R-10 AMENDMENT 2509.22-2006-2<br />

EFFECTIVE DATE: 07/14/2006<br />

DURATION: This amendment is effective until superseded or removed.<br />

Water Quality Issues<br />

Erosion of road embankment at<br />

culvert inlets & outlets.<br />

BMP 14.9<br />

_________ __________<br />

Contractor COR<br />

Additional comments:<br />

Reduced culvert capacity due to<br />

crushing or deformation.<br />

BMP 14.9<br />

_________ __________<br />

Contractor COR<br />

Additional comments:<br />

Ditch sediment load flowing<br />

directly into streams. BMP 14.9<br />

_________ __________<br />

Contractor COR<br />

Additional comments:<br />

Ditch sediment load flowing<br />

directly into streams due to culvert<br />

clearing in flowing streams or<br />

ditch clearing in actively flowing<br />

ditches. BMP 14.9<br />

_________ __________<br />

Contractor COR<br />

Additional comments:<br />

Ditch and road embankment scour<br />

and erosion. BMP 14.9<br />

_________ __________<br />

Contractor COR<br />

Additional comments:<br />

Deposition of excavated materials<br />

beyond roadway limits or on<br />

slopes adjacent to drainages.<br />

BMP 14.10 & 14.12<br />

_________ __________<br />

Contractor COR<br />

Additional comments:<br />

Scour, erosion, and increased<br />

sediment/bed-load in stream.<br />

BMP 14.14<br />

_________ __________<br />

Contractor COR<br />

Additional comments:<br />

FSH 2509.22 – SOIL AND WATER CONSERVATION HANDBOOK<br />

CHAPTER 10 – WATER QUALITY MANAGEMENT FOR<br />

NATIONAL FOREST SYSTEM LANDS IN ALASKA<br />

Mitigation Measures<br />

Place riprap as specified.<br />

14.5 Exhibit 01--Continued<br />

Timing<br />

2509.22_10<br />

Page 67 of 117<br />

Immediately after<br />

culvert installation.<br />

Implemented/<br />

Date if<br />

Appropriate<br />

________<br />

Install at design minimum depth. As identified. ________<br />

Install cross drain culvert to discharge on filter. As identified. ________<br />

When possible confine these activities to the period of July 15<br />

through August 15. If work is done outside this timeframe,<br />

construct sediment ponds, install silt fences, or hay/straw bales<br />

to mitigate sedimentation.<br />

________<br />

Install ditch blocks and riprap lining as specified. As identified. ________<br />

Confine excavation operation to within roadway, and avoid<br />

placing material near drainages.<br />

As identified. ________<br />

Avoid removing large woody debris from streams. As indentified. ________