<strong>UC</strong> STRATEGIC ENERGY PLAN<br />

University of California, <strong>Los</strong> <strong>Angeles</strong><br />

Prepared for<br />

University of California<br />

Office of the President<br />

December 31, 2008<br />

Prepared by:<br />

Newcomb Anderson McCormick, Inc.<br />

201 Mission Street, Suite 2010<br />

San Francisco, CA 94105<br />

Phone: (415) 896-0300<br />

Fax: (415) 896-1900<br />

2413.01


TABLE OF CONTENTS<br />

1. EXECUTIVE SUMMARY ............................................................................................. 1-1<br />

1.1 Policy on Sustainable Practices ...................................................................... 1-1<br />

1.2 <strong>Energy</strong> Use and Greenhouse Gas Reduction Targets .................................... 1-1<br />

1.3 <strong>Strategic</strong> <strong>Energy</strong> <strong>Plan</strong> Projects ........................................................................ 1-2<br />

2. INTROD<strong>UC</strong>TION ......................................................................................................... 2-1<br />

2.1 <strong>Strategic</strong> <strong>Energy</strong> <strong>Plan</strong> Methodology ................................................................ 2-1<br />

2.2 General Project Identification Categories and Approach ................................. 2-4<br />

2.3 <strong>Campus</strong> Overview ........................................................................................... 2-6<br />

2.4 Central <strong>Plan</strong>t .................................................................................................... 2-6<br />

2.5 <strong>Strategic</strong> <strong>Energy</strong> <strong>Plan</strong> Buildings ...................................................................... 2-6<br />

2.6 Recent <strong>Energy</strong> Project Inventory ..................................................................... 2-9<br />

3. HISTORICAL CAMPUS ENERGY USE ...................................................................... 3-1<br />

3.1 FY 99-00 and 06-07 <strong>Energy</strong> Baseline ............................................................. 3-1<br />

4. HISTORIC BUILDING ENERGY USE ......................................................................... 4-1<br />

4.1 Existing Metering Infrastructure ....................................................................... 4-1<br />

4.2 Individual Building Metering ............................................................................. 4-2<br />

4.3 Building <strong>Energy</strong> Use Targets ........................................................................... 4-3<br />

5. UTILITIES ................................................................................................................... 5-1<br />

5.1 Providers & Tariffs ........................................................................................... 5-1<br />

5.2 Procurement Options ....................................................................................... 5-1<br />

6. CAMPUS ELECTRIC INFRASTR<strong>UC</strong>TURE ................................................................ 6-1<br />

7. RENEWABLE ENERGY GENERATION ..................................................................... 7-1<br />

7.1 Technologies ................................................................................................... 7-1<br />

7.2 Existing Renewable Sources ........................................................................... 7-1<br />

8. RECOMMENDED ENERGY EFFICIENCY PROJECT DESCRIPTIONS ................... 8-1<br />

8.1 Lighting Projects .............................................................................................. 8-1<br />

8.2 HVAC Projects ................................................................................................. 8-5<br />

8.3 Monitoring Based Commissioning Projects ................................................... 8-12<br />

8.4 Capital Program Projects ............................................................................... 8-13<br />

8.5 Deferred Maintenance and Capital Renewal Projects ................................... 8-14<br />

8.6 <strong>Campus</strong> Wide Projects .................................................................................. 8-15<br />

8.7 Other Projects ................................................................................................ 8-17<br />

8.8 Custom Projects ............................................................................................ 8-18<br />

9. BUILDING OVERVIEW & PROJECTS ....................................................................... 9-1<br />

10. PROJECT SUMMARIES ........................................................................................... 10-1<br />

11. PROJECT LISTS & SUMMARY OF PROJECTS ...................................................... 11-1<br />

2413.01/Reports/<strong>UC</strong> SEP Draft Report – <strong>UC</strong>LA.doc i December 31, 2008<br />

Newcomb | Anderson | McCormick


TABLE OF CONTENTS (CONTINUED)<br />

12. ENERGY & GHG FORECAST .................................................................................. 12-1<br />

12.1 Electricity Emissions Factors ......................................................................... 12-1<br />

12.2 Gas Emissions Factors .................................................................................. 12-1<br />

12.3 Current <strong>Energy</strong> Usage and Emissions .......................................................... 12-1<br />

12.4 2014 Goals .................................................................................................... 12-1<br />

12.5 2020 Goals .................................................................................................... 12-2<br />

12.6 SEP <strong>Energy</strong> Efficiency and Renewable <strong>Energy</strong> Projects .............................. 12-2<br />

13. CONCLUSIONS ........................................................................................................ 13-1<br />

13.1 Next Steps and Recommendations ............................................................... 13-1<br />

13.2 Funding Sources ........................................................................................... 13-1<br />

APPENDICES<br />

Appendix A – Field Data Forms<br />

Appendix B – Savings Calculations<br />

Appendix C – Other Calculations and Data<br />

2413.01/Reports/<strong>UC</strong> SEP Draft Report – <strong>UC</strong>LA.doc ii December 31, 2008<br />

Newcomb | Anderson | McCormick


PREFACE<br />

This report was produced by Newcomb Anderson McCormick for the University of California,<br />

Office of the President (<strong>UC</strong>OP) and the University of California, <strong>Los</strong> <strong>Angeles</strong>. This report<br />

also includes recommendations for the medical facilities that are part of <strong>UC</strong>LA, which are<br />

technically part of the campus and therefore not referred to as a separate medical center.<br />

Valuable assistance and direction was provided for this project by George Getgen, Dirk<br />

VanUlden, Clifton Bowen, Matthew St. Clair and John Rolle of the <strong>UC</strong> Office of the<br />

President, and Dave Johnson, Robert Striff, Nick Stone, Marvin Peterson and Dan Batliwalla<br />

of <strong>UC</strong>LA.<br />

2413.01/Reports/<strong>UC</strong> SEP Draft Report – <strong>UC</strong>LA.doc iii December 31, 2008<br />

Newcomb | Anderson | McCormick


1. EXECUTIVE SUMMARY<br />

1.1 Policy on Sustainable Practices<br />

The Regents of the University of California adopted a Policy on Sustainable Practices in<br />

March 2007 which states that the University will develop a <strong>Strategic</strong> <strong>Energy</strong> <strong>Plan</strong> (SEP) for<br />

implementing energy efficiency projects in existing buildings. The initial goal for the retrofit<br />

projects is to reduce systemwide, growth adjusted energy consumption by 10% or more by<br />

2014 from the year 2000 base consumption level.<br />

In addition, the Policy directs the campuses to pursue the goal of reducing greenhouse gas<br />

(GHG) emissions to year 2000 levels by 2014 and to 1990 levels by 2020. This target is not<br />

growth adjusted. The 2020 target follows the AB32 directive on GHG emissions. Because<br />

electricity and gas purchases are expected to represent perhaps three quarters of a<br />

campus’ GHG emissions, the energy and GHG reduction goals are closely linked. It is<br />

anticipated that the <strong>Strategic</strong> <strong>Energy</strong> <strong>Plan</strong> projects will be one of the main tools the campus<br />

uses to meet its GHG targets.<br />

1.2 <strong>Energy</strong> and Greenhouse Gas Reduction Targets<br />

Table 1.1 lists past, current and projected energy purchases by <strong>UC</strong> <strong>Los</strong> <strong>Angeles</strong>, including<br />

medical facilities that are part of the campus, starting with the baseline year 2000. The<br />

energy purchases are divided by the gross building area of the campus to establish an<br />

<strong>Energy</strong> Use Index (EUI) to evaluate the growth adjusted energy use targets. Because the<br />

campus cogenerates a large portion of the electricity consumed on campus, the EUI for<br />

purchased utilities will differ from similar campuses which do not cogenerate, or from a EUI<br />

based on consumption. This cogeneration impact is a higher gas and lower electric EUI<br />

than might be otherwise anticipated.<br />

The energy purchases are also converted to GHG emissions, using emissions factors for<br />

electricity generation and natural gas use. Individual campuses are preparing plans for<br />

meeting the GHG goals, due by December 2008. Those plans will address the historical<br />

campus emissions in detail. At present the emissions factors for the different electricity<br />

providers operating in 2000 and 1990 are not available. For this <strong>Strategic</strong> <strong>Energy</strong> <strong>Plan</strong> the<br />

GHG emissions factors are based on the statewide emissions factors for 2000. The 1990<br />

utility purchases are not currently available from university or utility records so the 2020<br />

target is undefined.<br />

The <strong>UC</strong>LA and <strong>UC</strong>LA MC energy purchases in the most recent year (FY 06-07) are also<br />

shown in Table 1.1. The cost of this energy in this year is $14,028,371 for electricity and<br />

$22,654,091 for natural gas, for a combined cost of $36,682,462. The <strong>Energy</strong> Use Index<br />

and GHG emissions for this year can be compared with the 2000 baseline to see progress<br />

to date on achieving the 2014 target.<br />

Table 1.1 also shows growth in building area and energy use projected to the year 2014<br />

without investment in new energy efficiency, based on new construction identified in the Five<br />

Year Capital Program (2007-08 to 2011-12). Actual growth could be higher. Additionally,<br />

this growth number includes the energy savings anticipated by the end of 2008 for the<br />

Partnership projects funded in the 2006-08 Program.<br />

2413.01/Reports/<strong>UC</strong> SEP Draft Report – <strong>UC</strong>LA.doc 1-1 December 31, 2008<br />

Newcomb | Anderson | McCormick


1.3 <strong>Strategic</strong> <strong>Energy</strong> <strong>Plan</strong> Projects<br />

This <strong>Strategic</strong> <strong>Energy</strong> <strong>Plan</strong> is intended to provide initial identification of potential for energy<br />

efficiency retrofit projects at all buildings over 50,000 square feet at University of California<br />

<strong>Los</strong> <strong>Angeles</strong>. In initial stages of the plan at the campus’ request, it was agreed that a subset<br />

of buildings would be investigated as specified by the campus and results extrapolated to<br />

other buildings. This refined list of campus approved buildings investigated in this report is<br />

summarized in Table 1.2. This includes primarily lighting, HVAC, commissioning and central<br />

plant measures. A number of other measures that apply in all sizes of buildings are<br />

identified as well. The potential for energy efficiency in new construction and renovated<br />

buildings is also addressed, based on the same Capital Program. A number of these<br />

efficiency projects were initially identified and evaluated by the campuses. A separate line<br />

item shows the potential from addition of photovoltaic power to parking roof areas on<br />

campus. This report does not represent an investment grade audit so the numbers are<br />

expected to be refined in the engineering process before the campus submits them for<br />

funding. All projects except photovoltaics were evaluated using the campus energy<br />

recharge rates.<br />

The <strong>Strategic</strong> <strong>Energy</strong> <strong>Plan</strong> attempts to be comprehensive in its identification of potential<br />

energy projects, within the buildings agreed upon for investigation. As a result the total<br />

potential savings is significant and the payback periods for some of the measures are fairly<br />

long. During implementation the campus will select measures to implement which meet its<br />

investment and physical plant needs.<br />

The efficiency measures will be implemented through the <strong>UC</strong>/CSU Investor Owned Utility<br />

Partnership Program in the 2009-11 and 2012-14 funding cycles, and corresponding<br />

incentive programs from LADWP. Utility incentives are projected to be similar to past<br />

cycles, $0.24/kWh and $1.00/therm annual savings. <strong>Energy</strong> savings have been calculated<br />

on a project by project basis, with incentives based on the building level savings. The<br />

photovoltaic projects would be implemented using the California Solar Initiative incentives.<br />

The magnitude of project investment is many times greater than the size of past Partnership<br />

cycles, which have been constrained by the limited capital available from the campuses. A<br />

new funding mechanism will offer bond money from the Office of the President to pay<br />

upfront the University portion of the project cost, with the 15 year bond to be repaid by the<br />

campus through utility savings.<br />

The effect of these potential projects on meeting the efficiency and GHG targets is illustrated<br />

in Table 1.1. In this table the energy savings are reported as they would be measured at the<br />

utility meters, taking into account the effect of the cogeneration and TES at the central plant.<br />

The indication is that the 2014 energy goals can be met with an aggressive program of<br />

project implementation, but that more aggressive action may be required to achieve the<br />

GHG goals. The 2020 goals cannot be addressed until the 1990 baseline is established.<br />

The economics of these projects are described in Table 1.2, which lists the potential projects<br />

according to the funding source for the facility and the type of project. This table also lists<br />

the projected Partnership Program or Solar incentives and the net simple paybacks to the<br />

site, factoring in the incentives.<br />

2413.01/Reports/<strong>UC</strong> SEP Draft Report – <strong>UC</strong>LA.doc 1-2 December 31, 2008<br />

Newcomb | Anderson | McCormick


Table 1.1: Summary of Baseline and Projected <strong>Energy</strong> Usage, Emissions, and Goals<br />

<strong>Energy</strong> Component<br />

of GHG Emissions<br />

vs. 2000 Baseline<br />

2014 Target: 100%<br />

<strong>Energy</strong><br />

Component of<br />

GHG Emissions<br />

(tonne CO2 eq.)<br />

Source <strong>Energy</strong><br />

Use Index vs.<br />

2000 Baseline<br />

2014 Target: 90%<br />

Source<br />

<strong>Energy</strong> Use<br />

Index<br />

(kBtu/sf-yr)<br />

<strong>Campus</strong><br />

Area<br />

(GSF)<br />

Purchased<br />

Natural Gas<br />

(th/yr)<br />

Purchased<br />

Electricity<br />

(kWh/yr)<br />

19,817,189 217 100% 213,918 100%<br />

75,539,098 35,182,004<br />

Year <strong>Energy</strong> Use Basis<br />

1990 FY 89-90 Data Not<br />

Baseline<br />

Available<br />

2000 FY 99-00 Historical<br />

Baseline Use per <strong>UC</strong>OP<br />

22,774,007 220 101% 236,651 111%<br />

159,333,888 33,682,979<br />

FY 06-07 Historical<br />

Use per <strong>UC</strong>OP<br />

Most Recent<br />

Year<br />

25,175,205 231 106% 271,086 127%<br />

212,301,682 36,525,316<br />

With Projected Growth<br />

and 2006-2008<br />

Partnership Projects<br />

Add Potential<br />

<strong>Strategic</strong> <strong>Energy</strong> <strong>Plan</strong><br />

Efficiency Projects<br />

Add Potential Full<br />

Roof PV<br />

2014<br />

Projected<br />

25,175,205 186 86% 229,736 107%<br />

103,363,327 36,246,018<br />

25,175,205 183 84% 227,192 106%<br />

96,413,209 36,246,018<br />

2014<br />

Projected<br />

2014<br />

Projected<br />

2020 Growth Not Projected<br />

Notes:<br />

Source <strong>Energy</strong> 10,239 Btu/kWh Electric<br />

100,000 Btu/th Gas<br />

Emissions 0.000366 tonne CO2 eq/kWh<br />

0.005295 tonne CO2 eq/th<br />

2413.01/Reports/<strong>UC</strong> SEP Draft Report – <strong>UC</strong>LA.doc 1-3 December 31, 2008<br />

Newcomb | Anderson | McCormick


Table 1.2: SEP Project Savings and Economics Summary<br />

Purchased Utility Savings<br />

Net Simple<br />

Payback<br />

Period (yr)<br />

Net Project<br />

Cost ($)<br />

Anticipated<br />

Incentive ($)<br />

Monetary<br />

($/yr) Project Cost ($)<br />

Demand<br />

(kW) Gas (th/yr)<br />

1,688,231 10,618,251 3,976,161 $ 6,642,090 3.9<br />

3,004,396 27,552,281 7,904,780 $ 19,647,501 6.5<br />

1,464,872 24,427,106 3,995,107 $ 20,431,999 13.9<br />

560,089 4,586,700 1,521,237 $ 3,065,463 5.5<br />

550,316 5,982,444 1,333,220 $ 4,649,224 8.4<br />

573,605 10,395,000 1,479,558 $ 8,915,442 15.5<br />

$ 7,841,510 $ 83,561,782 $ 20,210,063 $ 63,351,719 8.1<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

1,289<br />

1,148<br />

4,645<br />

707<br />

472<br />

624<br />

8,885<br />

$ 282,316 $ 1,760,663 $ 598,718 $ 1,161,945 4.1<br />

173,703 2,999,102 457,131 $ 2,541,971 14.6<br />

$ 371,653 $ 2,943,537 $ 1,013,600 $ 1,929,937 5.2<br />

$ 1,104,523 $ 11,584,479 $ 2,616,475 $ 8,968,004 8.1<br />

$ 1,932,195 $ 19,287,781 $ 4,685,924 $ 14,601,857 7.6<br />

$ 9,773,705 $ 102,849,562 $ 24,895,987 $ 77,953,575 8.0<br />

115,570<br />

-<br />

-<br />

163,728<br />

279,298<br />

279,298<br />

192<br />

277<br />

501<br />

962<br />

1,932<br />

10,817<br />

Electricity<br />

Efficiency Projects<br />

(kWh/yr)<br />

State Funded<br />

MBCx 19,184,439<br />

HVAC Retrofits 34,140,869<br />

Lighting Retrofits 16,646,278<br />

Other Retrofits 6,364,652<br />

New Construction 6,253,593<br />

Deferred Maintenance & Capital Renewal 6,518,233<br />

Subtotals 89,108,065<br />

Non State Funded<br />

MBCx 2,328,228<br />

HVAC Retrofits 1,973,897<br />

Lighting Retrofits 4,223,324<br />

New Construction 11,304,840<br />

Subtotals 19,830,290<br />

Total Efficiency Projects 108,938,355<br />

Monetary<br />

($/yr) Note<br />

$ (27,720) Assumes Power Purchase Agreement Method of Delivery<br />

$ (222,565) Assumes Power Purchase Agreement Method of Delivery<br />

$ (250,285)<br />

Purchased Utility Savings<br />

Electricity Demand<br />

Renewable Projects<br />

(kWh/yr) (kW) Gas (th/yr)<br />

Photovoltaics, 1st MW 1,386,000 1,000 -<br />

Photovoltaics, Remaining Potential 5,564,118 4,015 -<br />

Subtotals 6,950,118 5,015 -<br />

Purchased Utility Savings<br />

Net Simple<br />

Monetary<br />

Anticipated Net Project Payback<br />

($/yr) Project Cost ($) Incentive ($) Cost ($) Period (yr)<br />

$ 7,841,510 $ 83,561,782 $ 20,210,063 $ 63,351,719 8.1<br />

$ 1,932,195 $ 19,287,781 $ 4,685,924 $ 14,601,857 7.6<br />

$ (250,285)<br />

$ 9,523,420 $ 102,849,562 $ 24,895,987 $ 77,953,575 8.2<br />

Demand<br />

(kW) Gas (th/yr)<br />

8,885 -<br />

1,932 279,298<br />

5,015 -<br />

15,832 279,298<br />

Electricity<br />

Total Projects<br />

(kWh/yr)<br />

State Funded Efficiency Projects 89,108,065<br />

Non State Funded Efficiency Projects 19,830,290<br />

Renewable Projects 6,950,118<br />

TOTAL <strong>UC</strong>LA 115,888,473


The campus has reviewed a preliminary version of the initial list of potential projects in this<br />

report and has initiated a planning process for engineering, scheduling and implementation of<br />

the projects over the next six years. It is anticipated that the list of potential projects will be<br />

continuously tuned and updated as projects are built, savings are measured, new technologies<br />

become commercially available, and campus loads change over the course of the next six<br />

years. Because the campus is served by a municipal electric utility, the campus did not actively<br />

select projects for implementation concurrent with the IOU campus deadlines, so no distinction<br />

is made between potential projects and the planned or committed projects.<br />

2413.01/Reports/<strong>UC</strong> SEP Draft Report – <strong>UC</strong>LA.doc 1-5 December 31, 2008<br />

Newcomb | Anderson | McCormick


2. INTROD<strong>UC</strong>TION<br />

2.1 <strong>Strategic</strong> <strong>Energy</strong> <strong>Plan</strong> Methodology<br />

The University of California Office of the President has contracted with Newcomb Anderson<br />

McCormick (NAM) to create a <strong>Strategic</strong> <strong>Energy</strong> <strong>Plan</strong> for nine campuses and five medical<br />

centers. This <strong>Plan</strong> will identify potential energy saving projects throughout these campuses that<br />

can be implemented over the next six years, and will evaluate their contribution to helping the<br />

campuses meet the system-wide goals of reduced energy consumption and reduced<br />

greenhouse gas emissions.<br />

Newcomb Anderson McCormick assembled a team of highly respected engineering firms and<br />

experts to perform the work at the campus and assemble the <strong>Strategic</strong> <strong>Energy</strong> <strong>Plan</strong>. The team<br />

for <strong>UC</strong> Irvine included:<br />

Team Member Role<br />

Newcomb Anderson McCormick Program Manager, SEP Aggregation<br />

P2S Engineering <strong>Campus</strong> Field Auditor, Efficiency Projects<br />

Michael Wall Engineering Renewable <strong>Energy</strong> Projects, Power Quality<br />

Cogent <strong>Energy</strong> Air Handler Simulations<br />

A kickoff meeting was held at the campus on February 28, 2008, with representation from the<br />

campus facilities staff and housing. The kickoff meeting introduced the SEP team and process,<br />

collected valuable input and provided an understanding of the campus’ priorities and needs.<br />

Additionally, the list of 50,000 square foot and larger buildings to be included in the SEP was<br />

reviewed and buildings were removed to align the effort of the SEP with campus priorities and<br />

the best opportunities for energy savings. The resulting list of buildings (referred to as SEP<br />

Building List, or SEP Buildings) became the basis for the field work and building specific project<br />

identification.<br />

Following the kickoff meeting the field investigation phase ensued. Collectively, the team<br />

performed audits and analysis of all SEP buildings and other specific opportunities to identify<br />

the list of projects included in this report. The energy efficiency projects identified by the<br />

<strong>Campus</strong> Field Auditor were focused on the SEP Buildings’ mechanical and lighting systems,<br />

with field data collected on standardized field data templates (included in Appendix A).<br />

Renewable energy potential was investigated by Michael Wall Engineering, along with a brief<br />

power quality and reliability investigation, while Newcomb Anderson McCormick’s efforts<br />

focused on historical data collection, campus wide projects, projects outside of the SEP<br />

buildings and green house gas emission impacts.<br />

During the analysis phase, the previously compiled field data was analyzed to develop projects<br />

with consistency and reasonableness in mind, using the most detailed methods of analysis<br />

possible in the time available. To this end, a standardized analysis tool was used to analyze the<br />

majority of the air hander related projects. The analysis tool provides results which incorporate<br />

factors typical of a more detailed investigation as opposed to a strategic level project analysis,<br />

including system specifics, site specific weather data, operating schedules, control strategies<br />

and typical system setpoints as determined by field investigation. Analysis of other projects was<br />

performed using project-specific engineering calculations and followed recognized engineering<br />

principles. Reasonable engineering judgment was applied to all project analyses.<br />

2413.01/Reports/<strong>UC</strong> SEP Draft Report – <strong>UC</strong>LA.doc 2-1 December 31, 2008<br />

Newcomb | Anderson | McCormick


Construction costs of recommended projects are built up from contractor quotes, Means<br />

manuals, experience from past project cycles, and a variety of other sources. Project costs are<br />

the sum of the construction cost and contingency (10%), engineering and design (15%),<br />

construction management (5%) and project management (6%). While individual projects’ final<br />

costs and savings may vary from the results presented in this report, it is anticipated that the<br />

aggregate level of accuracy by campus or by utility service territory will be reasonable.<br />

A preliminary list of energy efficiency projects, delivered to <strong>UC</strong>OP on March 28, was the initial<br />

step in delivery of the <strong>Strategic</strong> <strong>Energy</strong> <strong>Plan</strong> results. This list of projects was reviewed,<br />

prioritized and scheduled by the individual campuses and returned to <strong>UC</strong>OP. The compiled<br />

results were then used to determine the level of savings commitment for the Investor Owned<br />

Utilities to use in support of their filings to the CP<strong>UC</strong> for the <strong>UC</strong>/CSU/IOU Partnership Program.<br />

The results will also assist <strong>UC</strong>OP in planning for a bond to finance the campus contributions for<br />

the construction of these projects.<br />

As of the writing of this report, the details of the Partnership Program have not been defined for<br />

the 2009-2011 cycle, and discussions are ongoing with the Municipal utilities to solicit similar<br />

participation and incentive levels for the campuses. While these crucial details are not<br />

confirmed, this <strong>Strategic</strong> <strong>Energy</strong> <strong>Plan</strong> was in large part commissioned to determine overall<br />

potential for projects, and is a critical step in securing the incentive funding levels from both the<br />

IOU and Municipal utilities, and for <strong>UC</strong>OP funding. Consequently, this report assumes that<br />

many of the aspects of the current plan will be carried forward, including the incentive rates of<br />

$0.24/kWh and $1.00/therm of annual savings. These rates are used in the analyses of all<br />

projects in this report, including those at campuses served by Municipally Owned Utilities.<br />

Following delivery of the Preliminary List, the projects in this <strong>Strategic</strong> <strong>Energy</strong> <strong>Plan</strong> report were<br />

aggregated and assembled. The projects from the Preliminary List are included, with some<br />

refinements following additional quality control checks. Projects have been compared to<br />

historical energy use and project costs have been refined. Other projects have been added<br />

following the development of the Preliminary List, including renewable electric generation<br />

projects (such as photovoltaics, which qualify for different utility programs), and projects which<br />

save electricity supplied by Municipally Owned Utilities whose energy efficiency programs are<br />

not regulated by the CP<strong>UC</strong> (including SMUD, LADWP and the City of Riverside). Details for<br />

these projects replace the placeholder savings previously projected.<br />

The projects included in this SEP are the result of a survey of the campus, discussions with<br />

campus personnel, and preliminary engineering of projects. This effort is not an investment<br />

grade audit. This means that the projects will require additional detailed cost estimating and<br />

refinement of savings before the campuses or the utilities can commit to specific construction<br />

budgets and energy saving calculations.<br />

This effort was designed to identify significant physical modifications required to make buildings<br />

energy efficient. It did not concentrate on operational details that might be found in an<br />

investment grade audit, such as a broken economizer, or an improper control sequence.<br />

However, the <strong>Strategic</strong> <strong>Energy</strong> <strong>Plan</strong> does recommend the monitoring-based commissioning<br />

(MBCx) of each of these buildings over the next six years (excluding buildings that have already<br />

been commissioned through the Partnership). This process will ensure that the operational<br />

problems of each building are identified and corrected, so that all measures that might be<br />

identified in an investment grade audit will ultimately be included.<br />

2413.01/Reports/<strong>UC</strong> SEP Draft Report – <strong>UC</strong>LA.doc 2-2 December 31, 2008<br />

Newcomb | Anderson | McCormick


The equivalent energy and cost savings for projects presented in the Preliminary List were been<br />

simplified to meet the financial criteria established for the <strong>UC</strong>OP funding mechanism, and to be<br />

consistent with utility incentive requirements. For HVAC projects, chilled water and hot water<br />

(or steam) savings calculated at the buildings were converted to electric (kWh) and natural gas<br />

(therm) savings using marginal central plant efficiencies, and summed with direct electric and<br />

natural gas savings, which include cooling or heating from local sources. For all other projects,<br />

the electric and gas savings were calculated directly, without involving the intricacies of the<br />

central plant. The sums of these savings for each project became the equivalent electric and<br />

gas savings, and are used for the basis of the utility incentive. The published FY06-07 recharge<br />

rates, as provided by <strong>UC</strong>OP, were applied to the equivalent electric and gas savings to estimate<br />

the energy cost savings of projects. Using the recharge rate builds in a level of conservatism for<br />

future energy savings, as no utility rate escalation is built in, and meets <strong>UC</strong>OP bond funding<br />

requirements. Operational and maintenance savings have generally been discounted in<br />

financial analysis of measures, as <strong>UC</strong>OP funding will involve only the purchased utility budgets<br />

as a repayment source.<br />

The equivalent energy savings methodology remains unchanged from the preliminary list to this<br />

SEP report. However, the central plant and any cogeneration impacts are incorporated to<br />

reflect a purchased utility cost savings and give a more true estimate of utility cost savings for<br />

the campus.<br />

The following tables show the recharge rates and marginal central plant efficiencies used in this<br />

report. The individual campuses may charge themselves different prices internally, or may<br />

calculate marginal utility costs differently, and so can use other pricing in their internal project<br />

evaluation.<br />

Table 2.1: Recharge Rates - Non-State Funded and Auxiliaries FY 06-07<br />

<strong>Campus</strong> $/kWh $/Therm<br />

<strong>Los</strong> <strong>Angeles</strong> $0.088 $0.670<br />

Table 2.2: Marginal Central <strong>Plan</strong>t Efficiencies<br />

<strong>Plan</strong>t kWh/ <strong>Plan</strong>t Therm <strong>Plan</strong>t Therm/<br />

<strong>Campus</strong><br />

Bldg ton-hr /Bldg ton-hr Bldg MMBTU<br />

<strong>Los</strong> <strong>Angeles</strong> 0.8 0 12.5<br />

2413.01/Reports/<strong>UC</strong> SEP Draft Report – <strong>UC</strong>LA.doc 2-3 December 31, 2008<br />

Newcomb | Anderson | McCormick


<strong>Campus</strong><br />

<strong>Los</strong> <strong>Angeles</strong><br />

Santa Monica<br />

Hospital<br />

<strong>Los</strong> <strong>Angeles</strong>,<br />

Westwood<br />

Med Facilities<br />

Table 2.3: Central <strong>Plan</strong>t & Cogeneration Impacts on Purchased Utilities<br />

Building<br />

<strong>Energy</strong> Saved<br />

Steam<br />

Chilled Water<br />

Electricity<br />

Purchased Utility<br />

Savings Notes<br />

Steam not required for space heating is used in<br />

the low pressure end of the steam turbine to<br />

62.4 kWh/MBtu increase electrical output.<br />

High pressure steam diverted from the chillers<br />

to the steam turbine will increase electrical<br />

0.72 kWh/tonh output.<br />

1 kWh/kWh<br />

Combined Cycle Cogen: Reduction in electricity<br />

use lowers purchases from utility.<br />

Steam 12.5 th gas/MBtu Steam is delivered by natural gas fired boilers.<br />

Chilled Water 0.8 kWh/tonh<br />

Electricity 1 kWh/kWh No cogenerated electricity<br />

Steam 62.4 kWh/MBtu Steam comes from <strong>UC</strong> <strong>Los</strong> <strong>Angeles</strong>.<br />

Chilled Water 0.72 kWh/tonh From <strong>UC</strong> <strong>Los</strong> <strong>Angeles</strong><br />

Electricity 1 kWh/kWh Combined Cycle Cogen: Buy from <strong>UC</strong>LA.<br />

2.2 General Project Identification Categories and Approach<br />

The following is a general description of the projects that were identified by the <strong>Strategic</strong> <strong>Energy</strong><br />

<strong>Plan</strong>. More detailed scope and savings information is included in the Project Descriptions<br />

section of the report.<br />

In general, projects were selected for this report that will bring campus systems up to the state<br />

of the art technology. This is intended to identify all of the possible energy savings available<br />

through retrofit projects. This results in some projects with longer paybacks where the existing<br />

system may be moderately efficient, but not necessarily state of the art. However, it defines a<br />

maximum savings target for the buildings evaluated. The campuses can decide on the<br />

appropriate level of investment based on their individual needs and their performance in<br />

meeting energy savings and green house gas emissions goals.<br />

2.2.1 Lighting Projects<br />

The report identifies the potential to convert existing 32W T8 fluorescent fixtures to 28W T8<br />

lamps with premium efficiency ballasts with low ballast factor, at 42 W per two lamp fixture.<br />

Several campuses have alternative standards, including <strong>UC</strong> Santa Barbara, which is<br />

emphasizing dimming ballasts. Also recommended are increased penetration of occupancy<br />

sensor controls, daylight harvesting, new stairwell fixtures, and replacement of interior HID<br />

fixtures with fluorescent. Fluorescent conversion is also generally recommended for parking<br />

structures.<br />

2.2.2 HVAC Projects<br />

A variety of HVAC projects are recommended for implementation at campus buildings. The<br />

general intention of these retrofits is to make all air handlers of 10 hp and above meet basic<br />

efficiency standards: variable air volume with economizers, operating only the hours necessary,<br />

with direct digital controls, demand control ventilation where warranted, and static pressure<br />

2413.01/Reports/<strong>UC</strong> SEP Draft Report – <strong>UC</strong>LA.doc 2-4 December 31, 2008<br />

Newcomb | Anderson | McCormick


eset. Laboratory air handlers would also be converted to variable air volume, with variable flow<br />

fume hoods and minimum ventilation controls set at 6 air changes per hour. In some cases<br />

further savings will be achieved through air quality monitoring and automatic sash closers.<br />

Kitchen hoods are recommended for conversion to variable air volume as well. A variety of<br />

other chiller and boiler projects are recommended for other buildings that are not served by a<br />

central plant.<br />

2.2.3 Monitoring Based Commissioning Projects<br />

This report includes a monitoring-based commissioning project at every <strong>Strategic</strong> <strong>Energy</strong> <strong>Plan</strong><br />

building. This is an integral element of the retrofit projects that are recommended at most<br />

buildings. The combination of retrofits and commissioning will capture the majority of the<br />

energy saving potential of the HVAC systems. Monitoring based commissioning is also<br />

recommended for all main central plants where it has not yet been implemented.<br />

2.2.4 New Construction and Renovation from Capital Program<br />

This report includes a number of planned construction and renovation projects at each campus.<br />

It is assumed that a Savings By Design process will be in place to generate a design which<br />

outperforms Title 24 by at least 30%. The campus contribution to the resulting construction<br />

costs are assumed to come from <strong>UC</strong>OP bond funding. This removes the capital constraint from<br />

the construction budget and allows more efficient buildings to be designed and built.<br />

2.2.5 Deferred Maintenance and Capital Renewal Projects<br />

The campuses each spend up to $10 million per year on deferred maintenance and capital<br />

renewal projects. This report estimates that about 12% of these projects have an energy<br />

savings component. It is recommended that utility incentives be employed to make these<br />

measures marginally more efficient. It is also recommended that <strong>UC</strong>OP bond funds be used<br />

where possible to supplement project funding to allow construction of energy saving projects<br />

that otherwise might not be funded.<br />

2.2.6 <strong>Campus</strong> Wide Projects<br />

<strong>Campus</strong> wide projects include the replacement of pre-2001 refrigerators with <strong>Energy</strong> Star units,<br />

replacement of lab freezers with more efficient units, and the installation of occupancy sensor<br />

controls on vending machines. The campus wide use of power management software is<br />

recommended to reduce the energy consumption of network computers when they are not in<br />

use. The replacement of CRT monitors with LCD monitors is recommended as well. Finally, an<br />

estimate of the potential energy savings from computer server virtualization was included.<br />

2.2.7 Other Projects<br />

Several other miscellaneous projects were evaluated, including swimming pool projects. Pool<br />

covers with powered take up spools were recommended where they are not currently used.<br />

Variable speed drives are recommended for pool filter pumps during off hours operation. Solar<br />

collectors are also recommended for pools where adjacent roof space is available. In addition,<br />

boiler replacement was evaluated for swimming pool and other boilers for thermal loads not<br />

served by the central plant.<br />

2413.01/Reports/<strong>UC</strong> SEP Draft Report – <strong>UC</strong>LA.doc 2-5 December 31, 2008<br />

Newcomb | Anderson | McCormick


2.3 <strong>Campus</strong> Overview<br />

University of California, <strong>Los</strong> <strong>Angeles</strong> was founded in 1919 and opened its medical center in<br />

1955. The campus currently has approximately 27,000 undergraduate and 11,500 graduate<br />

students, and over 4,000 faculty members. <strong>UC</strong>LA is one of the most prestigious campuses in<br />

the University of California system with 174 buildings spread across 419 acres.<br />

The majority of the buildings audited for at <strong>UC</strong>LA are old and historic. Chilled water and heating<br />

hot water is supplied from campus central plant except for few buildings which have localized<br />

chillers and hydronic boilers. Buildings audited included residential, educational, athletic,<br />

medical and research facilities. Residential buildings use water source heat pumps and split air<br />

conditioning units. A majority of the laboratory buildings have constant volume fume hoods and<br />

dual duct mixing boxes for zone control. Molecular Science Building, a laboratory building has<br />

variable air volume fume hoods with VAV box for zone control. Animal research facilities also<br />

have constant volume terminal boxes with higher air change rate (ACH @ 15). Buildings employ<br />

either direct digital controls (DDC) or pneumatic controls to control and monitor major<br />

mechanical equipment and for zone control. Air handling units serving buildings vary from and<br />

include constant volume dual duct air handlers, variable air volume air handlers, and multi zone<br />

units. Some of VAV AHU’s have inlet guides vanes to control supply air flow. All major<br />

mechanical equipment in building is controlled and scheduled through campus energy<br />

management system (Siemens Apogee).<br />

2.4 Central <strong>Plan</strong>t<br />

The central plant at <strong>UC</strong>LA serves the main campus in Westwood. It is based on a cogeneration<br />

system which includes two GE LM 1600 gas turbines, each with a rating of 14.5 MW, two high<br />

pressure (600 psig) heat recovery steam generators with duct burners, and an<br />

induction/extraction condensing steam turbine, for a total generation capacity of about 40 MW.<br />

Power is generated in parallel with LADWP, providing most of the campus electric load, which<br />

peaks at about 50 MW. The facility also houses two backpressure steam turbine centrifugal<br />

chillers rated at 5,300 tons, four single stage absorption chillers, and an electric centrifugal<br />

chiller rated at 5,300 tons. Steam is provided to the campus at 100 psig. A portion of the gas<br />

used to operate this plant is recovered from the Mountain Gate Landfill.<br />

2.5 <strong>Strategic</strong> <strong>Energy</strong> <strong>Plan</strong> Buildings<br />

The following 41 buildings were investigated as part of this SEP effort, and were selected using<br />

the criteria described above. The total gross area of the SEP buildings represents<br />

approximately 6 million square feet, or 29% of the campus gross area (exclusive of parking). An<br />

additional 18 buildings were identified as appropriate to extrapolate findings to directly,<br />

incorporating approximately 8.7 million square feet (or 42%) of total building area into this<br />

report.<br />

2413.01/Reports/<strong>UC</strong> SEP Draft Report – <strong>UC</strong>LA.doc 2-6 December 31, 2008<br />

Newcomb | Anderson | McCormick


Table 2.4: SEP Buildings<br />

Building Key Building Name<br />

Basic Gross Area -<br />

Non-assignable Parking Area<br />

04C4202 PERLOFF HALL 65,909<br />

04C4203 YOUNG LIBRY 305,919<br />

04C4228A GEOLOGY 182,149<br />

04C4228C MOLECULR SCI 178,666<br />

04C4235 WOODEN/PS4 207,721<br />

04C4256A ENGR BLDG 4 294,124<br />

04C4260 FACMGMT BLDG 189,197<br />

04C4265 TIVERTON HSE 57,224<br />

04C4270 WILSHIRE CTR 315,208<br />

04C4302A CANYON POINT 107,419<br />

04C4302D COVEL COMMON 144,067<br />

04C4310 KERCKHOFF 70,820<br />

04C4315 GONDA CENTER 125,202<br />

04C4317 LAW 275,439<br />

04C4318A POWELL LIB 166,846<br />

04C4320 LIFE SCIENCE 214,613<br />

04C4325 DORIS STEIN 94,309<br />

04C4331 PUBLIC HLTH 140,563<br />

04C4332E M DAVIES CC 70,228<br />

04C4333 JULES STEIN 87,905<br />

04C4343 BOELTER HALL 373,904<br />

04C4344 MORTON MED 366,834<br />

04C4345 MED PLZA 200/300 101,095<br />

04C4348 MACDONALDLAB 144,611<br />

04C4352 SYCAMORE CT 98,951<br />

04C4360 SAC 113,383<br />

04C4374 FOWLER MUSM 101,995<br />

04C4375 ROYCE HALL 184,673<br />

04C4415 UNEX 95,065<br />

SOUTHERN REGIONAL<br />

04C4562 LIBRARY FACILITY 228,306<br />

04C4580 BUNCHE HALL 229,248<br />

04C510B SMH EMERGCY** 18,059<br />

04C510D SMH PAVILION** 194,181<br />

04C510F SMH WST TOWR** 202,568<br />

04C510H SMH CENT PLT** 21,427<br />

04C515A COLLINS CTR 31,311<br />

04C515B GOLD HALL 55,344<br />

04C515C ENTREP HALL 72,591<br />

04C515D CORNELL HALL 71,737<br />

04C515E ROSNFLD LIBR 51,046<br />

04C515F MULLIN CMNS 33,957<br />

2413.01/Reports/<strong>UC</strong> SEP Draft Report – <strong>UC</strong>LA.doc 2-7 December 31, 2008<br />

Newcomb | Anderson | McCormick


Table 2.4: SEP Buildings (Continued)<br />

Building Key Building Name<br />

Basic Gross Area -<br />

Non-assignable Parking Area<br />

Buildings with Extrapolated Results<br />

04C4332D MED SCHOOL N/A – only part of building<br />

04C4200 MURPHY HALL 220,188<br />

04C4227 SLICHTER 62,557<br />

04C4228B YOUNG HALL 297,589<br />

04C4319 FRANZ HALL 238,054<br />

04C4329 REED RESRCH 69,176<br />

04C4332B BRAIN RSCH 86,578<br />

04C4334 DENTISTRY 204,369<br />

04C4335 SCHOENBERG 122,552<br />

04C4336 FACTOR 199,857<br />

04C4359 MATH SCIENCE 224,078<br />

04C4363 KNUDSEN HALL 164,702<br />

04C4403 BOYER HALL 133,042<br />

04C4577A MELNITZ HALL 61,827<br />

04C4578 MACGOWAN 129,542<br />

04C4579 PUBLIC AFFAIRS 201,667<br />

04C4581 WARREN HALL 102,205<br />

04C4594 REHAB CENTER 142,566<br />

** Buildings removed from scope at request of campus during course of investigation due to<br />

availability of Med <strong>Center</strong> personnel and prioritization of activities related to the opening of the<br />

new hospital.<br />

2413.01/Reports/<strong>UC</strong> SEP Draft Report – <strong>UC</strong>LA.doc 2-8 December 31, 2008<br />

Newcomb | Anderson | McCormick


2.6 Recent <strong>Energy</strong> Project Inventory<br />

The campus has participated in the <strong>UC</strong>/CSU/IOU Partnership Programs. The projects in Table<br />

2.5 were implemented during the 2004-05 Partnership cycle. Since they were implemented no<br />

later than calendar year 2005, the associated energy savings are considered to be reflected in<br />

the historical energy use data gathered for 2006-07. Therefore, no adjustment has been made<br />

to the campus’ baseline energy use.<br />

Table 2.5: 2004-05 <strong>UC</strong>/CSU/IOU Project History<br />

Electric Gas<br />

Savings Savings<br />

Building Project Description<br />

(kWh/yr) (th/yr)<br />

3 Pools Pool covers - 3 pools (19,320 sqft) 0 90,070<br />

Pool Pool cover - 1 pool (6000 sqft) 0 23,470<br />

Pool Pool cover - 1 pool (3,750 sqft) 0 17,910<br />

Pool Pool cover - 1 pool (525 sqft) 0 2,610<br />

Factor Building MBCx 337,510 83,365<br />

The projects in Table 2.6 are planned, or may have begun during the current 2006-08<br />

<strong>UC</strong>/CSU/IOU Partnership, but were not substantially complete prior to the FY06-07 historical<br />

energy use baseline. Since they are scheduled for implementation, the SEP has considered<br />

these projects in a couple of ways. First, the projects recommended in this report have not<br />

included these projects, thereby avoiding duplication of measures. Second, the 2006-07<br />

baseline energy use has been adjusted by the anticipated energy savings for baseline energy<br />

use to compare the proposed projects to, and for the comparison of, building benchmarks.<br />

Details of savings for each project in SEP buildings and the associated adjustment in baseline<br />

energy are reflected on the building summary sheets later in this report.<br />

Table 2.6: 2006-08 <strong>UC</strong>/CSU/IOU Project History<br />

Electric<br />

Savings<br />

Building<br />

SEP Buildings<br />

Project Description<br />

(kWh/yr)<br />

MSB<br />

MSB<br />

Upgrade vent and controls and install ZP sensors on 194<br />

fume hoods<br />

Upgrade vent and controls and install ZP sensors on 26<br />

fume hoods<br />

37 Buildings Occupancy Sensor Project (not part of Partnership)<br />

Gas<br />

Savings<br />

(th/yr)<br />

Not<br />

Reported 167,232<br />

Not<br />

Reported 22,410<br />

Not<br />

Reported 0<br />

2413.01/Reports/<strong>UC</strong> SEP Draft Report – <strong>UC</strong>LA.doc 2-9 December 31, 2008<br />

Newcomb | Anderson | McCormick


3. HISTORICAL CAMPUS ENERGY USE<br />

3.1 FY 99-00 and 06-07 <strong>Energy</strong> Baseline<br />

Purchased electricity and natural gas consumption for the <strong>UC</strong>LA and <strong>UC</strong>LA MC are provided in<br />

the graphs below. The University of California Office of the President has provided information<br />

on purchases for fiscal years 1999-2000, 2005-2006, and 2006-2007 1 . Reliable information is<br />

not currently available for the fiscal year 1989-1990. The information is divided between statefunded<br />

buildings (shown in blue) and non state-funded buildings (shown in red). Savings from<br />

energy efficiency projects will use the fiscal year 2006-2007 as the baseline for comparison.<br />

1 <strong>Campus</strong> PU Costs & Usage State & NonSt.xls<br />

2413.01/Reports/<strong>UC</strong> SEP Draft Report – <strong>UC</strong>LA.doc 3-1 December 31, 2008<br />

Newcomb | Anderson | McCormick


4. HISTORIC BUILDING ENERGY USE<br />

4.1 Existing Metering Infrastructure<br />

Three types of metered historical energy use data were requested from <strong>UC</strong>LA energy<br />

management personnel – total annual, total monthly, and interval data for one summer and one<br />

winter week. An effort was made to obtain this data for each of the four utilities present on the<br />

<strong>UC</strong>LA campuses – electric, gas, chilled water, and steam. However, building-level meter data<br />

was not available for any of the utilities. The campus reports that there are existing building<br />

meters, but that they are not networked and are manually read. The campus indicated that any<br />

readings available would not be easy to obtain, nor valuable and requested averages be used<br />

for the purposes of this report.<br />

The percentage of SEP buildings on the <strong>UC</strong>LA campuses for which metered electricity and gas<br />

consumption was available is shown in Table 4.1. This table also shows estimates of the<br />

percentage of non-metered buildings, applying the assumption that if data was not provided it<br />

was because the building lacked a functioning meter. This is very likely to overstate the number<br />

of buildings without meters, as other causes for missing data were occasionally reported by<br />

energy management personnel throughout the <strong>UC</strong> system.<br />

Metered<br />

Table 4.1: Building Electric and Gas Meters<br />

SEP Buildings<br />

No Metered Data<br />

Available<br />

Electric Gas Electric Gas<br />

SEP<br />

Bldgs<br />

W/Local<br />

Gas<br />

Total<br />

SEP<br />

Bldgs<br />

Total<br />

Bldgs<br />

0 0% 0 0% 41 100% 41 100% - 41 372<br />

The number of SEP buildings for which chilled water and steam consumption was available is<br />

show in Table 4.2. Again, it is assumed that the SEP buildings with no metered data lacked a<br />

functioning meter.<br />

Table 4.2: Building BTU Meters<br />

SEP Buildings<br />

Metered<br />

No Metered Data<br />

Available<br />

SEP<br />

Bldgs<br />

W/Distr.<br />

Total<br />

SEP Total<br />

Heating Cooling Heating Cooling Heat Bldgs Bldgs<br />

0 0% 0 0% 41 100% 41 100% - 41 372<br />

We recommend that all SEP buildings that currently lack metered data be outfitted with a meter<br />

for each utility. The Monitoring Based Commissioning (MBCx) measures that we have outlined<br />

in Section 8.3 should provide meters for all of the SEP buildings. However, additional meters<br />

are appropriate for buildings that are below the 50,000 SF threshold that are large energy<br />

consumers.<br />

2413.01/Reports/<strong>UC</strong> SEP Draft Report – <strong>UC</strong>LA.doc 4-1 December 31, 2008<br />

Newcomb | Anderson | McCormick


4.2 Individual Building Metering<br />

Building-level meter data was not available for this study. Estimates of baseline building energy<br />

consumption were therefore made using campus average values. This campus average was<br />

estimated based on total campus energy purchase data, with adjustments to account for gas<br />

consumption and electricity production by the cogen facility. The sources of building energy<br />

estimate data for <strong>UC</strong>LA are summarized in Table 4.3.<br />

Table 4.3: Sources of Data Used for Baseline Building <strong>Energy</strong> Estimates<br />

PREFERRED METHOD<br />

Use actual metered consumption<br />

ALTERNATE METHOD<br />

Extrapolate use using average values from the following sources<br />

Basic Buildings Complex Buildings<br />

Electricity derived from total derived from total<br />

campus electricity campus electricity<br />

purchase, plus cogen purchase, plus cogen<br />

plant’s production plant’s production<br />

Gas derived from total derived from total<br />

campus gas<br />

campus gas<br />

purchase, less cogen purchase, less cogen<br />

plant’s consumption plant’s consumption<br />

[1a]<br />

[1b]<br />

Steam<br />

same as gas use same as gas use<br />

(SEP buildings only) [2a]<br />

[2b]<br />

Chilled Water<br />

(SEP buildings only)<br />

median value from<br />

other campuses<br />

median value from<br />

other campuses<br />

Using the various sources described in Table 4.3, factors with units of energy use – kWh, therm,<br />

or MMBtu – per gross square foot were developed for each of the energy use categories in the<br />

left column of the table. A procedure was required to apply the appropriate factors to each<br />

building. For SEP buildings, this procedure relied on the building classification – “basic” or<br />

“complex”. A sample of the decision structure applied to each building to determine the<br />

appropriate energy use factors for steam and gas is shown in Figure 4.1. Similar structures<br />

were used to apply appropriate factors for electricity and chilled water.<br />

2413.01/Reports/<strong>UC</strong> SEP Draft Report – <strong>UC</strong>LA.doc 4-2 December 31, 2008<br />

Newcomb | Anderson | McCormick


Figure 4.1: Decision Structure for Estimating Building Steam and Gas Consumption*<br />

Extrapolate Using<br />

[2a]<br />

Basic<br />

<strong>Campus</strong> provided<br />

building<br />

consumption data<br />

No<br />

Is it an SEP<br />

building?<br />

Yes<br />

Is heating provided<br />

by the central<br />

plant?<br />

Yes<br />

Building Type is<br />

Complex/Simple<br />

No<br />

Complex<br />

Yes<br />

Extrapolate Using<br />

[2b]<br />

[1a] – [2b] refer to the factors described in Table 4.3<br />

Report actual<br />

usage<br />

Report<br />

heating as gas<br />

Extrapolate Using<br />

[1a]<br />

Complex<br />

2413.01/Reports/<strong>UC</strong> SEP Draft Report – <strong>UC</strong>LA.doc 4-3 December 31, 2008<br />

Newcomb | Anderson | McCormick<br />

Basic<br />

Building Type is<br />

Complex/Simple<br />

Extrapolate Using<br />

[1b]<br />

The building energy consumption estimated by applying campus averages to building area<br />

provides a rough measure of the baseline building energy use for buildings that lacked metered<br />

data. The overall accuracy of this method is dependent upon the accuracy of the reported<br />

campus energy purchase on which it is based. The summed estimates of building energy<br />

consumption exactly equal the reported energy purchase. Building-level estimates developed<br />

by this method are useful as a baseline against which savings estimates can be measured.<br />

However, for any individual building the actual baseline energy use may differ significantly from<br />

the estimate due to the variation among buildings.<br />

4.3 Building <strong>Energy</strong> Use Targets<br />

The absence of metered annual energy use for buildings on the <strong>UC</strong>LA campuses precluded the<br />

development of building energy use targets based on local data. Instead, the building-level<br />

energy consumption from the <strong>UC</strong> San Diego SEP buildings is presented as indicative of the<br />

building energy consumption that can be achieved by buildings with similar use. Electricity use<br />

*


of <strong>UC</strong>SD buildings is shown in Figure 4.2, grouped according to whether the building is<br />

identified as Basic or Complex.<br />

Note that there is a broad range in electricity use intensities. In addition, some of the Basic<br />

buildings use more electricity per square foot than some of the Complex buildings. Although<br />

there are significant differences from one building to another, the performance of some buildings<br />

at a relatively low electricity use per square foot suggests a performance target for buildings on<br />

the <strong>UC</strong>LA campuses. The San Diego climate, on average, requires more cooling than the <strong>Los</strong><br />

<strong>Angeles</strong> climate. Therefore, performance targets based on the <strong>UC</strong> San Diego building-level<br />

data should represent a conservative estimate of the improvements that can be achieved in<br />

buildings on the <strong>UC</strong>LA campus.<br />

2413.01/Reports/<strong>UC</strong> SEP Draft Report – <strong>UC</strong>LA.doc 4-4 December 31, 2008<br />

Newcomb | Anderson | McCormick


Figure 4.2: Electricity Use Index for <strong>UC</strong> Santa Diego & MC Buildings with Meter Data<br />

80<br />

70<br />

60<br />

50<br />

40<br />

30<br />

20<br />

Electricity Consumption (kWh/GSF-yr)<br />

10<br />

0<br />

RITTER REPL<br />

NIEREN ANNEX<br />

GYMNASIUM<br />

SCI ENG RSCH<br />

PRICE CTR<br />

WAR LEC HALL<br />

NIERENBERG<br />

COG SCI BLDG<br />

CENTER HALL<br />

GALBRTH HALL<br />

GEISEL LIB<br />

TOR PINE NOR<br />

TOR PIN CTR<br />

H SS BLDG<br />

MULTIPURPOSE<br />

PEPCYNHALL<br />

SOC SCI BLDG<br />

RCRH ARGO<br />

UH BACH CYN<br />

TENAYA HALL<br />

TIOGA HALL<br />

GOLDBERG<br />

BLACK<br />

BRENNAN<br />

DOUGLAS<br />

7835 TRADE<br />

UH OUTPT CTR<br />

U HOSPITAL<br />

UH SOUTH WNG<br />

CLIN SCI BLD<br />

CMM EAST<br />

SVERDRUP<br />

PACIFIC HALL<br />

CMM WEST<br />

YORK HALL<br />

CENT MOL GEN<br />

PERLMAN HOSP<br />

THORNTON HSP<br />

BONNER HALL<br />

MTF<br />

BIOLOGY BLDG<br />

MCGILL/MANDLER<br />

BAS SCI BLDG<br />

CHEM RES BLD<br />

CALITIT<br />

UREY HALL<br />

MAYER HALL<br />

ENG UNIT 2<br />

ENG UNIT 1<br />

AP M BLDG<br />

EBU 3B<br />

RIMAC<br />

CTF (Hillcrest)<br />

MANDEVILLE<br />

HUBBS HALL<br />

CMRR<br />

Basic Complex<br />

2413.01/Reports/<strong>UC</strong> SEP Draft Report – <strong>UC</strong>LA.doc 4-5 December 31, 2008<br />

Newcomb | Anderson | McCormick


5. UTILITIES<br />

5.1 Providers & Tariffs<br />

In the baseline 2006-07 Fiscal Year, electricity at <strong>UC</strong>LA main campus was provided <strong>Los</strong><br />

<strong>Angeles</strong> Department of Water and Power, and by the cogeneration plant. The Santa Monica<br />

hospital is served by Southern California Edison (SCE), for both commodity and transmission<br />

and distribution.<br />

The campus purchases natural gas with the majority of the commodity for the cogeneration from<br />

the Department of General Services, and Southern California Gas (SCG) provides the<br />

transportation service. Approximately 8% of its natural gas is landfill gas provided by nearby<br />

Mountain Gate Landfill. SCG provides the natural gas for the remaining campus use, other than<br />

cogeneration.<br />

5.2 Procurement Options<br />

There are limited procurement options for the campus, but the campus is taking advantage of<br />

opportunities and should continue to explore other avenues if and when available.<br />

For electricity, current regulations do not allow for direct access, so electricity in excess of the<br />

campus’ self generating capacity is likely to remain with LADWP for the foreseeable future. For<br />

natural gas, the campus is already exercising its option to purchase gas commodity on the DGS<br />

rate schedule.<br />

2413.01/Reports/<strong>UC</strong> SEP Draft Report – <strong>UC</strong>LA.doc 5-1 December 31, 2008<br />

Newcomb | Anderson | McCormick


6. CAMPUS ELECTRIC INFRASTR<strong>UC</strong>TURE<br />

Although the term “power quality” can be used to describe a variety of electrical generation and<br />

distribution system attributes, for the purposes of this study, issues that could result in additional<br />

energy charges from the utility were the focus. Primarily, these are conditions that cause a<br />

differential between campus and/or facility kW and kVA usage. When this differential is large<br />

enough, the utility will apply an additional charge, commonly referred to as a VAR charge. A<br />

review of the <strong>UC</strong>LA campus utility charges and discussion with facilities personnel confirms that<br />

there are no power quality issues of this type on campus.<br />

2413.01/Reports/<strong>UC</strong> SEP Draft Report – <strong>UC</strong>LA.doc 6-1 December 31, 2008<br />

Newcomb | Anderson | McCormick


7. RENEWABLE ENERGY GENERATION<br />

7.1 Technologies<br />

Sustainable energy sources are available in many types and forms, including photovoltaics, fuel<br />

cells, and wind power. The use of direct solar heating as an alternative energy source is<br />

discussed under Section 8 of this report.<br />

Fuel cell infrastructure and operational requirements typically give this type of generation project<br />

an unacceptably long payback, unless the cell was designed to be installed as part of curriculum<br />

or research requirements. As such, fuel cell use was discounted. Additionally, wind patterns in<br />

and around the buildings at the campus were not conducive to a reliable pattern that could<br />

sustain sufficient power generation to make a wind power project viable.<br />

Photovoltaic sources were identified as the most cost-effective and readily available means of<br />

sustainable energy. The remaining evaluation of sustainable energy on campus is focused on<br />

this technology. The most efficient, least intrusive form of this technology is a relatively flat, nonpenetrating<br />

array mounted on a rooftop or parking structure canopy. This resource is available<br />

from several sources around the globe, and is not considered proprietary. Available square<br />

footage for power production assumes maximum exposure at a low angle of incidence, along<br />

with regular access and maintenance of the equipment. Due to the potential for substantial<br />

variance in the availability of incentives and funding for installation due to existing public utility<br />

agreements, third-party power contracts, and the potential for existing renewable resources<br />

already in use at the campus, no incentives are included to offset construction costs.<br />

7.2 Existing Renewable Sources<br />

<strong>UC</strong> <strong>Los</strong> <strong>Angeles</strong> currently procures approximately 8% of its natural gas consumed by the<br />

cogeneration plant from a landfill source. No other major renewable energy sources are on<br />

campus.<br />

7.2.1 Potential Projects<br />

The University’s cost of Power Purchase Agreement photovoltaic power used in this report is<br />

assumed to be $0.02/kWh above available retail power for the first 1 MW of photovoltaic power,<br />

assuming the third party receives the utility incentives, tax credits and so on. The University’s<br />

cost of PPA PV power for all capacity beyond the first 1 MW is assumed to be $0.04/kWh above<br />

available retail power for IOU customers. It is assumed that the campus will have access to the<br />

Renewable <strong>Energy</strong> Credits associated with this power, at least in time for the 2014 and 2020<br />

target dates.<br />

The study identified a total photovoltaic potential of 5 MW of system capacity at an estimated<br />

construction cost of $47.3M. System locations and details are listed in the table below. Based<br />

on the California <strong>Energy</strong> Commission’s Clean Power Estimator tool, the annual output of the<br />

system is estimated at 6,950,118 kWh.<br />

2413.01/Reports/<strong>UC</strong> SEP Draft Report – <strong>UC</strong>LA.doc 7-1 December 31, 2008<br />

Newcomb | Anderson | McCormick


Table 7.1: Photovoltaic Project Potential<br />

Estimated Annual<br />

Building<br />

Available Roof<br />

PV System<br />

Estimated PV System<br />

Building Name<br />

Power Output (kW-<br />

Number<br />

Area (sf)<br />

Capacity (kW)<br />

Construction Cost***<br />

h)**<br />

PARKG STR 9 04C4208 67,800 47,460 8.5 403 559,126 $3,832,395<br />

PV Power<br />

Density<br />

(W/sf)*<br />

Gross<br />

Roof Area<br />

(sf)<br />

PARKG STR 8 04C4209 206,400 109,480 8.5 931 1,289,784 $8,840,510<br />

PARKG STR 2 04C4210 99,000 69,300 8.5 589 816,423 $5,595,975<br />

PARKG ST CHS 04C4211 122,500 73,500 8.5 625 865,904 $5,935,125<br />

PARKG STR 32 04C4263 63,000 44,100 8.5 375 519,542 $3,561,075<br />

PARKG STR 1 04C4342 108,300 75,810 8.5 644 893,118 $6,121,658<br />

PARKG STR 5 04C4587 40,000 23,250 8.5 198 273,908 $1,877,438<br />

PARKG STR 3 112,250 72,963 8.5 620 859,577 $5,891,762<br />

MED PLZA 100 04C4006 17,500 6,860 8.5 58 80,818 $524,790<br />

DENTISTRY 04C4334 30,000 18,000 8.5 153 212,058 $1,377,000<br />

MORTON MED 04C4344 47,500 17,500 8.5 149 206,168 $1,338,750<br />

MED PLZA 300 04C4345 30,400 16,720 8.5 142 196,978 $1,279,080<br />

SMH WST TOWR 04C510F 27,280 15,000 8.5 128 176,715 $1,147,500<br />

<strong>UC</strong>LA <strong>Campus</strong> Total 589,943 5,015 6,950,118 $47,323,057<br />

* Based upon CEC typical PV module rating.<br />

** Based upon 1370 equivalent full load sun-hours per year, calculated using Clean Power Estimator (http://www.consumerenergycenter.org/renewables/estimator/index.html) for a Simple<br />

Commercial PV System, 5 degree tilt, south facing system in zip code 90095.<br />

*** Based upon $9.00 per watt for roof installation, or $9.50 per watt for parking structure installation, exclusive of tax credits, rebates, or incentives.<br />

2413.01/Reports/<strong>UC</strong> SEP Draft Report – <strong>UC</strong>LA.doc 7-2 December 31, 2008<br />

Newcomb | Anderson | McCormick


8. RECOMMENDED ENERGY EFFICIENCY PROJECT DESCRIPTIONS<br />

The projects identified in this SEP are described below, and the project titles are referenced for<br />

each applicable project on the individual Project Summary pages later in this report. While<br />

there are often alternative technologies or approaches to projects that can be considered for a<br />

given retrofit, this report’s recommendations focus on projects that can be implemented cost<br />

effectively with available technologies and methods. Where appropriate, alternate approaches<br />

and considerations are discussed for projects considered but not included as a recommendation<br />

of this SEP.<br />

For ease of reference, all SEP projects have been assigned an SEP ID Number. The SEP ID<br />

number consists of one letter followed by four digits, and is a unique number that will help easily<br />

locate projects. The SEP ID number has been included on the Building Overview pages later in<br />

this report, and the Project Summary section of this report is organized by SEP ID number to<br />

allow easy location of a project.<br />

8.1 Lighting Projects<br />

The <strong>Strategic</strong> <strong>Energy</strong> <strong>Plan</strong> includes a projection of the magnitude of lighting energy efficiency<br />

projects on the campus. The plan addresses interior fluorescent building lighting and interior<br />

HID lighting, as well as parking garage lighting and some outdoor lighting.<br />

8.1.1 Lighting Project 1. Interior Linear Fluorescent Lighting<br />

The standard project for fluorescent light fixtures is to use a state of the art lamp and ballast<br />

combination to limit each pair of fluorescent lamps and ballast to approximately 42 watts. This<br />

can be achieved through different combinations of lamps and ballasts according to each<br />

individual campus’s preference.<br />

Unless a campus expressed a specific preference, the default retrofit used for the analysis was<br />

to replace existing 32W T8 lamps and any remaining T12 lamps and their associated ballasts<br />

with 28W T8 lamps and premium efficiency ballasts with low ballast factors. The resulting<br />

fixtures typically operate at slightly lower light levels relative to the existing levels, but their<br />

improved color rendition has been shown to increase or maintain the perceived light level.<br />

<strong>Campus</strong>es can factor in color temperature, lamp life, lamp standardization, ballast<br />

standardization and a number of issues into their design.<br />

<strong>UC</strong> Santa Barbara, has chosen to install dimming ballasts in many applications instead of basic<br />

ballasts. This involves extra expense and operating complexity, but the potential for greater<br />

energy savings as well. The higher cost and savings are documented in the analysis.<br />

8.1.2 Lighting Project 2. Interior Lighting Controls<br />

Another standard lighting project is to install occupancy control in rooms that do not currently<br />

have occupancy control. The analysis accounts for the fact that most campuses already have<br />

occupancy sensors in some buildings, primarily in offices and classrooms. Some campuses<br />

have early generation occupancy sensors in classrooms, many of which have been disabled at<br />

the request of faculty and staff. Newer “dual technology” occupancy sensors, which detect both<br />

motion and heat, are much more reliable than the older technology, which was prone to turning<br />

off lights when occupants were not moving.<br />

2413.01/Reports/<strong>UC</strong> SEP Final Report – <strong>UC</strong>LA.doc 8-1 December 31, 2008<br />

Newcomb | Anderson | McCormick


Occupancy sensors are recommended in this report for all classrooms, offices, meeting rooms,<br />

restrooms, lecture halls, auditoriums, storage areas, some library spaces, and a portion of<br />

residential areas. They are not recommended in this report for laboratories, animal quarters,<br />

greenhouses, food service areas, museums, or medical service areas. On average, occupancy<br />

sensors are assumed to reduce lighting energy use by 25%, per utility incentive standards.<br />

Daylight harvesting has also been recommended at many campuses. Daylight harvesting<br />

should be applied to fixtures near skylights or windows, in areas that are overlit when sunlight is<br />

entering the building. Daylighting controls are assumed to apply to 10% of the fluorescent<br />

fixtures in classrooms, lecture halls, libraries, athletic areas, and common spaces, and 5% of<br />

fixtures in offices. For those fixtures, the daylighting controls are assumed to reduce energy use<br />

by 75% after occupancy sensor control.<br />

8.1.3 Lighting Project 3. Stairwell Lighting<br />

There is a significant energy savings potential from the lighting in stairwells. The standard<br />

project for these fixtures is to replace them with bi-level fluorescent fixtures. Bi-level fixtures are<br />

controlled by occupancy sensors that reduce lighting levels to a low standby mode when the<br />

space is unoccupied. The fixtures are specifically designed to meet fire code requirements for<br />

stairwells.<br />

It is recommended that <strong>UC</strong> replace every stairwell fixture in the system with this technology.<br />

<strong>UC</strong>LA has bi-level stairwell lighting in two buildings and intends to install more.<br />

8.1.4 Lighting Project 4. Interior High Bay Lighting<br />

Interior high intensity discharge (HID) fixtures are identified for conversion to fluorescent<br />

sources, generally T8 or T5 lamps, with occupancy sensor control. These are typically located<br />

in gymnasiums, sports facilities, swimming pools, and other high ceiling areas. Fluorescent has<br />

become the standard design for efficient lighting in high bay applications because of the<br />

relatively efficient output of the fluorescent sources, the higher output capacity of the T5 lamps,<br />

better color rendition, and the instant-on capability that permits occupancy control.<br />

8.1.5 Lighting Project 5. Parking Garage and Outdoor Pole Lighting<br />

Fluorescent lighting is a common conversion for parking garage lighting as well. A number of<br />

garages are lit with high pressure sodium (HPS) fluorescent fixtures, so the conversion to two or<br />

three lamp T8 fluorescent fixtures provides a significant energy savings and much improved<br />

color rendition. The lumen level is not necessarily maintained in these conversions, but<br />

occupant satisfaction is maintained. Some campuses are experimenting with bi-level garage<br />

lighting, controlled by occupancy sensors. This can be applied to HID as well as fluorescent<br />

light sources. Others have chosen to replace HID lighting with induction lighting, which is a<br />

more expensive technology that has much longer lamp life than any other technology.<br />

<strong>Campus</strong>es also have a significant amount of outdoor pole lighting, along sidewalks, in parking<br />

lots, and on the roofs of parking garages. Pole lighting is commonly LPS, HPS, or HID<br />

technology. LPS and HPS fixtures can be retrofitted with fluorescent technology, and metal<br />

halide fixtures with pulse start metal halide or fluorescent technology.<br />

2413.01/Reports/<strong>UC</strong> SEP Final Report – <strong>UC</strong>LA.doc 8-2 December 31, 2008<br />

Newcomb | Anderson | McCormick


One campus, <strong>UC</strong> Santa Barbara, has chosen to replace existing HPS pole street lights with new<br />

LED technology. LED technology is currently quite expensive, but has great potential for energy<br />

savings.<br />

8.1.6 <strong>Campus</strong> Specific Lighting Survey Details<br />

<strong>UC</strong>LA campus buildings currently have 32W T8 lamps and standard electronic ballasts in nearly<br />

all linear fluorescent fixtures. The campus recently began using 28W T8 lamps as a standard<br />

replacement lamp. This report includes an analysis of retrofitting all 32W T8 fixtures in campus<br />

buildings with 28W T8 lamps and premium efficiency ballasts with low ballast factors. The<br />

analysis is based on the campus’s estimate that there are 600,000 T8 lamps on the campus. Of<br />

these, it is estimated that 10% have already been replaced with 28W T8 lamps.<br />

An alternative to replacing both the lamps and ballasts is to replace only the lamps. This will<br />

achieve a higher light level than the recommended project, but fewer energy savings. A savings<br />

and cost analysis of replacing only the lamps is included in the appendix.<br />

<strong>UC</strong>LA has installed bi-level stairwell fixtures in two buildings, and plans to replace 600 fixtures<br />

with the bi-level technology. A savings and cost analysis of this project is included.<br />

<strong>UC</strong>LA has occupancy control in most offices, classrooms, and restrooms on campus. It is<br />

recommended that additional occupancy sensors be installed to cover all offices, classrooms,<br />

and restrooms, in addition to meeting rooms, auditoriums, storage areas, and some library<br />

spaces. Based on a small sampling of campus buildings, it is estimated that 25% of <strong>UC</strong>LA<br />

buildings do not yet have occupancy sensors. The analysis assumes that occupancy control is<br />

installed on the remaining 25% of the lighting.<br />

According to the <strong>UC</strong>LA Housing staff, approximately 95% of lighting fixtures in Housing<br />

buildings have 32W T8 fluorescent lamps and standard electronic ballasts. In renovations,<br />

occupancy sensor controls are included in offices, but not in residential rooms. Renovations<br />

also include bi-level stairwell fixtures. Because the campus did not request an analysis, a<br />

lighting retrofit was not analyzed for Housing areas.<br />

There are a few interior areas on campus that are lit with HID fixtures, such as the Wooden<br />

<strong>Center</strong> and SAC/Men’s Gym, Pauley Pavilion, and the Ackerman Bookstore. Alternatives have<br />

been analyzed and recommended.<br />

All of the parking structures are lit with high pressure sodium (HPS) fixtures, with the exception<br />

of one floor of the Parking Structure 5, which has induction lighting. At the request of the<br />

campus, induction lighting was analyzed as a retrofit for the parking structures.<br />

At the direction of the campus, the lighting analysis of the medical facilities was not included.<br />

8.1.7 Other Projects & Technologies to Consider<br />

Potential Lighting Alternate 1. Integrated Classroom Lighting System<br />

The Integrated Classroom Lighting System (ICLS) has been developed and promoted by the<br />

California <strong>Energy</strong> Commission’s PIER Program. ICLS combines direct-indirect fluorescent<br />

fixtures with occupancy and daylight sensors, and plug-and-play interconnection cables, to<br />

2413.01/Reports/<strong>UC</strong> SEP Final Report – <strong>UC</strong>LA.doc 8-3 December 31, 2008<br />

Newcomb | Anderson | McCormick


provide a highly energy-efficient system that offers teachers more control and flexibility than<br />

conventional systems. ICLS has been demonstrated to demand an average of 0.6 to 0.85 watts<br />

per square foot, compared to more conventional systems, which typically draw between 0.8 and<br />

1.4 watts per square foot.<br />

PIER has found that the cost of installing ICLS in new construction projects is often equal to or<br />

lower than for conventional systems, because the system is available as an integrated<br />

package. New construction or renovation costs have been in the range of $3,000 to $4,000 per<br />

classroom. Installing ICLS as a retrofit is less cost-effective at current prices. <strong>UC</strong> Berkeley<br />

installed a few ICLS systems with an added dimming feature, at a cost of approximately $9,000<br />

per classroom. Although the cost of ICLS can be high relative to conventional systems, it is<br />

expected to drop to competitive levels within the next six years.<br />

Potential Lighting Alternate 2. LED Exterior and Interior Lights<br />

LED lighting is a technology with significant energy-saving potential. Although the current cost<br />

of LEDs is significantly higher than more conventional systems, costs are expected to drop<br />

significantly within the next few years. With their anticipated drop in cost and extremely high<br />

efficiency, LEDs should be seriously considered for applications at the <strong>UC</strong> campuses within the<br />

next six years.<br />

Historically, LEDs have been used for specialized lighting applications that required bright point<br />

sources of light, but products are quickly emerging to address more standard commercial and<br />

residential lighting needs. Every <strong>UC</strong> campus is now using LED exit signs in their buildings, and<br />

LED stop lights have also become standard. <strong>UC</strong> Santa Barbara is currently planning to replace<br />

nearly 400 high pressure sodium (HPS) pole fixtures with LED pole fixtures, a project that will<br />

save an estimated 40% of the lights’ energy use. <strong>UC</strong> Davis has installed bathroom vanity lights<br />

in two residence halls that use LED technology. The vanity light combines a one watt LED<br />

nightlight with an occupancy sensor controlling the overhead light.<br />

Other emerging LED technologies applicable to the <strong>UC</strong> system include exterior pathway lights,<br />

exterior wall packs, office and classroom task lighting, and cabinet undermount fixtures.<br />

Potential Lighting Alternate 3. Wireless Lighting Controls<br />

A promising technology for lighting control is the wireless mesh network fixture controller being<br />

developed by Adura Technologies of San Francisco. This is a technology which was developed<br />

at the <strong>UC</strong> Berkeley <strong>Center</strong> for the Built Environment. Several test sites have been installed in<br />

<strong>UC</strong> Berkeley buildings.<br />

The controller under development is a device to be installed in every light fixture in a ceiling grid.<br />

It can turn one or two ballasts in a fixture on or off. The controller measures power use by the<br />

fixture so it can report back on actual operations. Wireless sensors are installed in the building<br />

in appropriate locations to measure occupancy, ambient light, and so on.<br />

The wireless mesh network allows the controllers and sensors to communicate with each other.<br />

An internet portal in the building gives access to web based software which is used to configure<br />

the system. A variety of logic applications can be used to control fixtures individually or in<br />

groups. One set of ambient light sensors might be used to turn off or reduce output from all<br />

fixtures on a west face. Occupancy sensors can be programmed to control any set of fixtures.<br />

2413.01/Reports/<strong>UC</strong> SEP Final Report – <strong>UC</strong>LA.doc 8-4 December 31, 2008<br />

Newcomb | Anderson | McCormick


The controllers themselves are programmed to respond to certain sensors as well as time<br />

control settings. Once programmed the mesh network can operate itself optimally with no<br />

external input. Or it can be used to control fixtures according to a web based signal, such as a<br />

demand response incident.<br />

Wireless mesh network lighting controllers promise extensive lighting control (time scheduling,<br />

occupancy sensor, daylight harvesting, and demand response) with power measurement and a<br />

relatively low first price. No wiring outside of the fixture is required, saving time and complexity.<br />

One feature not likely to be offered is dimming control, but with relatively low power fixtures, as<br />

well as individual ballast switching, this offers diminishing returns. This product is expected to<br />

be commercially available in one to two years.<br />

8.2 HVAC Projects<br />

8.2.1 Air Handler Project 1. Convert Constant Volume Air Handlers and Terminal Boxes to<br />

Variable Air Volume<br />

This project converts constant volume air handlers with terminal boxes to variable air volume.<br />

This project concentrates on larger air handlers which may be dual duct, multizone, reheat, or<br />

other constant volume configuration. These air handlers serve the zones through terminal<br />

boxes which may be mixing boxes or reheat boxes, often including pressure independent<br />

devices and sound attenuators.<br />

The project involves installing VFDs on the supply and return fans to allow the air flow to vary<br />

according to the load. In addition, a retrofit kit (damper, actuator, flow measuring station) is<br />

installed on each of the terminal boxes to convert it into a pressure independent variable volume<br />

device. This kit includes direct digital controls, which increases the cost but greatly increases<br />

the functionality. A large multizone air handler could fit in this category as well, with a retrofit kit<br />

installed in each zone duct and a two position actuator applied to the existing mixing dampers.<br />

The retrofit allows the zone temperatures to be properly controlled with less simultaneous<br />

heating and cooling energy use. In addition, reduced air flow requirements and lower operating<br />

static pressures will result in fan energy savings.<br />

In some cases, the air handlers have existing variable volume devices such as variable inlet<br />

vanes (VIV) or varicone flow devices, which are generally less efficient than modern VFDs, and<br />

may not be working optimally. In these cases, the project would replace the existing flow control<br />

device with a variable frequency drive, and the existing flow control is reflected in the project<br />

costs and savings.<br />

The savings are calculated for this project through a bin simulation adjusted for local weather,<br />

operating hours, building load characteristics, air handler flows and configuration, and<br />

temperature control strategies.<br />

The cost for implementing this project includes variable frequency drives for the supply and<br />

return fans, retrofit kits with DDC for each zone terminal box, and a control strategy to optimize<br />

the air flow and static pressure from the supply fan.<br />

2413.01/Reports/<strong>UC</strong> SEP Final Report – <strong>UC</strong>LA.doc 8-5 December 31, 2008<br />

Newcomb | Anderson | McCormick


This project does not apply to air handlers that serve patient areas in the medical centers, as<br />

they are required by OSHPD to operate at constant volume all of the time. It does not apply to<br />

laboratory air handlers, where more elaborate air flow control devices are needed.<br />

8.2.2 Air Handler Project 2. Convert Constant Volume Air Handlers to Variable Air Volume<br />

This project converts constant volume air handlers that do not use terminal boxes to variable air<br />

volume. This project concentrates on medium size air handlers which may be single zone, dual<br />

duct, multizone, reheat or other constant volume configuration. These air handlers do not serve<br />

zones through terminal boxes but through simpler reheat coils or mixing devices that do not<br />

have pressure independent controls. Large single zone air handlers without specific zone<br />

temperature control will fall into this category as well.<br />

The project involves installing VFDs on the supply and return fans to allow the air flow to vary<br />

according to the load. A retrofit kit is not installed at each zone temperature controller because<br />

there are not standardized boxes, the zones tend to be smaller and more numerous. Older<br />

construction tends to include plaster ceilings and other access constraints.<br />

In the case of a single zone air handler the VFD controls will be integrated into the current<br />

temperature controls to reduce the air flow to a minimum flow rate when the thermostat is not<br />

calling for full heating or cooling. For the other air handlers with zone temperature controls the<br />

retrofit includes DART wireless supply air temperature sensors or equivalent. This wireless<br />

control system allows the fan speed to be slowed to a minimum flow rate whenever the zone<br />

temperatures are satisfied.<br />

The retrofit allows the zone temperatures to be properly controlled with less simultaneous<br />

heating and cooling energy use. In addition, reduced air flow requirements and lower operating<br />

static pressures will result in fan energy savings.<br />

In some cases, the air handlers have existing variable volume devices such as variable inlet<br />

vanes (VIV) or varicone flow devices, which are generally less efficient than modern VFDs, and<br />

may not be working optimally. In these cases, the project would replace the existing flow control<br />

device with a variable frequency drive, and the existing flow control is reflected in the project<br />

costs and savings.<br />

The savings are calculated for this project through a bin simulation adjusted for local weather,<br />

operating hours, building load characteristics, air handler flows and configuration, and<br />

temperature control strategies.<br />

The cost for implementing this project includes variable frequency drives for the supply and<br />

return fans, wireless remote supply air temperature sensors for representative zone supply<br />

registers and a control strategy to optimize the air flow and static pressure from the supply fan.<br />

This project does not apply to air handlers that serve patient areas in the medical centers, as<br />

they are required by OSHPD to operate at constant volume all of the time. It does not apply to<br />

laboratory air handlers, where more elaborate air flow control devices are needed.<br />

2413.01/Reports/<strong>UC</strong> SEP Final Report – <strong>UC</strong>LA.doc 8-6 December 31, 2008<br />

Newcomb | Anderson | McCormick


8.2.3 Air Handler Project 3. Demand Control Ventilation<br />

This project adds a carbon dioxide sensor to air handlers that serve areas with highly variable<br />

occupancies, such as lecture halls, theaters, gymnasiums. Measurement of the carbon dioxide<br />

level is used to reset the minimum outside air flow function of the outside air economizer<br />

according to occupancy requirements. The project includes a carbon dioxide sensor which is<br />

usually located inside the lecture hall or building space. This will result in the heating and<br />

cooling of less outside air when it is not needed for ventilation.<br />

The minimum flow of outside air into the air handler has typically been designed according to full<br />

occupancy of the space. For example, if there are 200 seats in a lecture hall the minimum<br />

outside air flow may have been determined by multiplying 15 cfm per person (or seat) times 200<br />

seats, or 3,000 cfm. The outside air economizer would be adjusted never to drop below this<br />

level.<br />

In the modified case the minimum outside air flow will be allowed to drop to lower levels as long<br />

as adequate ventilation is maintained for the number of people in the room, as indicated by the<br />

carbon dioxide levels. This is a standard control sequence required by Title 24 for new<br />

construction in high density spaces. Title 24 requires a minimum outside air flow rate of at least<br />

0.15 cfm/sf, regardless of occupancy. This level of ventilation removes contaminants not<br />

related to human occupants. This level of outside air supply is typically found in office areas, so<br />

carbon dioxide sensors do not offer significant energy savings potential for offices and other<br />

areas that are never densely occupied.<br />

The savings are calculated for this project through a bin simulation adjusted for local weather,<br />

operating hours, building load characteristics, air handler flows and configuration, and<br />

temperature control strategies.<br />

The cost for implementing this project includes a carbon dioxide sensor, which can be factory<br />

calibrated with no need for additional calibration during its service life, and integration into the<br />

economizer control sequence. The campus can choose to monitor and log the carbon dioxide<br />

levels.<br />

This project does not apply to air handlers serving office areas or other relatively low density<br />

areas. It does not apply to patient handling or laboratory air handlers where other outside air<br />

requirements exist.<br />

8.2.4 Air Handler Project 4. Static Pressure Reset on Variable Air Volume Air Handlers<br />

This project adds a static pressure reset capability to existing VAV air handlers that do not have<br />

direct digital zone controls. The current design static pressure setpoint may be the appropriate<br />

pressure to operate at during hours of high air conditioning load, but it is not necessarily needed<br />

during other hours of operation. This project automatically resets the static pressure to a level<br />

that maintains comfort conditions but is typically lower than the original setpoint.<br />

There are two technologies commonly used to apply this control strategy. If the VAV system<br />

has direct digital controls at the room thermostats it is possible to use information from these<br />

thermostats to automatically reset the supply static pressure. It can be continuously reset so<br />

that a small portion of the VAV boxes are calling for full cooling. This would be an indicator that<br />

the pressure is operating at as low a point possible. For air handlers with DDC at the zones,<br />

2413.01/Reports/<strong>UC</strong> SEP Final Report – <strong>UC</strong>LA.doc 8-7 December 31, 2008<br />

Newcomb | Anderson | McCormick


this is a control sequence change which could be addressed in the commissioning project. The<br />

cost for reprogramming is relatively minor and so is not included in this section as a project.<br />

Other VAV air handlers do not have DDC at the zone level, and so do not provide this type of<br />

feedback. An alternative control strategy will be used to address this situation, SAV with InCITe<br />

offered by Federspiel Controls. This system uses air flow measurement at the air handler to<br />

quantify the building load and resets the supply air pressure accordingly. This control sequence<br />

has been installed in several <strong>UC</strong> buildings over the last several years. The cost and savings for<br />

applying SAV with InCITe to air handlers without DDC zone controls are included in this project.<br />

This approach to resetting supply pressure setpoints reduces fan energy use during part load<br />

conditions, while continuously meeting comfort requirements. The savings are calculated<br />

through a bin simulation adjusted for local weather, operating hours, building load<br />

characteristics, air handler flows and configurations and temperature control strategies.<br />

The cost of implementing this control involves either reprogramming the DDC system or<br />

installing the SAV with InCITe system. Either process requires fine tuning for optimal<br />

performance.<br />

This measure should apply to all existing VAV air handlers except in laboratories or other areas<br />

where static pressure control of the spaces is critical. It also applies to air handlers<br />

8.2.5 Air Handler Project 5. Reduce Air Handler Operating Hours<br />

This project shuts down air handlers during nights and weekends, when the areas they serve<br />

are not in use. This applies to classroom buildings, offices, lounges, gyms and libraries. These<br />

air handlers may operate continuously now in order to cool a server or telecom closet. Or they<br />

may operate to condition the building in case someone comes in to work during non-business<br />

hours.<br />

The building needs can typically be met by means other than running the air handlers<br />

continuously. In the case of the cooling needs of servers, the first choice would be to locate<br />

these servers in data centers where they receive cooling as needed, conditioned power, UPS<br />

backup, and continuous staffing. If there are servers or telecom equipment which cannot be<br />

relocated outside the building, they should be conditioned during nights and weekends by either<br />

split heat pumps, or dedicated chilled water coils where chilled water is continuously available.<br />

In the case where the comfort of faculty, staff or students is critical during non-standard hours,<br />

these requirements can be met in several ways with existing control systems. For example, the<br />

space temperature of the buildings can be monitored during the nights and weekends so when it<br />

drifts outside a given comfort zone (perhaps 65° to 80°F) the air handler can operate as long as<br />

necessary to reestablish temperature control. The air handler would then shut off again until the<br />

building drifts outside of the setback temperature control points again. Some faculty or staff<br />

could also be given phone in access to the building control system to allow them to request air<br />

handler operation for several hours at a time when they find the temperature unacceptable.<br />

The intention of this project is to provide a similar level of service to the University occupants<br />

that they currently enjoy, but at a lower energy use. The cost of this modification will be based<br />

on the number of spot cooling devices which may be necessary to serve specific building hot<br />

spots. The programming portion for the DDC system is not particularly expensive, as this is a<br />

2413.01/Reports/<strong>UC</strong> SEP Final Report – <strong>UC</strong>LA.doc 8-8 December 31, 2008<br />

Newcomb | Anderson | McCormick


standard control sequence. Temperature monitoring may be needed in older air handlers<br />

without direct digital control. Specific application notes are listed below.<br />

8.2.6 Air Handler Project 6. Convert Air Handlers to Direct Digital Control<br />

This measure involves replacing pneumatic controls on larger air handlers with direct digital<br />

controls. The intention is that no air handlers with supply fans of 10 hp or larger be left<br />

operating with pneumatic controls. The continued use of pneumatic controls creates problems<br />

in terms of calibration and drift, inadequate control sequences, inability to monitor and verify<br />

proper operation, incompatibility with demand response and inability to commission with lasting<br />

effect.<br />

8.2.7 Air Handler Project 7. Outside Air Ventilation Heat Recovery<br />

An energy recovery system is recommended in some facilities to capture heat or cooling from<br />

exhaust air and reuse some of it to precondition the make-up air before supplying it to the<br />

building. The type of heat exchangers or HVAC coils used to transfer this energy from the<br />

exhaust flow to the supply air can vary according to building design. Installation of a heat<br />

exchanger can result in significant energy savings in buildings that require a supply of 100%<br />

outside air. This was recommended for specific buildings in locations that experience significant<br />

variances in outdoor air temperature over the course of a year.<br />

8.2.8 Air Handler Project 8. Kitchen Hood VFD<br />

Demand ventilation controls are recommended for the university’s larger dining facilities’<br />

commercial kitchen hood exhaust fans (typically 3 hp and up). Standard exhaust hoods<br />

consume a significant amount of energy because they constantly run at maximum flow and<br />

require make-up air that must be heated or cooled. By installing VAV hoods controlled by<br />

infrared smoke sensors and temperature sensors, supply and exhaust fan speeds can be<br />

adjusted to match actual cooking activity under the hood, reducing the excess energy<br />

consumed in between meal preparation times. These controls have already been installed in<br />

several <strong>UC</strong> campus dining facilities with positive results that have led to further installation<br />

requests.<br />

8.2.9 Air Handler Project 9. Add Air Side Economizer<br />

This project adds air side economizer on air handlers. This project concentrates on larger air<br />

handlers which use minimum fresh air for ventilation and do not take advantages of outside air<br />

conditions for cooling (or for heating). During cooling mode, in the absence of an economizer<br />

return air that is generally warm is mixed with the minimum outside air and then cooled with the<br />

help of mechanical cooling to meet the supply air temperature requirements. The amount of<br />

fresh or outside air brought into space through air handlers is fixed and not varied.<br />

In the economizer mode, whenever outside conditions favor, outside air cooler than return air is<br />

brought into the space and, instead of being supplied back to the space, return air is exhausted.<br />

This is also known as free cooling, and significantly reduces cooling energy cost and system<br />

load. The same applies to heating mode where outside air warmer than return air is brought<br />

into the space to meet heating demand.<br />

2413.01/Reports/<strong>UC</strong> SEP Final Report – <strong>UC</strong>LA.doc 8-9 December 31, 2008<br />

Newcomb | Anderson | McCormick


The project involves installing DDC dampers on outside air intake, return air and exhaust air to<br />

control percentage of outside air and return air in supply air to vary according to the load and<br />

outside conditions. In addition, a retrofit kit (damper actuator, flow measuring station, outside air<br />

temperature and humidity monitoring station, mixed air temperature sensor) is installed on each<br />

of the air handler. This kit includes direct digital controls, which increases the cost but greatly<br />

increases the functionality. Enthalpy changeover control strategy will be adapted to use outside<br />

air in the most economical way without use of energy required to dehumidify additional outside<br />

air. Enthalpy is a measure of the total heat in the air, which is calculated by measuring both the<br />

dry bulb temperature and the relative humidity. Outside air will be used for cooling when the<br />

enthalpy of outside air is lower than the enthalpy of return air. Outside air and return air<br />

dampers are modulated to admit enough outside air to minimize cooling energy use. When<br />

outside air enthalpy is greater than the return air enthalpy, minimum outside air required for<br />

ventilation is brought into the space.<br />

8.2.10 Laboratory Air Handler Project 1. Convert Laboratory Air Handlers and Fume Hoods to<br />

Variable Air Volume<br />

The intention of this project is to convert laboratories to variable air volume systems and reduce<br />

the large outside air heating, cooling and fan power loads. Many existing labs are constant<br />

volume reheat systems, with a fixed air flow coming from the air handlers being reheated at the<br />

laboratory and exhausted through the constant volume hoods or room general exhaust. Most<br />

new laboratories utilize VAV air handlers and fume hoods. The intention of this project is to<br />

update the configuration of the existing labs so that they can operate as efficiently as the new<br />

labs. The <strong>UC</strong> EH&S Laboratory Safety Design Guide Second Edition September 2007 states<br />

“All laboratories should contain a fully integrated laboratory variable air volume (VAV)<br />

airflow/pressure control system to control room temperature, ventilation rate and room<br />

pressurization.”<br />

This project starts with a review of the air balance requirements of the facility. The air flow<br />

needs of each room are determined according to the function of the room, the number of hoods<br />

and the internal and external heat loads. This air balance may be significantly reduced from the<br />

existing design because of better understanding of actual loads or better design parameters.<br />

The minimum air changes typically needed in a laboratory are 6 air changes per hour for a room<br />

with a 10 foot ceiling, per the EH&S Design Guide. A given lab may need higher minimums,<br />

depending upon the density of hoods.<br />

The mechanical work includes converting the air handlers to VAV with the addition of VFDs to<br />

the supply fans. This may be appropriate for the exhaust fans as well, depending upon how<br />

they are ducted together. The hoods are converted to variable flow through the addition of an<br />

exhaust flow control valve and the sealing off of the sash bypass. If there are a small number of<br />

hoods in a larger room, these do not need to be converted to VAV, where the general exhaust<br />

requirements for the room are great enough that it makes no difference whether the air leaves<br />

through the hood or the general exhaust duct. The room supply air and general exhaust<br />

typically require new flow control valves or dampers as well to allow pressure control of each<br />

room. The exhaust fans may need stepping control and/or VFDs to maintain proper exhaust<br />

pressure in the duct and proper discharge velocity on the roof. The control systems should<br />

include supply temperature reset, utilizing either a DDC sequence or a controller such as DART,<br />

described above.<br />

2413.01/Reports/<strong>UC</strong> SEP Final Report – <strong>UC</strong>LA.doc 8-10 December 31, 2008<br />

Newcomb | Anderson | McCormick


8.2.11 Laboratory Air Handler Project 2. Rebalance Variable Air Volume Laboratory (or<br />

Vivarium) Air Handlers<br />

A number of newer laboratories at the campuses were designed and built with VAV fume hoods<br />

and air handlers. Some of these have presented opportunity for efficiency improvement through<br />

rebalance of their systems to provide desired minimum air change rates (6 ACH). The current<br />

air change rate may be higher if the labs were designed for standard heat loads that did not end<br />

up being installed in most places. In some buildings air changes were provided for future hoods<br />

that were not installed.<br />

This project will readjust the air balance in the existing labs to meet the air flow requirements as<br />

the buildings are currently operating. Should the operations of a given laboratory change in the<br />

future, the air change rate can be adjusted just for that room through a similar process.<br />

The work involved in implementing this project is the recalculation of air change minimum air<br />

flows for each lab, based on the current building loads and 6 ACH minimum. Where the<br />

building has a DDC system, the new minimum air flows are set for the boxes and the operation<br />

is observed for stability and temperature control. Where there is no DDC system a more<br />

involved air balance will be necessary, probably manually setting the minimum flows on the<br />

zone supply boxes. The existing static pressure controllers should provide the reduced air flow<br />

and fan savings when the minimum air flows occur. The control systems should include supply<br />

temperature reset, utilizing either a DDC sequence or a controller such as DART, described<br />

above.<br />

8.2.12 Laboratory Air Handler Project 3. Reduce Minimum Air Change Requirements through<br />

Continuous Monitoring<br />

The first two Laboratory Air Handler Projects will reduce air change rates according to the needs<br />

of the individual rooms, with minimum flows set for 6 air changes per hour. This project will<br />

further reduce the minimum air flow setpoints in laboratory areas, with monitoring provided to<br />

raise the air change rate should a chemical spill be detected. The plan from the <strong>UC</strong> Irvine<br />

campus is to drop minimum air flow setpoints to 4 ACH during hours when the laboratories are<br />

normally occupied and to 2 ACH during other hours. This will further reduce the use of<br />

electricity to circulate the air, as well as heating and cooling requirements for the 100% outside<br />

air flow.<br />

The approach at <strong>UC</strong> Irvine is comprised of a chemical monitoring system that monitors the<br />

concentration of a number of common gases. The currently proposed system is an Aircuity<br />

system which uses a central monitoring station physically connected by sampling tubing to<br />

perhaps 20 rooms. The air quality in each laboratory is sampled periodically, typically once<br />

every 15 minutes. Detection of high gas concentrations caused by a spill would automatically<br />

increase the air change rate in the affected lab. A push button in each lab could be manually<br />

activated to do the same.<br />

Implementation of this measure requires approval of the campus Environmental and Health<br />

Safety department, which exists at <strong>UC</strong> Irvine. An interest in this project was expressed by<br />

<strong>UC</strong>LA.<br />

2413.01/Reports/<strong>UC</strong> SEP Final Report – <strong>UC</strong>LA.doc 8-11 December 31, 2008<br />

Newcomb | Anderson | McCormick


8.2.13 <strong>Medical</strong> <strong>Center</strong> Air Handler Project 1. Optimization of Constant Volume Air Handlers<br />

In patient handling areas of medical centers, OSHPD typically requires constant volume air<br />

handlers to allow a precise air balance and maintenance of static pressure differences between<br />

rooms and hallways. This does not permit the use of VAV systems and their associated<br />

savings. Many of these systems are required to be 100% outside air as well. The most that can<br />

be done in a constant volume air handler is to ensure that the supply air temperature is set as<br />

high as possible while maintaining comfort, and ensuring that, if there is an outside air<br />

economizer, it is controlled according to the supply air temperature.<br />

This is a relatively easy programming effort in a DDC system. If a DDC system is not present<br />

some other optimizing approach is required. This could be a reset schedule based on outside<br />

air or other load indicator. It could also be done through a sampling of the supply air<br />

temperature in typical zones through a wireless mesh network of temperature sensors, as<br />

recommended in Air Handler Project 2, using the DART technology. It is not clear in which<br />

parts of a medical center this wireless technology could be employed.<br />

8.3 Monitoring Based Commissioning Projects<br />

8.3.1 Monitoring Based Commission for All SEP Buildings<br />

Monitoring Based Commissioning (MBCx) is recommended for all campus buildings of 50,000 sf<br />

and greater over the course of the next two utility funding cycles (six years). This process<br />

includes installing networked whole building meters on the buildings to automatically track<br />

electricity, steam, hot water, chilled water and/or natural gas use. It also includes a<br />

commissioning effort to review building operations, the functionality of controls, the<br />

appropriateness of sequences of operations, time scheduling, and numerous other building<br />

operation parameters. The process of identifying the SEP projects was a building survey, as<br />

opposed to an investment grade energy audit. The operational changes which would normally<br />

be identified in a detailed audit should be identified and resolved through the commissioning<br />

process.<br />

Where capital projects have been identified for buildings, for example, convert to variable air<br />

volume or install variable flow fume hoods, it is recommended that the commissioning process<br />

be integrated with the retrofit process, even though it is included separately in the project list.<br />

This is a hybrid MBCx process which will result in the most expedient change in building<br />

operations. In the case where no retrofit projects have been identified the commissioning<br />

process can be implemented at any time. It is possible that the commissioning process will<br />

result in the identification of additional retrofit measures which can be funded and installed in a<br />

later process.<br />

No commissioning project is recommended for buildings which received monitoring based<br />

commissioning in the 2004-2005 or 2006-2008 <strong>UC</strong> CSU IOU Partnership Program.<br />

The budgets for the MBCx projects were projected based on the 20060-2008 Partnership<br />

Program applications. The average cost for MBCx in Basic buildings was $0.61 per square foot.<br />

For Complex buildings the average cost is $1.22 per square foot.<br />

2413.01/Reports/<strong>UC</strong> SEP Final Report – <strong>UC</strong>LA.doc 8-12 December 31, 2008<br />

Newcomb | Anderson | McCormick


The projected MBCx energy savings for the SEP buildings are determined relative to the 2006-<br />

2008 Partnership Program applications. There is a 70% multiplier applied to all savings<br />

projections because the buildings already in the MBCx program were selected specifically for<br />

their potential, while the proposed SEP buildings are only selected based on size.<br />

Basic building applications average electricity savings of 10% or 1.1 kWh/sf-yr, and gas savings<br />

of 15% or 0.15 th/sf-yr. <strong>Energy</strong> savings are projected to SEP buildings according to historical<br />

energy use of the building, if it is known. If historical energy use is not known, savings are<br />

projected on the basis of the building area. In both cases a 70% savings scaling factor is<br />

applied.<br />

Complex building applications average electricity savings of 9% or 2.7 kWh/sf-yr, and gas<br />

savings of 21% or 0.29 th/sf-yr. <strong>Energy</strong> savings are projected to SEP buildings according to<br />

historical energy use of the building, if it is known. If historical energy use is not known, savings<br />

are projected on the basis of the building area. In both cases a 70% savings scaling factor is<br />

applied.<br />

In addition, MBCx was recommended for all central plants which have not previously been<br />

commissioned through the Partnership program.<br />

8.4 Capital Program Projects<br />

8.4.1 New Construction and Renovation from Capital Program<br />

There is a significant opportunity to integrate energy efficiency with new construction and<br />

renovation of campus facilities. This is currently implemented through the Savings By Design<br />

process administered by the statewide investor owned utilities, as well as SMUD. It is<br />

anticipated that this program will be continued in the 2009-2014 utility portfolio. It is hoped that<br />

it can be integrated with the <strong>UC</strong> CSU IOU Partnership Program to become more effective.<br />

The anticipated program modifications include the following: encourage energy savings of<br />

greater than 25% relative to Title 24 to earn the maximum incentive levels of $0.25 per kWh and<br />

$1.00 per therm; use the Partnership minimum required campus contribution of 20% rather than<br />

the Savings By Design requirement of 50%; remove the $150,000 or $450,000 cap per project;<br />

consider some up front engineering funding.<br />

On the <strong>UC</strong> side the current process is hampered by severe competition for construction funds to<br />

implement the efficiency measures. Even when funds are set aside in the design budgets to<br />

meet the current <strong>UC</strong> goal of 20% below Title 24, efficiency measures are sometimes lost in<br />

“value engineering” during the construction process. There are typically not enough funds<br />

available to allow construction of buildings with the energy efficiency measures justified by life<br />

cycle costing.<br />

The opportunity to use the energy efficiency bond money in new construction and renovation<br />

projects would create significantly more opportunities for the installation of energy efficiency in<br />

these projects. The potential cost and savings is projected for this analysis, assuming each<br />

project could reduce energy use by approximately 30% below Title 24 and assuming that the<br />

total investment to achieve this performance would result in a simple payback period of 7 years.<br />

It is possible that this performance level can be achieved with a shorter payback, or that higher<br />

percentage savings can be achieved with this payback period.<br />

2413.01/Reports/<strong>UC</strong> SEP Final Report – <strong>UC</strong>LA.doc 8-13 December 31, 2008<br />

Newcomb | Anderson | McCormick


The potential cost and savings for this measure is based on the planned construction for the<br />

campuses, as detailed in the 2007-08 to 2011-12 Capital Program document from the <strong>UC</strong>OP<br />

website. This includes construction and renovation projects on all campuses, independent of<br />

building funding source. The total project cost and savings were projected for individual<br />

projects, based on average performance numbers from existing <strong>UC</strong> buildings. A projected 30%<br />

savings in Basic buildings is 3.3 kWh/sf-yr and 0.3 th/sf-yr. A projected 30% savings in<br />

Complex buildings is 8.9 kWh/sf-yr and 0.4 th/sf-yr.<br />

These savings were projected to the building areas identified in the Capital Program document.<br />

Where building area was not directly identified, it was estimated from the project budget based<br />

on a projected construction cost of $611 per gross square foot. This is based on the average<br />

construction cost of the projects where stated ($917 per assignable square foot) and the<br />

observed ratio of gross square feet to assignable square feet from the <strong>UC</strong>OP comprehensive<br />

building list (1.5).<br />

The 2007-08 to 2011-12 Capital Program identifies hundreds of planned projects. Savings By<br />

Design projects for the <strong>Strategic</strong> <strong>Energy</strong> <strong>Plan</strong> were not calculated for projects which are<br />

currently on the <strong>UC</strong>OP list of Savings By Design projects underway through the current<br />

program. It was assumed that these projects are too advanced in the design process to switch<br />

to a deeper savings investment based on the proposed SEP process. In addition projects were<br />

not included on the SEP list if they are shown with an occupancy date of 2007-08 or 2008-09. It<br />

is assumed that these projects are too far along in design to allow significant changes. Once<br />

the new SEP program is underway, there may be an opportunity to include some of these<br />

projects, or to replace recommended measures that could not be supported in the original<br />

budget.<br />

Also excluded from the SEP project list are buildings listed for occupancy in 2014-15 or later,<br />

parking structures, and general infrastructure projects. Several buildings were added to the list<br />

by request of a campus.<br />

The projects listed include new buildings and renovation of existing buildings. In some cases<br />

the projects are not defined, but fall under general budgets, such as <strong>Campus</strong> Approved Projects<br />

Under $5 Million. The total list assumes that energy efficiency is an integral part of each of<br />

these projects.<br />

8.5 Deferred Maintenance and Capital Renewal Projects<br />

There is a significant budget spent on deferred maintenance and capital renewal projects each<br />

year. This is an investment in returning buildings and equipment to proper operating condition.<br />

This often includes roof replacement, window replacement and chiller or boiler replacement.<br />

This project comes from a different source than the capital project funding.<br />

Each campus produces a list based on a combination of priorities, although energy savings are<br />

typically not a factor. Although projects typically may save a nominal amount of energy, the<br />

replacement of this type of equipment typically has a long simple payback if calculated on<br />

energy savings only. Certainly some capital investment could be used to increase the efficiency<br />

of a project by improving the U value of a roof, increasing the performance of glazing or<br />

improving the efficiency of a chiller or boiler.<br />

2413.01/Reports/<strong>UC</strong> SEP Final Report – <strong>UC</strong>LA.doc 8-14 December 31, 2008<br />

Newcomb | Anderson | McCormick


The budget that each campus has to spend on these projects is highly variable. It can be in the<br />

range of $10 million per year in a good year.<br />

It has been estimated that about 12% of these projects have an energy savings component. An<br />

increment of $0.25 to $0.5 million per year of deferred maintenance and capital renewal projects<br />

is used in the SEP project list. The campuses could elect to include one or more of these<br />

projects per year in their SEP commitment.<br />

8.6 <strong>Campus</strong> Wide Projects<br />

8.6.1 <strong>Campus</strong> Wide Project 1. Refrigerators<br />

It is recommended that all pre-2001 refrigerator units be replaced by <strong>Energy</strong> Star units. Old<br />

refrigerators can consume twice the electricity of a current <strong>Energy</strong> Star unit. Refrigerators are<br />

especially prevalent in universities where they are widely used in both academic and residential<br />

settings. Electricity and cost savings were calculated using the <strong>Energy</strong> Star calculator adapted<br />

for replacement of pre-2001 residential-type refrigerators on campuses.<br />

Refrigerators in Housing – The number of refrigerators in housing per campus were estimated<br />

based on the total number of apartment-type housing and suite-type housing available on each<br />

campus. Where available, we used the numbers of housing refrigerators to be replaced, as<br />

specified by the campus.<br />

Refrigerators on <strong>Campus</strong> – The number of refrigerators on campus was estimated based data<br />

provided by the <strong>UC</strong>B BETS database and prorated by the number of enrolled students at each<br />

campus. The BETS database provides an inventory of refrigerators that were purchased before<br />

2001.<br />

8.6.2 <strong>Campus</strong> Wide Project 2. Lab Freezers<br />

It is recommended that all pre-2001 lab freezers be replaced by energy efficient units.<br />

According to New Brunswick Science (NBS), current energy efficient units consume half the<br />

amount of electricity of the industry average. Due to this significant waste of energy, <strong>Energy</strong><br />

Star is currently developing standards for the industry. These units are especially prevalent in<br />

universities where they are widely used in research settings. Electricity and cost savings are<br />

calculated using data for ultra-low temperature (-86°F) upright lab freezers provided by NBS.<br />

While the <strong>Energy</strong> Star standards are currently being developed, this calculation can serve as an<br />

estimate for -20° to -30°F lab freezers as well by using an average industry installed cost<br />

of $7,000. The number of ultra-low temperature lab freezers on each campus was estimated<br />

based on data provided by the <strong>UC</strong>B BETS database and prorated by the number of enrolled<br />

students at each campus.<br />

8.6.3 <strong>Campus</strong> Wide Project 3. Server Virtualization<br />

Server Virtualization maximizes the utilization of servers by installing virtualization software on<br />

existing servers and allows the elimination of idling or under-utilized physical servers. <strong>Energy</strong><br />

savings potential was calculated based on deemed values provided by the SCE "Virtual<br />

Machine" calculator, version 6. The baseline server assumed the default values provided by the<br />

SCE calculator, whereas the proposed VM server used an average of two servers'<br />

specifications, "HP DL 585" and "Dell Blade 1955", servers that <strong>UC</strong> Berkeley are considering for<br />

2413.01/Reports/<strong>UC</strong> SEP Final Report – <strong>UC</strong>LA.doc 8-15 December 31, 2008<br />

Newcomb | Anderson | McCormick


future VM projects. The number of "virtualizable servers" per campus was estimated using data<br />

provided by the <strong>UC</strong> Berkeley IT Department and then prorated by the number of enrolled<br />

students per campus in Fall 2006. This includes both the decentralized servers across campus<br />

and servers that are in the data center servers. A ratio of ten baseline servers consolidated<br />

onto one virtual machine was used based on a conservative estimate from past partnership<br />

projects.<br />

Note that this project is based on the reduction in the number of servers operating and their<br />

local air conditioning load. Where a large air handler was operating continuously to cool a<br />

server, this measure was included in the HVAC projects.<br />

8.6.4 <strong>Campus</strong> Wide Project 4. Network Computer Power Management Software/CRT<br />

Network computer power management software is recommended to power down computers<br />

that are on the network when they are not being used. Network PC power management<br />

software energy savings potential was calculated based on deemed values provided by the<br />

Verdiem PG&E work paper. Installed cost was estimated by the retail price of the software with<br />

installation, and with additional maintenance and support costs. For each campus, the number<br />

of computers on campus was estimated based on data provided by <strong>UC</strong> Berkeley's BETS<br />

database and prorated by the number of enrolled students per campus in Fall 2006. The BETS<br />

database showed the number of computers on campus older than 5 years. To be conservative,<br />

we estimated that half of these computers represented the number of managed, networkedcomputers<br />

on which power management software could be installed. However, we recommend<br />

that power management software be installed on all managed, networked-computers.<br />

CRT monitor to LCD monitor conversions were also recommended for each campus. Both the<br />

energy savings potential and cost were based on the <strong>Energy</strong> Star calculator for LCDs, adapted<br />

to represent conventional 17" CRT monitors to be replaced by <strong>Energy</strong> Star 17" LCDs. We<br />

recommend, however, that all CRTs be replaced with <strong>Energy</strong> Star LCDs to maximize energy<br />

savings.<br />

8.6.5 <strong>Campus</strong> Wide Project 5. Install Controllers on Vending Machines<br />

Vending machines and sliding-door coolers can easily be retrofit to use approximately 40<br />

percent less energy using inexpensive controllers. To examine the potential for this efficiency<br />

measure, counts of sliding door coolers and two types of vending machines, refrigerated and<br />

non-refrigerated, were collected from the <strong>UC</strong> campuses. Information about existing measures to<br />

reduce the energy consumption of these machines (e.g. requiring service providers to use<br />

<strong>Energy</strong> Star machines) was also gathered to avoid duplication of those efforts. For campuses<br />

that were not able to provide vending machine data, typical values determined for the rest of the<br />

<strong>UC</strong> system were applied.<br />

Based on the reported or estimated number of vending machines on each campus and the<br />

estimated annual energy usage of a machine, the existing energy consumption of all vending<br />

machines was calculated for each campus. For campuses that had not implemented controls or<br />

had done so only to a limited extent, full use of controllers on all campus vending machines and<br />

sliding-door coolers is recommended. The energy and cost savings associated with<br />

implementing this measure are calculated based on typical energy savings listed in the<br />

Database for <strong>Energy</strong> Efficient Resources (2005) and reported by equipment manufacturers.<br />

2413.01/Reports/<strong>UC</strong> SEP Final Report – <strong>UC</strong>LA.doc 8-16 December 31, 2008<br />

Newcomb | Anderson | McCormick


8.7 Other Projects<br />

8.7.1 Swimming Pools<br />

The <strong>Strategic</strong> <strong>Energy</strong> <strong>Plan</strong> includes energy savings and cost estimates for a number of energy<br />

efficiency measures for swimming pools. Four potential measures have been identified for<br />

campus pools and information is provided for each individual pool when appropriate.<br />

8.7.2 Pool Project 1. Variable Speed Drives and High Efficiency Motors for Filter Pumps<br />

Pool filter pumps are often continuously run at a constant flow rate regardless of usage and<br />

cleanliness standards. Codes typically require certain circulation rates when the pool is<br />

occupied. This measure includes installing a variable speed drive with control system and,<br />

when appropriate, replacing the motor with a premium efficiency motor. The energy savings<br />

calculations for this project assume that the pump will be slowed down to 50% of its normal<br />

speed during unoccupied hours (8 hours per day for most pools).<br />

8.7.3 Pool Project 2. Pool Covers<br />

Heated pools and spas lose approximately 70% of their energy to evaporation. Since<br />

evaporation is the major source of heat loss for pools, covering the pool when it is not in use is<br />

an effective manner of minimizing water and heat loss. This project includes standard insulating<br />

pool blankets, storage reels, and a power winder. <strong>Energy</strong> savings are modeled using the<br />

RETScreen4 software. The calculations assume that pool covers will be used eight hours per<br />

day.<br />

8.7.4 Pool Project 3. Solar Water Heating<br />

Solar water heating can significantly reduce pool operating cost by decreasing heating<br />

requirements. This measure is for a solar pool heating system of unglazed collectors with a total<br />

collecting area equal to 60% of the size of the area of the pool. <strong>Energy</strong> savings are modeled<br />

using RETScreen4 software. The calculations assume that pool covers are installed and used to<br />

minimize heat loss.<br />

8.7.5 Pool Project 4. Boiler Replacement<br />

This project replaces standard boilers for pool heating with dedicated high efficiency condensing<br />

boilers. The energy savings calculations for this measure assume 80% thermal efficiency for the<br />

currently installed boiler. Although some condensing boilers for pool heating claim up to 98%<br />

thermal efficiency, a conservative estimate of 90% thermal efficiency was used for the<br />

replacement boiler. The baseline energy consumption for this measure assumes that both pool<br />

covers and solar water heating are used. Information is not provided for pools that are heated<br />

using the central loop or a non-dedicated boiler.<br />

8.7.6 Domestic Solar Hot Water<br />

The use of solar hot water heating was explored as a possible measure to reduce energy use in<br />

campus residences. Total domestic hot water consumption was estimated for large residence<br />

halls and apartment buildings based on occupancy data collected from the campuses. Then,<br />

using data on the solar resource available on each campus and an assumed fraction of total<br />

2413.01/Reports/<strong>UC</strong> SEP Final Report – <strong>UC</strong>LA.doc 8-17 December 31, 2008<br />

Newcomb | Anderson | McCormick


water use to be provided, a solar hot water system was sized to meet demand. The cost of an<br />

appropriate system – active, closed-loop, with glazed flat-plate collectors – was then estimated<br />

to determine the cost effectiveness of this measure.<br />

Paybacks for domestic solar hot water were close to 80 years and therefore this measure was<br />

not recommended. However, in certain circumstances domestic solar hot water may prove more<br />

attractive. For example, where a solar hot water system has already been in use, adding or<br />

upgrading panels while preserving existing storage and pipes may offer a cost-effective<br />

measure. Also, access to state or federal tax credits and/or utility incentives – currently in pilot<br />

phase – could greatly increase the attractiveness of this measure.<br />

8.8 Custom Projects<br />

8.8.1 <strong>UC</strong>LA Custom Project 1. Boiler Replacement<br />

This project considers replacing existing old inefficient boilers with new energy efficient boilers.<br />

Existing boilers are old non-condensing boilers. Existing boilers do not capture latent heat from<br />

flue gases resulting in lower combustion efficiency. With condensing boilers 90-98% thermal<br />

efficiency is possible allowing significant natural gas savings. Conventional non condensing<br />

boilers are 70-80% efficient and require return water temperatures at comparatively higher<br />

temperatures. Condensing boilers have a specially designed heat exchanger which allows<br />

boiler to operate at lower return water temperatures and comparatively at higher delta T<br />

(difference between return water temperature and supply water temperature). Operating boiler<br />

at lower temperature reduces heat loss and standby losses.<br />

8.8.2 <strong>UC</strong>LA Custom Project 2. Chiller Replacement (SRLF, UNEX, Willshire <strong>Center</strong>)<br />

This project considers replacing existing old inefficient chillers with new energy efficient and<br />

environmental friendly chillers. Existing chillers are old and often require costly maintenance<br />

and downtime. Old chillers do not have good full load and part load efficiencies. In other words<br />

power (KW) used per cooling tons (ton) is comparatively high and therefore provides an<br />

opportunity for electric energy and demand savings. Chillers efficiencies are typically higher or<br />

are often designed for full load which occurs only for few hours per year. Rest of the time<br />

chillers see fewer loads or run at part load. Since cooling load is significantly driven by outside<br />

air and humidity, cooling needs also vary.<br />

Old chillers also use refrigerants containing Ozone-destroying Chlorofluorocarbons (CFC) which<br />

are no longer used in new chillers. New chillers use more environmental friendly<br />

Hydrochlroflurocarbon (HFC) refrigerants. Continuing use of old chillers with outdated<br />

technology and banned refrigerant causes wastage of energy and higher operating costs. Old<br />

chillers require refrigerants which are costly to obtain from a dwindling reclaimed supply. Also it<br />

becomes difficult, costlier and requires longer downtime to obtain parts for old chillers.<br />

Since building depends on local chillers for cooling needs and does not use chilled water from<br />

campus central plant, it is important to have efficient chillers to avoid hefty demand charges.<br />

New efficient chillers provides an opportunity to implement energy conservation measures such<br />

as chilled water supply reset, variable flow, condenser water reset etc without chiller penalty.<br />

With advanced chiller controls it is possible to limit demand and optimize chiller plant energy<br />

use. New chillers with advanced controls provide flexibility in plant operation and effectively use<br />

of plant equipment.<br />

2413.01/Reports/<strong>UC</strong> SEP Final Report – <strong>UC</strong>LA.doc 8-18 December 31, 2008<br />

Newcomb | Anderson | McCormick


8.8.3 <strong>UC</strong>LA Custom Project 3. TOD Controls on Exhaust Fans<br />

This project considers installing Time of Day Controls (TOD) on Toilet Exhaust Fans. Existing<br />

toilet fans run continuously and are not controlled through building energy management system.<br />

Fan with higher horsepower impose significant operating costs, both electric energy use and<br />

demand charges. Therefore with the time of day controls, fan operating hours will be matched<br />

with building occupancy schedule and controlled through building energy management system.<br />

This will allow fan to run only when building is occupied and turn off automatically when building<br />

is unoccupied.<br />

If required occupancy sensors can be also integrated with fan so that whenever occupancy<br />

detected, fan will be turn on. Time of day control on fan will significantly reduce electric energy<br />

usage charges.<br />

8.8.4 <strong>UC</strong>LA Custom Project 4. Condenser Water Reset<br />

This project considers implementing condenser water reset control strategy for water cooled<br />

chillers through use of existing building direct digital controls (DDC). In condenser water reset<br />

control, water supplied to chiller condenser is varied according to outside air wet bulb<br />

temperature. With condenser water reset methodology, variable set point is used to control<br />

condenser water entering temperature. Every cooling tower can cool water up to certain limits<br />

depending on tower design and ambient wet bulb temperature. Since tower size is fixed, only<br />

driving factor is ambient wet bulb temperature. Cooling tower can cool water to temperatures<br />

equal to “wet bulb temperature + cooling tower approach”. Approach is defined as the difference<br />

between cooling tower leaving water temperature and ambient wet bulb temperature. In other<br />

words if ambient wet bulb temperature is 50°F with cooling tower design approach of 14°F,<br />

cooling tower can cool water to temperature of 64°F. Most of the Chiller Manufacturer’s<br />

literature indicates that a one-degree drop in condenser entering water temperature will reduce<br />

chiller energy consumption by two percent. Due to location of the building, ambient conditions<br />

favor use of condenser water reset and fan power usage due to condenser water reset will be<br />

comparatively less than the energy used for the chiller. An algorithm will set upper and lower<br />

limits on condenser water temperature to protect chiller from damage and by restricting set point<br />

to minimum approach, fan speed will not be increased in vain to achieve impossibly low<br />

temperatures. Without condenser water reset strategy, Cooling tower will run at fixed low<br />

temperature wasting fan energy during conditions when cooling tower cannot achieve the setpoint<br />

due to higher outside air wet-bulb temperature/ or due to high cooling loads on chiller.<br />

Condenser water reset strategy calculates overall system load, chiller characteristics (kW/ton),<br />

outside air wet bulb (enthalpy) and determines the best possible condenser water set-point<br />

under given circumstances for an efficient plant operation.<br />

To implement condenser water reset strategy, a wet bulb temperature sensor and humidity<br />

sensor will be installed in cooling tower yard. The existing DDC panel will be programmed to<br />

add an algorithm to reset (lower) condenser water entering temperature based on ambient wet<br />

bulb temperature. This algorithm will be used to control cooling tower fan VFD to maintain preset<br />

temperature at existing temperature sensors.<br />

2413.01/Reports/<strong>UC</strong> SEP Final Report – <strong>UC</strong>LA.doc 8-19 December 31, 2008<br />

Newcomb | Anderson | McCormick


8.8.5 <strong>UC</strong>LA Custom Project 5. Install VFDs on Cooling Towers<br />

This project considers installing Variable Frequency drives (VFD) on Cooling Tower Fan. With<br />

VFD, fan speed is regulated to meet the required cooling needs. Since cooling tower is<br />

designed based on outside air wet bulb temperature, variation in wet bulb temperature affects<br />

tower performance. Highest wet bulb temperature for a particular location occurs only few hours<br />

per year; and it is not required to run tower fan at design speed (100%) for remaining hours. Fan<br />

speed can be reduced to meet cooling needs and therefore allowing significant electric energy<br />

and demand savings. VFD allows soft start and reduces wear and tear of fan belts, bearings.<br />

The power requirement of cooling tower fan varies as a cube of its speed. The VFD allows the<br />

cooling tower fan to operate at whatever speed is required to meet the cooing needs. Typically<br />

the fan runs at only 40 - 70% of design speed, thus saving 50% or more of the energy<br />

consumed by fixed speed system. Every time the actual wet bulb temperature is lower than the<br />

design wet bulb, an energy saving potential exists. Changes in the ambient wet bulb<br />

temperatures allow the fan speed to be regulated. Running fan at lower speed reduces energy<br />

consumed by the fan’s motor. The magnitude of this saving potential depends upon wet bulb<br />

temperature fluctuations. In addition to fan energy savings, running fan at lower speed reduces<br />

evaporation rate of treated water.<br />

8.8.6 <strong>UC</strong>LA Custom Project 6. Variable Speed Drives on Pumps<br />

This project considers installing Variable Frequency drives (VFD) on HVAC centrifugal pumps to<br />

vary pump speed by varying electrical frequency input to pump motor in relation to system<br />

heating and cooling load. This project focuses on pumps which run at fixed speed and do not<br />

alter flow of water in accordance with the HVAC system load requirements. In other words these<br />

pumps run at design speed (100%) independent of system characteristics wasting pumping<br />

energy and imposing electric demand charges on the campus. Generally pumps are designed<br />

to run at rated speed to meet the peak HVAC system demand which occurs only few hours per<br />

year. Rest of the time, due to the diversity in the system, the system does not require pump to<br />

deliver design flow (since the peak for each zone does not occur at the same time). Therefore<br />

system requires less flow than the design flow providing an opportunity to save pump energy by<br />

reducing pump speed to meet reduced system flow requirements. Speed reduction results in a<br />

more significant energy reduction. The larger the flow reduction from the designed operating<br />

point, the larger the energy savings. Since flow rate is directly proportional to pump speed and<br />

the differential pressure is directly proportional to the square of the pump speed, power usage is<br />

directly proportional to the cube of the pump speed. For example, reducing speed by 50%<br />

requires only 12.5% of the power needed at full speed.<br />

The project involves installing Variable Speed Drives on pumps and differential pressure<br />

transmitter in HVAC loop to control and monitor pump speed. Pump VFD and differential<br />

pressure transmitter will be connected to existing building energy management system.<br />

Also existing bypass valves in loop will be disabled for successful implementation of this ECM.<br />

This ECM assumes that existing pump motors are inverter duty type.<br />

2413.01/Reports/<strong>UC</strong> SEP Final Report – <strong>UC</strong>LA.doc 8-20 December 31, 2008<br />

Newcomb | Anderson | McCormick


9. BUILDING OVERVIEW & PROJECTS<br />

The following pages provide an overview of the recommended projects and summary of<br />

information for the associated buildings. The section is organized sequentially according to the<br />

Building Key, and each contains the following information for each SEP Building.<br />

• Basic information about the building is contained in the header.<br />

• Annual historical energy use by utility for the FY 06/07 baseline, whether metered or<br />

extrapolated.<br />

• Monthly historical energy use by utility, where data is available.<br />

• Hourly load profiles by utility for one summer week and one winter week, where data is<br />

available.<br />

• Currently planned energy projects being implemented as part of the 2006-08<br />

<strong>UC</strong>/CSU/IOU Partnership cycle, and their associated savings as approved for the<br />

incentive application.<br />

• Projects identified by the <strong>Strategic</strong> <strong>Energy</strong> <strong>Plan</strong>, and the projected savings and<br />

economics. The SEP ID Number is a key reference to find the applicable Project<br />

Summary.<br />

• Benchmarking information, calculating the baseline and projected energy uses after<br />

implementation of currently planned energy projects and after implementation of the<br />

projects identified in this SEP.<br />

2413.01/Reports/<strong>UC</strong> SEP Final Report – <strong>UC</strong>LA.doc 9-1 December 31, 2008<br />

Newcomb | Anderson | McCormick


Historical <strong>Energy</strong> Use (06/07)<br />

Electricity<br />

(kWh/yr)<br />

834,200<br />

Steam<br />

(MMBTU/yr)<br />

Hot Water<br />

(MMBTU/yr)<br />

Monthly <strong>Energy</strong> Use (Electric)<br />

Metered Data Not Available<br />

Metered Data Not Available<br />

PERLOFF HALL<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location:<br />

Building Key: 04C4202<br />

Funding Source: STATE<br />

Year Built:<br />

Natural Gas<br />

(th/yr)<br />

39,000<br />

LOS ANGELES<br />

Chilled Water<br />

(ton-hr/yr)<br />

Extrapolated N/A N/A Extrapolated N/A<br />

Monthly <strong>Energy</strong> Use (Gas/Heating Hot Water/Steam)<br />

Monthly <strong>Energy</strong> Use (Chilled Water)<br />

1952<br />

Basic Gross Area (sf): 65,909<br />

Building Type: BASIC<br />

Primary Asset Type: Laboratory<br />

Secondary Asset Type: Office<br />

Weekly Load Profile (Electric)<br />

Metered Data Not Available<br />

Weekly Load Profile (Natural Gas/Heating Hot Water/Steam)<br />

Metered Data Not Available<br />

Weekly Load Profile (Chilled Water)<br />

Metered Data Not Available Metered Data Not Available


<strong>Strategic</strong> <strong>Energy</strong> <strong>Plan</strong> Projects<br />

SEP ID<br />

Number Project Name<br />

PERLOFF HALL<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location:<br />

Building Key: 04C4202<br />

Funding Source: STATE<br />

Year Built:<br />

Electric<br />

(kWh/yr)<br />

Peak<br />

Demand<br />

(kW)<br />

D1051 CAV to VAV - AHU 1, 2, 5W and 5E & Add Economizer<br />

D3003 Monitoring Based Commissioning<br />

LOS ANGELES<br />

1952<br />

Building Savings Cost<br />

HW/Steam<br />

(MMBTU/yr)<br />

Gas<br />

(th/yr)<br />

Chilled<br />

Water<br />

(ton-hr/yr)<br />

Purchased<br />

Utility Cost<br />

Savings<br />

($/yr)<br />

104,141 4.0 304 0 145,777 $20,070<br />

50,750 6.0 0 6,920 0 $8,266<br />

Basic Gross Area (sf): 65,909<br />

Building Type: BASIC<br />

Primary Asset Type: Laboratory<br />

Secondary Asset Type: Office<br />

Project<br />

Cost<br />

($)<br />

Gross<br />

Potential<br />

Incentive<br />

($)<br />

Net<br />

Cost ($)<br />

Committed Tier:<br />

Simple<br />

Payback<br />

(yr)<br />

Backup<br />

$231,886 $56,783 $175,103 8.7<br />

Committed Tier:<br />

Backup<br />

$55,723 $19,100 $36,623 4.4<br />

Totals 154,891 10.0 304 6,920 145,777 $28,336 $287,609 $75,883 $211,726 7.5<br />

Building<br />

Benchmarking<br />

Baseline<br />

Implement Partnership Projects<br />

Implement SEP Projects<br />

Equivalent<br />

Electricity<br />

(kWh/yr)<br />

Equivalent<br />

Natural Gas<br />

(th/yr)<br />

Equivalent Electric<br />

<strong>Energy</strong> Use Index<br />

(kWh/sf-yr)<br />

Assumed Incentives: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh<br />

th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm<br />

kWh/ton-hr: 0.8<br />

Cap 80% project cost<br />

th/ton-hr: 0.0<br />

Equivalent Natural<br />

Gas <strong>Energy</strong> Use<br />

Index (th/sf-yr)<br />

Source <strong>Energy</strong><br />

Use Index<br />

(kBTU/sf-yr)<br />

834,200 39,000 12.7 0.6<br />

188.8<br />

834,200 39,000 12.7 0.6<br />

188.8<br />

562,687 28,280 8.5 0.4<br />

130.3<br />

Percent<br />

Savings<br />

(%)<br />

N/A<br />

0.0%<br />

31.0%<br />

Source <strong>Energy</strong> Use Conversion Factors:<br />

10.239 kBTU per kWh 100 kBTU per th


Historical <strong>Energy</strong> Use (06/07)<br />

Electricity<br />

(kWh/yr)<br />

3,872,200<br />

Steam<br />

(MMBTU/yr)<br />

Hot Water<br />

(MMBTU/yr)<br />

Monthly <strong>Energy</strong> Use (Electric)<br />

Metered Data Not Available<br />

Metered Data Not Available<br />

YOUNG LIBRY<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location:<br />

Building Key: 04C4203<br />

Funding Source: STATE<br />

Year Built:<br />

Natural Gas<br />

(th/yr)<br />

181,200<br />

LOS ANGELES<br />

Chilled Water<br />

(ton-hr/yr)<br />

Extrapolated N/A N/A Extrapolated N/A<br />

Monthly <strong>Energy</strong> Use (Gas/Heating Hot Water/Steam)<br />

Monthly <strong>Energy</strong> Use (Chilled Water)<br />

1964<br />

Basic Gross Area (sf): 305,919<br />

Building Type: BASIC<br />

Primary Asset Type: Telcom<br />

Secondary Asset Type: Library<br />

Weekly Load Profile (Electric)<br />

Metered Data Not Available<br />

Weekly Load Profile (Natural Gas/Heating Hot Water/Steam)<br />

Metered Data Not Available<br />

Weekly Load Profile (Chilled Water)<br />

Metered Data Not Available Metered Data Not Available


<strong>Strategic</strong> <strong>Energy</strong> <strong>Plan</strong> Projects<br />

SEP ID<br />

Number Project Name<br />

D1048 SAF-1 & 2 SP Reset<br />

D1049 SAF-3 to 8 CAV to VAV<br />

D1050 SAF 9 CAV to VAV<br />

D3004 Monitoring Based Commissioning<br />

YOUNG LIBRY<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location:<br />

Building Key: 04C4203<br />

Funding Source: STATE<br />

Year Built:<br />

Electric<br />

(kWh/yr)<br />

Peak<br />

Demand<br />

(kW)<br />

D3005 SBD, New/Renov - Young Research Library Renovation<br />

LOS ANGELES<br />

1964<br />

Building Savings Cost<br />

HW/Steam<br />

(MMBTU/yr)<br />

Gas<br />

(th/yr)<br />

Chilled<br />

Water<br />

(ton-hr/yr)<br />

Purchased<br />

Utility Cost<br />

Savings<br />

($/yr)<br />

141,010 1.0 2,791 0 69,598 $32,145<br />

513,097 63.0 4,419 0 199,569 $82,063<br />

46,394 2.0 410 0 40,684 $8,912<br />

235,558 27.0 0 32,121 0 $38,367<br />

302,198 34.0 0 28,314 0 $42,141<br />

Basic Gross Area (sf): 305,919<br />

Building Type: BASIC<br />

Primary Asset Type: Telcom<br />

Secondary Asset Type: Library<br />

Project<br />

Cost<br />

($)<br />

Gross<br />

Potential<br />

Incentive<br />

($)<br />

Net<br />

Cost ($)<br />

Committed Tier:<br />

Simple<br />

Payback<br />

(yr)<br />

Backup<br />

$61,824 $82,093 $12,365 0.4<br />

Committed Tier:<br />

Backup<br />

$260,501 $216,698 $52,100 0.6<br />

Committed Tier:<br />

Backup<br />

$33,239 $24,071 $9,168 1.0<br />

Committed Tier:<br />

Backup<br />

$258,643 $88,655 $169,988 4.4<br />

Committed Tier:<br />

Backup<br />

$442,353 $100,842 $341,511 8.1<br />

Totals 1,238,257 127.0 7,620 60,435 309,851 $203,628 $1,056,560 $512,359 $585,132 2.9<br />

Building<br />

Benchmarking<br />

Baseline<br />

Implement Partnership Projects<br />

Implement SEP Projects<br />

Equivalent<br />

Electricity<br />

(kWh/yr)<br />

Equivalent<br />

Natural Gas<br />

(th/yr)<br />

Equivalent Electric<br />

<strong>Energy</strong> Use Index<br />

(kWh/sf-yr)<br />

Equivalent Natural<br />

Gas <strong>Energy</strong> Use<br />

Index (th/sf-yr)<br />

Source <strong>Energy</strong><br />

Use Index<br />

(kBTU/sf-yr)<br />

3,872,200 181,200 12.7 0.6<br />

188.8<br />

3,872,200 181,200 12.7 0.6<br />

188.8<br />

2,386,062 25,515 7.8 0.1<br />

88.2<br />

Assumed Incentives: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh<br />

th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm<br />

kWh/ton-hr: 0.8<br />

Cap 80% project cost<br />

th/ton-hr: 0.0<br />

Percent<br />

Savings<br />

(%)<br />

N/A<br />

0.0%<br />

53.3%<br />

Source <strong>Energy</strong> Use Conversion Factors:<br />

10.239 kBTU per kWh 100 kBTU per th


Historical <strong>Energy</strong> Use (06/07)<br />

Electricity<br />

(kWh/yr)<br />

4,611,100<br />

Steam<br />

(MMBTU/yr)<br />

Hot Water<br />

(MMBTU/yr)<br />

Monthly <strong>Energy</strong> Use (Electric)<br />

Metered Data Not Available<br />

Metered Data Not Available<br />

GEOLOGY<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location:<br />

Building Key: 04C4228A<br />

Funding Source: STATE<br />

Year Built:<br />

Natural Gas<br />

(th/yr)<br />

215,800<br />

LOS ANGELES<br />

Chilled Water<br />

(ton-hr/yr)<br />

Extrapolated N/A N/A Extrapolated N/A<br />

Monthly <strong>Energy</strong> Use (Gas/Heating Hot Water/Steam)<br />

Monthly <strong>Energy</strong> Use (Chilled Water)<br />

1952<br />

Basic Gross Area (sf): 182,149<br />

Building Type: COMPLEX<br />

Primary Asset Type: Office Support<br />

Secondary Asset Type: Office<br />

Weekly Load Profile (Electric)<br />

Metered Data Not Available<br />

Weekly Load Profile (Natural Gas/Heating Hot Water/Steam)<br />

Metered Data Not Available<br />

Weekly Load Profile (Chilled Water)<br />

Metered Data Not Available Metered Data Not Available


<strong>Strategic</strong> <strong>Energy</strong> <strong>Plan</strong> Projects<br />

SEP ID<br />

Number Project Name<br />

D1054 S-1, 5, 9, 10 to 12<br />

D1055 S-1(Geophysics)<br />

D1056 Aircuity<br />

D3008 Monitoring Based Commissioning<br />

GEOLOGY<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location:<br />

Building Key: 04C4228A<br />

Funding Source: STATE<br />

Year Built:<br />

Electric<br />

(kWh/yr)<br />

Peak<br />

Demand<br />

(kW)<br />

LOS ANGELES<br />

1952<br />

Building Savings Cost<br />

HW/Steam<br />

(MMBTU/yr)<br />

Gas<br />

(th/yr)<br />

Chilled<br />

Water<br />

(ton-hr/yr)<br />

Purchased<br />

Utility Cost<br />

Savings<br />

($/yr)<br />

181,337 5.0 2,026 0 80,248 $32,167<br />

71,548 2.0 1,817 0 54,628 $19,735<br />

7,207 1.0 0 0 0 $634<br />

344,262 39.0 0 36,976 0 $50,599<br />

Basic Gross Area (sf): 182,149<br />

Building Type: COMPLEX<br />

Primary Asset Type: Office Support<br />

Secondary Asset Type: Office<br />

Project<br />

Cost<br />

($)<br />

Gross<br />

Potential<br />

Incentive<br />

($)<br />

Net<br />

Cost ($)<br />

Committed Tier:<br />

Simple<br />

Payback<br />

(yr)<br />

Backup<br />

$176,117 $84,253 $91,864 2.9<br />

Committed Tier:<br />

Backup<br />

$45,741 $50,373 $9,148 0.5<br />

Committed Tier:<br />

Backup<br />

$48,656 $1,730 $46,926 74.0<br />

Committed Tier:<br />

Backup<br />

$307,998 $119,599 $188,399 3.7<br />

Totals 604,354 47.0 3,843 36,976 134,876 $103,136 $578,512 $255,955 $336,337 3.3<br />

Building<br />

Benchmarking<br />

Baseline<br />

Implement Partnership Projects<br />

Implement SEP Projects<br />

Equivalent<br />

Electricity<br />

(kWh/yr)<br />

Equivalent<br />

Natural Gas<br />

(th/yr)<br />

Equivalent Electric<br />

<strong>Energy</strong> Use Index<br />

(kWh/sf-yr)<br />

Equivalent Natural<br />

Gas <strong>Energy</strong> Use<br />

Index (th/sf-yr)<br />

Source <strong>Energy</strong><br />

Use Index<br />

(kBTU/sf-yr)<br />

4,611,100 215,800 25.3 1.2<br />

377.7<br />

4,611,100 215,800 25.3 1.2<br />

377.7<br />

3,898,845 130,787 21.4 0.7<br />

291.0<br />

Assumed Incentives: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh<br />

th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm<br />

kWh/ton-hr: 0.8<br />

Cap 80% project cost<br />

th/ton-hr: 0.0<br />

Percent<br />

Savings<br />

(%)<br />

N/A<br />

0.0%<br />

23.0%<br />

Source <strong>Energy</strong> Use Conversion Factors:<br />

10.239 kBTU per kWh 100 kBTU per th


Historical <strong>Energy</strong> Use (06/07)<br />

Electricity<br />

(kWh/yr)<br />

6,784,350<br />

Steam<br />

(MMBTU/yr)<br />

Hot Water<br />

(MMBTU/yr)<br />

Monthly <strong>Energy</strong> Use (Electric)<br />

Metered Data Not Available<br />

Metered Data Not Available<br />

MOLECULR SCI<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location:<br />

Building Key: 04C4228C<br />

Funding Source: STATE<br />

Year Built:<br />

Natural Gas<br />

(th/yr)<br />

423,400<br />

LOS ANGELES<br />

Chilled Water<br />

(ton-hr/yr)<br />

Extrapolated N/A N/A Extrapolated N/A<br />

Monthly <strong>Energy</strong> Use (Gas/Heating Hot Water/Steam)<br />

Monthly <strong>Energy</strong> Use (Chilled Water)<br />

1993<br />

Basic Gross Area (sf): 178,666<br />

Building Type: COMPLEX<br />

Primary Asset Type: Office Support<br />

Secondary Asset Type: Office<br />

Weekly Load Profile (Electric)<br />

Metered Data Not Available<br />

Weekly Load Profile (Natural Gas/Heating Hot Water/Steam)<br />

Metered Data Not Available<br />

Weekly Load Profile (Chilled Water)<br />

Metered Data Not Available Metered Data Not Available


2006-2008 Partnership Projects<br />

<strong>Strategic</strong> <strong>Energy</strong> <strong>Plan</strong> Projects<br />

SEP ID<br />

Number Project Name<br />

MOLECULR SCI<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location:<br />

Building Key: 04C4228C<br />

Funding Source: STATE<br />

Year Built:<br />

Electric<br />

(kWh/yr)<br />

Peak<br />

Demand<br />

(kW)<br />

LOS ANGELES<br />

<strong>Plan</strong>ned Electric <strong>Plan</strong>ned Gas<br />

Savings<br />

Savings<br />

Project Description<br />

(kWh/yr)<br />

(th/yr)<br />

Upgrade vent and controls and install ZP sensors on 194 fume hoods 0 167,232<br />

Upgrade vent and controls and install ZP sensors on 26 fume hoods 0 22,410<br />

D1015 AHU - 5 VIV to VAV & SP Reset<br />

D1016 AHU 1, 2, 3, 4 & 6 Aircuity<br />

D3009 Monitoring Based Commissioning<br />

1993<br />

Building Savings Cost<br />

HW/Steam<br />

(MMBTU/yr)<br />

Gas<br />

(th/yr)<br />

Chilled<br />

Water<br />

(ton-hr/yr)<br />

Purchased<br />

Utility Cost<br />

Savings<br />

($/yr)<br />

10,294 0.0 16 0 1,857 $1,111<br />

2,629,450 68.0 13,688 0 104,815 $313,196<br />

337,679 38.0 0 36,269 0 $49,632<br />

Basic Gross Area (sf): 178,666<br />

Building Type: COMPLEX<br />

Primary Asset Type: Office Support<br />

Secondary Asset Type: Office<br />

Cost<br />

($)<br />

Project<br />

Cost<br />

($)<br />

Gross<br />

Potential<br />

Incentive<br />

($)<br />

Net<br />

Cost ($)<br />

Committed Tier:<br />

Simple<br />

Payback<br />

(yr)<br />

Backup<br />

$35,195 $3,027 $32,168 28.9<br />

Committed Tier:<br />

Backup<br />

$1,155,824 $822,292 $333,532 1.1<br />

Committed Tier:<br />

Backup<br />

$302,109 $117,312 $184,797 3.7<br />

Totals 2,977,423 106.0 13,704 36,269 106,672 $363,939 $1,493,128 $942,631 $550,497 1.5<br />

Building<br />

Benchmarking<br />

Baseline<br />

Implement Partnership Projects<br />

Implement SEP Projects<br />

Equivalent<br />

Electricity<br />

(kWh/yr)<br />

Equivalent<br />

Natural Gas<br />

(th/yr)<br />

Equivalent Electric<br />

<strong>Energy</strong> Use Index<br />

(kWh/sf-yr)<br />

Equivalent Natural<br />

Gas <strong>Energy</strong> Use<br />

Index (th/sf-yr)<br />

Source <strong>Energy</strong><br />

Use Index<br />

(kBTU/sf-yr)<br />

6,784,350 423,400 38.0 2.4<br />

625.8<br />

6,784,350 233,758 38.0 1.3<br />

519.6<br />

3,721,589 26,189 20.8 0.1<br />

227.9<br />

Assumed Incentives: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh<br />

th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm<br />

kWh/ton-hr: 0.8<br />

Cap 80% project cost<br />

th/ton-hr: 0.0<br />

Percent<br />

Savings<br />

(%)<br />

N/A<br />

17.0%<br />

56.1%<br />

Source <strong>Energy</strong> Use Conversion Factors:<br />

10.239 kBTU per kWh 100 kBTU per th


Historical <strong>Energy</strong> Use (06/07)<br />

Electricity<br />

(kWh/yr)<br />

2,629,200<br />

Steam<br />

(MMBTU/yr)<br />

Hot Water<br />

(MMBTU/yr)<br />

Monthly <strong>Energy</strong> Use (Electric)<br />

Metered Data Not Available<br />

Metered Data Not Available<br />

WOODEN/PS4<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location:<br />

Building Key: 04C4235<br />

Funding Source: STATE<br />

Year Built:<br />

Natural Gas<br />

(th/yr)<br />

123,000<br />

LOS ANGELES<br />

Chilled Water<br />

(ton-hr/yr)<br />

Extrapolated N/A N/A Extrapolated N/A<br />

Monthly <strong>Energy</strong> Use (Gas/Heating Hot Water/Steam)<br />

Monthly <strong>Energy</strong> Use (Chilled Water)<br />

1983<br />

Basic Gross Area (sf): 707,839<br />

Building Type: BASIC<br />

Primary Asset Type: Athletics<br />

Secondary Asset Type: Office<br />

Weekly Load Profile (Electric)<br />

Metered Data Not Available<br />

Weekly Load Profile (Natural Gas/Heating Hot Water/Steam)<br />

Metered Data Not Available<br />

Weekly Load Profile (Chilled Water)<br />

Metered Data Not Available Metered Data Not Available


<strong>Strategic</strong> <strong>Energy</strong> <strong>Plan</strong> Projects<br />

SEP ID<br />

Number Project Name<br />

D1028 AHU 1 VIV to VAV<br />

D1029 AHU 3 VIV to VAV & SP Reset<br />

D1030 CAV to VAV<br />

D1031 AHU 1 (Mcquay) SP reset<br />

D1032 AHU 1 Pace) SP reset<br />

D1033 AHU 2 Pace) SP reset<br />

D1034 AHU 4 CAV to VAV & DCV<br />

D3011 Monitoring Based Commissioning<br />

WOODEN/PS4<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location:<br />

Building Key: 04C4235<br />

Funding Source: STATE<br />

Year Built:<br />

Electric<br />

(kWh/yr)<br />

Peak<br />

Demand<br />

(kW)<br />

LOS ANGELES<br />

1983<br />

Building Savings Cost<br />

HW/Steam<br />

(MMBTU/yr)<br />

Gas<br />

(th/yr)<br />

Chilled<br />

Water<br />

(ton-hr/yr)<br />

Purchased<br />

Utility Cost<br />

Savings<br />

($/yr)<br />

22,785 0.0 183 0 10,374 $3,667<br />

58,384 1.0 434 0 24,388 $9,066<br />

236,777 57.0 -176 0 8,663 $20,419<br />

27,011 0.0 452 0 16,783 $5,922<br />

18,432 0.0 279 0 10,943 $3,847<br />

20,078 0.0 331 0 12,223 $4,359<br />

210,437 50.0 -282 0 2,584 $17,134<br />

159,945 18.0 0 21,811 0 $26,052<br />

D3203 Replace high pressure sodium fixtures with induction fixtures and install photocell control where appropriate<br />

397,003 45.0 0 0 0 $34,936<br />

Basic Gross Area (sf): 707,839<br />

Building Type: BASIC<br />

Primary Asset Type: Athletics<br />

Secondary Asset Type: Office<br />

Project<br />

Cost<br />

($)<br />

Gross<br />

Potential<br />

Incentive<br />

($)<br />

Net<br />

Cost ($)<br />

Committed Tier:<br />

Simple<br />

Payback<br />

(yr)<br />

Backup<br />

$36,733 $9,748 $26,985 7.4<br />

Committed Tier:<br />

Backup<br />

$65,921 $24,120 $41,801 4.6<br />

Committed Tier:<br />

Backup<br />

$125,784 $56,290 $69,494 3.4<br />

Committed Tier:<br />

Backup<br />

$47,848 $15,355 $32,493 5.5<br />

Committed Tier:<br />

Backup<br />

$2,784 $10,012 $557 0.1<br />

Committed Tier:<br />

Backup<br />

$2,784 $11,303 $557 0.1<br />

Committed Tier:<br />

Backup<br />

$62,008 $47,476 $14,532 0.8<br />

Committed Tier:<br />

Backup<br />

$175,619 $60,198 $115,421 4.4<br />

Committed Tier:<br />

Backup<br />

$286,838 $95,281 $191,557 5.5<br />

Totals 1,150,852 171.0 1,221 21,811 85,958 $125,403 $806,319 $329,783 $493,397 3.9<br />

Building<br />

Benchmarking<br />

Baseline<br />

Implement Partnership Projects<br />

Implement SEP Projects<br />

Equivalent<br />

Electricity<br />

(kWh/yr)<br />

Equivalent<br />

Natural Gas<br />

(th/yr)<br />

Equivalent Electric<br />

<strong>Energy</strong> Use Index<br />

(kWh/sf-yr)<br />

Equivalent Natural<br />

Gas <strong>Energy</strong> Use<br />

Index (th/sf-yr)<br />

Source <strong>Energy</strong><br />

Use Index<br />

(kBTU/sf-yr)<br />

2,629,200 123,000 3.7 0.2<br />

55.4<br />

2,629,200 123,000 3.7 0.2<br />

55.4<br />

1,409,582 85,927 2.0 0.1<br />

32.5<br />

Assumed Incentives: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh<br />

th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm<br />

kWh/ton-hr: 0.8<br />

Cap 80% project cost<br />

th/ton-hr: 0.0<br />

Percent<br />

Savings<br />

(%)<br />

N/A<br />

0.0%<br />

41.3%<br />

Source <strong>Energy</strong> Use Conversion Factors:<br />

10.239 kBTU per kWh 100 kBTU per th


Historical <strong>Energy</strong> Use (06/07)<br />

Electricity<br />

(kWh/yr)<br />

7,445,800<br />

Steam<br />

(MMBTU/yr)<br />

Hot Water<br />

(MMBTU/yr)<br />

Monthly <strong>Energy</strong> Use (Electric)<br />

Metered Data Not Available<br />

Metered Data Not Available<br />

ENGR BLDG 4<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location:<br />

Building Key: 04C4256A<br />

Funding Source: STATE<br />

Year Built:<br />

Natural Gas<br />

(th/yr)<br />

348,400<br />

LOS ANGELES<br />

Chilled Water<br />

(ton-hr/yr)<br />

Extrapolated N/A N/A Extrapolated N/A<br />

Monthly <strong>Energy</strong> Use (Gas/Heating Hot Water/Steam)<br />

Monthly <strong>Energy</strong> Use (Chilled Water)<br />

1990<br />

Basic Gross Area (sf): 294,124<br />

Building Type: COMPLEX<br />

Primary Asset Type: Office Support<br />

Secondary Asset Type: Office<br />

Weekly Load Profile (Electric)<br />

Metered Data Not Available<br />

Weekly Load Profile (Natural Gas/Heating Hot Water/Steam)<br />

Metered Data Not Available<br />

Weekly Load Profile (Chilled Water)<br />

Metered Data Not Available Metered Data Not Available


<strong>Strategic</strong> <strong>Energy</strong> <strong>Plan</strong> Projects<br />

SEP ID<br />

Number Project Name<br />

D1062 ACS - 1 to 5 - SP Reset<br />

D1063 ACS 8 (AHU-3) - Aircruity<br />

D1064 CF - 1 to 22 - VIV to VAV<br />

D1065 ACS 9 - CAV to VAV<br />

D3013 Monitoring Based Commissioning<br />

ENGR BLDG 4<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location:<br />

Building Key: 04C4256A<br />

Funding Source: STATE<br />

Year Built:<br />

Electric<br />

(kWh/yr)<br />

Peak<br />

Demand<br />

(kW)<br />

LOS ANGELES<br />

1990<br />

Building Savings Cost<br />

HW/Steam<br />

(MMBTU/yr)<br />

Gas<br />

(th/yr)<br />

Chilled<br />

Water<br />

(ton-hr/yr)<br />

Purchased<br />

Utility Cost<br />

Savings<br />

($/yr)<br />

283,121 3.0 3,127 0 155,143 $51,915<br />

242,891 22.0 3,191 0 162,129 $49,169<br />

743,261 143.0 0 0 601,695 $103,530<br />

25,138 4.0 815 0 39,788 $9,208<br />

555,894 64.0 0 59,707 0 $81,705<br />

Basic Gross Area (sf): 294,124<br />

Building Type: COMPLEX<br />

Primary Asset Type: Office Support<br />

Secondary Asset Type: Office<br />

Project<br />

Cost<br />

($)<br />

Gross<br />

Potential<br />

Incentive<br />

($)<br />

Net<br />

Cost ($)<br />

Committed Tier:<br />

Simple<br />

Payback<br />

(yr)<br />

Backup<br />

$126,983 $136,824 $25,397 0.5<br />

Committed Tier:<br />

Backup<br />

$1,551,693 $129,310 $1,422,383 28.9<br />

Committed Tier:<br />

Backup<br />

$755,712 $293,908 $461,804 4.5<br />

Committed Tier:<br />

Backup<br />

$32,243 $23,860 $8,383 0.9<br />

Committed Tier:<br />

Backup<br />

$497,340 $193,122 $304,218 3.7<br />

Totals 1,850,305 236.0 7,133 59,707 958,755 $295,529 $2,963,971 $777,024 $2,222,185 7.5<br />

Building<br />

Benchmarking<br />

Baseline<br />

Implement Partnership Projects<br />

Implement SEP Projects<br />

Equivalent<br />

Electricity<br />

(kWh/yr)<br />

Equivalent<br />

Natural Gas<br />

(th/yr)<br />

Equivalent Electric<br />

<strong>Energy</strong> Use Index<br />

(kWh/sf-yr)<br />

Equivalent Natural<br />

Gas <strong>Energy</strong> Use<br />

Index (th/sf-yr)<br />

Source <strong>Energy</strong><br />

Use Index<br />

(kBTU/sf-yr)<br />

7,445,800 348,400 25.3 1.2<br />

377.7<br />

7,445,800 348,400 25.3 1.2<br />

377.7<br />

4,828,491 199,531 16.4 0.7<br />

235.9<br />

Assumed Incentives: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh<br />

th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm<br />

kWh/ton-hr: 0.8<br />

Cap 80% project cost<br />

th/ton-hr: 0.0<br />

Percent<br />

Savings<br />

(%)<br />

N/A<br />

0.0%<br />

37.5%<br />

Source <strong>Energy</strong> Use Conversion Factors:<br />

10.239 kBTU per kWh 100 kBTU per th


Historical <strong>Energy</strong> Use (06/07)<br />

Electricity<br />

(kWh/yr)<br />

2,394,800<br />

Steam<br />

(MMBTU/yr)<br />

Hot Water<br />

(MMBTU/yr)<br />

Monthly <strong>Energy</strong> Use (Electric)<br />

Metered Data Not Available<br />

Metered Data Not Available<br />

FACMGMT BLDG<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location:<br />

Building Key: 04C4260<br />

Funding Source: STATE<br />

Year Built:<br />

Natural Gas<br />

(th/yr)<br />

112,100<br />

LOS ANGELES<br />

Chilled Water<br />

(ton-hr/yr)<br />

Extrapolated N/A N/A Extrapolated N/A<br />

Monthly <strong>Energy</strong> Use (Gas/Heating Hot Water/Steam)<br />

Monthly <strong>Energy</strong> Use (Chilled Water)<br />

1993<br />

Basic Gross Area (sf): 189,197<br />

Building Type: BASIC<br />

Primary Asset Type: Office<br />

Secondary Asset Type: Storage<br />

Weekly Load Profile (Electric)<br />

Metered Data Not Available<br />

Weekly Load Profile (Natural Gas/Heating Hot Water/Steam)<br />

Metered Data Not Available<br />

Weekly Load Profile (Chilled Water)<br />

Metered Data Not Available Metered Data Not Available


<strong>Strategic</strong> <strong>Energy</strong> <strong>Plan</strong> Projects<br />

SEP ID<br />

Number Project Name<br />

D1002 AHU 1 & 2 - SP Reset<br />

D3014 Monitoring Based Commissioning<br />

FACMGMT BLDG<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location:<br />

Building Key: 04C4260<br />

Funding Source: STATE<br />

Year Built:<br />

Electric<br />

(kWh/yr)<br />

Peak<br />

Demand<br />

(kW)<br />

LOS ANGELES<br />

1993<br />

Building Savings Cost<br />

HW/Steam<br />

(MMBTU/yr)<br />

Gas<br />

(th/yr)<br />

Chilled<br />

Water<br />

(ton-hr/yr)<br />

Purchased<br />

Utility Cost<br />

Savings<br />

($/yr)<br />

40,882 0.0 644 0 26,469 $8,811<br />

145,682 17.0 0 19,866 0 $23,729<br />

Basic Gross Area (sf): 189,197<br />

Building Type: BASIC<br />

Primary Asset Type: Office<br />

Secondary Asset Type: Storage<br />

Project<br />

Cost<br />

($)<br />

Gross<br />

Potential<br />

Incentive<br />

($)<br />

Net<br />

Cost ($)<br />

Committed Tier:<br />

Simple<br />

Payback<br />

(yr)<br />

Backup<br />

$46,233 $22,944 $23,289 2.6<br />

Committed Tier:<br />

Backup<br />

$159,960 $54,830 $105,130 4.4<br />

Totals 186,564 17.0 644 19,866 26,469 $32,540 $206,192 $77,774 $128,419 3.9<br />

Building<br />

Benchmarking<br />

Baseline<br />

Implement Partnership Projects<br />

Implement SEP Projects<br />

Equivalent<br />

Electricity<br />

(kWh/yr)<br />

Equivalent<br />

Natural Gas<br />

(th/yr)<br />

Equivalent Electric<br />

<strong>Energy</strong> Use Index<br />

(kWh/sf-yr)<br />

Equivalent Natural<br />

Gas <strong>Energy</strong> Use<br />

Index (th/sf-yr)<br />

Source <strong>Energy</strong><br />

Use Index<br />

(kBTU/sf-yr)<br />

2,394,800 112,100 12.7 0.6<br />

188.9<br />

2,394,800 112,100 12.7 0.6<br />

188.9<br />

2,187,061 84,184 11.6 0.4<br />

162.9<br />

Assumed Incentives: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh<br />

th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm<br />

kWh/ton-hr: 0.8<br />

Cap 80% project cost<br />

th/ton-hr: 0.0<br />

Percent<br />

Savings<br />

(%)<br />

N/A<br />

0.0%<br />

13.8%<br />

Source <strong>Energy</strong> Use Conversion Factors:<br />

10.239 kBTU per kWh 100 kBTU per th


Historical <strong>Energy</strong> Use (06/07)<br />

Electricity<br />

(kWh/yr)<br />

724,300<br />

Steam<br />

(MMBTU/yr)<br />

Hot Water<br />

(MMBTU/yr)<br />

Monthly <strong>Energy</strong> Use (Electric)<br />

Metered Data Not Available<br />

Metered Data Not Available<br />

TIVERTON HSE<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location:<br />

LOS ANGELES<br />

Building Key: 04C4265<br />

Funding Source: HOUSING<br />

Year Built:<br />

Natural Gas<br />

(th/yr)<br />

33,900<br />

Chilled Water<br />

(ton-hr/yr)<br />

Extrapolated N/A N/A Extrapolated N/A<br />

Monthly <strong>Energy</strong> Use (Gas/Heating Hot Water/Steam)<br />

Monthly <strong>Energy</strong> Use (Chilled Water)<br />

1993<br />

Basic Gross Area (sf): 121,634<br />

Building Type: BASIC<br />

Primary Asset Type: Residential<br />

Secondary Asset Type: Commons<br />

Weekly Load Profile (Electric)<br />

Metered Data Not Available<br />

Weekly Load Profile (Natural Gas/Heating Hot Water/Steam)<br />

Metered Data Not Available<br />

Weekly Load Profile (Chilled Water)<br />

Metered Data Not Available Metered Data Not Available


<strong>Strategic</strong> <strong>Energy</strong> <strong>Plan</strong> Projects<br />

SEP ID<br />

Number Project Name<br />

D3015 Monitoring Based Commissioning<br />

D6010 CT VFDs<br />

TIVERTON HSE<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location:<br />

Building Key: 04C4265<br />

Funding Source: HOUSING<br />

Year Built:<br />

Electric<br />

(kWh/yr)<br />

Peak<br />

Demand<br />

(kW)<br />

LOS ANGELES<br />

1993<br />

Building Savings Cost<br />

HW/Steam<br />

(MMBTU/yr)<br />

Gas<br />

(th/yr)<br />

Chilled<br />

Water<br />

(ton-hr/yr)<br />

Purchased<br />

Utility Cost<br />

Savings<br />

($/yr)<br />

44,062 5.0 0 6,009 0 $7,177<br />

24,661 4.0 0 0 0 $2,170<br />

Basic Gross Area (sf): 121,634<br />

Building Type: BASIC<br />

Primary Asset Type: Residential<br />

Secondary Asset Type: Commons<br />

Project<br />

Cost<br />

($)<br />

Gross<br />

Potential<br />

Incentive<br />

($)<br />

Net<br />

Cost ($)<br />

Committed Tier:<br />

Simple<br />

Payback<br />

(yr)<br />

Backup<br />

$48,381 $16,584 $31,797 4.4<br />

Committed Tier:<br />

Backup<br />

$10,928 $5,919 $5,009 2.3<br />

Totals 68,723 9.0 0 6,009 0 $9,347 $59,309 $22,503 $36,806 3.9<br />

Building<br />

Benchmarking<br />

Baseline<br />

Implement Partnership Projects<br />

Implement SEP Projects<br />

Equivalent<br />

Electricity<br />

(kWh/yr)<br />

Equivalent<br />

Natural Gas<br />

(th/yr)<br />

Equivalent Electric<br />

<strong>Energy</strong> Use Index<br />

(kWh/sf-yr)<br />

Assumed Incentives: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh<br />

th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm<br />

kWh/ton-hr: 0.8<br />

Cap 80% project cost<br />

th/ton-hr: 0.0<br />

Equivalent Natural<br />

Gas <strong>Energy</strong> Use<br />

Index (th/sf-yr)<br />

Source <strong>Energy</strong><br />

Use Index<br />

(kBTU/sf-yr)<br />

724,300 33,900 6.0 0.3<br />

88.8<br />

724,300 33,900 6.0 0.3<br />

88.8<br />

655,577 27,891 5.4 0.2<br />

78.1<br />

Percent<br />

Savings<br />

(%)<br />

N/A<br />

0.0%<br />

12.1%<br />

Source <strong>Energy</strong> Use Conversion Factors:<br />

10.239 kBTU per kWh 100 kBTU per th


Historical <strong>Energy</strong> Use (06/07)<br />

Electricity<br />

(kWh/yr)<br />

3,989,800<br />

Steam<br />

(MMBTU/yr)<br />

Hot Water<br />

(MMBTU/yr)<br />

Monthly <strong>Energy</strong> Use (Electric)<br />

Metered Data Not Available<br />

Metered Data Not Available<br />

WILSHIRE CTR<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location:<br />

Building Key: 04C4270<br />

Funding Source: OTHER<br />

Year Built:<br />

Natural Gas<br />

(th/yr)<br />

186,700<br />

LOS ANGELES<br />

Chilled Water<br />

(ton-hr/yr)<br />

Extrapolated N/A N/A Extrapolated N/A<br />

Monthly <strong>Energy</strong> Use (Gas/Heating Hot Water/Steam)<br />

Monthly <strong>Energy</strong> Use (Chilled Water)<br />

1981<br />

Basic Gross Area (sf): 455,912<br />

Building Type: BASIC<br />

Primary Asset Type: Office<br />

Secondary Asset Type: Retail<br />

Weekly Load Profile (Electric)<br />

Metered Data Not Available<br />

Weekly Load Profile (Natural Gas/Heating Hot Water/Steam)<br />

Metered Data Not Available<br />

Weekly Load Profile (Chilled Water)<br />

Metered Data Not Available Metered Data Not Available


<strong>Strategic</strong> <strong>Energy</strong> <strong>Plan</strong> Projects<br />

SEP ID<br />

Number Project Name<br />

D1027 AHU 1 & 2 SP Reset<br />

D3016 Monitoring Based Commissioning<br />

D6006 Replace Chiller<br />

WILSHIRE CTR<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location:<br />

Building Key: 04C4270<br />

Funding Source: OTHER<br />

Year Built:<br />

Electric<br />

(kWh/yr)<br />

Peak<br />

Demand<br />

(kW)<br />

LOS ANGELES<br />

1981<br />

Building Savings Cost<br />

HW/Steam<br />

(MMBTU/yr)<br />

Gas<br />

(th/yr)<br />

Chilled<br />

Water<br />

(ton-hr/yr)<br />

Purchased<br />

Utility Cost<br />

Savings<br />

($/yr)<br />

736,319 171.0 0 0 0 $64,796<br />

242,710 28.0 0 33,097 0 $39,533<br />

304,707 98.0 0 0 0 $26,814<br />

Basic Gross Area (sf): 455,912<br />

Building Type: BASIC<br />

Primary Asset Type: Office<br />

Secondary Asset Type: Retail<br />

Project<br />

Cost<br />

($)<br />

Gross<br />

Potential<br />

Incentive<br />

($)<br />

Net<br />

Cost ($)<br />

Committed Tier:<br />

Simple<br />

Payback<br />

(yr)<br />

Backup<br />

$1,729,872 $176,717 $1,553,155 24.0<br />

Committed Tier:<br />

Backup<br />

$266,496 $91,347 $175,149 4.4<br />

Committed Tier:<br />

Backup<br />

$847,454 $73,130 $774,324 28.9<br />

Totals 1,283,736 297.0 0 33,097 0 $131,143 $2,843,822 $341,194 $2,502,628 19.1<br />

Building<br />

Benchmarking<br />

Baseline<br />

Implement Partnership Projects<br />

Implement SEP Projects<br />

Equivalent<br />

Electricity<br />

(kWh/yr)<br />

Equivalent<br />

Natural Gas<br />

(th/yr)<br />

Equivalent Electric<br />

<strong>Energy</strong> Use Index<br />

(kWh/sf-yr)<br />

Equivalent Natural<br />

Gas <strong>Energy</strong> Use<br />

Index (th/sf-yr)<br />

Source <strong>Energy</strong><br />

Use Index<br />

(kBTU/sf-yr)<br />

3,989,800 186,700 8.8 0.4<br />

130.6<br />

3,989,800 186,700 8.8 0.4<br />

130.6<br />

2,706,064 153,603 5.9 0.3<br />

94.5<br />

Assumed Incentives: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh<br />

th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm<br />

kWh/ton-hr: 0.8<br />

Cap 80% project cost<br />

th/ton-hr: 0.0<br />

Percent<br />

Savings<br />

(%)<br />

N/A<br />

0.0%<br />

27.6%<br />

Source <strong>Energy</strong> Use Conversion Factors:<br />

10.239 kBTU per kWh 100 kBTU per th


Historical <strong>Energy</strong> Use (06/07)<br />

Electricity<br />

(kWh/yr)<br />

1,359,700<br />

Steam<br />

(MMBTU/yr)<br />

Hot Water<br />

(MMBTU/yr)<br />

Monthly <strong>Energy</strong> Use (Electric)<br />

Metered Data Not Available<br />

Metered Data Not Available<br />

CANYON POINT<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location:<br />

LOS ANGELES<br />

Building Key: 04C4302A<br />

Funding Source: HOUSING<br />

Year Built:<br />

Natural Gas<br />

(th/yr)<br />

63,600<br />

Chilled Water<br />

(ton-hr/yr)<br />

Extrapolated N/A N/A Extrapolated N/A<br />

Monthly <strong>Energy</strong> Use (Gas/Heating Hot Water/Steam)<br />

Monthly <strong>Energy</strong> Use (Chilled Water)<br />

1991<br />

Basic Gross Area (sf): 107,419<br />

Building Type: BASIC<br />

Primary Asset Type: Residential<br />

Secondary Asset Type: Commons<br />

Weekly Load Profile (Electric)<br />

Metered Data Not Available<br />

Weekly Load Profile (Natural Gas/Heating Hot Water/Steam)<br />

Metered Data Not Available<br />

Weekly Load Profile (Chilled Water)<br />

Metered Data Not Available Metered Data Not Available


<strong>Strategic</strong> <strong>Energy</strong> <strong>Plan</strong> Projects<br />

SEP ID<br />

Number Project Name<br />

D3019 Monitoring Based Commissioning<br />

D6001 Replace Boiler<br />

CANYON POINT<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location:<br />

Building Key: 04C4302A<br />

Funding Source: HOUSING<br />

Year Built:<br />

Electric<br />

(kWh/yr)<br />

Peak<br />

Demand<br />

(kW)<br />

LOS ANGELES<br />

1991<br />

Building Savings Cost<br />

HW/Steam<br />

(MMBTU/yr)<br />

Gas<br />

(th/yr)<br />

Chilled<br />

Water<br />

(ton-hr/yr)<br />

Purchased<br />

Utility Cost<br />

Savings<br />

($/yr)<br />

82,713 9.0 0 11,279 0 $13,472<br />

0 0.0 0 2,494 0 $1,370<br />

Basic Gross Area (sf): 107,419<br />

Building Type: BASIC<br />

Primary Asset Type: Residential<br />

Secondary Asset Type: Commons<br />

Project<br />

Cost<br />

($)<br />

Gross<br />

Potential<br />

Incentive<br />

($)<br />

Net<br />

Cost ($)<br />

Committed Tier:<br />

Simple<br />

Payback<br />

(yr)<br />

Backup<br />

$90,818 $31,130 $59,688 4.4<br />

Committed Tier:<br />

Backup<br />

$78,323 $2,494 $75,829 55.4<br />

Totals 82,713 9.0 0 13,773 0 $14,842 $169,140 $33,624 $135,517 9.1<br />

Building<br />

Benchmarking<br />

Baseline<br />

Implement Partnership Projects<br />

Implement SEP Projects<br />

Equivalent<br />

Electricity<br />

(kWh/yr)<br />

Equivalent<br />

Natural Gas<br />

(th/yr)<br />

Equivalent Electric<br />

<strong>Energy</strong> Use Index<br />

(kWh/sf-yr)<br />

Equivalent Natural<br />

Gas <strong>Energy</strong> Use<br />

Index (th/sf-yr)<br />

Source <strong>Energy</strong><br />

Use Index<br />

(kBTU/sf-yr)<br />

1,359,700 63,600 12.7 0.6<br />

188.8<br />

1,359,700 63,600 12.7 0.6<br />

188.8<br />

1,276,987 49,827 11.9 0.5<br />

168.1<br />

Assumed Incentives: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh<br />

th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm<br />

kWh/ton-hr: 0.8<br />

Cap 80% project cost<br />

th/ton-hr: 0.0<br />

Percent<br />

Savings<br />

(%)<br />

N/A<br />

0.0%<br />

11.0%<br />

Source <strong>Energy</strong> Use Conversion Factors:<br />

10.239 kBTU per kWh 100 kBTU per th


Historical <strong>Energy</strong> Use (06/07)<br />

Electricity<br />

(kWh/yr)<br />

1,823,500<br />

Steam<br />

(MMBTU/yr)<br />

Hot Water<br />

(MMBTU/yr)<br />

Monthly <strong>Energy</strong> Use (Electric)<br />

Metered Data Not Available<br />

Metered Data Not Available<br />

COVEL COMMON<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location:<br />

LOS ANGELES<br />

Building Key: 04C4302D<br />

Funding Source: HOUSING<br />

Year Built:<br />

Natural Gas<br />

(th/yr)<br />

85,300<br />

Chilled Water<br />

(ton-hr/yr)<br />

Extrapolated N/A N/A Extrapolated N/A<br />

Monthly <strong>Energy</strong> Use (Gas/Heating Hot Water/Steam)<br />

Monthly <strong>Energy</strong> Use (Chilled Water)<br />

1992<br />

Basic Gross Area (sf): 144,067<br />

Building Type: BASIC<br />

Primary Asset Type: Office<br />

Secondary Asset Type: Food Service<br />

Weekly Load Profile (Electric)<br />

Metered Data Not Available<br />

Weekly Load Profile (Natural Gas/Heating Hot Water/Steam)<br />

Metered Data Not Available<br />

Weekly Load Profile (Chilled Water)<br />

Metered Data Not Available Metered Data Not Available


<strong>Strategic</strong> <strong>Energy</strong> <strong>Plan</strong> Projects<br />

SEP ID<br />

Number Project Name<br />

COVEL COMMON<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location:<br />

Building Key: 04C4302D<br />

Funding Source: HOUSING<br />

Year Built:<br />

Electric<br />

(kWh/yr)<br />

D1006 DAC 1 to 4 & DAHU-1 - VIV to VAV SP Reset<br />

D3020 Monitoring Based Commissioning<br />

D6002 Replace Boiler<br />

Peak<br />

Demand<br />

(kW)<br />

LOS ANGELES<br />

1992<br />

Building Savings Cost<br />

HW/Steam<br />

(MMBTU/yr)<br />

Gas<br />

(th/yr)<br />

Chilled<br />

Water<br />

(ton-hr/yr)<br />

Purchased<br />

Utility Cost<br />

Savings<br />

($/yr)<br />

287,180 2.0 0 16,383 0 $34,268<br />

110,932 13.0 0 15,127 0 $18,069<br />

0 0.0 0 4,987 0 $2,738<br />

Basic Gross Area (sf): 144,067<br />

Building Type: BASIC<br />

Primary Asset Type: Office<br />

Secondary Asset Type: Food Service<br />

Project<br />

Cost<br />

($)<br />

Gross<br />

Potential<br />

Incentive<br />

($)<br />

Net<br />

Cost ($)<br />

Committed Tier:<br />

Simple<br />

Payback<br />

(yr)<br />

Backup<br />

$105,987 $85,306 $21,197 0.6<br />

Committed Tier:<br />

Backup<br />

$121,803 $41,751 $80,052 4.4<br />

Committed Tier:<br />

Backup<br />

$156,646 $4,987 $151,659 55.4<br />

Totals 398,112 15.0 0 36,497 0 $55,075 $384,435 $132,044 $252,908 4.6<br />

Building<br />

Benchmarking<br />

Baseline<br />

Implement Partnership Projects<br />

Implement SEP Projects<br />

Equivalent<br />

Electricity<br />

(kWh/yr)<br />

Equivalent<br />

Natural Gas<br />

(th/yr)<br />

Equivalent Electric<br />

<strong>Energy</strong> Use Index<br />

(kWh/sf-yr)<br />

Equivalent Natural<br />

Gas <strong>Energy</strong> Use<br />

Index (th/sf-yr)<br />

Source <strong>Energy</strong><br />

Use Index<br />

(kBTU/sf-yr)<br />

1,823,500 85,300 12.7 0.6<br />

188.8<br />

1,823,500 85,300 12.7 0.6<br />

188.8<br />

1,425,388 48,803 9.9 0.3<br />

135.2<br />

Assumed Incentives: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh<br />

th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm<br />

kWh/ton-hr: 0.8<br />

Cap 80% project cost<br />

th/ton-hr: 0.0<br />

Percent<br />

Savings<br />

(%)<br />

N/A<br />

0.0%<br />

28.4%<br />

Source <strong>Energy</strong> Use Conversion Factors:<br />

10.239 kBTU per kWh 100 kBTU per th


Historical <strong>Energy</strong> Use (06/07)<br />

Electricity<br />

(kWh/yr)<br />

896,400<br />

Steam<br />

(MMBTU/yr)<br />

Hot Water<br />

(MMBTU/yr)<br />

Monthly <strong>Energy</strong> Use (Electric)<br />

Metered Data Not Available<br />

Metered Data Not Available<br />

KERCKHOFF<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location:<br />

LOS ANGELES<br />

Building Key: 04C4310<br />

Funding Source: HOUSING<br />

Year Built:<br />

Natural Gas<br />

(th/yr)<br />

41,900<br />

Chilled Water<br />

(ton-hr/yr)<br />

Extrapolated N/A N/A Extrapolated N/A<br />

Monthly <strong>Energy</strong> Use (Gas/Heating Hot Water/Steam)<br />

Monthly <strong>Energy</strong> Use (Chilled Water)<br />

1930<br />

Basic Gross Area (sf): 70,820<br />

Building Type: BASIC<br />

Primary Asset Type: Office<br />

Secondary Asset Type: Commons<br />

Weekly Load Profile (Electric)<br />

Metered Data Not Available<br />

Weekly Load Profile (Natural Gas/Heating Hot Water/Steam)<br />

Metered Data Not Available<br />

Weekly Load Profile (Chilled Water)<br />

Metered Data Not Available Metered Data Not Available


<strong>Strategic</strong> <strong>Energy</strong> <strong>Plan</strong> Projects<br />

SEP ID<br />

Number Project Name<br />

D1007 AHU 1 SP Reset<br />

D1008 CAV to VAV - AHU 2<br />

D3021 Monitoring Based Commissioning<br />

KERCKHOFF<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location:<br />

Building Key: 04C4310<br />

Funding Source: HOUSING<br />

Year Built:<br />

Electric<br />

(kWh/yr)<br />

Peak<br />

Demand<br />

(kW)<br />

LOS ANGELES<br />

1930<br />

Building Savings Cost<br />

HW/Steam<br />

(MMBTU/yr)<br />

Gas<br />

(th/yr)<br />

Chilled<br />

Water<br />

(ton-hr/yr)<br />

Purchased<br />

Utility Cost<br />

Savings<br />

($/yr)<br />

31,578 0.0 451 0 18,206 $6,409<br />

29,236 1.0 226 0 12,178 $4,585<br />

54,531 6.0 0 7,436 0 $8,882<br />

Basic Gross Area (sf): 70,820<br />

Building Type: BASIC<br />

Primary Asset Type: Office<br />

Secondary Asset Type: Commons<br />

Project<br />

Cost<br />

($)<br />

Gross<br />

Potential<br />

Incentive<br />

($)<br />

Net<br />

Cost ($)<br />

Committed Tier:<br />

Simple<br />

Payback<br />

(yr)<br />

Backup<br />

$2,784 $16,712 $557 0.1<br />

Committed Tier:<br />

Backup<br />

$28,262 $12,180 $16,082 3.5<br />

Committed Tier:<br />

Backup<br />

$59,875 $20,523 $39,352 4.4<br />

Totals 115,345 7.0 677 7,436 30,384 $19,876 $90,921 $49,415 $55,991 2.8<br />

Building<br />

Benchmarking<br />

Baseline<br />

Implement Partnership Projects<br />

Implement SEP Projects<br />

Equivalent<br />

Electricity<br />

(kWh/yr)<br />

Equivalent<br />

Natural Gas<br />

(th/yr)<br />

Equivalent Electric<br />

<strong>Energy</strong> Use Index<br />

(kWh/sf-yr)<br />

Assumed Incentives: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh<br />

th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm<br />

kWh/ton-hr: 0.8<br />

Cap 80% project cost<br />

th/ton-hr: 0.0<br />

Equivalent Natural<br />

Gas <strong>Energy</strong> Use<br />

Index (th/sf-yr)<br />

Source <strong>Energy</strong><br />

Use Index<br />

(kBTU/sf-yr)<br />

896,400 41,900 12.7 0.6<br />

188.8<br />

896,400 41,900 12.7 0.6<br />

188.8<br />

756,748 26,002 10.7 0.4<br />

146.1<br />

Percent<br />

Savings<br />

(%)<br />

N/A<br />

0.0%<br />

22.6%<br />

Source <strong>Energy</strong> Use Conversion Factors:<br />

10.239 kBTU per kWh 100 kBTU per th


Historical <strong>Energy</strong> Use (06/07)<br />

Electricity<br />

(kWh/yr)<br />

3,169,500<br />

Steam<br />

(MMBTU/yr)<br />

Hot Water<br />

(MMBTU/yr)<br />

Monthly <strong>Energy</strong> Use (Electric)<br />

Metered Data Not Available<br />

Metered Data Not Available<br />

GONDA CENTER<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location:<br />

Building Key: 04C4315<br />

Funding Source: STATE<br />

Year Built:<br />

Natural Gas<br />

(th/yr)<br />

148,300<br />

LOS ANGELES<br />

Chilled Water<br />

(ton-hr/yr)<br />

Extrapolated N/A N/A Extrapolated N/A<br />

Monthly <strong>Energy</strong> Use (Gas/Heating Hot Water/Steam)<br />

Monthly <strong>Energy</strong> Use (Chilled Water)<br />

1998<br />

Basic Gross Area (sf): 125,202<br />

Building Type: COMPLEX<br />

Primary Asset Type: Office Support<br />

Secondary Asset Type: Office<br />

Weekly Load Profile (Electric)<br />

Metered Data Not Available<br />

Weekly Load Profile (Natural Gas/Heating Hot Water/Steam)<br />

Metered Data Not Available<br />

Weekly Load Profile (Chilled Water)<br />

Metered Data Not Available Metered Data Not Available


<strong>Strategic</strong> <strong>Energy</strong> <strong>Plan</strong> Projects<br />

SEP ID<br />

Number Project Name<br />

D1005 CV Rebalance<br />

D3022 Monitoring Based Commissioning<br />

GONDA CENTER<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location:<br />

Building Key: 04C4315<br />

Funding Source: STATE<br />

Year Built:<br />

Electric<br />

(kWh/yr)<br />

Peak<br />

Demand<br />

(kW)<br />

LOS ANGELES<br />

1998<br />

Building Savings Cost<br />

HW/Steam<br />

(MMBTU/yr)<br />

Gas<br />

(th/yr)<br />

Chilled<br />

Water<br />

(ton-hr/yr)<br />

Purchased<br />

Utility Cost<br />

Savings<br />

($/yr)<br />

211,550 24.0 1,194 0 59,189 $28,923<br />

236,632 27.0 0 25,416 0 $34,780<br />

Basic Gross Area (sf): 125,202<br />

Building Type: COMPLEX<br />

Primary Asset Type: Office Support<br />

Secondary Asset Type: Office<br />

Project<br />

Cost<br />

($)<br />

Gross<br />

Potential<br />

Incentive<br />

($)<br />

Net<br />

Cost ($)<br />

Committed Tier:<br />

Simple<br />

Payback<br />

(yr)<br />

Backup<br />

$86,096 $77,061 $17,219 0.6<br />

Committed Tier:<br />

Backup<br />

$211,707 $82,208 $129,499 3.7<br />

Totals 448,182 51.0 1,194 25,416 59,189 $63,703 $297,804 $159,269 $146,718 2.3<br />

Building<br />

Benchmarking<br />

Baseline<br />

Implement Partnership Projects<br />

Implement SEP Projects<br />

Equivalent<br />

Electricity<br />

(kWh/yr)<br />

Equivalent<br />

Natural Gas<br />

(th/yr)<br />

Equivalent Electric<br />

<strong>Energy</strong> Use Index<br />

(kWh/sf-yr)<br />

Equivalent Natural<br />

Gas <strong>Energy</strong> Use<br />

Index (th/sf-yr)<br />

Source <strong>Energy</strong><br />

Use Index<br />

(kBTU/sf-yr)<br />

3,169,500 148,300 25.3 1.2<br />

377.6<br />

3,169,500 148,300 25.3 1.2<br />

377.6<br />

2,673,967 107,959 21.4 0.9<br />

304.9<br />

Assumed Incentives: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh<br />

th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm<br />

kWh/ton-hr: 0.8<br />

Cap 80% project cost<br />

th/ton-hr: 0.0<br />

Percent<br />

Savings<br />

(%)<br />

N/A<br />

0.0%<br />

19.3%<br />

Source <strong>Energy</strong> Use Conversion Factors:<br />

10.239 kBTU per kWh 100 kBTU per th


Historical <strong>Energy</strong> Use (06/07)<br />

Electricity<br />

(kWh/yr)<br />

3,486,400<br />

Steam<br />

(MMBTU/yr)<br />

Hot Water<br />

(MMBTU/yr)<br />

Monthly <strong>Energy</strong> Use (Electric)<br />

LAW<br />

Metered Data Not Available<br />

Metered Data Not Available<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location:<br />

Building Key: 04C4317<br />

Funding Source: STATE<br />

Year Built:<br />

Natural Gas<br />

(th/yr)<br />

163,100<br />

LOS ANGELES<br />

Chilled Water<br />

(ton-hr/yr)<br />

Extrapolated N/A N/A Extrapolated N/A<br />

Monthly <strong>Energy</strong> Use (Gas/Heating Hot Water/Steam)<br />

Monthly <strong>Energy</strong> Use (Chilled Water)<br />

1951<br />

Basic Gross Area (sf): 275,439<br />

Building Type: BASIC<br />

Primary Asset Type: Library<br />

Secondary Asset Type: Office<br />

Weekly Load Profile (Electric)<br />

Metered Data Not Available<br />

Weekly Load Profile (Natural Gas/Heating Hot Water/Steam)<br />

Metered Data Not Available<br />

Weekly Load Profile (Chilled Water)<br />

Metered Data Not Available Metered Data Not Available


<strong>Strategic</strong> <strong>Energy</strong> <strong>Plan</strong> Projects<br />

SEP ID<br />

Number Project Name<br />

D1043 SF 1 & 2 SP Reset<br />

D1044 SF 3 & 7 VIV to VAV & SP Reset<br />

D1045 S-4 CAV to VAV<br />

D1046 S-5 & 6 CAV to VAV<br />

D1047 S-8 CAV to VAV<br />

D3023 Monitoring Based Commissioning<br />

LAW<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location:<br />

Building Key: 04C4317<br />

Funding Source: STATE<br />

Year Built:<br />

Electric<br />

(kWh/yr)<br />

Peak<br />

Demand<br />

(kW)<br />

LOS ANGELES<br />

1951<br />

Building Savings Cost<br />

HW/Steam<br />

(MMBTU/yr)<br />

Gas<br />

(th/yr)<br />

Chilled<br />

Water<br />

(ton-hr/yr)<br />

Purchased<br />

Utility Cost<br />

Savings<br />

($/yr)<br />

47,789 0.0 393 0 6,684 $6,787<br />

139,406 1.0 526 0 27,871 $16,922<br />

16,081 1.0 449 0 38,223 $6,302<br />

115,646 4.0 834 0 73,910 $19,439<br />

27,915 1.0 200 0 12,057 $4,319<br />

212,088 24.0 0 28,921 0 $34,545<br />

Basic Gross Area (sf): 275,439<br />

Building Type: BASIC<br />

Primary Asset Type: Library<br />

Secondary Asset Type: Office<br />

Project<br />

Cost<br />

($)<br />

Gross<br />

Potential<br />

Incentive<br />

($)<br />

Net<br />

Cost ($)<br />

Committed Tier:<br />

Simple<br />

Payback<br />

(yr)<br />

Backup<br />

$46,817 $17,665 $29,152 4.3<br />

Committed Tier:<br />

Backup<br />

$96,194 $45,384 $50,810 3.0<br />

Committed Tier:<br />

Backup<br />

$30,085 $16,811 $13,274 2.1<br />

Committed Tier:<br />

Backup<br />

$81,053 $52,371 $28,682 1.5<br />

Committed Tier:<br />

Backup<br />

$30,759 $11,515 $19,244 4.5<br />

Committed Tier:<br />

Backup<br />

$232,872 $79,822 $153,050 4.4<br />

Totals 558,925 31.0 2,402 28,921 158,745 $88,314 $517,781 $223,568 $294,212 3.3<br />

Building<br />

Benchmarking<br />

Baseline<br />

Implement Partnership Projects<br />

Implement SEP Projects<br />

Equivalent<br />

Electricity<br />

(kWh/yr)<br />

Equivalent<br />

Natural Gas<br />

(th/yr)<br />

Equivalent Electric<br />

<strong>Energy</strong> Use Index<br />

(kWh/sf-yr)<br />

Equivalent Natural<br />

Gas <strong>Energy</strong> Use<br />

Index (th/sf-yr)<br />

Source <strong>Energy</strong><br />

Use Index<br />

(kBTU/sf-yr)<br />

3,486,400 163,100 12.7 0.6<br />

188.8<br />

3,486,400 163,100 12.7 0.6<br />

188.8<br />

2,800,479 104,154 10.2 0.4<br />

141.9<br />

Assumed Incentives: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh<br />

th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm<br />

kWh/ton-hr: 0.8<br />

Cap 80% project cost<br />

th/ton-hr: 0.0<br />

Percent<br />

Savings<br />

(%)<br />

N/A<br />

0.0%<br />

24.8%<br />

Source <strong>Energy</strong> Use Conversion Factors:<br />

10.239 kBTU per kWh 100 kBTU per th


Historical <strong>Energy</strong> Use (06/07)<br />

Electricity<br />

(kWh/yr)<br />

2,111,900<br />

Steam<br />

(MMBTU/yr)<br />

Hot Water<br />

(MMBTU/yr)<br />

Monthly <strong>Energy</strong> Use (Electric)<br />

Metered Data Not Available<br />

Metered Data Not Available<br />

POWELL LIB<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location:<br />

Building Key: 04C4318A<br />

Funding Source: STATE<br />

Year Built:<br />

Natural Gas<br />

(th/yr)<br />

98,800<br />

LOS ANGELES<br />

Chilled Water<br />

(ton-hr/yr)<br />

Extrapolated N/A N/A Extrapolated N/A<br />

Monthly <strong>Energy</strong> Use (Gas/Heating Hot Water/Steam)<br />

Monthly <strong>Energy</strong> Use (Chilled Water)<br />

1930<br />

Basic Gross Area (sf): 166,846<br />

Building Type: BASIC<br />

Primary Asset Type: Library<br />

Secondary Asset Type: Office<br />

Weekly Load Profile (Electric)<br />

Metered Data Not Available<br />

Weekly Load Profile (Natural Gas/Heating Hot Water/Steam)<br />

Metered Data Not Available<br />

Weekly Load Profile (Chilled Water)<br />

Metered Data Not Available Metered Data Not Available


<strong>Strategic</strong> <strong>Energy</strong> <strong>Plan</strong> Projects<br />

SEP ID<br />

Number Project Name<br />

D1017 S-1 CAV to VAV<br />

D1018 AH 1 to 4, 17 & 37 CAV to VAV with DCV<br />

D1019 AH-19 CAV to VAV<br />

D1020 AH 18, 38 & 39 CAV to VAV<br />

D1021 AH 20 CAV to VAV<br />

D3024 Monitoring Based Commissioning<br />

POWELL LIB<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location:<br />

Building Key: 04C4318A<br />

Funding Source: STATE<br />

Year Built:<br />

Electric<br />

(kWh/yr)<br />

Peak<br />

Demand<br />

(kW)<br />

LOS ANGELES<br />

1930<br />

Building Savings Cost<br />

HW/Steam<br />

(MMBTU/yr)<br />

Gas<br />

(th/yr)<br />

Chilled<br />

Water<br />

(ton-hr/yr)<br />

Purchased<br />

Utility Cost<br />

Savings<br />

($/yr)<br />

7,870 1.0 143 0 7,191 $1,933<br />

44,410 10.0 -23 0 4,351 $4,057<br />

79,947 7.0 532 0 38,959 $12,425<br />

23,523 5.0 -3 0 2,409 $2,206<br />

45,021 4.0 396 0 32,750 $8,211<br />

128,471 15.0 0 17,519 0 $20,925<br />

Basic Gross Area (sf): 166,846<br />

Building Type: BASIC<br />

Primary Asset Type: Library<br />

Secondary Asset Type: Office<br />

Project<br />

Cost<br />

($)<br />

Gross<br />

Potential<br />

Incentive<br />

($)<br />

Net<br />

Cost ($)<br />

Committed Tier:<br />

Simple<br />

Payback<br />

(yr)<br />

Backup<br />

$36,901 $5,057 $31,844 16.5<br />

Committed Tier:<br />

Backup<br />

$48,385 $11,206 $37,179 9.2<br />

Committed Tier:<br />

Backup<br />

$46,563 $33,317 $13,246 1.1<br />

Committed Tier:<br />

Backup<br />

$19,798 $6,071 $13,727 6.2<br />

Committed Tier:<br />

Backup<br />

$44,343 $22,043 $22,300 2.7<br />

Committed Tier:<br />

Backup<br />

$141,062 $48,352 $92,710 4.4<br />

Totals 329,242 42.0 1,045 17,519 85,660 $49,759 $337,051 $126,046 $211,006 4.2<br />

Building<br />

Benchmarking<br />

Baseline<br />

Implement Partnership Projects<br />

Implement SEP Projects<br />

Equivalent<br />

Electricity<br />

(kWh/yr)<br />

Equivalent<br />

Natural Gas<br />

(th/yr)<br />

Equivalent Electric<br />

<strong>Energy</strong> Use Index<br />

(kWh/sf-yr)<br />

Equivalent Natural<br />

Gas <strong>Energy</strong> Use<br />

Index (th/sf-yr)<br />

Source <strong>Energy</strong><br />

Use Index<br />

(kBTU/sf-yr)<br />

2,111,900 98,800 12.7 0.6<br />

188.8<br />

2,111,900 98,800 12.7 0.6<br />

188.8<br />

1,714,130 68,219 10.3 0.4<br />

146.1<br />

Assumed Incentives: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh<br />

th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm<br />

kWh/ton-hr: 0.8<br />

Cap 80% project cost<br />

th/ton-hr: 0.0<br />

Percent<br />

Savings<br />

(%)<br />

N/A<br />

0.0%<br />

22.6%<br />

Source <strong>Energy</strong> Use Conversion Factors:<br />

10.239 kBTU per kWh 100 kBTU per th


Historical <strong>Energy</strong> Use (06/07)<br />

Electricity<br />

(kWh/yr)<br />

5,432,900<br />

Steam<br />

(MMBTU/yr)<br />

Hot Water<br />

(MMBTU/yr)<br />

Monthly <strong>Energy</strong> Use (Electric)<br />

Metered Data Not Available<br />

Metered Data Not Available<br />

LIFE SCIENCE<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location:<br />

Building Key: 04C4320<br />

Funding Source: STATE<br />

Year Built:<br />

Natural Gas<br />

(th/yr)<br />

254,200<br />

LOS ANGELES<br />

Chilled Water<br />

(ton-hr/yr)<br />

Extrapolated N/A N/A Extrapolated N/A<br />

Monthly <strong>Energy</strong> Use (Gas/Heating Hot Water/Steam)<br />

Monthly <strong>Energy</strong> Use (Chilled Water)<br />

1954<br />

Basic Gross Area (sf): 214,613<br />

Building Type: COMPLEX<br />

Primary Asset Type: Office Support<br />

Secondary Asset Type: Laboratory<br />

Weekly Load Profile (Electric)<br />

Metered Data Not Available<br />

Weekly Load Profile (Natural Gas/Heating Hot Water/Steam)<br />

Metered Data Not Available<br />

Weekly Load Profile (Chilled Water)<br />

Metered Data Not Available Metered Data Not Available


<strong>Strategic</strong> <strong>Energy</strong> <strong>Plan</strong> Projects<br />

SEP ID<br />

Number Project Name<br />

D1009 Vivarium - CV Rebalance<br />

D1010 SF - 4 & 5 - Aircuity<br />

D3025 Monitoring Based Commissioning<br />

LIFE SCIENCE<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location:<br />

Building Key: 04C4320<br />

Funding Source: STATE<br />

Year Built:<br />

Electric<br />

(kWh/yr)<br />

Peak<br />

Demand<br />

(kW)<br />

LOS ANGELES<br />

1954<br />

Building Savings Cost<br />

HW/Steam<br />

(MMBTU/yr)<br />

Gas<br />

(th/yr)<br />

Chilled<br />

Water<br />

(ton-hr/yr)<br />

Purchased<br />

Utility Cost<br />

Savings<br />

($/yr)<br />

0 0.0 725 0 43,530 $6,739<br />

350,121 32.0 5,889 0 299,188 $82,105<br />

405,619 46.0 0 43,566 0 $59,617<br />

Basic Gross Area (sf): 214,613<br />

Building Type: COMPLEX<br />

Primary Asset Type: Office Support<br />

Secondary Asset Type: Laboratory<br />

Project<br />

Cost<br />

($)<br />

Gross<br />

Potential<br />

Incentive<br />

($)<br />

Net<br />

Cost ($)<br />

Committed Tier:<br />

Simple<br />

Payback<br />

(yr)<br />

Backup<br />

$58,784 $17,420 $41,364 6.1<br />

Committed Tier:<br />

Backup<br />

$2,503,946 $215,086 $2,288,860 27.9<br />

Committed Tier:<br />

Backup<br />

$362,894 $140,915 $221,979 3.7<br />

Totals 755,740 78.0 6,614 43,566 342,718 $148,461 $2,925,624 $373,421 $2,552,203 17.2<br />

Building<br />

Benchmarking<br />

Baseline<br />

Implement Partnership Projects<br />

Implement SEP Projects<br />

Equivalent<br />

Electricity<br />

(kWh/yr)<br />

Equivalent<br />

Natural Gas<br />

(th/yr)<br />

Equivalent Electric<br />

<strong>Energy</strong> Use Index<br />

(kWh/sf-yr)<br />

Equivalent Natural<br />

Gas <strong>Energy</strong> Use<br />

Index (th/sf-yr)<br />

Source <strong>Energy</strong><br />

Use Index<br />

(kBTU/sf-yr)<br />

5,432,900 254,200 25.3 1.2<br />

377.6<br />

5,432,900 254,200 25.3 1.2<br />

377.6<br />

4,402,986 127,959 20.5 0.6<br />

269.7<br />

Assumed Incentives: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh<br />

th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm<br />

kWh/ton-hr: 0.8<br />

Cap 80% project cost<br />

th/ton-hr: 0.0<br />

Percent<br />

Savings<br />

(%)<br />

N/A<br />

0.0%<br />

28.6%<br />

Source <strong>Energy</strong> Use Conversion Factors:<br />

10.239 kBTU per kWh 100 kBTU per th


Historical <strong>Energy</strong> Use (06/07)<br />

Electricity<br />

(kWh/yr)<br />

2,387,400<br />

Steam<br />

(MMBTU/yr)<br />

Hot Water<br />

(MMBTU/yr)<br />

Monthly <strong>Energy</strong> Use (Electric)<br />

Metered Data Not Available<br />

Metered Data Not Available<br />

DORIS STEIN<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location:<br />

Building Key: 04C4325<br />

Funding Source: STATE<br />

Year Built:<br />

Natural Gas<br />

(th/yr)<br />

111,700<br />

LOS ANGELES<br />

Chilled Water<br />

(ton-hr/yr)<br />

Extrapolated N/A N/A Extrapolated N/A<br />

Monthly <strong>Energy</strong> Use (Gas/Heating Hot Water/Steam)<br />

Monthly <strong>Energy</strong> Use (Chilled Water)<br />

1989<br />

Basic Gross Area (sf): 94,309<br />

Building Type: COMPLEX<br />

Primary Asset Type: Office<br />

Secondary Asset Type: Hospitals<br />

Weekly Load Profile (Electric)<br />

Metered Data Not Available<br />

Weekly Load Profile (Natural Gas/Heating Hot Water/Steam)<br />

Metered Data Not Available<br />

Weekly Load Profile (Chilled Water)<br />

Metered Data Not Available Metered Data Not Available


<strong>Strategic</strong> <strong>Energy</strong> <strong>Plan</strong> Projects<br />

SEP ID<br />

Number Project Name<br />

D1061 AHU - 1, 2 & 3 VIV to VAV SP Reset<br />

D3026 Monitoring Based Commissioning<br />

DORIS STEIN<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location:<br />

Building Key: 04C4325<br />

Funding Source: STATE<br />

Year Built:<br />

Electric<br />

(kWh/yr)<br />

Peak<br />

Demand<br />

(kW)<br />

LOS ANGELES<br />

1989<br />

Building Savings Cost<br />

HW/Steam<br />

(MMBTU/yr)<br />

Gas<br />

(th/yr)<br />

Chilled<br />

Water<br />

(ton-hr/yr)<br />

Purchased<br />

Utility Cost<br />

Savings<br />

($/yr)<br />

159,060 1.0 860 0 60,756 $22,569<br />

178,244 20.0 0 19,145 0 $26,198<br />

Basic Gross Area (sf): 94,309<br />

Building Type: COMPLEX<br />

Primary Asset Type: Office<br />

Secondary Asset Type: Hospitals<br />

Project<br />

Cost<br />

($)<br />

Gross<br />

Potential<br />

Incentive<br />

($)<br />

Net<br />

Cost ($)<br />

Committed Tier:<br />

Simple<br />

Payback<br />

(yr)<br />

Backup<br />

$117,329 $60,590 $56,739 2.5<br />

Committed Tier:<br />

Backup<br />

$159,469 $61,924 $97,545 3.7<br />

Totals 337,304 21.0 860 19,145 60,756 $48,768 $276,798 $122,514 $154,284 3.2<br />

Building<br />

Benchmarking<br />

Baseline<br />

Implement Partnership Projects<br />

Implement SEP Projects<br />

Equivalent<br />

Electricity<br />

(kWh/yr)<br />

Equivalent<br />

Natural Gas<br />

(th/yr)<br />

Equivalent Electric<br />

<strong>Energy</strong> Use Index<br />

(kWh/sf-yr)<br />

Equivalent Natural<br />

Gas <strong>Energy</strong> Use<br />

Index (th/sf-yr)<br />

Source <strong>Energy</strong><br />

Use Index<br />

(kBTU/sf-yr)<br />

2,387,400 111,700 25.3 1.2<br />

377.6<br />

2,387,400 111,700 25.3 1.2<br />

377.6<br />

2,001,491 81,805 21.2 0.9<br />

304.0<br />

Assumed Incentives: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh<br />

th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm<br />

kWh/ton-hr: 0.8<br />

Cap 80% project cost<br />

th/ton-hr: 0.0<br />

Percent<br />

Savings<br />

(%)<br />

N/A<br />

0.0%<br />

19.5%<br />

Source <strong>Energy</strong> Use Conversion Factors:<br />

10.239 kBTU per kWh 100 kBTU per th


Historical <strong>Energy</strong> Use (06/07)<br />

Electricity<br />

(kWh/yr)<br />

3,558,400<br />

Steam<br />

(MMBTU/yr)<br />

Hot Water<br />

(MMBTU/yr)<br />

Monthly <strong>Energy</strong> Use (Electric)<br />

Metered Data Not Available<br />

Metered Data Not Available<br />

PUBLIC HLTH<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location:<br />

Building Key: 04C4331<br />

Funding Source: STATE<br />

Year Built:<br />

Natural Gas<br />

(th/yr)<br />

166,500<br />

LOS ANGELES<br />

Chilled Water<br />

(ton-hr/yr)<br />

Extrapolated N/A N/A Extrapolated N/A<br />

Monthly <strong>Energy</strong> Use (Gas/Heating Hot Water/Steam)<br />

Monthly <strong>Energy</strong> Use (Chilled Water)<br />

1968<br />

Basic Gross Area (sf): 140,563<br />

Building Type: COMPLEX<br />

Primary Asset Type: Office<br />

Secondary Asset Type: Office Support<br />

Weekly Load Profile (Electric)<br />

Metered Data Not Available<br />

Weekly Load Profile (Natural Gas/Heating Hot Water/Steam)<br />

Metered Data Not Available<br />

Weekly Load Profile (Chilled Water)<br />

Metered Data Not Available Metered Data Not Available


<strong>Strategic</strong> <strong>Energy</strong> <strong>Plan</strong> Projects<br />

SEP ID<br />

Number Project Name<br />

D1041 CAV to VAV - AHU S-2 to S-9<br />

D1042 CV Rebalance - S-1<br />

D3027 Monitoring Based Commissioning<br />

PUBLIC HLTH<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location:<br />

Building Key: 04C4331<br />

Funding Source: STATE<br />

Year Built:<br />

Electric<br />

(kWh/yr)<br />

Peak<br />

Demand<br />

(kW)<br />

LOS ANGELES<br />

1968<br />

Building Savings Cost<br />

HW/Steam<br />

(MMBTU/yr)<br />

Gas<br />

(th/yr)<br />

Chilled<br />

Water<br />

(ton-hr/yr)<br />

Purchased<br />

Utility Cost<br />

Savings<br />

($/yr)<br />

148,425 12.0 1,184 0 59,890 $23,358<br />

0 0.0 881 0 52,901 $8,190<br />

265,664 30.0 0 28,534 0 $39,047<br />

Basic Gross Area (sf): 140,563<br />

Building Type: COMPLEX<br />

Primary Asset Type: Office<br />

Secondary Asset Type: Office Support<br />

Project<br />

Cost<br />

($)<br />

Gross<br />

Potential<br />

Incentive<br />

($)<br />

Net<br />

Cost ($)<br />

Committed Tier:<br />

Simple<br />

Payback<br />

(yr)<br />

Backup<br />

$219,224 $61,921 $157,303 6.7<br />

Committed Tier:<br />

Backup<br />

$26,664 $21,169 $5,495 0.7<br />

Committed Tier:<br />

Backup<br />

$237,681 $92,293 $145,388 3.7<br />

Totals 414,089 42.0 2,065 28,534 112,791 $70,594 $483,569 $175,383 $308,186 4.4<br />

Building<br />

Benchmarking<br />

Baseline<br />

Implement Partnership Projects<br />

Implement SEP Projects<br />

Equivalent<br />

Electricity<br />

(kWh/yr)<br />

Equivalent<br />

Natural Gas<br />

(th/yr)<br />

Equivalent Electric<br />

<strong>Energy</strong> Use Index<br />

(kWh/sf-yr)<br />

Equivalent Natural<br />

Gas <strong>Energy</strong> Use<br />

Index (th/sf-yr)<br />

Source <strong>Energy</strong><br />

Use Index<br />

(kBTU/sf-yr)<br />

3,558,400 166,500 25.3 1.2<br />

377.7<br />

3,558,400 166,500 25.3 1.2<br />

377.7<br />

3,054,078 112,154 21.7 0.8<br />

302.3<br />

Assumed Incentives: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh<br />

th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm<br />

kWh/ton-hr: 0.8<br />

Cap 80% project cost<br />

th/ton-hr: 0.0<br />

Percent<br />

Savings<br />

(%)<br />

N/A<br />

0.0%<br />

20.0%<br />

Source <strong>Energy</strong> Use Conversion Factors:<br />

10.239 kBTU per kWh 100 kBTU per th


Historical <strong>Energy</strong> Use (06/07)<br />

Electricity<br />

(kWh/yr)<br />

1,777,800<br />

Steam<br />

(MMBTU/yr)<br />

Hot Water<br />

(MMBTU/yr)<br />

Monthly <strong>Energy</strong> Use (Electric)<br />

Metered Data Not Available<br />

Metered Data Not Available<br />

M DAVIES CC<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location:<br />

Building Key: 04C4332E<br />

Funding Source: STATE<br />

Year Built:<br />

Natural Gas<br />

(th/yr)<br />

83,200<br />

LOS ANGELES<br />

Chilled Water<br />

(ton-hr/yr)<br />

Extrapolated N/A N/A Extrapolated N/A<br />

Monthly <strong>Energy</strong> Use (Gas/Heating Hot Water/Steam)<br />

Monthly <strong>Energy</strong> Use (Chilled Water)<br />

1962<br />

Basic Gross Area (sf): 70,228<br />

Building Type: COMPLEX<br />

Primary Asset Type: Office<br />

Secondary Asset Type: Office Support<br />

Weekly Load Profile (Electric)<br />

Metered Data Not Available<br />

Weekly Load Profile (Natural Gas/Heating Hot Water/Steam)<br />

Metered Data Not Available<br />

Weekly Load Profile (Chilled Water)<br />

Metered Data Not Available Metered Data Not Available


<strong>Strategic</strong> <strong>Energy</strong> <strong>Plan</strong> Projects<br />

SEP ID<br />

Number Project Name<br />

D1040 AHU 1 CAV to VAV<br />

D3028 Monitoring Based Commissioning<br />

M DAVIES CC<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location:<br />

Building Key: 04C4332E<br />

Funding Source: STATE<br />

Year Built:<br />

Electric<br />

(kWh/yr)<br />

Peak<br />

Demand<br />

(kW)<br />

LOS ANGELES<br />

1962<br />

Building Savings Cost<br />

HW/Steam<br />

(MMBTU/yr)<br />

Gas<br />

(th/yr)<br />

Chilled<br />

Water<br />

(ton-hr/yr)<br />

Purchased<br />

Utility Cost<br />

Savings<br />

($/yr)<br />

24,750 1.0 184 0 5,680 $3,548<br />

132,731 15.0 0 14,256 0 $19,509<br />

Basic Gross Area (sf): 70,228<br />

Building Type: COMPLEX<br />

Primary Asset Type: Office<br />

Secondary Asset Type: Office Support<br />

Project<br />

Cost<br />

($)<br />

Gross<br />

Potential<br />

Incentive<br />

($)<br />

Net<br />

Cost ($)<br />

Committed Tier:<br />

Simple<br />

Payback<br />

(yr)<br />

Backup<br />

$26,360 $9,331 $17,029 4.8<br />

Committed Tier:<br />

Backup<br />

$118,751 $46,111 $72,640 3.7<br />

Totals 157,481 16.0 184 14,256 5,680 $23,057 $145,111 $55,442 $89,669 3.9<br />

Building<br />

Benchmarking<br />

Baseline<br />

Implement Partnership Projects<br />

Implement SEP Projects<br />

Equivalent<br />

Electricity<br />

(kWh/yr)<br />

Equivalent<br />

Natural Gas<br />

(th/yr)<br />

Equivalent Electric<br />

<strong>Energy</strong> Use Index<br />

(kWh/sf-yr)<br />

Equivalent Natural<br />

Gas <strong>Energy</strong> Use<br />

Index (th/sf-yr)<br />

Source <strong>Energy</strong><br />

Use Index<br />

(kBTU/sf-yr)<br />

1,777,800 83,200 25.3 1.2<br />

377.7<br />

1,777,800 83,200 25.3 1.2<br />

377.7<br />

1,615,775 66,644 23.0 0.9<br />

330.5<br />

Assumed Incentives: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh<br />

th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm<br />

kWh/ton-hr: 0.8<br />

Cap 80% project cost<br />

th/ton-hr: 0.0<br />

Percent<br />

Savings<br />

(%)<br />

N/A<br />

0.0%<br />

12.5%<br />

Source <strong>Energy</strong> Use Conversion Factors:<br />

10.239 kBTU per kWh 100 kBTU per th


Historical <strong>Energy</strong> Use (06/07)<br />

Electricity<br />

(kWh/yr)<br />

2,225,300<br />

Steam<br />

(MMBTU/yr)<br />

Hot Water<br />

(MMBTU/yr)<br />

Monthly <strong>Energy</strong> Use (Electric)<br />

Metered Data Not Available<br />

Metered Data Not Available<br />

JULES STEIN<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location:<br />

Building Key: 04C4333<br />

Funding Source: STATE<br />

Year Built:<br />

Natural Gas<br />

(th/yr)<br />

104,100<br />

LOS ANGELES<br />

Chilled Water<br />

(ton-hr/yr)<br />

Extrapolated N/A N/A Extrapolated N/A<br />

Monthly <strong>Energy</strong> Use (Gas/Heating Hot Water/Steam)<br />

Monthly <strong>Energy</strong> Use (Chilled Water)<br />

1967<br />

Basic Gross Area (sf): 87,905<br />

Building Type: COMPLEX<br />

Primary Asset Type: Hospitals<br />

Secondary Asset Type: Office<br />

Weekly Load Profile (Electric)<br />

Metered Data Not Available<br />

Weekly Load Profile (Natural Gas/Heating Hot Water/Steam)<br />

Metered Data Not Available<br />

Weekly Load Profile (Chilled Water)<br />

Metered Data Not Available Metered Data Not Available


<strong>Strategic</strong> <strong>Energy</strong> <strong>Plan</strong> Projects<br />

SEP ID<br />

Number Project Name<br />

D1038 S-1, 5 & 6 CAV to VAV<br />

D1039 S2, 3 & 4Aircuity<br />

D3030 Monitoring Based Commissioning<br />

JULES STEIN<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location:<br />

Building Key: 04C4333<br />

Funding Source: STATE<br />

Year Built:<br />

Electric<br />

(kWh/yr)<br />

Peak<br />

Demand<br />

(kW)<br />

D3031 SBD, New/Renov - Jules Stein Eye Institute Seismic Repair<br />

LOS ANGELES<br />

1967<br />

Building Savings Cost<br />

HW/Steam<br />

(MMBTU/yr)<br />

Gas<br />

(th/yr)<br />

Chilled<br />

Water<br />

(ton-hr/yr)<br />

Purchased<br />

Utility Cost<br />

Savings<br />

($/yr)<br />

279,911 7.0 2,196 0 108,103 $43,540<br />

102,285 9.0 1,358 0 64,913 $20,571<br />

166,140 19.0 0 17,845 0 $24,419<br />

667,434 76.0 0 31,804 0 $76,198<br />

Basic Gross Area (sf): 87,905<br />

Building Type: COMPLEX<br />

Primary Asset Type: Hospitals<br />

Secondary Asset Type: Office<br />

Project<br />

Cost<br />

($)<br />

Gross<br />

Potential<br />

Incentive<br />

($)<br />

Net<br />

Cost ($)<br />

Committed Tier:<br />

Simple<br />

Payback<br />

(yr)<br />

Backup<br />

$121,465 $115,384 $24,293 0.6<br />

Committed Tier:<br />

Backup<br />

$317,011 $53,987 $263,024 12.8<br />

Committed Tier:<br />

Backup<br />

$148,640 $57,719 $90,921 3.7<br />

Committed Tier:<br />

Backup<br />

$777,227 $191,988 $585,239 7.7<br />

Totals 1,215,770 111.0 3,554 49,649 173,016 $164,729 $1,364,343 $419,078 $963,477 5.8<br />

Building<br />

Benchmarking<br />

Baseline<br />

Implement Partnership Projects<br />

Implement SEP Projects<br />

Equivalent<br />

Electricity<br />

(kWh/yr)<br />

Equivalent<br />

Natural Gas<br />

(th/yr)<br />

Equivalent Electric<br />

<strong>Energy</strong> Use Index<br />

(kWh/sf-yr)<br />

Equivalent Natural<br />

Gas <strong>Energy</strong> Use<br />

Index (th/sf-yr)<br />

Source <strong>Energy</strong><br />

Use Index<br />

(kBTU/sf-yr)<br />

2,225,300 104,100 25.3 1.2<br />

377.6<br />

2,225,300 104,100 25.3 1.2<br />

377.6<br />

871,117 10,026 9.9 0.1<br />

112.9<br />

Assumed Incentives: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh<br />

th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm<br />

kWh/ton-hr: 0.8<br />

Cap 80% project cost<br />

th/ton-hr: 0.0<br />

Percent<br />

Savings<br />

(%)<br />

N/A<br />

0.0%<br />

70.1%<br />

Source <strong>Energy</strong> Use Conversion Factors:<br />

10.239 kBTU per kWh 100 kBTU per th


Historical <strong>Energy</strong> Use (06/07)<br />

Electricity<br />

(kWh/yr)<br />

9,465,400<br />

Steam<br />

(MMBTU/yr)<br />

Hot Water<br />

(MMBTU/yr)<br />

Monthly <strong>Energy</strong> Use (Electric)<br />

Metered Data Not Available<br />

Metered Data Not Available<br />

BOELTER HALL<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location:<br />

Building Key: 04C4343<br />

Funding Source: STATE<br />

Year Built:<br />

Natural Gas<br />

(th/yr)<br />

442,900<br />

LOS ANGELES<br />

Chilled Water<br />

(ton-hr/yr)<br />

Extrapolated N/A N/A Extrapolated N/A<br />

Monthly <strong>Energy</strong> Use (Gas/Heating Hot Water/Steam)<br />

Monthly <strong>Energy</strong> Use (Chilled Water)<br />

1959<br />

Basic Gross Area (sf): 373,904<br />

Building Type: COMPLEX<br />

Primary Asset Type: Office<br />

Secondary Asset Type: Office Support<br />

Weekly Load Profile (Electric)<br />

Metered Data Not Available<br />

Weekly Load Profile (Natural Gas/Heating Hot Water/Steam)<br />

Metered Data Not Available<br />

Weekly Load Profile (Chilled Water)<br />

Metered Data Not Available Metered Data Not Available


<strong>Strategic</strong> <strong>Energy</strong> <strong>Plan</strong> Projects<br />

SEP ID<br />

Number Project Name<br />

D1052 S-1 to 11 except 9 - CAV to VAV<br />

D1053 AH 4 to 7, 10 to 12 - SP Reset<br />

D3032 Monitoring Based Commissioning<br />

BOELTER HALL<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location:<br />

Building Key: 04C4343<br />

Funding Source: STATE<br />

Year Built:<br />

Electric<br />

(kWh/yr)<br />

Peak<br />

Demand<br />

(kW)<br />

LOS ANGELES<br />

1959<br />

Building Savings Cost<br />

HW/Steam<br />

(MMBTU/yr)<br />

Gas<br />

(th/yr)<br />

Chilled<br />

Water<br />

(ton-hr/yr)<br />

Purchased<br />

Utility Cost<br />

Savings<br />

($/yr)<br />

557,218 15.0 10,256 0 320,081 $125,633<br />

291,309 2.0 5,187 0 166,363 $64,659<br />

706,679 81.0 0 75,903 0 $103,868<br />

Basic Gross Area (sf): 373,904<br />

Building Type: COMPLEX<br />

Primary Asset Type: Office<br />

Secondary Asset Type: Office Support<br />

Project<br />

Cost<br />

($)<br />

Gross<br />

Potential<br />

Incentive<br />

($)<br />

Net<br />

Cost ($)<br />

Committed Tier:<br />

Simple<br />

Payback<br />

(yr)<br />

Backup<br />

$358,186 $323,388 $71,637 0.6<br />

Committed Tier:<br />

Backup<br />

$161,132 $166,693 $32,226 0.5<br />

Committed Tier:<br />

Backup<br />

$632,242 $245,506 $386,736 3.7<br />

Totals 1,555,206 98.0 15,443 75,903 486,444 $294,160 $1,151,560 $735,587 $490,599 1.7<br />

Building<br />

Benchmarking<br />

Baseline<br />

Implement Partnership Projects<br />

Implement SEP Projects<br />

Equivalent<br />

Electricity<br />

(kWh/yr)<br />

Equivalent<br />

Natural Gas<br />

(th/yr)<br />

Equivalent Electric<br />

<strong>Energy</strong> Use Index<br />

(kWh/sf-yr)<br />

Equivalent Natural<br />

Gas <strong>Energy</strong> Use<br />

Index (th/sf-yr)<br />

Source <strong>Energy</strong><br />

Use Index<br />

(kBTU/sf-yr)<br />

9,465,400 442,900 25.3 1.2<br />

377.7<br />

9,465,400 442,900 25.3 1.2<br />

377.7<br />

7,521,039 173,960 20.1 0.5<br />

252.5<br />

Assumed Incentives: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh<br />

th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm<br />

kWh/ton-hr: 0.8<br />

Cap 80% project cost<br />

th/ton-hr: 0.0<br />

Percent<br />

Savings<br />

(%)<br />

N/A<br />

0.0%<br />

33.1%<br />

Source <strong>Energy</strong> Use Conversion Factors:<br />

10.239 kBTU per kWh 100 kBTU per th


Historical <strong>Energy</strong> Use (06/07)<br />

Electricity<br />

(kWh/yr)<br />

9,286,400<br />

Steam<br />

(MMBTU/yr)<br />

Hot Water<br />

(MMBTU/yr)<br />

Monthly <strong>Energy</strong> Use (Electric)<br />

Metered Data Not Available<br />

Metered Data Not Available<br />

MORTON MED<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location:<br />

Building Key: 04C4344<br />

Funding Source: STATE<br />

Year Built:<br />

Natural Gas<br />

(th/yr)<br />

434,600<br />

LOS ANGELES<br />

Chilled Water<br />

(ton-hr/yr)<br />

Extrapolated N/A N/A Extrapolated N/A<br />

Monthly <strong>Energy</strong> Use (Gas/Heating Hot Water/Steam)<br />

Monthly <strong>Energy</strong> Use (Chilled Water)<br />

1990<br />

Basic Gross Area (sf): 366,834<br />

Building Type: COMPLEX<br />

Primary Asset Type: Hospitals<br />

Secondary Asset Type: Office<br />

Weekly Load Profile (Electric)<br />

Metered Data Not Available<br />

Weekly Load Profile (Natural Gas/Heating Hot Water/Steam)<br />

Metered Data Not Available<br />

Weekly Load Profile (Chilled Water)<br />

Metered Data Not Available Metered Data Not Available


<strong>Strategic</strong> <strong>Energy</strong> <strong>Plan</strong> Projects<br />

SEP ID<br />

Number Project Name<br />

D3033 Monitoring Based Commissioning<br />

MORTON MED<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location:<br />

Building Key: 04C4344<br />

Funding Source: STATE<br />

Year Built:<br />

Electric<br />

(kWh/yr)<br />

Peak<br />

Demand<br />

(kW)<br />

LOS ANGELES<br />

1990<br />

Building Savings Cost<br />

HW/Steam<br />

(MMBTU/yr)<br />

Gas<br />

(th/yr)<br />

Chilled<br />

Water<br />

(ton-hr/yr)<br />

Purchased<br />

Utility Cost<br />

Savings<br />

($/yr)<br />

693,316 79.0 0 74,467 0 $101,903<br />

Basic Gross Area (sf): 366,834<br />

Building Type: COMPLEX<br />

Primary Asset Type: Hospitals<br />

Secondary Asset Type: Office<br />

Project<br />

Cost<br />

($)<br />

Gross<br />

Potential<br />

Incentive<br />

($)<br />

Net<br />

Cost ($)<br />

Committed Tier:<br />

Simple<br />

Payback<br />

(yr)<br />

Backup<br />

$620,286 $240,863 $379,423 3.7<br />

Totals 693,316 79.0 0 74,467 0 $101,903 $620,286 $240,863 $379,423 3.7<br />

Building<br />

Benchmarking<br />

Baseline<br />

Implement Partnership Projects<br />

Implement SEP Projects<br />

Equivalent<br />

Electricity<br />

(kWh/yr)<br />

Equivalent<br />

Natural Gas<br />

(th/yr)<br />

Equivalent Electric<br />

<strong>Energy</strong> Use Index<br />

(kWh/sf-yr)<br />

Equivalent Natural<br />

Gas <strong>Energy</strong> Use<br />

Index (th/sf-yr)<br />

Source <strong>Energy</strong><br />

Use Index<br />

(kBTU/sf-yr)<br />

9,286,400 434,600 25.3 1.2<br />

377.7<br />

9,286,400 434,600 25.3 1.2<br />

377.7<br />

8,593,084 360,133 23.4 1.0<br />

338.0<br />

Assumed Incentives: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh<br />

th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm<br />

kWh/ton-hr: 0.8<br />

Cap 80% project cost<br />

th/ton-hr: 0.0<br />

Percent<br />

Savings<br />

(%)<br />

N/A<br />

0.0%<br />

10.5%<br />

Source <strong>Energy</strong> Use Conversion Factors:<br />

10.239 kBTU per kWh 100 kBTU per th


Historical <strong>Energy</strong> Use (06/07)<br />

Electricity<br />

(kWh/yr)<br />

2,559,200<br />

Steam<br />

(MMBTU/yr)<br />

Hot Water<br />

(MMBTU/yr)<br />

Monthly <strong>Energy</strong> Use (Electric)<br />

Metered Data Not Available<br />

Metered Data Not Available<br />

MED PLZA 300<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location:<br />

Building Key: 04C4345<br />

Funding Source: STATE<br />

Year Built:<br />

Natural Gas<br />

(th/yr)<br />

119,800<br />

LOS ANGELES<br />

Chilled Water<br />

(ton-hr/yr)<br />

Extrapolated N/A N/A Extrapolated N/A<br />

Monthly <strong>Energy</strong> Use (Gas/Heating Hot Water/Steam)<br />

Monthly <strong>Energy</strong> Use (Chilled Water)<br />

1990<br />

Basic Gross Area (sf): 101,095<br />

Building Type: COMPLEX<br />

Primary Asset Type: Office<br />

Secondary Asset Type: Hospitals<br />

Weekly Load Profile (Electric)<br />

Metered Data Not Available<br />

Weekly Load Profile (Natural Gas/Heating Hot Water/Steam)<br />

Metered Data Not Available<br />

Weekly Load Profile (Chilled Water)<br />

Metered Data Not Available Metered Data Not Available


<strong>Strategic</strong> <strong>Energy</strong> <strong>Plan</strong> Projects<br />

SEP ID<br />

Number Project Name<br />

D3034 Monitoring Based Commissioning<br />

D6008 CW Reset<br />

MED PLZA 300<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location:<br />

Building Key: 04C4345<br />

Funding Source: STATE<br />

Year Built:<br />

Electric<br />

(kWh/yr)<br />

Peak<br />

Demand<br />

(kW)<br />

LOS ANGELES<br />

1990<br />

Building Savings Cost<br />

HW/Steam<br />

(MMBTU/yr)<br />

Gas<br />

(th/yr)<br />

Chilled<br />

Water<br />

(ton-hr/yr)<br />

Purchased<br />

Utility Cost<br />

Savings<br />

($/yr)<br />

191,070 22.0 0 20,522 0 $28,083<br />

170,100 0.0 0 0 0 $14,969<br />

Basic Gross Area (sf): 101,095<br />

Building Type: COMPLEX<br />

Primary Asset Type: Office<br />

Secondary Asset Type: Hospitals<br />

Project<br />

Cost<br />

($)<br />

Gross<br />

Potential<br />

Incentive<br />

($)<br />

Net<br />

Cost ($)<br />

Committed Tier:<br />

Simple<br />

Payback<br />

(yr)<br />

Backup<br />

$170,944 $66,379 $104,565 3.7<br />

Committed Tier:<br />

Backup<br />

$9,013 $40,824 $1,803 0.1<br />

Totals 361,170 22.0 0 20,522 0 $43,052 $179,957 $107,203 $106,368 2.5<br />

Building<br />

Benchmarking<br />

Baseline<br />

Implement Partnership Projects<br />

Implement SEP Projects<br />

Equivalent<br />

Electricity<br />

(kWh/yr)<br />

Equivalent<br />

Natural Gas<br />

(th/yr)<br />

Equivalent Electric<br />

<strong>Energy</strong> Use Index<br />

(kWh/sf-yr)<br />

Equivalent Natural<br />

Gas <strong>Energy</strong> Use<br />

Index (th/sf-yr)<br />

Source <strong>Energy</strong><br />

Use Index<br />

(kBTU/sf-yr)<br />

2,559,200 119,800 25.3 1.2<br />

377.7<br />

2,559,200 119,800 25.3 1.2<br />

377.7<br />

2,198,030 99,278 21.7 1.0<br />

320.8<br />

Assumed Incentives: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh<br />

th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm<br />

kWh/ton-hr: 0.8<br />

Cap 80% project cost<br />

th/ton-hr: 0.0<br />

Percent<br />

Savings<br />

(%)<br />

N/A<br />

0.0%<br />

15.1%<br />

Source <strong>Energy</strong> Use Conversion Factors:<br />

10.239 kBTU per kWh 100 kBTU per th


Historical <strong>Energy</strong> Use (06/07)<br />

Electricity<br />

(kWh/yr)<br />

3,660,800<br />

Steam<br />

(MMBTU/yr)<br />

Hot Water<br />

(MMBTU/yr)<br />

Monthly <strong>Energy</strong> Use (Electric)<br />

Metered Data Not Available<br />

Metered Data Not Available<br />

MACDONALDLAB<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location:<br />

Building Key: 04C4348<br />

Funding Source: STATE<br />

Year Built:<br />

Natural Gas<br />

(th/yr)<br />

171,300<br />

LOS ANGELES<br />

Chilled Water<br />

(ton-hr/yr)<br />

Extrapolated N/A N/A Extrapolated N/A<br />

Monthly <strong>Energy</strong> Use (Gas/Heating Hot Water/Steam)<br />

Monthly <strong>Energy</strong> Use (Chilled Water)<br />

1991<br />

Basic Gross Area (sf): 144,611<br />

Building Type: COMPLEX<br />

Primary Asset Type: Office Support<br />

Secondary Asset Type: Office<br />

Weekly Load Profile (Electric)<br />

Metered Data Not Available<br />

Weekly Load Profile (Natural Gas/Heating Hot Water/Steam)<br />

Metered Data Not Available<br />

Weekly Load Profile (Chilled Water)<br />

Metered Data Not Available Metered Data Not Available


<strong>Strategic</strong> <strong>Energy</strong> <strong>Plan</strong> Projects<br />

SEP ID<br />

Number Project Name<br />

D1011 AHU 1 VIV to VAV & SP Reset<br />

D1012 AHU 2 Vivarium Aircuity<br />

D1013 Lab CAV to VAV with Aircuity<br />

D3035 Monitoring Based Commissioning<br />

MACDONALDLAB<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location:<br />

Building Key: 04C4348<br />

Funding Source: STATE<br />

Year Built:<br />

Electric<br />

(kWh/yr)<br />

Peak<br />

Demand<br />

(kW)<br />

LOS ANGELES<br />

1991<br />

Building Savings Cost<br />

HW/Steam<br />

(MMBTU/yr)<br />

Gas<br />

(th/yr)<br />

Chilled<br />

Water<br />

(ton-hr/yr)<br />

Purchased<br />

Utility Cost<br />

Savings<br />

($/yr)<br />

9,792 -2.0 2 0 2,157 $1,009<br />

124,761 14.0 584 0 35,066 $16,408<br />

1,477,065 154.0 9,274 0 388,927 $205,550<br />

273,315 31.0 0 29,356 0 $40,172<br />

Basic Gross Area (sf): 144,611<br />

Building Type: COMPLEX<br />

Primary Asset Type: Office Support<br />

Secondary Asset Type: Office<br />

Project<br />

Cost<br />

($)<br />

Gross<br />

Potential<br />

Incentive<br />

($)<br />

Net<br />

Cost ($)<br />

Committed Tier:<br />

Simple<br />

Payback<br />

(yr)<br />

Backup<br />

$46,015 $2,789 $43,226 42.8<br />

Committed Tier:<br />

Backup<br />

$495,153 $43,975 $451,178 27.5<br />

Committed Tier:<br />

Backup<br />

$4,023,619 $545,095 $3,478,524 16.9<br />

Committed Tier:<br />

Backup<br />

$244,525 $94,952 $149,573 3.7<br />

Totals 1,884,933 197.0 9,860 29,356 426,150 $263,138 $4,809,311 $686,811 $4,122,501 15.7<br />

Building<br />

Benchmarking<br />

Baseline<br />

Implement Partnership Projects<br />

Implement SEP Projects<br />

Equivalent<br />

Electricity<br />

(kWh/yr)<br />

Equivalent<br />

Natural Gas<br />

(th/yr)<br />

Equivalent Electric<br />

<strong>Energy</strong> Use Index<br />

(kWh/sf-yr)<br />

Equivalent Natural<br />

Gas <strong>Energy</strong> Use<br />

Index (th/sf-yr)<br />

Source <strong>Energy</strong><br />

Use Index<br />

(kBTU/sf-yr)<br />

3,660,800 171,300 25.3 1.2<br />

377.7<br />

3,660,800 171,300 25.3 1.2<br />

377.7<br />

1,434,947 18,694 9.9 0.1<br />

114.5<br />

Assumed Incentives: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh<br />

th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm<br />

kWh/ton-hr: 0.8<br />

Cap 80% project cost<br />

th/ton-hr: 0.0<br />

Percent<br />

Savings<br />

(%)<br />

N/A<br />

0.0%<br />

69.7%<br />

Source <strong>Energy</strong> Use Conversion Factors:<br />

10.239 kBTU per kWh 100 kBTU per th


Historical <strong>Energy</strong> Use (06/07)<br />

Electricity<br />

(kWh/yr)<br />

1,252,500<br />

Steam<br />

(MMBTU/yr)<br />

Hot Water<br />

(MMBTU/yr)<br />

Monthly <strong>Energy</strong> Use (Electric)<br />

Metered Data Not Available<br />

Metered Data Not Available<br />

SYCAMORE CT<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location:<br />

LOS ANGELES<br />

Building Key: 04C4352<br />

Funding Source: HOUSING<br />

Year Built:<br />

Natural Gas<br />

(th/yr)<br />

58,600<br />

Chilled Water<br />

(ton-hr/yr)<br />

Extrapolated N/A N/A Extrapolated N/A<br />

Monthly <strong>Energy</strong> Use (Gas/Heating Hot Water/Steam)<br />

Monthly <strong>Energy</strong> Use (Chilled Water)<br />

2004<br />

Basic Gross Area (sf): 140,526<br />

Building Type: BASIC<br />

Primary Asset Type: Residential<br />

Secondary Asset Type: 01C1014 - Inactive<br />

Weekly Load Profile (Electric)<br />

Metered Data Not Available<br />

Weekly Load Profile (Natural Gas/Heating Hot Water/Steam)<br />

Metered Data Not Available<br />

Weekly Load Profile (Chilled Water)<br />

Metered Data Not Available Metered Data Not Available


<strong>Strategic</strong> <strong>Energy</strong> <strong>Plan</strong> Projects<br />

SEP ID<br />

Number Project Name<br />

D3036 Monitoring Based Commissioning<br />

SYCAMORE CT<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location:<br />

Building Key: 04C4352<br />

Funding Source: HOUSING<br />

Year Built:<br />

Electric<br />

(kWh/yr)<br />

Peak<br />

Demand<br />

(kW)<br />

LOS ANGELES<br />

2004<br />

Building Savings Cost<br />

HW/Steam<br />

(MMBTU/yr)<br />

Gas<br />

(th/yr)<br />

Chilled<br />

Water<br />

(ton-hr/yr)<br />

Purchased<br />

Utility Cost<br />

Savings<br />

($/yr)<br />

76,192 9.0 0 10,390 0 $12,410<br />

Basic Gross Area (sf): 140,526<br />

Building Type: BASIC<br />

Primary Asset Type: Residential<br />

Secondary Asset Type: 01C1014 - Inactive<br />

Project<br />

Cost<br />

($)<br />

Gross<br />

Potential<br />

Incentive<br />

($)<br />

Net<br />

Cost ($)<br />

Committed Tier:<br />

Simple<br />

Payback<br />

(yr)<br />

Backup<br />

$83,659 $28,676 $54,983 4.4<br />

Totals 76,192 9.0 0 10,390 0 $12,410 $83,659 $28,676 $54,983 4.4<br />

Building<br />

Benchmarking<br />

Baseline<br />

Implement Partnership Projects<br />

Implement SEP Projects<br />

Equivalent<br />

Electricity<br />

(kWh/yr)<br />

Equivalent<br />

Natural Gas<br />

(th/yr)<br />

Equivalent Electric<br />

<strong>Energy</strong> Use Index<br />

(kWh/sf-yr)<br />

Equivalent Natural<br />

Gas <strong>Energy</strong> Use<br />

Index (th/sf-yr)<br />

Source <strong>Energy</strong><br />

Use Index<br />

(kBTU/sf-yr)<br />

1,252,500 58,600 8.9 0.4<br />

133.0<br />

1,252,500 58,600 8.9 0.4<br />

133.0<br />

1,176,308 48,210 8.4 0.3<br />

120.0<br />

Assumed Incentives: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh<br />

th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm<br />

kWh/ton-hr: 0.8<br />

Cap 80% project cost<br />

th/ton-hr: 0.0<br />

Percent<br />

Savings<br />

(%)<br />

N/A<br />

0.0%<br />

9.7%<br />

Source <strong>Energy</strong> Use Conversion Factors:<br />

10.239 kBTU per kWh 100 kBTU per th


Historical <strong>Energy</strong> Use (06/07)<br />

Electricity<br />

(kWh/yr)<br />

1,435,100<br />

Steam<br />

(MMBTU/yr)<br />

Hot Water<br />

(MMBTU/yr)<br />

Monthly <strong>Energy</strong> Use (Electric)<br />

SAC<br />

Metered Data Not Available<br />

Metered Data Not Available<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location:<br />

Building Key: 04C4360<br />

Funding Source: OTHER<br />

Year Built:<br />

Natural Gas<br />

(th/yr)<br />

67,200<br />

LOS ANGELES<br />

Chilled Water<br />

(ton-hr/yr)<br />

Extrapolated N/A N/A Extrapolated N/A<br />

Monthly <strong>Energy</strong> Use (Gas/Heating Hot Water/Steam)<br />

Monthly <strong>Energy</strong> Use (Chilled Water)<br />

1932<br />

Basic Gross Area (sf): 113,383<br />

Building Type: BASIC<br />

Primary Asset Type: Office<br />

Secondary Asset Type: Athletics<br />

Weekly Load Profile (Electric)<br />

Metered Data Not Available<br />

Weekly Load Profile (Natural Gas/Heating Hot Water/Steam)<br />

Metered Data Not Available<br />

Weekly Load Profile (Chilled Water)<br />

Metered Data Not Available Metered Data Not Available


<strong>Strategic</strong> <strong>Energy</strong> <strong>Plan</strong> Projects<br />

SEP ID<br />

Number Project Name<br />

D1004 AHU 4 SP Reset<br />

D1024 AHU1 to 6 SP Reset<br />

D3037 Monitoring Based Commissioning<br />

SAC<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location:<br />

Building Key: 04C4360<br />

Funding Source: OTHER<br />

Year Built:<br />

Electric<br />

(kWh/yr)<br />

Peak<br />

Demand<br />

(kW)<br />

LOS ANGELES<br />

1932<br />

Building Savings Cost<br />

HW/Steam<br />

(MMBTU/yr)<br />

Gas<br />

(th/yr)<br />

Chilled<br />

Water<br />

(ton-hr/yr)<br />

Purchased<br />

Utility Cost<br />

Savings<br />

($/yr)<br />

32,518 0.0 512 0 17,290 $6,769<br />

116,981 1.0 1,640 0 70,765 $23,784<br />

87,305 10.0 0 11,905 0 $14,220<br />

D3217 Replace existing GYM HID fixtures with new fluorescent fixtures highbays w/sensors<br />

113,896 13.0 0 0 0 $10,023<br />

D3218 Replace gym HID and strength & conditioning fixtures with new fluorescent fixtures highbays (sensors in gyms only)<br />

229,211 30.0 0 0 0 $20,171<br />

Basic Gross Area (sf): 113,383<br />

Building Type: BASIC<br />

Primary Asset Type: Office<br />

Secondary Asset Type: Athletics<br />

Project<br />

Cost<br />

($)<br />

Gross<br />

Potential<br />

Incentive<br />

($)<br />

Net<br />

Cost ($)<br />

Committed Tier:<br />

Simple<br />

Payback<br />

(yr)<br />

Backup<br />

$22,142 $17,524 $4,618 0.7<br />

Committed Tier:<br />

Backup<br />

$16,705 $62,162 $3,341 0.1<br />

Committed Tier:<br />

Backup<br />

$95,861 $32,858 $63,003 4.4<br />

Committed Tier:<br />

Backup<br />

$38,731 $27,335 $11,396 1.1<br />

Committed Tier:<br />

Backup<br />

$83,199 $55,011 $28,188 1.4<br />

Totals 579,911 54.0 2,152 11,905 88,055 $74,966 $256,638 $194,890 $110,546 1.5<br />

Building<br />

Benchmarking<br />

Baseline<br />

Implement Partnership Projects<br />

Implement SEP Projects<br />

Equivalent<br />

Electricity<br />

(kWh/yr)<br />

Equivalent<br />

Natural Gas<br />

(th/yr)<br />

Equivalent Electric<br />

<strong>Energy</strong> Use Index<br />

(kWh/sf-yr)<br />

Equivalent Natural<br />

Gas <strong>Energy</strong> Use<br />

Index (th/sf-yr)<br />

Source <strong>Energy</strong><br />

Use Index<br />

(kBTU/sf-yr)<br />

1,435,100 67,200 12.7 0.6<br />

188.9<br />

1,435,100 67,200 12.7 0.6<br />

188.9<br />

784,745 28,395 6.9 0.3<br />

95.9<br />

Assumed Incentives: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh<br />

th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm<br />

kWh/ton-hr: 0.8<br />

Cap 80% project cost<br />

th/ton-hr: 0.0<br />

Percent<br />

Savings<br />

(%)<br />

N/A<br />

0.0%<br />

49.2%<br />

Source <strong>Energy</strong> Use Conversion Factors:<br />

10.239 kBTU per kWh 100 kBTU per th


Historical <strong>Energy</strong> Use (06/07)<br />

Electricity<br />

(kWh/yr)<br />

2,582,000<br />

Steam<br />

(MMBTU/yr)<br />

Hot Water<br />

(MMBTU/yr)<br />

Monthly <strong>Energy</strong> Use (Electric)<br />

Metered Data Not Available<br />

Metered Data Not Available<br />

FOWLER MUSM<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location:<br />

Building Key: 04C4374<br />

Funding Source: STATE<br />

Year Built:<br />

Natural Gas<br />

(th/yr)<br />

120,800<br />

LOS ANGELES<br />

Chilled Water<br />

(ton-hr/yr)<br />

Extrapolated N/A N/A Extrapolated N/A<br />

Monthly <strong>Energy</strong> Use (Gas/Heating Hot Water/Steam)<br />

Monthly <strong>Energy</strong> Use (Chilled Water)<br />

1990<br />

Basic Gross Area (sf): 101,995<br />

Building Type: COMPLEX<br />

Primary Asset Type: Museums<br />

Secondary Asset Type: Office<br />

Weekly Load Profile (Electric)<br />

Metered Data Not Available<br />

Weekly Load Profile (Natural Gas/Heating Hot Water/Steam)<br />

Metered Data Not Available<br />

Weekly Load Profile (Chilled Water)<br />

Metered Data Not Available Metered Data Not Available


<strong>Strategic</strong> <strong>Energy</strong> <strong>Plan</strong> Projects<br />

SEP ID<br />

Number Project Name<br />

D1003 AHU 1 & 2 SP Reset<br />

D3038 Monitoring Based Commissioning<br />

FOWLER MUSM<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location:<br />

Building Key: 04C4374<br />

Funding Source: STATE<br />

Year Built:<br />

Electric<br />

(kWh/yr)<br />

Peak<br />

Demand<br />

(kW)<br />

LOS ANGELES<br />

1990<br />

Building Savings Cost<br />

HW/Steam<br />

(MMBTU/yr)<br />

Gas<br />

(th/yr)<br />

Chilled<br />

Water<br />

(ton-hr/yr)<br />

Purchased<br />

Utility Cost<br />

Savings<br />

($/yr)<br />

161,685 1.0 2,357 0 82,464 $32,396<br />

192,771 22.0 0 20,705 0 $28,333<br />

Basic Gross Area (sf): 101,995<br />

Building Type: COMPLEX<br />

Primary Asset Type: Museums<br />

Secondary Asset Type: Office<br />

Project<br />

Cost<br />

($)<br />

Gross<br />

Potential<br />

Incentive<br />

($)<br />

Net<br />

Cost ($)<br />

Committed Tier:<br />

Simple<br />

Payback<br />

(yr)<br />

Backup<br />

$49,351 $84,100 $9,870 0.3<br />

Committed Tier:<br />

Backup<br />

$172,464 $66,970 $105,494 3.7<br />

Totals 354,456 23.0 2,357 20,705 82,464 $60,729 $221,815 $151,070 $115,364 1.9<br />

Building<br />

Benchmarking<br />

Baseline<br />

Implement Partnership Projects<br />

Implement SEP Projects<br />

Equivalent<br />

Electricity<br />

(kWh/yr)<br />

Equivalent<br />

Natural Gas<br />

(th/yr)<br />

Equivalent Electric<br />

<strong>Energy</strong> Use Index<br />

(kWh/sf-yr)<br />

Equivalent Natural<br />

Gas <strong>Energy</strong> Use<br />

Index (th/sf-yr)<br />

Source <strong>Energy</strong><br />

Use Index<br />

(kBTU/sf-yr)<br />

2,582,000 120,800 25.3 1.2<br />

377.6<br />

2,582,000 120,800 25.3 1.2<br />

377.6<br />

2,161,573 70,633 21.2 0.7<br />

286.2<br />

Assumed Incentives: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh<br />

th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm<br />

kWh/ton-hr: 0.8<br />

Cap 80% project cost<br />

th/ton-hr: 0.0<br />

Percent<br />

Savings<br />

(%)<br />

N/A<br />

0.0%<br />

24.2%<br />

Source <strong>Energy</strong> Use Conversion Factors:<br />

10.239 kBTU per kWh 100 kBTU per th


Historical <strong>Energy</strong> Use (06/07)<br />

Electricity<br />

(kWh/yr)<br />

2,337,500<br />

Steam<br />

(MMBTU/yr)<br />

Hot Water<br />

(MMBTU/yr)<br />

Monthly <strong>Energy</strong> Use (Electric)<br />

Metered Data Not Available<br />

Metered Data Not Available<br />

ROYCE HALL<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location:<br />

Building Key: 04C4375<br />

Funding Source: STATE<br />

Year Built:<br />

Natural Gas<br />

(th/yr)<br />

109,400<br />

LOS ANGELES<br />

Chilled Water<br />

(ton-hr/yr)<br />

Extrapolated N/A N/A Extrapolated N/A<br />

Monthly <strong>Energy</strong> Use (Gas/Heating Hot Water/Steam)<br />

Monthly <strong>Energy</strong> Use (Chilled Water)<br />

1929<br />

Basic Gross Area (sf): 184,673<br />

Building Type: BASIC<br />

Primary Asset Type: Office<br />

Secondary Asset Type: Auditorium<br />

Weekly Load Profile (Electric)<br />

Metered Data Not Available<br />

Weekly Load Profile (Natural Gas/Heating Hot Water/Steam)<br />

Metered Data Not Available<br />

Weekly Load Profile (Chilled Water)<br />

Metered Data Not Available Metered Data Not Available


<strong>Strategic</strong> <strong>Energy</strong> <strong>Plan</strong> Projects<br />

SEP ID<br />

Number Project Name<br />

D1022 AC 1 & 2 - SP Reset<br />

D1023 AC 3, 4, 6 to 8 - CAV to VAV<br />

D3039 Monitoring Based Commissioning<br />

ROYCE HALL<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location:<br />

Building Key: 04C4375<br />

Funding Source: STATE<br />

Year Built:<br />

Electric<br />

(kWh/yr)<br />

Peak<br />

Demand<br />

(kW)<br />

LOS ANGELES<br />

1929<br />

Building Savings Cost<br />

HW/Steam<br />

(MMBTU/yr)<br />

Gas<br />

(th/yr)<br />

Chilled<br />

Water<br />

(ton-hr/yr)<br />

Purchased<br />

Utility Cost<br />

Savings<br />

($/yr)<br />

41,632 0.0 765 0 29,290 $9,720<br />

116,731 11.0 -46 0 584 $10,057<br />

142,198 16.0 0 19,391 0 $23,161<br />

Basic Gross Area (sf): 184,673<br />

Building Type: BASIC<br />

Primary Asset Type: Office<br />

Secondary Asset Type: Auditorium<br />

Project<br />

Cost<br />

($)<br />

Gross<br />

Potential<br />

Incentive<br />

($)<br />

Net<br />

Cost ($)<br />

Committed Tier:<br />

Simple<br />

Payback<br />

(yr)<br />

Backup<br />

$45,550 $25,178 $20,372 2.1<br />

Committed Tier:<br />

Backup<br />

$185,171 $27,553 $157,618 15.7<br />

Committed Tier:<br />

Backup<br />

$156,134 $53,519 $102,615 4.4<br />

Totals 300,561 27.0 719 19,391 29,874 $42,938 $386,856 $106,250 $280,605 6.5<br />

Building<br />

Benchmarking<br />

Baseline<br />

Implement Partnership Projects<br />

Implement SEP Projects<br />

Equivalent<br />

Electricity<br />

(kWh/yr)<br />

Equivalent<br />

Natural Gas<br />

(th/yr)<br />

Equivalent Electric<br />

<strong>Energy</strong> Use Index<br />

(kWh/sf-yr)<br />

Equivalent Natural<br />

Gas <strong>Energy</strong> Use<br />

Index (th/sf-yr)<br />

Source <strong>Energy</strong><br />

Use Index<br />

(kBTU/sf-yr)<br />

2,337,500 109,400 12.7 0.6<br />

188.8<br />

2,337,500 109,400 12.7 0.6<br />

188.8<br />

2,013,040 81,022 10.9 0.4<br />

155.5<br />

Assumed Incentives: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh<br />

th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm<br />

kWh/ton-hr: 0.8<br />

Cap 80% project cost<br />

th/ton-hr: 0.0<br />

Percent<br />

Savings<br />

(%)<br />

N/A<br />

0.0%<br />

17.7%<br />

Source <strong>Energy</strong> Use Conversion Factors:<br />

10.239 kBTU per kWh 100 kBTU per th


Historical <strong>Energy</strong> Use (06/07)<br />

Electricity<br />

(kWh/yr)<br />

1,203,300<br />

Steam<br />

(MMBTU/yr)<br />

Hot Water<br />

(MMBTU/yr)<br />

Monthly <strong>Energy</strong> Use (Electric)<br />

Metered Data Not Available<br />

Metered Data Not Available<br />

UNEX<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location:<br />

Building Key: 04C4415<br />

Funding Source: STATE<br />

Year Built:<br />

Natural Gas<br />

(th/yr)<br />

56,300<br />

LOS ANGELES<br />

Chilled Water<br />

(ton-hr/yr)<br />

Extrapolated N/A N/A Extrapolated N/A<br />

Monthly <strong>Energy</strong> Use (Gas/Heating Hot Water/Steam)<br />

Monthly <strong>Energy</strong> Use (Chilled Water)<br />

1971<br />

Basic Gross Area (sf): 95,065<br />

Building Type: BASIC<br />

Primary Asset Type: Office<br />

Secondary Asset Type: College Lecture Cl<br />

Weekly Load Profile (Electric)<br />

Metered Data Not Available<br />

Weekly Load Profile (Natural Gas/Heating Hot Water/Steam)<br />

Metered Data Not Available<br />

Weekly Load Profile (Chilled Water)<br />

Metered Data Not Available Metered Data Not Available


<strong>Strategic</strong> <strong>Energy</strong> <strong>Plan</strong> Projects<br />

SEP ID<br />

Number Project Name<br />

D1035 AHU 1 to 8 T-1 & T-2 CAV to VAV<br />

D3040 Monitoring Based Commissioning<br />

D6003 Replace Boiler<br />

D6005 Replace Chiller<br />

D6011 CT VFDs<br />

UNEX<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location:<br />

Building Key: 04C4415<br />

Funding Source: STATE<br />

Year Built:<br />

Electric<br />

(kWh/yr)<br />

Peak<br />

Demand<br />

(kW)<br />

LOS ANGELES<br />

1971<br />

Building Savings Cost<br />

HW/Steam<br />

(MMBTU/yr)<br />

Gas<br />

(th/yr)<br />

Chilled<br />

Water<br />

(ton-hr/yr)<br />

Purchased<br />

Utility Cost<br />

Savings<br />

($/yr)<br />

412,262 21.0 0 34,433 0 $55,187<br />

73,200 8.0 0 9,982 0 $11,923<br />

0 0.0 0 5,938 0 $3,261<br />

212,201 72.0 0 0 0 $18,674<br />

11,650 2.0 0 0 0 $1,025<br />

Basic Gross Area (sf): 95,065<br />

Building Type: BASIC<br />

Primary Asset Type: Office<br />

Secondary Asset Type: College Lecture Cl<br />

Project<br />

Cost<br />

($)<br />

Gross<br />

Potential<br />

Incentive<br />

($)<br />

Net<br />

Cost ($)<br />

Committed Tier:<br />

Simple<br />

Payback<br />

(yr)<br />

Backup<br />

$3,048,573 $133,376 $2,915,197 52.8<br />

Committed Tier:<br />

Backup<br />

$80,373 $27,550 $52,823 4.4<br />

Committed Tier:<br />

Backup<br />

$156,646 $5,938 $150,708 46.2<br />

Committed Tier:<br />

Backup<br />

$352,860 $50,928 $301,932 16.2<br />

Committed Tier:<br />

Backup<br />

$7,599 $2,796 $4,803 4.7<br />

Totals 709,313 103.0 0 50,353 0 $90,069 $3,646,051 $220,588 $3,425,463 38.0<br />

Building<br />

Benchmarking<br />

Baseline<br />

Implement Partnership Projects<br />

Implement SEP Projects<br />

Equivalent<br />

Electricity<br />

(kWh/yr)<br />

Equivalent<br />

Natural Gas<br />

(th/yr)<br />

Equivalent Electric<br />

<strong>Energy</strong> Use Index<br />

(kWh/sf-yr)<br />

Equivalent Natural<br />

Gas <strong>Energy</strong> Use<br />

Index (th/sf-yr)<br />

Source <strong>Energy</strong><br />

Use Index<br />

(kBTU/sf-yr)<br />

1,203,300 56,300 12.7 0.6<br />

188.8<br />

1,203,300 56,300 12.7 0.6<br />

188.8<br />

493,987 5,947 5.2 0.1<br />

59.5<br />

Assumed Incentives: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh<br />

th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm<br />

kWh/ton-hr: 0.8<br />

Cap 80% project cost<br />

th/ton-hr: 0.0<br />

Percent<br />

Savings<br />

(%)<br />

N/A<br />

0.0%<br />

68.5%<br />

Source <strong>Energy</strong> Use Conversion Factors:<br />

10.239 kBTU per kWh 100 kBTU per th


Historical <strong>Energy</strong> Use (06/07)<br />

Electricity<br />

(kWh/yr)<br />

2,889,800<br />

Steam<br />

(MMBTU/yr)<br />

Hot Water<br />

(MMBTU/yr)<br />

Monthly <strong>Energy</strong> Use (Electric)<br />

Metered Data Not Available<br />

Metered Data Not Available<br />

SOUTHERN REGIONAL LIBRARY FACILITY<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location:<br />

Building Key: 04C4562<br />

Funding Source: STATE<br />

Year Built:<br />

Natural Gas<br />

(th/yr)<br />

135,200<br />

LOS ANGELES<br />

Chilled Water<br />

(ton-hr/yr)<br />

Extrapolated N/A N/A Extrapolated N/A<br />

Monthly <strong>Energy</strong> Use (Gas/Heating Hot Water/Steam)<br />

Monthly <strong>Energy</strong> Use (Chilled Water)<br />

1987<br />

Basic Gross Area (sf): 228,306<br />

Building Type: BASIC<br />

Primary Asset Type: Library<br />

Secondary Asset Type: Office<br />

Weekly Load Profile (Electric)<br />

Metered Data Not Available<br />

Weekly Load Profile (Natural Gas/Heating Hot Water/Steam)<br />

Metered Data Not Available<br />

Weekly Load Profile (Chilled Water)<br />

Metered Data Not Available Metered Data Not Available


<strong>Strategic</strong> <strong>Energy</strong> <strong>Plan</strong> Projects<br />

SEP ID<br />

Number Project Name<br />

D1025 AHU 1, 2 & 4 SP Reset<br />

D1026 AHU 3 5 & SF-1 CAV to VAV with SP Reset<br />

D3042 Monitoring Based Commissioning<br />

D6004 Replace Chiller<br />

D6009 CW Reset<br />

SOUTHERN REGIONAL LIBRARY FACILITY<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location:<br />

Building Key: 04C4562<br />

Funding Source: STATE<br />

Year Built:<br />

Electric<br />

(kWh/yr)<br />

Peak<br />

Demand<br />

(kW)<br />

LOS ANGELES<br />

1987<br />

Building Savings Cost<br />

HW/Steam<br />

(MMBTU/yr)<br />

Gas<br />

(th/yr)<br />

Chilled<br />

Water<br />

(ton-hr/yr)<br />

Purchased<br />

Utility Cost<br />

Savings<br />

($/yr)<br />

320,992 5.0 3,742 0 0 $48,795<br />

89,403 4.0 925 0 0 $12,947<br />

175,796 20.0 0 23,972 0 $28,634<br />

264,354 80.0 0 0 0 $23,263<br />

40,032 0.0 0 0 0 $3,523<br />

Basic Gross Area (sf): 228,306<br />

Building Type: BASIC<br />

Primary Asset Type: Library<br />

Secondary Asset Type: Office<br />

Project<br />

Cost<br />

($)<br />

Gross<br />

Potential<br />

Incentive<br />

($)<br />

Net<br />

Cost ($)<br />

Committed Tier:<br />

Simple<br />

Payback<br />

(yr)<br />

Backup<br />

$72,370 $123,813 $14,474 0.3<br />

Committed Tier:<br />

Backup<br />

$132,983 $33,019 $99,964 7.7<br />

Committed Tier:<br />

Backup<br />

$193,024 $66,163 $126,861 4.4<br />

Committed Tier:<br />

Backup<br />

$387,408 $63,445 $323,963 13.9<br />

Committed Tier:<br />

Backup<br />

$9,013 $9,608 $1,803 0.5<br />

Totals 890,577 109.0 4,667 23,972 0 $117,162 $794,797 $296,048 $567,065 4.8<br />

Building<br />

Benchmarking<br />

Baseline<br />

Implement Partnership Projects<br />

Implement SEP Projects<br />

Equivalent<br />

Electricity<br />

(kWh/yr)<br />

Equivalent<br />

Natural Gas<br />

(th/yr)<br />

Equivalent Electric<br />

<strong>Energy</strong> Use Index<br />

(kWh/sf-yr)<br />

Equivalent Natural<br />

Gas <strong>Energy</strong> Use<br />

Index (th/sf-yr)<br />

Source <strong>Energy</strong><br />

Use Index<br />

(kBTU/sf-yr)<br />

2,889,800 135,200 12.7 0.6<br />

188.8<br />

2,889,800 135,200 12.7 0.6<br />

188.8<br />

1,999,223 52,891 8.8 0.2<br />

112.8<br />

Assumed Incentives: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh<br />

th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm<br />

kWh/ton-hr: 0.8<br />

Cap 80% project cost<br />

th/ton-hr: 0.0<br />

Percent<br />

Savings<br />

(%)<br />

N/A<br />

0.0%<br />

40.2%<br />

Source <strong>Energy</strong> Use Conversion Factors:<br />

10.239 kBTU per kWh 100 kBTU per th


Historical <strong>Energy</strong> Use (06/07)<br />

Electricity<br />

(kWh/yr)<br />

2,901,700<br />

Steam<br />

(MMBTU/yr)<br />

Hot Water<br />

(MMBTU/yr)<br />

Monthly <strong>Energy</strong> Use (Electric)<br />

Metered Data Not Available<br />

Metered Data Not Available<br />

BUNCHE HALL<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location:<br />

Building Key: 04C4580<br />

Funding Source: STATE<br />

Year Built:<br />

Natural Gas<br />

(th/yr)<br />

135,800<br />

LOS ANGELES<br />

Chilled Water<br />

(ton-hr/yr)<br />

Extrapolated N/A N/A Extrapolated N/A<br />

Monthly <strong>Energy</strong> Use (Gas/Heating Hot Water/Steam)<br />

Monthly <strong>Energy</strong> Use (Chilled Water)<br />

1964<br />

Basic Gross Area (sf): 229,248<br />

Building Type: BASIC<br />

Primary Asset Type: Office<br />

Secondary Asset Type: Laboratory<br />

Weekly Load Profile (Electric)<br />

Metered Data Not Available<br />

Weekly Load Profile (Natural Gas/Heating Hot Water/Steam)<br />

Metered Data Not Available<br />

Weekly Load Profile (Chilled Water)<br />

Metered Data Not Available Metered Data Not Available


<strong>Strategic</strong> <strong>Energy</strong> <strong>Plan</strong> Projects<br />

SEP ID<br />

Number Project Name<br />

D1060 Apply DDC controls, convert to VAV<br />

D3043 Monitoring Based Commissioning<br />

D6013 TOD EF<br />

BUNCHE HALL<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location:<br />

Building Key: 04C4580<br />

Funding Source: STATE<br />

Year Built:<br />

Electric<br />

(kWh/yr)<br />

Peak<br />

Demand<br />

(kW)<br />

LOS ANGELES<br />

1964<br />

Building Savings Cost<br />

HW/Steam<br />

(MMBTU/yr)<br />

Gas<br />

(th/yr)<br />

Chilled<br />

Water<br />

(ton-hr/yr)<br />

Purchased<br />

Utility Cost<br />

Savings<br />

($/yr)<br />

1,411,691 67.0 7,204 0 0 $163,787<br />

176,521 20.0 0 24,071 0 $28,752<br />

8,081 0.0 0 0 0 $711<br />

Basic Gross Area (sf): 229,248<br />

Building Type: BASIC<br />

Primary Asset Type: Office<br />

Secondary Asset Type: Laboratory<br />

Project<br />

Cost<br />

($)<br />

Gross<br />

Potential<br />

Incentive<br />

($)<br />

Net<br />

Cost ($)<br />

Committed Tier:<br />

Simple<br />

Payback<br />

(yr)<br />

Backup<br />

$3,634,425 $428,856 $3,205,569 19.6<br />

Committed Tier:<br />

Backup<br />

$193,820 $66,436 $127,384 4.4<br />

Committed Tier:<br />

Backup<br />

$2,253 $1,939 $451 0.6<br />

Totals 1,596,293 87.0 7,204 24,071 0 $193,250 $3,830,498 $497,231 $3,333,404 17.2<br />

Building<br />

Benchmarking<br />

Baseline<br />

Implement Partnership Projects<br />

Implement SEP Projects<br />

Equivalent<br />

Electricity<br />

(kWh/yr)<br />

Equivalent<br />

Natural Gas<br />

(th/yr)<br />

Equivalent Electric<br />

<strong>Energy</strong> Use Index<br />

(kWh/sf-yr)<br />

Equivalent Natural<br />

Gas <strong>Energy</strong> Use<br />

Index (th/sf-yr)<br />

Source <strong>Energy</strong><br />

Use Index<br />

(kBTU/sf-yr)<br />

2,901,700 135,800 12.7 0.6<br />

188.8<br />

2,901,700 135,800 12.7 0.6<br />

188.8<br />

1,305,407 21,679 5.7 0.1<br />

67.8<br />

Assumed Incentives: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh<br />

th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm<br />

kWh/ton-hr: 0.8<br />

Cap 80% project cost<br />

th/ton-hr: 0.0<br />

Percent<br />

Savings<br />

(%)<br />

N/A<br />

0.0%<br />

64.1%<br />

Source <strong>Energy</strong> Use Conversion Factors:<br />

10.239 kBTU per kWh 100 kBTU per th


Historical <strong>Energy</strong> Use (06/07)<br />

Electricity<br />

(kWh/yr)<br />

396,300<br />

Steam<br />

(MMBTU/yr)<br />

Hot Water<br />

(MMBTU/yr)<br />

Monthly <strong>Energy</strong> Use (Electric)<br />

Metered Data Not Available<br />

Metered Data Not Available<br />

COLLINS CTR<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location:<br />

Building Key: 04C515A<br />

Funding Source: STATE<br />

Year Built:<br />

Natural Gas<br />

(th/yr)<br />

18,500<br />

LOS ANGELES<br />

Chilled Water<br />

(ton-hr/yr)<br />

Extrapolated N/A N/A Extrapolated N/A<br />

Monthly <strong>Energy</strong> Use (Gas/Heating Hot Water/Steam)<br />

Monthly <strong>Energy</strong> Use (Chilled Water)<br />

1995<br />

Basic Gross Area (sf): 31,311<br />

Building Type: BASIC<br />

Primary Asset Type: Office<br />

Secondary Asset Type: Laboratory<br />

Weekly Load Profile (Electric)<br />

Metered Data Not Available<br />

Weekly Load Profile (Natural Gas/Heating Hot Water/Steam)<br />

Metered Data Not Available<br />

Weekly Load Profile (Chilled Water)<br />

Metered Data Not Available Metered Data Not Available


<strong>Strategic</strong> <strong>Energy</strong> <strong>Plan</strong> Projects<br />

SEP ID<br />

Number Project Name<br />

D1001 AHU - 1 VIV to VAV SP Reset<br />

D3045 Monitoring Based Commissioning<br />

COLLINS CTR<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location:<br />

Building Key: 04C515A<br />

Funding Source: STATE<br />

Year Built:<br />

Electric<br />

(kWh/yr)<br />

Peak<br />

Demand<br />

(kW)<br />

LOS ANGELES<br />

1995<br />

Building Savings Cost<br />

HW/Steam<br />

(MMBTU/yr)<br />

Gas<br />

(th/yr)<br />

Chilled<br />

Water<br />

(ton-hr/yr)<br />

Purchased<br />

Utility Cost<br />

Savings<br />

($/yr)<br />

61,694 0.0 418 0 25,367 $9,332<br />

24,109 3.0 0 3,288 0 $3,927<br />

Basic Gross Area (sf): 31,311<br />

Building Type: BASIC<br />

Primary Asset Type: Office<br />

Secondary Asset Type: Laboratory<br />

Project<br />

Cost<br />

($)<br />

Gross<br />

Potential<br />

Incentive<br />

($)<br />

Net<br />

Cost ($)<br />

Committed Tier:<br />

Simple<br />

Payback<br />

(yr)<br />

Backup<br />

$40,897 $24,902 $15,995 1.7<br />

Committed Tier:<br />

Backup<br />

$26,473 $9,074 $17,399 4.4<br />

Totals 85,803 3.0 418 3,288 25,367 $13,259 $67,370 $33,976 $33,394 2.5<br />

Building<br />

Benchmarking<br />

Baseline<br />

Implement Partnership Projects<br />

Implement SEP Projects<br />

Equivalent<br />

Electricity<br />

(kWh/yr)<br />

Equivalent<br />

Natural Gas<br />

(th/yr)<br />

Equivalent Electric<br />

<strong>Energy</strong> Use Index<br />

(kWh/sf-yr)<br />

Assumed Incentives: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh<br />

th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm<br />

kWh/ton-hr: 0.8<br />

Cap 80% project cost<br />

th/ton-hr: 0.0<br />

Equivalent Natural<br />

Gas <strong>Energy</strong> Use<br />

Index (th/sf-yr)<br />

Source <strong>Energy</strong><br />

Use Index<br />

(kBTU/sf-yr)<br />

396,300 18,500 12.7 0.6<br />

188.7<br />

396,300 18,500 12.7 0.6<br />

188.7<br />

290,203 9,987 9.3 0.3<br />

126.8<br />

Percent<br />

Savings<br />

(%)<br />

N/A<br />

0.0%<br />

32.8%<br />

Source <strong>Energy</strong> Use Conversion Factors:<br />

10.239 kBTU per kWh 100 kBTU per th


Historical <strong>Energy</strong> Use (06/07)<br />

Electricity<br />

(kWh/yr)<br />

700,500<br />

Steam<br />

(MMBTU/yr)<br />

Hot Water<br />

(MMBTU/yr)<br />

Monthly <strong>Energy</strong> Use (Electric)<br />

Metered Data Not Available<br />

Metered Data Not Available<br />

GOLD HALL<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location:<br />

Building Key: 04C515B<br />

Funding Source: STATE<br />

Year Built:<br />

Natural Gas<br />

(th/yr)<br />

32,800<br />

LOS ANGELES<br />

Chilled Water<br />

(ton-hr/yr)<br />

Extrapolated N/A N/A Extrapolated N/A<br />

Monthly <strong>Energy</strong> Use (Gas/Heating Hot Water/Steam)<br />

Monthly <strong>Energy</strong> Use (Chilled Water)<br />

1995<br />

Basic Gross Area (sf): 55,344<br />

Building Type: BASIC<br />

Primary Asset Type: Office<br />

Secondary Asset Type: College Lecture Cl<br />

Weekly Load Profile (Electric)<br />

Metered Data Not Available<br />

Weekly Load Profile (Natural Gas/Heating Hot Water/Steam)<br />

Metered Data Not Available<br />

Weekly Load Profile (Chilled Water)<br />

Metered Data Not Available Metered Data Not Available


<strong>Strategic</strong> <strong>Energy</strong> <strong>Plan</strong> Projects<br />

SEP ID<br />

Number Project Name<br />

D1014 AHU - 2, 7, 9 VIV to VAV SP Reset<br />

D3046 Monitoring Based Commissioning<br />

GOLD HALL<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location:<br />

Building Key: 04C515B<br />

Funding Source: STATE<br />

Year Built:<br />

Electric<br />

(kWh/yr)<br />

Peak<br />

Demand<br />

(kW)<br />

LOS ANGELES<br />

1995<br />

Building Savings Cost<br />

HW/Steam<br />

(MMBTU/yr)<br />

Gas<br />

(th/yr)<br />

Chilled<br />

Water<br />

(ton-hr/yr)<br />

Purchased<br />

Utility Cost<br />

Savings<br />

($/yr)<br />

135,028 1.0 991 0 57,174 $20,947<br />

42,615 5.0 0 5,811 0 $6,941<br />

Basic Gross Area (sf): 55,344<br />

Building Type: BASIC<br />

Primary Asset Type: Office<br />

Secondary Asset Type: College Lecture Cl<br />

Project<br />

Cost<br />

($)<br />

Gross<br />

Potential<br />

Incentive<br />

($)<br />

Net<br />

Cost ($)<br />

Committed Tier:<br />

Simple<br />

Payback<br />

(yr)<br />

Backup<br />

$115,534 $55,772 $59,762 2.9<br />

Committed Tier:<br />

Backup<br />

$46,791 $16,039 $30,752 4.4<br />

Totals 177,643 6.0 991 5,811 57,174 $27,888 $162,325 $71,811 $90,514 3.2<br />

Building<br />

Benchmarking<br />

Baseline<br />

Implement Partnership Projects<br />

Implement SEP Projects<br />

Equivalent<br />

Electricity<br />

(kWh/yr)<br />

Equivalent<br />

Natural Gas<br />

(th/yr)<br />

Equivalent Electric<br />

<strong>Energy</strong> Use Index<br />

(kWh/sf-yr)<br />

Assumed Incentives: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh<br />

th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm<br />

kWh/ton-hr: 0.8<br />

Cap 80% project cost<br />

th/ton-hr: 0.0<br />

Equivalent Natural<br />

Gas <strong>Energy</strong> Use<br />

Index (th/sf-yr)<br />

Source <strong>Energy</strong><br />

Use Index<br />

(kBTU/sf-yr)<br />

700,500 32,800 12.7 0.6<br />

188.9<br />

700,500 32,800 12.7 0.6<br />

188.9<br />

477,118 14,602 8.6 0.3<br />

114.7<br />

Percent<br />

Savings<br />

(%)<br />

N/A<br />

0.0%<br />

39.3%<br />

Source <strong>Energy</strong> Use Conversion Factors:<br />

10.239 kBTU per kWh 100 kBTU per th


Historical <strong>Energy</strong> Use (06/07)<br />

Electricity<br />

(kWh/yr)<br />

918,800<br />

Steam<br />

(MMBTU/yr)<br />

Hot Water<br />

(MMBTU/yr)<br />

Monthly <strong>Energy</strong> Use (Electric)<br />

Metered Data Not Available<br />

Metered Data Not Available<br />

ENTREP HALL<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location:<br />

Building Key: 04C515C<br />

Funding Source: STATE<br />

Year Built:<br />

Natural Gas<br />

(th/yr)<br />

43,000<br />

LOS ANGELES<br />

Chilled Water<br />

(ton-hr/yr)<br />

Extrapolated N/A N/A Extrapolated N/A<br />

Monthly <strong>Energy</strong> Use (Gas/Heating Hot Water/Steam)<br />

Monthly <strong>Energy</strong> Use (Chilled Water)<br />

1995<br />

Basic Gross Area (sf): 72,591<br />

Building Type: BASIC<br />

Primary Asset Type: Office<br />

Secondary Asset Type: Auditorium<br />

Weekly Load Profile (Electric)<br />

Metered Data Not Available<br />

Weekly Load Profile (Natural Gas/Heating Hot Water/Steam)<br />

Metered Data Not Available<br />

Weekly Load Profile (Chilled Water)<br />

Metered Data Not Available Metered Data Not Available


<strong>Strategic</strong> <strong>Energy</strong> <strong>Plan</strong> Projects<br />

SEP ID<br />

Number Project Name<br />

D1036 AHU - 3 VIV to VAV SP Reset<br />

D1037 VFD + DCV for a CAV system<br />

D3047 Monitoring Based Commissioning<br />

ENTREP HALL<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location:<br />

Building Key: 04C515C<br />

Funding Source: STATE<br />

Year Built:<br />

Electric<br />

(kWh/yr)<br />

Peak<br />

Demand<br />

(kW)<br />

LOS ANGELES<br />

1995<br />

Building Savings Cost<br />

HW/Steam<br />

(MMBTU/yr)<br />

Gas<br />

(th/yr)<br />

Chilled<br />

Water<br />

(ton-hr/yr)<br />

Purchased<br />

Utility Cost<br />

Savings<br />

($/yr)<br />

79,357 1.0 600 0 33,987 $12,432<br />

51,550 2.0 117 0 3,161 $5,379<br />

55,895 6.0 0 7,622 0 $9,104<br />

Basic Gross Area (sf): 72,591<br />

Building Type: BASIC<br />

Primary Asset Type: Office<br />

Secondary Asset Type: Auditorium<br />

Project<br />

Cost<br />

($)<br />

Gross<br />

Potential<br />

Incentive<br />

($)<br />

Net<br />

Cost ($)<br />

Committed Tier:<br />

Simple<br />

Payback<br />

(yr)<br />

Backup<br />

$41,969 $33,071 $8,898 0.7<br />

Committed Tier:<br />

Backup<br />

$10,407 $14,441 $2,081 0.4<br />

Committed Tier:<br />

Backup<br />

$61,372 $21,037 $40,335 4.4<br />

Totals 186,802 9.0 717 7,622 37,148 $26,915 $113,748 $68,549 $51,314 1.9<br />

Building<br />

Benchmarking<br />

Baseline<br />

Implement Partnership Projects<br />

Implement SEP Projects<br />

Equivalent<br />

Electricity<br />

(kWh/yr)<br />

Equivalent<br />

Natural Gas<br />

(th/yr)<br />

Equivalent Electric<br />

<strong>Energy</strong> Use Index<br />

(kWh/sf-yr)<br />

Assumed Incentives: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh<br />

th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm<br />

kWh/ton-hr: 0.8<br />

Cap 80% project cost<br />

th/ton-hr: 0.0<br />

Equivalent Natural<br />

Gas <strong>Energy</strong> Use<br />

Index (th/sf-yr)<br />

Source <strong>Energy</strong><br />

Use Index<br />

(kBTU/sf-yr)<br />

918,800 43,000 12.7 0.6<br />

188.8<br />

918,800 43,000 12.7 0.6<br />

188.8<br />

702,280 26,416 9.7 0.4<br />

135.4<br />

Percent<br />

Savings<br />

(%)<br />

N/A<br />

0.0%<br />

28.3%<br />

Source <strong>Energy</strong> Use Conversion Factors:<br />

10.239 kBTU per kWh 100 kBTU per th


Historical <strong>Energy</strong> Use (06/07)<br />

Electricity<br />

(kWh/yr)<br />

908,000<br />

Steam<br />

(MMBTU/yr)<br />

Hot Water<br />

(MMBTU/yr)<br />

Monthly <strong>Energy</strong> Use (Electric)<br />

Metered Data Not Available<br />

Metered Data Not Available<br />

CORNELL HALL<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location:<br />

Building Key: 04C515D<br />

Funding Source: STATE<br />

Year Built:<br />

Natural Gas<br />

(th/yr)<br />

42,500<br />

LOS ANGELES<br />

Chilled Water<br />

(ton-hr/yr)<br />

Extrapolated N/A N/A Extrapolated N/A<br />

Monthly <strong>Energy</strong> Use (Gas/Heating Hot Water/Steam)<br />

Monthly <strong>Energy</strong> Use (Chilled Water)<br />

1995<br />

Basic Gross Area (sf): 71,737<br />

Building Type: BASIC<br />

Primary Asset Type: Office<br />

Secondary Asset Type: College Lecture Cl<br />

Weekly Load Profile (Electric)<br />

Metered Data Not Available<br />

Weekly Load Profile (Natural Gas/Heating Hot Water/Steam)<br />

Metered Data Not Available<br />

Weekly Load Profile (Chilled Water)<br />

Metered Data Not Available Metered Data Not Available


<strong>Strategic</strong> <strong>Energy</strong> <strong>Plan</strong> Projects<br />

SEP ID<br />

Number Project Name<br />

D1057 AHU - 4 VIV to VAV SP Reset<br />

D3048 Monitoring Based Commissioning<br />

D6007 CW Reset<br />

CORNELL HALL<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location:<br />

Building Key: 04C515D<br />

Funding Source: STATE<br />

Year Built:<br />

Electric<br />

(kWh/yr)<br />

Peak<br />

Demand<br />

(kW)<br />

LOS ANGELES<br />

1995<br />

Building Savings Cost<br />

HW/Steam<br />

(MMBTU/yr)<br />

Gas<br />

(th/yr)<br />

Chilled<br />

Water<br />

(ton-hr/yr)<br />

Purchased<br />

Utility Cost<br />

Savings<br />

($/yr)<br />

70,904 0.0 549 0 30,662 $11,197<br />

55,237 6.0 0 7,532 0 $8,997<br />

68,040 0.0 0 0 0 $5,988<br />

Basic Gross Area (sf): 71,737<br />

Building Type: BASIC<br />

Primary Asset Type: Office<br />

Secondary Asset Type: College Lecture Cl<br />

Project<br />

Cost<br />

($)<br />

Gross<br />

Potential<br />

Incentive<br />

($)<br />

Net<br />

Cost ($)<br />

Committed Tier:<br />

Simple<br />

Payback<br />

(yr)<br />

Backup<br />

$45,552 $29,767 $15,785 1.4<br />

Committed Tier:<br />

Backup<br />

$60,651 $20,789 $39,862 4.4<br />

Committed Tier:<br />

Backup<br />

$9,013 $16,330 $1,803 0.3<br />

Totals 194,181 6.0 549 7,532 30,662 $26,181 $115,217 $66,886 $57,450 2.2<br />

Building<br />

Benchmarking<br />

Baseline<br />

Implement Partnership Projects<br />

Implement SEP Projects<br />

Equivalent<br />

Electricity<br />

(kWh/yr)<br />

Equivalent<br />

Natural Gas<br />

(th/yr)<br />

Equivalent Electric<br />

<strong>Energy</strong> Use Index<br />

(kWh/sf-yr)<br />

Assumed Incentives: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh<br />

th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm<br />

kWh/ton-hr: 0.8<br />

Cap 80% project cost<br />

th/ton-hr: 0.0<br />

Equivalent Natural<br />

Gas <strong>Energy</strong> Use<br />

Index (th/sf-yr)<br />

Source <strong>Energy</strong><br />

Use Index<br />

(kBTU/sf-yr)<br />

908,000 42,500 12.7 0.6<br />

188.8<br />

908,000 42,500 12.7 0.6<br />

188.8<br />

689,289 28,106 9.6 0.4<br />

137.6<br />

Percent<br />

Savings<br />

(%)<br />

N/A<br />

0.0%<br />

27.2%<br />

Source <strong>Energy</strong> Use Conversion Factors:<br />

10.239 kBTU per kWh 100 kBTU per th


Historical <strong>Energy</strong> Use (06/07)<br />

Electricity<br />

(kWh/yr)<br />

646,100<br />

Steam<br />

(MMBTU/yr)<br />

Hot Water<br />

(MMBTU/yr)<br />

Monthly <strong>Energy</strong> Use (Electric)<br />

Metered Data Not Available<br />

Metered Data Not Available<br />

ROSNFLD LIBR<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location:<br />

Building Key: 04C515E<br />

Funding Source: STATE<br />

Year Built:<br />

Natural Gas<br />

(th/yr)<br />

30,200<br />

LOS ANGELES<br />

Chilled Water<br />

(ton-hr/yr)<br />

Extrapolated N/A N/A Extrapolated N/A<br />

Monthly <strong>Energy</strong> Use (Gas/Heating Hot Water/Steam)<br />

Monthly <strong>Energy</strong> Use (Chilled Water)<br />

1995<br />

Basic Gross Area (sf): 51,046<br />

Building Type: BASIC<br />

Primary Asset Type: Library<br />

Secondary Asset Type: Office<br />

Weekly Load Profile (Electric)<br />

Metered Data Not Available<br />

Weekly Load Profile (Natural Gas/Heating Hot Water/Steam)<br />

Metered Data Not Available<br />

Weekly Load Profile (Chilled Water)<br />

Metered Data Not Available Metered Data Not Available


<strong>Strategic</strong> <strong>Energy</strong> <strong>Plan</strong> Projects<br />

SEP ID<br />

Number Project Name<br />

D1058 AHU - 6 VIV to VAV SP Reset<br />

D3049 Monitoring Based Commissioning<br />

ROSNFLD LIBR<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location:<br />

Building Key: 04C515E<br />

Funding Source: STATE<br />

Year Built:<br />

Electric<br />

(kWh/yr)<br />

Peak<br />

Demand<br />

(kW)<br />

LOS ANGELES<br />

1995<br />

Building Savings Cost<br />

HW/Steam<br />

(MMBTU/yr)<br />

Gas<br />

(th/yr)<br />

Chilled<br />

Water<br />

(ton-hr/yr)<br />

Purchased<br />

Utility Cost<br />

Savings<br />

($/yr)<br />

77,567 1.0 582 0 33,154 $12,122<br />

39,305 4.0 0 5,360 0 $6,402<br />

Basic Gross Area (sf): 51,046<br />

Building Type: BASIC<br />

Primary Asset Type: Library<br />

Secondary Asset Type: Office<br />

Project<br />

Cost<br />

($)<br />

Gross<br />

Potential<br />

Incentive<br />

($)<br />

Net<br />

Cost ($)<br />

Committed Tier:<br />

Simple<br />

Payback<br />

(yr)<br />

Backup<br />

$47,642 $32,257 $15,385 1.3<br />

Committed Tier:<br />

Backup<br />

$43,159 $14,793 $28,366 4.4<br />

Totals 116,872 5.0 582 5,360 33,154 $18,525 $90,800 $47,050 $43,751 2.4<br />

Building<br />

Benchmarking<br />

Baseline<br />

Implement Partnership Projects<br />

Implement SEP Projects<br />

Equivalent<br />

Electricity<br />

(kWh/yr)<br />

Equivalent<br />

Natural Gas<br />

(th/yr)<br />

Equivalent Electric<br />

<strong>Energy</strong> Use Index<br />

(kWh/sf-yr)<br />

Assumed Incentives: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh<br />

th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm<br />

kWh/ton-hr: 0.8<br />

Cap 80% project cost<br />

th/ton-hr: 0.0<br />

Equivalent Natural<br />

Gas <strong>Energy</strong> Use<br />

Index (th/sf-yr)<br />

Source <strong>Energy</strong><br />

Use Index<br />

(kBTU/sf-yr)<br />

646,100 30,200 12.7 0.6<br />

188.8<br />

646,100 30,200 12.7 0.6<br />

188.8<br />

502,705 17,565 9.8 0.3<br />

135.2<br />

Percent<br />

Savings<br />

(%)<br />

N/A<br />

0.0%<br />

28.4%<br />

Source <strong>Energy</strong> Use Conversion Factors:<br />

10.239 kBTU per kWh 100 kBTU per th


Historical <strong>Energy</strong> Use (06/07)<br />

Electricity<br />

(kWh/yr)<br />

429,800<br />

Steam<br />

(MMBTU/yr)<br />

Hot Water<br />

(MMBTU/yr)<br />

Monthly <strong>Energy</strong> Use (Electric)<br />

Metered Data Not Available<br />

Metered Data Not Available<br />

MULLIN CMNS<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location:<br />

Building Key: 04C515F<br />

Funding Source: STATE<br />

Year Built:<br />

Natural Gas<br />

(th/yr)<br />

20,100<br />

LOS ANGELES<br />

Chilled Water<br />

(ton-hr/yr)<br />

Extrapolated N/A N/A Extrapolated N/A<br />

Monthly <strong>Energy</strong> Use (Gas/Heating Hot Water/Steam)<br />

Monthly <strong>Energy</strong> Use (Chilled Water)<br />

1995<br />

Basic Gross Area (sf): 33,957<br />

Building Type: BASIC<br />

Primary Asset Type: Office<br />

Secondary Asset Type: Food Service<br />

Weekly Load Profile (Electric)<br />

Metered Data Not Available<br />

Weekly Load Profile (Natural Gas/Heating Hot Water/Steam)<br />

Metered Data Not Available<br />

Weekly Load Profile (Chilled Water)<br />

Metered Data Not Available Metered Data Not Available


<strong>Strategic</strong> <strong>Energy</strong> <strong>Plan</strong> Projects<br />

SEP ID<br />

Number Project Name<br />

D1059 AHU - 5 & 10 VIV to VAV SP Reset<br />

D3050 Monitoring Based Commissioning<br />

MULLIN CMNS<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location:<br />

Building Key: 04C515F<br />

Funding Source: STATE<br />

Year Built:<br />

Electric<br />

(kWh/yr)<br />

Peak<br />

Demand<br />

(kW)<br />

LOS ANGELES<br />

1995<br />

Building Savings Cost<br />

HW/Steam<br />

(MMBTU/yr)<br />

Gas<br />

(th/yr)<br />

Chilled<br />

Water<br />

(ton-hr/yr)<br />

Purchased<br />

Utility Cost<br />

Savings<br />

($/yr)<br />

82,155 1.0 599 0 34,737 $12,720<br />

26,147 3.0 0 3,565 0 $4,259<br />

Basic Gross Area (sf): 33,957<br />

Building Type: BASIC<br />

Primary Asset Type: Office<br />

Secondary Asset Type: Food Service<br />

Project<br />

Cost<br />

($)<br />

Gross<br />

Potential<br />

Incentive<br />

($)<br />

Net<br />

Cost ($)<br />

Committed Tier:<br />

Simple<br />

Payback<br />

(yr)<br />

Backup<br />

$74,077 $33,874 $40,203 3.2<br />

Committed Tier:<br />

Backup<br />

$28,708 $9,840 $18,868 4.4<br />

Totals 108,302 4.0 599 3,565 34,737 $16,978 $102,785 $43,714 $59,071 3.5<br />

Building<br />

Benchmarking<br />

Baseline<br />

Implement Partnership Projects<br />

Implement SEP Projects<br />

Equivalent<br />

Electricity<br />

(kWh/yr)<br />

Equivalent<br />

Natural Gas<br />

(th/yr)<br />

Equivalent Electric<br />

<strong>Energy</strong> Use Index<br />

(kWh/sf-yr)<br />

Assumed Incentives: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh<br />

th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm<br />

kWh/ton-hr: 0.8<br />

Cap 80% project cost<br />

th/ton-hr: 0.0<br />

Equivalent Natural<br />

Gas <strong>Energy</strong> Use<br />

Index (th/sf-yr)<br />

Source <strong>Energy</strong><br />

Use Index<br />

(kBTU/sf-yr)<br />

429,800 20,100 12.7 0.6<br />

188.8<br />

429,800 20,100 12.7 0.6<br />

188.8<br />

293,708 9,048 8.6 0.3<br />

115.2<br />

Percent<br />

Savings<br />

(%)<br />

N/A<br />

0.0%<br />

39.0%<br />

Source <strong>Energy</strong> Use Conversion Factors:<br />

10.239 kBTU per kWh 100 kBTU per th


10. PROJECT SUMMARIES<br />

The following pages provide a concise project summary for each SEP project. The section,<br />

organized by SEP ID Number, includes the following summary information, and additional<br />

information for each project can be found in the Appendices.<br />

• Basic information including the project SEP ID Number, name, and project location.<br />

• Project prioritization, as committed to by the campus upon review of the preliminary<br />

project list. Tier 1 projects formed a committed energy savings level to the Investor<br />

Owned Utilities. Tier 2 projects reflect the campus’ planned projects to achieve<br />

approximately 150% of the committed energy savings. Backup projects serve as<br />

potential projects the campus may consider or substitute for other projects at any time.<br />

It should be noted that energy savings for select projects may have been refined since<br />

the preliminary project list, as discussed in Section 2 of this report. (Note that all <strong>UC</strong>LA<br />

projects will be shown as “Backup” because the campus did not formally commit to<br />

projects in conjunction with the IOU deadlines.)<br />

• The Calculation File Name provides a reference for the file name, and path if applicable,<br />

of the energy calculation which is included as a soft copy in the appendix of this report.<br />

• The Project Description Reference provides the titles of the projects (Air Handler Project<br />

1, Lighting Project 3, etc) as defined in the <strong>Energy</strong> Efficiency Project Description section<br />

earlier in this report.<br />

• Building <strong>Energy</strong> Savings. The project energy savings are summarized at the building<br />

level, which include chilled water and heating hot water or steam, if supplied from a<br />

central plant, as well as the direct gas or electric savings. The total cost savings are<br />

estimated based on the purchased utility savings (including central plant and<br />

cogeneration impacts) and campus recharge rates.<br />

• Incentive Calculation Basis. The projected utility incentive is provided using the<br />

equivalent electric and gas savings, which convert chilled water and heating hot water or<br />

steam savings to electric or gas savings using the central plant efficiencies. The<br />

incentive shown in this section is the gross potential incentive, without consideration of a<br />

project cost cap.<br />

• Project Cost Summary. Details are displayed for the cost buildup, including appropriate<br />

multipliers and soft costs. If the source of a cost is the construction cost, contingency,<br />

engineering, construction management and project management is added. If the bare<br />

costs are known, the applicable city multipliers, tax, and O&P included obtaining the<br />

estimated construction cost, to which the soft costs are added.<br />

• Project Economics Summary. The project costs, savings and resulting simple payback<br />

are calculated. The utility incentive stated here takes into consideration the project cost<br />

cap, and is highlighted if it is capped by the project cost. The monetary savings is based<br />

on the purchased utility savings and campus recharge rate.<br />

2413.01/Reports/<strong>UC</strong> SEP Final Report – <strong>UC</strong>LA.doc 10-1 December 31, 2008<br />

Newcomb | Anderson | McCormick


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: AHU - 1 VIV to VAV SP Reset<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: COLLINS CTR<br />

Building Key: 04C515A<br />

Basic Gross Area (sf): 31,311<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D1001<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

61,694<br />

0.0<br />

0<br />

25,367<br />

418<br />

Equipment Description Qty<br />

\1. Collins CTR\1. <strong>UC</strong>LA CVRH_VAV Collins CTR AHU 1 VIV to VAV SP Reset.xls<br />

Project Description Reference(s): Air Handler Project 2. Convert Constant Volume Air Handlers to Variable Air Volume & Air Handler Project 4.<br />

Static Pressure Reset on Variable Air Volume Air Handlers .<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

81,988<br />

5,225<br />

Extended Bare<br />

Labor Cost ($)<br />

$24,902<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

15 hp VFD 1 $2,275.00 $2,332 $820.00<br />

$919<br />

30 hp VFD 1 $4,775.00 $4,894 $1,100.00 $1,233<br />

SAV with InCite 1 $4,500.00 $4,613 $7,150.00 $8,015<br />

License Fee (estimated per 1000 CFM) 25 $0.00 $0 $56.00 $1,569<br />

VIV Removal 16 $0.00 $0 $100.00 $1,794<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

Raw Costs:<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

$11,839 $13,530<br />

$977<br />

$1,538<br />

$14,353<br />

$1,435<br />

$4,869<br />

$1,623<br />

$1,947<br />

N/A<br />

$1,624<br />

$15,154<br />

$1,515<br />

Totals: $15,789 $16,670<br />

Total Project Cost: $40,897<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $40,897<br />

Rebate/Incentive*:<br />

$24,902<br />

Net Project Cost: $15,995<br />

Net Simple Payback Period (yrs): 1.7<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

106,041<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.<br />

0<br />

$9,332


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: AHU 1 & 2 - SP Reset<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: FACMGMT BLDG<br />

Building Key: 04C4260<br />

Basic Gross Area (sf): 189,197<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D1002<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

40,882<br />

0.0<br />

0<br />

26,469<br />

644<br />

Equipment Description Qty<br />

\10. Facilities Management\1. <strong>UC</strong>LA CVRH_VAV FacMgmt Bldg AHU 1, 2 - SP Reset.xls<br />

Project Description Reference(s): Air Handler Project 4. Static Pressure Reset on Variable Air Volume Air Handlers .<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

62,057<br />

8,050<br />

Extended Bare<br />

Labor Cost ($)<br />

$22,944<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

SAV with InCite 2 $4,500.00 $9,225 $7,150.00 $16,030<br />

License Fee (estimated per 1000 CFM) 60 $0.00 $0 $56.00 $3,767<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

Raw Costs:<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

$9,225 $19,797<br />

$761<br />

$1,198<br />

$11,184<br />

$1,118<br />

$5,504<br />

$1,835<br />

$2,202<br />

N/A<br />

$2,376<br />

$22,172<br />

$2,217<br />

Totals: $12,303 $24,390<br />

Total Project Cost: $46,233<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $46,233<br />

Rebate/Incentive*:<br />

$22,944<br />

Net Project Cost: $23,289<br />

Net Simple Payback Period (yrs): 2.6<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

100,125<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.<br />

0<br />

$8,811


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: AHU 1 & 2 SP Reset<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: FOWLER MUSM<br />

Building Key: 04C4374<br />

Basic Gross Area (sf): 101,995<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D1003<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

161,685<br />

1.0<br />

0<br />

82,464<br />

2,357<br />

Equipment Description Qty<br />

\11. Fowler Musm\1. <strong>UC</strong>LA CVRH_VAV_60 Fowler MusmAHU 1 & 2 SP Reset.xls<br />

Project Description Reference(s): Air Handler Project 4. Static Pressure Reset on Variable Air Volume Air Handlers .<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

Extended Bare<br />

Labor Cost ($)<br />

227,656<br />

29,463<br />

$84,100<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

SAV with InCite 2 $4,500.00 $9,225 $7,150.00 $16,030<br />

License Fee (estimated per 1000 CFM) 92 $0.00 $0 $56.00 $5,775<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

Raw Costs:<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

$9,225 $21,806<br />

$761<br />

$1,198<br />

$11,184<br />

$1,118<br />

$5,875<br />

$1,958<br />

$2,350<br />

N/A<br />

$2,617<br />

$24,422<br />

$2,442<br />

Totals: $12,303 $26,865<br />

Total Project Cost: $49,351<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $49,351<br />

Rebate/Incentive*:<br />

$39,481<br />

Net Project Cost: $9,870<br />

Net Simple Payback Period (yrs): 0.3<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

368,136<br />

0<br />

$32,396<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: AHU 4 SP Reset<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: SAC<br />

Building Key: 04C4360<br />

Basic Gross Area (sf): 113,383<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D1004<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

32,518<br />

0.0<br />

0<br />

17,290<br />

512<br />

Equipment Description Qty<br />

\12. Gonda <strong>Center</strong>\1. <strong>UC</strong>LA CVRH_VAV Gonda <strong>Center</strong> AHU 4 SP Reset.xls<br />

Project Description Reference(s): Air Handler Project 4. Static Pressure Reset on Variable Air Volume Air Handlers .<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

46,350<br />

6,400<br />

Extended Bare<br />

Labor Cost ($)<br />

$17,524<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

License Fee (estimated per 1000 CFM) 20 $0.00 $0 $56.00 $1,256<br />

SAV with InCite 1 $4,500.00 $4,613 $7,150.00 $8,015<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

Raw Costs:<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

$4,613 $9,271<br />

$381<br />

$599<br />

$5,592<br />

$559<br />

$2,636<br />

$879<br />

$1,054<br />

N/A<br />

$1,112<br />

$10,383<br />

$1,038<br />

Totals: $6,151 $11,421<br />

Total Project Cost: $22,142<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $22,142<br />

Rebate/Incentive*:<br />

$17,524<br />

Net Project Cost: $4,618<br />

Net Simple Payback Period (yrs): 0.7<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.<br />

76,916<br />

0<br />

$6,769


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: CV Rebalance<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: GONDA CENTER<br />

Building Key: 04C4315<br />

Basic Gross Area (sf): 125,202<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D1005<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

211,550<br />

24.0<br />

0<br />

59,189<br />

1,194<br />

Equipment Description Qty<br />

\12. Gonda <strong>Center</strong>\2.1 <strong>UC</strong>LA HVAC Lab-1 Gonda <strong>Center</strong> CV Rebalance.xls<br />

Project Description Reference(s): Laboratory Air Handler Project 1. Convert Laboratory Air Handlers and Fume Hoods to Variable Air Volume.<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

Extended Bare<br />

Labor Cost ($)<br />

258,901<br />

14,925<br />

$77,061<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

Rebalance ($1.75 per square foot) 19,580 $0.00 $0 $1.75 $38,411<br />

40 hp VFD 1 $7,025.00 $7,201 $1,100.00 $1,233<br />

5 hp VFD 2 $1,675.00 $3,434 $455.00 $1,020<br />

1 hp VFD 1 $350.00 $359 $400.00<br />

$448<br />

2 hp VFD 2 $700.00 $1,435 $400.00<br />

$897<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

Raw Costs:<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

$12,428 $42,009<br />

$1,025<br />

$1,614<br />

$15,068<br />

$1,507<br />

$10,250<br />

$3,417<br />

$4,100<br />

N/A<br />

$5,041<br />

$47,051<br />

$4,705<br />

Totals: $16,575 $51,756<br />

Total Project Cost: $86,096<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $86,096<br />

Rebate/Incentive*:<br />

$68,877<br />

Net Project Cost: $17,219<br />

Net Simple Payback Period (yrs): 0.6<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

328,672<br />

0<br />

$28,923<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: DAC 1 to 4 & DAHU-1 - VIV to VAV SP Reset<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: COVEL COMMON<br />

Building Key: 04C4302D<br />

Basic Gross Area (sf): 144,067<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D1006<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

287,180<br />

2.0<br />

16,383<br />

Equipment Description Qty<br />

\14. Covel Commons\1. <strong>UC</strong>LA CVRH_VAV Covel Commons DAC 1 to 4 & DAHU-1 VIV to VAV SP Reset.xls<br />

Project Description Reference(s): Air Handler Project 2. Convert Constant Volume Air Handlers to Variable Air Volume & Air Handler Project 4.<br />

Static Pressure Reset on Variable Air Volume Air Handlers .<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

Extended Bare<br />

Labor Cost ($)<br />

287,180<br />

16,383<br />

$85,306<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

VIV Removal 80 $0.00 $0 $100.00 $8,968<br />

Program SP reset 80 $100.00 $8,968<br />

5 hp VFD 1 $1,675.00 $1,717 $455.00<br />

$510<br />

7.5 hp VFD 1 $1,975.00 $2,024 $545.00<br />

$611<br />

15 hp VFD 3 $2,275.00 $6,996 $820.00 $2,758<br />

20 hp VFD 1 $3,375.00 $3,459 $820.00<br />

$919<br />

25 hp VFD 1 $3,925.00 $4,023 $1,100.00 $1,233<br />

40 hp VFD 2 $7,025.00 $14,401 $1,100.00 $2,466<br />

30 hp VFD 1 $4,775.00 $4,894 $1,100.00 $1,233<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

Raw Costs:<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

$37,515 $27,666<br />

$3,095<br />

$4,873<br />

$45,483<br />

$4,548<br />

$12,617<br />

$4,206<br />

$5,047<br />

N/A<br />

$3,320<br />

$30,986<br />

$3,099<br />

Totals: $50,032 $34,085<br />

Total Project Cost: $105,987<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $105,987<br />

Rebate/Incentive*:<br />

$84,789<br />

Net Project Cost: $21,197<br />

Net Simple Payback Period (yrs): 0.6<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

389,410<br />

0<br />

$34,268<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: AHU 1 SP Reset<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: KERCKHOFF<br />

Building Key: 04C4310<br />

Basic Gross Area (sf): 70,820<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D1007<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

31,578<br />

0.0<br />

0<br />

18,206<br />

451<br />

Equipment Description Qty<br />

\17. Kerckhoff\1. <strong>UC</strong>LA CVRH_VAV Kerckhoff Hall AHU 1SP Reset.xls<br />

Project Description Reference(s): Air Handler Project 4. Static Pressure Reset on Variable Air Volume Air Handlers .<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

46,143<br />

5,638<br />

Extended Bare<br />

Labor Cost ($)<br />

$16,712<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

Program SP Reset 16 $0.00 $0 $100.00 $1,794<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

Raw Costs:<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

$0 $1,794<br />

$0<br />

$0<br />

$0<br />

$0<br />

$331<br />

$110<br />

$133<br />

N/A<br />

$215<br />

$2,009<br />

$201<br />

Totals: $0 $2,210<br />

Total Project Cost: $2,784<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $2,784<br />

Rebate/Incentive*:<br />

$2,227<br />

Net Project Cost: $557<br />

Net Simple Payback Period (yrs): 0.1<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.<br />

72,829<br />

0<br />

$6,409


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: CAV to VAV - AHU 2<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: KERCKHOFF<br />

Building Key: 04C4310<br />

Basic Gross Area (sf): 70,820<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D1008<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

29,236<br />

1.0<br />

0<br />

12,178<br />

226<br />

Equipment Description Qty<br />

\17. Kerckhoff\2. <strong>UC</strong>LA MZ_DD_VAV Kerckkhoff AHU 2 CAV to VAV.xls<br />

Project Description Reference(s): Air Handler Project 2. Convert Constant Volume Air Handlers to Variable Air Volume.<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

38,978<br />

2,825<br />

Extended Bare<br />

Labor Cost ($)<br />

$12,180<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

Dart @ zone 2 $440.00 $902 $128.00<br />

$287<br />

Dart Control 1 $8,710.00 $8,928 $2,900.00 $3,251<br />

2 hp VFD 1 $700.00 $718 $400.00<br />

$448<br />

10 hp VFD 1 $1,975.00 $2,024 $545.00<br />

$611<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

Raw Costs:<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

$12,572 $4,597<br />

$1,037<br />

$1,633<br />

$15,242<br />

$1,524<br />

$3,364<br />

$1,121<br />

$1,346<br />

N/A<br />

$552<br />

$5,149<br />

$515<br />

Totals: $16,766 $5,664<br />

Total Project Cost: $28,262<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $28,262<br />

Rebate/Incentive*:<br />

$12,180<br />

Net Project Cost: $16,082<br />

Net Simple Payback Period (yrs): 3.5<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.<br />

52,107<br />

0<br />

$4,585


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: Vivarium - CV Rebalance<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: LIFE SCIENCE<br />

Building Key: 04C4320<br />

Basic Gross Area (sf): 214,613<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D1009<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

0<br />

0.0<br />

0<br />

43,530<br />

725<br />

Equipment Description Qty<br />

\18. Life Sciences\1. <strong>UC</strong>LA_HVAC Lab_Life Science_Vivarium SF-2 - CV Rebalance.xls<br />

Project Description Reference(s): Laboratory Air Handler Project 1. Convert Laboratory Air Handlers and Fume Hoods to Variable Air Volume.<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

34,824<br />

9,063<br />

Extended Bare<br />

Labor Cost ($)<br />

$17,420<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

Rebalance ($1.75 per square foot) 12,359 $0.00 $0 $1.75 $24,245<br />

50 hp VFD 1 $7,650.00 $7,841 $1,375.00 $1,541<br />

2 hp VFD 1 $700.00 $718 $400.00<br />

$448<br />

5 hp VFD 1 $1,675.00 $1,717 $455.00<br />

$510<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

Raw Costs:<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

$10,276 $26,745<br />

$848<br />

$1,335<br />

$12,458<br />

$1,246<br />

$6,998<br />

$2,333<br />

$2,799<br />

N/A<br />

$3,209<br />

$29,955<br />

$2,995<br />

Totals: $13,704 $32,950<br />

Total Project Cost: $58,784<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $58,784<br />

Rebate/Incentive*:<br />

$17,420<br />

Net Project Cost: $41,364<br />

Net Simple Payback Period (yrs): 6.1<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.<br />

76,582<br />

0<br />

$6,739


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: SF - 4 & 5 - Aircuity<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: LIFE SCIENCE<br />

Building Key: 04C4320<br />

Basic Gross Area (sf): 214,613<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D1010<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

350,121<br />

32.0<br />

0<br />

299,188<br />

5,889<br />

Equipment Description Qty<br />

\18. Life Sciences\2. <strong>UC</strong>LA_HVAC Lab_Life Science SF-4 & 5 - Aircuity.xls<br />

Project Description Reference(s): Laboratory Air Handler Project 1. Convert Laboratory Air Handlers and Fume Hoods to Variable Air Volume &<br />

Laboratory Air Handler Project 2. Rebalance Variable Air Volume Laboratory (or Vivarium) Air Handlers.<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr): 589,471<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

73,613<br />

Extended Bare<br />

Labor Cost ($)<br />

$215,086<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

Fume Hood Conversion - CAV to VAV 60 $11,250.00 $691,875 $11,250.00 $756,675<br />

Aircuity, per sensor 15 $2,500.00 $38,438 $2,000.00 $33,630<br />

0.5 hp VFD 1 $175.00 $179 $350.00<br />

$392<br />

2 hp VFD 6 $700.00 $4,305 $400.00 $2,690<br />

3 hp VFD 1 $1,525.00 $1,563 $455.00<br />

$510<br />

5 hp VFD 3 $1,675.00 $5,151 $455.00 $1,530<br />

7.5 hp VFD 1 $1,975.00 $2,024 $545.00<br />

$611<br />

25 hp VFD 1 $3,925.00 $4,023 $1,100.00 $1,233<br />

30 hp VFD 1 $4,775.00 $4,894 $1,100.00 $1,233<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

Raw Costs:<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

$752,453 $798,505<br />

$62,077<br />

$97,744<br />

$912,273<br />

$91,227<br />

$298,089<br />

$99,363<br />

$119,236<br />

N/A<br />

$95,821<br />

$894,326<br />

$89,433<br />

Totals: $1,003,501 $983,758<br />

Total Project Cost: $2,503,946<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $2,503,946<br />

Rebate/Incentive*:<br />

$215,086<br />

Net Project Cost: $2,288,860<br />

Net Simple Payback Period (yrs): 27.9<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

933,010<br />

0<br />

$82,105<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: AHU 1 VIV to VAV & SP Reset<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: MACDONALDLAB<br />

Building Key: 04C4348<br />

Basic Gross Area (sf): 144,611<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D1011<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

9,792<br />

-2.0<br />

0<br />

2,157<br />

Equipment Description Qty<br />

\19. Macdonald Lab\1. <strong>UC</strong>LA CVRH_VAV Macdonald lab AHU 1 VIV to VAV & SP Reset.xls<br />

Project Description Reference(s): Air Handler Project 2. Convert Constant Volume Air Handlers to Variable Air Volume & Air Handler Project 4.<br />

Static Pressure Reset on Variable Air Volume Air Handlers .<br />

2<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

11,518<br />

25<br />

$2,789<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

Extended Bare<br />

Labor Cost ($)<br />

50 hp VFD 1 $7,650.00 $7,841 $1,375.00 $1,541<br />

License Fee (estimated per 1000 CFM) 32 $0.00 $0 $56.00 $2,009<br />

SAV with InCite 1 $4,500.00 $4,613 $7,150.00 $8,015<br />

VIV Removal 16 $0.00 $0 $100.00 $1,794<br />

10 hp VFD 1 $1,975.00 $2,024 $545.00<br />

$611<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

Raw Costs:<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

$14,478 $13,970<br />

$1,194<br />

$1,881<br />

$17,553<br />

$1,755<br />

$5,478<br />

$1,826<br />

$2,191<br />

N/A<br />

$1,676<br />

$15,646<br />

$1,565<br />

Totals: $19,309 $17,211<br />

Total Project Cost: $46,015<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $46,015<br />

Rebate/Incentive*:<br />

$2,789<br />

Net Project Cost: $43,226<br />

Net Simple Payback Period (yrs): 42.8<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.<br />

11,470<br />

0<br />

$1,009<br />

Backup


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: AHU 2 Vivarium Aircuity<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: MACDONALDLAB<br />

Building Key: 04C4348<br />

Basic Gross Area (sf): 144,611<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D1012<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

124,761<br />

14.0<br />

0<br />

35,066<br />

584<br />

Equipment Description Qty<br />

\19. Macdonald Lab\2 <strong>UC</strong>LA Lab Model Macdonald Lab AHU 2 Aircuity Vivarium.xls<br />

Project Description Reference(s): Laboratory Air Handler Project 1. Convert Laboratory Air Handlers and Fume Hoods to Variable Air Volume &<br />

Laboratory Air Handler Project 2. Rebalance Variable Air Volume Laboratory (or Vivarium) Air Handlers.<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr): 152,814<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

7,300<br />

Extended Bare<br />

Labor Cost ($)<br />

$43,975<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

Aircuity, per sensor 3 $2,500.00 $7,688 $2,000.00 $6,726<br />

Fume Hood Conversion - CAV to VAV 12 $11,250.00 $138,375 $11,250.00 $151,335<br />

10 hp VFD 1 $1,975.00 $2,024 $545.00<br />

$611<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

Raw Costs:<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

$148,087 $158,672<br />

$12,217<br />

$19,236<br />

$179,541<br />

$17,954<br />

$58,947<br />

$19,649<br />

$23,579<br />

N/A<br />

$19,041<br />

$177,713<br />

$17,771<br />

Totals: $197,495 $195,484<br />

Total Project Cost: $495,153<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $495,153<br />

Rebate/Incentive*:<br />

$43,975<br />

Net Project Cost: $451,178<br />

Net Simple Payback Period (yrs): 27.5<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

186,450<br />

0<br />

$16,408<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: Lab CAV to VAV with Aircuity<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: MACDONALDLAB<br />

Building Key: 04C4348<br />

Basic Gross Area (sf): 144,611<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D1013<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

1,477,065<br />

154.0<br />

0<br />

388,927<br />

9,274<br />

Equipment Description Qty<br />

\19. Macdonald Lab\3 <strong>UC</strong>LA .Lab Model Macdonald Lab.xls<br />

Project Description Reference(s): Air Handler Project 2. Convert Constant Volume Air Handlers to Variable Air Volume.<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

Extended Bare<br />

Labor Cost ($)<br />

1,788,207<br />

115,925<br />

$545,095<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

Aircuity, per sensor 30 $2,500.00 $76,875 $2,000.00 $67,260<br />

15 hp VFD 4 $2,275.00 $9,328 $820.00 $3,677<br />

25 hp VFD 2 $3,925.00 $8,046 $1,100.00 $2,466<br />

125 hp VFD 2 $12,900.00 $26,445 $1,800.00 $4,036<br />

Fume Hood Conversion - CAV to VAV 95 $11,250.00 $1,095,469 $11,250.00 $1,198,069<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

Raw Costs:<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

$1,216,163 $1,275,507<br />

$100,333<br />

$157,980<br />

$1,474,475<br />

$147,448<br />

$479,002<br />

$159,667<br />

$191,601<br />

N/A<br />

$153,061<br />

$1,428,568<br />

$142,857<br />

Totals: $1,621,923 $1,571,425<br />

Total Project Cost: $4,023,619<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $4,023,619<br />

Rebate/Incentive*:<br />

$545,095<br />

Net Project Cost: $3,478,524<br />

Net Simple Payback Period (yrs): 16.9<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

2,335,790<br />

0<br />

$205,550<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: AHU - 2, 7, 9 VIV to VAV SP Reset<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: GOLD HALL<br />

Building Key: 04C515B<br />

Basic Gross Area (sf): 55,344<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D1014<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

135,028<br />

1.0<br />

0<br />

57,174<br />

991<br />

Equipment Description Qty<br />

\2. Gold Hall\1. <strong>UC</strong>LA CVRH_VAV Gold Hall AHU 2, 7, 9 VIV to VAV SP Reset.xls<br />

Project Description Reference(s): Air Handler Project 2. Convert Constant Volume Air Handlers to Variable Air Volume & Air Handler Project 4.<br />

Static Pressure Reset on Variable Air Volume Air Handlers .<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

Extended Bare<br />

Labor Cost ($)<br />

180,767<br />

12,388<br />

$55,772<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

50 hp VFD 1 $7,650.00 $7,841 $1,375.00 $1,541<br />

VIV Removal 48 $0.00 $0 $100.00 $5,381<br />

License Fee (estimated per 1000 CFM) 59 $0.00 $0 $56.00 $3,704<br />

SAV with InCite 3 $4,500.00 $13,838 $7,150.00 $24,045<br />

Dart Control 0 $8,710.00 $0 $2,900.00<br />

$0<br />

15 hp VFD 2 $2,275.00 $4,664 $820.00 $1,838<br />

5 hp VFD 2 $1,675.00 $3,434 $455.00 $1,020<br />

Dart @ Zone 0 $440.00 $0 $128.00<br />

$0<br />

20 hp VFD 1 $3,375.00 $3,459 $820.00<br />

$919<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

Raw Costs:<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

$33,236 $38,449<br />

$2,742<br />

$4,317<br />

$40,295<br />

$4,029<br />

$13,754<br />

$4,585<br />

$5,502<br />

N/A<br />

$4,614<br />

$43,063<br />

$4,306<br />

Totals: $44,324 $47,369<br />

Total Project Cost: $115,534<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $115,534<br />

Rebate/Incentive*:<br />

$55,772<br />

Net Project Cost: $59,762<br />

Net Simple Payback Period (yrs): 2.9<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

238,032<br />

0<br />

$20,947<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: AHU - 5 VIV to VAV & SP Reset<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: MOLECULR SCI<br />

Building Key: 04C4228C<br />

Basic Gross Area (sf): 178,666<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D1015<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

10,294<br />

0.0<br />

0<br />

1,857<br />

Equipment Description Qty<br />

\22. Molecular Sci\1. <strong>UC</strong>LA CVRH_VAVMolecular Sci AHU 5 VIV to VAV SP Reset.xls<br />

Project Description Reference(s): Air Handler Project 2. Convert Constant Volume Air Handlers to Variable Air Volume & Air Handler Project 4.<br />

Static Pressure Reset on Variable Air Volume Air Handlers .<br />

16<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

11,780<br />

200<br />

$3,027<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

Extended Bare<br />

Labor Cost ($)<br />

20 hp VFD 1 $3,375.00 $3,459 $820.00<br />

$919<br />

VIV Removal 16 $0.00 $0 $100.00 $1,794<br />

SAV with InCite 1 $4,500.00 $4,613 $7,150.00 $8,015<br />

3 hp VFD 1 $1,525.00 $1,563 $455.00<br />

$510<br />

License Fee (estimated per 1000 CFM) 16 $0.00 $0 $56.00 $1,004<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

Raw Costs:<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

$9,635 $12,242<br />

$795<br />

$1,252<br />

$11,681<br />

$1,168<br />

$4,190<br />

$1,397<br />

$1,676<br />

N/A<br />

$1,469<br />

$13,712<br />

$1,371<br />

Totals: $12,850 $15,083<br />

Total Project Cost: $35,195<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $35,195<br />

Rebate/Incentive*:<br />

$3,027<br />

Net Project Cost: $32,168<br />

Net Simple Payback Period (yrs): 28.9<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.<br />

12,629<br />

0<br />

$1,111<br />

Backup


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: AHU 1, 2, 3, 4 & 6 Aircuity<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: MOLECULR SCI<br />

Building Key: 04C4228C<br />

Basic Gross Area (sf): 178,666<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D1016<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

2,629,450<br />

68.0<br />

0<br />

104,815<br />

13,688<br />

Equipment Description Qty<br />

\22. Molecular Sci\2. <strong>UC</strong>LA HVAC Lab Molecular Sci AHU 1, 2, 3, 4 & 6 Aircuity.xls<br />

Project Description Reference(s): Laboratory Air Handler Project 3. Reduce Minimum Air Change Requirements through Continuous Monitoring.<br />

Scaled savings to account for previous hood project<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr): 2,713,302<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

Extended Bare<br />

Labor Cost ($)<br />

171,100<br />

$822,292<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

Rebalance ($1.75 per square foot) 175,000 $0.00 $0 $1.75 $343,306<br />

Aircuity, per sensor 80 $2,500.00 $205,000 $2,000.00 $179,360<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

Raw Costs:<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

$205,000 $522,666<br />

$16,913<br />

$26,630<br />

$248,542<br />

$24,854<br />

$137,598<br />

$45,866<br />

$55,039<br />

N/A<br />

$62,720<br />

$585,386<br />

$58,539<br />

Totals: $273,396 $643,925<br />

Total Project Cost: $1,155,824<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $1,155,824<br />

Rebate/Incentive*:<br />

$822,292<br />

Net Project Cost: $333,532<br />

Net Simple Payback Period (yrs): 1.1<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

3,559,048<br />

0<br />

$313,196<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: S-1 CAV to VAV<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: POWELL LIB<br />

Building Key: 04C4318A<br />

Basic Gross Area (sf): 166,846<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D1017<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

7,870<br />

1.0<br />

0<br />

7,191<br />

143<br />

Equipment Description Qty<br />

\23. Powell Lib\1. <strong>UC</strong>LA MZ_DD_VAV Powell Lib S-1 CAV to VAV.xls<br />

Project Description Reference(s): Air Handler Project 2. Convert Constant Volume Air Handlers to Variable Air Volume.<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

13,623<br />

1,788<br />

$5,057<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

Extended Bare<br />

Labor Cost ($)<br />

5 hp VFD 1 $1,675.00 $1,717 $455.00<br />

$510<br />

10 hp VFD 1 $1,975.00 $2,024 $545.00<br />

$611<br />

Dart Control 1 $8,710.00 $8,928 $2,900.00 $3,251<br />

Dart @ zone 9 $440.00 $4,059 $128.00 $1,291<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

Raw Costs:<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

$16,728 $5,663<br />

$1,380<br />

$2,173<br />

$20,281<br />

$2,028<br />

$4,393<br />

$1,464<br />

$1,757<br />

N/A<br />

$680<br />

$6,343<br />

$634<br />

Totals: $22,309 $6,977<br />

Total Project Cost: $36,901<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $36,901<br />

Rebate/Incentive*:<br />

$5,057<br />

Net Project Cost: $31,844<br />

Net Simple Payback Period (yrs): 16.5<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.<br />

21,971<br />

0<br />

$1,933<br />

Backup


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: AH 1 to 4, 17 & 37 CAV to VAV with DCV<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: POWELL LIB<br />

Building Key: 04C4318A<br />

Basic Gross Area (sf): 166,846<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D1018<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

44,410<br />

10.0<br />

0<br />

4,351<br />

-23<br />

Equipment Description Qty<br />

\23. Powell Lib\2. <strong>UC</strong>LA DCV - SZ_VAV Powell Lib AH 1 to 4, 17 & 37 CAV to VAV & DCV.xls<br />

Project Description Reference(s): Air Handler Project 2. Convert Constant Volume Air Handlers to Variable Air Volume & Air Handler Project 3.<br />

Demand Control Ventilation.<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr): 47,891<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

-288<br />

Extended Bare<br />

Labor Cost ($)<br />

$11,206<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

Program VSD based on room T 96 $100.00 $10,762<br />

CO2 Sensor 6 $400.00 $2,460 $0.00<br />

$0<br />

3 hp VFD 4 $1,525.00 $6,253 $455.00 $2,040<br />

7.5 hp VFD 1 $1,975.00 $2,024 $545.00<br />

$611<br />

Program DCV 24 $0.00 $0 $100.00 $2,690<br />

15 hp VFD 1 $2,275.00 $2,332 $820.00<br />

$919<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

Raw Costs:<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

$13,069 $17,022<br />

$1,078<br />

$1,698<br />

$15,845<br />

$1,584<br />

$5,760<br />

$1,920<br />

$2,304<br />

N/A<br />

$2,043<br />

$19,065<br />

$1,907<br />

Totals: $17,429 $20,972<br />

Total Project Cost: $48,385<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $48,385<br />

Rebate/Incentive*:<br />

$11,206<br />

Net Project Cost: $37,179<br />

Net Simple Payback Period (yrs): 9.2<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.<br />

46,108<br />

0<br />

$4,057


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: AH-19 CAV to VAV<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: POWELL LIB<br />

Building Key: 04C4318A<br />

Basic Gross Area (sf): 166,846<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D1019<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

79,947<br />

7.0<br />

0<br />

38,959<br />

532<br />

Equipment Description Qty<br />

\23. Powell Lib\3. <strong>UC</strong>LA MZ_DD_VAV Powell Lib AH-19 CAV to VAV.xls<br />

Project Description Reference(s): Air Handler Project 2. Convert Constant Volume Air Handlers to Variable Air Volume.<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

Extended Bare<br />

Labor Cost ($)<br />

111,114<br />

6,650<br />

$33,317<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

75 hp VFD 1 $11,500.00 $11,788 $1,600.00 $1,794<br />

Dart Control 1 $8,710.00 $8,928 $2,900.00 $3,251<br />

Dart @ zone 4 $440.00 $1,804 $128.00<br />

$574<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

Raw Costs:<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

$22,519 $5,618<br />

$1,858<br />

$2,925<br />

$27,302<br />

$2,730<br />

$5,543<br />

$1,848<br />

$2,217<br />

N/A<br />

$674<br />

$6,293<br />

$629<br />

Totals: $30,033 $6,922<br />

Total Project Cost: $46,563<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $46,563<br />

Rebate/Incentive*:<br />

$33,317<br />

Net Project Cost: $13,246<br />

Net Simple Payback Period (yrs): 1.1<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

141,194<br />

0<br />

$12,425<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: AH 18, 38 & 39 CAV to VAV<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: POWELL LIB<br />

Building Key: 04C4318A<br />

Basic Gross Area (sf): 166,846<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D1020<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

23,523<br />

5.0<br />

0<br />

2,409<br />

Equipment Description Qty<br />

\23. Powell Lib\4. <strong>UC</strong>LA DCV - SZ_VAV Powell Lib AH 18, 38 & 39 CAV to VAV.xls<br />

Project Description Reference(s): Air Handler Project 2. Convert Constant Volume Air Handlers to Variable Air Volume.<br />

-3<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

25,450<br />

-38<br />

$6,071<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

Extended Bare<br />

Labor Cost ($)<br />

3 hp VFD 1 $1,525.00 $1,563 $455.00<br />

$510<br />

5 hp VFD 1 $1,675.00 $1,717 $455.00<br />

$510<br />

7.5 hp VFD 1 $1,975.00 $2,024 $545.00<br />

$611<br />

Program VSD based on room T 48 $100.00 $5,381<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

Raw Costs:<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

$5,304 $7,012<br />

$438<br />

$689<br />

$0<br />

$0<br />

$1,296<br />

$432<br />

$518<br />

N/A<br />

$841<br />

$7,853<br />

$785<br />

Totals: $0 $8,639<br />

Total Project Cost: $10,885<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $10,885<br />

Rebate/Incentive*:<br />

$6,071<br />

Net Project Cost: $4,814<br />

Net Simple Payback Period (yrs): 2.2<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.<br />

25,070<br />

0<br />

$2,206<br />

Backup


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: AH 20 CAV to VAV<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: POWELL LIB<br />

Building Key: 04C4318A<br />

Basic Gross Area (sf): 166,846<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D1021<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

45,021<br />

4.0<br />

0<br />

32,750<br />

396<br />

Equipment Description Qty<br />

\23. Powell Lib\5. <strong>UC</strong>LA CVRH_VAV Powell Lib AH 20 CAV to VAV.xls<br />

Project Description Reference(s): Air Handler Project 2. Convert Constant Volume Air Handlers to Variable Air Volume.<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

71,221<br />

4,950<br />

Extended Bare<br />

Labor Cost ($)<br />

$22,043<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

30 hp VFD 1 $4,775.00 $4,894 $1,100.00 $1,233<br />

Dart @ Controls 1 $8,710.00 $8,928 $2,900.00 $3,251<br />

10 hp VFD 1 $1,975.00 $2,024 $545.00<br />

$611<br />

Dart @ Zones 10 $440.00 $4,510 $128.00 $1,435<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

Raw Costs:<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

$20,357 $6,530<br />

$1,679<br />

$2,644<br />

$24,680<br />

$2,468<br />

$5,279<br />

$1,760<br />

$2,112<br />

N/A<br />

$784<br />

$7,313<br />

$731<br />

Totals: $27,148 $8,045<br />

Total Project Cost: $44,343<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $44,343<br />

Rebate/Incentive*:<br />

$22,043<br />

Net Project Cost: $22,300<br />

Net Simple Payback Period (yrs): 2.7<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.<br />

93,311<br />

0<br />

$8,211


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: AC 1 & 2 - SP Reset<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: ROYCE HALL<br />

Building Key: 04C4375<br />

Basic Gross Area (sf): 184,673<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D1022<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

41,632<br />

0.0<br />

0<br />

29,290<br />

765<br />

Equipment Description Qty<br />

\24. Royce Hall\1. <strong>UC</strong>LA CVRH_VAV Royce Hall AC-1 & 2 - SP Reset.xls<br />

Project Description Reference(s): Air Handler Project 4. Static Pressure Reset on Variable Air Volume Air Handlers .<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

65,064<br />

9,563<br />

Extended Bare<br />

Labor Cost ($)<br />

$25,178<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

SAV with InCite 2 $4,500.00 $9,225 $7,150.00 $16,030<br />

License Fee (estimated per 1000 CFM) 53 $0.00 $0 $56.00 $3,327<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

Raw Costs:<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

$9,225 $19,357<br />

$761<br />

$1,198<br />

$11,184<br />

$1,118<br />

$5,423<br />

$1,808<br />

$2,169<br />

N/A<br />

$2,323<br />

$21,680<br />

$2,168<br />

Totals: $12,303 $23,848<br />

Total Project Cost: $45,550<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $45,550<br />

Rebate/Incentive*:<br />

$25,178<br />

Net Project Cost: $20,372<br />

Net Simple Payback Period (yrs): 2.1<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

110,457<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.<br />

0<br />

$9,720


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: AC 3, 4, 6 to 8 - CAV to VAV<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: ROYCE HALL<br />

Building Key: 04C4375<br />

Basic Gross Area (sf): 184,673<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D1023<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

116,731<br />

11.0<br />

0<br />

584<br />

-46<br />

Equipment Description Qty<br />

\24. Royce Hall\2. <strong>UC</strong>LA DCV - SZ_VAV_60 Royce Hall AC 3,4,6,7,8 - CAv to VAV.xls<br />

Project Description Reference(s): Air Handler Project 2. Convert Constant Volume Air Handlers to Variable Air Volume & Air Handler Project 6.<br />

Convert Air Handlers to Direct Digital Control.<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr): 117,198<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

-575<br />

Extended Bare<br />

Labor Cost ($)<br />

$27,553<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

2 hp VFD 3 $700.00 $2,153 $400.00 $1,345<br />

5 hp VFD 3 $1,675.00 $5,151 $455.00 $1,530<br />

20 hp VFD 2 $3,375.00 $6,919 $820.00 $1,838<br />

SZ CAV to VAV (105 points) 5 $11,063.41 $56,700 $6,743.98 $37,800<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

Raw Costs:<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

$70,922 $42,514<br />

$5,851<br />

$9,213<br />

$85,986<br />

$8,599<br />

$22,044<br />

$7,348<br />

$8,818<br />

N/A<br />

$5,102<br />

$47,615<br />

$4,762<br />

Totals: $94,584 $52,377<br />

Total Project Cost: $185,171<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $185,171<br />

Rebate/Incentive*:<br />

$27,553<br />

Net Project Cost: $157,618<br />

Net Simple Payback Period (yrs): 15.7<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

114,281<br />

0<br />

$10,057<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: AHU1 to 6 SP Reset<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: SAC<br />

Building Key: 04C4360<br />

Basic Gross Area (sf): 113,383<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D1024<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

116,981<br />

1.0<br />

0<br />

70,765<br />

1,640<br />

Equipment Description Qty<br />

\25. SAC\1. <strong>UC</strong>LA CVRH_VAV SAC AHU 1 to 6 SP Reset.xls<br />

Project Description Reference(s): Air Handler Project 4. Static Pressure Reset on Variable Air Volume Air Handlers .<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

Extended Bare<br />

Labor Cost ($)<br />

173,593<br />

20,500<br />

$62,162<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

Program SP Reset 96 $0.00 $0 $100.00 $10,762<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

Raw Costs:<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

$0 $10,762<br />

$0<br />

$0<br />

$0<br />

$0<br />

$1,989<br />

$663<br />

$795<br />

N/A<br />

$1,291<br />

$12,053<br />

$1,205<br />

Totals: $0 $13,258<br />

Total Project Cost: $16,705<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $16,705<br />

Rebate/Incentive*:<br />

$13,364<br />

Net Project Cost: $3,341<br />

Net Simple Payback Period (yrs): 0.1<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

270,268<br />

0<br />

$23,784<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: AHU 1, 2 & 4 SP Reset<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: SOUTHERN REGIONAL LIBRARY FACI<br />

Building Key: 04C4562<br />

Basic Gross Area (sf): 228,306<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D1025<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

320,992<br />

5.0<br />

0<br />

0<br />

3,742<br />

Equipment Description Qty<br />

\26. Sourthern Regional Library FAC\1. <strong>UC</strong>LA CVRH_VAV SRLF AHU 1, 2 & 4 SP Reset.xls<br />

Project Description Reference(s): Air Handler Project 4. Static Pressure Reset on Variable Air Volume Air Handlers .<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

Extended Bare<br />

Labor Cost ($)<br />

320,992<br />

46,775<br />

$123,813<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

SAV with InCite 3 $4,500.00 $13,838 $7,150.00 $24,045<br />

License Fee (estimated per 1000 CFM) 121 $0.00 $0 $56.00 $7,596<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

Raw Costs:<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

$13,838 $31,641<br />

$1,142<br />

$1,797<br />

$16,777<br />

$1,678<br />

$8,615<br />

$2,872<br />

$3,446<br />

N/A<br />

$3,797<br />

$35,438<br />

$3,544<br />

Totals: $18,454 $38,982<br />

Total Project Cost: $72,370<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $72,370<br />

Rebate/Incentive*:<br />

$57,896<br />

Net Project Cost: $14,474<br />

Net Simple Payback Period (yrs): 0.3<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

554,493<br />

0<br />

$48,795<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: AHU 3 5 & SF-1 CAV to VAV with SP Reset<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: SOUTHERN REGIONAL LIBRARY FACI<br />

Building Key: 04C4562<br />

Basic Gross Area (sf): 228,306<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D1026<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

89,403<br />

4.0<br />

0<br />

0<br />

925<br />

Equipment Description Qty<br />

\26. Sourthern Regional Library FAC\2. <strong>UC</strong>LA CVRH_VAV SRLF AHU 3, 5, SF-1 CAV to VAV SP Reset.xls<br />

Project Description Reference(s): Air Handler Project 2. Convert Constant Volume Air Handlers to Variable Air Volume & Air Handler Project 4.<br />

Static Pressure Reset on Variable Air Volume Air Handlers .<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

89,403<br />

11,563<br />

Extended Bare<br />

Labor Cost ($)<br />

$33,019<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

SAV with InCite 3 $4,500.00 $13,838 $7,150.00 $24,045<br />

Dart @ Zone 6 $0.00 $0 $56.00<br />

$377<br />

License Fee (estimated per 1000 CFM) 11 $0.00 $0 $56.00<br />

$691<br />

7.5 hp VFD 2 $1,975.00 $4,049 $545.00 $1,222<br />

2 hp VFD 1 $700.00 $718 $400.00<br />

$448<br />

Dart Control 3 $8,710.00 $26,783 $2,900.00 $9,753<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

Raw Costs:<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

$45,387 $36,536<br />

$3,744<br />

$5,896<br />

$55,027<br />

$5,503<br />

$15,831<br />

$5,277<br />

$6,333<br />

N/A<br />

$4,384<br />

$40,920<br />

$4,092<br />

Totals: $60,530 $45,012<br />

Total Project Cost: $132,983<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $132,983<br />

Rebate/Incentive*:<br />

$33,019<br />

Net Project Cost: $99,964<br />

Net Simple Payback Period (yrs): 7.7<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

147,123<br />

0<br />

$12,947<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: AHU 1 & 2 SP Reset<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: WILSHIRE CTR<br />

Building Key: 04C4270<br />

Basic Gross Area (sf): 455,912<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D1027<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

736,319<br />

171.0<br />

Equipment Description Qty<br />

\27. Wilshire CTR\1. <strong>UC</strong>LA CVRH_VAV_60 Wilshire CTR AHU 1 & 2 SP Reset.xls<br />

Project Description Reference(s): Air Handler Project 4. Static Pressure Reset on Variable Air Volume Air Handlers .<br />

0<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

Extended Bare<br />

Labor Cost ($)<br />

736,319<br />

0<br />

$176,717<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

Program SP Reset 32 $0.00 $0 $100.00 $3,587<br />

0 $0.00 $0 $56.00<br />

$0<br />

Zone Level Controller & DDC - cooling only 252 $2,458.54 $635,041 $1,498.66 $423,359<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

Raw Costs:<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

$635,041 $426,947<br />

$52,391<br />

$82,492<br />

$769,924<br />

$76,992<br />

$205,937<br />

$68,646<br />

$82,375<br />

N/A<br />

$51,234<br />

$478,180<br />

$47,818<br />

Totals: $846,916 $525,998<br />

Total Project Cost: $1,729,872<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $1,729,872<br />

Rebate/Incentive*:<br />

$176,717<br />

Net Project Cost: $1,553,155<br />

Net Simple Payback Period (yrs): 24.0<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

736,319<br />

0<br />

$64,796<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: AHU 1 VIV to VAV<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: WOODEN/PS4<br />

Building Key: 04C4235<br />

Basic Gross Area (sf): 707,839<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D1028<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

22,785<br />

0.0<br />

0<br />

10,374<br />

183<br />

Equipment Description Qty<br />

\28. Woodenps4\1. <strong>UC</strong>LA CVRH_VAV Woodenps4 AHU 1 VIV to VAV.xls<br />

Project Description Reference(s): Air Handler Project 2. Convert Constant Volume Air Handlers to Variable Air Volume & Air Handler Project 6.<br />

Convert Air Handlers to Direct Digital Control.<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr): 31,084<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

2,288<br />

$9,748<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

Extended Bare<br />

Labor Cost ($)<br />

5 hp VFD 1 $1,675.00 $1,717 $455.00<br />

$510<br />

15 hp VFD 1 $2,275.00 $2,332 $820.00<br />

$919<br />

CAV - RH to VAV - RH (17 points) 1 $8,956.10 $9,180 $5,459.41 $6,120<br />

0 $4,500.00 $0 $7,150.00<br />

$0<br />

0 $0.00 $0 $56.00<br />

$0<br />

VIV Removal 16 $0.00 $0 $100.00 $1,794<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

Raw Costs:<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

$13,229 $9,343<br />

$1,091<br />

$1,718<br />

$16,039<br />

$1,604<br />

$4,373<br />

$1,458<br />

$1,749<br />

N/A<br />

$1,121<br />

$10,464<br />

$1,046<br />

Totals: $17,642 $11,510<br />

Total Project Cost: $36,733<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $36,733<br />

Rebate/Incentive*:<br />

$9,748<br />

Net Project Cost: $26,985<br />

Net Simple Payback Period (yrs): 7.4<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.<br />

41,673<br />

0<br />

$3,667<br />

Backup


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: AHU 3 VIV to VAV & SP Reset<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: WOODEN/PS4<br />

Building Key: 04C4235<br />

Basic Gross Area (sf): 707,839<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D1029<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

58,384<br />

1.0<br />

0<br />

24,388<br />

434<br />

Equipment Description Qty<br />

\28. Woodenps4\2. <strong>UC</strong>LA CVRH_VAV Woodenps4 AHU 3 VIV to VAV SP reset.xls<br />

Project Description Reference(s): Air Handler Project 2. Convert Constant Volume Air Handlers to Variable Air Volume, Air Handler Project 4.<br />

Static Pressure Reset on Variable Air Volume Air Handlers & Air Handler Project 6. Convert Air Handlers to<br />

Direct Digital Control.<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr): 77,894<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

5,425<br />

Extended Bare<br />

Labor Cost ($)<br />

$24,120<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

30 hp VFD 1 $4,775.00 $4,894 $1,100.00 $1,233<br />

VIV Removal 16 $0.00 $0 $100.00 $1,794<br />

License Fee (estimated per 1000 CFM) 26 $0.00 $0 $56.00 $1,632<br />

15 hp VFD 1 $2,275.00 $2,332 $820.00<br />

$919<br />

SAV with InCite 1 $4,500.00 $4,613 $7,150.00 $8,015<br />

CAV - RH to VAV - RH (17 points) 1 $8,956.10 $9,180 $5,459.41 $6,120<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

Raw Costs:<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

$21,019 $19,713<br />

$1,734<br />

$2,730<br />

$25,483<br />

$2,548<br />

$7,848<br />

$2,616<br />

$3,139<br />

N/A<br />

$2,366<br />

$22,079<br />

$2,208<br />

Totals: $28,031 $24,287<br />

Total Project Cost: $65,921<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $65,921<br />

Rebate/Incentive*:<br />

$24,120<br />

Net Project Cost: $41,801<br />

Net Simple Payback Period (yrs): 4.6<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

103,025<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.<br />

0<br />

$9,066


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: CAV to VAV<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: WOODEN/PS4<br />

Building Key: 04C4235<br />

Basic Gross Area (sf): 707,839<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D1030<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

236,777<br />

57.0<br />

0<br />

8,663<br />

-176<br />

Equipment Description Qty<br />

\28. Woodenps4\3. DCV - SZ_VAV Woodenps4 AHU 2, 5 & 6 CAV to VAV.xls<br />

Project Description Reference(s): Air Handler Project 2. Convert Constant Volume Air Handlers to Variable Air Volume & Air Handler Project 6.<br />

Convert Air Handlers to Direct Digital Control.<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr): 243,707<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

-2,200<br />

Extended Bare<br />

Labor Cost ($)<br />

$56,290<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

SZ CAV to VAV (63 points) 3 $11,063.41 $34,020 $6,743.98 $22,680<br />

7.5 hp VFD 2 $1,975.00 $4,049 $545.00 $1,222<br />

15 hp VFD 3 $2,275.00 $6,996 $820.00 $2,758<br />

25 hp VFD 1 $3,925.00 $4,023 $1,100.00 $1,233<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

Raw Costs:<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

$49,087 $27,893<br />

$4,050<br />

$6,376<br />

$59,514<br />

$5,951<br />

$14,974<br />

$4,991<br />

$5,990<br />

N/A<br />

$3,347<br />

$31,240<br />

$3,124<br />

Totals: $65,465 $34,364<br />

Total Project Cost: $125,784<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $125,784<br />

Rebate/Incentive*:<br />

$56,290<br />

Net Project Cost: $69,494<br />

Net Simple Payback Period (yrs): 3.4<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

232,032<br />

0<br />

$20,419<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: AHU 1 (Mcquay) SP reset<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: WOODEN/PS4<br />

Building Key: 04C4235<br />

Basic Gross Area (sf): 707,839<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D1031<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

27,011<br />

0.0<br />

0<br />

16,783<br />

452<br />

Equipment Description Qty<br />

\28. Woodenps4\4.. <strong>UC</strong>LA CVRH_VAV Woodenps4 AHU 1 (Mcquay) SP reset.xls<br />

Project Description Reference(s): Air Handler Project 4. Static Pressure Reset on Variable Air Volume Air Handlers & Air Handler Project 6.<br />

Convert Air Handlers to Direct Digital Control.<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr): 40,437<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

5,650<br />

Extended Bare<br />

Labor Cost ($)<br />

$15,355<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

License Fee (estimated per 1000 CFM) 28 $0.00 $0 $56.00 $1,758<br />

CAV - RH to VAV - RH (17 points) 1 $8,956.10 $9,180 $5,459.41 $6,120<br />

SAV with InCite 1 $4,500.00 $4,613 $7,150.00 $8,015<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

Raw Costs:<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

$13,793 $15,893<br />

$1,138<br />

$1,792<br />

$16,722<br />

$1,672<br />

$5,696<br />

$1,899<br />

$2,278<br />

N/A<br />

$1,907<br />

$17,800<br />

$1,780<br />

Totals: $18,394 $19,580<br />

Total Project Cost: $47,848<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $47,848<br />

Rebate/Incentive*:<br />

$15,355<br />

Net Project Cost: $32,493<br />

Net Simple Payback Period (yrs): 5.5<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.<br />

67,300<br />

0<br />

$5,922


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: AHU 1 Pace) SP reset<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: WOODEN/PS4<br />

Building Key: 04C4235<br />

Basic Gross Area (sf): 707,839<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D1032<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

18,432<br />

0.0<br />

0<br />

10,943<br />

279<br />

Equipment Description Qty<br />

\28. Woodenps4\5.. <strong>UC</strong>LA CVRH_VAV Woodenps4 AHU 1 (Pace) SP reset.xls<br />

Project Description Reference(s): Air Handler Project 4. Static Pressure Reset on Variable Air Volume Air Handlers .<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

27,186<br />

3,488<br />

Extended Bare<br />

Labor Cost ($)<br />

$10,012<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

Program SP Reset 16 $0.00 $0 $100.00 $1,794<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

Raw Costs:<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

$0 $1,794<br />

$0<br />

$0<br />

$0<br />

$0<br />

$331<br />

$110<br />

$133<br />

N/A<br />

$215<br />

$2,009<br />

$201<br />

Totals: $0 $2,210<br />

Total Project Cost: $2,784<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $2,784<br />

Rebate/Incentive*:<br />

$2,227<br />

Net Project Cost: $557<br />

Net Simple Payback Period (yrs): 0.1<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.<br />

43,721<br />

0<br />

$3,847


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: AHU 2 Pace) SP reset<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: WOODEN/PS4<br />

Building Key: 04C4235<br />

Basic Gross Area (sf): 707,839<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D1033<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

20,078<br />

0.0<br />

0<br />

12,223<br />

331<br />

Equipment Description Qty<br />

\28. Woodenps4\6.. <strong>UC</strong>LA CVRH_VAV Woodenps4 AHU 2 (Pace) SP reset.xls<br />

Project Description Reference(s): Air Handler Project 4. Static Pressure Reset on Variable Air Volume Air Handlers .<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

29,856<br />

4,138<br />

Extended Bare<br />

Labor Cost ($)<br />

$11,303<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

Program SP Reset 16 $0.00 $0 $100.00 $1,794<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

Raw Costs:<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

$0 $1,794<br />

$0<br />

$0<br />

$0<br />

$0<br />

$331<br />

$110<br />

$133<br />

N/A<br />

$215<br />

$2,009<br />

$201<br />

Totals: $0 $2,210<br />

Total Project Cost: $2,784<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $2,784<br />

Rebate/Incentive*:<br />

$2,227<br />

Net Project Cost: $557<br />

Net Simple Payback Period (yrs): 0.1<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.<br />

49,533<br />

0<br />

$4,359


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: AHU 4 CAV to VAV & DCV<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: WOODEN/PS4<br />

Building Key: 04C4235<br />

Basic Gross Area (sf): 707,839<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D1034<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

210,437<br />

50.0<br />

0<br />

2,584<br />

-282<br />

Equipment Description Qty<br />

\28. Woodenps4\7. DCV - SZ_VAV Woodenps4 AHU 4 CAV to VAV DCV.xls<br />

Project Description Reference(s): Air Handler Project 2. Convert Constant Volume Air Handlers to Variable Air Volume, Air Handler Project 6.<br />

Convert Air Handlers to Direct Digital Control & Air Handler Project 3. Demand Control Ventilation.<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

Extended Bare<br />

Labor Cost ($)<br />

212,504<br />

-3,525<br />

$47,476<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

Program DCV 4 $100.00 $448<br />

CO2 Sensor 1 $400.00 $410<br />

20 hp VFD 1 $3,375.00 $3,459 $820.00<br />

$919<br />

75 hp VFD 1 $11,500.00 $11,788 $1,600.00 $1,794<br />

SZ CAV to VAV (21 points) 1 $11,063.41 $11,340 $6,743.98 $7,560<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

Raw Costs:<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

$26,997 $10,721<br />

$2,227<br />

$3,507<br />

$32,731<br />

$3,273<br />

$7,382<br />

$2,461<br />

$2,953<br />

N/A<br />

$1,287<br />

$12,008<br />

$1,201<br />

Totals: $36,004 $13,209<br />

Total Project Cost: $62,008<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $62,008<br />

Rebate/Incentive*:<br />

$47,476<br />

Net Project Cost: $14,532<br />

Net Simple Payback Period (yrs): 0.8<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

194,701<br />

0<br />

$17,134<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: AHU 1 to 8 T-1 & T-2 CAV to VAV<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: UNEX<br />

Building Key: 04C4415<br />

Basic Gross Area (sf): 95,065<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D1035<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

412,262<br />

21.0<br />

34,433<br />

Equipment Description Qty<br />

\29. Unex\1. <strong>UC</strong>LA MZ_DD_VAV Unex AHU 1 to 8 T-1 & T-2 CAV to VAV.xls<br />

Project Description Reference(s): Air Handler Project 1. Convert Constant Volume Air Handlers and Terminal Boxes to Variable Air Volume & Air<br />

Handler Project 6. Convert Air Handlers to Direct Digital Control.<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

Extended Bare<br />

Labor Cost ($)<br />

412,262<br />

34,433<br />

$133,376<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

20 hp VFD 7 $3,375.00 $24,216 $820.00 $6,435<br />

7.5 hp VFD 2 $1,975.00 $4,049 $545.00 $1,222<br />

DD CAV to VAV (207 points) 9 $12,117.07 $111,780 $7,386.26 $74,520<br />

Zone Level Controller & DDC - dual duct 212 $4,097.56 $890,400 $2,497.77 $593,600<br />

DART Control 8 $8,710.00 $71,422 $2,900.00 $26,007<br />

Dart @ Zone 106 $440.00 $47,806 $128.00 $15,210<br />

5 hp VFD 1 $1,675.00 $1,717 $455.00<br />

$510<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

Raw Costs:<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

$1,151,389 $717,503<br />

$94,990<br />

$149,565<br />

$1,395,944<br />

$139,594<br />

$362,925<br />

$120,975<br />

$145,170<br />

N/A<br />

$86,100<br />

$803,604<br />

$80,360<br />

Totals: $1,535,538 $883,964<br />

Total Project Cost: $3,048,573<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $3,048,573<br />

Rebate/Incentive*:<br />

$133,376<br />

Net Project Cost: $2,915,197<br />

Net Simple Payback Period (yrs): 52.8<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

627,124<br />

0<br />

$55,187<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: AHU - 3 VIV to VAV SP Reset<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: ENTREP HALL<br />

Building Key: 04C515C<br />

Basic Gross Area (sf): 72,591<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D1036<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

79,357<br />

1.0<br />

0<br />

33,987<br />

600<br />

Equipment Description Qty<br />

\3. Entrep Hall\1. <strong>UC</strong>LA CVRH_VAV Entrep Hall AHU 3 VIV to VAV SP Reset.xls<br />

Project Description Reference(s): Air Handler Project 2. Convert Constant Volume Air Handlers to Variable Air Volume & Air Handler Project 4.<br />

Static Pressure Reset on Variable Air Volume Air Handlers .<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

Extended Bare<br />

Labor Cost ($)<br />

106,547<br />

7,500<br />

$33,071<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

15 hp VFD 1 $2,275.00 $2,332 $820.00<br />

$919<br />

30 hp VFD 1 $4,775.00 $4,894 $1,100.00 $1,233<br />

SAV with InCite 1 $4,500.00 $4,613 $7,150.00 $8,015<br />

VIV Removal 16 $0.00 $0 $100.00 $1,794<br />

License Fee (estimated per 1000 CFM) 36 $0.00 $0 $56.00 $2,260<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

Raw Costs:<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

$11,839 $14,221<br />

$977<br />

$1,538<br />

$14,353<br />

$1,435<br />

$4,996<br />

$1,665<br />

$1,999<br />

N/A<br />

$1,707<br />

$15,928<br />

$1,593<br />

Totals: $15,789 $17,520<br />

Total Project Cost: $41,969<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $41,969<br />

Rebate/Incentive*:<br />

$33,071<br />

Net Project Cost: $8,898<br />

Net Simple Payback Period (yrs): 0.7<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

141,268<br />

0<br />

$12,432<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: VFD + DCV for a CAV system<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: ENTREP HALL<br />

Building Key: 04C515C<br />

Basic Gross Area (sf): 72,591<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D1037<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

51,550<br />

2.0<br />

0<br />

3,161<br />

117<br />

Equipment Description Qty<br />

\3. Entrep Hall\2. <strong>UC</strong>LA DCV - SZ_VAV_60 Entrep Hall AHU 8 DCV.xls<br />

Project Description Reference(s): Air Handler Project 2. Convert Constant Volume Air Handlers to Variable Air Volume & Air Handler Project 3.<br />

Demand Control Ventilation.<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr): 54,079<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

1,463<br />

Extended Bare<br />

Labor Cost ($)<br />

$14,441<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

5 hp VFD 1 $1,675.00 $1,717 $455.00<br />

$510<br />

15 hp VFD 1 $2,275.00 $2,332 $820.00<br />

$919<br />

Program DCV 4 $0.00 $0 $100.00<br />

$448<br />

CO2 sensor 1 $400.00 $410 $0.00<br />

$0<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

Raw Costs:<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

$4,459 $1,878<br />

$368<br />

$579<br />

$5,406<br />

$541<br />

$1,239<br />

$413<br />

$496<br />

N/A<br />

$225<br />

$2,103<br />

$210<br />

Totals: $5,946 $2,313<br />

Total Project Cost: $10,407<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $10,407<br />

Rebate/Incentive*:<br />

$8,326<br />

Net Project Cost: $2,081<br />

Net Simple Payback Period (yrs): 0.4<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.<br />

61,127<br />

0<br />

$5,379


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: S-1, 5 & 6 CAV to VAV<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: JULES STEIN<br />

Building Key: 04C4333<br />

Basic Gross Area (sf): 87,905<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D1038<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

279,911<br />

7.0<br />

0<br />

108,103<br />

2,196<br />

Equipment Description Qty<br />

\30. Jules Stein\1. <strong>UC</strong>LA MZ_DD_VAV Jules Stein S-1, 5 & 6 CAV to VAV.xls<br />

Project Description Reference(s): Air Handler Project 2. Convert Constant Volume Air Handlers to Variable Air Volume.<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

Extended Bare<br />

Labor Cost ($)<br />

366,393<br />

27,450<br />

$115,384<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

20 hp VFD 4 $3,375.00 $13,838 $820.00 $3,677<br />

Dart Control 3 $8,710.00 $26,783 $2,900.00 $9,753<br />

Dart @ zone 33 $440.00 $14,883 $128.00 $4,735<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

Raw Costs:<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

$55,504 $18,165<br />

$4,579<br />

$7,210<br />

$67,293<br />

$6,729<br />

$14,460<br />

$4,820<br />

$5,784<br />

N/A<br />

$2,180<br />

$20,344<br />

$2,034<br />

Totals: $74,022 $22,379<br />

Total Project Cost: $121,465<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $121,465<br />

Rebate/Incentive*:<br />

$97,172<br />

Net Project Cost: $24,293<br />

Net Simple Payback Period (yrs): 0.6<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

494,776<br />

0<br />

$43,540<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: S2, 3 & 4Aircuity<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: JULES STEIN<br />

Building Key: 04C4333<br />

Basic Gross Area (sf): 87,905<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D1039<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

102,285<br />

9.0<br />

0<br />

64,913<br />

1,358<br />

Equipment Description Qty<br />

\30. Jules Stein\2. <strong>UC</strong>LA HVAC Lab Julies Stein Aircuity.xls<br />

Project Description Reference(s): Laboratory Air Handler Project 1. Convert Laboratory Air Handlers and Fume Hoods to Variable Air Volume &<br />

Laboratory Air Handler Project 2. Rebalance Variable Air Volume Laboratory (or Vivarium) Air Handlers.<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr): 154,215<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

16,975<br />

Extended Bare<br />

Labor Cost ($)<br />

$53,987<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

Aircuity, per sensor 3 $2,500.00 $7,688 $2,000.00 $6,726<br />

0.5 hp VFD 13 $175.00 $2,332 $350.00 $5,101<br />

2 hp VFD 1 $700.00 $718 $400.00<br />

$448<br />

5 hp VFD 1 $1,675.00 $1,717 $455.00<br />

$510<br />

7.5 hp VFD 1 $1,975.00 $2,024 $545.00<br />

$611<br />

Rebalance ($1.75 per square foot) 7,500 $0.00 $0 $1.75 $14,713<br />

Autosash closure 32 $2,700.00 $88,560 $1,800.00 $64,570<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

Raw Costs:<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

$103,038 $92,679<br />

$8,501<br />

$13,385<br />

$124,923<br />

$12,492<br />

$37,739<br />

$12,580<br />

$15,096<br />

N/A<br />

$11,121<br />

$103,800<br />

$10,380<br />

Totals: $137,416 $114,180<br />

Total Project Cost: $317,011<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $317,011<br />

Rebate/Incentive*:<br />

$53,987<br />

Net Project Cost: $263,024<br />

Net Simple Payback Period (yrs): 12.8<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

233,762<br />

0<br />

$20,571<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: AHU 1 CAV to VAV<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: M DAVIES CC<br />

Building Key: 04C4332E<br />

Basic Gross Area (sf): 70,228<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D1040<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

24,750<br />

1.0<br />

0<br />

5,680<br />

184<br />

Equipment Description Qty<br />

\31. M Davies CC\1. <strong>UC</strong>LA MZ_DD_VAV M davies CC AHU 1 CAV to VAV.xls<br />

Project Description Reference(s): Air Handler Project 2. Convert Constant Volume Air Handlers to Variable Air Volume.<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

29,294<br />

2,300<br />

$9,331<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

Extended Bare<br />

Labor Cost ($)<br />

Dart Control 1 $8,710.00 $8,928 $2,900.00 $3,251<br />

Dart @ zone 2 $440.00 $902 $128.00<br />

$287<br />

7.5 hp VFD 1 $1,975.00 $2,024 $545.00<br />

$611<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

Raw Costs:<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

$11,854 $4,149<br />

$978<br />

$1,540<br />

$14,372<br />

$1,437<br />

$3,138<br />

$1,046<br />

$1,255<br />

N/A<br />

$498<br />

$4,647<br />

$465<br />

Totals: $15,809 $5,111<br />

Total Project Cost: $26,360<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $26,360<br />

Rebate/Incentive*:<br />

$9,331<br />

Net Project Cost: $17,029<br />

Net Simple Payback Period (yrs): 4.8<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.<br />

40,321<br />

0<br />

$3,548<br />

Backup


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: CAV to VAV - AHU S-2 to S-9<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: PUBLIC HLTH<br />

Building Key: 04C4331<br />

Basic Gross Area (sf): 140,563<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D1041<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

148,425<br />

12.0<br />

0<br />

59,890<br />

1,184<br />

Equipment Description Qty<br />

\32. Public Hlth\1. <strong>UC</strong>LA MZ_DD_VAV Public hlth S-2 to 9 CAV to VAV.xls<br />

Project Description Reference(s): Air Handler Project 2. Convert Constant Volume Air Handlers to Variable Air Volume.<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

Extended Bare<br />

Labor Cost ($)<br />

196,337<br />

14,800<br />

$61,921<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

Dart @ zone 60 $440.00 $27,060 $128.00 $8,609<br />

Dart Control 8 $8,710.00 $71,422 $2,900.00 $26,007<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

Raw Costs:<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

$98,482 $34,616<br />

$8,125<br />

$12,793<br />

$119,400<br />

$11,940<br />

$26,098<br />

$8,699<br />

$10,439<br />

N/A<br />

$4,154<br />

$38,770<br />

$3,877<br />

Totals: $131,340 $42,648<br />

Total Project Cost: $219,224<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $219,224<br />

Rebate/Incentive*:<br />

$61,921<br />

Net Project Cost: $157,303<br />

Net Simple Payback Period (yrs): 6.7<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

265,427<br />

0<br />

$23,358<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: CV Rebalance - S-1<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: PUBLIC HLTH<br />

Building Key: 04C4331<br />

Basic Gross Area (sf): 140,563<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D1042<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

0<br />

0.0<br />

0<br />

52,901<br />

881<br />

Equipment Description Qty<br />

\32. Public Hlth\2. <strong>UC</strong>LA HVAC Lab Public Hlth Vivarium CV Rebalance S-1.xls<br />

Project Description Reference(s): Laboratory Air Handler Project 2. Rebalance Variable Air Volume Laboratory (or Vivarium) Air Handlers.<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

42,321<br />

11,013<br />

Extended Bare<br />

Labor Cost ($)<br />

$21,169<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

Rebalance ($1.75 per square foot) 8,756 $0.00 $0 $1.75 $17,177<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

Raw Costs:<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

$0 $17,177<br />

$0<br />

$0<br />

$0<br />

$0<br />

$3,174<br />

$1,058<br />

$1,270<br />

N/A<br />

$2,061<br />

$19,238<br />

$1,924<br />

Totals: $0 $21,162<br />

Total Project Cost: $26,664<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $26,664<br />

Rebate/Incentive*:<br />

$21,169<br />

Net Project Cost: $5,495<br />

Net Simple Payback Period (yrs): 0.7<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.<br />

93,063<br />

0<br />

$8,190


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: SF 1 & 2 SP Reset<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: LAW<br />

Building Key: 04C4317<br />

Basic Gross Area (sf): 275,439<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D1043<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

47,789<br />

0.0<br />

0<br />

6,684<br />

393<br />

Equipment Description Qty<br />

\33. LAW\1. <strong>UC</strong>LA CVRH_VAV LAW SF 1 & 2 SP Reset.xls<br />

Project Description Reference(s): Air Handler Project 4. Static Pressure Reset on Variable Air Volume Air Handlers .<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

53,136<br />

4,913<br />

Extended Bare<br />

Labor Cost ($)<br />

$17,665<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

SAV with InCite 2 $4,500.00 $9,225 $7,150.00 $16,030<br />

License Fee (estimated per 1000 CFM) 66 $0.00 $0 $56.00 $4,143<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

Raw Costs:<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

$9,225 $20,174<br />

$761<br />

$1,198<br />

$11,184<br />

$1,118<br />

$5,573<br />

$1,858<br />

$2,229<br />

N/A<br />

$2,421<br />

$22,594<br />

$2,259<br />

Totals: $12,303 $24,854<br />

Total Project Cost: $46,817<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $46,817<br />

Rebate/Incentive*:<br />

$17,665<br />

Net Project Cost: $29,152<br />

Net Simple Payback Period (yrs): 4.3<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.<br />

77,125<br />

0<br />

$6,787


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: SF 3 & 7 VIV to VAV & SP Reset<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: LAW<br />

Building Key: 04C4317<br />

Basic Gross Area (sf): 275,439<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D1044<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

139,406<br />

1.0<br />

0<br />

27,871<br />

526<br />

Equipment Description Qty<br />

\33. LAW\2. <strong>UC</strong>LA CVRH_VAV LAW SF 3 & 7 VIV to VAV & SP Reset.xls<br />

Project Description Reference(s): Air Handler Project 2. Convert Constant Volume Air Handlers to Variable Air Volume & Air Handler Project 4.<br />

Static Pressure Reset on Variable Air Volume Air Handlers .<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

Extended Bare<br />

Labor Cost ($)<br />

161,703<br />

6,575<br />

$45,384<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

15 hp VFD 1 $2,275.00 $2,332 $820.00<br />

$919<br />

License Fee (estimated per 1000 CFM) 66 $0.00 $0 $56.00 $4,143<br />

VIV Removal 32 $0.00 $0 $100.00 $3,587<br />

60 hp VFD 1 $8,375.00 $8,584 $1,600.00 $1,794<br />

20 hp VFD 1 $3,375.00 $3,459 $820.00<br />

$919<br />

40 hp VFD 1 $7,025.00 $7,201 $1,100.00 $1,233<br />

SAV with InCite 2 $4,500.00 $9,225 $7,150.00 $16,030<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

Raw Costs:<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

$30,801 $28,626<br />

$2,541<br />

$4,001<br />

$37,343<br />

$3,734<br />

$11,452<br />

$3,817<br />

$4,581<br />

N/A<br />

$3,435<br />

$32,061<br />

$3,206<br />

Totals: $41,078 $35,267<br />

Total Project Cost: $96,194<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $96,194<br />

Rebate/Incentive*:<br />

$45,384<br />

Net Project Cost: $50,810<br />

Net Simple Payback Period (yrs): 3.0<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

192,296<br />

0<br />

$16,922<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: S-4 CAV to VAV<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: LAW<br />

Building Key: 04C4317<br />

Basic Gross Area (sf): 275,439<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D1045<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

16,081<br />

1.0<br />

0<br />

38,223<br />

449<br />

Equipment Description Qty<br />

\33. LAW\3. <strong>UC</strong>LA CVRH_VAV LAW S 4 CAV to VAV.xls<br />

Project Description Reference(s): Air Handler Project 2. Convert Constant Volume Air Handlers to Variable Air Volume.<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

46,659<br />

5,613<br />

Extended Bare<br />

Labor Cost ($)<br />

$16,811<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

3 hp VFD 1 $1,525.00 $1,563 $455.00<br />

$510<br />

5 hp VFD 1 $1,675.00 $1,717 $455.00<br />

$510<br />

Dart Controls 1 $8,710.00 $8,928 $2,900.00 $3,251<br />

Dart @ zones 3 $440.00 $1,353 $128.00<br />

$430<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

Raw Costs:<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

$13,561 $4,701<br />

$1,119<br />

$1,762<br />

$16,441<br />

$1,644<br />

$3,582<br />

$1,194<br />

$1,433<br />

N/A<br />

$564<br />

$5,266<br />

$527<br />

Totals: $18,085 $5,792<br />

Total Project Cost: $30,085<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $30,085<br />

Rebate/Incentive*:<br />

$16,811<br />

Net Project Cost: $13,274<br />

Net Simple Payback Period (yrs): 2.1<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.<br />

71,619<br />

0<br />

$6,302


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: S-5 & 6 CAV to VAV<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: LAW<br />

Building Key: 04C4317<br />

Basic Gross Area (sf): 275,439<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D1046<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

115,646<br />

4.0<br />

0<br />

73,910<br />

834<br />

Equipment Description Qty<br />

\33. LAW\4. <strong>UC</strong>LA MZ_DD_VAV_60 LAW S-5 & 6 CAV to VAV.xls<br />

Project Description Reference(s): Air Handler Project 2. Convert Constant Volume Air Handlers to Variable Air Volume.<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

Extended Bare<br />

Labor Cost ($)<br />

174,774<br />

10,425<br />

$52,371<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

DART Control 2 $8,710.00 $17,856 $2,900.00 $6,502<br />

Dart @ Zone 27 $440.00 $12,177 $128.00 $3,874<br />

20 hp VFD 2 $3,375.00 $6,919 $820.00 $1,838<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

Raw Costs:<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

$36,951 $12,214<br />

$3,048<br />

$4,800<br />

$44,800<br />

$4,480<br />

$9,649<br />

$3,216<br />

$3,860<br />

N/A<br />

$1,466<br />

$13,680<br />

$1,368<br />

Totals: $49,280 $15,048<br />

Total Project Cost: $81,053<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $81,053<br />

Rebate/Incentive*:<br />

$52,371<br />

Net Project Cost: $28,682<br />

Net Simple Payback Period (yrs): 1.5<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

220,903<br />

0<br />

$19,439<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: S-8 CAV to VAV<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: LAW<br />

Building Key: 04C4317<br />

Basic Gross Area (sf): 275,439<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D1047<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

27,915<br />

1.0<br />

0<br />

12,057<br />

200<br />

Equipment Description Qty<br />

\33. LAW\5. <strong>UC</strong>LA CVRH_VAV LAW S 8 CAV to VAV.xls<br />

Project Description Reference(s): Air Handler Project 2. Convert Constant Volume Air Handlers to Variable Air Volume.<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

37,561<br />

2,500<br />

Extended Bare<br />

Labor Cost ($)<br />

$11,515<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

10 hp VFD 1 $1,975.00 $2,024 $545.00<br />

$611<br />

Dart Controls 1 $8,710.00 $8,928 $2,900.00 $3,251<br />

Dart @ zones 3 $440.00 $1,353 $128.00<br />

$430<br />

3 hp VFD 1 $1,525.00 $1,563 $455.00<br />

$510<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

Raw Costs:<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

$13,868 $4,802<br />

$1,144<br />

$1,801<br />

$16,814<br />

$1,681<br />

$3,662<br />

$1,221<br />

$1,465<br />

N/A<br />

$576<br />

$5,379<br />

$538<br />

Totals: $18,495 $5,917<br />

Total Project Cost: $30,759<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $30,759<br />

Rebate/Incentive*:<br />

$11,515<br />

Net Project Cost: $19,244<br />

Net Simple Payback Period (yrs): 4.5<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.<br />

49,076<br />

0<br />

$4,319


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: SAF-1 & 2 SP Reset<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: YOUNG LIBRY<br />

Building Key: 04C4203<br />

Basic Gross Area (sf): 305,919<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D1048<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

141,010<br />

1.0<br />

0<br />

69,598<br />

2,791<br />

Equipment Description Qty<br />

\34. Young Libry\1. <strong>UC</strong>LA MZ_DD_VAV Young Libry SAF 1 & 2 SP Reset.xls<br />

Project Description Reference(s): Air Handler Project 4. Static Pressure Reset on Variable Air Volume Air Handlers .<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

Extended Bare<br />

Labor Cost ($)<br />

196,688<br />

34,888<br />

$82,093<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

SAV with Incite 2 $4,500.00 $9,225 $7,150.00 $16,030<br />

License Fee (estimated per 1000 CFM) 220 $0.00 $0 $56.00 $13,811<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

Raw Costs:<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

$9,225 $29,841<br />

$761<br />

$1,198<br />

$11,184<br />

$1,118<br />

$7,360<br />

$2,453<br />

$2,944<br />

N/A<br />

$3,581<br />

$33,422<br />

$3,342<br />

Totals: $12,303 $36,764<br />

Total Project Cost: $61,824<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $61,824<br />

Rebate/Incentive*:<br />

$49,460<br />

Net Project Cost: $12,365<br />

Net Simple Payback Period (yrs): 0.4<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

365,279<br />

0<br />

$32,145<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: SAF-3 to 8 CAV to VAV<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: YOUNG LIBRY<br />

Building Key: 04C4203<br />

Basic Gross Area (sf): 305,919<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D1049<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

513,097<br />

63.0<br />

0<br />

199,569<br />

4,419<br />

Equipment Description Qty<br />

\34. Young Libry\2. <strong>UC</strong>LA MZ_DD_VAV Young Libry SAF 3 to 8 CAV to VAV.xls<br />

Project Description Reference(s): Air Handler Project 2. Convert Constant Volume Air Handlers to Variable Air Volume.<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

Extended Bare<br />

Labor Cost ($)<br />

672,752<br />

55,238<br />

$216,698<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

Dart @ Control 6 $8,710.00 $53,567 $2,900.00 $19,505<br />

Dart @ Zone 74 $440.00 $33,374 $128.00 $10,618<br />

20 hp VFD 5 $3,375.00 $17,297 $820.00 $4,596<br />

7.5 hp VFD 6 $1,975.00 $12,146 $545.00 $3,666<br />

15 hp VFD 1 $2,275.00 $2,332 $820.00<br />

$919<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

Raw Costs:<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

$118,716 $39,305<br />

$9,794<br />

$15,421<br />

$143,931<br />

$14,393<br />

$31,012<br />

$10,337<br />

$12,405<br />

N/A<br />

$4,717<br />

$44,021<br />

$4,402<br />

Totals: $158,324 $48,423<br />

Total Project Cost: $260,501<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $260,501<br />

Rebate/Incentive*:<br />

$208,401<br />

Net Project Cost: $52,100<br />

Net Simple Payback Period (yrs): 0.6<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

932,532<br />

0<br />

$82,063<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: SAF 9 CAV to VAV<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: YOUNG LIBRY<br />

Building Key: 04C4203<br />

Basic Gross Area (sf): 305,919<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D1050<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

46,394<br />

2.0<br />

0<br />

40,684<br />

410<br />

Equipment Description Qty<br />

\34. Young Libry\3. <strong>UC</strong>LA MZ_DD_VAV Young Libry SAF 9 CAV to VAV.xls<br />

Project Description Reference(s): Air Handler Project 2. Convert Constant Volume Air Handlers to Variable Air Volume.<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

78,941<br />

5,125<br />

Extended Bare<br />

Labor Cost ($)<br />

$24,071<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

15 hp VFD 1 $2,275.00 $2,332 $820.00<br />

$919<br />

Dart @ Control 1 $8,710.00 $8,928 $2,900.00 $3,251<br />

Dart @ Zone 8 $440.00 $3,608 $128.00 $1,148<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

Raw Costs:<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

$14,868 $5,318<br />

$1,227<br />

$1,931<br />

$18,026<br />

$1,803<br />

$3,957<br />

$1,319<br />

$1,583<br />

N/A<br />

$638<br />

$5,956<br />

$596<br />

Totals: $19,828 $6,552<br />

Total Project Cost: $33,239<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $33,239<br />

Rebate/Incentive*:<br />

$24,071<br />

Net Project Cost: $9,168<br />

Net Simple Payback Period (yrs): 1.0<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

101,270<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.<br />

0<br />

$8,912


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: CAV to VAV - AHU 1, 2, 5W and 5E & Add Economizer<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: PERLOFF HALL<br />

Building Key: 04C4202<br />

Basic Gross Area (sf): 65,909<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D1051<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

104,141<br />

4.0<br />

0<br />

145,777<br />

304<br />

Equipment Description Qty<br />

\35. Perloff Hall\1. <strong>UC</strong>LA MZ_DD_VAV Perloff Hall AHU 1, 2, 5W & 5E CAV to VAV.xls<br />

Project Description Reference(s): Air Handler Project 2. Convert Constant Volume Air Handlers to Variable Air Volume & Air Handler Project 9.<br />

Add Air Side Economizer.<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr): 220,763<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

3,800<br />

Extended Bare<br />

Labor Cost ($)<br />

$56,783<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

5 hp VFD 4 $1,675.00 $6,868 $455.00 $2,040<br />

10 hp VFD 2 $1,975.00 $4,049 $545.00 $1,222<br />

Dart Control 4 $8,710.00 $35,711 $2,900.00 $13,004<br />

Dart @ zone 25 $440.00 $11,275 $128.00 $3,587<br />

Economizer 4 $9,000.00 $36,900 $6,000.00 $26,904<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

Raw Costs:<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

$94,802 $46,757<br />

$7,821<br />

$12,315<br />

$114,938<br />

$11,494<br />

$27,605<br />

$9,202<br />

$11,042<br />

N/A<br />

$5,611<br />

$52,368<br />

$5,237<br />

Totals: $126,432 $57,605<br />

Total Project Cost: $231,886<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $231,886<br />

Rebate/Incentive*:<br />

$56,783<br />

Net Project Cost: $175,103<br />

Net Simple Payback Period (yrs): 8.7<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

228,070<br />

0<br />

$20,070<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: S-1 to 11 except 9 - CAV to VAV<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: BOELTER HALL<br />

Building Key: 04C4343<br />

Basic Gross Area (sf): 373,904<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D1052<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

557,218<br />

15.0<br />

0<br />

320,081<br />

10,256<br />

Equipment Description Qty<br />

\36. Boelter Hall\1. <strong>UC</strong>LA MZ_DD_VAV Boelter Hall S-1 to 11 except 9 - CAV to VAV.xls<br />

Project Description Reference(s): Air Handler Project 2. Convert Constant Volume Air Handlers to Variable Air Volume.<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

Extended Bare<br />

Labor Cost ($)<br />

813,283<br />

128,200<br />

$323,388<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

Dart Control 10 $8,710.00 $89,278 $2,900.00 $32,509<br />

3 hp VFD 3 $1,525.00 $4,689 $455.00 $1,530<br />

Dart @ zone 95 $440.00 $42,845 $128.00 $13,631<br />

5 hp VFD 2 $1,675.00 $3,434 $455.00 $1,020<br />

2 hp VFD 2 $700.00 $1,435 $400.00<br />

$897<br />

10 hp VFD 5 $1,975.00 $10,122 $545.00 $3,055<br />

15 hp VFD 4 $2,275.00 $9,328 $820.00 $3,677<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

Raw Costs:<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

$161,130 $56,319<br />

$13,293<br />

$20,931<br />

$195,354<br />

$19,535<br />

$42,641<br />

$14,214<br />

$17,056<br />

N/A<br />

$6,758<br />

$63,077<br />

$6,308<br />

Totals: $214,889 $69,385<br />

Total Project Cost: $358,186<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $358,186<br />

Rebate/Incentive*:<br />

$286,549<br />

Net Project Cost: $71,637<br />

Net Simple Payback Period (yrs): 0.6<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

1,427,651<br />

0<br />

$125,633<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: AH 4 to 7, 10 to 12 - SP Reset<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: BOELTER HALL<br />

Building Key: 04C4343<br />

Basic Gross Area (sf): 373,904<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D1053<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

291,309<br />

2.0<br />

0<br />

166,363<br />

5,187<br />

Equipment Description Qty<br />

\36. Boelter Hall\2. <strong>UC</strong>LA CVRH_VAV Boelter Hall AH 4 to 7, 10 to 12 - SP Reset.xls<br />

Project Description Reference(s): Air Handler Project 4. Static Pressure Reset on Variable Air Volume Air Handlers .<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

Extended Bare<br />

Labor Cost ($)<br />

424,399<br />

64,838<br />

$166,693<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

SAV with InCite 7 $4,500.00 $32,288 $7,150.00 $56,106<br />

License Fee (estimated per 1000 CFM) 203 $0.00 $0 $56.00 $12,744<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

Raw Costs:<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

$32,288 $68,850<br />

$2,664<br />

$4,194<br />

$39,145<br />

$3,915<br />

$19,182<br />

$6,394<br />

$7,673<br />

N/A<br />

$8,262<br />

$77,112<br />

$7,711<br />

Totals: $43,060 $84,823<br />

Total Project Cost: $161,132<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $161,132<br />

Rebate/Incentive*:<br />

$128,906<br />

Net Project Cost: $32,226<br />

Net Simple Payback Period (yrs): 0.5<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

734,759<br />

0<br />

$64,659<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: S-1, 5, 9, 10 to 12<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: GEOLOGY<br />

Building Key: 04C4228A<br />

Basic Gross Area (sf): 182,149<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D1054<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

181,337<br />

5.0<br />

0<br />

80,248<br />

2,026<br />

Equipment Description Qty<br />

\37. Geology\1. <strong>UC</strong>LA MZ_DD_VAV GEOLOGY S-1, 5, 9, 10 to 12 CAV to VAV.xls<br />

Project Description Reference(s): Air Handler Project 2. Convert Constant Volume Air Handlers to Variable Air Volume.<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

Extended Bare<br />

Labor Cost ($)<br />

245,535<br />

25,325<br />

$84,253<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

Dart Control 6 $8,710.00 $53,567 $2,900.00 $19,505<br />

Dart @ zone 31 $440.00 $13,981 $128.00 $4,448<br />

10 hp VFD 1 $1,975.00 $2,024 $545.00<br />

$611<br />

7.5 hp VFD 4 $1,975.00 $8,098 $545.00 $2,444<br />

5 hp VFD 1 $1,675.00 $1,717 $455.00<br />

$510<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

Raw Costs:<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

$79,386 $27,518<br />

$6,549<br />

$10,312<br />

$96,248<br />

$9,625<br />

$20,966<br />

$6,989<br />

$8,387<br />

N/A<br />

$3,302<br />

$30,821<br />

$3,082<br />

Totals: $105,873 $33,903<br />

Total Project Cost: $176,117<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $176,117<br />

Rebate/Incentive*:<br />

$84,253<br />

Net Project Cost: $91,864<br />

Net Simple Payback Period (yrs): 2.9<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

365,538<br />

0<br />

$32,167<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: S-1(Geophysics)<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: GEOLOGY<br />

Building Key: 04C4228A<br />

Basic Gross Area (sf): 182,149<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D1055<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

71,548<br />

2.0<br />

0<br />

54,628<br />

1,817<br />

Equipment Description Qty<br />

\37. Geology\2. <strong>UC</strong>LA MZ_DD_VAV GEOLOGY S-1(Geophysics) CAV to VAV.xls<br />

Project Description Reference(s): Air Handler Project 2. Convert Constant Volume Air Handlers to Variable Air Volume.<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

Extended Bare<br />

Labor Cost ($)<br />

115,250<br />

22,713<br />

$50,373<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

15 hp VFD 1 $2,275.00 $2,332 $820.00<br />

$919<br />

Dart Control 1 $8,710.00 $8,928 $2,900.00 $3,251<br />

Dart @ zone 17 $440.00 $7,667 $128.00 $2,439<br />

5 hp VFD 1 $1,675.00 $1,717 $455.00<br />

$510<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

Raw Costs:<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

$20,644 $7,119<br />

$1,703<br />

$2,682<br />

$25,028<br />

$2,503<br />

$5,445<br />

$1,815<br />

$2,178<br />

N/A<br />

$854<br />

$7,974<br />

$797<br />

Totals: $27,531 $8,771<br />

Total Project Cost: $45,741<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $45,741<br />

Rebate/Incentive*:<br />

$36,593<br />

Net Project Cost: $9,148<br />

Net Simple Payback Period (yrs): 0.5<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

224,261<br />

0<br />

$19,735<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: Aircuity<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: GEOLOGY<br />

Building Key: 04C4228A<br />

Basic Gross Area (sf): 182,149<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D1056<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

7,207<br />

Equipment Description Qty<br />

\37. Geology\3. <strong>UC</strong>LA HVAC Lab GEOLOGY Aircuity.xls<br />

Project Description Reference(s): Laboratory Air Handler Project 1. Convert Laboratory Air Handlers and Fume Hoods to Variable Air Volume &<br />

Laboratory Air Handler Project 2. Rebalance Variable Air Volume Laboratory (or Vivarium) Air Handlers.<br />

1.0<br />

0<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr): 7,207<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

0<br />

$1,730<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

Extended Bare<br />

Labor Cost ($)<br />

2 hp VFD 1 $700.00 $718 $400.00<br />

$448<br />

Aircuity, per sensor 2 $2,500.00 $5,125 $2,000.00 $4,484<br />

Rebalance 5,000 $0.00 $0 $1.75 $9,809<br />

0.25 hp VFD 21 $87.50 $1,883 $350.00 $8,239<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

Raw Costs:<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

$7,726 $22,981<br />

$637<br />

$1,004<br />

$9,367<br />

$937<br />

$5,792<br />

$1,931<br />

$2,317<br />

N/A<br />

$2,758<br />

$25,738<br />

$2,574<br />

Totals: $10,304 $28,312<br />

Total Project Cost: $48,656<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $48,656<br />

Rebate/Incentive*:<br />

$1,730<br />

Net Project Cost: $46,926<br />

Net Simple Payback Period (yrs): 74.0<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.<br />

7,207<br />

0<br />

$634<br />

Backup


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: AHU - 4 VIV to VAV SP Reset<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: CORNELL HALL<br />

Building Key: 04C515D<br />

Basic Gross Area (sf): 71,737<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D1057<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

70,904<br />

0.0<br />

0<br />

30,662<br />

549<br />

Equipment Description Qty<br />

\4. Cornell Hall\1. <strong>UC</strong>LA CVRH_VAV Cornell Hall AHU 4 VIV to VAV SP Reset.xls<br />

Project Description Reference(s): Air Handler Project 2. Convert Constant Volume Air Handlers to Variable Air Volume & Air Handler Project 4.<br />

Static Pressure Reset on Variable Air Volume Air Handlers .<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

95,434<br />

6,863<br />

Extended Bare<br />

Labor Cost ($)<br />

$29,767<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

40 hp VFD 1 $7,025.00 $7,201 $1,100.00 $1,233<br />

SAV with InCite 1 $4,500.00 $4,613 $7,150.00 $8,015<br />

License Fee (estimated per 1000 CFM) 33 $0.00 $0 $56.00 $2,072<br />

VIV Removal 16 $0.00 $0 $100.00 $1,794<br />

15 hp VFD 1 $2,275.00 $2,332 $820.00<br />

$919<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

Raw Costs:<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

$14,145 $14,033<br />

$1,167<br />

$1,837<br />

$17,149<br />

$1,715<br />

$5,423<br />

$1,808<br />

$2,169<br />

N/A<br />

$1,684<br />

$15,717<br />

$1,572<br />

Totals: $18,864 $17,288<br />

Total Project Cost: $45,552<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $45,552<br />

Rebate/Incentive*:<br />

$29,767<br />

Net Project Cost: $15,785<br />

Net Simple Payback Period (yrs): 1.4<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

127,238<br />

0<br />

$11,197<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: AHU - 6 VIV to VAV SP Reset<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: ROSNFLD LIBR<br />

Building Key: 04C515E<br />

Basic Gross Area (sf): 51,046<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D1058<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

77,567<br />

1.0<br />

0<br />

33,154<br />

582<br />

Equipment Description Qty<br />

\5. Rosnfld LBR\1. <strong>UC</strong>LA CVRH_VAV Rosnfld LBR AHU 6 VIV to VAV SP Reset.xls<br />

Project Description Reference(s): Air Handler Project 2. Convert Constant Volume Air Handlers to Variable Air Volume & Air Handler Project 4.<br />

Static Pressure Reset on Variable Air Volume Air Handlers .<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

Extended Bare<br />

Labor Cost ($)<br />

104,090<br />

7,275<br />

$32,257<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

20 hp VFD 1 $3,375.00 $3,459 $820.00<br />

$919<br />

40 hp VFD 1 $7,025.00 $7,201 $1,100.00 $1,233<br />

SAV with InCite 1 $4,500.00 $4,613 $7,150.00 $8,015<br />

License Fee (estimated per 1000 CFM) 35 $0.00 $0 $56.00 $2,197<br />

VIV Removal 16 $0.00 $0 $100.00 $1,794<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

Raw Costs:<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

$15,273 $14,158<br />

$1,260<br />

$1,984<br />

$18,516<br />

$1,852<br />

$5,672<br />

$1,891<br />

$2,269<br />

N/A<br />

$1,699<br />

$15,857<br />

$1,586<br />

Totals: $20,368 $17,443<br />

Total Project Cost: $47,642<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $47,642<br />

Rebate/Incentive*:<br />

$32,257<br />

Net Project Cost: $15,385<br />

Net Simple Payback Period (yrs): 1.3<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

137,755<br />

0<br />

$12,122<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: AHU - 5 & 10 VIV to VAV SP Reset<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: MULLIN CMNS<br />

Building Key: 04C515F<br />

Basic Gross Area (sf): 33,957<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D1059<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

82,155<br />

1.0<br />

0<br />

34,737<br />

599<br />

Equipment Description Qty<br />

\6. Mullin CMNS\1. <strong>UC</strong>LA CVRH_VAV Mullin CMNS AHU 5 & 10 VIV to VAV SP Reset.xls<br />

Project Description Reference(s): Air Handler Project 2. Convert Constant Volume Air Handlers to Variable Air Volume & Air Handler Project 4.<br />

Static Pressure Reset on Variable Air Volume Air Handlers .<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

Extended Bare<br />

Labor Cost ($)<br />

109,945<br />

7,488<br />

$33,874<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

License Fee (estimated per 1000 CFM) 36 $0.00 $0 $56.00 $2,260<br />

VIV Removal 32 $0.00 $0 $100.00 $3,587<br />

25 hp VFD 1 $3,925.00 $4,023 $1,100.00 $1,233<br />

20 hp VFD 1 $3,375.00 $3,459 $820.00<br />

$919<br />

10 hp VFD 1 $1,975.00 $2,024 $545.00<br />

$611<br />

7.5 hp VFD 1 $1,975.00 $2,024 $545.00<br />

$611<br />

SAV with InCite 2 $4,500.00 $9,225 $7,150.00 $16,030<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

Raw Costs:<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

$20,756 $25,252<br />

$1,712<br />

$2,696<br />

$25,165<br />

$2,516<br />

$8,819<br />

$2,940<br />

$3,527<br />

N/A<br />

$3,030<br />

$28,282<br />

$2,828<br />

Totals: $27,681 $31,110<br />

Total Project Cost: $74,077<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $74,077<br />

Rebate/Incentive*:<br />

$33,874<br />

Net Project Cost: $40,203<br />

Net Simple Payback Period (yrs): 3.2<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

144,543<br />

0<br />

$12,720<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: Apply DDC controls, convert to VAV<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: BUNCHE HALL<br />

Building Key: 04C4580<br />

Basic Gross Area (sf): 229,248<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D1060<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

1,411,691<br />

67.0<br />

0<br />

0<br />

7,204<br />

Equipment Description Qty<br />

\7. Bunche Hall\1. <strong>UC</strong>LA MZ_DD_VAV_60 Bunche Hall CAV to VAV.xls<br />

Project Description Reference(s): Air Handler Project 1. Convert Constant Volume Air Handlers and Terminal Boxes to Variable Air Volume & Air<br />

Handler Project 6. Convert Air Handlers to Direct Digital Control.<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

Extended Bare<br />

Labor Cost ($)<br />

1,411,691<br />

90,050<br />

$428,856<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

30 hp VFD 2 $4,775.00 $9,789 $1,100.00 $2,466<br />

5 hp VFD 5 $1,675.00 $8,584 $455.00 $2,550<br />

Zone Level Typical DD Controls: DD Mixing Box 211 $5,597.56 $1,210,612 $3,997.77 $945,597<br />

40 hp VFD 3 $7,025.00 $21,602 $1,100.00 $3,699<br />

25 hp VFD 1 $3,925.00 $4,023 $1,100.00 $1,233<br />

20 hp VFD 1 $3,375.00 $3,459 $820.00<br />

$919<br />

10 hp VFD 1 $1,975.00 $2,024 $545.00<br />

$611<br />

7.5 hp VFD 2 $1,975.00 $4,049 $545.00 $1,222<br />

75 hp VFD 1 $11,500.00 $11,788 $1,600.00 $1,794<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

Raw Costs:<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

$1,275,930 $960,091<br />

$105,264<br />

$165,743<br />

$1,546,938<br />

$154,694<br />

$432,670<br />

$144,223<br />

$173,068<br />

N/A<br />

$115,211<br />

$1,075,302<br />

$107,530<br />

Totals: $1,701,632 $1,182,832<br />

Total Project Cost: $3,634,425<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $3,634,425<br />

Rebate/Incentive*:<br />

$428,856<br />

Net Project Cost: $3,205,569<br />

Net Simple Payback Period (yrs): 19.6<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

1,861,221<br />

0<br />

$163,787<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: AHU - 1, 2 & 3 VIV to VAV SP Reset<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: DORIS STEIN<br />

Building Key: 04C4325<br />

Basic Gross Area (sf): 94,309<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D1061<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

159,060<br />

1.0<br />

0<br />

60,756<br />

860<br />

Equipment Description Qty<br />

\8. Doris Stein\1. <strong>UC</strong>LA CVRH_VAV Doris Stein AHU 1, 2 & 3 VIV to VAV SP Reset.xls<br />

Project Description Reference(s): Air Handler Project 2. Convert Constant Volume Air Handlers to Variable Air Volume & Air Handler Project 4.<br />

Static Pressure Reset on Variable Air Volume Air Handlers .<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

Extended Bare<br />

Labor Cost ($)<br />

207,665<br />

10,750<br />

$60,590<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

License Fee (estimated per 1000 CFM) 51 $0.00 $0 $56.00 $3,202<br />

VIV Removal 48 $0.00 $0 $100.00 $5,381<br />

30 hp VFD 1 $4,775.00 $4,894 $1,100.00 $1,233<br />

25 hp VFD 2 $3,925.00 $8,046 $1,100.00 $2,466<br />

20 hp VFD 1 $3,375.00 $3,459 $820.00<br />

$919<br />

10 hp VFD 2 $1,975.00 $4,049 $545.00 $1,222<br />

SAV with InCite 3 $4,500.00 $13,838 $7,150.00 $24,045<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

Raw Costs:<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

$34,286 $38,468<br />

$2,829<br />

$4,454<br />

$41,569<br />

$4,157<br />

$13,968<br />

$4,656<br />

$5,587<br />

N/A<br />

$4,616<br />

$43,084<br />

$4,308<br />

Totals: $45,726 $47,393<br />

Total Project Cost: $117,329<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $117,329<br />

Rebate/Incentive*:<br />

$60,590<br />

Net Project Cost: $56,739<br />

Net Simple Payback Period (yrs): 2.5<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

256,468<br />

0<br />

$22,569<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: ACS - 1 to 5 - SP Reset<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: ENGR BLDG 4<br />

Building Key: 04C4256A<br />

Basic Gross Area (sf): 294,124<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D1062<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

283,121<br />

3.0<br />

0<br />

155,143<br />

3,127<br />

Equipment Description Qty<br />

\9. Engineering IV\1. <strong>UC</strong>LA CVRH_VAV Engineering IV ACS 1 to 5 - SP Reset.xls<br />

Project Description Reference(s): Air Handler Project 4. Static Pressure Reset on Variable Air Volume Air Handlers .<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

Extended Bare<br />

Labor Cost ($)<br />

407,235<br />

39,088<br />

$136,824<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

SAV with InCite 5 $4,500.00 $23,063 $7,150.00 $40,076<br />

License Fee (estimated per 1000 CFM) 267 $0.00 $0 $56.00 $16,761<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

Raw Costs:<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

$23,063 $56,837<br />

$1,903<br />

$2,996<br />

$27,961<br />

$2,796<br />

$15,117<br />

$5,039<br />

$6,047<br />

N/A<br />

$6,820<br />

$63,657<br />

$6,366<br />

Totals: $30,757 $70,023<br />

Total Project Cost: $126,983<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $126,983<br />

Rebate/Incentive*:<br />

$101,586<br />

Net Project Cost: $25,397<br />

Net Simple Payback Period (yrs): 0.5<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

589,949<br />

0<br />

$51,915<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: ACS 8 (AHU-3) - Aircruity<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: ENGR BLDG 4<br />

Building Key: 04C4256A<br />

Basic Gross Area (sf): 294,124<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D1063<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

242,891<br />

22.0<br />

0<br />

162,129<br />

3,191<br />

Equipment Description Qty<br />

\9. Engineering IV\2. <strong>UC</strong>LA HVAC Lab Engineering IV ACS 8 - Aircuity.xls<br />

Project Description Reference(s): Laboratory Air Handler Project 1. Convert Laboratory Air Handlers and Fume Hoods to Variable Air Volume &<br />

Laboratory Air Handler Project 2. Rebalance Variable Air Volume Laboratory (or Vivarium) Air Handlers.<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr): 372,594<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

39,888<br />

Extended Bare<br />

Labor Cost ($)<br />

$129,310<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

0.5 hp VFD 11 $175.00 $1,973 $350.00 $4,316<br />

1 hp VFD 5 $350.00 $1,794 $400.00 $2,242<br />

0.25 hp VFD 1 $87.50 $90 $350.00<br />

$392<br />

3 hp VFD 2 $1,525.00 $3,126 $455.00 $1,020<br />

Aircuity, per sensor 15 $2,500.00 $38,438 $2,000.00 $33,630<br />

Autosash closure 30 $2,700.00 $83,025 $1,800.00 $60,534<br />

Fume Hood Conversion - CAV to VAV 30 $11,250.00 $345,938 $11,250.00 $378,338<br />

7.5 hp VFD 2 $1,975.00 $4,049 $545.00 $1,222<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

Raw Costs:<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

$478,432 $481,694<br />

$39,471<br />

$62,148<br />

$580,050<br />

$58,005<br />

$184,725<br />

$61,575<br />

$73,890<br />

N/A<br />

$57,803<br />

$539,497<br />

$53,950<br />

Totals: $638,055 $593,447<br />

Total Project Cost: $1,551,693<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $1,551,693<br />

Rebate/Incentive*:<br />

$129,310<br />

Net Project Cost: $1,422,383<br />

Net Simple Payback Period (yrs): 28.9<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

558,742<br />

0<br />

$49,169<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: CF - 1 to 22 - VIV to VAV<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: ENGR BLDG 4<br />

Building Key: 04C4256A<br />

Basic Gross Area (sf): 294,124<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D1064<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

743,261<br />

143.0<br />

0<br />

601,695<br />

Equipment Description Qty<br />

\9. Engineering IV\3. <strong>UC</strong>LA CVRH_VAV Engineering IV CF - 1 to 22 - VIV to VAV.xls<br />

Project Description Reference(s): Air Handler Project 2. Convert Constant Volume Air Handlers to Variable Air Volume.<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

Extended Bare<br />

Labor Cost ($)<br />

1,224,617<br />

0<br />

$293,908<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

30 hp VFD 4 $4,775.00 $19,578 $1,100.00 $4,932<br />

VIV Removal 352 $0.00 $0 $100.00 $39,459<br />

Dart @ Zone 22 $440.00 $9,922 $128.00 $3,157<br />

2 hp VFD 1 $700.00 $718 $400.00<br />

$448<br />

Dart Control 22 $8,710.00 $196,411 $2,900.00 $71,520<br />

50 hp VFD 2 $7,650.00 $15,683 $1,375.00 $3,083<br />

10 hp VFD 1 $1,975.00 $2,024 $545.00<br />

$611<br />

5 hp VFD 1 $1,675.00 $1,717 $455.00<br />

$510<br />

15 hp VFD 1 $2,275.00 $2,332 $820.00<br />

$919<br />

20 hp VFD 3 $3,375.00 $10,378 $820.00 $2,758<br />

25 hp VFD 4 $3,925.00 $16,093 $1,100.00 $4,932<br />

40 hp VFD 6 $7,025.00 $43,204 $1,100.00 $7,399<br />

7.5 hp VFD 1 $1,975.00 $2,024 $545.00<br />

$611<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

Raw Costs:<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

$320,082 $140,339<br />

$26,407<br />

$41,579<br />

$388,067<br />

$38,807<br />

$89,966<br />

$29,989<br />

$35,986<br />

N/A<br />

$16,841<br />

$157,180<br />

$15,718<br />

Totals: $426,874 $172,898<br />

Total Project Cost: $755,712<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $755,712<br />

Rebate/Incentive*:<br />

$293,908<br />

Net Project Cost: $461,804<br />

Net Simple Payback Period (yrs): 4.5<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

1,176,481<br />

0<br />

$103,530<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: ACS 9 - CAV to VAV<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: ENGR BLDG 4<br />

Building Key: 04C4256A<br />

Basic Gross Area (sf): 294,124<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D1065<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

25,138<br />

4.0<br />

0<br />

39,788<br />

815<br />

Equipment Description Qty<br />

\9. Engineering IV\4. <strong>UC</strong>LA CVRH_VAV Engineering IV ACS 9 - CAV to VAV.xls<br />

Project Description Reference(s): Air Handler Project 2. Convert Constant Volume Air Handlers to Variable Air Volume.<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

56,968<br />

10,188<br />

Extended Bare<br />

Labor Cost ($)<br />

$23,860<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

Dart @ Zone 8 $440.00 $3,608 $128.00 $1,148<br />

Dart Control 1 $8,710.00 $8,928 $2,900.00 $3,251<br />

10 hp VFD 1 $1,975.00 $2,024 $545.00<br />

$611<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

Raw Costs:<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

$14,560 $5,010<br />

$1,201<br />

$1,891<br />

$17,653<br />

$1,765<br />

$3,838<br />

$1,279<br />

$1,535<br />

N/A<br />

$601<br />

$5,611<br />

$561<br />

Totals: $19,418 $6,172<br />

Total Project Cost: $32,243<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $32,243<br />

Rebate/Incentive*:<br />

$23,860<br />

Net Project Cost: $8,383<br />

Net Simple Payback Period (yrs): 0.9<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

104,641<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.<br />

0<br />

$9,208


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: SBD, New/Renov - Outpatient Wing Seismic Renovation<br />

<strong>Campus</strong>: LOS ANGELES MC<br />

Location: LOS ANGELES MED CTR - WESTWOO<br />

Building: MED PLZA 100<br />

Building Key: 04C4006<br />

Basic Gross Area (sf): 50,679<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3001<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

388,131<br />

44.0<br />

36,365<br />

Equipment Description Qty<br />

<strong>UC</strong> SEP Capital Project Savings Potential (27 Mar) - Checked MZ 032708.xls<br />

Project Description Reference(s): New Construction and Renovation from Capital Program.<br />

Estimated Construction Cost 1<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

25.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

Extended Bare<br />

Labor Cost ($)<br />

388,131<br />

36,365<br />

$129,516<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$204,957<br />

$51,239<br />

$76,859<br />

$25,620<br />

$30,743<br />

N/A<br />

$204,956<br />

$51,239<br />

Totals: $256,196 $256,195<br />

Total Project Cost: $645,613<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $645,613<br />

Rebate/Incentive*:<br />

$129,516<br />

Net Project Cost: $516,097<br />

Net Simple Payback Period (yrs): 9.5<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

615,049<br />

0<br />

$54,124<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: SBD, New/Renov - Lake Arrowhead Facility Improvements<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: ARWHD LODGE<br />

Building Key: 04C4201<br />

Basic Gross Area (sf): 17,785<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3002<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

45,881<br />

5.0<br />

4,299<br />

Equipment Description Qty<br />

<strong>UC</strong> SEP Capital Project Savings Potential (27 Mar) - Checked MZ 032708.xls<br />

Project Description Reference(s): New Construction and Renovation from Capital Program.<br />

Estimated Construction Cost 1<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

45,881<br />

4,299<br />

Extended Bare<br />

Labor Cost ($)<br />

$15,310<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$24,227<br />

$2,423<br />

$7,995<br />

$2,665<br />

$3,198<br />

N/A<br />

$24,227<br />

$2,423<br />

Totals: $26,650 $26,650<br />

Total Project Cost: $67,157<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $67,157<br />

Rebate/Incentive*:<br />

$15,310<br />

Net Project Cost: $51,847<br />

Net Simple Payback Period (yrs): 8.1<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.<br />

72,707<br />

0<br />

$6,398


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: Monitoring Based Commissioning<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: PERLOFF HALL<br />

Building Key: 04C4202<br />

Basic Gross Area (sf): 65,909<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3003<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

50,750<br />

6.0<br />

6,920<br />

Equipment Description Qty<br />

SEP MBCx Analysis MZ 080326 Final.Checked by LCK.xls<br />

Project Description Reference(s): Monitoring Based Commission for All SEP Buildings.<br />

Estimated Construction Cost 1<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

50,750<br />

6,920<br />

Extended Bare<br />

Labor Cost ($)<br />

$19,100<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$10,051<br />

$1,005<br />

$6,634<br />

$2,211<br />

$2,653<br />

N/A<br />

$30,153<br />

$3,015<br />

Totals: $11,056 $33,168<br />

Total Project Cost: $55,723<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $55,723<br />

Rebate/Incentive*:<br />

$19,100<br />

Net Project Cost: $36,623<br />

Net Simple Payback Period (yrs): 4.4<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.<br />

93,931<br />

0<br />

$8,266


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: Monitoring Based Commissioning<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: YOUNG LIBRY<br />

Building Key: 04C4203<br />

Basic Gross Area (sf): 305,919<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3004<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

235,558<br />

27.0<br />

32,121<br />

Equipment Description Qty<br />

SEP MBCx Analysis MZ 080326 Final.Checked by LCK.xls<br />

Project Description Reference(s): Monitoring Based Commission for All SEP Buildings.<br />

Estimated Construction Cost 1<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

Extended Bare<br />

Labor Cost ($)<br />

235,558<br />

32,121<br />

$88,655<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$46,653<br />

$4,665<br />

$30,791<br />

$10,264<br />

$12,316<br />

N/A<br />

$139,958<br />

$13,996<br />

Totals: $51,318 $153,954<br />

Total Project Cost: $258,643<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $258,643<br />

Rebate/Incentive*:<br />

$88,655<br />

Net Project Cost: $169,988<br />

Net Simple Payback Period (yrs): 4.4<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

435,993<br />

0<br />

$38,367<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: SBD, New/Renov - Young Research Library Renovation<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: YOUNG LIBRY<br />

Building Key: 04C4203<br />

Basic Gross Area (sf): 305,919<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3005<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

302,198<br />

34.0<br />

28,314<br />

Equipment Description Qty<br />

<strong>UC</strong> SEP Capital Project Savings Potential (27 Mar) - Checked MZ 032708.xls<br />

Project Description Reference(s): New Construction and Renovation from Capital Program.<br />

Estimated Construction Cost 1<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

Extended Bare<br />

Labor Cost ($)<br />

302,198<br />

28,314<br />

$100,842<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$159,579<br />

$15,958<br />

$52,661<br />

$17,554<br />

$21,064<br />

N/A<br />

$159,579<br />

$15,958<br />

Totals: $175,537 $175,537<br />

Total Project Cost: $442,353<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $442,353<br />

Rebate/Incentive*:<br />

$100,842<br />

Net Project Cost: $341,511<br />

Net Simple Payback Period (yrs): 8.1<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

478,877<br />

0<br />

$42,141<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: SBD, New/Renov - Pauley Pavilion Renovation and Expansion<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: PAULEY<br />

Building Key: 04C4204<br />

Basic Gross Area (sf): 204,465<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3006<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

784,215<br />

90.0<br />

73,476<br />

Equipment Description Qty<br />

<strong>UC</strong> SEP Capital Project Savings Potential (27 Mar) - Checked MZ 032708.xls<br />

Project Description Reference(s): New Construction and Renovation from Capital Program.<br />

Estimated Construction Cost 1<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

Extended Bare<br />

Labor Cost ($)<br />

784,215<br />

73,476<br />

$261,688<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$414,113<br />

$41,411<br />

$136,657<br />

$45,552<br />

$54,663<br />

N/A<br />

$414,113<br />

$41,411<br />

Totals: $455,524 $455,524<br />

Total Project Cost: $1,147,921<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $1,147,921<br />

Rebate/Incentive*:<br />

$261,688<br />

Net Project Cost: $886,233<br />

Net Simple Payback Period (yrs): 8.1<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

1,242,705<br />

0<br />

$109,358<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: SBD, New/Renov - CHS Parking E General Clinical Research<br />

<strong>Center</strong>/Biomarker Seismic Renovation<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: PARKG ST CHS<br />

Building Key: 04C4211<br />

Basic Gross Area (sf): 652,811<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3007<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

160,920<br />

18.0<br />

7,668<br />

Equipment Description Qty<br />

<strong>UC</strong> SEP Capital Project Savings Potential (27 Mar) - Checked MZ 032708.xls<br />

Project Description Reference(s): New Construction and Renovation from Capital Program.<br />

Estimated Construction Cost 1<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

Extended Bare<br />

Labor Cost ($)<br />

160,920<br />

7,668<br />

$46,289<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$67,603<br />

$6,760<br />

$22,309<br />

$7,436<br />

$8,924<br />

N/A<br />

$67,602<br />

$6,760<br />

Totals: $74,363 $74,362<br />

Total Project Cost: $187,394<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $187,394<br />

Rebate/Incentive*:<br />

$46,289<br />

Net Project Cost: $141,105<br />

Net Simple Payback Period (yrs): 7.7<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

208,768<br />

0<br />

$18,372<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: Monitoring Based Commissioning<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: GEOLOGY<br />

Building Key: 04C4228A<br />

Basic Gross Area (sf): 182,149<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3008<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

344,262<br />

39.0<br />

36,976<br />

Equipment Description Qty<br />

SEP MBCx Analysis MZ 080326 Final.Checked by LCK.xls<br />

Project Description Reference(s): Monitoring Based Commission for All SEP Buildings.<br />

Estimated Construction Cost 1<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

Extended Bare<br />

Labor Cost ($)<br />

344,262<br />

36,976<br />

$119,599<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$55,555<br />

$5,556<br />

$36,666<br />

$12,222<br />

$14,667<br />

N/A<br />

$166,666<br />

$16,667<br />

Totals: $61,111 $183,333<br />

Total Project Cost: $307,998<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $307,998<br />

Rebate/Incentive*:<br />

$119,599<br />

Net Project Cost: $188,399<br />

Net Simple Payback Period (yrs): 3.7<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

574,992<br />

0<br />

$50,599<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: Monitoring Based Commissioning<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: MOLECULR SCI<br />

Building Key: 04C4228C<br />

Basic Gross Area (sf): 178,666<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3009<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

337,679<br />

38.0<br />

36,269<br />

Equipment Description Qty<br />

SEP MBCx Analysis MZ 080326 Final.Checked by LCK.xls<br />

Project Description Reference(s): Monitoring Based Commission for All SEP Buildings.<br />

Estimated Construction Cost 1<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

Extended Bare<br />

Labor Cost ($)<br />

337,679<br />

36,269<br />

$117,312<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$54,493<br />

$5,449<br />

$35,965<br />

$11,988<br />

$14,386<br />

N/A<br />

$163,479<br />

$16,348<br />

Totals: $59,942 $179,827<br />

Total Project Cost: $302,109<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $302,109<br />

Rebate/Incentive*:<br />

$117,312<br />

Net Project Cost: $184,797<br />

Net Simple Payback Period (yrs): 3.7<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

563,998<br />

0<br />

$49,632<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: SBD, New/Renov - Police Station Replacement Building<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: POLICE STN<br />

Building Key: 04C4230<br />

Basic Gross Area (sf): 11,617<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3010<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

74,296<br />

8.0<br />

6,961<br />

Equipment Description Qty<br />

<strong>UC</strong> SEP Capital Project Savings Potential (27 Mar) - Checked MZ 032708.xls<br />

Project Description Reference(s): New Construction and Renovation from Capital Program.<br />

Estimated Construction Cost 1<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

74,296<br />

6,961<br />

Extended Bare<br />

Labor Cost ($)<br />

$24,792<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$39,232<br />

$3,923<br />

$12,946<br />

$4,315<br />

$5,179<br />

N/A<br />

$39,231<br />

$3,923<br />

Totals: $43,155 $43,154<br />

Total Project Cost: $108,750<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $108,750<br />

Rebate/Incentive*:<br />

$24,792<br />

Net Project Cost: $83,958<br />

Net Simple Payback Period (yrs): 8.1<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

117,733<br />

0<br />

$10,360<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: Monitoring Based Commissioning<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: WOODEN/PS4<br />

Building Key: 04C4235<br />

Basic Gross Area (sf): 707,839<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3011<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

159,945<br />

18.0<br />

21,811<br />

Equipment Description Qty<br />

SEP MBCx Analysis MZ 080326 Final.Checked by LCK.xls<br />

Project Description Reference(s): Monitoring Based Commission for All SEP Buildings.<br />

Estimated Construction Cost 1<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

Extended Bare<br />

Labor Cost ($)<br />

159,945<br />

21,811<br />

$60,198<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$31,677<br />

$3,168<br />

$20,907<br />

$6,969<br />

$8,363<br />

N/A<br />

$95,032<br />

$9,503<br />

Totals: $34,845 $104,535<br />

Total Project Cost: $175,619<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $175,619<br />

Rebate/Incentive*:<br />

$60,198<br />

Net Project Cost: $115,421<br />

Net Simple Payback Period (yrs): 4.4<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

296,046<br />

0<br />

$26,052<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: SBD, New/Renov - Dykstra Repairs and Refurbishment<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: DYKSTRA HALL<br />

Building Key: 04C4246<br />

Basic Gross Area (sf): 163,262<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3012<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

1,503,493<br />

172.0<br />

71,643<br />

Equipment Description Qty<br />

<strong>UC</strong> SEP Capital Project Savings Potential (27 Mar) - Checked MZ 032708.xls<br />

Project Description Reference(s): New Construction and Renovation from Capital Program.<br />

Estimated Construction Cost 1<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

Extended Bare<br />

Labor Cost ($)<br />

1,503,493<br />

71,643<br />

$432,481<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$631,607<br />

$63,161<br />

$208,430<br />

$69,477<br />

$83,372<br />

N/A<br />

$631,606<br />

$63,161<br />

Totals: $694,768 $694,767<br />

Total Project Cost: $1,750,813<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $1,750,813<br />

Rebate/Incentive*:<br />

$432,481<br />

Net Project Cost: $1,318,332<br />

Net Simple Payback Period (yrs): 7.7<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

1,950,545<br />

0<br />

$171,648<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: Monitoring Based Commissioning<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: ENGR BLDG 4<br />

Building Key: 04C4256A<br />

Basic Gross Area (sf): 294,124<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3013<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

555,894<br />

64.0<br />

59,707<br />

Equipment Description Qty<br />

SEP MBCx Analysis MZ 080326 Final.Checked by LCK.xls<br />

Project Description Reference(s): Monitoring Based Commission for All SEP Buildings.<br />

Estimated Construction Cost 1<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

Extended Bare<br />

Labor Cost ($)<br />

555,894<br />

59,707<br />

$193,122<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$89,708<br />

$8,971<br />

$59,207<br />

$19,736<br />

$23,683<br />

N/A<br />

$269,123<br />

$26,912<br />

Totals: $98,679 $296,035<br />

Total Project Cost: $497,340<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $497,340<br />

Rebate/Incentive*:<br />

$193,122<br />

Net Project Cost: $304,218<br />

Net Simple Payback Period (yrs): 3.7<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

928,466<br />

0<br />

$81,705<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: Monitoring Based Commissioning<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: FACMGMT BLDG<br />

Building Key: 04C4260<br />

Basic Gross Area (sf): 189,197<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3014<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

145,682<br />

17.0<br />

19,866<br />

Equipment Description Qty<br />

SEP MBCx Analysis MZ 080326 Final.Checked by LCK.xls<br />

Project Description Reference(s): Monitoring Based Commission for All SEP Buildings.<br />

Estimated Construction Cost 1<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

Extended Bare<br />

Labor Cost ($)<br />

145,682<br />

19,866<br />

$54,830<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$28,853<br />

$2,885<br />

$19,043<br />

$6,348<br />

$7,617<br />

N/A<br />

$86,558<br />

$8,656<br />

Totals: $31,738 $95,214<br />

Total Project Cost: $159,960<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $159,960<br />

Rebate/Incentive*:<br />

$54,830<br />

Net Project Cost: $105,130<br />

Net Simple Payback Period (yrs): 4.4<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

269,646<br />

0<br />

$23,729<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: Monitoring Based Commissioning<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: TIVERTON HSE<br />

Building Key: 04C4265<br />

Basic Gross Area (sf): 121,634<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3015<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

44,062<br />

5.0<br />

6,009<br />

Equipment Description Qty<br />

SEP MBCx Analysis MZ 080326 Final.Checked by LCK.xls<br />

Project Description Reference(s): Monitoring Based Commission for All SEP Buildings.<br />

Estimated Construction Cost 1<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

44,062<br />

6,009<br />

Extended Bare<br />

Labor Cost ($)<br />

$16,584<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$8,727<br />

$873<br />

$5,760<br />

$1,920<br />

$2,304<br />

N/A<br />

$26,180<br />

$2,618<br />

Totals: $9,600 $28,798<br />

Total Project Cost: $48,381<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $48,381<br />

Rebate/Incentive*:<br />

$16,584<br />

Net Project Cost: $31,797<br />

Net Simple Payback Period (yrs): 4.4<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.<br />

81,558<br />

0<br />

$7,177


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: Monitoring Based Commissioning<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: WILSHIRE CTR<br />

Building Key: 04C4270<br />

Basic Gross Area (sf): 455,912<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3016<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

242,710<br />

28.0<br />

33,097<br />

Equipment Description Qty<br />

SEP MBCx Analysis MZ 080326 Final.Checked by LCK.xls<br />

Project Description Reference(s): Monitoring Based Commission for All SEP Buildings.<br />

Estimated Construction Cost 1<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

Extended Bare<br />

Labor Cost ($)<br />

242,710<br />

33,097<br />

$91,347<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$48,069<br />

$4,807<br />

$31,726<br />

$10,575<br />

$12,690<br />

N/A<br />

$144,208<br />

$14,421<br />

Totals: $52,876 $158,629<br />

Total Project Cost: $266,496<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $266,496<br />

Rebate/Incentive*:<br />

$91,347<br />

Net Project Cost: $175,149<br />

Net Simple Payback Period (yrs): 4.4<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

449,235<br />

0<br />

$39,533<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: SBD, New/Renov - Rieber Repairs and Refurbishment<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: RIEBER HALL<br />

Building Key: 04C4298<br />

Basic Gross Area (sf): 199,076<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3017<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

490,519<br />

56.0<br />

45,959<br />

Equipment Description Qty<br />

<strong>UC</strong> SEP Capital Project Savings Potential (27 Mar) - Checked MZ 032708.xls<br />

Project Description Reference(s): New Construction and Renovation from Capital Program.<br />

Estimated Construction Cost 1<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

Extended Bare<br />

Labor Cost ($)<br />

490,519<br />

45,959<br />

$163,684<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$259,025<br />

$25,903<br />

$85,478<br />

$28,493<br />

$34,191<br />

N/A<br />

$259,024<br />

$25,902<br />

Totals: $284,928 $284,926<br />

Total Project Cost: $718,016<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $718,016<br />

Rebate/Incentive*:<br />

$163,684<br />

Net Project Cost: $554,332<br />

Net Simple Payback Period (yrs): 8.1<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

777,303<br />

0<br />

$68,403<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: SBD, New/Renov - Hedrick Repairs and Refurbishment<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: HEDRICK HALL<br />

Building Key: 04C4299<br />

Basic Gross Area (sf): 198,485<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3018<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

458,131<br />

52.0<br />

42,924<br />

Equipment Description Qty<br />

<strong>UC</strong> SEP Capital Project Savings Potential (27 Mar) - Checked MZ 032708.xls<br />

Project Description Reference(s): New Construction and Renovation from Capital Program.<br />

Estimated Construction Cost 1<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

Extended Bare<br />

Labor Cost ($)<br />

458,131<br />

42,924<br />

$152,875<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$241,920<br />

$24,192<br />

$79,834<br />

$26,611<br />

$31,933<br />

N/A<br />

$241,920<br />

$24,192<br />

Totals: $266,112 $266,112<br />

Total Project Cost: $670,602<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $670,602<br />

Rebate/Incentive*:<br />

$152,875<br />

Net Project Cost: $517,727<br />

Net Simple Payback Period (yrs): 8.1<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

725,977<br />

0<br />

$63,886<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: Monitoring Based Commissioning<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: CANYON POINT<br />

Building Key: 04C4302A<br />

Basic Gross Area (sf): 107,419<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3019<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

82,713<br />

9.0<br />

11,279<br />

Equipment Description Qty<br />

SEP MBCx Analysis MZ 080326 Final.Checked by LCK.xls<br />

Project Description Reference(s): Monitoring Based Commission for All SEP Buildings.<br />

Estimated Construction Cost 1<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

82,713<br />

11,279<br />

Extended Bare<br />

Labor Cost ($)<br />

$31,130<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$16,381<br />

$1,638<br />

$10,812<br />

$3,604<br />

$4,325<br />

N/A<br />

$49,144<br />

$4,914<br />

Totals: $18,019 $54,058<br />

Total Project Cost: $90,818<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $90,818<br />

Rebate/Incentive*:<br />

$31,130<br />

Net Project Cost: $59,688<br />

Net Simple Payback Period (yrs): 4.4<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

153,094<br />

0<br />

$13,472<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: Monitoring Based Commissioning<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: COVEL COMMON<br />

Building Key: 04C4302D<br />

Basic Gross Area (sf): 144,067<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3020<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

110,932<br />

13.0<br />

15,127<br />

Equipment Description Qty<br />

SEP MBCx Analysis MZ 080326 Final.Checked by LCK.xls<br />

Project Description Reference(s): Monitoring Based Commission for All SEP Buildings.<br />

Estimated Construction Cost 1<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

Extended Bare<br />

Labor Cost ($)<br />

110,932<br />

15,127<br />

$41,751<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$21,970<br />

$2,197<br />

$14,500<br />

$4,833<br />

$5,800<br />

N/A<br />

$65,911<br />

$6,591<br />

Totals: $24,167 $72,502<br />

Total Project Cost: $121,803<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $121,803<br />

Rebate/Incentive*:<br />

$41,751<br />

Net Project Cost: $80,052<br />

Net Simple Payback Period (yrs): 4.4<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

205,324<br />

0<br />

$18,069<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: Monitoring Based Commissioning<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: KERCKHOFF<br />

Building Key: 04C4310<br />

Basic Gross Area (sf): 70,820<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3021<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

54,531<br />

6.0<br />

7,436<br />

Equipment Description Qty<br />

SEP MBCx Analysis MZ 080326 Final.Checked by LCK.xls<br />

Project Description Reference(s): Monitoring Based Commission for All SEP Buildings.<br />

Estimated Construction Cost 1<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

54,531<br />

7,436<br />

Extended Bare<br />

Labor Cost ($)<br />

$20,523<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$10,800<br />

$1,080<br />

$7,128<br />

$2,376<br />

$2,851<br />

N/A<br />

$32,400<br />

$3,240<br />

Totals: $11,880 $35,640<br />

Total Project Cost: $59,875<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $59,875<br />

Rebate/Incentive*:<br />

$20,523<br />

Net Project Cost: $39,352<br />

Net Simple Payback Period (yrs): 4.4<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

100,932<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.<br />

0<br />

$8,882


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: Monitoring Based Commissioning<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: GONDA CENTER<br />

Building Key: 04C4315<br />

Basic Gross Area (sf): 125,202<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3022<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

236,632<br />

27.0<br />

25,416<br />

Equipment Description Qty<br />

SEP MBCx Analysis MZ 080326 Final.Checked by LCK.xls<br />

Project Description Reference(s): Monitoring Based Commission for All SEP Buildings.<br />

Estimated Construction Cost 1<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

Extended Bare<br />

Labor Cost ($)<br />

236,632<br />

25,416<br />

$82,208<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$38,187<br />

$3,819<br />

$25,203<br />

$8,401<br />

$10,081<br />

N/A<br />

$114,560<br />

$11,456<br />

Totals: $42,006 $126,016<br />

Total Project Cost: $211,707<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $211,707<br />

Rebate/Incentive*:<br />

$82,208<br />

Net Project Cost: $129,499<br />

Net Simple Payback Period (yrs): 3.7<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

395,228<br />

0<br />

$34,780<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: Monitoring Based Commissioning<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: LAW<br />

Building Key: 04C4317<br />

Basic Gross Area (sf): 275,439<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3023<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

212,088<br />

24.0<br />

28,921<br />

Equipment Description Qty<br />

SEP MBCx Analysis MZ 080326 Final.Checked by LCK.xls<br />

Project Description Reference(s): Monitoring Based Commission for All SEP Buildings.<br />

Estimated Construction Cost 1<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

Extended Bare<br />

Labor Cost ($)<br />

212,088<br />

28,921<br />

$79,822<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$42,004<br />

$4,200<br />

$27,723<br />

$9,241<br />

$11,089<br />

N/A<br />

$126,013<br />

$12,601<br />

Totals: $46,204 $138,614<br />

Total Project Cost: $232,872<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $232,872<br />

Rebate/Incentive*:<br />

$79,822<br />

Net Project Cost: $153,050<br />

Net Simple Payback Period (yrs): 4.4<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

392,555<br />

0<br />

$34,545<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: Monitoring Based Commissioning<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: POWELL LIB<br />

Building Key: 04C4318A<br />

Basic Gross Area (sf): 166,846<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3024<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

128,471<br />

15.0<br />

17,519<br />

Equipment Description Qty<br />

SEP MBCx Analysis MZ 080326 Final.Checked by LCK.xls<br />

Project Description Reference(s): Monitoring Based Commission for All SEP Buildings.<br />

Estimated Construction Cost 1<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

Extended Bare<br />

Labor Cost ($)<br />

128,471<br />

17,519<br />

$48,352<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$25,444<br />

$2,544<br />

$16,793<br />

$5,598<br />

$6,717<br />

N/A<br />

$76,332<br />

$7,633<br />

Totals: $27,988 $83,965<br />

Total Project Cost: $141,062<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $141,062<br />

Rebate/Incentive*:<br />

$48,352<br />

Net Project Cost: $92,710<br />

Net Simple Payback Period (yrs): 4.4<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

237,790<br />

0<br />

$20,925<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: Monitoring Based Commissioning<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: LIFE SCIENCE<br />

Building Key: 04C4320<br />

Basic Gross Area (sf): 214,613<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3025<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

405,619<br />

46.0<br />

43,566<br />

Equipment Description Qty<br />

SEP MBCx Analysis MZ 080326 Final.Checked by LCK.xls<br />

Project Description Reference(s): Monitoring Based Commission for All SEP Buildings.<br />

Estimated Construction Cost 1<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

Extended Bare<br />

Labor Cost ($)<br />

405,619<br />

43,566<br />

$140,915<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$65,457<br />

$6,546<br />

$43,202<br />

$14,401<br />

$17,281<br />

N/A<br />

$196,371<br />

$19,637<br />

Totals: $72,003 $216,008<br />

Total Project Cost: $362,894<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $362,894<br />

Rebate/Incentive*:<br />

$140,915<br />

Net Project Cost: $221,979<br />

Net Simple Payback Period (yrs): 3.7<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

677,471<br />

0<br />

$59,617<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: Monitoring Based Commissioning<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: DORIS STEIN<br />

Building Key: 04C4325<br />

Basic Gross Area (sf): 94,309<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3026<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

178,244<br />

20.0<br />

19,145<br />

Equipment Description Qty<br />

SEP MBCx Analysis MZ 080326 Final.Checked by LCK.xls<br />

Project Description Reference(s): Monitoring Based Commission for All SEP Buildings.<br />

Estimated Construction Cost 1<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

Extended Bare<br />

Labor Cost ($)<br />

178,244<br />

19,145<br />

$61,924<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$28,764<br />

$2,876<br />

$18,984<br />

$6,328<br />

$7,594<br />

N/A<br />

$86,293<br />

$8,629<br />

Totals: $31,640 $94,922<br />

Total Project Cost: $159,469<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $159,469<br />

Rebate/Incentive*:<br />

$61,924<br />

Net Project Cost: $97,545<br />

Net Simple Payback Period (yrs): 3.7<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

297,709<br />

0<br />

$26,198<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: Monitoring Based Commissioning<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: PUBLIC HLTH<br />

Building Key: 04C4331<br />

Basic Gross Area (sf): 140,563<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3027<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

265,664<br />

30.0<br />

28,534<br />

Equipment Description Qty<br />

SEP MBCx Analysis MZ 080326 Final.Checked by LCK.xls<br />

Project Description Reference(s): Monitoring Based Commission for All SEP Buildings.<br />

Estimated Construction Cost 1<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

Extended Bare<br />

Labor Cost ($)<br />

265,664<br />

28,534<br />

$92,293<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$42,872<br />

$4,287<br />

$28,295<br />

$9,432<br />

$11,318<br />

N/A<br />

$128,615<br />

$12,862<br />

Totals: $47,159 $141,477<br />

Total Project Cost: $237,681<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $237,681<br />

Rebate/Incentive*:<br />

$92,293<br />

Net Project Cost: $145,388<br />

Net Simple Payback Period (yrs): 3.7<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

443,716<br />

0<br />

$39,047<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: Monitoring Based Commissioning<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: M DAVIES CC<br />

Building Key: 04C4332E<br />

Basic Gross Area (sf): 70,228<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3028<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

132,731<br />

15.0<br />

14,256<br />

Equipment Description Qty<br />

SEP MBCx Analysis MZ 080326 Final.Checked by LCK.xls<br />

Project Description Reference(s): Monitoring Based Commission for All SEP Buildings.<br />

Estimated Construction Cost 1<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

Extended Bare<br />

Labor Cost ($)<br />

132,731<br />

14,256<br />

$46,111<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$21,420<br />

$2,142<br />

$14,137<br />

$4,712<br />

$5,655<br />

N/A<br />

$64,259<br />

$6,426<br />

Totals: $23,562 $70,685<br />

Total Project Cost: $118,751<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $118,751<br />

Rebate/Incentive*:<br />

$46,111<br />

Net Project Cost: $72,640<br />

Net Simple Payback Period (yrs): 3.7<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

221,688<br />

0<br />

$19,509<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: SBD, New/Renov - CHS South Tower Seismic Renovation<br />

<strong>Campus</strong>: LOS ANGELES MC<br />

Location: LOS ANGELES MED CTR - WESTWOO<br />

Building: SEMEL INST<br />

Building Key: 04C4332F<br />

Basic Gross Area (sf): 280,188<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3029<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

1,222,992<br />

140.0<br />

114,587<br />

Equipment Description Qty<br />

<strong>UC</strong> SEP Capital Project Savings Potential (27 Mar) - Checked MZ 032708.xls<br />

Project Description Reference(s): New Construction and Renovation from Capital Program.<br />

Estimated Construction Cost 1<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

25.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

Extended Bare<br />

Labor Cost ($)<br />

1,222,992<br />

114,587<br />

$408,105<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$645,817<br />

$161,454<br />

$242,181<br />

$80,727<br />

$96,872<br />

N/A<br />

$645,816<br />

$161,454<br />

Totals: $807,271 $807,270<br />

Total Project Cost: $2,034,322<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $2,034,322<br />

Rebate/Incentive*:<br />

$408,105<br />

Net Project Cost: $1,626,217<br />

Net Simple Payback Period (yrs): 9.5<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

1,938,015<br />

0<br />

$170,545<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: Monitoring Based Commissioning<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: JULES STEIN<br />

Building Key: 04C4333<br />

Basic Gross Area (sf): 87,905<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3030<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

166,140<br />

19.0<br />

17,845<br />

Equipment Description Qty<br />

SEP MBCx Analysis MZ 080326 Final.Checked by LCK.xls<br />

Project Description Reference(s): Monitoring Based Commission for All SEP Buildings.<br />

Estimated Construction Cost 1<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

Extended Bare<br />

Labor Cost ($)<br />

166,140<br />

17,845<br />

$57,719<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$26,811<br />

$2,681<br />

$17,695<br />

$5,898<br />

$7,078<br />

N/A<br />

$80,433<br />

$8,043<br />

Totals: $29,492 $88,476<br />

Total Project Cost: $148,640<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $148,640<br />

Rebate/Incentive*:<br />

$57,719<br />

Net Project Cost: $90,921<br />

Net Simple Payback Period (yrs): 3.7<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

277,493<br />

0<br />

$24,419<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: SBD, New/Renov - Jules Stein Eye Institute Seismic Repair<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: JULES STEIN<br />

Building Key: 04C4333<br />

Basic Gross Area (sf): 87,905<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3031<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

667,434<br />

76.0<br />

31,804<br />

Equipment Description Qty<br />

<strong>UC</strong> SEP Capital Project Savings Potential (27 Mar) - Checked MZ 032708.xls<br />

Project Description Reference(s): New Construction and Renovation from Capital Program.<br />

Estimated Construction Cost 1<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

Extended Bare<br />

Labor Cost ($)<br />

667,434<br />

31,804<br />

$191,988<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$280,385<br />

$28,039<br />

$92,527<br />

$30,842<br />

$37,011<br />

N/A<br />

$280,385<br />

$28,039<br />

Totals: $308,424 $308,424<br />

Total Project Cost: $777,227<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $777,227<br />

Rebate/Incentive*:<br />

$191,988<br />

Net Project Cost: $585,239<br />

Net Simple Payback Period (yrs): 7.7<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

865,891<br />

0<br />

$76,198<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: Monitoring Based Commissioning<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: BOELTER HALL<br />

Building Key: 04C4343<br />

Basic Gross Area (sf): 373,904<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3032<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

706,679<br />

81.0<br />

75,903<br />

Equipment Description Qty<br />

SEP MBCx Analysis MZ 080326 Final.Checked by LCK.xls<br />

Project Description Reference(s): Monitoring Based Commission for All SEP Buildings.<br />

Estimated Construction Cost 1<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

Extended Bare<br />

Labor Cost ($)<br />

706,679<br />

75,903<br />

$245,506<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$114,041<br />

$11,404<br />

$75,267<br />

$25,089<br />

$30,107<br />

N/A<br />

$342,122<br />

$34,212<br />

Totals: $125,445 $376,334<br />

Total Project Cost: $632,242<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $632,242<br />

Rebate/Incentive*:<br />

$245,506<br />

Net Project Cost: $386,736<br />

Net Simple Payback Period (yrs): 3.7<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

1,180,314<br />

0<br />

$103,868<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: Monitoring Based Commissioning<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: MORTON MED<br />

Building Key: 04C4344<br />

Basic Gross Area (sf): 366,834<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3033<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

693,316<br />

79.0<br />

74,467<br />

Equipment Description Qty<br />

SEP MBCx Analysis MZ 080326 Final.Checked by LCK.xls<br />

Project Description Reference(s): Monitoring Based Commission for All SEP Buildings.<br />

Estimated Construction Cost 1<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

Extended Bare<br />

Labor Cost ($)<br />

693,316<br />

74,467<br />

$240,863<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$111,884<br />

$11,188<br />

$73,844<br />

$24,615<br />

$29,537<br />

N/A<br />

$335,653<br />

$33,565<br />

Totals: $123,072 $369,218<br />

Total Project Cost: $620,286<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $620,286<br />

Rebate/Incentive*:<br />

$240,863<br />

Net Project Cost: $379,423<br />

Net Simple Payback Period (yrs): 3.7<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

1,157,990<br />

0<br />

$101,903<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: Monitoring Based Commissioning<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: MED PLZA 300<br />

Building Key: 04C4345<br />

Basic Gross Area (sf): 101,095<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3034<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

191,070<br />

22.0<br />

20,522<br />

Equipment Description Qty<br />

SEP MBCx Analysis MZ 080326 Final.Checked by LCK.xls<br />

Project Description Reference(s): Monitoring Based Commission for All SEP Buildings.<br />

Estimated Construction Cost 1<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

Extended Bare<br />

Labor Cost ($)<br />

191,070<br />

20,522<br />

$66,379<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$30,834<br />

$3,083<br />

$20,350<br />

$6,783<br />

$8,140<br />

N/A<br />

$92,502<br />

$9,250<br />

Totals: $33,917 $101,752<br />

Total Project Cost: $170,944<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $170,944<br />

Rebate/Incentive*:<br />

$66,379<br />

Net Project Cost: $104,565<br />

Net Simple Payback Period (yrs): 3.7<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

319,127<br />

0<br />

$28,083<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: Monitoring Based Commissioning<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: MACDONALDLAB<br />

Building Key: 04C4348<br />

Basic Gross Area (sf): 144,611<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3035<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

273,315<br />

31.0<br />

29,356<br />

Equipment Description Qty<br />

SEP MBCx Analysis MZ 080326 Final.Checked by LCK.xls<br />

Project Description Reference(s): Monitoring Based Commission for All SEP Buildings.<br />

Estimated Construction Cost 1<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

Extended Bare<br />

Labor Cost ($)<br />

273,315<br />

29,356<br />

$94,952<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$44,106<br />

$4,411<br />

$29,110<br />

$9,703<br />

$11,644<br />

N/A<br />

$132,319<br />

$13,232<br />

Totals: $48,517 $145,551<br />

Total Project Cost: $244,525<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $244,525<br />

Rebate/Incentive*:<br />

$94,952<br />

Net Project Cost: $149,573<br />

Net Simple Payback Period (yrs): 3.7<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

456,496<br />

0<br />

$40,172<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: Monitoring Based Commissioning<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: SYCAMORE CT<br />

Building Key: 04C4352<br />

Basic Gross Area (sf): 140,526<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3036<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

76,192<br />

9.0<br />

10,390<br />

Equipment Description Qty<br />

SEP MBCx Analysis MZ 080326 Final.Checked by LCK.xls<br />

Project Description Reference(s): Monitoring Based Commission for All SEP Buildings.<br />

Estimated Construction Cost 1<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

76,192<br />

10,390<br />

Extended Bare<br />

Labor Cost ($)<br />

$28,676<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$15,090<br />

$1,509<br />

$9,959<br />

$3,320<br />

$3,984<br />

N/A<br />

$45,270<br />

$4,527<br />

Totals: $16,599 $49,797<br />

Total Project Cost: $83,659<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $83,659<br />

Rebate/Incentive*:<br />

$28,676<br />

Net Project Cost: $54,983<br />

Net Simple Payback Period (yrs): 4.4<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

141,026<br />

0<br />

$12,410<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: Monitoring Based Commissioning<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: SAC<br />

Building Key: 04C4360<br />

Basic Gross Area (sf): 113,383<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3037<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

87,305<br />

10.0<br />

11,905<br />

Equipment Description Qty<br />

SEP MBCx Analysis MZ 080326 Final.Checked by LCK.xls<br />

Project Description Reference(s): Monitoring Based Commission for All SEP Buildings.<br />

Estimated Construction Cost 1<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

87,305<br />

11,905<br />

Extended Bare<br />

Labor Cost ($)<br />

$32,858<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$17,291<br />

$1,729<br />

$11,412<br />

$3,804<br />

$4,565<br />

N/A<br />

$51,873<br />

$5,187<br />

Totals: $19,020 $57,060<br />

Total Project Cost: $95,861<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $95,861<br />

Rebate/Incentive*:<br />

$32,858<br />

Net Project Cost: $63,003<br />

Net Simple Payback Period (yrs): 4.4<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

161,592<br />

0<br />

$14,220<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: Monitoring Based Commissioning<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: FOWLER MUSM<br />

Building Key: 04C4374<br />

Basic Gross Area (sf): 101,995<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3038<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

192,771<br />

22.0<br />

20,705<br />

Equipment Description Qty<br />

SEP MBCx Analysis MZ 080326 Final.Checked by LCK.xls<br />

Project Description Reference(s): Monitoring Based Commission for All SEP Buildings.<br />

Estimated Construction Cost 1<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

Extended Bare<br />

Labor Cost ($)<br />

192,771<br />

20,705<br />

$66,970<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$31,108<br />

$3,111<br />

$20,531<br />

$6,844<br />

$8,213<br />

N/A<br />

$93,325<br />

$9,333<br />

Totals: $34,219 $102,658<br />

Total Project Cost: $172,464<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $172,464<br />

Rebate/Incentive*:<br />

$66,970<br />

Net Project Cost: $105,494<br />

Net Simple Payback Period (yrs): 3.7<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

321,970<br />

0<br />

$28,333<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: Monitoring Based Commissioning<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: ROYCE HALL<br />

Building Key: 04C4375<br />

Basic Gross Area (sf): 184,673<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3039<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

142,198<br />

16.0<br />

19,391<br />

Equipment Description Qty<br />

SEP MBCx Analysis MZ 080326 Final.Checked by LCK.xls<br />

Project Description Reference(s): Monitoring Based Commission for All SEP Buildings.<br />

Estimated Construction Cost 1<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

Extended Bare<br />

Labor Cost ($)<br />

142,198<br />

19,391<br />

$53,519<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$28,163<br />

$2,816<br />

$18,587<br />

$6,196<br />

$7,435<br />

N/A<br />

$84,488<br />

$8,449<br />

Totals: $30,979 $92,937<br />

Total Project Cost: $156,134<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $156,134<br />

Rebate/Incentive*:<br />

$53,519<br />

Net Project Cost: $102,615<br />

Net Simple Payback Period (yrs): 4.4<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

263,198<br />

0<br />

$23,161<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: Monitoring Based Commissioning<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: UNEX<br />

Building Key: 04C4415<br />

Basic Gross Area (sf): 95,065<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3040<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

73,200<br />

8.0<br />

9,982<br />

Equipment Description Qty<br />

SEP MBCx Analysis MZ 080326 Final.Checked by LCK.xls<br />

Project Description Reference(s): Monitoring Based Commission for All SEP Buildings.<br />

Estimated Construction Cost 1<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

73,200<br />

9,982<br />

Extended Bare<br />

Labor Cost ($)<br />

$27,550<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$14,497<br />

$1,450<br />

$9,568<br />

$3,189<br />

$3,827<br />

N/A<br />

$43,492<br />

$4,349<br />

Totals: $15,947 $47,841<br />

Total Project Cost: $80,373<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $80,373<br />

Rebate/Incentive*:<br />

$27,550<br />

Net Project Cost: $52,823<br />

Net Simple Payback Period (yrs): 4.4<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

135,488<br />

0<br />

$11,923<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: SBD, New/Renov - Clark Library Seismic Correction<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: CLARK LIB<br />

Building Key: 04C4451<br />

Basic Gross Area (sf): 15,302<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3041<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

61,938<br />

7.0<br />

5,803<br />

Equipment Description Qty<br />

<strong>UC</strong> SEP Capital Project Savings Potential (27 Mar) - Checked MZ 032708.xls<br />

Project Description Reference(s): New Construction and Renovation from Capital Program.<br />

Estimated Construction Cost 1<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

61,938<br />

5,803<br />

Extended Bare<br />

Labor Cost ($)<br />

$20,668<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$32,708<br />

$3,271<br />

$10,793<br />

$3,598<br />

$4,317<br />

N/A<br />

$32,707<br />

$3,271<br />

Totals: $35,979 $35,978<br />

Total Project Cost: $90,665<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $90,665<br />

Rebate/Incentive*:<br />

$20,668<br />

Net Project Cost: $69,997<br />

Net Simple Payback Period (yrs): 8.1<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.<br />

98,149<br />

0<br />

$8,637


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: Monitoring Based Commissioning<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: SOUTHERN REGIONAL LIBRARY FACI<br />

Building Key: 04C4562<br />

Basic Gross Area (sf): 228,306<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3042<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

175,796<br />

20.0<br />

23,972<br />

Equipment Description Qty<br />

SEP MBCx Analysis MZ 080326 Final.Checked by LCK.xls<br />

Project Description Reference(s): Monitoring Based Commission for All SEP Buildings.<br />

Estimated Construction Cost 1<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

Extended Bare<br />

Labor Cost ($)<br />

175,796<br />

23,972<br />

$66,163<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$34,817<br />

$3,482<br />

$22,979<br />

$7,660<br />

$9,192<br />

N/A<br />

$104,450<br />

$10,445<br />

Totals: $38,299 $114,895<br />

Total Project Cost: $193,024<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $193,024<br />

Rebate/Incentive*:<br />

$66,163<br />

Net Project Cost: $126,861<br />

Net Simple Payback Period (yrs): 4.4<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

325,381<br />

0<br />

$28,634<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: Monitoring Based Commissioning<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: BUNCHE HALL<br />

Building Key: 04C4580<br />

Basic Gross Area (sf): 229,248<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3043<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

176,521<br />

20.0<br />

24,071<br />

Equipment Description Qty<br />

SEP MBCx Analysis MZ 080326 Final.Checked by LCK.xls<br />

Project Description Reference(s): Monitoring Based Commission for All SEP Buildings.<br />

Estimated Construction Cost 1<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

Extended Bare<br />

Labor Cost ($)<br />

176,521<br />

24,071<br />

$66,436<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$34,960<br />

$3,496<br />

$23,074<br />

$7,691<br />

$9,230<br />

N/A<br />

$104,881<br />

$10,488<br />

Totals: $38,456 $115,369<br />

Total Project Cost: $193,820<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $193,820<br />

Rebate/Incentive*:<br />

$66,436<br />

Net Project Cost: $127,384<br />

Net Simple Payback Period (yrs): 4.4<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

326,724<br />

0<br />

$28,752<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: SBD, New/Renov - Santa Monica/Orthopaedic Replacement Hospital<br />

and Parking Structure<br />

<strong>Campus</strong>: LOS ANGELES MC<br />

Location: LOS ANGELES MED CTR - SANTA MO<br />

Building: SMH WST TOWR<br />

Building Key: 04C510F<br />

Basic Gross Area (sf): 202,568<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3044<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

2,748,782<br />

314.0<br />

130,982<br />

Equipment Description Qty<br />

<strong>UC</strong> SEP Capital Project Savings Potential (27 Mar) - Checked MZ 032708.xls<br />

Project Description Reference(s): New Construction and Renovation from Capital Program.<br />

Estimated Construction Cost 1<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

25.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

Extended Bare<br />

Labor Cost ($)<br />

2,748,782<br />

130,982<br />

$790,690<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$1,154,741<br />

$288,685<br />

$433,028<br />

$144,343<br />

$173,211<br />

N/A<br />

$1,154,741<br />

$288,685<br />

Totals: $1,443,426 $1,443,426<br />

Total Project Cost: $3,637,434<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $3,637,434<br />

Rebate/Incentive*:<br />

$790,690<br />

Net Project Cost: $2,846,744<br />

Net Simple Payback Period (yrs): 8.1<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

2,748,782<br />

163,728<br />

$351,590<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: Monitoring Based Commissioning<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: COLLINS CTR<br />

Building Key: 04C515A<br />

Basic Gross Area (sf): 31,311<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3045<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

24,109<br />

3.0<br />

3,288<br />

Equipment Description Qty<br />

SEP MBCx Analysis MZ 080326 Final.Checked by LCK.xls<br />

Project Description Reference(s): Monitoring Based Commission for All SEP Buildings.<br />

Estimated Construction Cost 1<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

24,109<br />

3,288<br />

$9,074<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$4,775<br />

$478<br />

$3,152<br />

$1,051<br />

$1,261<br />

Extended Bare<br />

Labor Cost ($)<br />

N/A<br />

$14,325<br />

$1,433<br />

Totals: $5,253 $15,758<br />

Total Project Cost: $26,473<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $26,473<br />

Rebate/Incentive*:<br />

$9,074<br />

Net Project Cost: $17,399<br />

Net Simple Payback Period (yrs): 4.4<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.<br />

44,626<br />

0<br />

$3,927<br />

Backup


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: Monitoring Based Commissioning<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: GOLD HALL<br />

Building Key: 04C515B<br />

Basic Gross Area (sf): 55,344<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3046<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

42,615<br />

5.0<br />

5,811<br />

Equipment Description Qty<br />

SEP MBCx Analysis MZ 080326 Final.Checked by LCK.xls<br />

Project Description Reference(s): Monitoring Based Commission for All SEP Buildings.<br />

Estimated Construction Cost 1<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

42,615<br />

5,811<br />

Extended Bare<br />

Labor Cost ($)<br />

$16,039<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$8,440<br />

$844<br />

$5,570<br />

$1,857<br />

$2,228<br />

N/A<br />

$25,320<br />

$2,532<br />

Totals: $9,284 $27,852<br />

Total Project Cost: $46,791<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $46,791<br />

Rebate/Incentive*:<br />

$16,039<br />

Net Project Cost: $30,752<br />

Net Simple Payback Period (yrs): 4.4<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.<br />

78,876<br />

0<br />

$6,941


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: Monitoring Based Commissioning<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: ENTREP HALL<br />

Building Key: 04C515C<br />

Basic Gross Area (sf): 72,591<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3047<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

55,895<br />

6.0<br />

7,622<br />

Equipment Description Qty<br />

SEP MBCx Analysis MZ 080326 Final.Checked by LCK.xls<br />

Project Description Reference(s): Monitoring Based Commission for All SEP Buildings.<br />

Estimated Construction Cost 1<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

55,895<br />

7,622<br />

Extended Bare<br />

Labor Cost ($)<br />

$21,037<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$11,070<br />

$1,107<br />

$7,306<br />

$2,435<br />

$2,922<br />

N/A<br />

$33,210<br />

$3,321<br />

Totals: $12,177 $36,531<br />

Total Project Cost: $61,372<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $61,372<br />

Rebate/Incentive*:<br />

$21,037<br />

Net Project Cost: $40,335<br />

Net Simple Payback Period (yrs): 4.4<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

103,456<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.<br />

0<br />

$9,104


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: Monitoring Based Commissioning<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: CORNELL HALL<br />

Building Key: 04C515D<br />

Basic Gross Area (sf): 71,737<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3048<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

55,237<br />

6.0<br />

7,532<br />

Equipment Description Qty<br />

SEP MBCx Analysis MZ 080326 Final.Checked by LCK.xls<br />

Project Description Reference(s): Monitoring Based Commission for All SEP Buildings.<br />

Estimated Construction Cost 1<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

55,237<br />

7,532<br />

Extended Bare<br />

Labor Cost ($)<br />

$20,789<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$10,940<br />

$1,094<br />

$7,220<br />

$2,407<br />

$2,888<br />

N/A<br />

$32,820<br />

$3,282<br />

Totals: $12,034 $36,102<br />

Total Project Cost: $60,651<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $60,651<br />

Rebate/Incentive*:<br />

$20,789<br />

Net Project Cost: $39,862<br />

Net Simple Payback Period (yrs): 4.4<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

102,237<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.<br />

0<br />

$8,997


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: Monitoring Based Commissioning<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: ROSNFLD LIBR<br />

Building Key: 04C515E<br />

Basic Gross Area (sf): 51,046<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3049<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

39,305<br />

4.0<br />

5,360<br />

Equipment Description Qty<br />

SEP MBCx Analysis MZ 080326 Final.Checked by LCK.xls<br />

Project Description Reference(s): Monitoring Based Commission for All SEP Buildings.<br />

Estimated Construction Cost 1<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

39,305<br />

5,360<br />

Extended Bare<br />

Labor Cost ($)<br />

$14,793<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$7,785<br />

$779<br />

$5,138<br />

$1,713<br />

$2,055<br />

N/A<br />

$23,354<br />

$2,335<br />

Totals: $8,564 $25,689<br />

Total Project Cost: $43,159<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $43,159<br />

Rebate/Incentive*:<br />

$14,793<br />

Net Project Cost: $28,366<br />

Net Simple Payback Period (yrs): 4.4<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.<br />

72,751<br />

0<br />

$6,402


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: Monitoring Based Commissioning<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: MULLIN CMNS<br />

Building Key: 04C515F<br />

Basic Gross Area (sf): 33,957<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3050<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

26,147<br />

3.0<br />

3,565<br />

Equipment Description Qty<br />

SEP MBCx Analysis MZ 080326 Final.Checked by LCK.xls<br />

Project Description Reference(s): Monitoring Based Commission for All SEP Buildings.<br />

Estimated Construction Cost 1<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

26,147<br />

3,565<br />

$9,840<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$5,178<br />

$518<br />

$3,418<br />

$1,139<br />

$1,367<br />

Extended Bare<br />

Labor Cost ($)<br />

N/A<br />

$15,535<br />

$1,554<br />

Totals: $5,696 $17,089<br />

Total Project Cost: $28,708<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $28,708<br />

Rebate/Incentive*:<br />

$9,840<br />

Net Project Cost: $18,868<br />

Net Simple Payback Period (yrs): 4.4<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.<br />

48,393<br />

0<br />

$4,259<br />

Backup


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: SBD, New/Renov - CNSI-BSL3 Laboratory<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: CNSI - BSL 3 LABORATORY<br />

Building Key: 04CTBD1<br />

Basic Gross Area (sf):<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3051<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

80,532<br />

9.0<br />

3,837<br />

Equipment Description Qty<br />

<strong>UC</strong> SEP Capital Project Savings Potential (27 Mar) - Checked MZ 032708.xls<br />

Project Description Reference(s): New Construction and Renovation from Capital Program.<br />

Estimated Construction Cost 1<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

80,532<br />

3,837<br />

Extended Bare<br />

Labor Cost ($)<br />

$23,165<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$33,831<br />

$3,383<br />

$11,164<br />

$3,721<br />

$4,466<br />

N/A<br />

$33,831<br />

$3,383<br />

Totals: $37,214 $37,214<br />

Total Project Cost: $93,780<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $93,780<br />

Rebate/Incentive*:<br />

$23,165<br />

Net Project Cost: $70,615<br />

Net Simple Payback Period (yrs): 7.7<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

104,475<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.<br />

0<br />

$9,194


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: SBD, New/Renov - South <strong>Campus</strong> Student <strong>Center</strong><br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: SOUTH CAMPUS STUDENT CTR<br />

Building Key: 04CTBD2<br />

Basic Gross Area (sf):<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3052<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

89,910<br />

10.0<br />

8,424<br />

Equipment Description Qty<br />

<strong>UC</strong> SEP Capital Project Savings Potential (27 Mar) - Checked MZ 032708.xls<br />

Project Description Reference(s): New Construction and Renovation from Capital Program.<br />

Estimated Construction Cost 1<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

89,910<br />

8,424<br />

Extended Bare<br />

Labor Cost ($)<br />

$30,002<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$47,478<br />

$4,748<br />

$15,668<br />

$5,223<br />

$6,267<br />

N/A<br />

$47,477<br />

$4,748<br />

Totals: $52,226 $52,225<br />

Total Project Cost: $131,608<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $131,608<br />

Rebate/Incentive*:<br />

$30,002<br />

Net Project Cost: $101,606<br />

Net Simple Payback Period (yrs): 8.1<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

142,476<br />

0<br />

$12,538<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: SBD, New/Renov - Hilgard Graduate Student Housing<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: HILGARD GRAD STUD HOUSING<br />

Building Key: 04CTBD3<br />

Basic Gross Area (sf):<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3053<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

138,371<br />

16.0<br />

12,965<br />

Equipment Description Qty<br />

<strong>UC</strong> SEP Capital Project Savings Potential (27 Mar) - Checked MZ 032708.xls<br />

Project Description Reference(s): New Construction and Renovation from Capital Program.<br />

Estimated Construction Cost 1<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

Extended Bare<br />

Labor Cost ($)<br />

138,371<br />

12,965<br />

$46,174<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$73,070<br />

$7,307<br />

$24,113<br />

$8,038<br />

$9,645<br />

N/A<br />

$73,069<br />

$7,307<br />

Totals: $80,377 $80,376<br />

Total Project Cost: $202,549<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $202,549<br />

Rebate/Incentive*:<br />

$46,174<br />

Net Project Cost: $156,375<br />

Net Simple Payback Period (yrs): 8.1<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

219,273<br />

0<br />

$19,296<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: SBD, New/Renov - Southwest <strong>Campus</strong> Housing Commons Building<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: SOUTHWEST CAMPUS HOUSING CO<br />

Building Key: 04CTBD4<br />

Basic Gross Area (sf):<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3054<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

87,413<br />

10.0<br />

8,190<br />

Equipment Description Qty<br />

<strong>UC</strong> SEP Capital Project Savings Potential (27 Mar) - Checked MZ 032708.xls<br />

Project Description Reference(s): New Construction and Renovation from Capital Program.<br />

Estimated Construction Cost 1<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

87,413<br />

8,190<br />

Extended Bare<br />

Labor Cost ($)<br />

$29,169<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$46,158<br />

$4,616<br />

$15,232<br />

$5,077<br />

$6,093<br />

N/A<br />

$46,158<br />

$4,616<br />

Totals: $50,774 $50,774<br />

Total Project Cost: $127,950<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $127,950<br />

Rebate/Incentive*:<br />

$29,169<br />

Net Project Cost: $98,781<br />

Net Simple Payback Period (yrs): 8.1<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

138,519<br />

0<br />

$12,190<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: SBD, New/Renov - Telemedicine and Prime Facilities Phase 2<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: TELEMEDICINE AND PRIME FACILITIE<br />

Building Key: 04CTBD5<br />

Basic Gross Area (sf):<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3055<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

382,712<br />

44.0<br />

18,237<br />

Equipment Description Qty<br />

<strong>UC</strong> SEP Capital Project Savings Potential (27 Mar) - Checked MZ 032708.xls<br />

Project Description Reference(s): New Construction and Renovation from Capital Program.<br />

Estimated Construction Cost 1<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

Extended Bare<br />

Labor Cost ($)<br />

382,712<br />

18,237<br />

$110,088<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$160,776<br />

$16,078<br />

$53,056<br />

$17,685<br />

$21,222<br />

N/A<br />

$160,776<br />

$16,078<br />

Totals: $176,854 $176,854<br />

Total Project Cost: $445,671<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $445,671<br />

Rebate/Incentive*:<br />

$110,088<br />

Net Project Cost: $335,583<br />

Net Simple Payback Period (yrs): 7.7<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

496,511<br />

0<br />

$43,693<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: SBD, New/Renov - Letters and Science Expansion<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: LETTERS AND SCIENCE EXPANSION<br />

Building Key: 04CTBD6<br />

Basic Gross Area (sf):<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3056<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

349,650<br />

40.0<br />

32,760<br />

Equipment Description Qty<br />

<strong>UC</strong> SEP Capital Project Savings Potential (27 Mar) - Checked MZ 032708.xls<br />

Project Description Reference(s): New Construction and Renovation from Capital Program.<br />

Estimated Construction Cost 1<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

Extended Bare<br />

Labor Cost ($)<br />

349,650<br />

32,760<br />

$116,676<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$184,636<br />

$18,464<br />

$60,930<br />

$20,310<br />

$24,372<br />

N/A<br />

$184,635<br />

$18,464<br />

Totals: $203,100 $203,099<br />

Total Project Cost: $511,810<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $511,810<br />

Rebate/Incentive*:<br />

$116,676<br />

Net Project Cost: $395,134<br />

Net Simple Payback Period (yrs): 8.1<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

554,072<br />

0<br />

$48,758<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: SBD, New/Renov - Northwest <strong>Campus</strong> Student Housing Unit<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: NORTHWEST CAMPUS STUDENT HO<br />

Building Key: 04CTBD7<br />

Basic Gross Area (sf):<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3057<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

2,112,945<br />

241.0<br />

197,970<br />

Equipment Description Qty<br />

<strong>UC</strong> SEP Capital Project Savings Potential (27 Mar) - Checked MZ 032708.xls<br />

Project Description Reference(s): New Construction and Renovation from Capital Program.<br />

Estimated Construction Cost 1<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

Extended Bare<br />

Labor Cost ($)<br />

2,112,945<br />

197,970<br />

$705,077<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$1,115,765<br />

$111,577<br />

$368,202<br />

$122,734<br />

$147,281<br />

N/A<br />

$1,115,765<br />

$111,577<br />

Totals: $1,227,342 $1,227,342<br />

Total Project Cost: $3,092,901<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $3,092,901<br />

Rebate/Incentive*:<br />

$705,077<br />

Net Project Cost: $2,387,824<br />

Net Simple Payback Period (yrs): 8.1<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

3,348,278<br />

0<br />

$294,648<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: First Electric Savings Component of DM and CR Projects 2009<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: CAMPUSWIDE<br />

Building Key: 04CWIDE<br />

Basic Gross Area (sf):<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3058<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

454,550<br />

52.0<br />

Equipment Description Qty<br />

Deferred Maintenance and Capital Renewal Projects - Checked MZ 032708.xls<br />

Project Description Reference(s): Deferred Maintenance and Capital Renewal Projects.<br />

Estimated Construction Cost 1<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

0<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

Extended Bare<br />

Labor Cost ($)<br />

454,550<br />

0<br />

$109,092<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$250,000<br />

$25,000<br />

$82,500<br />

$27,500<br />

$33,000<br />

N/A<br />

$250,000<br />

$25,000<br />

Totals: $275,000 $275,000<br />

Total Project Cost: $693,000<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $693,000<br />

Rebate/Incentive*:<br />

$109,092<br />

Net Project Cost: $583,908<br />

Net Simple Payback Period (yrs): 14.6<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

454,550<br />

0<br />

$40,000<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: Second Electric Savings Component of DM and CR Projects 2009<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: CAMPUSWIDE<br />

Building Key: 04CWIDE<br />

Basic Gross Area (sf):<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3059<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

454,550<br />

52.0<br />

Equipment Description Qty<br />

Deferred Maintenance and Capital Renewal Projects - Checked MZ 032708.xls<br />

Project Description Reference(s): Deferred Maintenance and Capital Renewal Projects.<br />

Estimated Construction Cost 1<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

0<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

Extended Bare<br />

Labor Cost ($)<br />

454,550<br />

0<br />

$109,092<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$250,000<br />

$25,000<br />

$82,500<br />

$27,500<br />

$33,000<br />

N/A<br />

$250,000<br />

$25,000<br />

Totals: $275,000 $275,000<br />

Total Project Cost: $693,000<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $693,000<br />

Rebate/Incentive*:<br />

$109,092<br />

Net Project Cost: $583,908<br />

Net Simple Payback Period (yrs): 14.6<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

454,550<br />

0<br />

$40,000<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: Natural Gas Component of DM and CR Projects 2009<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: CAMPUSWIDE<br />

Building Key: 04CWIDE<br />

Basic Gross Area (sf):<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3060<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

0<br />

0.0<br />

28,409<br />

Equipment Description Qty<br />

Deferred Maintenance and Capital Renewal Projects - Checked MZ 032708.xls<br />

Project Description Reference(s): Deferred Maintenance and Capital Renewal Projects.<br />

Estimated Construction Cost 1<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

0<br />

28,409<br />

Extended Bare<br />

Labor Cost ($)<br />

$28,409<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$125,000<br />

$12,500<br />

$41,250<br />

$13,750<br />

$16,500<br />

N/A<br />

$125,000<br />

$12,500<br />

Totals: $137,500 $137,500<br />

Total Project Cost: $346,500<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $346,500<br />

Rebate/Incentive*:<br />

$28,409<br />

Net Project Cost: $318,091<br />

Net Simple Payback Period (yrs): 20.4<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

177,272<br />

0<br />

$15,600<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: First Electric Savings Component of DM and CR Projects 2010<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: CAMPUSWIDE<br />

Building Key: 04CWIDE<br />

Basic Gross Area (sf):<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3061<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

454,550<br />

52.0<br />

Equipment Description Qty<br />

Deferred Maintenance and Capital Renewal Projects - Checked MZ 032708.xls<br />

Project Description Reference(s): Deferred Maintenance and Capital Renewal Projects.<br />

Estimated Construction Cost 1<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

0<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

Extended Bare<br />

Labor Cost ($)<br />

454,550<br />

0<br />

$109,092<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$250,000<br />

$25,000<br />

$82,500<br />

$27,500<br />

$33,000<br />

N/A<br />

$250,000<br />

$25,000<br />

Totals: $275,000 $275,000<br />

Total Project Cost: $693,000<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $693,000<br />

Rebate/Incentive*:<br />

$109,092<br />

Net Project Cost: $583,908<br />

Net Simple Payback Period (yrs): 14.6<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

454,550<br />

0<br />

$40,000<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: Second Electric Savings Component of DM and CR Projects 2010<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: CAMPUSWIDE<br />

Building Key: 04CWIDE<br />

Basic Gross Area (sf):<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3062<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

454,550<br />

52.0<br />

Equipment Description Qty<br />

Deferred Maintenance and Capital Renewal Projects - Checked MZ 032708.xls<br />

Project Description Reference(s): Deferred Maintenance and Capital Renewal Projects.<br />

Estimated Construction Cost 1<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

0<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

Extended Bare<br />

Labor Cost ($)<br />

454,550<br />

0<br />

$109,092<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$250,000<br />

$25,000<br />

$82,500<br />

$27,500<br />

$33,000<br />

N/A<br />

$250,000<br />

$25,000<br />

Totals: $275,000 $275,000<br />

Total Project Cost: $693,000<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $693,000<br />

Rebate/Incentive*:<br />

$109,092<br />

Net Project Cost: $583,908<br />

Net Simple Payback Period (yrs): 14.6<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

454,550<br />

0<br />

$40,000<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: Natural Gas Component of DM and CR Projects 2010<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: CAMPUSWIDE<br />

Building Key: 04CWIDE<br />

Basic Gross Area (sf):<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3063<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

0<br />

0.0<br />

28,409<br />

Equipment Description Qty<br />

Deferred Maintenance and Capital Renewal Projects - Checked MZ 032708.xls<br />

Project Description Reference(s): Deferred Maintenance and Capital Renewal Projects.<br />

Estimated Construction Cost 1<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

0<br />

28,409<br />

Extended Bare<br />

Labor Cost ($)<br />

$28,409<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$125,000<br />

$12,500<br />

$41,250<br />

$13,750<br />

$16,500<br />

N/A<br />

$125,000<br />

$12,500<br />

Totals: $137,500 $137,500<br />

Total Project Cost: $346,500<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $346,500<br />

Rebate/Incentive*:<br />

$28,409<br />

Net Project Cost: $318,091<br />

Net Simple Payback Period (yrs): 20.4<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

177,272<br />

0<br />

$15,600<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: First Electric Savings Component of DM and CR Projects 2011<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: CAMPUSWIDE<br />

Building Key: 04CWIDE<br />

Basic Gross Area (sf):<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3064<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

454,550<br />

52.0<br />

Equipment Description Qty<br />

Deferred Maintenance and Capital Renewal Projects - Checked MZ 032708.xls<br />

Project Description Reference(s): Deferred Maintenance and Capital Renewal Projects.<br />

Estimated Construction Cost 1<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

0<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

Extended Bare<br />

Labor Cost ($)<br />

454,550<br />

0<br />

$109,092<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$250,000<br />

$25,000<br />

$82,500<br />

$27,500<br />

$33,000<br />

N/A<br />

$250,000<br />

$25,000<br />

Totals: $275,000 $275,000<br />

Total Project Cost: $693,000<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $693,000<br />

Rebate/Incentive*:<br />

$109,092<br />

Net Project Cost: $583,908<br />

Net Simple Payback Period (yrs): 14.6<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

454,550<br />

0<br />

$40,000<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: Second Electric Savings Component of DM and CR Projects 2011<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: CAMPUSWIDE<br />

Building Key: 04CWIDE<br />

Basic Gross Area (sf):<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3065<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

454,550<br />

52.0<br />

Equipment Description Qty<br />

Deferred Maintenance and Capital Renewal Projects - Checked MZ 032708.xls<br />

Project Description Reference(s): Deferred Maintenance and Capital Renewal Projects.<br />

Estimated Construction Cost 1<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

0<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

Extended Bare<br />

Labor Cost ($)<br />

454,550<br />

0<br />

$109,092<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$250,000<br />

$25,000<br />

$82,500<br />

$27,500<br />

$33,000<br />

N/A<br />

$250,000<br />

$25,000<br />

Totals: $275,000 $275,000<br />

Total Project Cost: $693,000<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $693,000<br />

Rebate/Incentive*:<br />

$109,092<br />

Net Project Cost: $583,908<br />

Net Simple Payback Period (yrs): 14.6<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

454,550<br />

0<br />

$40,000<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: Natural Gas Component of DM and CR Projects 2011<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: CAMPUSWIDE<br />

Building Key: 04CWIDE<br />

Basic Gross Area (sf):<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3066<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

0<br />

0.0<br />

28,409<br />

Equipment Description Qty<br />

Deferred Maintenance and Capital Renewal Projects - Checked MZ 032708.xls<br />

Project Description Reference(s): Deferred Maintenance and Capital Renewal Projects.<br />

Estimated Construction Cost 1<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

0<br />

28,409<br />

Extended Bare<br />

Labor Cost ($)<br />

$28,409<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$125,000<br />

$12,500<br />

$41,250<br />

$13,750<br />

$16,500<br />

N/A<br />

$125,000<br />

$12,500<br />

Totals: $137,500 $137,500<br />

Total Project Cost: $346,500<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $346,500<br />

Rebate/Incentive*:<br />

$28,409<br />

Net Project Cost: $318,091<br />

Net Simple Payback Period (yrs): 20.4<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

177,272<br />

0<br />

$15,600<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: First Electric Savings Component of DM and CR Projects 2012<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: CAMPUSWIDE<br />

Building Key: 04CWIDE<br />

Basic Gross Area (sf):<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3067<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

454,550<br />

52.0<br />

Equipment Description Qty<br />

Deferred Maintenance and Capital Renewal Projects - Checked MZ 032708.xls<br />

Project Description Reference(s): Deferred Maintenance and Capital Renewal Projects.<br />

Estimated Construction Cost 1<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

0<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

Extended Bare<br />

Labor Cost ($)<br />

454,550<br />

0<br />

$109,092<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$250,000<br />

$25,000<br />

$82,500<br />

$27,500<br />

$33,000<br />

N/A<br />

$250,000<br />

$25,000<br />

Totals: $275,000 $275,000<br />

Total Project Cost: $693,000<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $693,000<br />

Rebate/Incentive*:<br />

$109,092<br />

Net Project Cost: $583,908<br />

Net Simple Payback Period (yrs): 14.6<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

454,550<br />

0<br />

$40,000<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: Second Electric Savings Component of DM and CR Projects 2012<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: CAMPUSWIDE<br />

Building Key: 04CWIDE<br />

Basic Gross Area (sf):<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3068<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

454,550<br />

52.0<br />

Equipment Description Qty<br />

Deferred Maintenance and Capital Renewal Projects - Checked MZ 032708.xls<br />

Project Description Reference(s): Deferred Maintenance and Capital Renewal Projects.<br />

Estimated Construction Cost 1<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

0<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

Extended Bare<br />

Labor Cost ($)<br />

454,550<br />

0<br />

$109,092<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$250,000<br />

$25,000<br />

$82,500<br />

$27,500<br />

$33,000<br />

N/A<br />

$250,000<br />

$25,000<br />

Totals: $275,000 $275,000<br />

Total Project Cost: $693,000<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $693,000<br />

Rebate/Incentive*:<br />

$109,092<br />

Net Project Cost: $583,908<br />

Net Simple Payback Period (yrs): 14.6<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

454,550<br />

0<br />

$40,000<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: Natural Gas Component of DM and CR Projects 2012<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: CAMPUSWIDE<br />

Building Key: 04CWIDE<br />

Basic Gross Area (sf):<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3069<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

0<br />

0.0<br />

28,409<br />

Equipment Description Qty<br />

Deferred Maintenance and Capital Renewal Projects - Checked MZ 032708.xls<br />

Project Description Reference(s): Deferred Maintenance and Capital Renewal Projects.<br />

Estimated Construction Cost 1<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

0<br />

28,409<br />

Extended Bare<br />

Labor Cost ($)<br />

$28,409<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$125,000<br />

$12,500<br />

$41,250<br />

$13,750<br />

$16,500<br />

N/A<br />

$125,000<br />

$12,500<br />

Totals: $137,500 $137,500<br />

Total Project Cost: $346,500<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $346,500<br />

Rebate/Incentive*:<br />

$28,409<br />

Net Project Cost: $318,091<br />

Net Simple Payback Period (yrs): 20.4<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

177,272<br />

0<br />

$15,600<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: First Electric Savings Component of DM and CR Projects 2013<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: CAMPUSWIDE<br />

Building Key: 04CWIDE<br />

Basic Gross Area (sf):<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3070<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

454,550<br />

52.0<br />

Equipment Description Qty<br />

Deferred Maintenance and Capital Renewal Projects - Checked MZ 032708.xls<br />

Project Description Reference(s): Deferred Maintenance and Capital Renewal Projects.<br />

Estimated Construction Cost 1<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

0<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

Extended Bare<br />

Labor Cost ($)<br />

454,550<br />

0<br />

$109,092<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$250,000<br />

$25,000<br />

$82,500<br />

$27,500<br />

$33,000<br />

N/A<br />

$250,000<br />

$25,000<br />

Totals: $275,000 $275,000<br />

Total Project Cost: $693,000<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $693,000<br />

Rebate/Incentive*:<br />

$109,092<br />

Net Project Cost: $583,908<br />

Net Simple Payback Period (yrs): 14.6<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

454,550<br />

0<br />

$40,000<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: Second Electric Savings Component of DM and CR Projects 2013<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: CAMPUSWIDE<br />

Building Key: 04CWIDE<br />

Basic Gross Area (sf):<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3071<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

454,550<br />

52.0<br />

Equipment Description Qty<br />

Deferred Maintenance and Capital Renewal Projects - Checked MZ 032708.xls<br />

Project Description Reference(s): Deferred Maintenance and Capital Renewal Projects.<br />

Estimated Construction Cost 1<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

0<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

Extended Bare<br />

Labor Cost ($)<br />

454,550<br />

0<br />

$109,092<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$250,000<br />

$25,000<br />

$82,500<br />

$27,500<br />

$33,000<br />

N/A<br />

$250,000<br />

$25,000<br />

Totals: $275,000 $275,000<br />

Total Project Cost: $693,000<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $693,000<br />

Rebate/Incentive*:<br />

$109,092<br />

Net Project Cost: $583,908<br />

Net Simple Payback Period (yrs): 14.6<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

454,550<br />

0<br />

$40,000<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: Natural Gas Component of DM and CR Projects 2013<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: CAMPUSWIDE<br />

Building Key: 04CWIDE<br />

Basic Gross Area (sf):<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3072<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

0<br />

0.0<br />

28,409<br />

Equipment Description Qty<br />

Deferred Maintenance and Capital Renewal Projects - Checked MZ 032708.xls<br />

Project Description Reference(s): Deferred Maintenance and Capital Renewal Projects.<br />

Estimated Construction Cost 1<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

0<br />

28,409<br />

Extended Bare<br />

Labor Cost ($)<br />

$28,409<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$125,000<br />

$12,500<br />

$41,250<br />

$13,750<br />

$16,500<br />

N/A<br />

$125,000<br />

$12,500<br />

Totals: $137,500 $137,500<br />

Total Project Cost: $346,500<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $346,500<br />

Rebate/Incentive*:<br />

$28,409<br />

Net Project Cost: $318,091<br />

Net Simple Payback Period (yrs): 20.4<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

177,272<br />

0<br />

$15,600<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: First Electric Savings Component of DM and CR Projects 2014<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: CAMPUSWIDE<br />

Building Key: 04CWIDE<br />

Basic Gross Area (sf):<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3073<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

454,550<br />

52.0<br />

Equipment Description Qty<br />

Deferred Maintenance and Capital Renewal Projects - Checked MZ 032708.xls<br />

Project Description Reference(s): Deferred Maintenance and Capital Renewal Projects.<br />

Estimated Construction Cost 1<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

0<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

Extended Bare<br />

Labor Cost ($)<br />

454,550<br />

0<br />

$109,092<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$250,000<br />

$25,000<br />

$82,500<br />

$27,500<br />

$33,000<br />

N/A<br />

$250,000<br />

$25,000<br />

Totals: $275,000 $275,000<br />

Total Project Cost: $693,000<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $693,000<br />

Rebate/Incentive*:<br />

$109,092<br />

Net Project Cost: $583,908<br />

Net Simple Payback Period (yrs): 14.6<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

454,550<br />

0<br />

$40,000<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: Second Electric Savings Component of DM and CR Projects 2014<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: CAMPUSWIDE<br />

Building Key: 04CWIDE<br />

Basic Gross Area (sf):<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3074<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

454,550<br />

52.0<br />

Equipment Description Qty<br />

Deferred Maintenance and Capital Renewal Projects - Checked MZ 032708.xls<br />

Project Description Reference(s): Deferred Maintenance and Capital Renewal Projects.<br />

Estimated Construction Cost 1<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

0<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

Extended Bare<br />

Labor Cost ($)<br />

454,550<br />

0<br />

$109,092<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$250,000<br />

$25,000<br />

$82,500<br />

$27,500<br />

$33,000<br />

N/A<br />

$250,000<br />

$25,000<br />

Totals: $275,000 $275,000<br />

Total Project Cost: $693,000<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $693,000<br />

Rebate/Incentive*:<br />

$109,092<br />

Net Project Cost: $583,908<br />

Net Simple Payback Period (yrs): 14.6<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

454,550<br />

0<br />

$40,000<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: Natural Gas Component of DM and CR Projects 2014<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: CAMPUSWIDE<br />

Building Key: 04CWIDE<br />

Basic Gross Area (sf):<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3075<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

0<br />

0.0<br />

28,409<br />

Equipment Description Qty<br />

Deferred Maintenance and Capital Renewal Projects - Checked MZ 032708.xls<br />

Project Description Reference(s): Deferred Maintenance and Capital Renewal Projects.<br />

Estimated Construction Cost 1<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

0<br />

28,409<br />

Extended Bare<br />

Labor Cost ($)<br />

$28,409<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$125,000<br />

$12,500<br />

$41,250<br />

$13,750<br />

$16,500<br />

N/A<br />

$125,000<br />

$12,500<br />

Totals: $137,500 $137,500<br />

Total Project Cost: $346,500<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $346,500<br />

Rebate/Incentive*:<br />

$28,409<br />

Net Project Cost: $318,091<br />

Net Simple Payback Period (yrs): 20.4<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

177,272<br />

0<br />

$15,600<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: SBD, New/Renov - <strong>Campus</strong> Approved Projects Under $5 Million<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: CAMPUSWIDE<br />

Building Key: 04CWIDE<br />

Basic Gross Area (sf):<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3076<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

28,172<br />

3.0<br />

2,640<br />

Equipment Description Qty<br />

<strong>UC</strong> SEP Capital Project Savings Potential (27 Mar) - Checked MZ 032708.xls<br />

Project Description Reference(s): New Construction and Renovation from Capital Program.<br />

Estimated Construction Cost 1<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

28,172<br />

2,640<br />

$9,401<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$14,879<br />

$1,488<br />

$4,910<br />

$1,637<br />

$1,964<br />

Extended Bare<br />

Labor Cost ($)<br />

N/A<br />

$14,878<br />

$1,488<br />

Totals: $16,367 $16,366<br />

Total Project Cost: $41,243<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $41,243<br />

Rebate/Incentive*:<br />

$9,401<br />

Net Project Cost: $31,842<br />

Net Simple Payback Period (yrs): 8.1<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.<br />

44,646<br />

0<br />

$3,929<br />

Backup


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: SBD, New/Renov - <strong>Campus</strong> Approved Projects Under $5 Million<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: CAMPUSWIDE<br />

Building Key: 04CWIDE<br />

Basic Gross Area (sf):<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3077<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

28,172<br />

3.0<br />

2,640<br />

Equipment Description Qty<br />

<strong>UC</strong> SEP Capital Project Savings Potential (27 Mar) - Checked MZ 032708.xls<br />

Project Description Reference(s): New Construction and Renovation from Capital Program.<br />

Estimated Construction Cost 1<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

28,172<br />

2,640<br />

$9,401<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$14,879<br />

$1,488<br />

$4,910<br />

$1,637<br />

$1,964<br />

Extended Bare<br />

Labor Cost ($)<br />

N/A<br />

$14,878<br />

$1,488<br />

Totals: $16,367 $16,366<br />

Total Project Cost: $41,243<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $41,243<br />

Rebate/Incentive*:<br />

$9,401<br />

Net Project Cost: $31,842<br />

Net Simple Payback Period (yrs): 8.1<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.<br />

44,646<br />

0<br />

$3,929<br />

Backup


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: SBD, New/Renov - <strong>Campus</strong> Approved Projects Under $5 Million<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: CAMPUSWIDE<br />

Building Key: 04CWIDE<br />

Basic Gross Area (sf):<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3078<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

28,172<br />

3.0<br />

2,640<br />

Equipment Description Qty<br />

<strong>UC</strong> SEP Capital Project Savings Potential (27 Mar) - Checked MZ 032708.xls<br />

Project Description Reference(s): New Construction and Renovation from Capital Program.<br />

Estimated Construction Cost 1<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

28,172<br />

2,640<br />

$9,401<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$14,879<br />

$1,488<br />

$4,910<br />

$1,637<br />

$1,964<br />

Extended Bare<br />

Labor Cost ($)<br />

N/A<br />

$14,878<br />

$1,488<br />

Totals: $16,367 $16,366<br />

Total Project Cost: $41,243<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $41,243<br />

Rebate/Incentive*:<br />

$9,401<br />

Net Project Cost: $31,842<br />

Net Simple Payback Period (yrs): 8.1<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.<br />

44,646<br />

0<br />

$3,929<br />

Backup


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: SBD, New/Renov - <strong>Campus</strong> Approved Projects Under $5 Million<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: CAMPUSWIDE<br />

Building Key: 04CWIDE<br />

Basic Gross Area (sf):<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3079<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

28,172<br />

3.0<br />

2,640<br />

Equipment Description Qty<br />

<strong>UC</strong> SEP Capital Project Savings Potential (27 Mar) - Checked MZ 032708.xls<br />

Project Description Reference(s): New Construction and Renovation from Capital Program.<br />

Estimated Construction Cost 1<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

28,172<br />

2,640<br />

$9,401<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$14,879<br />

$1,488<br />

$4,910<br />

$1,637<br />

$1,964<br />

Extended Bare<br />

Labor Cost ($)<br />

N/A<br />

$14,878<br />

$1,488<br />

Totals: $16,367 $16,366<br />

Total Project Cost: $41,243<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $41,243<br />

Rebate/Incentive*:<br />

$9,401<br />

Net Project Cost: $31,842<br />

Net Simple Payback Period (yrs): 8.1<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.<br />

44,646<br />

0<br />

$3,929<br />

Backup


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: SBD, New/Renov - <strong>Campus</strong> Approved Projects Under $5 Million<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: CAMPUSWIDE<br />

Building Key: 04CWIDE<br />

Basic Gross Area (sf):<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3080<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

28,172<br />

3.0<br />

2,640<br />

Equipment Description Qty<br />

<strong>UC</strong> SEP Capital Project Savings Potential (27 Mar) - Checked MZ 032708.xls<br />

Project Description Reference(s): New Construction and Renovation from Capital Program.<br />

Estimated Construction Cost 1<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

28,172<br />

2,640<br />

$9,401<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$14,879<br />

$1,488<br />

$4,910<br />

$1,637<br />

$1,964<br />

Extended Bare<br />

Labor Cost ($)<br />

N/A<br />

$14,878<br />

$1,488<br />

Totals: $16,367 $16,366<br />

Total Project Cost: $41,243<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $41,243<br />

Rebate/Incentive*:<br />

$9,401<br />

Net Project Cost: $31,842<br />

Net Simple Payback Period (yrs): 8.1<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.<br />

44,646<br />

0<br />

$3,929<br />

Backup


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: SBD, New/Renov - <strong>Campus</strong> Approved Projects Under $5 Million<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: CAMPUSWIDE<br />

Building Key: 04CWIDE<br />

Basic Gross Area (sf):<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3081<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

28,172<br />

3.0<br />

2,640<br />

Equipment Description Qty<br />

<strong>UC</strong> SEP Capital Project Savings Potential (27 Mar) - Checked MZ 032708.xls<br />

Project Description Reference(s): New Construction and Renovation from Capital Program.<br />

Estimated Construction Cost 1<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

28,172<br />

2,640<br />

$9,401<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$14,879<br />

$1,488<br />

$4,910<br />

$1,637<br />

$1,964<br />

Extended Bare<br />

Labor Cost ($)<br />

N/A<br />

$14,878<br />

$1,488<br />

Totals: $16,367 $16,366<br />

Total Project Cost: $41,243<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $41,243<br />

Rebate/Incentive*:<br />

$9,401<br />

Net Project Cost: $31,842<br />

Net Simple Payback Period (yrs): 8.1<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.<br />

44,646<br />

0<br />

$3,929<br />

Backup


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: SBD, New/Renov - <strong>Campus</strong> Approved Projects Under $5 Million<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: CAMPUSWIDE<br />

Building Key: 04CWIDE<br />

Basic Gross Area (sf):<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3082<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

28,172<br />

3.0<br />

2,640<br />

Equipment Description Qty<br />

<strong>UC</strong> SEP Capital Project Savings Potential (27 Mar) - Checked MZ 032708.xls<br />

Project Description Reference(s): New Construction and Renovation from Capital Program.<br />

Estimated Construction Cost 1<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

28,172<br />

2,640<br />

$9,401<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$14,879<br />

$1,488<br />

$4,910<br />

$1,637<br />

$1,964<br />

Extended Bare<br />

Labor Cost ($)<br />

N/A<br />

$14,878<br />

$1,488<br />

Totals: $16,367 $16,366<br />

Total Project Cost: $41,243<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $41,243<br />

Rebate/Incentive*:<br />

$9,401<br />

Net Project Cost: $31,842<br />

Net Simple Payback Period (yrs): 8.1<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.<br />

44,646<br />

0<br />

$3,929<br />

Backup


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: SBD, New/Renov - <strong>Campus</strong> Approved Projects Under $5 Million<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: CAMPUSWIDE<br />

Building Key: 04CWIDE<br />

Basic Gross Area (sf):<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3083<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

28,172<br />

3.0<br />

2,640<br />

Equipment Description Qty<br />

<strong>UC</strong> SEP Capital Project Savings Potential (27 Mar) - Checked MZ 032708.xls<br />

Project Description Reference(s): New Construction and Renovation from Capital Program.<br />

Estimated Construction Cost 1<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

28,172<br />

2,640<br />

$9,401<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$14,879<br />

$1,488<br />

$4,910<br />

$1,637<br />

$1,964<br />

Extended Bare<br />

Labor Cost ($)<br />

N/A<br />

$14,878<br />

$1,488<br />

Totals: $16,367 $16,366<br />

Total Project Cost: $41,243<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $41,243<br />

Rebate/Incentive*:<br />

$9,401<br />

Net Project Cost: $31,842<br />

Net Simple Payback Period (yrs): 8.1<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.<br />

44,646<br />

0<br />

$3,929<br />

Backup


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: MBCx Central <strong>Plan</strong>t<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: CAMPUSWIDE<br />

Building Key: 04CWIDE<br />

Basic Gross Area (sf):<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3084<br />

<strong>UC</strong> SEP Central <strong>Plan</strong>t MBCx - Checked MZ 032808.xls<br />

Project Description Reference(s): Monitoring Based Commission for All SEP Buildings.<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

750,000<br />

86.0<br />

60,000<br />

Equipment Description Qty<br />

Estimated Construction Cost 1<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

Extended Bare<br />

Labor Cost ($)<br />

750,000<br />

60,000<br />

$240,000<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$100,000<br />

$10,000<br />

$82,500<br />

$27,500<br />

$33,000<br />

N/A<br />

$400,000<br />

$40,000<br />

Totals: $110,000 $440,000<br />

Total Project Cost: $693,000<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $693,000<br />

Rebate/Incentive*:<br />

$240,000<br />

Net Project Cost: $453,000<br />

Net Simple Payback Period (yrs): 4.6<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

1,124,400<br />

0<br />

$98,947<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: SBD, New/Renov - <strong>Campus</strong> Approved Projects Under $5 Million<br />

<strong>Campus</strong>: LOS ANGELES MC<br />

Location: LOS ANGELES MED CTR - WESTWOO<br />

Building: CAMPUSWIDE - MED CTR<br />

Building Key: 04CWIDEM<br />

Basic Gross Area (sf):<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3085<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

28,172<br />

3.0<br />

2,640<br />

Equipment Description Qty<br />

<strong>UC</strong> SEP Capital Project Savings Potential (27 Mar) - Checked MZ 032708.xls<br />

Project Description Reference(s): New Construction and Renovation from Capital Program.<br />

Estimated Construction Cost 1<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

25.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

28,172<br />

2,640<br />

$9,401<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$14,879<br />

$3,720<br />

$5,579<br />

$1,860<br />

$2,232<br />

Extended Bare<br />

Labor Cost ($)<br />

N/A<br />

$14,878<br />

$3,720<br />

Totals: $18,599 $18,598<br />

Total Project Cost: $46,867<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $46,867<br />

Rebate/Incentive*:<br />

$9,401<br />

Net Project Cost: $37,466<br />

Net Simple Payback Period (yrs): 9.5<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.<br />

44,646<br />

0<br />

$3,929<br />

Backup


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: SBD, New/Renov - <strong>Campus</strong> Approved Projects Under $5 Million<br />

<strong>Campus</strong>: LOS ANGELES MC<br />

Location: LOS ANGELES MED CTR - WESTWOO<br />

Building: CAMPUSWIDE - MED CTR<br />

Building Key: 04CWIDEM<br />

Basic Gross Area (sf):<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3086<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

28,172<br />

3.0<br />

2,640<br />

Equipment Description Qty<br />

<strong>UC</strong> SEP Capital Project Savings Potential (27 Mar) - Checked MZ 032708.xls<br />

Project Description Reference(s): New Construction and Renovation from Capital Program.<br />

Estimated Construction Cost 1<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

25.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

28,172<br />

2,640<br />

$9,401<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$14,879<br />

$3,720<br />

$5,579<br />

$1,860<br />

$2,232<br />

Extended Bare<br />

Labor Cost ($)<br />

N/A<br />

$14,878<br />

$3,720<br />

Totals: $18,599 $18,598<br />

Total Project Cost: $46,867<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $46,867<br />

Rebate/Incentive*:<br />

$9,401<br />

Net Project Cost: $37,466<br />

Net Simple Payback Period (yrs): 9.5<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.<br />

44,646<br />

0<br />

$3,929<br />

Backup


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: SBD, New/Renov - <strong>Campus</strong> Approved Projects Under $5 Million<br />

<strong>Campus</strong>: LOS ANGELES MC<br />

Location: LOS ANGELES MED CTR - WESTWOO<br />

Building: CAMPUSWIDE - MED CTR<br />

Building Key: 04CWIDEM<br />

Basic Gross Area (sf):<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3087<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

28,172<br />

3.0<br />

2,640<br />

Equipment Description Qty<br />

<strong>UC</strong> SEP Capital Project Savings Potential (27 Mar) - Checked MZ 032708.xls<br />

Project Description Reference(s): New Construction and Renovation from Capital Program.<br />

Estimated Construction Cost 1<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

25.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

28,172<br />

2,640<br />

$9,401<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$14,879<br />

$3,720<br />

$5,579<br />

$1,860<br />

$2,232<br />

Extended Bare<br />

Labor Cost ($)<br />

N/A<br />

$14,878<br />

$3,720<br />

Totals: $18,599 $18,598<br />

Total Project Cost: $46,867<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $46,867<br />

Rebate/Incentive*:<br />

$9,401<br />

Net Project Cost: $37,466<br />

Net Simple Payback Period (yrs): 9.5<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.<br />

44,646<br />

0<br />

$3,929<br />

Backup


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: SBD, New/Renov - <strong>Campus</strong> Approved Projects Under $5 Million<br />

<strong>Campus</strong>: LOS ANGELES MC<br />

Location: LOS ANGELES MED CTR - WESTWOO<br />

Building: CAMPUSWIDE - MED CTR<br />

Building Key: 04CWIDEM<br />

Basic Gross Area (sf):<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3088<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

28,172<br />

3.0<br />

2,640<br />

Equipment Description Qty<br />

<strong>UC</strong> SEP Capital Project Savings Potential (27 Mar) - Checked MZ 032708.xls<br />

Project Description Reference(s): New Construction and Renovation from Capital Program.<br />

Estimated Construction Cost 1<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

25.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

28,172<br />

2,640<br />

$9,401<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$14,879<br />

$3,720<br />

$5,579<br />

$1,860<br />

$2,232<br />

Extended Bare<br />

Labor Cost ($)<br />

N/A<br />

$14,878<br />

$3,720<br />

Totals: $18,599 $18,598<br />

Total Project Cost: $46,867<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $46,867<br />

Rebate/Incentive*:<br />

$9,401<br />

Net Project Cost: $37,466<br />

Net Simple Payback Period (yrs): 9.5<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.<br />

44,646<br />

0<br />

$3,929<br />

Backup


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: SBD, New/Renov - <strong>Campus</strong> Approved Projects Under $5 Million<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: CAMPUSWIDE - OTHER<br />

Building Key: 04CWIDEO<br />

Basic Gross Area (sf):<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3089<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

28,172<br />

3.0<br />

2,640<br />

Equipment Description Qty<br />

<strong>UC</strong> SEP Capital Project Savings Potential (27 Mar) - Checked MZ 032708.xls<br />

Project Description Reference(s): New Construction and Renovation from Capital Program.<br />

Estimated Construction Cost 1<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

28,172<br />

2,640<br />

$9,401<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$14,879<br />

$1,488<br />

$4,910<br />

$1,637<br />

$1,964<br />

Extended Bare<br />

Labor Cost ($)<br />

N/A<br />

$14,878<br />

$1,488<br />

Totals: $16,367 $16,366<br />

Total Project Cost: $41,243<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $41,243<br />

Rebate/Incentive*:<br />

$9,401<br />

Net Project Cost: $31,842<br />

Net Simple Payback Period (yrs): 8.1<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.<br />

44,646<br />

0<br />

$3,929<br />

Backup


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: SBD, New/Renov - <strong>Campus</strong> Approved Projects Under $5 Million<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: CAMPUSWIDE - OTHER<br />

Building Key: 04CWIDEO<br />

Basic Gross Area (sf):<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3090<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

28,172<br />

3.0<br />

2,640<br />

Equipment Description Qty<br />

<strong>UC</strong> SEP Capital Project Savings Potential (27 Mar) - Checked MZ 032708.xls<br />

Project Description Reference(s): New Construction and Renovation from Capital Program.<br />

Estimated Construction Cost 1<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

28,172<br />

2,640<br />

$9,401<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$14,879<br />

$1,488<br />

$4,910<br />

$1,637<br />

$1,964<br />

Extended Bare<br />

Labor Cost ($)<br />

N/A<br />

$14,878<br />

$1,488<br />

Totals: $16,367 $16,366<br />

Total Project Cost: $41,243<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $41,243<br />

Rebate/Incentive*:<br />

$9,401<br />

Net Project Cost: $31,842<br />

Net Simple Payback Period (yrs): 8.1<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.<br />

44,646<br />

0<br />

$3,929<br />

Backup


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: SBD, New/Renov - <strong>Campus</strong> Approved Projects Under $5 Million<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: CAMPUSWIDE - OTHER<br />

Building Key: 04CWIDEO<br />

Basic Gross Area (sf):<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3091<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

28,172<br />

3.0<br />

2,640<br />

Equipment Description Qty<br />

<strong>UC</strong> SEP Capital Project Savings Potential (27 Mar) - Checked MZ 032708.xls<br />

Project Description Reference(s): New Construction and Renovation from Capital Program.<br />

Estimated Construction Cost 1<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

28,172<br />

2,640<br />

$9,401<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$14,879<br />

$1,488<br />

$4,910<br />

$1,637<br />

$1,964<br />

Extended Bare<br />

Labor Cost ($)<br />

N/A<br />

$14,878<br />

$1,488<br />

Totals: $16,367 $16,366<br />

Total Project Cost: $41,243<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $41,243<br />

Rebate/Incentive*:<br />

$9,401<br />

Net Project Cost: $31,842<br />

Net Simple Payback Period (yrs): 8.1<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.<br />

44,646<br />

0<br />

$3,929<br />

Backup


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: SBD, New/Renov - <strong>Campus</strong> Approved Projects Under $5 Million<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: CAMPUSWIDE - OTHER<br />

Building Key: 04CWIDEO<br />

Basic Gross Area (sf):<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3092<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

28,172<br />

3.0<br />

2,640<br />

Equipment Description Qty<br />

<strong>UC</strong> SEP Capital Project Savings Potential (27 Mar) - Checked MZ 032708.xls<br />

Project Description Reference(s): New Construction and Renovation from Capital Program.<br />

Estimated Construction Cost 1<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

28,172<br />

2,640<br />

$9,401<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$14,879<br />

$1,488<br />

$4,910<br />

$1,637<br />

$1,964<br />

Extended Bare<br />

Labor Cost ($)<br />

N/A<br />

$14,878<br />

$1,488<br />

Totals: $16,367 $16,366<br />

Total Project Cost: $41,243<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $41,243<br />

Rebate/Incentive*:<br />

$9,401<br />

Net Project Cost: $31,842<br />

Net Simple Payback Period (yrs): 8.1<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.<br />

44,646<br />

0<br />

$3,929<br />

Backup


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: Lab Freezers Phase 1 of 4: 20 Lab Freezer Replacements<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: CAMPUSWIDE<br />

Building Key: 04CWIDE<br />

Basic Gross Area (sf):<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3093<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

77,280<br />

Equipment Description Qty<br />

Lab Freezer Projects SEP MZ 032708-Checked by LCK.xls<br />

Project Description Reference(s): <strong>Campus</strong> Wide Project 2. Lab Freezers .<br />

<strong>Energy</strong> Star Lab Freezer 20<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

9.0<br />

0<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

77,280<br />

0<br />

Extended Bare<br />

Labor Cost ($)<br />

$18,547<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$280,000<br />

$28,000<br />

$46,200<br />

$15,400<br />

$18,480<br />

N/A<br />

Totals: $308,000 $0<br />

Total Project Cost: $388,080<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $388,080<br />

Rebate/Incentive*:<br />

$18,547<br />

Net Project Cost: $369,533<br />

Net Simple Payback Period (yrs): 54.3<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.<br />

77,280<br />

0<br />

$6,801<br />

$0<br />

$0


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: Lab Freezers Phase 2 of 4: 20 Lab Freezer Replacements<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: CAMPUSWIDE<br />

Building Key: 04CWIDE<br />

Basic Gross Area (sf):<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3094<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

77,280<br />

Equipment Description Qty<br />

Lab Freezer Projects SEP MZ 032708-Checked by LCK.xls<br />

Project Description Reference(s): <strong>Campus</strong> Wide Project 2. Lab Freezers .<br />

<strong>Energy</strong> Star Lab Freezer 20<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

9.0<br />

0<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

77,280<br />

0<br />

Extended Bare<br />

Labor Cost ($)<br />

$18,547<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$280,000<br />

$28,000<br />

$46,200<br />

$15,400<br />

$18,480<br />

N/A<br />

Totals: $308,000 $0<br />

Total Project Cost: $388,080<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $388,080<br />

Rebate/Incentive*:<br />

$18,547<br />

Net Project Cost: $369,533<br />

Net Simple Payback Period (yrs): 54.3<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.<br />

77,280<br />

0<br />

$6,801<br />

$0<br />

$0


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: Lab Freezers Phase 3 of 4: 20 Lab Freezer Replacements<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: CAMPUSWIDE<br />

Building Key: 04CWIDE<br />

Basic Gross Area (sf):<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3095<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

77,280<br />

Equipment Description Qty<br />

Lab Freezer Projects SEP MZ 032708-Checked by LCK.xls<br />

Project Description Reference(s): <strong>Campus</strong> Wide Project 2. Lab Freezers .<br />

<strong>Energy</strong> Star Lab Freezer 20<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

9.0<br />

0<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

77,280<br />

0<br />

Extended Bare<br />

Labor Cost ($)<br />

$18,547<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$280,000<br />

$28,000<br />

$46,200<br />

$15,400<br />

$18,480<br />

N/A<br />

Totals: $308,000 $0<br />

Total Project Cost: $388,080<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $388,080<br />

Rebate/Incentive*:<br />

$18,547<br />

Net Project Cost: $369,533<br />

Net Simple Payback Period (yrs): 54.3<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.<br />

77,280<br />

0<br />

$6,801<br />

$0<br />

$0


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: Lab Freezers Phase 4 of 4: 6 Lab Freezer Replacements<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: CAMPUSWIDE<br />

Building Key: 04CWIDE<br />

Basic Gross Area (sf):<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3096<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

23,184<br />

Equipment Description Qty<br />

Lab Freezer Projects SEP MZ 032708-Checked by LCK.xls<br />

Project Description Reference(s): <strong>Campus</strong> Wide Project 2. Lab Freezers .<br />

<strong>Energy</strong> Star Lab Freezer 6<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

3.0<br />

0<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

23,184<br />

0<br />

$5,564<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$84,000<br />

$8,400<br />

$13,860<br />

$4,620<br />

$5,544<br />

Extended Bare<br />

Labor Cost ($)<br />

N/A<br />

Totals: $92,400 $0<br />

Total Project Cost: $116,424<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $116,424<br />

Rebate/Incentive*:<br />

$5,564<br />

Net Project Cost: $110,860<br />

Net Simple Payback Period (yrs): 54.3<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.<br />

23,184<br />

0<br />

$2,040<br />

$0<br />

$0<br />

Backup


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: Refrigerators Phase 1 of 5: 100 <strong>Energy</strong> Star Refrigerator<br />

Replacements<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: CAMPUSWIDE<br />

Building Key: 04CWIDE<br />

Basic Gross Area (sf):<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3097<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

224,300<br />

26.0<br />

Equipment Description Qty<br />

Refrigerator (<strong>Campus</strong>-wide) Projects SEP MZ 032608.Checked by LCK.xls<br />

Project Description Reference(s): <strong>Campus</strong> Wide Project 1. Refrigerators.<br />

<strong>Energy</strong> Star Refrigerator 100<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

0<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

Extended Bare<br />

Labor Cost ($)<br />

224,300<br />

0<br />

$53,832<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$69,800<br />

$6,980<br />

$11,517<br />

$3,839<br />

$4,607<br />

N/A<br />

Totals: $76,780 $0<br />

Total Project Cost: $96,743<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $96,743<br />

Rebate/Incentive*:<br />

Net Project Cost: $42,911<br />

Net Simple Payback Period (yrs): 2.2<br />

$53,832<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

224,300<br />

0<br />

$19,738<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.<br />

$0<br />

$0


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: Refrigerators Phase 2 of 5: 100 <strong>Energy</strong> Star Refrigerator<br />

Replacements<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: CAMPUSWIDE<br />

Building Key: 04CWIDE<br />

Basic Gross Area (sf):<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3098<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

224,300<br />

26.0<br />

Equipment Description Qty<br />

Refrigerator (<strong>Campus</strong>-wide) Projects SEP MZ 032608.Checked by LCK.xls<br />

Project Description Reference(s): <strong>Campus</strong> Wide Project 1. Refrigerators.<br />

<strong>Energy</strong> Star Refrigerator 100<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

0<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

Extended Bare<br />

Labor Cost ($)<br />

224,300<br />

0<br />

$53,832<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$69,800<br />

$6,980<br />

$11,517<br />

$3,839<br />

$4,607<br />

N/A<br />

Totals: $76,780 $0<br />

Total Project Cost: $96,743<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $96,743<br />

Rebate/Incentive*:<br />

Net Project Cost: $42,911<br />

Net Simple Payback Period (yrs): 2.2<br />

$53,832<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

224,300<br />

0<br />

$19,738<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.<br />

$0<br />

$0


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: Refrigerators Phase 3 of 5: 100 <strong>Energy</strong> Star Refrigerator<br />

Replacements<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: CAMPUSWIDE<br />

Building Key: 04CWIDE<br />

Basic Gross Area (sf):<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3099<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

224,300<br />

26.0<br />

Equipment Description Qty<br />

Refrigerator (<strong>Campus</strong>-wide) Projects SEP MZ 032608.Checked by LCK.xls<br />

Project Description Reference(s): <strong>Campus</strong> Wide Project 1. Refrigerators.<br />

<strong>Energy</strong> Star Refrigerator 100<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

0<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

Extended Bare<br />

Labor Cost ($)<br />

224,300<br />

0<br />

$53,832<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$69,800<br />

$6,980<br />

$11,517<br />

$3,839<br />

$4,607<br />

N/A<br />

Totals: $76,780 $0<br />

Total Project Cost: $96,743<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $96,743<br />

Rebate/Incentive*:<br />

Net Project Cost: $42,911<br />

Net Simple Payback Period (yrs): 2.2<br />

$53,832<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

224,300<br />

0<br />

$19,738<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.<br />

$0<br />

$0


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: Refrigerators Phase 4 of 5: 100 <strong>Energy</strong> Star Refrigerator<br />

Replacements<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: CAMPUSWIDE<br />

Building Key: 04CWIDE<br />

Basic Gross Area (sf):<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3100<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

224,300<br />

26.0<br />

Equipment Description Qty<br />

Refrigerator (<strong>Campus</strong>-wide) Projects SEP MZ 032608.Checked by LCK.xls<br />

Project Description Reference(s): <strong>Campus</strong> Wide Project 1. Refrigerators.<br />

<strong>Energy</strong> Star Refrigerator 100<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

0<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

Extended Bare<br />

Labor Cost ($)<br />

224,300<br />

0<br />

$53,832<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$69,800<br />

$6,980<br />

$11,517<br />

$3,839<br />

$4,607<br />

N/A<br />

Totals: $76,780 $0<br />

Total Project Cost: $96,743<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $96,743<br />

Rebate/Incentive*:<br />

Net Project Cost: $42,911<br />

Net Simple Payback Period (yrs): 2.2<br />

$53,832<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

224,300<br />

0<br />

$19,738<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.<br />

$0<br />

$0


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: Refrigerators Phase 5 of 5: 73 <strong>Energy</strong> Star Refrigerator Replacements<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: CAMPUSWIDE<br />

Building Key: 04CWIDE<br />

Basic Gross Area (sf):<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3101<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

163,739<br />

19.0<br />

Equipment Description Qty<br />

Refrigerator (<strong>Campus</strong>-wide) Projects SEP MZ 032608.Checked by LCK.xls<br />

Project Description Reference(s): <strong>Campus</strong> Wide Project 1. Refrigerators.<br />

<strong>Energy</strong> Star Refrigerator 73<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

0<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

Extended Bare<br />

Labor Cost ($)<br />

163,739<br />

0<br />

$39,297<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$50,954<br />

$5,095<br />

$8,407<br />

$2,802<br />

$3,363<br />

N/A<br />

Totals: $56,049 $0<br />

Total Project Cost: $70,622<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $70,622<br />

Rebate/Incentive*:<br />

Net Project Cost: $31,325<br />

Net Simple Payback Period (yrs): 2.2<br />

$39,297<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

163,739<br />

0<br />

$14,409<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.<br />

$0<br />

$0


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: Refrigerators Phase 1 of 7: 100 <strong>Energy</strong> Star Refrigerator<br />

Replacements<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: CAMPUSWIDE<br />

Building Key: 04CWIDE<br />

Basic Gross Area (sf):<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3102<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

224,300<br />

26.0<br />

Equipment Description Qty<br />

Refrigerator (Housing) Projects SEP MZ 032608.Checked by LCK.xls<br />

Project Description Reference(s): <strong>Campus</strong> Wide Project 1. Refrigerators.<br />

<strong>Energy</strong> Star Refrigerator 100<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

0<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

Extended Bare<br />

Labor Cost ($)<br />

224,300<br />

0<br />

$53,832<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$69,800<br />

$6,980<br />

$11,517<br />

$3,839<br />

$4,607<br />

N/A<br />

Totals: $76,780 $0<br />

Total Project Cost: $96,743<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $96,743<br />

Rebate/Incentive*:<br />

Net Project Cost: $42,911<br />

Net Simple Payback Period (yrs): 2.2<br />

$53,832<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

224,300<br />

0<br />

$19,738<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.<br />

$0<br />

$0


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: Refrigerators Phase 2 of 7: 100 <strong>Energy</strong> Star Refrigerator<br />

Replacements<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: CAMPUSWIDE<br />

Building Key: 04CWIDE<br />

Basic Gross Area (sf):<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3103<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

224,300<br />

26.0<br />

Equipment Description Qty<br />

Refrigerator (Housing) Projects SEP MZ 032608.Checked by LCK.xls<br />

Project Description Reference(s): <strong>Campus</strong> Wide Project 1. Refrigerators.<br />

<strong>Energy</strong> Star Refrigerator 100<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

0<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

Extended Bare<br />

Labor Cost ($)<br />

224,300<br />

0<br />

$53,832<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$69,800<br />

$6,980<br />

$11,517<br />

$3,839<br />

$4,607<br />

N/A<br />

Totals: $76,780 $0<br />

Total Project Cost: $96,743<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $96,743<br />

Rebate/Incentive*:<br />

Net Project Cost: $42,911<br />

Net Simple Payback Period (yrs): 2.2<br />

$53,832<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

224,300<br />

0<br />

$19,738<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.<br />

$0<br />

$0


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: Refrigerators Phase 3 of 7: 100 <strong>Energy</strong> Star Refrigerator<br />

Replacements<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: CAMPUSWIDE<br />

Building Key: 04CWIDE<br />

Basic Gross Area (sf):<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3104<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

224,300<br />

26.0<br />

Equipment Description Qty<br />

Refrigerator (Housing) Projects SEP MZ 032608.Checked by LCK.xls<br />

Project Description Reference(s): <strong>Campus</strong> Wide Project 1. Refrigerators.<br />

<strong>Energy</strong> Star Refrigerator 100<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

0<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

Extended Bare<br />

Labor Cost ($)<br />

224,300<br />

0<br />

$53,832<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$69,800<br />

$6,980<br />

$11,517<br />

$3,839<br />

$4,607<br />

N/A<br />

Totals: $76,780 $0<br />

Total Project Cost: $96,743<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $96,743<br />

Rebate/Incentive*:<br />

Net Project Cost: $42,911<br />

Net Simple Payback Period (yrs): 2.2<br />

$53,832<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

224,300<br />

0<br />

$19,738<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.<br />

$0<br />

$0


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: Refrigerators Phase 4 of 7: 100 <strong>Energy</strong> Star Refrigerator<br />

Replacements<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: CAMPUSWIDE<br />

Building Key: 04CWIDE<br />

Basic Gross Area (sf):<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3105<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

224,300<br />

26.0<br />

Equipment Description Qty<br />

Refrigerator (Housing) Projects SEP MZ 032608.Checked by LCK.xls<br />

Project Description Reference(s): <strong>Campus</strong> Wide Project 1. Refrigerators.<br />

<strong>Energy</strong> Star Refrigerator 100<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

0<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

Extended Bare<br />

Labor Cost ($)<br />

224,300<br />

0<br />

$53,832<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$69,800<br />

$6,980<br />

$11,517<br />

$3,839<br />

$4,607<br />

N/A<br />

Totals: $76,780 $0<br />

Total Project Cost: $96,743<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $96,743<br />

Rebate/Incentive*:<br />

Net Project Cost: $42,911<br />

Net Simple Payback Period (yrs): 2.2<br />

$53,832<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

224,300<br />

0<br />

$19,738<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.<br />

$0<br />

$0


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: Refrigerators Phase 5 of 7: 100 <strong>Energy</strong> Star Refrigerator<br />

Replacements<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: CAMPUSWIDE<br />

Building Key: 04CWIDE<br />

Basic Gross Area (sf):<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3106<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

224,300<br />

26.0<br />

Equipment Description Qty<br />

Refrigerator (Housing) Projects SEP MZ 032608.Checked by LCK.xls<br />

Project Description Reference(s): <strong>Campus</strong> Wide Project 1. Refrigerators.<br />

<strong>Energy</strong> Star Refrigerator 100<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

0<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

Extended Bare<br />

Labor Cost ($)<br />

224,300<br />

0<br />

$53,832<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$69,800<br />

$6,980<br />

$11,517<br />

$3,839<br />

$4,607<br />

N/A<br />

Totals: $76,780 $0<br />

Total Project Cost: $96,743<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $96,743<br />

Rebate/Incentive*:<br />

Net Project Cost: $42,911<br />

Net Simple Payback Period (yrs): 2.2<br />

$53,832<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

224,300<br />

0<br />

$19,738<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.<br />

$0<br />

$0


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: Refrigerators Phase 6 of 7: 100 <strong>Energy</strong> Star Refrigerator<br />

Replacements<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: CAMPUSWIDE<br />

Building Key: 04CWIDE<br />

Basic Gross Area (sf):<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3107<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

224,300<br />

26.0<br />

Equipment Description Qty<br />

Refrigerator (Housing) Projects SEP MZ 032608.Checked by LCK.xls<br />

Project Description Reference(s): <strong>Campus</strong> Wide Project 1. Refrigerators.<br />

<strong>Energy</strong> Star Refrigerator 100<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

0<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

Extended Bare<br />

Labor Cost ($)<br />

224,300<br />

0<br />

$53,832<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$69,800<br />

$6,980<br />

$11,517<br />

$3,839<br />

$4,607<br />

N/A<br />

Totals: $76,780 $0<br />

Total Project Cost: $96,743<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $96,743<br />

Rebate/Incentive*:<br />

Net Project Cost: $42,911<br />

Net Simple Payback Period (yrs): 2.2<br />

$53,832<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

224,300<br />

0<br />

$19,738<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.<br />

$0<br />

$0


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: Refrigerators Phase 7 of 7: 69 <strong>Energy</strong> Star Refrigerator Replacements<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: CAMPUSWIDE<br />

Building Key: 04CWIDE<br />

Basic Gross Area (sf):<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3108<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

154,767<br />

18.0<br />

Equipment Description Qty<br />

Refrigerator (Housing) Projects SEP MZ 032608.Checked by LCK.xls<br />

Project Description Reference(s): <strong>Campus</strong> Wide Project 1. Refrigerators.<br />

<strong>Energy</strong> Star Refrigerator 69<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

0<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

Extended Bare<br />

Labor Cost ($)<br />

154,767<br />

0<br />

$37,144<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$48,162<br />

$4,816<br />

$7,947<br />

$2,649<br />

$3,179<br />

N/A<br />

Totals: $52,978 $0<br />

Total Project Cost: $66,753<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $66,753<br />

Rebate/Incentive*:<br />

Net Project Cost: $29,609<br />

Net Simple Payback Period (yrs): 2.2<br />

$37,144<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

154,767<br />

0<br />

$13,619<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.<br />

$0<br />

$0


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: LCD Phase 1 of 9: 1000 Verdiem (PC Power Management)<br />

Installations and 40 CRT Replacements<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: CAMPUSWIDE<br />

Building Key: 04CWIDE<br />

Basic Gross Area (sf):<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3109<br />

Verdiem & CRT Projects SEP MZ 032608 - TLH.xls<br />

Project Description Reference(s): <strong>Campus</strong> Wide Project 4. Network Computer Power Management Software/CRT .<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

213,796<br />

27.0<br />

Equipment Description Qty<br />

Verdiem (or similar) Software, Licence & Installation 1,000<br />

LCD Monitor & Installation 40<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

0<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

Extended Bare<br />

Labor Cost ($)<br />

213,796<br />

0<br />

$51,311<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$48,200<br />

$4,820<br />

$8,118<br />

$2,706<br />

$3,247<br />

N/A<br />

$1,000<br />

$100<br />

Totals: $53,020 $1,100<br />

Total Project Cost: $68,191<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $68,191<br />

Rebate/Incentive*:<br />

$51,311<br />

Net Project Cost: $16,880<br />

Net Simple Payback Period (yrs): 0.9<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

213,796<br />

0<br />

$18,814<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: LCD Phase 2 of 9: 1000 Verdiem (PC Power Management)<br />

Installations and 40 CRT Replacements<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: CAMPUSWIDE<br />

Building Key: 04CWIDE<br />

Basic Gross Area (sf):<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3110<br />

Verdiem & CRT Projects SEP MZ 032608 - TLH.xls<br />

Project Description Reference(s): <strong>Campus</strong> Wide Project 4. Network Computer Power Management Software/CRT .<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

213,796<br />

27.0<br />

Equipment Description Qty<br />

Verdiem (or similar) Software, Licence & Installation 1,000<br />

LCD Monitor & Installation 40<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

0<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

Extended Bare<br />

Labor Cost ($)<br />

213,796<br />

0<br />

$51,311<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$48,200<br />

$4,820<br />

$8,118<br />

$2,706<br />

$3,247<br />

N/A<br />

$1,000<br />

$100<br />

Totals: $53,020 $1,100<br />

Total Project Cost: $68,191<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $68,191<br />

Rebate/Incentive*:<br />

$51,311<br />

Net Project Cost: $16,880<br />

Net Simple Payback Period (yrs): 0.9<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

213,796<br />

0<br />

$18,814<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: LCD Phase 3 of 9: 1000 Verdiem (PC Power Management)<br />

Installations and 40 CRT Replacements<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: CAMPUSWIDE<br />

Building Key: 04CWIDE<br />

Basic Gross Area (sf):<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3111<br />

Verdiem & CRT Projects SEP MZ 032608 - TLH.xls<br />

Project Description Reference(s): <strong>Campus</strong> Wide Project 4. Network Computer Power Management Software/CRT .<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

213,796<br />

27.0<br />

Equipment Description Qty<br />

Verdiem (or similar) Software, Licence & Installation 1,000<br />

LCD Monitor & Installation 40<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

0<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

Extended Bare<br />

Labor Cost ($)<br />

213,796<br />

0<br />

$51,311<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$48,200<br />

$4,820<br />

$8,118<br />

$2,706<br />

$3,247<br />

N/A<br />

$1,000<br />

$100<br />

Totals: $53,020 $1,100<br />

Total Project Cost: $68,191<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $68,191<br />

Rebate/Incentive*:<br />

$51,311<br />

Net Project Cost: $16,880<br />

Net Simple Payback Period (yrs): 0.9<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

213,796<br />

0<br />

$18,814<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: LCD Phase 4 of 9: 1000 Verdiem (PC Power Management)<br />

Installations and 40 CRT Replacements<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: CAMPUSWIDE<br />

Building Key: 04CWIDE<br />

Basic Gross Area (sf):<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3112<br />

Verdiem & CRT Projects SEP MZ 032608 - TLH.xls<br />

Project Description Reference(s): <strong>Campus</strong> Wide Project 4. Network Computer Power Management Software/CRT .<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

213,796<br />

27.0<br />

Equipment Description Qty<br />

Verdiem (or similar) Software, Licence & Installation 1,000<br />

LCD Monitor & Installation 40<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

0<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

Extended Bare<br />

Labor Cost ($)<br />

213,796<br />

0<br />

$51,311<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$48,200<br />

$4,820<br />

$8,118<br />

$2,706<br />

$3,247<br />

N/A<br />

$1,000<br />

$100<br />

Totals: $53,020 $1,100<br />

Total Project Cost: $68,191<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $68,191<br />

Rebate/Incentive*:<br />

$51,311<br />

Net Project Cost: $16,880<br />

Net Simple Payback Period (yrs): 0.9<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

213,796<br />

0<br />

$18,814<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: LCD Phase 5 of 9: 1000 Verdiem (PC Power Management)<br />

Installations and 40 CRT Replacements<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: CAMPUSWIDE<br />

Building Key: 04CWIDE<br />

Basic Gross Area (sf):<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3113<br />

Verdiem & CRT Projects SEP MZ 032608 - TLH.xls<br />

Project Description Reference(s): <strong>Campus</strong> Wide Project 4. Network Computer Power Management Software/CRT .<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

213,796<br />

27.0<br />

Equipment Description Qty<br />

LCD Monitor & Installation 40<br />

Verdiem (or similar) Software, Licence & Installation 1,000<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

0<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

Extended Bare<br />

Labor Cost ($)<br />

213,796<br />

0<br />

$51,311<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$48,200<br />

$4,820<br />

$8,118<br />

$2,706<br />

$3,247<br />

N/A<br />

$1,000<br />

$100<br />

Totals: $53,020 $1,100<br />

Total Project Cost: $68,191<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $68,191<br />

Rebate/Incentive*:<br />

$51,311<br />

Net Project Cost: $16,880<br />

Net Simple Payback Period (yrs): 0.9<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

213,796<br />

0<br />

$18,814<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: LCD Phase 6 of 9: 1000 Verdiem (PC Power Management)<br />

Installations and 40 CRT Replacements<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: CAMPUSWIDE<br />

Building Key: 04CWIDE<br />

Basic Gross Area (sf):<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3114<br />

Verdiem & CRT Projects SEP MZ 032608 - TLH.xls<br />

Project Description Reference(s): <strong>Campus</strong> Wide Project 4. Network Computer Power Management Software/CRT .<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

213,796<br />

27.0<br />

Equipment Description Qty<br />

Verdiem (or similar) Software, Licence & Installation 1,000<br />

LCD Monitor & Installation 40<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

0<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

Extended Bare<br />

Labor Cost ($)<br />

213,796<br />

0<br />

$51,311<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$48,200<br />

$4,820<br />

$8,118<br />

$2,706<br />

$3,247<br />

N/A<br />

$1,000<br />

$100<br />

Totals: $53,020 $1,100<br />

Total Project Cost: $68,191<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $68,191<br />

Rebate/Incentive*:<br />

$51,311<br />

Net Project Cost: $16,880<br />

Net Simple Payback Period (yrs): 0.9<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

213,796<br />

0<br />

$18,814<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: LCD Phase 7 of 9: 1000 Verdiem (PC Power Management)<br />

Installations and 40 CRT Replacements<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: CAMPUSWIDE<br />

Building Key: 04CWIDE<br />

Basic Gross Area (sf):<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3115<br />

Verdiem & CRT Projects SEP MZ 032608 - TLH.xls<br />

Project Description Reference(s): <strong>Campus</strong> Wide Project 4. Network Computer Power Management Software/CRT .<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

213,796<br />

27.0<br />

Equipment Description Qty<br />

LCD Monitor & Installation 40<br />

Verdiem (or similar) Software, Licence & Installation 1,000<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

0<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

Extended Bare<br />

Labor Cost ($)<br />

213,796<br />

0<br />

$51,311<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$48,200<br />

$4,820<br />

$8,118<br />

$2,706<br />

$3,247<br />

N/A<br />

$1,000<br />

$100<br />

Totals: $53,020 $1,100<br />

Total Project Cost: $68,191<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $68,191<br />

Rebate/Incentive*:<br />

$51,311<br />

Net Project Cost: $16,880<br />

Net Simple Payback Period (yrs): 0.9<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

213,796<br />

0<br />

$18,814<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: LCD Phase 8 of 9: 1000 Verdiem (PC Power Management)<br />

Installations and 40 CRT Replacements<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: CAMPUSWIDE<br />

Building Key: 04CWIDE<br />

Basic Gross Area (sf):<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3116<br />

Verdiem & CRT Projects SEP MZ 032608 - TLH.xls<br />

Project Description Reference(s): <strong>Campus</strong> Wide Project 4. Network Computer Power Management Software/CRT .<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

213,796<br />

27.0<br />

Equipment Description Qty<br />

Verdiem (or similar) Software, Licence & Installation 1,000<br />

LCD Monitor & Installation 40<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

0<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

Extended Bare<br />

Labor Cost ($)<br />

213,796<br />

0<br />

$51,311<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$48,200<br />

$4,820<br />

$8,118<br />

$2,706<br />

$3,247<br />

N/A<br />

$1,000<br />

$100<br />

Totals: $53,020 $1,100<br />

Total Project Cost: $68,191<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $68,191<br />

Rebate/Incentive*:<br />

$51,311<br />

Net Project Cost: $16,880<br />

Net Simple Payback Period (yrs): 0.9<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

213,796<br />

0<br />

$18,814<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: LCD Phase 9 of 9: 222 Verdiem (PC Power Management) Installations<br />

and 9 CRT Replacements<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: CAMPUSWIDE<br />

Building Key: 04CWIDE<br />

Basic Gross Area (sf):<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3117<br />

Verdiem & CRT Projects SEP MZ 032608 - TLH.xls<br />

Project Description Reference(s): <strong>Campus</strong> Wide Project 4. Network Computer Power Management Software/CRT .<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

47,463<br />

Equipment Description Qty<br />

Verdiem (or similar) Software, Licence & Installation 222<br />

LCD Monitor & Installation 35<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

6.0<br />

0<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

47,463<br />

0<br />

Extended Bare<br />

Labor Cost ($)<br />

$11,391<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$19,320<br />

$1,932<br />

$3,332<br />

$1,111<br />

$1,333<br />

N/A<br />

$875<br />

$88<br />

Totals: $21,252 $963<br />

Total Project Cost: $27,990<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $27,990<br />

Rebate/Incentive*:<br />

$11,391<br />

Net Project Cost: $16,599<br />

Net Simple Payback Period (yrs): 4.0<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.<br />

47,463<br />

0<br />

$4,177


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: Server Virtualization Phase 1 of 5: 10 VM Installations<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: CAMPUSWIDE<br />

Building Key: 04CWIDE<br />

Basic Gross Area (sf):<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3118<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

280,000<br />

35.0<br />

Equipment Description Qty<br />

Virtualization Projects SEP MZ 032608 - Checked ADM 032808.xls<br />

Project Description Reference(s): <strong>Campus</strong> Wide Project 3. Server Virtualization .<br />

Hardware, Software, License & Installation; VM or similar, per Virt 10<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

0<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

Extended Bare<br />

Labor Cost ($)<br />

280,000<br />

0<br />

$67,200<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$210,000<br />

$21,000<br />

$34,650<br />

$11,550<br />

$13,860<br />

N/A<br />

Totals: $231,000 $0<br />

Total Project Cost: $291,060<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $291,060<br />

Rebate/Incentive*:<br />

Net Project Cost: $223,860<br />

Net Simple Payback Period (yrs): 9.1<br />

$67,200<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

280,000<br />

0<br />

$24,640<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.<br />

$0<br />

$0


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: Server Virtualization Phase 2 of 5: 10 VM Installations<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: CAMPUSWIDE<br />

Building Key: 04CWIDE<br />

Basic Gross Area (sf):<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3119<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

280,000<br />

35.0<br />

Equipment Description Qty<br />

Virtualization Projects SEP MZ 032608 - Checked ADM 032808.xls<br />

Project Description Reference(s): <strong>Campus</strong> Wide Project 3. Server Virtualization .<br />

Hardware, Software, License & Installation; VM or similar, per Virt 10<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

0<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

Extended Bare<br />

Labor Cost ($)<br />

280,000<br />

0<br />

$67,200<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$210,000<br />

$21,000<br />

$34,650<br />

$11,550<br />

$13,860<br />

N/A<br />

Totals: $231,000 $0<br />

Total Project Cost: $291,060<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $291,060<br />

Rebate/Incentive*:<br />

Net Project Cost: $223,860<br />

Net Simple Payback Period (yrs): 9.1<br />

$67,200<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

280,000<br />

0<br />

$24,640<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.<br />

$0<br />

$0


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: Server Virtualization Phase 3 of 5: 10 VM Installations<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: CAMPUSWIDE<br />

Building Key: 04CWIDE<br />

Basic Gross Area (sf):<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3120<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

280,000<br />

35.0<br />

Equipment Description Qty<br />

Virtualization Projects SEP MZ 032608 - Checked ADM 032808.xls<br />

Project Description Reference(s): <strong>Campus</strong> Wide Project 3. Server Virtualization .<br />

Hardware, Software, License & Installation; VM or similar, per Virt 10<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

0<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

Extended Bare<br />

Labor Cost ($)<br />

280,000<br />

0<br />

$67,200<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$210,000<br />

$21,000<br />

$34,650<br />

$11,550<br />

$13,860<br />

N/A<br />

Totals: $231,000 $0<br />

Total Project Cost: $291,060<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $291,060<br />

Rebate/Incentive*:<br />

Net Project Cost: $223,860<br />

Net Simple Payback Period (yrs): 9.1<br />

$67,200<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

280,000<br />

0<br />

$24,640<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.<br />

$0<br />

$0


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: Server Virtualization Phase 4 of 5: 10 VM Installations<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: CAMPUSWIDE<br />

Building Key: 04CWIDE<br />

Basic Gross Area (sf):<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3121<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

280,000<br />

35.0<br />

Equipment Description Qty<br />

Virtualization Projects SEP MZ 032608 - Checked ADM 032808.xls<br />

Project Description Reference(s): <strong>Campus</strong> Wide Project 3. Server Virtualization .<br />

Hardware, Software, License & Installation; VM or similar, per Virt 10<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

0<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

Extended Bare<br />

Labor Cost ($)<br />

280,000<br />

0<br />

$67,200<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$210,000<br />

$21,000<br />

$34,650<br />

$11,550<br />

$13,860<br />

N/A<br />

Totals: $231,000 $0<br />

Total Project Cost: $291,060<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $291,060<br />

Rebate/Incentive*:<br />

Net Project Cost: $223,860<br />

Net Simple Payback Period (yrs): 9.1<br />

$67,200<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

280,000<br />

0<br />

$24,640<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.<br />

$0<br />

$0


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: Server Virtualization Phase 5 of 5: 5 VM Installations<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: CAMPUSWIDE<br />

Building Key: 04CWIDE<br />

Basic Gross Area (sf):<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3122<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

140,000<br />

18.0<br />

Equipment Description Qty<br />

Virtualization Projects SEP MZ 032608 - Checked ADM 032808.xls<br />

Project Description Reference(s): <strong>Campus</strong> Wide Project 3. Server Virtualization .<br />

Hardware, Software, License & Installation; VM or similar, per Virt 5<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

0<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

Extended Bare<br />

Labor Cost ($)<br />

140,000<br />

0<br />

$33,600<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$105,000<br />

$10,500<br />

$17,325<br />

$5,775<br />

$6,930<br />

N/A<br />

Totals: $115,500 $0<br />

Total Project Cost: $145,530<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $145,530<br />

Rebate/Incentive*:<br />

Net Project Cost: $111,930<br />

Net Simple Payback Period (yrs): 9.1<br />

$33,600<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

140,000<br />

0<br />

$12,320<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.<br />

$0<br />

$0


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: Monitoring Based Commissioning<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: MURPHY HALL<br />

Building Key: 04C4200<br />

Basic Gross Area (sf): 220,188<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3124<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

169,545<br />

19.0<br />

23,120<br />

Equipment Description Qty<br />

SEP MBCx Analysis MZ 080326 Final.Checked by LCK.xls<br />

Project Description Reference(s): Monitoring Based Commission for All SEP Buildings.<br />

Estimated Construction Cost 1<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

Extended Bare<br />

Labor Cost ($)<br />

169,545<br />

23,120<br />

$63,811<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$33,579<br />

$3,358<br />

$22,162<br />

$7,387<br />

$8,865<br />

N/A<br />

$100,736<br />

$10,074<br />

Totals: $36,937 $110,810<br />

Total Project Cost: $186,161<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $186,161<br />

Rebate/Incentive*:<br />

$63,811<br />

Net Project Cost: $122,350<br />

Net Simple Payback Period (yrs): 4.4<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

313,814<br />

0<br />

$27,616<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: Monitoring Based Commissioning<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: SLICHTER<br />

Building Key: 04C4227<br />

Basic Gross Area (sf): 62,557<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3128<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

48,169<br />

6.0<br />

6,568<br />

Equipment Description Qty<br />

SEP MBCx Analysis MZ 080326 Final.Checked by LCK.xls<br />

Project Description Reference(s): Monitoring Based Commission for All SEP Buildings.<br />

Estimated Construction Cost 1<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

48,169<br />

6,568<br />

Extended Bare<br />

Labor Cost ($)<br />

$18,129<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$9,540<br />

$954<br />

$6,296<br />

$2,099<br />

$2,519<br />

N/A<br />

$28,620<br />

$2,862<br />

Totals: $10,494 $31,482<br />

Total Project Cost: $52,890<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $52,890<br />

Rebate/Incentive*:<br />

$18,129<br />

Net Project Cost: $34,761<br />

Net Simple Payback Period (yrs): 4.4<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.<br />

89,153<br />

0<br />

$7,845


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: Monitoring Based Commissioning<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: YOUNG HALL<br />

Building Key: 04C4228B<br />

Basic Gross Area (sf): 297,589<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3131<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

562,443<br />

64.0<br />

60,411<br />

Equipment Description Qty<br />

SEP MBCx Analysis MZ 080326 Final.Checked by LCK.xls<br />

Project Description Reference(s): Monitoring Based Commission for All SEP Buildings.<br />

Estimated Construction Cost 1<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

Extended Bare<br />

Labor Cost ($)<br />

562,443<br />

60,411<br />

$195,397<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$90,765<br />

$9,077<br />

$59,905<br />

$19,968<br />

$23,962<br />

N/A<br />

$272,294<br />

$27,229<br />

Totals: $99,842 $299,523<br />

Total Project Cost: $503,200<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $503,200<br />

Rebate/Incentive*:<br />

$195,397<br />

Net Project Cost: $307,803<br />

Net Simple Payback Period (yrs): 3.7<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

939,408<br />

0<br />

$82,668<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: Monitoring Based Commissioning<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: FRANZ HALL<br />

Building Key: 04C4319<br />

Basic Gross Area (sf): 238,054<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3143<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

449,922<br />

51.0<br />

48,325<br />

Equipment Description Qty<br />

SEP MBCx Analysis MZ 080326 Final.Checked by LCK.xls<br />

Project Description Reference(s): Monitoring Based Commission for All SEP Buildings.<br />

Estimated Construction Cost 1<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

Extended Bare<br />

Labor Cost ($)<br />

449,922<br />

48,325<br />

$156,306<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$72,606<br />

$7,261<br />

$47,920<br />

$15,973<br />

$19,168<br />

N/A<br />

$217,819<br />

$21,782<br />

Totals: $79,867 $239,601<br />

Total Project Cost: $402,529<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $402,529<br />

Rebate/Incentive*:<br />

$156,306<br />

Net Project Cost: $246,223<br />

Net Simple Payback Period (yrs): 3.7<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

751,470<br />

0<br />

$66,129<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: Monitoring Based Commissioning<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: REED RESRCH<br />

Building Key: 04C4329<br />

Basic Gross Area (sf): 69,176<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3147<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

130,743<br />

15.0<br />

14,043<br />

Equipment Description Qty<br />

SEP MBCx Analysis MZ 080326 Final.Checked by LCK.xls<br />

Project Description Reference(s): Monitoring Based Commission for All SEP Buildings.<br />

Estimated Construction Cost 1<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

Extended Bare<br />

Labor Cost ($)<br />

130,743<br />

14,043<br />

$45,421<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$21,099<br />

$2,110<br />

$13,925<br />

$4,642<br />

$5,570<br />

N/A<br />

$63,296<br />

$6,330<br />

Totals: $23,209 $69,626<br />

Total Project Cost: $116,971<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $116,971<br />

Rebate/Incentive*:<br />

$45,421<br />

Net Project Cost: $71,550<br />

Net Simple Payback Period (yrs): 3.7<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

218,371<br />

0<br />

$19,217<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: Monitoring Based Commissioning<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: BRAIN RSCH<br />

Building Key: 04C4332B<br />

Basic Gross Area (sf): 86,578<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3150<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

163,632<br />

19.0<br />

17,575<br />

Equipment Description Qty<br />

SEP MBCx Analysis MZ 080326 Final.Checked by LCK.xls<br />

Project Description Reference(s): Monitoring Based Commission for All SEP Buildings.<br />

Estimated Construction Cost 1<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

Extended Bare<br />

Labor Cost ($)<br />

163,632<br />

17,575<br />

$56,847<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$26,406<br />

$2,641<br />

$17,428<br />

$5,809<br />

$6,971<br />

N/A<br />

$79,219<br />

$7,922<br />

Totals: $29,047 $87,141<br />

Total Project Cost: $146,396<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $146,396<br />

Rebate/Incentive*:<br />

$56,847<br />

Net Project Cost: $89,549<br />

Net Simple Payback Period (yrs): 3.7<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

273,300<br />

0<br />

$24,050<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: Monitoring Based Commissioning<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: DENTISTRY<br />

Building Key: 04C4334<br />

Basic Gross Area (sf): 204,369<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3154<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

386,257<br />

44.0<br />

41,487<br />

Equipment Description Qty<br />

SEP MBCx Analysis MZ 080326 Final.Checked by LCK.xls<br />

Project Description Reference(s): Monitoring Based Commission for All SEP Buildings.<br />

Estimated Construction Cost 1<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

Extended Bare<br />

Labor Cost ($)<br />

386,257<br />

41,487<br />

$134,189<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$62,333<br />

$6,233<br />

$41,140<br />

$13,713<br />

$16,456<br />

N/A<br />

$186,998<br />

$18,700<br />

Totals: $68,566 $205,698<br />

Total Project Cost: $345,573<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $345,573<br />

Rebate/Incentive*:<br />

$134,189<br />

Net Project Cost: $211,384<br />

Net Simple Payback Period (yrs): 3.7<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

645,136<br />

0<br />

$56,772<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: Monitoring Based Commissioning<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: SCHOENBERG<br />

Building Key: 04C4335<br />

Basic Gross Area (sf): 122,552<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3156<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

94,365<br />

11.0<br />

12,868<br />

Equipment Description Qty<br />

SEP MBCx Analysis MZ 080326 Final.Checked by LCK.xls<br />

Project Description Reference(s): Monitoring Based Commission for All SEP Buildings.<br />

Estimated Construction Cost 1<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

94,365<br />

12,868<br />

Extended Bare<br />

Labor Cost ($)<br />

$35,516<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$18,689<br />

$1,869<br />

$12,335<br />

$4,112<br />

$4,934<br />

N/A<br />

$56,068<br />

$5,607<br />

Totals: $20,558 $61,675<br />

Total Project Cost: $103,613<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $103,613<br />

Rebate/Incentive*:<br />

$35,516<br />

Net Project Cost: $68,097<br />

Net Simple Payback Period (yrs): 4.4<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

174,661<br />

0<br />

$15,370<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: Monitoring Based Commissioning<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: FACTOR<br />

Building Key: 04C4336<br />

Basic Gross Area (sf): 199,857<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3158<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

377,730<br />

43.0<br />

40,571<br />

Equipment Description Qty<br />

SEP MBCx Analysis MZ 080326 Final.Checked by LCK.xls<br />

Project Description Reference(s): Monitoring Based Commission for All SEP Buildings.<br />

Estimated Construction Cost 1<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

Extended Bare<br />

Labor Cost ($)<br />

377,730<br />

40,571<br />

$131,226<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$60,956<br />

$6,096<br />

$40,231<br />

$13,410<br />

$16,092<br />

N/A<br />

$182,869<br />

$18,287<br />

Totals: $67,052 $201,156<br />

Total Project Cost: $337,941<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $337,941<br />

Rebate/Incentive*:<br />

$131,226<br />

Net Project Cost: $206,715<br />

Net Simple Payback Period (yrs): 3.7<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

630,893<br />

0<br />

$55,519<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: Monitoring Based Commissioning<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: MATH SCIENCE<br />

Building Key: 04C4359<br />

Basic Gross Area (sf): 224,078<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3164<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

423,507<br />

48.0<br />

45,488<br />

Equipment Description Qty<br />

SEP MBCx Analysis MZ 080326 Final.Checked by LCK.xls<br />

Project Description Reference(s): Monitoring Based Commission for All SEP Buildings.<br />

Estimated Construction Cost 1<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

Extended Bare<br />

Labor Cost ($)<br />

423,507<br />

45,488<br />

$147,130<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$68,344<br />

$6,834<br />

$45,107<br />

$15,036<br />

$18,043<br />

N/A<br />

$205,031<br />

$20,503<br />

Totals: $75,178 $225,534<br />

Total Project Cost: $378,898<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $378,898<br />

Rebate/Incentive*:<br />

$147,130<br />

Net Project Cost: $231,768<br />

Net Simple Payback Period (yrs): 3.7<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

707,352<br />

0<br />

$62,247<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: Monitoring Based Commissioning<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: KNUDSEN HALL<br />

Building Key: 04C4363<br />

Basic Gross Area (sf): 164,702<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3168<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

311,287<br />

36.0<br />

33,435<br />

Equipment Description Qty<br />

SEP MBCx Analysis MZ 080326 Final.Checked by LCK.xls<br />

Project Description Reference(s): Monitoring Based Commission for All SEP Buildings.<br />

Estimated Construction Cost 1<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

Extended Bare<br />

Labor Cost ($)<br />

311,287<br />

33,435<br />

$108,144<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$50,234<br />

$5,023<br />

$33,154<br />

$11,051<br />

$13,262<br />

N/A<br />

$150,702<br />

$15,070<br />

Totals: $55,257 $165,772<br />

Total Project Cost: $278,497<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $278,497<br />

Rebate/Incentive*:<br />

$108,144<br />

Net Project Cost: $170,353<br />

Net Simple Payback Period (yrs): 3.7<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

519,921<br />

0<br />

$45,753<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: Monitoring Based Commissioning<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: BOYER HALL<br />

Building Key: 04C4403<br />

Basic Gross Area (sf): 133,042<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3172<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

251,449<br />

29.0<br />

27,008<br />

Equipment Description Qty<br />

SEP MBCx Analysis MZ 080326 Final.Checked by LCK.xls<br />

Project Description Reference(s): Monitoring Based Commission for All SEP Buildings.<br />

Estimated Construction Cost 1<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

Extended Bare<br />

Labor Cost ($)<br />

251,449<br />

27,008<br />

$87,356<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$40,578<br />

$4,058<br />

$26,781<br />

$8,927<br />

$10,713<br />

N/A<br />

$121,733<br />

$12,173<br />

Totals: $44,636 $133,906<br />

Total Project Cost: $224,963<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $224,963<br />

Rebate/Incentive*:<br />

$87,356<br />

Net Project Cost: $137,607<br />

Net Simple Payback Period (yrs): 3.7<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

419,979<br />

0<br />

$36,958<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: Monitoring Based Commissioning<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: MELNITZ HALL<br />

Building Key: 04C4577A<br />

Basic Gross Area (sf): 61,827<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3176<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

47,607<br />

5.0<br />

6,492<br />

Equipment Description Qty<br />

SEP MBCx Analysis MZ 080326 Final.Checked by LCK.xls<br />

Project Description Reference(s): Monitoring Based Commission for All SEP Buildings.<br />

Estimated Construction Cost 1<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

47,607<br />

6,492<br />

Extended Bare<br />

Labor Cost ($)<br />

$17,918<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$9,429<br />

$943<br />

$6,223<br />

$2,074<br />

$2,489<br />

N/A<br />

$28,286<br />

$2,829<br />

Totals: $10,372 $31,115<br />

Total Project Cost: $52,273<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $52,273<br />

Rebate/Incentive*:<br />

$17,918<br />

Net Project Cost: $34,355<br />

Net Simple Payback Period (yrs): 4.4<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.<br />

88,117<br />

0<br />

$7,754


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: Monitoring Based Commissioning<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: MACGOWAN<br />

Building Key: 04C4578<br />

Basic Gross Area (sf): 129,542<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3178<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

99,747<br />

11.0<br />

13,602<br />

Equipment Description Qty<br />

SEP MBCx Analysis MZ 080326 Final.Checked by LCK.xls<br />

Project Description Reference(s): Monitoring Based Commission for All SEP Buildings.<br />

Estimated Construction Cost 1<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

99,747<br />

13,602<br />

Extended Bare<br />

Labor Cost ($)<br />

$37,541<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$19,755<br />

$1,976<br />

$13,038<br />

$4,346<br />

$5,215<br />

N/A<br />

$59,265<br />

$5,927<br />

Totals: $21,731 $65,192<br />

Total Project Cost: $109,522<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $109,522<br />

Rebate/Incentive*:<br />

$37,541<br />

Net Project Cost: $71,981<br />

Net Simple Payback Period (yrs): 4.4<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

184,623<br />

0<br />

$16,247<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: Monitoring Based Commissioning<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: PUBLIC AFFAIRS<br />

Building Key: 04C4579<br />

Basic Gross Area (sf): 201,667<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3180<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

155,284<br />

18.0<br />

21,175<br />

Equipment Description Qty<br />

SEP MBCx Analysis MZ 080326 Final.Checked by LCK.xls<br />

Project Description Reference(s): Monitoring Based Commission for All SEP Buildings.<br />

Estimated Construction Cost 1<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

Extended Bare<br />

Labor Cost ($)<br />

155,284<br />

21,175<br />

$58,443<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$30,754<br />

$3,075<br />

$20,298<br />

$6,766<br />

$8,119<br />

N/A<br />

$92,263<br />

$9,226<br />

Totals: $33,829 $101,489<br />

Total Project Cost: $170,502<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $170,502<br />

Rebate/Incentive*:<br />

$58,443<br />

Net Project Cost: $112,059<br />

Net Simple Payback Period (yrs): 4.4<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

287,416<br />

0<br />

$25,293<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: Monitoring Based Commissioning<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: WARREN HALL<br />

Building Key: 04C4581<br />

Basic Gross Area (sf): 102,205<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3183<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

193,167<br />

22.0<br />

20,748<br />

Equipment Description Qty<br />

SEP MBCx Analysis MZ 080326 Final.Checked by LCK.xls<br />

Project Description Reference(s): Monitoring Based Commission for All SEP Buildings.<br />

Estimated Construction Cost 1<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

Extended Bare<br />

Labor Cost ($)<br />

193,167<br />

20,748<br />

$67,108<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$31,173<br />

$3,117<br />

$20,574<br />

$6,858<br />

$8,230<br />

N/A<br />

$93,518<br />

$9,352<br />

Totals: $34,290 $102,870<br />

Total Project Cost: $172,822<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $172,822<br />

Rebate/Incentive*:<br />

$67,108<br />

Net Project Cost: $105,714<br />

Net Simple Payback Period (yrs): 3.7<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

322,635<br />

0<br />

$28,392<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: Monitoring Based Commissioning<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: REHAB CENTER<br />

Building Key: 04C4594<br />

Basic Gross Area (sf): 142,566<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3185<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

269,450<br />

31.0<br />

28,941<br />

Equipment Description Qty<br />

SEP MBCx Analysis MZ 080326 Final.Checked by LCK.xls<br />

Project Description Reference(s): Monitoring Based Commission for All SEP Buildings.<br />

Estimated Construction Cost 1<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

Extended Bare<br />

Labor Cost ($)<br />

269,450<br />

28,941<br />

$93,609<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$43,483<br />

$4,348<br />

$28,699<br />

$9,566<br />

$11,479<br />

N/A<br />

$130,448<br />

$13,045<br />

Totals: $47,831 $143,493<br />

Total Project Cost: $241,068<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $241,068<br />

Rebate/Incentive*:<br />

$93,609<br />

Net Project Cost: $147,459<br />

Net Simple Payback Period (yrs): 3.7<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

450,042<br />

0<br />

$39,604<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: Replace 600 additional stairwell light fixtures with bi-level fixtures<br />

with occupancy sensors in campus buildings<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: CAMPUSWIDE<br />

Building Key: 04CWIDE<br />

Basic Gross Area (sf):<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3192<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

210,000<br />

Equipment Description Qty<br />

<strong>Campus</strong>wide Bi-level Stairwell Lighting Custom Calc AML Checked TLH.xls<br />

Project Description Reference(s): Lighting Project 3. Stairwell Lighting.<br />

0.0<br />

0<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

Extended Bare<br />

Labor Cost ($)<br />

210,000<br />

0<br />

$50,400<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

Stairwell Fixture 600 $90.00 $55,350 $135.00 $90,801<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

Raw Costs:<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

$55,350 $90,801<br />

$4,566<br />

$7,190<br />

$67,106<br />

$6,711<br />

$27,853<br />

$9,284<br />

$11,141<br />

N/A<br />

$10,896<br />

$101,697<br />

$10,170<br />

Totals: $73,817 $111,867<br />

Total Project Cost: $233,962<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $233,962<br />

Rebate/Incentive*:<br />

$50,400<br />

Net Project Cost: $183,562<br />

Net Simple Payback Period (yrs): 9.9<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

210,000<br />

0<br />

$18,480<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: Retrofit existing 175-watt suspended metal halide fixtures with<br />

ceramic metal halide and replace quartz floods with fluorescent T5HO<br />

wall washes<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: ACKERMAN<br />

Building Key: 04C4582<br />

Basic Gross Area (sf): 213,143<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3193<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

222,825<br />

42.0<br />

Equipment Description Qty<br />

<strong>UC</strong>LA Ackerman Bookstore SEP Custom Calculation.xls<br />

Project Description Reference(s): Lighting Project 5. Parking Garage and Outdoor Pole Lighting.<br />

0<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

Extended Bare<br />

Labor Cost ($)<br />

222,825<br />

0<br />

$53,478<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

100-watt CMH kit 300 $175.00 $53,813 $150.00 $50,445<br />

48-watt T5HO wall washer (24") 20 $100.00 $2,050 $80.00 $1,794<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

Raw Costs:<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

$55,863 $52,239<br />

$4,609<br />

$7,257<br />

$67,728<br />

$6,773<br />

$20,829<br />

$6,943<br />

$8,332<br />

N/A<br />

$6,269<br />

$58,507<br />

$5,851<br />

Totals: $74,500 $64,358<br />

Total Project Cost: $174,962<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $174,962<br />

Rebate/Incentive*:<br />

$53,478<br />

Net Project Cost: $121,484<br />

Net Simple Payback Period (yrs): 6.2<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

222,825<br />

0<br />

$19,609<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: Retrofit kitchen fixtures from F40T12 lamps with magnetic ballasts to<br />

F32T8 (28-watt) lamps with RLO electronic ballasts<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: FACULTY CTR<br />

Building Key: 04C4261<br />

Basic Gross Area (sf): 30,573<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3194<br />

<strong>UC</strong>LA Faculty <strong>Center</strong> SEP Custom Calc.NAM.xls<br />

Project Description Reference(s): Lighting Project 1. Interior Linear Fluorescent Lighting.<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

7,425<br />

Equipment Description Qty<br />

2.0<br />

0<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

7,425<br />

0<br />

$1,782<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

Extended Bare<br />

Labor Cost ($)<br />

2L 2F32T8 (28-watt) retrofit 50 $17.80 $912 $25.00 $1,401<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

Raw Costs:<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

$912 $1,401<br />

$75<br />

$119<br />

$1,106<br />

$111<br />

$441<br />

$147<br />

$177<br />

N/A<br />

$168<br />

$1,569<br />

$157<br />

Totals: $1,217 $1,726<br />

Total Project Cost: $3,708<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $3,708<br />

Rebate/Incentive*:<br />

$1,782<br />

Net Project Cost: $1,926<br />

Net Simple Payback Period (yrs): 2.9<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.<br />

7,425<br />

0<br />

$653<br />

Backup


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: Replace high pressure sodium fixtures with induction fixtures and<br />

install photocell control where appropriate<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: PARKG ST CHS<br />

Building Key: 04C4211<br />

Basic Gross Area (sf): 652,811<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3195<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

195,795<br />

22.0<br />

Equipment Description Qty<br />

<strong>UC</strong>LA Parking Structures SEP Custom Calc NAM 051208.xls<br />

Project Description Reference(s): Lighting Project 5. Parking Garage and Outdoor Pole Lighting.<br />

85-watt Induction Fixture 217<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

0<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

Extended Bare<br />

Labor Cost ($)<br />

195,795<br />

0<br />

$46,991<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$79,357<br />

$7,936<br />

$16,841<br />

$5,614<br />

$6,736<br />

N/A<br />

$22,709<br />

$2,271<br />

Totals: $87,293 $24,980<br />

Total Project Cost: $141,463<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $141,463<br />

Rebate/Incentive*:<br />

$46,991<br />

Net Project Cost: $94,472<br />

Net Simple Payback Period (yrs): 5.5<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

195,795<br />

0<br />

$17,230<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: Replace high pressure sodium fixtures with induction fixtures and<br />

install photocell control where appropriate<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: PARKG STR DD<br />

Building Key: 04C4490<br />

Basic Gross Area (sf): 98,834<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3196<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

44,212<br />

Equipment Description Qty<br />

<strong>UC</strong>LA Parking Structures SEP Custom Calc NAM 051208.xls<br />

Project Description Reference(s): Lighting Project 5. Parking Garage and Outdoor Pole Lighting.<br />

85-watt Induction Fixture 49<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

5.0<br />

0<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

44,212<br />

0<br />

Extended Bare<br />

Labor Cost ($)<br />

$10,611<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$17,919<br />

$1,792<br />

$3,803<br />

$1,268<br />

$1,521<br />

N/A<br />

$5,128<br />

$513<br />

Totals: $19,711 $5,641<br />

Total Project Cost: $31,943<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $31,943<br />

Rebate/Incentive*:<br />

$10,611<br />

Net Project Cost: $21,332<br />

Net Simple Payback Period (yrs): 5.5<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.<br />

44,212<br />

0<br />

$3,891


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: Replace high pressure sodium fixtures with induction fixtures and<br />

install photocell control where appropriate<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: PARKG STR RC<br />

Building Key: 04C4301<br />

Basic Gross Area (sf): 55,861<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3197<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

26,166<br />

Equipment Description Qty<br />

<strong>UC</strong>LA Parking Structures SEP Custom Calc NAM 051208.xls<br />

Project Description Reference(s): Lighting Project 5. Parking Garage and Outdoor Pole Lighting.<br />

85-watt Induction Fixture 29<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

3.0<br />

0<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

26,166<br />

0<br />

$6,280<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$10,605<br />

$1,061<br />

$2,251<br />

$750<br />

$900<br />

Extended Bare<br />

Labor Cost ($)<br />

N/A<br />

$3,035<br />

$303<br />

Totals: $11,666 $3,338<br />

Total Project Cost: $18,905<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $18,905<br />

Rebate/Incentive*:<br />

$6,280<br />

Net Project Cost: $12,625<br />

Net Simple Payback Period (yrs): 5.5<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.<br />

26,166<br />

0<br />

$2,303<br />

Backup


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: Replace high pressure sodium fixtures with induction fixtures and<br />

install photocell control where appropriate<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: COURTSIDE/PK<br />

Building Key: 04C4302C<br />

Basic Gross Area (sf): 364,888<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3198<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

175,042<br />

20.0<br />

Equipment Description Qty<br />

<strong>UC</strong>LA Parking Structures SEP Custom Calc NAM 051208.xls<br />

Project Description Reference(s): Lighting Project 5. Parking Garage and Outdoor Pole Lighting.<br />

85-watt Induction Fixture 194<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

0<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

Extended Bare<br />

Labor Cost ($)<br />

175,042<br />

0<br />

$42,010<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$70,946<br />

$7,095<br />

$15,056<br />

$5,019<br />

$6,022<br />

N/A<br />

$20,302<br />

$2,030<br />

Totals: $78,040 $22,332<br />

Total Project Cost: $126,470<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $126,470<br />

Rebate/Incentive*:<br />

$42,010<br />

Net Project Cost: $84,460<br />

Net Simple Payback Period (yrs): 5.5<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

175,042<br />

0<br />

$15,404<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: Replace high pressure sodium fixtures with induction fixtures and<br />

install photocell control where appropriate<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: PARKG STR 32<br />

Building Key: 04C4263<br />

Basic Gross Area (sf): 308,410<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3199<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

154,290<br />

18.0<br />

Equipment Description Qty<br />

<strong>UC</strong>LA Parking Structures SEP Custom Calc NAM 051208.xls<br />

Project Description Reference(s): Lighting Project 5. Parking Garage and Outdoor Pole Lighting.<br />

85-watt Induction Fixture 171<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

0<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

Extended Bare<br />

Labor Cost ($)<br />

154,290<br />

0<br />

$37,030<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$62,535<br />

$6,253<br />

$13,271<br />

$4,424<br />

$5,308<br />

N/A<br />

$17,895<br />

$1,790<br />

Totals: $68,788 $19,685<br />

Total Project Cost: $111,476<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $111,476<br />

Rebate/Incentive*:<br />

$37,030<br />

Net Project Cost: $74,446<br />

Net Simple Payback Period (yrs): 5.5<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

154,290<br />

0<br />

$13,578<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: Replace high pressure sodium fixtures with induction fixtures and<br />

install photocell control where appropriate<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: PARKG STR 1<br />

Building Key: 04C4342<br />

Basic Gross Area (sf): 1,008,954<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3200<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

632,498<br />

72.0<br />

Equipment Description Qty<br />

<strong>UC</strong>LA Parking Structures SEP Custom Calc NAM 051208.xls<br />

Project Description Reference(s): Lighting Project 5. Parking Garage and Outdoor Pole Lighting.<br />

85-watt Induction Fixture 701<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

0<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

Extended Bare<br />

Labor Cost ($)<br />

632,498<br />

0<br />

$151,800<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$256,356<br />

$25,636<br />

$54,403<br />

$18,134<br />

$21,761<br />

N/A<br />

$73,360<br />

$7,336<br />

Totals: $281,991 $80,696<br />

Total Project Cost: $456,985<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $456,985<br />

Rebate/Incentive*:<br />

$151,800<br />

Net Project Cost: $305,185<br />

Net Simple Payback Period (yrs): 5.5<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

632,498<br />

0<br />

$55,660<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: Replace high pressure sodium fixtures with induction fixtures and<br />

install photocell control where appropriate<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: PARKG STR 2<br />

Building Key: 04C4210<br />

Basic Gross Area (sf): 771,328<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3201<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

468,283<br />

53.0<br />

Equipment Description Qty<br />

<strong>UC</strong>LA Parking Structures SEP Custom Calc NAM 051208.xls<br />

Project Description Reference(s): Lighting Project 5. Parking Garage and Outdoor Pole Lighting.<br />

85-watt Induction Fixture 519<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

0<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

Extended Bare<br />

Labor Cost ($)<br />

468,283<br />

0<br />

$112,388<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$189,798<br />

$18,980<br />

$40,278<br />

$13,426<br />

$16,111<br />

N/A<br />

$54,313<br />

$5,431<br />

Totals: $208,778 $59,745<br />

Total Project Cost: $338,339<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $338,339<br />

Rebate/Incentive*:<br />

$112,388<br />

Net Project Cost: $225,951<br />

Net Simple Payback Period (yrs): 5.5<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

468,283<br />

0<br />

$41,209<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: Replace high pressure sodium fixtures with induction fixtures and<br />

install photocell control where appropriate<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: PARKG STR 3<br />

Building Key: 04C4207<br />

Basic Gross Area (sf): 412,864<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3202<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

247,225<br />

28.0<br />

Equipment Description Qty<br />

<strong>UC</strong>LA Parking Structures SEP Custom Calc NAM 051208.xls<br />

Project Description Reference(s): Lighting Project 5. Parking Garage and Outdoor Pole Lighting.<br />

85-watt Induction Fixture 274<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

0<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

Extended Bare<br />

Labor Cost ($)<br />

247,225<br />

0<br />

$59,334<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$100,202<br />

$10,020<br />

$21,265<br />

$7,088<br />

$8,506<br />

N/A<br />

$28,674<br />

$2,867<br />

Totals: $110,222 $31,542<br />

Total Project Cost: $178,622<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $178,622<br />

Rebate/Incentive*:<br />

$59,334<br />

Net Project Cost: $119,288<br />

Net Simple Payback Period (yrs): 5.5<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

247,225<br />

0<br />

$21,756<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: Replace high pressure sodium fixtures with induction fixtures and<br />

install photocell control where appropriate<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: WOODEN/PS4<br />

Building Key: 04C4235<br />

Basic Gross Area (sf): 707,839<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3203<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

397,003<br />

45.0<br />

Equipment Description Qty<br />

<strong>UC</strong>LA Parking Structures SEP Custom Calc NAM 051208.xls<br />

Project Description Reference(s): Lighting Project 5. Parking Garage and Outdoor Pole Lighting.<br />

85-watt Induction Fixture 440<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

0<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

Extended Bare<br />

Labor Cost ($)<br />

397,003<br />

0<br />

$95,281<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$160,908<br />

$16,091<br />

$34,147<br />

$11,382<br />

$13,659<br />

N/A<br />

$46,046<br />

$4,605<br />

Totals: $176,999 $50,651<br />

Total Project Cost: $286,838<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $286,838<br />

Rebate/Incentive*:<br />

$95,281<br />

Net Project Cost: $191,557<br />

Net Simple Payback Period (yrs): 5.5<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

397,003<br />

0<br />

$34,936<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: Replace high pressure sodium fixtures with induction fixtures and<br />

install photocell control where appropriate<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: PARKG STR 5<br />

Building Key: 04C4587<br />

Basic Gross Area (sf): 339,631<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3204<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

115,041<br />

13.0<br />

Equipment Description Qty<br />

<strong>UC</strong>LA Parking Structures SEP Custom Calc NAM 051208.xls<br />

Project Description Reference(s): Lighting Project 5. Parking Garage and Outdoor Pole Lighting.<br />

85-watt Induction Fixture 128<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

0<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

Extended Bare<br />

Labor Cost ($)<br />

115,041<br />

0<br />

$27,610<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$46,810<br />

$4,681<br />

$9,934<br />

$3,311<br />

$3,974<br />

N/A<br />

$13,395<br />

$1,340<br />

Totals: $51,491 $14,735<br />

Total Project Cost: $83,444<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $83,444<br />

Rebate/Incentive*:<br />

$27,610<br />

Net Project Cost: $55,834<br />

Net Simple Payback Period (yrs): 5.5<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

115,041<br />

0<br />

$10,124<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: Replace high pressure sodium fixtures with induction fixtures and<br />

install photocell control where appropriate<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: PARKG STR 6<br />

Building Key: 04C4219<br />

Basic Gross Area (sf): 282,212<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3205<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

165,117<br />

19.0<br />

Equipment Description Qty<br />

<strong>UC</strong>LA Parking Structures SEP Custom Calc NAM 051208.xls<br />

Project Description Reference(s): Lighting Project 5. Parking Garage and Outdoor Pole Lighting.<br />

85-watt Induction Fixture 183<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

0<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

Extended Bare<br />

Labor Cost ($)<br />

165,117<br />

0<br />

$39,628<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$66,923<br />

$6,692<br />

$14,202<br />

$4,734<br />

$5,681<br />

N/A<br />

$19,151<br />

$1,915<br />

Totals: $73,615 $21,066<br />

Total Project Cost: $119,299<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $119,299<br />

Rebate/Incentive*:<br />

$39,628<br />

Net Project Cost: $79,671<br />

Net Simple Payback Period (yrs): 5.5<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

165,117<br />

0<br />

$14,530<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: Replace high pressure sodium fixtures with induction fixtures and<br />

install photocell control where appropriate<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: PARKG STR 7<br />

Building Key: 04C4322<br />

Basic Gross Area (sf): 508,306<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3206<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

369,935<br />

42.0<br />

Equipment Description Qty<br />

<strong>UC</strong>LA Parking Structures SEP Custom Calc NAM 051208.xls<br />

Project Description Reference(s): Lighting Project 5. Parking Garage and Outdoor Pole Lighting.<br />

85-watt Induction Fixture 410<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

0<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

Extended Bare<br />

Labor Cost ($)<br />

369,935<br />

0<br />

$88,784<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$149,937<br />

$14,994<br />

$31,819<br />

$10,606<br />

$12,728<br />

N/A<br />

$42,907<br />

$4,291<br />

Totals: $164,931 $47,197<br />

Total Project Cost: $267,281<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $267,281<br />

Rebate/Incentive*:<br />

$88,784<br />

Net Project Cost: $178,497<br />

Net Simple Payback Period (yrs): 5.5<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

369,935<br />

0<br />

$32,554<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: Replace high pressure sodium fixtures with induction fixtures and<br />

install photocell control where appropriate<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: PARKG STR 8<br />

Building Key: 04C4209<br />

Basic Gross Area (sf): 990,564<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3207<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

642,423<br />

73.0<br />

Equipment Description Qty<br />

<strong>UC</strong>LA Parking Structures SEP Custom Calc NAM 051208.xls<br />

Project Description Reference(s): Lighting Project 5. Parking Garage and Outdoor Pole Lighting.<br />

85-watt Induction Fixture 712<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

0<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

Extended Bare<br />

Labor Cost ($)<br />

642,423<br />

0<br />

$154,182<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$260,378<br />

$26,038<br />

$55,257<br />

$18,419<br />

$22,103<br />

N/A<br />

$74,511<br />

$7,451<br />

Totals: $286,416 $81,962<br />

Total Project Cost: $464,156<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $464,156<br />

Rebate/Incentive*:<br />

$154,182<br />

Net Project Cost: $309,974<br />

Net Simple Payback Period (yrs): 5.5<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

642,423<br />

0<br />

$56,533<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: Replace high pressure sodium fixtures with induction fixtures and<br />

install photocell control where appropriate<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: PARKG STR 9<br />

Building Key: 04C4208<br />

Basic Gross Area (sf): 678,618<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3208<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

382,567<br />

44.0<br />

Equipment Description Qty<br />

<strong>UC</strong>LA Parking Structures SEP Custom Calc NAM 051208.xls<br />

Project Description Reference(s): Lighting Project 5. Parking Garage and Outdoor Pole Lighting.<br />

85-watt Induction Fixture 424<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

0<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

Extended Bare<br />

Labor Cost ($)<br />

382,567<br />

0<br />

$91,816<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$155,057<br />

$15,506<br />

$32,906<br />

$10,969<br />

$13,162<br />

N/A<br />

$44,372<br />

$4,437<br />

Totals: $170,562 $48,809<br />

Total Project Cost: $276,408<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $276,408<br />

Rebate/Incentive*:<br />

$91,816<br />

Net Project Cost: $184,592<br />

Net Simple Payback Period (yrs): 5.5<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

382,567<br />

0<br />

$33,666<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: Replace high pressure sodium fixtures with induction fixtures and<br />

install photocell control where appropriate<br />

<strong>Campus</strong>: LOS ANGELES MC<br />

Location: LOS ANGELES MED CTR - WESTWOO<br />

Building: PARKG STR E<br />

Building Key: 04C4332H<br />

Basic Gross Area (sf): 95,116<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3209<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

38,798<br />

Equipment Description Qty<br />

<strong>UC</strong>LA Parking Structures SEP Custom Calc NAM 051208.xls<br />

Project Description Reference(s): Lighting Project 5. Parking Garage and Outdoor Pole Lighting.<br />

85-watt Induction Fixture 43<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

4.0<br />

0<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

25.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

38,798<br />

0<br />

$9,312<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$15,725<br />

$3,931<br />

$3,792<br />

$1,264<br />

$1,517<br />

Extended Bare<br />

Labor Cost ($)<br />

N/A<br />

$4,500<br />

$1,125<br />

Totals: $19,656 $5,625<br />

Total Project Cost: $31,854<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $31,854<br />

Rebate/Incentive*:<br />

$9,312<br />

Net Project Cost: $22,542<br />

Net Simple Payback Period (yrs): 6.6<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.<br />

38,798<br />

0<br />

$3,414<br />

Backup


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: Retrofit gym HID fixtures with Pulse Start Metal Halide lamps<br />

w/electronic ballasts<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: PAULEY<br />

Building Key: 04C4204<br />

Basic Gross Area (sf): 204,465<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3210<br />

<strong>UC</strong>LA Pauley Arena SEP Custom Calc.NAM.xls<br />

Project Description Reference(s): Lighting Project 4. Interior High Bay Lighting .<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

54,600<br />

Equipment Description Qty<br />

8.0<br />

0<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

54,600<br />

0<br />

Extended Bare<br />

Labor Cost ($)<br />

$13,104<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

875-watt PSMH retrofit kit 60 $175.00 $10,763 $250.00 $16,815<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

Raw Costs:<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

$10,763 $16,815<br />

$888<br />

$1,398<br />

$13,048<br />

$1,305<br />

$5,260<br />

$1,753<br />

$2,104<br />

N/A<br />

$2,018<br />

$18,833<br />

$1,883<br />

Totals: $14,353 $20,716<br />

Total Project Cost: $44,187<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $44,187<br />

Rebate/Incentive*:<br />

$13,104<br />

Net Project Cost: $31,083<br />

Net Simple Payback Period (yrs): 6.5<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.<br />

54,600<br />

0<br />

$4,805


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: SAC Pool: Variable Speed Circulation Pumps<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: CAMPUSWIDE<br />

Building Key: 04CWIDE<br />

Basic Gross Area (sf):<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3211<br />

<strong>UC</strong>LA Pools 051208 AML.xls<br />

Project Description Reference(s): Pool Project 1. Variable Speed Drives and High Efficiency Motors for Filter Pumps.<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

36,809<br />

Equipment Description Qty<br />

0.0<br />

0<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

36,809<br />

0<br />

$8,834<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

Extended Bare<br />

Labor Cost ($)<br />

VSD and Controls 1 $9,600.00 $9,840 $1,391.25 $1,560<br />

Premium Efficiency Motor 1 $1,225.00 $1,256 $80.00<br />

$90<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

Raw Costs:<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

$11,096 $1,649<br />

$915<br />

$1,441<br />

$13,452<br />

$1,345<br />

$2,524<br />

$841<br />

$1,010<br />

N/A<br />

$198<br />

$1,847<br />

$185<br />

Totals: $14,798 $2,032<br />

Total Project Cost: $21,205<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $21,205<br />

Rebate/Incentive*:<br />

$8,834<br />

Net Project Cost: $12,371<br />

Net Simple Payback Period (yrs): 3.8<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.<br />

36,809<br />

0<br />

$3,239<br />

Backup


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: SAC Pool: Solar Pool Water Heater<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: CAMPUSWIDE<br />

Building Key: 04CWIDE<br />

Basic Gross Area (sf):<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3212<br />

<strong>UC</strong>LA Pools 051208 AML.xls<br />

Project Description Reference(s): Pool Project 3. Solar Water Heating .<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

0<br />

0.0<br />

12,614<br />

Equipment Description Qty<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

0<br />

12,614<br />

Extended Bare<br />

Labor Cost ($)<br />

$12,614<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

Solar Water Heating System 1 $28,569.57 $29,284 $37,183.63 $41,683<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

Raw Costs:<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

$29,284 $41,683<br />

$2,416<br />

$3,804<br />

$35,504<br />

$3,550<br />

$13,561<br />

$4,520<br />

$5,424<br />

N/A<br />

$5,002<br />

$46,685<br />

$4,668<br />

Totals: $39,054 $51,353<br />

Total Project Cost: $113,913<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $113,913<br />

Rebate/Incentive*:<br />

$12,614<br />

Net Project Cost: $101,299<br />

Net Simple Payback Period (yrs): 14.6<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.<br />

78,711<br />

0<br />

$6,927


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: North Pool: Variable Speed Circulation Pumps<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: CAMPUSWIDE<br />

Building Key: 04CWIDE<br />

Basic Gross Area (sf):<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3213<br />

<strong>UC</strong>LA Pools 051208 AML.xls<br />

Project Description Reference(s): Pool Project 1. Variable Speed Drives and High Efficiency Motors for Filter Pumps.<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

54,089<br />

Equipment Description Qty<br />

0.0<br />

0<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

54,089<br />

0<br />

Extended Bare<br />

Labor Cost ($)<br />

$12,981<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

VSD and Controls 1 $7,680.00 $7,872 $1,113.00 $1,248<br />

Premium Efficiency Motor 1 $1,000.00 $1,025 $84.00<br />

$94<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

Raw Costs:<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

$8,897 $1,342<br />

$734<br />

$1,156<br />

$10,787<br />

$1,079<br />

$2,028<br />

$676<br />

$811<br />

N/A<br />

$161<br />

$1,503<br />

$150<br />

Totals: $11,865 $1,653<br />

Total Project Cost: $17,033<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $17,033<br />

Rebate/Incentive*:<br />

$12,981<br />

Net Project Cost: $4,052<br />

Net Simple Payback Period (yrs): 0.9<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.<br />

54,089<br />

0<br />

$4,760


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: Sunset Canyon Park Pool: Variable Speed Circulation Pumps<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: CAMPUSWIDE<br />

Building Key: 04CWIDE<br />

Basic Gross Area (sf):<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3214<br />

<strong>UC</strong>LA Pools 051208 AML.xls<br />

Project Description Reference(s): Pool Project 1. Variable Speed Drives and High Efficiency Motors for Filter Pumps.<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

132,655<br />

Equipment Description Qty<br />

0.0<br />

0<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

Extended Bare<br />

Labor Cost ($)<br />

132,655<br />

0<br />

$31,837<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

Premium Efficiency Motor 1 $4,350.00 $4,459 $84.00<br />

$94<br />

VSD and Controls 1 $28,800.00 $29,520 $4,173.75 $4,679<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

Raw Costs:<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

$33,979 $4,773<br />

$2,803<br />

$4,414<br />

$41,196<br />

$4,120<br />

$7,679<br />

$2,560<br />

$3,072<br />

N/A<br />

$573<br />

$5,346<br />

$535<br />

Totals: $45,315 $5,880<br />

Total Project Cost: $64,507<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $64,507<br />

Rebate/Incentive*:<br />

$31,837<br />

Net Project Cost: $32,670<br />

Net Simple Payback Period (yrs): 2.8<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

132,655<br />

0<br />

$11,674<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: Sunset Canyon Diving & Family Pools: Variable Speed Circulation<br />

Pumps<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: CAMPUSWIDE<br />

Building Key: 04CWIDE<br />

Basic Gross Area (sf):<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3215<br />

<strong>UC</strong>LA Pools 051208 AML.xls<br />

Project Description Reference(s): Pool Project 1. Variable Speed Drives and High Efficiency Motors for Filter Pumps.<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

71,539<br />

Equipment Description Qty<br />

0.0<br />

0<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

71,539<br />

0<br />

Extended Bare<br />

Labor Cost ($)<br />

$17,169<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

Premium Efficiency Motor 1 $1,425.00 $1,461 $74.50<br />

$84<br />

VSD and Controls 1 $11,520.00 $11,808 $1,669.50 $1,872<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

Raw Costs:<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

$13,269 $1,955<br />

$1,095<br />

$1,724<br />

$16,087<br />

$1,609<br />

$3,016<br />

$1,005<br />

$1,206<br />

N/A<br />

$235<br />

$2,190<br />

$219<br />

Totals: $17,696 $2,409<br />

Total Project Cost: $25,331<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $25,331<br />

Rebate/Incentive*:<br />

$17,169<br />

Net Project Cost: $8,162<br />

Net Simple Payback Period (yrs): 1.3<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.<br />

71,539<br />

0<br />

$6,295


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: Future Million-Gallon Pool at Sunset Canyon: Variable Speed<br />

Circulation Pumps<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: CAMPUSWIDE<br />

Building Key: 04CWIDE<br />

Basic Gross Area (sf):<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3216<br />

<strong>UC</strong>LA Pools 051208 AML.xls<br />

Project Description Reference(s): Pool Project 1. Variable Speed Drives and High Efficiency Motors for Filter Pumps.<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

156,488<br />

Equipment Description Qty<br />

0.0<br />

0<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

Extended Bare<br />

Labor Cost ($)<br />

156,488<br />

0<br />

$37,557<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

VSD and Controls 1 $38,400.00 $39,360 $5,565.00 $6,238<br />

Premium Efficiency Motor 1 $0.00 $0 $74.50<br />

$84<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

Raw Costs:<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

$39,360 $6,322<br />

$3,247<br />

$5,113<br />

$47,720<br />

$4,772<br />

$9,042<br />

$3,014<br />

$3,617<br />

N/A<br />

$759<br />

$7,081<br />

$708<br />

Totals: $52,492 $7,789<br />

Total Project Cost: $75,954<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $75,954<br />

Rebate/Incentive*:<br />

$37,557<br />

Net Project Cost: $38,397<br />

Net Simple Payback Period (yrs): 2.8<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

156,488<br />

0<br />

$13,771<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: Replace existing GYM HID fixtures with new fluorescent fixtures<br />

highbays w/sensors<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: SAC<br />

Building Key: 04C4360<br />

Basic Gross Area (sf): 113,383<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3217<br />

<strong>UC</strong>LA SAC Gym <strong>UC</strong> SEP Custom Calculation.NAM.xls<br />

Project Description Reference(s): Lighting Project 4. Interior High Bay Lighting .<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

113,896<br />

13.0<br />

Equipment Description Qty<br />

0<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

Extended Bare<br />

Labor Cost ($)<br />

113,896<br />

0<br />

$27,335<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

4L F54T5HO High Bay (or 6-32T8 HLO) w/sensor 56 $250.00 $14,350 $150.00 $9,416<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

Raw Costs:<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

$14,350 $9,416<br />

$1,184<br />

$1,864<br />

$17,398<br />

$1,740<br />

$4,611<br />

$1,537<br />

$1,844<br />

N/A<br />

$1,130<br />

$10,546<br />

$1,055<br />

Totals: $19,138 $11,601<br />

Total Project Cost: $38,731<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $38,731<br />

Rebate/Incentive*:<br />

$27,335<br />

Net Project Cost: $11,396<br />

Net Simple Payback Period (yrs): 1.1<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

113,896<br />

0<br />

$10,023<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: Replace gym HID and strength & conditioning fixtures with new<br />

fluorescent fixtures highbays (sensors in gyms only)<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: SAC<br />

Building Key: 04C4360<br />

Basic Gross Area (sf): 113,383<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3218<br />

<strong>UC</strong>LA Wooden Gym <strong>UC</strong> SEP Custom Calc.NAM.xls<br />

Project Description Reference(s): Lighting Project 4. Interior High Bay Lighting .<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

229,211<br />

30.0<br />

Equipment Description Qty<br />

0<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

Extended Bare<br />

Labor Cost ($)<br />

229,211<br />

0<br />

$55,011<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

4L F54T5HO High Bay (or 6-32T8 HLO) no sensor 47 $150.00 $7,226 $150.00 $7,903<br />

4L F54T5HO High Bay (or 6-32T8 HLO) w/sensor 85 $250.00 $21,781 $150.00 $14,293<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

Raw Costs:<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

$29,008 $22,196<br />

$2,393<br />

$3,768<br />

$35,169<br />

$3,517<br />

$9,905<br />

$3,302<br />

$3,962<br />

N/A<br />

$2,663<br />

$24,859<br />

$2,486<br />

Totals: $38,686 $27,345<br />

Total Project Cost: $83,199<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $83,199<br />

Rebate/Incentive*:<br />

$55,011<br />

Net Project Cost: $28,188<br />

Net Simple Payback Period (yrs): 1.4<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

229,211<br />

0<br />

$20,171<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: Retrofit all F32T8 fixtures with 28W F32 T8 lamps and RLO ballasts,<br />

and install additional occupancy sensors<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: CAMPUSWIDE<br />

Building Key: 04CWIDE<br />

Basic Gross Area (sf):<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3219<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

15,977,250<br />

4,590.0<br />

Equipment Description Qty<br />

<strong>UC</strong>LA T8 to 28W T8 Lighting Custom Calc checked JCR.xls<br />

Project Description Reference(s): Lighting Project 1. Interior Linear Fluorescent Lighting & Lighting Project 2. Interior Lighting Controls.<br />

0<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

Extended Bare<br />

Labor Cost ($)<br />

15,977,250<br />

0<br />

$3,834,540<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

2L 2F32T8 (28-watt) retrofit 270,000 $18.00 $4,981,500 $25.00 $7,566,750<br />

Occupancy Sensor 22,500 $43.00 $991,688 $53.00 $1,336,793<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

Raw Costs:<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

$5,973,188 $8,903,543<br />

$492,788<br />

$775,917<br />

$7,241,893<br />

$724,189<br />

$2,840,287<br />

$946,762<br />

$1,136,115<br />

N/A<br />

$1,068,425<br />

$9,971,968<br />

$997,197<br />

Totals: $7,966,082 $10,969,164<br />

Total Project Cost: $23,858,410<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $23,858,410<br />

Rebate/Incentive*:<br />

$3,834,540<br />

Net Project Cost: $20,023,870<br />

Net Simple Payback Period (yrs): 14.2<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

15,977,250<br />

0<br />

$1,405,998<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: Dual Duct Conversion to VAV (Cogent Report)<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: SCHOENBERG<br />

Building Key: 04C4335<br />

Basic Gross Area (sf): 122,552<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3220<br />

<strong>UC</strong>LA VAV scoping study report 04-17-2008.xlsx<br />

Project Description Reference(s): Air Handler Project 2. Convert Constant Volume Air Handlers to Variable Air Volume. Savings from Cogent<br />

Analysis, Costs from SEP Results<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

316,831<br />

0.0<br />

0<br />

198,917<br />

3,537<br />

Equipment Description Qty<br />

Estimated Cosntruction Cost 1<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr): 475,965<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

44,213<br />

Extended Bare<br />

Labor Cost ($)<br />

$158,444<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$114,167<br />

$11,417<br />

$31,396<br />

$10,465<br />

$12,558<br />

N/A<br />

$76,111<br />

$7,611<br />

Totals: $125,584 $83,723<br />

Total Project Cost: $263,726<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $263,726<br />

Rebate/Incentive*:<br />

$158,444<br />

Net Project Cost: $105,282<br />

Net Simple Payback Period (yrs): 1.8<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

680,760<br />

0<br />

$59,907<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: Dual Duct Conversion to VAV (Cogent Report)<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: PUBLIC AFFAIRS<br />

Building Key: 04C4579<br />

Basic Gross Area (sf): 201,667<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3221<br />

<strong>UC</strong>LA VAV scoping study report 04-17-2008.xlsx<br />

Project Description Reference(s): Air Handler Project 2. Convert Constant Volume Air Handlers to Variable Air Volume. Savings from Cogent<br />

Analysis, Costs from SEP Results<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

206,642<br />

0.0<br />

0<br />

69,336<br />

1,507<br />

Equipment Description Qty<br />

Estimated Cosntruction Cost 1<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr): 262,111<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

18,838<br />

Extended Bare<br />

Labor Cost ($)<br />

$81,744<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$146,786<br />

$14,679<br />

$40,366<br />

$13,455<br />

$16,146<br />

N/A<br />

$97,858<br />

$9,786<br />

Totals: $161,465 $107,643<br />

Total Project Cost: $339,076<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $339,076<br />

Rebate/Incentive*:<br />

$81,744<br />

Net Project Cost: $257,332<br />

Net Simple Payback Period (yrs): 8.3<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

350,601<br />

0<br />

$30,853<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: Dual Duct Conversion to VAV (Cogent Report)<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: MACGOWAN<br />

Building Key: 04C4578<br />

Basic Gross Area (sf): 129,542<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3222<br />

<strong>UC</strong>LA VAV scoping study report 04-17-2008.xlsx<br />

Project Description Reference(s): Air Handler Project 2. Convert Constant Volume Air Handlers to Variable Air Volume. Savings from Cogent<br />

Analysis, Costs from SEP Results<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

196,395<br />

0.0<br />

0<br />

41,057<br />

1,731<br />

Equipment Description Qty<br />

Estimated Cosntruction Cost 1<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr): 229,241<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

21,638<br />

Extended Bare<br />

Labor Cost ($)<br />

$76,655<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$130,477<br />

$13,048<br />

$35,881<br />

$11,960<br />

$14,352<br />

N/A<br />

$86,984<br />

$8,698<br />

Totals: $143,524 $95,683<br />

Total Project Cost: $301,401<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $301,401<br />

Rebate/Incentive*:<br />

$76,655<br />

Net Project Cost: $224,746<br />

Net Simple Payback Period (yrs): 7.6<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

333,970<br />

0<br />

$29,389<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: Dual Duct Conversion to VAV (Cogent Report)<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: FRANZ HALL<br />

Building Key: 04C4319<br />

Basic Gross Area (sf): 238,054<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3223<br />

<strong>UC</strong>LA VAV scoping study report 04-17-2008.xlsx<br />

Project Description Reference(s): Air Handler Project 2. Convert Constant Volume Air Handlers to Variable Air Volume. Savings from Cogent<br />

Analysis, Costs from SEP Results<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

303,182<br />

0.0<br />

0<br />

62,461<br />

1,704<br />

Equipment Description Qty<br />

Estimated Cosntruction Cost 1<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr): 353,151<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

21,300<br />

Extended Bare<br />

Labor Cost ($)<br />

$106,056<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$130,477<br />

$13,048<br />

$35,881<br />

$11,960<br />

$14,352<br />

N/A<br />

$86,984<br />

$8,698<br />

Totals: $143,524 $95,683<br />

Total Project Cost: $301,401<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $301,401<br />

Rebate/Incentive*:<br />

$106,056<br />

Net Project Cost: $195,345<br />

Net Simple Payback Period (yrs): 4.9<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

454,484<br />

0<br />

$39,995<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: Dual Duct Conversion to VAV (Cogent Report)<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: MELNITZ HALL<br />

Building Key: 04C4577A<br />

Basic Gross Area (sf): 61,827<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3224<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

56,857<br />

1.0<br />

0<br />

38,536<br />

353<br />

Equipment Description Qty<br />

<strong>UC</strong> SEP Custom Calculation - <strong>UC</strong>LA Extrapolated Savings.xls<br />

Project Description Reference(s): Air Handler Project 2. Convert Constant Volume Air Handlers to Variable Air Volume. Extrapolated from SEP<br />

Results of Similar Buildings<br />

Estimated Cosntruction Cost 1<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr): 87,686<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

4,413<br />

Extended Bare<br />

Labor Cost ($)<br />

$25,457<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$32,619<br />

$3,262<br />

$8,970<br />

$2,990<br />

$3,588<br />

N/A<br />

$21,746<br />

$2,175<br />

Totals: $35,881 $23,921<br />

Total Project Cost: $75,350<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $75,350<br />

Rebate/Incentive*:<br />

$25,457<br />

Net Project Cost: $49,893<br />

Net Simple Payback Period (yrs): 5.3<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

106,630<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.<br />

0<br />

$9,383


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: Dual Duct Conversion to VAV (Cogent Report)<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: MURPHY HALL<br />

Building Key: 04C4200<br />

Basic Gross Area (sf): 220,188<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3225<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

85,286<br />

2.0<br />

0<br />

57,805<br />

529<br />

Equipment Description Qty<br />

<strong>UC</strong> SEP Custom Calculation - <strong>UC</strong>LA Extrapolated Savings.xls<br />

Project Description Reference(s): Air Handler Project 2. Convert Constant Volume Air Handlers to Variable Air Volume. Extrapolated from SEP<br />

Results of Similar Buildings<br />

Estimated Cosntruction Cost 1<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr): 131,530<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

6,613<br />

Extended Bare<br />

Labor Cost ($)<br />

$38,180<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$48,929<br />

$4,893<br />

$13,455<br />

$4,485<br />

$5,382<br />

N/A<br />

$32,619<br />

$3,262<br />

Totals: $53,822 $35,881<br />

Total Project Cost: $113,025<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $113,025<br />

Rebate/Incentive*:<br />

$38,180<br />

Net Project Cost: $74,845<br />

Net Simple Payback Period (yrs): 5.3<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

159,915<br />

0<br />

$14,073<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: Dual Duct Conversion to VAV (Cogent Report)<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: REHAB CENTER<br />

Building Key: 04C4594<br />

Basic Gross Area (sf): 142,566<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3226<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

933,037<br />

23.0<br />

0<br />

360,343<br />

7,320<br />

Equipment Description Qty<br />

<strong>UC</strong> SEP Custom Calculation - <strong>UC</strong>LA Extrapolated Savings.xls<br />

Project Description Reference(s): Air Handler Project 2. Convert Constant Volume Air Handlers to Variable Air Volume. Extrapolated from SEP<br />

Results of Similar Buildings<br />

Estimated Cosntruction Cost 1<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr): 1,221,311<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

91,500<br />

Extended Bare<br />

Labor Cost ($)<br />

$384,615<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$163,096<br />

$16,310<br />

$44,851<br />

$14,950<br />

$17,941<br />

N/A<br />

$108,731<br />

$10,873<br />

Totals: $179,406 $119,604<br />

Total Project Cost: $376,752<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $376,752<br />

Rebate/Incentive*:<br />

$301,401<br />

Net Project Cost: $75,350<br />

Net Simple Payback Period (yrs): 0.5<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

1,649,252<br />

0<br />

$145,134<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: Dual Duct Conversion to VAV (Cogent Report)<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: BOYER HALL<br />

Building Key: 04C4403<br />

Basic Gross Area (sf): 133,042<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3227<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

272,885<br />

7.0<br />

0<br />

123,664<br />

3,642<br />

Equipment Description Qty<br />

<strong>UC</strong> SEP Custom Calculation - <strong>UC</strong>LA Extrapolated Savings.xls<br />

Project Description Reference(s): Air Handler Project 2. Convert Constant Volume Air Handlers to Variable Air Volume. Extrapolated from SEP<br />

Results of Similar Buildings<br />

Estimated Cosntruction Cost 1<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr): 371,816<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

45,525<br />

Extended Bare<br />

Labor Cost ($)<br />

$134,761<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$114,167<br />

$11,417<br />

$31,396<br />

$10,465<br />

$12,558<br />

N/A<br />

$76,111<br />

$7,611<br />

Totals: $125,584 $83,723<br />

Total Project Cost: $263,726<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $263,726<br />

Rebate/Incentive*:<br />

$134,761<br />

Net Project Cost: $128,965<br />

Net Simple Payback Period (yrs): 2.5<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

589,184<br />

0<br />

$51,848<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: Dual Duct Conversion to VAV (Cogent Report)<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: BRAIN RSCH<br />

Building Key: 04C4332B<br />

Basic Gross Area (sf): 86,578<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3228<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

467,804<br />

13.0<br />

0<br />

211,996<br />

6,244<br />

Equipment Description Qty<br />

<strong>UC</strong> SEP Custom Calculation - <strong>UC</strong>LA Extrapolated Savings.xls<br />

Project Description Reference(s): Air Handler Project 2. Convert Constant Volume Air Handlers to Variable Air Volume. Extrapolated from SEP<br />

Results of Similar Buildings<br />

Estimated Cosntruction Cost 1<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr): 637,401<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

78,050<br />

Extended Bare<br />

Labor Cost ($)<br />

$231,026<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$195,715<br />

$19,572<br />

$53,822<br />

$17,941<br />

$21,529<br />

N/A<br />

$130,477<br />

$13,048<br />

Totals: $215,287 $143,524<br />

Total Project Cost: $452,102<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $452,102<br />

Rebate/Incentive*:<br />

$231,026<br />

Net Project Cost: $221,076<br />

Net Simple Payback Period (yrs): 2.5<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

1,010,067<br />

0<br />

$88,886<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: Dual Duct Conversion to VAV (Cogent Report)<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: DENTISTRY<br />

Building Key: 04C4334<br />

Basic Gross Area (sf): 204,369<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3229<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

350,853<br />

10.0<br />

0<br />

158,997<br />

4,683<br />

Equipment Description Qty<br />

<strong>UC</strong> SEP Custom Calculation - <strong>UC</strong>LA Extrapolated Savings.xls<br />

Project Description Reference(s): Air Handler Project 2. Convert Constant Volume Air Handlers to Variable Air Volume. Extrapolated from SEP<br />

Results of Similar Buildings<br />

Estimated Cosntruction Cost 1<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr): 478,051<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

58,538<br />

Extended Bare<br />

Labor Cost ($)<br />

$173,270<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$146,786<br />

$14,679<br />

$40,366<br />

$13,455<br />

$16,146<br />

N/A<br />

$97,858<br />

$9,786<br />

Totals: $161,465 $107,643<br />

Total Project Cost: $339,076<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $339,076<br />

Rebate/Incentive*:<br />

$173,270<br />

Net Project Cost: $165,806<br />

Net Simple Payback Period (yrs): 2.5<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

757,550<br />

0<br />

$66,664<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: Dual Duct Conversion to VAV (Cogent Report)<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: FACTOR<br />

Building Key: 04C4336<br />

Basic Gross Area (sf): 199,857<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3230<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

272,885<br />

7.0<br />

0<br />

123,664<br />

3,642<br />

Equipment Description Qty<br />

<strong>UC</strong> SEP Custom Calculation - <strong>UC</strong>LA Extrapolated Savings.xls<br />

Project Description Reference(s): Air Handler Project 2. Convert Constant Volume Air Handlers to Variable Air Volume. Extrapolated from SEP<br />

Results of Similar Buildings<br />

Estimated Cosntruction Cost 1<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr): 371,816<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

45,525<br />

Extended Bare<br />

Labor Cost ($)<br />

$134,761<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$114,167<br />

$11,417<br />

$31,396<br />

$10,465<br />

$12,558<br />

N/A<br />

$76,111<br />

$7,611<br />

Totals: $125,584 $83,723<br />

Total Project Cost: $263,726<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $263,726<br />

Rebate/Incentive*:<br />

$134,761<br />

Net Project Cost: $128,965<br />

Net Simple Payback Period (yrs): 2.5<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

589,184<br />

0<br />

$51,848<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: Dual Duct Conversion to VAV (Cogent Report)<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: KNUDSEN HALL<br />

Building Key: 04C4363<br />

Basic Gross Area (sf): 164,702<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3231<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

428,820<br />

12.0<br />

0<br />

194,329<br />

5,724<br />

Equipment Description Qty<br />

<strong>UC</strong> SEP Custom Calculation - <strong>UC</strong>LA Extrapolated Savings.xls<br />

Project Description Reference(s): Air Handler Project 2. Convert Constant Volume Air Handlers to Variable Air Volume. Extrapolated from SEP<br />

Results of Similar Buildings<br />

Estimated Cosntruction Cost 1<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr): 584,283<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

71,550<br />

Extended Bare<br />

Labor Cost ($)<br />

$211,778<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$179,406<br />

$17,941<br />

$49,337<br />

$16,446<br />

$19,735<br />

N/A<br />

$119,604<br />

$11,960<br />

Totals: $197,346 $131,564<br />

Total Project Cost: $414,427<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $414,427<br />

Rebate/Incentive*:<br />

$211,778<br />

Net Project Cost: $202,649<br />

Net Simple Payback Period (yrs): 2.5<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

925,914<br />

0<br />

$81,480<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: Dual Duct Conversion to VAV (Cogent Report)<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: MATH SCIENCE<br />

Building Key: 04C4359<br />

Basic Gross Area (sf): 224,078<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3232<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

272,885<br />

7.0<br />

0<br />

123,664<br />

3,642<br />

Equipment Description Qty<br />

<strong>UC</strong> SEP Custom Calculation - <strong>UC</strong>LA Extrapolated Savings.xls<br />

Project Description Reference(s): Air Handler Project 2. Convert Constant Volume Air Handlers to Variable Air Volume. Extrapolated from SEP<br />

Results of Similar Buildings<br />

Estimated Cosntruction Cost 1<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr): 371,816<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

45,525<br />

Extended Bare<br />

Labor Cost ($)<br />

$134,761<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$114,167<br />

$11,417<br />

$31,396<br />

$10,465<br />

$12,558<br />

N/A<br />

$76,111<br />

$7,611<br />

Totals: $125,584 $83,723<br />

Total Project Cost: $263,726<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $263,726<br />

Rebate/Incentive*:<br />

$134,761<br />

Net Project Cost: $128,965<br />

Net Simple Payback Period (yrs): 2.5<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

589,184<br />

0<br />

$51,848<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: Dual Duct Conversion to VAV (Cogent Report)<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: HEALTH SCI<br />

Building Key: 04C4332D<br />

Basic Gross Area (sf): 1,265,387<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3233<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

584,755<br />

16.0<br />

0<br />

264,995<br />

7,805<br />

Equipment Description Qty<br />

<strong>UC</strong> SEP Custom Calculation - <strong>UC</strong>LA Extrapolated Savings.xls<br />

Project Description Reference(s): Air Handler Project 2. Convert Constant Volume Air Handlers to Variable Air Volume. Extrapolated from SEP<br />

Results of Similar Buildings<br />

Estimated Cosntruction Cost 1<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr): 796,751<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

97,563<br />

Extended Bare<br />

Labor Cost ($)<br />

$288,783<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$244,644<br />

$24,464<br />

$67,277<br />

$22,426<br />

$26,911<br />

N/A<br />

$163,096<br />

$16,310<br />

Totals: $269,108 $179,406<br />

Total Project Cost: $565,127<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $565,127<br />

Rebate/Incentive*:<br />

$288,783<br />

Net Project Cost: $276,344<br />

Net Simple Payback Period (yrs): 2.5<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

1,262,583<br />

0<br />

$111,107<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: Dual Duct Conversion to VAV (Cogent Report)<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: REED RESRCH<br />

Building Key: 04C4329<br />

Basic Gross Area (sf): 69,176<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3234<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

116,951<br />

3.0<br />

0<br />

52,999<br />

1,561<br />

Equipment Description Qty<br />

<strong>UC</strong> SEP Custom Calculation - <strong>UC</strong>LA Extrapolated Savings.xls<br />

Project Description Reference(s): Air Handler Project 2. Convert Constant Volume Air Handlers to Variable Air Volume. Extrapolated from SEP<br />

Results of Similar Buildings<br />

Estimated Cosntruction Cost 1<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr): 159,350<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

19,513<br />

Extended Bare<br />

Labor Cost ($)<br />

$57,757<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$48,929<br />

$4,893<br />

$13,455<br />

$4,485<br />

$5,382<br />

N/A<br />

$32,619<br />

$3,262<br />

Totals: $53,822 $35,881<br />

Total Project Cost: $113,025<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $113,025<br />

Rebate/Incentive*:<br />

$57,757<br />

Net Project Cost: $55,268<br />

Net Simple Payback Period (yrs): 2.5<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

252,517<br />

0<br />

$22,221<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: Dual Duct Conversion to VAV (Cogent Report)<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: SLICHTER<br />

Building Key: 04C4227<br />

Basic Gross Area (sf): 62,557<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3235<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

155,935<br />

4.0<br />

0<br />

70,665<br />

2,081<br />

Equipment Description Qty<br />

<strong>UC</strong> SEP Custom Calculation - <strong>UC</strong>LA Extrapolated Savings.xls<br />

Project Description Reference(s): Air Handler Project 2. Convert Constant Volume Air Handlers to Variable Air Volume. Extrapolated from SEP<br />

Results of Similar Buildings<br />

Estimated Cosntruction Cost 1<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr): 212,467<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

26,013<br />

Extended Bare<br />

Labor Cost ($)<br />

$77,005<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$65,238<br />

$6,524<br />

$17,941<br />

$5,980<br />

$7,176<br />

N/A<br />

$43,492<br />

$4,349<br />

Totals: $71,762 $47,841<br />

Total Project Cost: $150,701<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $150,701<br />

Rebate/Incentive*:<br />

$77,005<br />

Net Project Cost: $73,696<br />

Net Simple Payback Period (yrs): 2.5<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

336,668<br />

0<br />

$29,627<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: Dual Duct Conversion to VAV (Cogent Report)<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: WARREN HALL<br />

Building Key: 04C4581<br />

Basic Gross Area (sf): 102,205<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3236<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

194,918<br />

5.0<br />

0<br />

88,332<br />

2,602<br />

Equipment Description Qty<br />

<strong>UC</strong> SEP Custom Calculation - <strong>UC</strong>LA Extrapolated Savings.xls<br />

Project Description Reference(s): Air Handler Project 2. Convert Constant Volume Air Handlers to Variable Air Volume. Extrapolated from SEP<br />

Results of Similar Buildings<br />

Estimated Cosntruction Cost 1<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr): 265,584<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

32,525<br />

Extended Bare<br />

Labor Cost ($)<br />

$96,265<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$81,548<br />

$8,155<br />

$22,426<br />

$7,475<br />

$8,970<br />

N/A<br />

$54,365<br />

$5,437<br />

Totals: $89,703 $59,802<br />

Total Project Cost: $188,376<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $188,376<br />

Rebate/Incentive*:<br />

$96,265<br />

Net Project Cost: $92,111<br />

Net Simple Payback Period (yrs): 2.5<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

420,882<br />

0<br />

$37,038<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: Dual Duct Conversion to VAV (Cogent Report)<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: YOUNG HALL<br />

Building Key: 04C4228B<br />

Basic Gross Area (sf): 297,589<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3237<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

233,902<br />

6.0<br />

0<br />

105,998<br />

3,122<br />

Equipment Description Qty<br />

<strong>UC</strong> SEP Custom Calculation - <strong>UC</strong>LA Extrapolated Savings.xls<br />

Project Description Reference(s): Air Handler Project 2. Convert Constant Volume Air Handlers to Variable Air Volume. Extrapolated from SEP<br />

Results of Similar Buildings<br />

Estimated Cosntruction Cost 1<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr): 318,700<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

39,025<br />

Extended Bare<br />

Labor Cost ($)<br />

$115,513<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$97,858<br />

$9,786<br />

$26,911<br />

$8,970<br />

$10,764<br />

N/A<br />

$65,238<br />

$6,524<br />

Totals: $107,643 $71,762<br />

Total Project Cost: $226,051<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $226,051<br />

Rebate/Incentive*:<br />

$115,513<br />

Net Project Cost: $110,538<br />

Net Simple Payback Period (yrs): 2.5<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

505,033<br />

0<br />

$44,443<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: Monitoring Based Commissioning<br />

<strong>Campus</strong>: LOS ANGELES MC<br />

Location: LOS ANGELES MED CTR - WESTWOO<br />

Building: MED PLZA 100<br />

Building Key: 04C4006<br />

Basic Gross Area (sf): 50,679<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3501<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

95,783<br />

11.0<br />

10,288<br />

Equipment Description Qty<br />

SEP MBCx Analysis MZ 080326 Final.Checked by LCK.xls<br />

Project Description Reference(s): Monitoring Based Commission for All SEP Buildings.<br />

Estimated Construction Cost 1<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

25.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

95,783<br />

10,288<br />

Extended Bare<br />

Labor Cost ($)<br />

$33,276<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$15,457<br />

$3,864<br />

$11,593<br />

$3,864<br />

$4,637<br />

N/A<br />

$46,371<br />

$11,593<br />

Totals: $19,321 $57,964<br />

Total Project Cost: $97,379<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $97,379<br />

Rebate/Incentive*:<br />

$33,276<br />

Net Project Cost: $64,103<br />

Net Simple Payback Period (yrs): 4.6<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

159,980<br />

0<br />

$14,078<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: Monitoring Based Commissioning<br />

<strong>Campus</strong>: LOS ANGELES MC<br />

Location: LOS ANGELES MED CTR - SANTA MO<br />

Building: SMH EMERGCY<br />

Building Key: 04C510B<br />

Basic Gross Area (sf): 18,059<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3503<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

34,132<br />

4.0<br />

3,666<br />

Equipment Description Qty<br />

SEP MBCx Analysis MZ 080326 Final.Checked by LCK.xls<br />

Project Description Reference(s): Monitoring Based Commission for All SEP Buildings.<br />

Estimated Construction Cost 1<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

25.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

34,132<br />

3,666<br />

Extended Bare<br />

Labor Cost ($)<br />

$11,858<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$5,508<br />

$1,377<br />

$4,131<br />

$1,377<br />

$1,652<br />

N/A<br />

$16,524<br />

$4,131<br />

Totals: $6,885 $20,655<br />

Total Project Cost: $34,700<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $34,700<br />

Rebate/Incentive*:<br />

$11,858<br />

Net Project Cost: $22,842<br />

Net Simple Payback Period (yrs): 3.8<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.<br />

34,132<br />

4,583<br />

$6,074


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: Monitoring Based Commissioning<br />

<strong>Campus</strong>: LOS ANGELES MC<br />

Location: LOS ANGELES MED CTR - SANTA MO<br />

Building: SMH PAVILION<br />

Building Key: 04C510D<br />

Basic Gross Area (sf): 194,181<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3505<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

367,002<br />

42.0<br />

39,419<br />

Equipment Description Qty<br />

SEP MBCx Analysis MZ 080326 Final.Checked by LCK.xls<br />

Project Description Reference(s): Monitoring Based Commission for All SEP Buildings.<br />

Estimated Construction Cost 1<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

25.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

Extended Bare<br />

Labor Cost ($)<br />

367,002<br />

39,419<br />

$127,499<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$59,225<br />

$14,806<br />

$44,419<br />

$14,806<br />

$17,768<br />

N/A<br />

$177,676<br />

$44,419<br />

Totals: $74,031 $222,095<br />

Total Project Cost: $373,119<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $373,119<br />

Rebate/Incentive*:<br />

$127,499<br />

Net Project Cost: $245,620<br />

Net Simple Payback Period (yrs): 3.8<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

367,002<br />

49,274<br />

$65,310<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: Monitoring Based Commissioning<br />

<strong>Campus</strong>: LOS ANGELES MC<br />

Location: LOS ANGELES MED CTR - SANTA MO<br />

Building: SMH WST TOWR<br />

Building Key: 04C510F<br />

Basic Gross Area (sf): 202,568<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3507<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

382,854<br />

44.0<br />

41,121<br />

Equipment Description Qty<br />

SEP MBCx Analysis MZ 080326 Final.Checked by LCK.xls<br />

Project Description Reference(s): Monitoring Based Commission for All SEP Buildings.<br />

Estimated Construction Cost 1<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

25.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

Extended Bare<br />

Labor Cost ($)<br />

382,854<br />

41,121<br />

$133,006<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$61,783<br />

$15,446<br />

$46,337<br />

$15,446<br />

$18,535<br />

N/A<br />

$185,350<br />

$46,338<br />

Totals: $77,229 $231,688<br />

Total Project Cost: $389,234<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $389,234<br />

Rebate/Incentive*:<br />

$133,006<br />

Net Project Cost: $256,228<br />

Net Simple Payback Period (yrs): 3.8<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

382,854<br />

51,401<br />

$68,130<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: Monitoring Based Commissioning<br />

<strong>Campus</strong>: LOS ANGELES MC<br />

Location: LOS ANGELES MED CTR - SANTA MO<br />

Building: SMH CENT PLT<br />

Building Key: 04C510H<br />

Basic Gross Area (sf): 21,427<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3509<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

16,499<br />

2.0<br />

2,250<br />

Equipment Description Qty<br />

SEP MBCx Analysis MZ 080326 Final.Checked by LCK.xls<br />

Project Description Reference(s): Monitoring Based Commission for All SEP Buildings.<br />

Estimated Construction Cost 1<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

25.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

16,499<br />

2,250<br />

$6,210<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$3,268<br />

$817<br />

$2,451<br />

$817<br />

$980<br />

Extended Bare<br />

Labor Cost ($)<br />

N/A<br />

$9,803<br />

$2,451<br />

Totals: $4,085 $12,254<br />

Total Project Cost: $20,587<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $20,587<br />

Rebate/Incentive*:<br />

$6,210<br />

Net Project Cost: $14,377<br />

Net Simple Payback Period (yrs): 4.3<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.<br />

16,499<br />

2,813<br />

$3,336<br />

Backup


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: MBCx Central <strong>Plan</strong>t<br />

<strong>Campus</strong>: LOS ANGELES MC<br />

Location: LOS ANGELES MED CTR - SANTA MO<br />

Building: SMH CENT PLT<br />

Building Key: 04C510H<br />

Basic Gross Area (sf): 21,427<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3510<br />

<strong>UC</strong> SEP Central <strong>Plan</strong>t MBCx - Checked MZ 032808.xls<br />

Project Description Reference(s): Monitoring Based Commission for All SEP Buildings.<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

75,000<br />

9.0<br />

6,000<br />

Equipment Description Qty<br />

Estimated Construction Cost 1<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

Raw Costs:<br />

25.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

75,000<br />

6,000<br />

Extended Bare<br />

Labor Cost ($)<br />

$24,000<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

$10,000<br />

$2,500<br />

$9,375<br />

$3,125<br />

$3,750<br />

N/A<br />

$40,000<br />

$10,000<br />

Totals: $12,500 $50,000<br />

Total Project Cost: $78,750<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $78,750<br />

Rebate/Incentive*:<br />

$24,000<br />

Net Project Cost: $54,750<br />

Net Simple Payback Period (yrs): 4.7<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

75,000<br />

7,500<br />

$11,625<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: Replace Boiler<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: CANYON POINT<br />

Building Key: 04C4302A<br />

Basic Gross Area (sf): 107,419<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D6001<br />

<strong>UC</strong>LA Boiler Replace Calculation-Multiple.xls<br />

Project Description Reference(s): <strong>UC</strong>LA Custom Project 1. Boiler Replacement.<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

0<br />

0.0<br />

2,494<br />

Equipment Description Qty<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

0<br />

2,494<br />

$2,494<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

Extended Bare<br />

Labor Cost ($)<br />

Boiler 1 $28,000.00 $28,700 $16,000.00 $17,936<br />

Programming 1 $500.00 $513 $800.00<br />

$897<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

Raw Costs:<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

$29,213 $18,833<br />

$2,410<br />

$3,795<br />

$35,417<br />

$3,542<br />

$9,324<br />

$3,108<br />

$3,730<br />

N/A<br />

$2,260<br />

$21,093<br />

$2,109<br />

Totals: $38,959 $23,202<br />

Total Project Cost: $78,323<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $78,323<br />

Rebate/Incentive*:<br />

$2,494<br />

Net Project Cost: $75,829<br />

Net Simple Payback Period (yrs): 55.4<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.<br />

15,563<br />

0<br />

$1,370<br />

Backup


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: Replace Boiler<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: COVEL COMMON<br />

Building Key: 04C4302D<br />

Basic Gross Area (sf): 144,067<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D6002<br />

<strong>UC</strong>LA Boiler Replace Calculation-Multiple.xls<br />

Project Description Reference(s): <strong>UC</strong>LA Custom Project 1. Boiler Replacement.<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

0<br />

0.0<br />

4,987<br />

Equipment Description Qty<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

0<br />

4,987<br />

$4,987<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

Extended Bare<br />

Labor Cost ($)<br />

Boiler 2 $28,000.00 $57,400 $16,000.00 $35,872<br />

Programming 2 $500.00 $1,025 $800.00 $1,794<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

Raw Costs:<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

$58,425 $37,666<br />

$4,820<br />

$7,589<br />

$70,834<br />

$7,083<br />

$18,648<br />

$6,216<br />

$7,459<br />

N/A<br />

$4,520<br />

$42,185<br />

$4,219<br />

Totals: $77,918 $46,404<br />

Total Project Cost: $156,646<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $156,646<br />

Rebate/Incentive*:<br />

$4,987<br />

Net Project Cost: $151,659<br />

Net Simple Payback Period (yrs): 55.4<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.<br />

31,119<br />

0<br />

$2,738<br />

Backup


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: Replace Boiler<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: UNEX<br />

Building Key: 04C4415<br />

Basic Gross Area (sf): 95,065<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D6003<br />

<strong>UC</strong>LA Boiler Replace Calculation-Multiple.xls<br />

Project Description Reference(s): <strong>UC</strong>LA Custom Project 1. Boiler Replacement.<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

0<br />

0.0<br />

5,938<br />

Equipment Description Qty<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

0<br />

5,938<br />

$5,938<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

Extended Bare<br />

Labor Cost ($)<br />

Programming 2 $500.00 $1,025 $800.00 $1,794<br />

Boiler 2 $28,000.00 $57,400 $16,000.00 $35,872<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

Raw Costs:<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

$58,425 $37,666<br />

$4,820<br />

$7,589<br />

$70,834<br />

$7,083<br />

$18,648<br />

$6,216<br />

$7,459<br />

N/A<br />

$4,520<br />

$42,185<br />

$4,219<br />

Totals: $77,918 $46,404<br />

Total Project Cost: $156,646<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $156,646<br />

Rebate/Incentive*:<br />

$5,938<br />

Net Project Cost: $150,708<br />

Net Simple Payback Period (yrs): 46.2<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.<br />

37,053<br />

0<br />

$3,261<br />

Backup


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: Replace Chiller<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: SOUTHERN REGIONAL LIBRARY FACI<br />

Building Key: 04C4562<br />

Basic Gross Area (sf): 228,306<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D6004<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

264,354<br />

80.0<br />

Equipment Description Qty<br />

/26. Sourthern Regional Library FAC/<strong>UC</strong> SEP Custom Calculation - SRLF Chiller Replacement.xls<br />

Project Description Reference(s): <strong>UC</strong>LA Custom Project 2. Chiller Replacement.<br />

0<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

Extended Bare<br />

Labor Cost ($)<br />

264,354<br />

0<br />

$63,445<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

140 ton Chiller 2 $67,200.00 $137,760 $44,800.00 $100,442<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

Raw Costs:<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

$137,760 $100,442<br />

$11,365<br />

$17,895<br />

$167,020<br />

$16,702<br />

$46,120<br />

$15,373<br />

$18,448<br />

N/A<br />

$12,053<br />

$112,495<br />

$11,249<br />

Totals: $183,722 $123,744<br />

Total Project Cost: $387,408<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $387,408<br />

Rebate/Incentive*:<br />

$63,445<br />

Net Project Cost: $323,963<br />

Net Simple Payback Period (yrs): 13.9<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

264,354<br />

0<br />

$23,263<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: Replace Chiller<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: UNEX<br />

Building Key: 04C4415<br />

Basic Gross Area (sf): 95,065<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D6005<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

212,201<br />

72.0<br />

Equipment Description Qty<br />

/29. UNEX/<strong>UC</strong> SEP Custom Calculation - UNEX Chiller Replacement.xls<br />

Project Description Reference(s): <strong>UC</strong>LA Custom Project 2. Chiller Replacement.<br />

0<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

Extended Bare<br />

Labor Cost ($)<br />

212,201<br />

0<br />

$50,928<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

150 ton Chiller 2 $60,000.00 $123,000 $42,000.00 $94,164<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

Raw Costs:<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

$123,000 $94,164<br />

$10,148<br />

$15,978<br />

$149,125<br />

$14,913<br />

$42,007<br />

$14,002<br />

$16,803<br />

N/A<br />

$11,300<br />

$105,464<br />

$10,546<br />

Totals: $164,038 $116,010<br />

Total Project Cost: $352,860<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $352,860<br />

Rebate/Incentive*:<br />

$50,928<br />

Net Project Cost: $301,932<br />

Net Simple Payback Period (yrs): 16.2<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

212,201<br />

0<br />

$18,674<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: Replace Chiller<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: WILSHIRE CTR<br />

Building Key: 04C4270<br />

Basic Gross Area (sf): 455,912<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D6006<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

304,707<br />

98.0<br />

Equipment Description Qty<br />

/27. Wilshire CTR/<strong>UC</strong> SEP Custom Calculation - Willshire Chiller Replacement.xls<br />

Project Description Reference(s): <strong>UC</strong>LA Custom Project 2. Chiller Replacement.<br />

0<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

Extended Bare<br />

Labor Cost ($)<br />

304,707<br />

0<br />

$73,130<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

350 ton chiller 2 $147,000.00 $301,350 $98,000.00 $219,716<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

Raw Costs:<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

$301,350 $219,716<br />

$24,861<br />

$39,145<br />

$365,357<br />

$36,536<br />

$100,887<br />

$33,629<br />

$40,355<br />

N/A<br />

$26,366<br />

$246,082<br />

$24,608<br />

Totals: $401,892 $270,690<br />

Total Project Cost: $847,454<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $847,454<br />

Rebate/Incentive*:<br />

$73,130<br />

Net Project Cost: $774,324<br />

Net Simple Payback Period (yrs): 28.9<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

304,707<br />

0<br />

$26,814<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: CW Reset<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: CORNELL HALL<br />

Building Key: 04C515D<br />

Basic Gross Area (sf): 71,737<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D6007<br />

<strong>UC</strong>LA Condenser Water Reset Calculation-Multiple.xls<br />

Project Description Reference(s): <strong>UC</strong>LA Custom Project 4. Condenser Water Reset.<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

68,040<br />

Equipment Description Qty<br />

0.0<br />

0<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

68,040<br />

0<br />

Extended Bare<br />

Labor Cost ($)<br />

$16,330<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

Programming 4 $500.00 $2,050 $800.00 $3,587<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

Raw Costs:<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

$2,050 $3,587<br />

$169<br />

$266<br />

$2,485<br />

$249<br />

$1,073<br />

$358<br />

$429<br />

N/A<br />

$430<br />

$4,018<br />

$402<br />

Totals: $2,734 $4,419<br />

Total Project Cost: $9,013<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $9,013<br />

Rebate/Incentive*:<br />

$7,211<br />

Net Project Cost: $1,803<br />

Net Simple Payback Period (yrs): 0.3<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.<br />

68,040<br />

0<br />

$5,988


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: CW Reset<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: MED PLZA 300<br />

Building Key: 04C4345<br />

Basic Gross Area (sf): 101,095<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D6008<br />

<strong>UC</strong>LA Condenser Water Reset Calculation-Multiple.xls<br />

Project Description Reference(s): <strong>UC</strong>LA Custom Project 4. Condenser Water Reset.<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

170,100<br />

Equipment Description Qty<br />

0.0<br />

0<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

Extended Bare<br />

Labor Cost ($)<br />

170,100<br />

0<br />

$40,824<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

Programming 4 $500.00 $2,050 $800.00 $3,587<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

Raw Costs:<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

$2,050 $3,587<br />

$169<br />

$266<br />

$2,485<br />

$249<br />

$1,073<br />

$358<br />

$429<br />

N/A<br />

$430<br />

$4,018<br />

$402<br />

Totals: $2,734 $4,419<br />

Total Project Cost: $9,013<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $9,013<br />

Rebate/Incentive*:<br />

$7,211<br />

Net Project Cost: $1,803<br />

Net Simple Payback Period (yrs): 0.1<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

170,100<br />

0<br />

$14,969<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: CW Reset<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: SOUTHERN REGIONAL LIBRARY FACI<br />

Building Key: 04C4562<br />

Basic Gross Area (sf): 228,306<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D6009<br />

<strong>UC</strong>LA Condenser Water Reset Calculation-Multiple.xls<br />

Project Description Reference(s): <strong>UC</strong>LA Custom Project 4. Condenser Water Reset.<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

40,032<br />

Equipment Description Qty<br />

0.0<br />

0<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

40,032<br />

0<br />

$9,608<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

Extended Bare<br />

Labor Cost ($)<br />

Programming 4 $500.00 $2,050 $800.00 $3,587<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

Raw Costs:<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

$2,050 $3,587<br />

$169<br />

$266<br />

$2,485<br />

$249<br />

$1,073<br />

$358<br />

$429<br />

N/A<br />

$430<br />

$4,018<br />

$402<br />

Totals: $2,734 $4,419<br />

Total Project Cost: $9,013<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $9,013<br />

Rebate/Incentive*:<br />

$7,211<br />

Net Project Cost: $1,803<br />

Net Simple Payback Period (yrs): 0.5<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.<br />

40,032<br />

0<br />

$3,523<br />

Backup


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: CT VFDs<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: TIVERTON HSE<br />

Building Key: 04C4265<br />

Basic Gross Area (sf): 121,634<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D6010<br />

<strong>UC</strong>LA CT VFD Calculation-Multiple.xls<br />

Project Description Reference(s): <strong>UC</strong>LA Custom Project 5. Install VFDs on Cooling Towers.<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

24,661<br />

Equipment Description Qty<br />

4.0<br />

0<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

24,661<br />

0<br />

$5,919<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

Extended Bare<br />

Labor Cost ($)<br />

Programming 1 $500.00 $513 $800.00<br />

$897<br />

25 hp VFD 1 $3,925.00 $4,023 $1,100.00 $1,233<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

Raw Costs:<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

$4,536 $2,130<br />

$374<br />

$589<br />

$5,499<br />

$550<br />

$1,301<br />

$434<br />

$520<br />

N/A<br />

$256<br />

$2,385<br />

$239<br />

Totals: $6,049 $2,624<br />

Total Project Cost: $10,928<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $10,928<br />

Rebate/Incentive*:<br />

$5,919<br />

Net Project Cost: $5,009<br />

Net Simple Payback Period (yrs): 2.3<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.<br />

24,661<br />

0<br />

$2,170<br />

Backup


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: CT VFDs<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: UNEX<br />

Building Key: 04C4415<br />

Basic Gross Area (sf): 95,065<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D6011<br />

<strong>UC</strong>LA CT VFD Calculation-Multiple.xls<br />

Project Description Reference(s): <strong>UC</strong>LA Custom Project 5. Install VFDs on Cooling Towers.<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

11,650<br />

Equipment Description Qty<br />

2.0<br />

0<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

11,650<br />

0<br />

$2,796<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

Extended Bare<br />

Labor Cost ($)<br />

Programming 1 $500.00 $513 $800.00<br />

$897<br />

15 hp VFD 1 $2,275.00 $2,332 $820.00<br />

$919<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

Raw Costs:<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

$2,844 $1,816<br />

$235<br />

$369<br />

$3,449<br />

$345<br />

$905<br />

$302<br />

$362<br />

N/A<br />

$218<br />

$2,034<br />

$203<br />

Totals: $3,793 $2,237<br />

Total Project Cost: $7,599<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $7,599<br />

Rebate/Incentive*:<br />

$2,796<br />

Net Project Cost: $4,803<br />

Net Simple Payback Period (yrs): 4.7<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.<br />

11,650<br />

0<br />

$1,025<br />

Backup


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: Pump VFDs<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: CAMPUSWIDE<br />

Building Key: 04CWIDE<br />

Basic Gross Area (sf):<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D6012<br />

<strong>UC</strong>LA Pump VFD Calculation-Multiple.xls<br />

Project Description Reference(s): <strong>UC</strong>LA Custom Project 6. Variable Speed Drives on Pumps.<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

201,511<br />

34.0<br />

Equipment Description Qty<br />

0<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

Extended Bare<br />

Labor Cost ($)<br />

201,511<br />

0<br />

$48,363<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

7.5 hp 3 $1,975.00 $6,073 $545.00 $1,833<br />

10 hp 3 $1,975.00 $6,073 $545.00 $1,833<br />

15 hp 5 $2,275.00 $11,659 $820.00 $4,596<br />

20 hp 4 $3,375.00 $13,838 $820.00 $3,677<br />

Programming 15 $500.00 $7,688 $800.00 $13,452<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

Raw Costs:<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

$45,331 $25,391<br />

$3,740<br />

$5,888<br />

$54,959<br />

$5,496<br />

$13,760<br />

$4,587<br />

$5,504<br />

N/A<br />

$3,047<br />

$28,438<br />

$2,844<br />

Totals: $60,455 $31,281<br />

Total Project Cost: $115,587<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $115,587<br />

Rebate/Incentive*:<br />

$48,363<br />

Net Project Cost: $67,224<br />

Net Simple Payback Period (yrs): 3.8<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

201,511<br />

0<br />

$17,733<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.


PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: TOD EF<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: BUNCHE HALL<br />

Building Key: 04C4580<br />

Basic Gross Area (sf): 229,248<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D6013<br />

<strong>UC</strong>LA TOD on EF Calculation.xls<br />

Project Description Reference(s): <strong>UC</strong>LA Custom Project 3. TOD Controls on Exhaust Fans.<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

8,081<br />

Equipment Description Qty<br />

0.0<br />

0<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

8,081<br />

0<br />

$1,939<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

Extended Bare<br />

Labor Cost ($)<br />

Programming 1 $500.00 $513 $800.00<br />

$897<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

Raw Costs:<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

$513 $897<br />

$42<br />

$67<br />

$621<br />

$62<br />

$268<br />

$89<br />

$107<br />

N/A<br />

$108<br />

$1,004<br />

$100<br />

Totals: $683 $1,105<br />

Total Project Cost: $2,253<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $2,253<br />

Rebate/Incentive*:<br />

$1,803<br />

Net Project Cost: $451<br />

Net Simple Payback Period (yrs): 0.6<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.<br />

8,081<br />

0<br />

$711<br />

Backup


11. PROJECT LISTS & SUMMARY OF PROJECTS<br />

The following table is a complete list of all projects identified through the SEP effort, organized<br />

by funding source and project types. Subtotals are provided for savings and costs by project<br />

type and fund source. It is anticipated that the campus may wish to sort and view the list in a<br />

number of different manners. A complete project list is also provided electronically with this<br />

report for this purpose. See Appendix C.<br />

2413.01/Reports/<strong>UC</strong> SEP Final Report – <strong>UC</strong>LA.doc 11-1 December 31, 2008<br />

Newcomb | Anderson | McCormick


Table 11.1: SEP Projects by Funding Source and Project Type<br />

Net<br />

Simple<br />

Payback<br />

(yrs)<br />

Net Project<br />

Cost ($)<br />

Gross<br />

Estimated<br />

Utility<br />

Incentive ($)<br />

Estimated<br />

Project Cost ($)<br />

Total Cost<br />

Savings ($/yr)<br />

Total<br />

Purchased<br />

Gas Savings<br />

(th/yr)<br />

Demand<br />

Savings (kW)<br />

Total<br />

Purchased<br />

Electricity<br />

Savings<br />

(kWh/yr)<br />

Building<br />

Key Building Name Project Name<br />

SEP<br />

Project<br />

ID<br />

State Funded Buildings<br />

MBCx Projects<br />

D3124 04C4200 MURPHY HALL Monitoring Based Commissioning 313,814<br />

19.0<br />

- $ 27,616 $ 186,161 $ 63,811 $ 122,350 4.4<br />

D3003 04C4202 PERLOFF HALL Monitoring Based Commissioning 93,931<br />

6.0<br />

- $ 8,266 $ 55,723 $ 19,100 $ 36,623 4.4<br />

D3004 04C4203 YOUNG LIBRY Monitoring Based Commissioning 435,993<br />

27.0<br />

- $ 38,367 $ 258,643 $ 88,655 $ 169,988 4.4<br />

D3128 04C4227 SLICHTER Monitoring Based Commissioning 89,153<br />

6.0<br />

- $ 7,845 $ 52,890 $ 18,129 $ 34,761 4.4<br />

D3008 04C4228A GEOLOGY Monitoring Based Commissioning 574,992<br />

39.0<br />

- $ 50,599 $ 307,998 $ 119,599 $ 188,399 3.7<br />

D3131 04C4228B YOUNG HALL Monitoring Based Commissioning 939,408<br />

64.0<br />

- $ 82,668 $ 503,200 $ 195,397 $ 307,803 3.7<br />

D3009 04C4228C MOLECULR SCI Monitoring Based Commissioning 563,998<br />

38.0<br />

- $ 49,632 $ 302,109 $ 117,312 $ 184,797 3.7<br />

D3011 04C4235 WOODEN/PS4 Monitoring Based Commissioning 296,046<br />

18.0<br />

- $ 26,052 $ 175,619 $ 60,198 $ 115,421 4.4<br />

D3013 04C4256A ENGR BLDG 4 Monitoring Based Commissioning 928,466<br />

64.0<br />

- $ 81,705 $ 497,340 $ 193,122 $ 304,218 3.7<br />

D3014 04C4260 FACMGMT BLDG Monitoring Based Commissioning 269,646<br />

17.0<br />

- $ 23,729 $ 159,960 $ 54,830 $ 105,130 4.4<br />

D3022 04C4315 GONDA CENTER Monitoring Based Commissioning 395,228<br />

27.0<br />

- $ 34,780 $ 211,707 $ 82,208 $ 129,499 3.7<br />

D3023 04C4317 LAW Monitoring Based Commissioning 392,555<br />

24.0<br />

- $ 34,545 $ 232,872 $ 79,822 $ 153,050 4.4<br />

D3024 04C4318A POWELL LIB Monitoring Based Commissioning 237,790<br />

15.0<br />

- $ 20,925 $ 141,062 $ 48,352 $ 92,710 4.4<br />

D3143 04C4319 FRANZ HALL Monitoring Based Commissioning 751,470<br />

51.0<br />

- $ 66,129 $ 402,529 $ 156,306 $ 246,223 3.7<br />

D3025 04C4320 LIFE SCIENCE Monitoring Based Commissioning 677,471<br />

46.0<br />

- $ 59,617 $ 362,894 $ 140,915 $ 221,979 3.7<br />

D3026 04C4325 DORIS STEIN Monitoring Based Commissioning 297,709<br />

20.0<br />

- $ 26,198 $ 159,469 $ 61,924 $ 97,545 3.7<br />

D3147 04C4329 REED RESRCH Monitoring Based Commissioning 218,371<br />

15.0<br />

- $ 19,217 $ 116,971 $ 45,421 $ 71,550 3.7<br />

D3027 04C4331 PUBLIC HLTH HLTH Monitoring Based Based Commissioning Commissioning 443 443,716 716 30 30.0 0 - $ 39 39,047 047 $ 237 237,681 681 $ 92 92,293 293 $ 145 145,388 388 37 3.7<br />

D3150 04C4332B BRAIN RSCH Monitoring Based Commissioning 273,300<br />

19.0<br />

- $ 24,050 $ 146,396 $ 56,847 $ 89,549 3.7<br />

D3028 04C4332E M DAVIES CC Monitoring Based Commissioning 221,688<br />

15.0<br />

- $ 19,509 $ 118,751 $ 46,111 $ 72,640 3.7<br />

D3030 04C4333 JULES STEIN Monitoring Based Commissioning 277,493<br />

19.0<br />

- $ 24,419 $ 148,640 $ 57,719 $ 90,921 3.7<br />

D3154 04C4334 DENTISTRY Monitoring Based Commissioning 645,136<br />

44.0<br />

- $ 56,772 $ 345,573 $ 134,189 $ 211,384 3.7<br />

D3156 04C4335 SCHOENBERG Monitoring Based Commissioning 174,661<br />

11.0<br />

- $ 15,370 $ 103,613 $ 35,516 $ 68,097 4.4<br />

D3158 04C4336 FACTOR Monitoring Based Commissioning 630,893<br />

43.0<br />

- $ 55,519 $ 337,941 $ 131,226 $ 206,715 3.7<br />

D3032 04C4343 BOELTER HALL Monitoring Based Commissioning 1,180,314<br />

81.0<br />

- $ 103,868 $ 632,242 $ 245,506 $ 386,736 3.7<br />

D3033 04C4344 MORTON MED Monitoring Based Commissioning 1,157,990<br />

79.0<br />

- $ 101,903 $ 620,286 $ 240,863 $ 379,423 3.7<br />

D3034 04C4345 MED PLZA 300 Monitoring Based Commissioning 319,127<br />

22.0<br />

- $ 28,083 $ 170,944 $ 66,379 $ 104,565 3.7<br />

D3035 04C4348 MACDONALDLAB Monitoring Based Commissioning 456,496<br />

31.0<br />

- $ 40,172 $ 244,525 $ 94,952 $ 149,573 3.7<br />

D3164 04C4359 MATH SCIENCE Monitoring Based Commissioning 707,352<br />

48.0<br />

- $ 62,247 $ 378,898 $ 147,130 $ 231,768 3.7<br />

D3168 04C4363 KNUDSEN HALL Monitoring Based Commissioning 519,921<br />

36.0<br />

- $ 45,753 $ 278,497 $ 108,144 $ 170,353 3.7<br />

D3038 04C4374 FOWLER MUSM Monitoring Based Commissioning 321,970<br />

22.0<br />

- $ 28,333 $ 172,464 $ 66,970 $ 105,494 3.7<br />

D3039 04C4375 ROYCE HALL Monitoring Based Commissioning 263,198<br />

16.0<br />

- $ 23,161 $ 156,134 $ 53,519 $ 102,615 4.4<br />

D3172 04C4403 BOYER HALL Monitoring Based Commissioning 419,979<br />

29.0<br />

- $ 36,958 $ 224,963 $ 87,356 $ 137,607 3.7<br />

D3040 04C4415 UNEX Monitoring Based Commissioning 135,488<br />

8.0<br />

- $ 11,923 $ 80,373 $ 27,550 $ 52,823 4.4<br />

SOUTHERN REGIONAL<br />

D3042 04C4562 LIBRARY FACILITY Monitoring Based Commissioning 325,381<br />

20.0<br />

- $ 28,634 $ 193,024 $ 66,163 $ 126,861 4.4<br />

D3176 04C4577A MELNITZ HALL Monitoring Based Commissioning 88,117<br />

5.0<br />

- $ 7,754 $ 52,273 $ 17,918 $ 34,355 4.4<br />

D3178 04C4578 MACGOWAN Monitoring Based Commissioning 184,623<br />

11.0<br />

- $ 16,247 $ 109,522 $ 37,541 $ 71,981 4.4<br />

D3180 04C4579 PUBLIC AFFAIRS Monitoring Based Commissioning 287,416<br />

18.0<br />

- $ 25,293 $ 170,502 $ 58,443 $ 112,059 4.4<br />

D3043 04C4580 BUNCHE HALL Monitoring Based Commissioning 326,724<br />

20.0<br />

- $ 28,752 $ 193,820 $ 66,436 $ 127,384 4.4<br />

D3183 04C4581 WARREN HALL Monitoring Based Commissioning 322,635<br />

22.0<br />

- $ 28,392 $ 172,822 $ 67,108 $ 105,714 3.7<br />

D3185 04C4594 REHAB CENTER Monitoring Based Commissioning 450,042<br />

31.0<br />

- $ 39,604 $ 241,068 $ 93,609 $ 147,459 3.7<br />

D3045 04C515A COLLINS CTR Monitoring Based Commissioning 44,626<br />

3.0<br />

- $ 3,927 $ 26,473 $ 9,074 $ 17,399 4.4<br />

D3046 04C515B GOLD HALL Monitoring Based Commissioning 78,876<br />

5.0<br />

- $ 6,941 $ 46,791 $ 16,039 $ 30,752 4.4<br />

D3047 04C515C ENTREP HALL Monitoring Based Commissioning 103,456<br />

6.0<br />

- $ 9,104 $ 61,372 $ 21,037 $ 40,335 4.4<br />

D3048 04C515D CORNELL HALL Monitoring Based Commissioning 102,237<br />

6.0<br />

- $ 8,997 $ 60,651 $ 20,789 $ 39,862 4.4<br />

D3049 04C515E ROSNFLD LIBR Monitoring Based Commissioning 72,751<br />

4.0<br />

- $ 6,402 $ 43,159 $ 14,793 $ 28,366 4.4<br />

D3050 04C515F MULLIN CMNS Monitoring Based Commissioning 48,393<br />

3.0<br />

- $ 4,259 $ 28,708 $ 9,840 $ 18,868 4.4<br />

D3084 04CWIDE CAMPUSWIDE MBCx Central <strong>Plan</strong>t 1,124,400<br />

86.0<br />

- $ 98,947 $ 693,000 $ 240,000 $ 453,000 4.6<br />

Subtotal, State Funded, MBCx Projects 19,184,439 1,289.0<br />

- $ 1,688,231 $ 10,618,251 $ 3,976,161 $ 6,642,090 3.9


Table 11.1: SEP Projects by Funding Source and Project Type (Continued)<br />

Net<br />

Simple<br />

Payback<br />

(yrs)<br />

Net Project<br />

Cost ($)<br />

Gross<br />

Estimated<br />

Utility<br />

Incentive ($)<br />

Estimated<br />

Project Cost ($)<br />

Total Cost<br />

Savings ($/yr)<br />

Total<br />

Purchased<br />

Gas Savings<br />

(th/yr)<br />

Demand<br />

Savings (kW)<br />

Total<br />

Purchased<br />

Electricity<br />

Savings<br />

(kWh/yr)<br />

SEP<br />

Project Building<br />

ID Key Building Name Project Name<br />

New Construction Projects<br />

$ 42,141 $ 442,353 $ 100,842 $ 341,511 8.1<br />

-<br />

34.0<br />

D3005 04C4203 YOUNG LIBRY SBD, New/Renov - Young Research Library Renovation 478,877<br />

$ 109,358 $ 1,147,921 $ 261,688 $ 886,233 8.1<br />

$ 10,360 $ 108,750 $ 24,792 $ 83,958 8.1<br />

$ 170,545 $ 2,034,322 $ 408,105 $ 1,626,217 9.5<br />

$ 76,198 $ 777,227 $ 191,988 $ 585,239 7.7<br />

$ 8,637 $ 90,665 $ 20,668 $ 69,997 8.1<br />

$ 9,194 $ 93,780 $ 23,165 $ 70,615 7.7<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

90.0<br />

8.0<br />

140.0<br />

76.0<br />

7.0<br />

9.0<br />

$ 43,693 $ 445,671 $ 110,088 $ 335,583 7.7<br />

-<br />

44.0<br />

$ 48,758 $ 511,810 $ 116,676 $ 395,134 8.1<br />

-<br />

40.0<br />

D3006 04C4204 PAULEY SBD, New/Renov - Pauley Pavilion Renovation and Expansion 1,242,705<br />

D3010 04C4230 POLICE STN SBD, New/Renov - Police Station Replacement Building 117,733<br />

D3029 04C4332F SEMEL INST SBD, New/Renov - CHS South Tower Seismic Renovation 1,938,015<br />

D3031 04C4333 JULES STEIN SBD, New/Renov - Jules Stein Eye Institute Seismic Repair 865,891<br />

D3041 04C4451 CLARK LIB SBD, New/Renov - Clark Library Seismic Correction 98,149<br />

D3051 04CTBD1 CNSI - BSL 3 LABORATORY SBD, New/Renov - CNSI-BSL3 Laboratory 104,475<br />

TELEMEDICINE AND PRIME<br />

D3055 04CTBD5 FACILITIES SBD, New/Renov - Telemedicine and Prime Facilities Phase 2 496,511<br />

LETTERS AND SCIENCE<br />

D3056 04CTBD6 EXPANSION SBD, New/Renov - Letters and Science Expansion 554,072<br />

$ 3,929 $ 41,243 $ 9,401 $ 31,842 8.1<br />

-<br />

3.0<br />

D3083 04CWIDE CAMPUSWIDE SBD, New/Renov - <strong>Campus</strong> Approved Projects Under $5 Million 44,646<br />

$ 3,929 $ 41,243 $ 9,401 $ 31,842 8.1<br />

-<br />

3.0<br />

D3082 04CWIDE CAMPUSWIDE SBD, New/Renov - <strong>Campus</strong> Approved Projects Under $5 Million 44,646<br />

$ 3,929 $ 41,243 $ 9,401 $ 31,842 8.1<br />

-<br />

3.0<br />

D3081 04CWIDE CAMPUSWIDE SBD, New/Renov - <strong>Campus</strong> Approved Projects Under $5 Million 44,646<br />

$ 3,929 $ 41,243 $ 9,401 $ 31,842 8.1<br />

-<br />

3.0<br />

D3080 04CWIDE CAMPUSWIDE SBD, New/Renov - <strong>Campus</strong> Approved Projects Under $5 Million 44,646<br />

$ 3,929 $ 41,243 $ 9,401 $ 31,842 8.1<br />

-<br />

3.0<br />

D3079 04CWIDE CAMPUSWIDE SBD, New/Renov - <strong>Campus</strong> Approved Projects Under $5 Million 44,646<br />

$ 3,929 $ 41,243 $ 9,401 $ 31,842 8.1<br />

-<br />

3.0<br />

D3078 04CWIDE CAMPUSWIDE SBD, New/Renov - <strong>Campus</strong> Approved Projects Under $5 Million 44,646<br />

$ 3,929 $ 41,243 $ 9,401 $ 31,842 8.1<br />

-<br />

3.0<br />

D3077 04CWIDE CAMPUSWIDE SBD, New/Renov - <strong>Campus</strong> Approved Projects Under $5 Million 44,646<br />

$ 3,929 $ 41,243 $ 9,401 $ 31,842 8.1<br />

$ 550,316 $ 5,982,444 $ 1,333,220 $ 4,649,224 8.4<br />

-<br />

-<br />

3.0<br />

472.0<br />

D3076 04CWIDE CAMPUSWIDE SBD, New/Renov - <strong>Campus</strong> Approved Projects Under $5 Million 44,646<br />

Subtotal, State Funded, New Construction Projects 6,253,593<br />

$ 14,073 $ 113,025 $ 38,180 $ 74,845 5.3<br />

$ 20,070 $ 231,886 $ 56,783 $ 175,103 8.7<br />

$ 8,912 $ 33,239 $ 24,071 $ 9,168 1.0<br />

$ 82,063 $ 260,501 $ 216,698 $ 52,100 0.6<br />

$ 32,145 $ 61,824 $ 82,093 $ 12,365 0.4<br />

$ 29,627 $ 150,701 $ 77,005 $ 73,696 2.5<br />

$ 634 $ 48,656 $ 1,730 $ 46,926 74.0<br />

$ 19,735 $ 45,741 $ 50,373 $ 9,148 0.5<br />

$ 32,167 $ 176,117 $ 84,253 $ 91,864 2.9<br />

$ 44,443 $ 226,051 $ 115,513 $ 110,538 2.5<br />

$ 313,196 $ 1,155,824 $ 822,292 $ 333,532 1.1<br />

$ 1,111 $ 35,195 $ 3,027 $ 32,168 28.9<br />

$ 17,134 $ 62,008 $ 47,476 $ 14,532 0.8<br />

$ 4,359 $ 2,784 $ 11,303 $ 557 0.1<br />

$ 3,847 $ 2,784 $ 10,012 $ 557 0.1<br />

$ 5,922 $ 47,848 $ 15,355 $ 32,493 5.5<br />

$ 20,419 $ 125,784 $ 56,290 $ 69,494 3.4<br />

$ 9,066 $ 65,921 $ 24,120 $ 41,801 4.6<br />

$ 3,667 $ 36,733 $ 9,748 $ 26,985 7.4<br />

$ 9,208 $ 32,243 $ 23,860 $ 8,383 0.9<br />

$ 103,530 $ 755,712 $ 293,908 $ 461,804 4.5<br />

$ 49,169 $ 1,551,693 $ 129,310 $ 1,422,383 28.9<br />

$ 51,915 $ 126,983 $ 136,824 $ 25,397 0.5<br />

$ 8,811 $ 46,233 $ 22,944 $ 23,289 2.6<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

2.0<br />

4.0<br />

2.0<br />

63.0<br />

1.0<br />

4.0<br />

1.0<br />

2.0<br />

5.0<br />

6.0<br />

68.0<br />

-<br />

50.0<br />

-<br />

-<br />

-<br />

57.0<br />

1.0<br />

-<br />

4.0<br />

143.0<br />

22.0<br />

3.0<br />

-<br />

HVAC Projects<br />

D3225 04C4200 MURPHY HALL Dual Duct Conversion to VAV (Cogent Report) 159,915<br />

D1051 04C4202 PERLOFF HALL CAV to VAV - AHU 1, 2, 5W and 5E & Add Economizer 228,070<br />

D1050 04C4203 YOUNG LIBRY SAF 9 CAV to VAV 101,270<br />

D1049 04C4203 YOUNG LIBRY SAF-3 to 8 CAV to VAV 932,532<br />

D1048 04C4203 YOUNG LIBRY SAF-1 & 2 SP Reset 365,279<br />

D3235 04C4227 SLICHTER Dual Duct Conversion to VAV (Cogent Report) 336,668<br />

D1056 04C4228A GEOLOGY Aircuity 7,207<br />

D1055 04C4228A GEOLOGY S-1(Geophysics) 224,261<br />

D1054 04C4228A GEOLOGY S-1, 5, 9, 10 to 12 365,538<br />

D3237 04C4228B YOUNG HALL Dual Duct Conversion to VAV (Cogent Report) 505,033<br />

D1016 04C4228C MOLECULR SCI AHU 1, 2, 3, 4 & 6 Aircuity 3,559,048<br />

D1015 04C4228C MOLECULR SCI AHU - 5 VIV to VAV & SP Reset 12,629<br />

D1034 04C4235 WOODEN/PS4 AHU 4 CAV to VAV & DCV 194,701<br />

D1033 04C4235 WOODEN/PS4 AHU 2 Pace) SP reset 49,533<br />

D1032 04C4235 WOODEN/PS4 AHU 1 Pace) SP reset 43,721<br />

D1031 04C4235 WOODEN/PS4 AHU 1 (Mcquay) SP reset 67,300<br />

D1030 04C4235 WOODEN/PS4 CAV to VAV 232,032<br />

D1029 04C4235 WOODEN/PS4 AHU 3 VIV to VAV & SP Reset 103,025<br />

D1028 04C4235 WOODEN/PS4 AHU 1 VIV to VAV 41,673<br />

D1065 04C4256A ENGR BLDG 4 ACS 9 - CAV to VAV 104,641<br />

D1064 04C4256A ENGR BLDG 4 CF - 1 to 22 - VIV to VAV 1,176,481<br />

D1063 04C4256A ENGR BLDG 4 ACS 8 (AHU-3) - Aircruity 558,742<br />

D1062 04C4256A ENGR BLDG 4 ACS - 1 to 5 - SP Reset 589,949<br />

D1002 04C4260 FACMGMT BLDG AHU 1 & 2 - SP Reset 100,125<br />

(0)<br />

-<br />

-<br />

-<br />

(0)<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-


Table 11.1: SEP Projects by Funding Source and Project Type (Continued)<br />

Gross<br />

Net<br />

Estimated<br />

Simple<br />

Total Cost Estimated Utility Net Project Payback<br />

Savings ($/yr) Project Cost ($) Incentive ($) Cost ($) (yrs)<br />

$ 28,923 $ 86,096 $ 77,061 $ 17,219 0.6<br />

$ 4,319 $ 30,759 $ 11,515 $ 19,244 4.5<br />

$ 19,439 $ 81,053 $ 52,371 $ 28,682 1.5<br />

$ 6,302 $ 30,085 $ 16,811 $ 13,274 2.1<br />

$ 16,922 $ 96,194 $ 45,384 $ 50,810 3.0<br />

$ 6,787 $ 46,817 $ 17,665 $ 29,152 4.3<br />

$ 8,211 $ 44,343 $ 22,043 $ 22,300 2.7<br />

$ 2,206 $ 19,798 $ 6,071 $ 13,727 6.2<br />

$ 12,425 $ 46,563 $ 33,317 $ 13,246 1.1<br />

$ 4,057 $ 48,385 $ 11,206 $ 37,179 9.2<br />

$ 1,933 $ 36,901 $ 5,057 $ 31,844 16.5<br />

$ 39,995 $ 301,401 $ 106,056 $ 195,345 4.9<br />

$ 82,105 $ 2,503,946 $ 215,086 $ 2,288,860 27.9<br />

$ 6,739 $ 58,784 $ 17,420 $ 41,364 6.1<br />

$ 22,569 $ 117,329 $ 60,590 $ 56,739 2.5<br />

$ 22,221 $ 113,025 $ 57,757 $ 55,268 2.5<br />

$ 8,190 $ 26,664 $ 21,169 $ 5,495 0.7<br />

$ 23,358 $ 219,224 $ 61,921 $ 157,303 6.7<br />

$ 88,886 $ 452,102 $ 231,026 $ 221,076 2.5<br />

$ 111,107 $ 565,127 $ 288,783 $ 276,344 2.5<br />

$ 3,548 $ 26,360 $ 9,331 $ 17,029 4.8<br />

$ 20,571 $ 317,011 $ 53,987 $ 263,024 12.8<br />

$ 43,540 $ 121,465 $ 115,384 $ 24,293 0.6<br />

$ 66,664 $ 339,076 $ 173,270 $ 165,806 2.5<br />

$ 59,907 $ 263,726 $ 158,444 $ 105,282 1.8<br />

$ 51,848 $ 263,726 $ 134,761 $ 128,965 2.5<br />

$ 64,659 $ 161,132 $ 166,693 $ 32,226 0.5<br />

$ 125,633 $ 358,186 $ 323,388 $ 71,637 0.6<br />

$ 14,969 $ 9,013 $ 40,824 $ 1,803 0.1<br />

$ 205,550 $ 4,023,619 $ 545,095 $ 3,478,524 16.9<br />

$ 16,408 $ 495,153 $ 43,975 $ 451,178 27.5<br />

$ 1,009 $ 46,015 $ 2,789 $ 43,226 42.8<br />

$ 51,848 $ 263,726 $ 134,761 $ 128,965 2.5<br />

$ 81,480 $ 414,427 $ 211,778 $ 202,649 2.5<br />

$ 32,396 $ 49,351 $ 84,100 $ 9,870 0.3<br />

$ 10,057 $ 185,171 $ 27,553 $ 157,618 15.7<br />

$ 9,720 $ 45,550 $ 25,178 $ 20,372 2.1<br />

$ 51,848 $ 263,726 $ 134,761 $ 128,965 2.5<br />

$ 1,025 $ 7,599 $ 2,796 $ 4,803 4.7<br />

$ 18,674 $ 352,860 $ 50,928 $ 301,932 16.2<br />

$ 3,261 $ 156,646 $ 5,938 $ 150,708 46.2<br />

$ 55,187 $ 3,048,573 $ 133,376 $ 2,915,197 52.8<br />

Total<br />

Purchased<br />

Gas Savings<br />

(th/yr)<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

(0)<br />

-<br />

(0)<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

Demand<br />

Savings (kW)<br />

24.0<br />

1.0<br />

4.0<br />

1.0<br />

1.0<br />

-<br />

4.0<br />

5.0<br />

7.0<br />

10.0<br />

1.0<br />

-<br />

32.0<br />

-<br />

1.0<br />

3.0<br />

-<br />

12.0<br />

13.0<br />

16.0<br />

1.0<br />

9.0<br />

7.0<br />

10.0<br />

-<br />

7.0<br />

2.0<br />

15.0<br />

-<br />

154.0<br />

14.0<br />

(2.0)<br />

7.0<br />

12.0<br />

1.0<br />

11.0<br />

-<br />

7.0<br />

2.0<br />

72.0<br />

-<br />

21.0<br />

Total<br />

Purchased<br />

SEP<br />

Electricity<br />

Project Building<br />

Savings<br />

ID Key Building Name Project Name<br />

(kWh/yr)<br />

D1005 04C4315 GONDA CENTER CV Rebalance 328,672<br />

D1047 04C4317 LAW S-8 CAV to VAV 49,076<br />

D1046 04C4317 LAW S-5 & 6 CAV to VAV 220,903<br />

D1045 04C4317 LAW S-4 CAV to VAV 71,619<br />

D1044 04C4317 LAW SF 3 & 7 VIV to VAV & SP Reset 192,296<br />

D1043 04C4317 LAW SF 1 & 2 SP Reset 77,125<br />

D1021 04C4318A POWELL LIB AH 20 CAV to VAV 93,311<br />

D1020 04C4318A POWELL LIB AH 18, 38 & 39 CAV to VAV 25,070<br />

D1019 04C4318A POWELL LIB AH-19 CAV to VAV 141,194<br />

D1018 04C4318A POWELL LIB AH 1 to 4, 17 & 37 CAV to VAV with DCV 46,108<br />

D1017 04C4318A POWELL LIB S-1 CAV to VAV 21,971<br />

D3223 04C4319 FRANZ HALL Dual Duct Conversion to VAV (Cogent Report) 454,484<br />

D1010 04C4320 LIFE SCIENCE SF - 4 & 5 - Aircuity 933,010<br />

D1009 04C4320 LIFE SCIENCE Vivarium - CV Rebalance 76,582<br />

D1061 04C4325 DORIS STEIN AHU - 1, 2 & 3 VIV to VAV SP Reset 256,468<br />

D3234 04C4329 REED RESRCH Dual Duct Conversion to VAV (Cogent Report) 252,517<br />

D1042 04C4331 PUBLIC HLTH CV Rebalance - S-1 93,063<br />

D1041 04C4331 PUBLIC HLTH CAV to VAV - AHU S-2 to S-9 265,427<br />

D3228 04C4332B BRAIN RSCH Dual Duct Conversion to VAV (Cogent Report) 1,010,067<br />

D3233 04C4332D HEALTH SCI Dual Duct Conversion to VAV (Cogent Report) 1,262,583<br />

D1040 04C4332E M DAVIES CC AHU 1 CAV to VAV 40,321<br />

D1039 04C4333 JULES STEIN S2, 3 & 4Aircuity 233,762<br />

D1038 04C4333 JULES STEIN S-1, 5 & 6 CAV to VAV 494,776<br />

D3229 04C4334 DENTISTRY Dual Duct Conversion to VAV (Cogent Report) 757,550<br />

D3220 04C4335 SCHOENBERG Dual Duct Conversion to VAV (Cogent Report) 680,760<br />

D3230 04C4336 FACTOR Dual Duct Conversion to VAV (Cogent Report) 589,184<br />

D1053 04C4343 BOELTER HALL AH 4 to 7, 10 to 12 - SP Reset 734,759<br />

D1052 04C4343 BOELTER HALL S-1 to 11 except 9 - CAV to VAV 1,427,651<br />

D6008 04C4345 MED PLZA 300 CW Reset 170,100<br />

D1013 04C4348 MACDONALDLAB Lab CAV to VAV with Aircuity 2,335,790<br />

D1012 04C4348 MACDONALDLAB AHU 2 Vivarium Aircuity 186,450<br />

D1011 04C4348 MACDONALDLAB AHU 1 VIV to VAV & SP Reset 11,470<br />

D3232 04C4359 MATH SCIENCE Dual Duct Conversion to VAV (Cogent Report) 589,184<br />

D3231 04C4363 KNUDSEN HALL Dual Duct Conversion to VAV (Cogent Report) 925,914<br />

D1003 04C4374 FOWLER MUSM AHU 1 & 2 SP Reset 368,136<br />

D1023 04C4375 ROYCE HALL AC 3, 4, 6 to 8 - CAV to VAV 114,281<br />

D1022 04C4375 ROYCE HALL AC 1 & 2 - SP Reset 110,457<br />

D3227 04C4403 BOYER HALL Dual Duct Conversion to VAV (Cogent Report) 589,184<br />

D6011 04C4415 UNEX CT VFDs 11,650<br />

D6005 04C4415 UNEX Replace Chiller 212,201<br />

D6003 04C4415 UNEX Replace Boiler 37,053<br />

D1035 04C4415 UNEX AHU 1 to 8 T-1 & T-2 CAV to VAV 627,124<br />

SOUTHERN REGIONAL<br />

D6009 04C4562 LIBRARY FACILITY CW Reset 40,032<br />

SOUTHERN REGIONAL<br />

D6004 04C4562 LIBRARY FACILITY Replace Chiller 264,354<br />

SOUTHERN REGIONAL<br />

D1026 04C4562 LIBRARY FACILITY AHU 3 5 & SF-1 CAV to VAV with SP Reset 147,123<br />

SOUTHERN REGIONAL<br />

D1025 04C4562 LIBRARY FACILITY AHU 1, 2 & 4 SP Reset 554,493<br />

D3224 04C4577A MELNITZ HALL Dual Duct Conversion to VAV (Cogent Report) 106,630<br />

D3222 04C4578 MACGOWAN Dual Duct Conversion to VAV (Cogent Report) 333,970<br />

D3221 04C4579 PUBLIC AFFAIRS Dual Duct Conversion to VAV (Cogent Report) 350,601<br />

D6013 04C4580 BUNCHE HALL TOD EF 8,081<br />

D1060 04C4580 BUNCHE HALL Apply DDC controls, convert to VAV 1,861,221<br />

D3236 04C4581 WARREN HALL Dual Duct Conversion to VAV (Cogent Report) 420,882<br />

(0)<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

$ 3,523 $ 9,013 $ 9,608 $ 1,803 0.5<br />

-<br />

-<br />

$ 23,263 $ 387,408 $ 63,445 $ 323,963 13.9<br />

-<br />

80.0<br />

$ 12,947 $ 132,983 $ 33,019 $ 99,964 7.7<br />

-<br />

4.0<br />

$ 48,795 $ 72,370 $ 123,813 $ 14,474 0.3<br />

$ 9,383 $ 75,350 $ 25,457 $ 49,893 5.3<br />

$ 29,389 $ 301,401 $ 76,655 $ 224,746 7.6<br />

$ 30,853 $ 339,076 $ 81,744 $ 257,332 8.3<br />

$ 711 $ 2,253 $ 1,939 $ 451 0.6<br />

$ 163,787 $ 3,634,425 $ 428,856 $ 3,205,569 19.6<br />

$ 37,038 $ 188,376 $ 96,265 $ 92,111 2.5<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

5.0<br />

1.0<br />

-<br />

-<br />

-<br />

67.0<br />

5.0


Table 11.1: SEP Projects by Funding Source and Project Type (Continued)<br />

Gross<br />

Net<br />

Estimated<br />

Simple<br />

Total Cost Estimated Utility Net Project Payback<br />

Savings ($/yr) Project Cost ($) Incentive ($) Cost ($) (yrs)<br />

$ 145,134 $ 376,752 $ 384,615 $ 75,350 0.5<br />

$ 9,332 $ 40,897 $ 24,902 $ 15,995 1.7<br />

$ 20,947 $ 115,534 $ 55,772 $ 59,762 2.9<br />

$ 5,379 $ 10,407 $ 14,441 $ 2,081 0.4<br />

$ 12,432 $ 41,969 $ 33,071 $ 8,898 0.7<br />

$ 5,988 $ 9,013 $ 16,330 $ 1,803 0.3<br />

$ 11,197 $ 45,552 $ 29,767 $ 15,785 1.4<br />

$ 12,122 $ 47,642 $ 32,257 $ 15,385 1.3<br />

$ 12,720 $ 74,077 $ 33,874 $ 40,203 3.2<br />

$ 17,733 $ 115,587 $ 48,363 $ 67,224 3.8<br />

$ 3,004,396 $ 27,552,281 $ 7,904,780 $ 19,647,501 6.5<br />

Total<br />

Purchased<br />

Gas Savings<br />

(th/yr)<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

Demand<br />

Savings (kW)<br />

23.0<br />

-<br />

1.0<br />

2.0<br />

1.0<br />

-<br />

-<br />

1.0<br />

1.0<br />

34.0<br />

1,148.0<br />

$ 4,805 $ 44,187 $ 13,104 $ 31,083 6.5<br />

-<br />

8.0<br />

$ 34,936 $ 286,838 $ 95,281 $ 191,557 5.5<br />

Total<br />

Purchased<br />

SEP<br />

Electricity<br />

Project Building<br />

Savings<br />

ID Key Building Name Project Name<br />

(kWh/yr)<br />

D3226 04C4594 REHAB CENTER Dual Duct Conversion to VAV (Cogent Report) 1,649,252<br />

D1001 04C515A COLLINS CTR AHU - 1 VIV to VAV SP Reset 106,041<br />

D1014 04C515B GOLD HALL AHU - 2, 7, 9 VIV to VAV SP Reset 238,032<br />

D1037 04C515C ENTREP HALL VFD + DCV for a CAV system 61,127<br />

D1036 04C515C ENTREP HALL AHU - 3 VIV to VAV SP Reset 141,268<br />

D6007 04C515D CORNELL HALL CW Reset 68,040<br />

D1057 04C515D CORNELL HALL AHU - 4 VIV to VAV SP Reset 127,238<br />

D1058 04C515E ROSNFLD LIBR AHU - 6 VIV to VAV SP Reset 137,755<br />

D1059 04C515F MULLIN CMNS AHU - 5 & 10 VIV to VAV SP Reset 144,543<br />

D6012 04CWIDE CAMPUSWIDE Pump VFDs 201,511<br />

Subtotal, State Funded, HVAC Projects 34,140,869<br />

Lighting Projects<br />

Retrofit gym HID fixtures with Pulse Start Metal Halide lamps<br />

D3210 04C4204 PAULEY<br />

w/electronic ballasts 54,600<br />

Replace high pressure sodium fixtures with induction fixtures<br />

D3203 04C4235 WOODEN/PS4<br />

and install photocell control where appropriate 397,003<br />

-<br />

45.0<br />

$ 653 $ 3,708 $ 1,782 $ 1,926 2.9<br />

-<br />

2.0<br />

$ 1,405,998 $ 23,858,410 $ 3,834,540 $ 20,023,870 14.2<br />

-<br />

4,590.0<br />

$ 18,480 $ 233,962 $ 50,400 $ 183,562 9.9<br />

$ 1,464,872 $ 24,427,106 $ 3,995,107 $ 20,431,999 13.9<br />

-<br />

-<br />

-<br />

4,645.0<br />

Retrofit kitchen fixtures from F40T12 lamps with magnetic<br />

D3194 04C4261 FACULTY CTR<br />

ballasts to F32T8 (28-watt) lamps with RLO electronic ballasts 7,425<br />

Retrofit all F32T8 fixtures with 28W F32 T8 lamps and RLO<br />

D3219 04CWIDE CAMPUSWIDE<br />

ballasts, and install additional occupancy sensors 15,977,250<br />

Replace 600 additional stairwell light fixtures with bi-level fixtures<br />

D3192 04CWIDE CAMPUSWIDE with occupancy sensors in campus buildings 210,000<br />

Subtotal, State Funded, Lighting Projects 16,646,278<br />

Other Projects<br />

$ 13,771 $ 75,954 $ 37,557 $ 38,397 2.8<br />

-<br />

-<br />

Future Million-Gallon Pool at Sunset Canyon: Variable Speed<br />

Circulation Pumps 156,488<br />

Sunset Canyon Diving & Family Pools: Variable Speed<br />

Circulation Pumps 71,539<br />

D3216 04CWIDE CAMPUSWIDE<br />

$ 6,295 $ 25,331 $ 17,169 $ 8,162 1.3<br />

-<br />

-<br />

D3215 04CWIDE CAMPUSWIDE<br />

$ 11,674 $ 64,507 $ 31,837 $ 32,670 2.8<br />

$ 4,760 $ 17,033 $ 12,981 $ 4,052 0.9<br />

$ 6,927 $ 113,913 $ 12,614 $ 101,299 14.6<br />

$ 3,239 $ 21,205 $ 8,834 $ 12,371 3.8<br />

$ 12,320 $ 145,530 $ 33,600 $ 111,930 9.1<br />

$ 24,640 $ 291,060 $ 67,200 $ 223,860 9.1<br />

$ 24,640 $ 291,060 $ 67,200 $ 223,860 9.1<br />

$ 24,640 $ 291,060 $ 67,200 $ 223,860 9.1<br />

$ 24,640 $ 291,060 $ 67,200 $ 223,860 9.1<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

18.0<br />

35.0<br />

35.0<br />

35.0<br />

35.0<br />

$ 4,177 $ 27,990 $ 11,391 $ 16,599 4.0<br />

-<br />

6.0<br />

$ 18,814 $ 68,191 $ 51,311 $ 16,880 0.9<br />

-<br />

27.0<br />

$ 18,814 $ 68,191 $ 51,311 $ 16,880 0.9<br />

D3214 04CWIDE CAMPUSWIDE Sunset Canyon Park Pool: Variable Speed Circulation Pumps 132,655<br />

D3213 04CWIDE CAMPUSWIDE North Pool: Variable Speed Circulation Pumps 54,089<br />

D3212 04CWIDE CAMPUSWIDE SAC Pool: Solar Pool Water Heater 78,711<br />

D3211 04CWIDE CAMPUSWIDE SAC Pool: Variable Speed Circulation Pumps 36,809<br />

D3122 04CWIDE CAMPUSWIDE Server Virtualization Phase 5 of 5: 5 VM Installations 140,000<br />

D3121 04CWIDE CAMPUSWIDE Server Virtualization Phase 4 of 5: 10 VM Installations 280,000<br />

D3120 04CWIDE CAMPUSWIDE Server Virtualization Phase 3 of 5: 10 VM Installations 280,000<br />

D3119 04CWIDE CAMPUSWIDE Server Virtualization Phase 2 of 5: 10 VM Installations 280,000<br />

D3118 04CWIDE CAMPUSWIDE Server Virtualization Phase 1 of 5: 10 VM Installations 280,000<br />

LCD Phase 9 of 9: 222 Verdiem (PC Power Management)<br />

D3117 04CWIDE CAMPUSWIDE<br />

Installations and 9 CRT Replacements 47,463<br />

LCD Phase 8 of 9: 1000 Verdiem (PC Power Management)<br />

D3116 04CWIDE CAMPUSWIDE<br />

Installations and 40 CRT Replacements 213,796<br />

LCD Phase 7 of 9: 1000 Verdiem (PC Power Management)<br />

D3115 04CWIDE CAMPUSWIDE<br />

Installations and 40 CRT Replacements 213,796<br />

LCD Phase 6 of 9: 1000 Verdiem (PC Power Management)<br />

D3114 04CWIDE CAMPUSWIDE<br />

Installations and 40 CRT Replacements 213,796<br />

LCD Phase 5 of 9: 1000 Verdiem (PC Power Management)<br />

D3113 04CWIDE CAMPUSWIDE<br />

Installations and 40 CRT Replacements 213,796<br />

LCD Phase 4 of 9: 1000 Verdiem (PC Power Management)<br />

D3112 04CWIDE CAMPUSWIDE<br />

Installations and 40 CRT Replacements 213,796<br />

LCD Phase 3 of 9: 1000 Verdiem (PC Power Management)<br />

D3111 04CWIDE CAMPUSWIDE<br />

Installations and 40 CRT Replacements 213,796<br />

LCD Phase 2 of 9: 1000 Verdiem (PC Power Management)<br />

D3110 04CWIDE CAMPUSWIDE<br />

Installations and 40 CRT Replacements 213,796<br />

-<br />

27.0<br />

$ 18,814 $ 68,191 $ 51,311 $ 16,880 0.9<br />

-<br />

27.0<br />

$ 18,814 $ 68,191 $ 51,311 $ 16,880 0.9<br />

-<br />

27.0<br />

$ 18,814 $ 68,191 $ 51,311 $ 16,880 0.9<br />

-<br />

27.0<br />

$ 18,814 $ 68,191 $ 51,311 $ 16,880 0.9<br />

-<br />

27.0<br />

$ 18,814 $ 68,191 $ 51,311 $ 16,880 0.9<br />

-<br />

27.0


Table 11.1: SEP Projects by Funding Source and Project Type (Continued)<br />

Net<br />

Simple<br />

Payback<br />

(yrs)<br />

Net Project<br />

Cost ($)<br />

Gross<br />

Estimated<br />

Utility<br />

Incentive ($)<br />

Estimated<br />

Project Cost ($)<br />

Total Cost<br />

Savings ($/yr)<br />

Total<br />

Purchased<br />

Gas Savings<br />

(th/yr)<br />

Demand<br />

Savings (kW)<br />

$ 18,814 $ 68,191 $ 51,311 $ 16,880 0.9<br />

-<br />

27.0<br />

$ 13,619 $ 66,753 $ 37,144 $ 29,609 2.2<br />

-<br />

18.0<br />

$ 19,738 $ 96,743 $ 53,832 $ 42,911 2.2<br />

-<br />

26.0<br />

$ 19,738 $ 96,743 $ 53,832 $ 42,911 2.2<br />

-<br />

26.0<br />

$ 19,738 $ 96,743 $ 53,832 $ 42,911 2.2<br />

-<br />

26.0<br />

$ 19,738 $ 96,743 $ 53,832 $ 42,911 2.2<br />

-<br />

26.0<br />

$ 19,738 $ 96,743 $ 53,832 $ 42,911 2.2<br />

Total<br />

Purchased<br />

SEP<br />

Electricity<br />

Project Building<br />

Savings<br />

ID Key Building Name Project Name<br />

(kWh/yr)<br />

LCD Phase 1 of 9: 1000 Verdiem (PC Power Management)<br />

D3109 04CWIDE CAMPUSWIDE<br />

Installations and 40 CRT Replacements 213,796<br />

Refrigerators Phase 7 of 7: 69 <strong>Energy</strong> Star Refrigerator<br />

D3108 04CWIDE CAMPUSWIDE<br />

Replacements 154,767<br />

Refrigerators Phase 6 of 7: 100 <strong>Energy</strong> Star Refrigerator<br />

D3107 04CWIDE CAMPUSWIDE<br />

Replacements 224,300<br />

Refrigerators Phase 5 of 7: 100 <strong>Energy</strong> Star Refrigerator<br />

D3106 04CWIDE CAMPUSWIDE<br />

Replacements 224,300<br />

Refrigerators Phase 4 of 7: 100 <strong>Energy</strong> Star Refrigerator<br />

D3105 04CWIDE CAMPUSWIDE<br />

Replacements 224,300<br />

Refrigerators Phase 3 of 7: 100 <strong>Energy</strong> Star Refrigerator<br />

D3104 04CWIDE CAMPUSWIDE<br />

Replacements 224,300<br />

Refrigerators Phase 2 of 7: 100 <strong>Energy</strong> Star Refrigerator<br />

D3103 04CWIDE CAMPUSWIDE<br />

Replacements 224,300<br />

Refrigerators Phase 1 of 7: 100 <strong>Energy</strong> Star Refrigerator<br />

D3102 04CWIDE CAMPUSWIDE<br />

Replacements 224,300<br />

Refrigerators Phase 5 of 5: 73 <strong>Energy</strong> Star Refrigerator<br />

D3101 04CWIDE CAMPUSWIDE<br />

Replacements 163,739<br />

Refrigerators Phase 4 of 5: 100 <strong>Energy</strong> Star Refrigerator<br />

D3100 04CWIDE CAMPUSWIDE<br />

Replacements 224,300<br />

Refrigerators Phase 3 of 5: 100 <strong>Energy</strong> Star Refrigerator<br />

D3099 04CWIDE CAMPUSWIDE<br />

Replacements 224,300<br />

Refrigerators Phase 2 of 5: 100 <strong>Energy</strong> Star Refrigerator<br />

D3098 04CWIDE CAMPUSWIDE<br />

Replacements 224,300<br />

Refrigerators Phase 1 of 5: 100 <strong>Energy</strong> Star Refrigerator<br />

D3097 04CWIDE CAMPUSWIDE<br />

Replacements 224,300<br />

D3096 04CWIDE CAMPUSWIDE Lab Freezers Phase 4 of 4: 6 Lab Freezer Replacements 23,184<br />

D3095 04CWIDE CAMPUSWIDE Lab Freezers Phase 3 of 4: 20 Lab Freezer Replacements 77,280<br />

D3094 04CWIDE CAMPUSWIDE Lab Freezers Phase 2 of 4: 20 Lab Freezer Replacements 77,280<br />

D3093 04CWIDE CAMPUSWIDE Lab Freezers Phase 1 of 4: 20 Lab Freezer Replacements 77,280<br />

Subtotal, State Funded, Other Projects 6,364,652<br />

-<br />

26.0<br />

$ 19,738 $ 96,743 $ 53,832 $ 42,911 2.2<br />

-<br />

26.0<br />

$ 14,409 $ 70,622 $ 39,297 $ 31,325 2.2<br />

-<br />

19.0<br />

$ 19,738 $ 96,743 $ 53,832 $ 42,911 2.2<br />

-<br />

26.0<br />

$ 19,738 $ 96,743 $ 53,832 $ 42,911 2.2<br />

-<br />

26.0<br />

$ 19,738 $ 96,743 $ 53,832 $ 42,911 2.2<br />

-<br />

26.0<br />

$ 19,738 $ 96,743 $ 53,832 $ 42,911 2.2<br />

$ 2,040 $ 116,424 $ 5,564 $ 110,860 54.3<br />

$ 6,801 $ 388,080 $ 18,547 $ 369,533 54.3<br />

$ 6,801 $ 388,080 $ 18,547 $ 369,533 54.3<br />

$ 6,801 $ 388,080 $ 18,547 $ 369,533 54.3<br />

$ 560,089 $ 4,586,700 $ 1,521,237 $ 3,065,463 5.5<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

26.0<br />

3.0<br />

9.0<br />

9.0<br />

9.0<br />

707.0<br />

$ 15,600 $ 346,500 $ 28,409 $ 318,091 20.4<br />

-<br />

-<br />

$ 40,000 $ 693,000 $ 109,092 $ 583,908 14.6<br />

-<br />

52.0<br />

Savings by Design (SBD) - Deferred Maintenance & Capital Renewal Projects<br />

D3075 04CWIDE CAMPUSWIDE Natural Gas Component of DM and CR Projects 2014 177,272<br />

Second Electric Savings Component of DM and CR Projects<br />

D3074 04CWIDE CAMPUSWIDE<br />

2014 454,550<br />

$ 40,000 $ 693,000 $ 109,092 $ 583,908 14.6<br />

$ 15,600 $ 346,500 $ 28,409 $ 318,091 20.4<br />

-<br />

-<br />

52.0<br />

-<br />

$ 40,000 $ 693,000 $ 109,092 $ 583,908 14.6<br />

-<br />

52.0<br />

D3073 04CWIDE CAMPUSWIDE First Electric Savings Component of DM and CR Projects 2014 454,550<br />

D3072 04CWIDE CAMPUSWIDE Natural Gas Component of DM and CR Projects 2013 177,272<br />

Second Electric Savings Component of DM and CR Projects<br />

D3071 04CWIDE CAMPUSWIDE<br />

2013 454,550<br />

$ 40,000 $ 693,000 $ 109,092 $ 583,908 14.6<br />

$ 15,600 $ 346,500 $ 28,409 $ 318,091 20.4<br />

-<br />

-<br />

52.0<br />

-<br />

$ 40,000 $ 693,000 $ 109,092 $ 583,908 14.6<br />

-<br />

52.0<br />

D3070 04CWIDE CAMPUSWIDE First Electric Savings Component of DM and CR Projects 2013 454,550<br />

D3069 04CWIDE CAMPUSWIDE Natural Gas Component of DM and CR Projects 2012 177,272<br />

Second Electric Savings Component of DM and CR Projects<br />

D3068 04CWIDE CAMPUSWIDE<br />

2012 454,550<br />

$ 40,000 $ 693,000 $ 109,092 $ 583,908 14.6<br />

$ 15,600 $ 346,500 $ 28,409 $ 318,091 20.4<br />

-<br />

-<br />

52.0<br />

-<br />

$ 40,000 $ 693,000 $ 109,092 $ 583,908 14.6<br />

-<br />

52.0<br />

D3067 04CWIDE CAMPUSWIDE First Electric Savings Component of DM and CR Projects 2012 454,550<br />

D3066 04CWIDE CAMPUSWIDE Natural Gas Component of DM and CR Projects 2011 177,272<br />

Second Electric Savings Component of DM and CR Projects<br />

D3065 04CWIDE CAMPUSWIDE<br />

2011 454,550<br />

$ 40,000 $ 693,000 $ 109,092 $ 583,908 14.6<br />

$ 15,600 $ 346,500 $ 28,409 $ 318,091 20.4<br />

-<br />

-<br />

52.0<br />

-<br />

$ 40,000 $ 693,000 $ 109,092 $ 583,908 14.6<br />

-<br />

52.0<br />

D3064 04CWIDE CAMPUSWIDE First Electric Savings Component of DM and CR Projects 2011 454,550<br />

D3063 04CWIDE CAMPUSWIDE Natural Gas Component of DM and CR Projects 2010 177,272<br />

Second Electric Savings Component of DM and CR Projects<br />

D3062 04CWIDE CAMPUSWIDE<br />

2010 454,550


Table 11.1: SEP Projects by Funding Source and Project Type (Continued)<br />

Net<br />

Simple<br />

Payback<br />

(yrs)<br />

Net Project<br />

Cost ($)<br />

Gross<br />

Estimated<br />

Utility<br />

Incentive ($)<br />

Estimated<br />

Project Cost ($)<br />

Total Cost<br />

Savings ($/yr)<br />

Total<br />

Purchased<br />

Gas Savings<br />

(th/yr)<br />

Demand<br />

Savings (kW)<br />

Total<br />

Purchased<br />

Electricity<br />

Savings<br />

(kWh/yr)<br />

Building<br />

Key Building Name Project Name<br />

SEP<br />

Project<br />

ID<br />

$ 40,000 $ 693,000 $ 109,092 $ 583,908 14.6<br />

$ 15,600 $ 346,500 $ 28,409 $ 318,091 20.4<br />

-<br />

-<br />

52.0<br />

-<br />

$ 40,000 $ 693,000 $ 109,092 $ 583,908 14.6<br />

-<br />

52.0<br />

D3061 04CWIDE CAMPUSWIDE First Electric Savings Component of DM and CR Projects 2010 454,550<br />

D3060 04CWIDE CAMPUSWIDE Natural Gas Component of DM and CR Projects 2009 177,272<br />

Second Electric Savings Component of DM and CR Projects<br />

D3059 04CWIDE CAMPUSWIDE<br />

2009 454,550<br />

D3058 04CWIDE CAMPUSWIDE First Electric Savings Component of DM and CR Projects 2009 454,550<br />

52.0<br />

- $ 40,000 $ 693,000 $ 109,092 $ 583,908 14.6<br />

Subtotal, State Funded, (SBD) - Deferred Maintenance & Capital Renewal Projects 6,518,233 624.0<br />

- $ 573,605 $ 10,395,000 $ 1,479,558 $ 8,915,442 15.5<br />

Subtotal, State Funded Projects 89,108,065 8,885.0 - $ 7,841,510 $ 83,561,782 $ 20,210,063 $ 63,351,719 8.1<br />

$ 14,078 $ 97,379 $ 33,276 $ 64,103 4.6<br />

$ 6,074 $ 34,700 $ 11,858 $ 22,842 3.8<br />

$ 65,310 $ 373,119 $ 127,499 $ 245,620 3.8<br />

$ 68,130 $ 389,234 $ 133,006 $ 256,228 3.8<br />

$ 11,625 $ 78,750 $ 24,000 $ 54,750 4.7<br />

$ 3,336 $ 20,587 $ 6,210 $ 14,377 4.3<br />

$ 168,553 $ 993,770 $ 335,849 $ 657,921 3.9<br />

-<br />

4,583<br />

49,274<br />

51,401<br />

7,500<br />

2,813<br />

115,570<br />

11.0<br />

4.0<br />

42.0<br />

44.0<br />

9.0<br />

2.0<br />

112.0<br />

Med <strong>Center</strong> Funded Buildings<br />

MBCx Projects<br />

D3501 04C4006 MED PLZA 100 Monitoring Based Commissioning 159,980<br />

D3503 04C510B SMH EMERGCY Monitoring Based Commissioning 34,132<br />

D3505 04C510D SMH PAVILION Monitoring Based Commissioning 367,002<br />

D3507 04C510F SMH WST TOWR Monitoring Based Commissioning 382,854<br />

D3510 04C510H SMH CENT PLT MBCx Central <strong>Plan</strong>t 75,000<br />

D3509 04C510H SMH CENT PLT Monitoring Based Commissioning 16,499<br />

Subtotal, Med <strong>Center</strong> Funded, MBCx Projects 1,035,467<br />

New Construction<br />

D3001 04C4006 MED PLZA 100 100 SBD, New/Renov New/Renov - Outpatient Wing Wing Seismic Renovation Renovation 615,049<br />

44.0<br />

- $ 54,124 $ 645,613 $ 129,516 $ 516,097 9.5<br />

SBD, New/Renov - Santa Monica/Orthopaedic Replacement<br />

D3044 04C510F SMH WST TOWR<br />

Hospital and Parking Structure 2,748,782 314.0 163,728 $ 351,590 $ 3,637,434 $ 790,690 $ 2,846,744 8.1<br />

$ 3,929 $ 46,867 $ 9,401 $ 37,466 9.5<br />

-<br />

3.0<br />

D3088 04CWIDEM CAMPUSWIDE - MED CTR SBD, New/Renov - <strong>Campus</strong> Approved Projects Under $5 Million 44,646<br />

$ 3,929 $ 46,867 $ 9,401 $ 37,466 9.5<br />

-<br />

3.0<br />

D3087 04CWIDEM CAMPUSWIDE - MED CTR SBD, New/Renov - <strong>Campus</strong> Approved Projects Under $5 Million 44,646<br />

$ 3,929 $ 46,867 $ 9,401 $ 37,466 9.5<br />

-<br />

3.0<br />

D3086 04CWIDEM CAMPUSWIDE - MED CTR SBD, New/Renov - <strong>Campus</strong> Approved Projects Under $5 Million 44,646<br />

D3085 04CWIDEM CAMPUSWIDE - MED CTR SBD, New/Renov - <strong>Campus</strong> Approved Projects Under $5 Million 44,646<br />

3.0<br />

- $ 3,929 $ 46,867 $ 9,401 $ 37,466 9.5<br />

Subtotal, Med <strong>Center</strong> Funded, New Construction 3,542,413 370.0 163,728 $ 421,430 $ 4,470,516 $ 957,810 $ 3,512,706 8.3<br />

Subtotal, Med <strong>Center</strong> Funded Projects 4,577,880 482.0 279,298 $ 589,983 $ 5,464,286 $ 1,293,659 $ 4,170,627 7.1<br />

$ 7,177 $ 48,381 $ 16,584 $ 31,797 4.4<br />

$ 13,472 $ 90,818 $ 31,130 $ 59,688 4.4<br />

$ 18,069 $ 121,803 $ 41,751 $ 80,052 4.4<br />

$ 8,882 $ 59,875 $ 20,523 $ 39,352 4.4<br />

$ 12,410 $ 83,659 $ 28,676 $ 54,983 4.4<br />

$ 60,010 $ 404,536 $ 138,664 $ 265,872 4.4<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

5.0<br />

9.0<br />

13.0<br />

6.0<br />

9.0<br />

42.0<br />

Housing Funded<br />

MBCx<br />

D3015 04C4265 TIVERTON HSE Monitoring Based Commissioning 81,558<br />

D3019 04C4302A CANYON POINT Monitoring Based Commissioning 153,094<br />

D3020 04C4302D COVEL COMMON Monitoring Based Commissioning 205,324<br />

D3021 04C4310 KERCKHOFF Monitoring Based Commissioning 100,932<br />

D3036 04C4352 SYCAMORE CT Monitoring Based Commissioning 141,026<br />

Subtotal, Housing, MBCx 681,934<br />

$ 6,398 $ 67,157 $ 15,310 $ 51,847 8.1<br />

$ 171,648 $ 1,750,813 $ 432,481 $ 1,318,332 7.7<br />

$ 68,403 $ 718,016 $ 163,684 $ 554,332 8.1<br />

$ 63,886 $ 670,602 $ 152,875 $ 517,727 8.1<br />

$ 19,296 $ 202,549 $ 46,174 $ 156,375 8.1<br />

-<br />

-<br />

-<br />

-<br />

-<br />

5.0<br />

172.0<br />

56.0<br />

52.0<br />

16.0<br />

$ 12,190 $ 127,950 $ 29,169 $ 98,781 8.1<br />

-<br />

10.0<br />

$ 294,648 $ 3,092,901 $ 705,077 $ 2,387,824 8.1<br />

$ 636,469 $ 6,629,988 $ 1,544,770 $ 5,085,218 8.0<br />

-<br />

-<br />

241.0<br />

552.0<br />

New Construction<br />

D3002 04C4201 ARWHD LODGE SBD, New/Renov - Lake Arrowhead Facility Improvements 72,707<br />

D3012 04C4246 DYKSTRA HALL SBD, New/Renov - Dykstra Repairs and Refurbishment 1,950,545<br />

D3017 04C4298 RIEBER HALL SBD, New/Renov - Rieber Repairs and Refurbishment 777,303<br />

D3018 04C4299 HEDRICK HALL SBD, New/Renov - Hedrick Repairs and Refurbishment 725,977<br />

D3053 04CTBD3 HILGARD GRAD STUD SBD, New/Renov - Hilgard Graduate Student Housing 219,273<br />

SOUTHWEST CAMPUS SBD, New/Renov - Southwest <strong>Campus</strong> Housing Commons<br />

D3054 04CTBD4 HOUSING COMMONS<br />

Building 138,519<br />

NORTHWEST CAMPUS<br />

D3057 04CTBD7 STUDENT HOUSING BUILDING SBD, New/Renov - Northwest <strong>Campus</strong> Student Housing Unit 3,348,278<br />

Subtotal, Housing, New Construction 7,232,601


Table 11.1: SEP Projects by Funding Source and Project Type (Continued)<br />

Net<br />

Simple<br />

Payback<br />

(yrs)<br />

Net Project<br />

Cost ($)<br />

Gross<br />

Estimated<br />

Utility<br />

Incentive ($)<br />

Estimated<br />

Project Cost ($)<br />

Total Cost<br />

Savings ($/yr)<br />

Total<br />

Purchased<br />

Gas Savings<br />

(th/yr)<br />

Demand<br />

Savings (kW)<br />

Total<br />

Purchased<br />

Electricity<br />

Savings<br />

(kWh/yr)<br />

Building<br />

Key Building Name Project Name<br />

SEP<br />

Project<br />

ID<br />

$ 2,170 $ 10,928 $ 5,919 $ 5,009 2.3<br />

$ 1,370 $ 78,323 $ 2,494 $ 75,829 55.4<br />

$ 2,738 $ 156,646 $ 4,987 $ 151,659 55.4<br />

$ 34,268 $ 105,987 $ 85,306 $ 21,197 0.6<br />

$ 4,585 $ 28,262 $ 12,180 $ 16,082 3.5<br />

$ 6,409 $ 2,784 $ 16,712 $ 557 0.1<br />

$ 51,541 $ 382,929 $ 127,598 $ 255,331 5.0<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

4.0<br />

-<br />

-<br />

2.0<br />

1.0<br />

-<br />

7.0<br />

HVAC Projects<br />

D6010 04C4265 TIVERTON HSE CT VFDs 24,661<br />

D6001 04C4302A CANYON POINT Replace Boiler 15,563<br />

D6002 04C4302D COVEL COMMON Replace Boiler 31,119<br />

D1006 04C4302D COVEL COMMON DAC 1 to 4 & DAHU-1 - VIV to VAV SP Reset 389,410<br />

D1008 04C4310 KERCKHOFF CAV to VAV - AHU 2 52,107<br />

D1007 04C4310 KERCKHOFF AHU 1 SP Reset 72,829<br />

Subtotal, Housing, HVAC Projects 585,688<br />

Lighting Projects<br />

Replace high pressure sodium fixtures with induction fixtures<br />

D3198 04C4302C COURTSIDE/PK<br />

and install photocell control where appropriate 175,042<br />

20.0<br />

- $ 15,404 $ 126,470 $ 42,010 $ 84,460 5.5<br />

Subtotal, Housing, Lighting Projects 175,042<br />

20.0<br />

- $ 15,404 $ 126,470 $ 42,010 $ 84,460 5.5<br />

Subtotal, Housing Funded Projects 8,675,264 621.0 - $ 763,423 $ 7,543,922 $ 1,853,042 $ 5,690,880 7.5<br />

$ 39,533 $ 266,496 $ 91,347 $ 175,149 4.4<br />

$ 14,220 $ 95,861 $ 32,858 $ 63,003 4.4<br />

$ 53,753 $ 362,357 $ 124,205 $ 238,152 4.4<br />

-<br />

-<br />

-<br />

28.0<br />

10.0<br />

38.0<br />

Other Fund Source<br />

MBCx<br />

D3016 04C4270 WILSHIRE CTR Monitoring Based Commissioning 449,235<br />

D3037 04C4360 SAC Monitoring Based Commissioning 161,592<br />

Subtotal, Other Fund Source MBCx Proejcts 610,827<br />

$ 18,372 $ 187,394 $ 46,289 $ 141,105 7.7<br />

$ 12,538 $ 131,608 $ 30,002 $ 101,606 8.1<br />

-<br />

-<br />

18.0<br />

10.0<br />

New Construction<br />

SBD, New/Renov - CHS Parking E General Clinical Research<br />

D3007 04C4211 PARKG ST CHS<br />

<strong>Center</strong>/Biomarker Seismic Renovation 208,768<br />

D3052 04CTBD2 SOUTH CAMPUS STUDENT SBD, New/Renov - South <strong>Campus</strong> Student <strong>Center</strong> 142,476<br />

$ 3,929 $ 41,243 $ 9,401 $ 31,842 8.1<br />

-<br />

3.0<br />

D3092 04CWIDEO CAMPUSWIDE - OTHER SBD, New/Renov - <strong>Campus</strong> Approved Projects Under $5 Million 44,646<br />

$ 3,929 $ 41,243 $ 9,401 $ 31,842 8.1<br />

-<br />

3.0<br />

D3091 04CWIDEO CAMPUSWIDE - OTHER SBD, New/Renov - <strong>Campus</strong> Approved Projects Under $5 Million 44,646<br />

$ 3,929 $ 41,243 $ 9,401 $ 31,842 8.1<br />

-<br />

3.0<br />

D3090 04CWIDEO CAMPUSWIDE - OTHER SBD, New/Renov - <strong>Campus</strong> Approved Projects Under $5 Million 44,646<br />

$ 3,929 $ 41,243 $ 9,401 $ 31,842 8.1<br />

$ 46,625 $ 483,975 $ 113,895 $ 370,080 7.9<br />

-<br />

-<br />

3.0<br />

40.0<br />

D3089 04CWIDEO CAMPUSWIDE - OTHER SBD, New/Renov - <strong>Campus</strong> Approved Projects Under $5 Million 44,646<br />

Subtotal, Other Fund Source New Construction 529,826<br />

$ 26,814 $ 847,454 $ 73,130 $ 774,324 28.9<br />

$ 64,796 $ 1,729,872 $ 176,717 $ 1,553,155 24.0<br />

$ 23,784 $ 16,705 $ 62,162 $ 3,341 0.1<br />

$ 6,769 $ 22,142 $ 17,524 $ 4,618 0.7<br />

$ 122,162 $ 2,616,173 $ 329,533 $ 2,286,640 18.7<br />

-<br />

-<br />

-<br />

-<br />

-<br />

98.0<br />

171.0<br />

1.0<br />

-<br />

270.0<br />

HVAC Projects<br />

D6006 04C4270 WILSHIRE CTR Replace Chiller 304,707<br />

D1027 04C4270 WILSHIRE CTR AHU 1 & 2 SP Reset 736,319<br />

D1024 04C4360 SAC AHU1 to 6 SP Reset 270,268<br />

D1004 04C4360 SAC AHU 4 SP Reset 76,916<br />

Subtotal, Other Fund Source HVAC 1,388,209<br />

Lighting Projects<br />

$ 21,756 $ 178,622 $ 59,334 $ 119,288 5.5<br />

-<br />

28.0<br />

Replace high pressure sodium fixtures with induction fixtures<br />

and install photocell control where appropriate 247,225<br />

Replace high pressure sodium fixtures with induction fixtures<br />

and install photocell control where appropriate 382,567<br />

Replace high pressure sodium fixtures with induction fixtures<br />

and install photocell control where appropriate 642,423<br />

Replace high pressure sodium fixtures with induction fixtures<br />

and install photocell control where appropriate 468,283<br />

Replace high pressure sodium fixtures with induction fixtures<br />

and install photocell control where appropriate 195,795<br />

Replace high pressure sodium fixtures with induction fixtures<br />

and install photocell control where appropriate 165,117<br />

D3202 04C4207 PARKG STR 3<br />

$ 33,666 $ 276,408 $ 91,816 $ 184,592 5.5<br />

-<br />

44.0<br />

D3208 04C4208 PARKG STR 9<br />

$ 56,533 $ 464,156 $ 154,182 $ 309,974 5.5<br />

-<br />

73.0<br />

D3207 04C4209 PARKG STR 8<br />

$ 41,209 $ 338,339 $ 112,388 $ 225,951 5.5<br />

-<br />

53.0<br />

D3201 04C4210 PARKG STR 2<br />

$ 17,230 $ 141,463 $ 46,991 $ 94,472 5.5<br />

-<br />

22.0<br />

D3195 04C4211 PARKG ST CHS<br />

$ 14,530 $ 119,299 $ 39,628 $ 79,671 5.5<br />

-<br />

19.0<br />

D3205 04C4219 PARKG STR 6


Table 11.1: SEP Projects by Funding Source and Project Type (Continued)<br />

Net<br />

Simple<br />

Payback<br />

(yrs)<br />

Net Project<br />

Cost ($)<br />

Gross<br />

Estimated<br />

Utility<br />

Incentive ($)<br />

Estimated<br />

Project Cost ($)<br />

Total Cost<br />

Savings ($/yr)<br />

Total<br />

Purchased<br />

Gas Savings<br />

(th/yr)<br />

Demand<br />

Savings (kW)<br />

$ 13,578 $ 111,476 $ 37,030 $ 74,446 5.5<br />

-<br />

18.0<br />

$ 2,303 $ 18,905 $ 6,280 $ 12,625 5.5<br />

-<br />

3.0<br />

$ 32,554 $ 267,281 $ 88,784 $ 178,497 5.5<br />

-<br />

42.0<br />

$ 3,414 $ 31,854 $ 9,312 $ 22,542 6.6<br />

-<br />

4.0<br />

$ 55,660 $ 456,985 $ 151,800 $ 305,185 5.5<br />

-<br />

72.0<br />

Total<br />

Purchased<br />

SEP<br />

Electricity<br />

Project Building<br />

Savings<br />

ID Key Building Name Project Name<br />

(kWh/yr)<br />

Replace high pressure sodium fixtures with induction fixtures<br />

D3199 04C4263 PARKG STR 32<br />

and install photocell control where appropriate 154,290<br />

Replace high pressure sodium fixtures with induction fixtures<br />

D3197 04C4301 PARKG STR RC<br />

and install photocell control where appropriate 26,166<br />

Replace high pressure sodium fixtures with induction fixtures<br />

D3206 04C4322 PARKG STR 7<br />

and install photocell control where appropriate 369,935<br />

Replace high pressure sodium fixtures with induction fixtures<br />

D3209 04C4332H PARKG STR E<br />

and install photocell control where appropriate 38,798<br />

Replace high pressure sodium fixtures with induction fixtures<br />

D3200 04C4342 PARKG STR 1<br />

and install photocell control where appropriate 632,498<br />

Replace gym HID and strength & conditioning fixtures with new<br />

D3218 04C4360 SAC<br />

fluorescent fixtures highbays (sensors in gyms only) 229,211<br />

Replace existing GYM HID fixtures with new fluorescent fixtures<br />

D3217 04C4360 SAC<br />

highbays w/sensors 113,896<br />

Replace high pressure sodium fixtures with induction fixtures<br />

D3196 04C4490 PARKG STR DD<br />

and install photocell control where appropriate 44,212<br />

Retrofit existing 175-watt suspended metal halide fixtures with<br />

ceramic metal halide and replace quartz floods with fluorescent<br />

D3193 04C4582 ACKERMAN<br />

T5HO wall washes 222,825<br />

Replace high pressure sodium fixtures with induction fixtures<br />

D3204 04C4587 PARKG STR 5<br />

and install photocell control where appropriate 115,041<br />

Subtotal, Other Fund Source Lighting 4,048,282<br />

Subtotal, Other Fund Source Projects 6,577,145<br />

<strong>UC</strong> <strong>Los</strong> <strong>Angeles</strong> Total 108,938,355<br />

$ 20,171 $ 83,199 $ 55,011 $ 28,188 1.4<br />

-<br />

30.0<br />

$ 10,023 $ 38,731 $ 27,335 $ 11,396 1.1<br />

-<br />

13.0<br />

$ 3,891 $ 31,943 $ 10,611 $ 21,332 5.5<br />

-<br />

5.0<br />

$ 19,609 $ 174,962 $ 53,478 $ 121,484 6.2<br />

-<br />

42.0<br />

$ 10,124 $ 83,444 $ 27,610 $ 55,834 5.5<br />

$ 356,249 $ 2,817,067 $ 971,590 $ 1,845,477 5.2<br />

$ 578,789 $ 6,279,572 $ 1,539,223 $ 4,740,349 8.2<br />

$ 9,773,705 $ 102,849,562 $ 24,895,987 $ 77,953,575 8.0<br />

-<br />

-<br />

-<br />

279,298<br />

13.0<br />

481.0<br />

829.0<br />

10,817.0


12. ENERGY & GHG FORECAST<br />

The University of California 2007 Policy of Sustainable Practices sets the goal of reducing<br />

greenhouse gas emissions to 2000 levels by 2014 and to 1990 levels by 2020. Each campus<br />

will need to develop complete greenhouse gas emissions calculations for the baseline years of<br />

1990 and 2000. In order to determine the potential impact of energy efficiency and renewable<br />

energy projects identified in the <strong>Strategic</strong> <strong>Energy</strong> <strong>Plan</strong>, current, past, and future greenhouse gas<br />

emissions from purchased electricity and natural gas have been estimated based on<br />

information provided on energy purchases for fiscal years 1999-2000 and 2006-2007.<br />

Greenhouse gas emissions savings for the projects identified have also been calculated in order<br />

to compare their impact with the greenhouse gas emissions reduction goals. While these<br />

emissions calculations do not include all sources of campus greenhouse gas emissions, they do<br />

provide a way of measuring the impact of the projects identified in the SEP in relation to<br />

electricity and natural gas usage.<br />

12.1 Electricity Emissions Factors<br />

Although some California utilities publish greenhouse gas emissions factors for their delivered<br />

power, a complete record of historical and current factors is not available. Therefore, in<br />

accordance with the California Climate Action Registry (CCAR) General Reporting Protocol,<br />

EPA’s eGRID emissions factor for the CALI – WECC California subregion for 2000 of 0.000366<br />

metric tons of CO2e/kWh was used to calculate greenhouse gas emissions from purchased<br />

electricity. This number includes greenhouse gas emissions of carbon dioxide, methane, and<br />

nitrous oxide and uses global warming potential factors published in the IPCC’s Third<br />

Assessment Report to convert methane and nitrous oxide emissions to carbon dioxide<br />

equivalents. The emissions factor is reported in metric tons of carbon dioxide equivalent per<br />

kWh (CO2e/kWh) of electricity purchased. While the emissions factor does normally vary by<br />

year based on the actual fuel mix used, a constant value was used to isolate the impacts of<br />

energy efficiency and renewable energy projects. Each campus may choose to develop utility<br />

and year specific emissions factors when filing their greenhouse gas emissions with the<br />

California Climate Action Registry.<br />

12.2 Gas Emissions Factors<br />

The emission factors provided in the California Climate Action Registry General Reporting<br />

Protocol, Tables C.5 and C.6 were used to calculate the greenhouse gas emissions associated<br />

with natural gas purchases. This number is 0.005295 metric tons of CO2e per therm.<br />

12.3 Current <strong>Energy</strong> Usage and Emissions<br />

Current emissions from purchased utilities are shown in Table 1.1<br />

12.4 2014 Goals<br />

The University of California has set the goal of meeting 2000 greenhouse gas emission by<br />

2014. In 2000 many campuses were purchasing their energy from Enron which relied on a<br />

different power mix than the state-wide average. This information is not accurately reflected in<br />

the average state-wide emissions factor and therefore actual greenhouse gas emissions for<br />

campuses purchasing Enron power will be much higher than calculated. In addition to the<br />

campus wide greenhouse gas emissions goal, the campus also needs to meet the goal of<br />

2413.01/Reports/<strong>UC</strong> SEP Final Report – <strong>UC</strong>LA.doc 12-1 December 31, 2008<br />

Newcomb | Anderson | McCormick


educing growth adjusted electricity consumption to 10% below 2000 levels by 2014. The<br />

energy consumption and greenhouse gas emissions associated with the 2014 goals are shown<br />

in Table 1.1. The emissions are based on the statewide average emissions factor.<br />

12.5 2020 Goals<br />

While the goal of achieving a reduction of greenhouse gas emissions to 1990 levels by 2020<br />

has been set, the lack of data on energy consumption and emission factors in 1990 has made it<br />

infeasible to determine an accurate baseline.<br />

12.6 SEP <strong>Energy</strong> Efficiency and Renewable <strong>Energy</strong> Projects<br />

The <strong>Strategic</strong> <strong>Energy</strong> <strong>Plan</strong> has identified energy efficiency and renewable energy projects to<br />

help meet the greenhouse gas emissions targets of each campus. The impact of these<br />

proposed projects on greenhouse gas emissions is shown in Table 1.1. If the campus chooses<br />

to install the photovoltaic systems proposed in the SEP, they will need to retain ownership of the<br />

renewable energy credits (RECs) associated with the production of electricity from the PV<br />

panels in order to claim credit for the greenhouse gas emissions reductions from the system.<br />

2413.01/Reports/<strong>UC</strong> SEP Final Report – <strong>UC</strong>LA.doc 12-2 December 31, 2008<br />

Newcomb | Anderson | McCormick


13. CONCLUSIONS<br />

13.1 Next Steps and Recommendations<br />

13.1.1 Action <strong>Plan</strong><br />

The <strong>UC</strong> <strong>Strategic</strong> <strong>Energy</strong> <strong>Plan</strong> was driven by the <strong>UC</strong>’s Policy on Sustainable Practices, Section<br />

II d., which stipulates that the system (1) reduce systemwide growth-adjusted energy<br />

consumption by 10 percent or more by 2014 from the year 2000 base consumption level, and<br />

(2) reduce GHG emissions to 2000 levels by 2014.<br />

To accomplish these goals, the campus must create a strategic action plan for implementing<br />

energy-saving projects through the year 2014. The plan should address both State and Nonstate<br />

funded facilities. The SEP project list should be used as a starting point to guide these<br />

action plans, but the University should continuously evaluate the feasibility of additional energysaving<br />

measures. Every campus has begun to develop an action plan through 2011. For each<br />

year in the six year program, the University should re-evaluate and modify the action plan to<br />

reflect actual progress towards goals and necessary future steps.<br />

13.1.2 College Performance: Measurement and Reporting<br />

To ensure meeting the goals and requirements of the <strong>UC</strong> Policy on Sustainable Practices, the<br />

campus must measure, evaluate, and report energy use and greenhouse gas emissions<br />

regularly.<br />

A Climate Change Working Group at each campus is currently developing a protocol to allow for<br />

growth adjustment and normalization of data and accurate reporting procedures. These<br />

Working Groups will monitor progress toward reaching the stated goals for GHG reduction, and<br />

will evaluate suggestions for programs to reach these goals.<br />

13.2 Funding Sources<br />

Significant financial investment will be required to accomplish the <strong>UC</strong> Policy on Sustainable<br />

Practices goals. A variety of financing programs and funding sources are available to the<br />

Universities. Two major funding sources designed specifically to support energy efficiency<br />

projects are the Utility Incentive Programs and the <strong>UC</strong>OP’s <strong>Energy</strong> Efficiency Financing<br />

program.<br />

13.2.1 Utility Incentive Programs<br />

Most Utilities in California offer incentives to customers to support the implementation of energysaving<br />

projects.<br />

The University of California/California State University/Investor-Owned Utility (<strong>UC</strong>/CSU/IOU)<br />

<strong>Energy</strong> Efficiency Partnership Program provides funding to all campuses served by San Diego<br />

Gas and Electric (SDG&E), Southern California Gas (SCG), Southern California Edison (SCE),<br />

Pacific Gas and Electric (PG&E). Through the Partnership, these IOUs distribute incentives<br />

from Public Purpose Programs (formerly Publics Good Charges) that customers pay on their<br />

utility bills. Since 2004, the IOUs have paid <strong>UC</strong> almost $20 million in incentives through this<br />

Partnership, and the IOUs have offered to increase <strong>UC</strong> funding in future years. As a preliminary<br />

2413.01/Reports/<strong>UC</strong> SEP Final Report – <strong>UC</strong>LA.doc 13-1 December 31, 2008<br />

Newcomb | Anderson | McCormick


step within the <strong>Strategic</strong> <strong>Energy</strong> <strong>Plan</strong>, commitments were made to the IOUs to coincide with<br />

CP<strong>UC</strong> filing deadlines and it is anticipated that funding levels will be granted for the<br />

commitment. Current <strong>UC</strong>/CSU/IOU Partnership incentive rates are $0.24 per kilowatt-hour<br />

saved in the first year and $1.00 per therm saved in the first year, and the Partnership will pay<br />

up to 80% of the project cost. This incentive structure is anticipated to remain unchanged in the<br />

future program years.<br />

Publicly-Owned Utilities, such as <strong>Los</strong> <strong>Angeles</strong> Department of Public Works (LADWP),<br />

Sacramento Municipal Utility District (SMUD), Riverside Public Utilities (RPU) also manage<br />

energy efficiency incentive programs that have historically paid substantial incentives to<br />

Universities in their territories. There have been discussions with each of these utilities to<br />

negotiate similar incentive rates, and LADWP has agreed to match the $0.24/kWh incentive rate<br />

for project completed by <strong>UC</strong>LA.<br />

13.2.2 <strong>UC</strong>OP <strong>Energy</strong> Efficiency Financing<br />

<strong>UC</strong>OP has designed a program to work in concert with the Utility incentive programs to provide<br />

low-interest loan to cover the cost to the campuses after the incentives. <strong>Campus</strong>es will pay<br />

back the loans to <strong>UC</strong>OP using the energy cost savings. To do so will require Department of<br />

Finance approval to allow for capital debt service to be paid with energy cost savings. In order<br />

to be eligible for the <strong>UC</strong>OP borrowed funds, a portfolio of projects must meet minimum,<br />

although liberal, project cost return requirement. The anticipated criteria include a 85% ratio of<br />

loan payment to energy savings, which equates to approximately 15 year simple payback on the<br />

portfolio of projects.<br />

<strong>UC</strong>OP is prepared to lend up to $500 million to campuses through 2014 to support energysaving<br />

projects.<br />

To learn more about <strong>UC</strong>OP <strong>Energy</strong> Efficiency Project Financing, contact<br />

Dirk van Ulden<br />

Associate Director<br />

<strong>Energy</strong> & Utilities Services<br />

University of California Office of the President<br />

510-987-9392<br />

Dirk.vanulden@ucop.edu<br />

2413.01/Reports/<strong>UC</strong> SEP Final Report – <strong>UC</strong>LA.doc 13-2 December 31, 2008<br />

Newcomb | Anderson | McCormick


APPENDICES


Appendix A<br />

Field Data Forms<br />

(Electronic copies only – see folder “Appendix A - Field Data Forms” on disk)


Appendix B<br />

Savings Calculations<br />

(Electronic copies only – see folder “Appendix B- Savings Calculations” on disk)


Appendix C<br />

Other Calculations and Data<br />

(Electronic copies only – see folder “Appendix C- Other Calculations and Data” on disk)