, and books and<br />
records within its custody or control available to the Illinois Attorney General, the<br />
Illinois Auditor General, the TOLLWAY Inspector General, the TOLLWAY<br />
Department of Internal Audit, the TOLLWAY or any other governmental agency<br />
or agent thereof that is authorized to audit or inspect such books and records.<br />
P. The introductory recitals included at the beginning of this <strong>AG</strong>REEMENT are<br />
agreed to and incorporated into this <strong>AG</strong>REEMENT.<br />
IN WITNESS THEREOF, the PARTIES have executed this <strong>AG</strong>REEMENT on<br />
the dates indicated.<br />
KANE COUNTY<br />
By: ___________________________ Attest: _______________________<br />
Christopher J. Lauzen, Chairman John A. Cunningham, Clerk<br />
<strong>Kane</strong> <strong>County</strong> Board <strong>Kane</strong> <strong>County</strong> Board<br />
Date: _________________<br />
THE <strong>IL</strong>LINOIS STATE TOLL HIGHWAY AUTHORITY<br />
By: ___________________________ Date: _____________________<br />
Kristi Lafleur, Executive Director<br />
Approved as to Form and Constitutionality<br />
_______________________________________________________<br />
Tiffany I. Bohn, Assistant Attorney General, State of Illinois<br />
JMR_IGA_<strong>Kane</strong> <strong>County</strong>_I-90 – U.S.20 to Elgin Plaza.docx<br />
12
ts<br />
Tyrrell Rd.<br />
59<br />
72<br />
21<br />
Randall Rd.<br />
90<br />
Randall Road at I-90 Tollway Improvements<br />
0 500 1,000 2,000 3,000 4,000<br />
Feet<br />
0 1 Miles<br />
Tollway Improvements<br />
M:\dotserver2\USERS\Committee\20<strong>13</strong>04 <strong>April</strong>\Implementation\Construction\I-90 at Randall Rd ISTHA IGA\Map Standard_Randall Rd at I90 loc map.mxd<br />
Sleepy<br />
Hollow<br />
Legend<br />
Hampshire Rutland Dundee<br />
Burlington<br />
Virgil<br />
467 34<br />
§¨¦ 88<br />
£¤ 30<br />
!( 31<br />
Plato<br />
Elgin<br />
Campton St. Charles<br />
Geneva<br />
<strong>Kane</strong>ville Blackberry<br />
Batavia<br />
Big Rock Sugar Grove Aurora<br />
Interstates<br />
US Roads<br />
State Roads<br />
<strong>County</strong> Roads<br />
Other Roads<br />
Rail Roads<br />
<strong>County</strong> Boundry<br />
Township Boundry<br />
Fox River<br />
Forest Preserves<br />
Municipalities<br />
/
Tyrrell Rd.<br />
59<br />
72<br />
21<br />
Randall Rd.<br />
90<br />
Randall Road at I-90 Tollway Improvements<br />
0 500 1,000 2,000 3,000 4,000<br />
Feet<br />
0 1 Miles<br />
Tollway Improvements<br />
M:\dotserver2\USERS\Committee\20<strong>13</strong>04 <strong>April</strong>\Implementation\Construction\I-90 at Randall Rd ISTHA IGA\Map Standard Aerial_Randall Rd at I90 loc map.mxd<br />
Legend<br />
Hampshire Rutland Dundee<br />
Burlington<br />
Virgil<br />
467 34<br />
§¨¦ 88<br />
£¤ 30<br />
!( 31<br />
Plato<br />
Elgin<br />
Campton St. Charles<br />
Geneva<br />
<strong>Kane</strong>ville Blackberry<br />
Batavia<br />
Big Rock Sugar Grove Aurora<br />
Interstates<br />
US Roads<br />
State Roads<br />
<strong>County</strong> Roads<br />
Other Roads<br />
Rail Roads<br />
<strong>County</strong> Boundry<br />
Township Boundry<br />
Fox River<br />
Forest Preserves<br />
Municipalities<br />
/
If not budgeted,<br />
explain funding<br />
source<br />
<strong>AG</strong>ENDA ITEM EXECUTIVE SUMMARY Agenda Item #<br />
Presenter/Sponsor:<br />
Name<br />
Budget Information: Was this item budgeted?<br />
SUMMARY:<br />
Attachments:<br />
Detailed information available from :<br />
Resolution/Ordinance Tracking:<br />
Staff Name:<br />
Appropriation Amount:<br />
Steve Coffinbargar, Assistant Director Phone: 630-406-7170<br />
Assigned Committee: Transportation Sent to: Executive<br />
on: 04/11/20<strong>13</strong><br />
If Other, specify:<br />
Committee Remarks:<br />
<strong>County</strong> Board Date:<br />
Resolution<br />
Ordinance<br />
Yes<br />
No N/A<br />
Next Committee: Executive Sent to: <strong>County</strong> Board on: 05/08/20<strong>13</strong><br />
If Other, specify:<br />
Committee Remarks:<br />
Next Committee: Sent to: on:<br />
Committee Remarks:<br />
8D-1a<br />
Approving a Wetland Mitigation Agreement with V3 Wetland Restoration, L.L.C. for<br />
Jericho Road over Blackberry Creek, <strong>Kane</strong> <strong>County</strong> Section No. 04-00329-00-BR<br />
Steve Coffinbargar - Assistant Director of Transportation<br />
$35,200.00<br />
The proposed Jericho Road over Blackberry Creek bridge replacement improvement is in design engineering and<br />
construction is programmed for 2014. Prior to construction, a permit from the Army Corps of Engineers (ACOE) must be<br />
obtained to allow work to occur in Waters of the United States. Wetland mitigation is required due to impacts to these<br />
areas. Mitigation is addressed either through the purchase of mitigation credits from existing "wetland banks" or, when not<br />
available, the design,acquisition, construction and monitoring of a wetland at a greater cost.<br />
Staff has negotiated an agreement with V3 Wetland Restoration, L.L.C., to provide wetland mitigation credits for impacts to<br />
0.22 acres at a cost of $35,200.00. The mitigation will take place at the ACOE approved Blackberry Creek Headwaters<br />
Wetland Mitigation Bank.<br />
Resolution, Agreement, Maps<br />
05/14/20<strong>13</strong>
STATE OF <strong>IL</strong>LINOIS<br />
COUNTY OF KANE<br />
RESOLUTION NO. <strong>13</strong> -<br />
APPROVING A WETLAND MITIGATION <strong>AG</strong>REEMENT<br />
WITH V3 WETLAND RESTORATION, L.L.C.<br />
FOR JERICHO ROAD OVER BLACKBERRY CREEK<br />
KANE COUNTY SECTION NO. 04-00329-00-BR<br />
WHEREAS, it is deemed to be in the best interest of the <strong>County</strong> of <strong>Kane</strong> and the motoring<br />
public to undertake the improvement of <strong>Kane</strong> <strong>County</strong> Highway No. 24 (Jericho Road) over Blackberry<br />
Creek (hereinafter the “Improvement”); and<br />
WHEREAS, due to the Improvement, approximately 0.22 acres of existing wetlands will be<br />
disturbed; and<br />
WHEREAS, in order to mitigate the wetland impacts as required by the US Army Corp of<br />
Engineers permit issued in conjunction with the Improvement, 0.44 acres of wetland will be purchased<br />
at an approved wetland mitigation bank (hereinafter the “credit”) for an amount not to exceed Thirty<br />
Five Thousand Two Hundred Dollars ($35,200.00); and<br />
WHEREAS, V3 Wetland Restoration LLC operates an approved wetland mitigation bank<br />
appropriate for the mitigation of wetland impacts caused by the Improvement.<br />
NOW, THEREFORE, BE IT RESOLVED by the <strong>Kane</strong> <strong>County</strong> Board that the Chairman thereof<br />
is hereby authorized to execute an agreement with V3 Wetland Restoration, L.L.C. (a copy of which is<br />
on file with the <strong>County</strong> Clerk's Office) for the purchase of the credit for the wetland mitigation.<br />
BE IT FURTHER RESOLVED that the <strong>Kane</strong> <strong>County</strong> Board appropriates the not to exceed sum<br />
of Thirty Five Thousand Two Hundred Dollars ($35,200.00) to pay for said credit for wetland mitigation<br />
and that said funds be paid from Transportation Sales Tax Bond Fund #305, Line Item # 73010 (Bridge<br />
Construction).<br />
Line Item Line Item Description Was<br />
personnel/item/service<br />
approved in original<br />
budget or a subsequent<br />
budget revision?<br />
Are funds currently<br />
available for this<br />
personnel/item/service in<br />
the specific line item?<br />
305.520.527.73010 Bridge Construction Yes Yes<br />
If funds are not<br />
currently available in<br />
the specified line item,<br />
where are the funds<br />
available?
Passed by the <strong>Kane</strong> <strong>County</strong> Board on May 14, 20<strong>13</strong>.<br />
Page 2 of 2, Res. #<strong>13</strong>-<br />
______________________________________ ___________________________________<br />
John A. Cunningham Christopher J. Lauzen<br />
Clerk, <strong>County</strong> Board Chairman, <strong>County</strong> Board<br />
<strong>Kane</strong> <strong>County</strong>, Illinois <strong>Kane</strong> <strong>County</strong>, Illinois<br />
Vote:<br />
Yes _____<br />
No _____<br />
Voice _____<br />
Abstentions _____<br />
5JRCHO OVER BLKBRRY-WTLNDMTGTN.4LH
Galena Blvd.<br />
Bridge Work<br />
Jericho Rd<br />
0 475 950 1,900 2,850 3,800<br />
Feet<br />
Barnes<br />
Rd.<br />
0 1 Miles<br />
Orchard Rd.<br />
Section Number 04-00329-00-BR<br />
Jericho Road over Blackberry Creek<br />
83<br />
M:\dotserver2\USERS\Committee\201211 November\Implementation\Design\Jericho over Blackberry Creek\Map Standard_Jericho Rd over Blackberry Crk loc map<br />
Edgelawn Dr.<br />
Montgomery<br />
Aucutt Rd.<br />
Legend<br />
Hampshire Rutland Dundee<br />
Burlington<br />
Virgil<br />
467 34<br />
§¨¦ 88<br />
tu 30<br />
!( 31<br />
Plato<br />
Campton<br />
A<br />
Prairie<br />
Elgin<br />
Geneva<br />
<strong>Kane</strong>ville Blackberry<br />
Batavia<br />
Big Rock Sugar Grove Aurora<br />
Interstates<br />
US Roads<br />
State Roads<br />
<strong>County</strong> Roads<br />
Other Roads<br />
Rail Roads<br />
<strong>County</strong> Boundry<br />
Township Boundry<br />
Fox River<br />
Forest Preserves<br />
Municipalities<br />
/
Galena Blvd.<br />
Bridge Work<br />
Jericho Rd<br />
0 475 950 1,900 2,850 3,800<br />
Feet<br />
Barnes<br />
Rd.<br />
0 1 Miles<br />
Orchard Rd.<br />
83<br />
Section Number 04-00329-00-BR<br />
Jericho Road over Blackberry Creek<br />
Edgelawn Dr.<br />
Aucutt Rd.<br />
M:\dotserver2\USERS\Committee\201211 November\Implementation\Design\Jericho over Blackberry Creek\Map Standard Aerial_Jericho Rd over Blackberry Crk loc map<br />
Legend<br />
Hampshire Rutland Dundee<br />
Burlington<br />
Virgil<br />
467 34<br />
§¨¦ 88<br />
tu 30<br />
!( 31<br />
Plato<br />
Campton<br />
Prairie<br />
Elgin<br />
Geneva<br />
<strong>Kane</strong>ville Blackberry<br />
Batavia<br />
Big Rock Sugar Grove Aurora<br />
Interstates<br />
US Roads<br />
State Roads<br />
<strong>County</strong> Roads<br />
Other Roads<br />
Rail Roads<br />
<strong>County</strong> Boundry<br />
Township Boundry<br />
Fox River<br />
Forest Preserves<br />
Municipalities<br />
/
If not budgeted,<br />
explain funding<br />
source<br />
<strong>AG</strong>ENDA ITEM EXECUTIVE SUMMARY Agenda Item #<br />
Presenter/Sponsor:<br />
Name<br />
Budget Information: Was this item budgeted?<br />
SUMMARY:<br />
Attachments:<br />
Detailed information available from :<br />
Resolution/Ordinance Tracking:<br />
Staff Name:<br />
Appropriation Amount:<br />
Steve Coffinbargar, Assistant Director Phone: 630-406-7170<br />
Assigned Committee: Transportation Sent to: Executive<br />
on: 04/11/20<strong>13</strong><br />
If Other, specify:<br />
Committee Remarks:<br />
<strong>County</strong> Board Date:<br />
Resolution<br />
Ordinance<br />
Yes<br />
No N/A<br />
Next Committee: Executive Sent to: <strong>County</strong> Board on: 05/08/20<strong>13</strong><br />
If Other, specify:<br />
Committee Remarks:<br />
Next Committee: Sent to: on:<br />
Committee Remarks:<br />
8D-2a<br />
Approving a Wetland Mitigation Agreement with V3 Wetland Restoration, L.L.C. for<br />
the LaFox Road over Mill Creek, <strong>Kane</strong> <strong>County</strong> Section No. 11-00417-00-BR<br />
Steve Coffinbargar - Assistant Director of Transportation<br />
$55,280.00<br />
The proposed LaFox Road over Mill Creek bridge replacements are in design engineering and construction is programmed<br />
for 2014. Prior to construction, a permit from the Army Corps of Engineers (ACOE) must be obtained to allow work to occur<br />
in Waters of the United States. Wetland mitigation is required, due to impacts to these areas. Mitigation is addressed either<br />
through the purchase of mitigation credits from existing "wetland banks" or, when not available, the design,acquisition,<br />
construction and monitoring of a wetland at a greater cost.<br />
Staff has negotiated an agreement with V3 Wetland Restoration, L.L.C., to provide wetland mitigation credits for impacts to<br />
0.1984 acres at a cost of $55,280.00. The mitigation will take place at the ACOE approved Blackberry Creek Headwaters<br />
Wetland Mitigation Bank. Due to the high quality of wetlands impacted at this location, the required mitigation ratio and<br />
associated cost is higher than at other locations.<br />
Resolution, Agreement<br />
05/14/20<strong>13</strong>
STATE OF <strong>IL</strong>LINOIS<br />
COUNTY OF KANE<br />
RESOLUTION NO. <strong>13</strong> -<br />
APPROVING A WETLAND MITIGATION <strong>AG</strong>REEMENT<br />
WITH V3 WETLAND RESTORATION, L.L.C.<br />
FOR LAFOX ROAD OVER M<strong>IL</strong>L CREEK<br />
KANE COUNTY SECTION NO. 11-00417-00-BR<br />
WHEREAS, it is deemed to be in the best interest of the <strong>County</strong> of <strong>Kane</strong> and the motoring<br />
public to undertake the improvement of <strong>Kane</strong> <strong>County</strong> Highway No. 81 (LaFox Road) over Mill Creek<br />
(hereinafter the “Improvement”); and<br />
WHEREAS, due to the Improvement, approximately 0.1984 acres of existing wetlands will be<br />
disturbed; and<br />
WHEREAS, in order to mitigate the wetland impacts as required by the US Army Corp of<br />
Engineers permit issued in conjunction with the Improvement, 0.691 acres of wetland will be<br />
purchased at an approved wetland mitigation bank (hereinafter the “credit”) for an amount not to<br />
exceed Fifty Five Thousand Two Hundred Eighty Dollars ($55,280.00); and<br />
WHEREAS, V3 Wetland Restoration LLC operates an approved wetland mitigation bank,<br />
appropriate for the mitigation of wetland impacts caused by Improvement.<br />
NOW, THEREFORE, BE IT RESOLVED by the <strong>Kane</strong> <strong>County</strong> Board that the Chairman thereof<br />
is hereby authorized to execute an agreement with V3 Wetland Restoration, L.L.C. (a copy of which is<br />
on file with the <strong>County</strong> Clerk's Office) for the purchase of the credit for wetland mitigation.<br />
BE IT FURTHER RESOLVED that the <strong>Kane</strong> <strong>County</strong> Board appropriates the not to exceed sum<br />
of Fifty Five Thousand Two Hundred Eighty Dollars ($55,280.00) to pay for said credit for wetland<br />
mitigation and that said funds be paid from Transportation Sales Tax Fund #305, Line Item # 73010<br />
(Bridge Construction).<br />
Line Item Line Item Description Was<br />
personnel/item/service<br />
approved in original<br />
budget or a subsequent<br />
budget revision?<br />
Are funds currently<br />
available for this<br />
personnel/item/service in<br />
the specific line item?<br />
305.520.527.73010 Bridge Construction Yes Yes<br />
If funds are not<br />
currently available in<br />
the specified line item,<br />
where are the funds<br />
available?
Passed by the <strong>Kane</strong> <strong>County</strong> Board on May 14, 20<strong>13</strong>.<br />
Page 2 of 2, Res. #<strong>13</strong>-<br />
______________________________________ ___________________________________<br />
John A. Cunningham Christopher J. Lauzen<br />
Clerk, <strong>County</strong> Board Chairman, <strong>County</strong> Board<br />
<strong>Kane</strong> <strong>County</strong>, Illinois <strong>Kane</strong> <strong>County</strong>, Illinois<br />
Vote:<br />
Yes _____<br />
No _____<br />
Voice _____<br />
Abstentions _____<br />
5LFXOVERM<strong>IL</strong>LCR-WTLNDMTGTN.4LH
Town Hall Rd.<br />
Harley Rd.<br />
Rd.<br />
Wasco<br />
64<br />
0 600 1,200 2,400 3,600 4,800<br />
Feet<br />
0 1 Miles<br />
Lafox Rd.<br />
81<br />
La Fox<br />
41<br />
Bridge<br />
Replacement<br />
Campton Hills Rd<br />
Brundige Rd.<br />
Section Number 11-00417-00-BR<br />
LaFox Road over Mill Creek - Structure Replacement<br />
M:\dotserver2\USERS\Committee\201107 July\Implementation\Engineering\LaFox Road over Mill Creek - Phase I&II Engineering\Map Standard_LaFox Rd over Mill Crk Phase I&II Enginerring loc map.mxd<br />
Bu<br />
38<br />
Legend<br />
467 34<br />
§¨¦ 88<br />
£¤ 30<br />
!( 31<br />
Hampshire Rutland Dundee<br />
Burlington Plato<br />
Virgil<br />
Big Rock<br />
Campton<br />
Interstates<br />
US Roads<br />
State Roads<br />
<strong>County</strong> Roads<br />
Other Roads<br />
Rail Roads<br />
Elgin<br />
Geneva<br />
<strong>Kane</strong>ville Blackberry<br />
Batavia<br />
Aurora<br />
Peck Rd.<br />
Fox River<br />
d.<br />
84<br />
<strong>County</strong> Boundry<br />
Township Boundry<br />
Forest Preserves<br />
Municipalities<br />
/<br />
B<br />
Ke
Town Hall Rd.<br />
Harley Rd.<br />
Rd.<br />
Wasco<br />
64<br />
0 600 1,200 2,400 3,600 4,800<br />
Feet<br />
0 1 Miles<br />
Lafox Rd.<br />
81<br />
La Fox<br />
41<br />
Bridge<br />
Replacement<br />
Campton Hills Rd<br />
Brundige Rd.<br />
Section Number 11-00417-00-BR<br />
LaFox Road over Mill Creek - Structure Replacement<br />
Bu<br />
38<br />
Legend<br />
Hampshire Rutland Dundee<br />
Peck Rd.<br />
M:\dotserver2\USERS\Committee\201107 July\Implementation\Engineering\LaFox Road over Mill Creek - Phase I&II Engineering\Map Standard Aerial_LaFox Rd over Mill Crk Phase I&II Enginerring loc map.mxd<br />
467 34<br />
§¨¦ 88<br />
£¤ 30<br />
!( 31<br />
Burlington Plato<br />
Virgil<br />
Big Rock<br />
Campton<br />
Interstates<br />
US Roads<br />
State Roads<br />
<strong>County</strong> Roads<br />
Other Roads<br />
Rail Roads<br />
Fox River<br />
Elgin<br />
Geneva<br />
<strong>Kane</strong>ville Blackberry<br />
Batavia<br />
Aurora<br />
d.<br />
84<br />
<strong>County</strong> Boundry<br />
Township Boundry<br />
Forest Preserves<br />
Municipalities<br />
/<br />
B<br />
Ke