R-10 AMENDMENT 2509.22-2006-2<br />

EFFECTIVE DATE: 07/14/2006<br />

DURATION: This amendment is effective until superseded or removed.<br />

Water Quality Issues<br />

Insufficient ditch relief culverts.<br />

BMP 14<br />

__________ __________<br />

Contractor COR<br />

Additional comments:<br />

Excessive area laid bare and<br />

seeding/fertilizing not<br />

implemented timely. BMP 12/17,<br />

14.8 & 14.10<br />

__________ __________<br />

Contractor COR<br />

Additional comments:<br />

Unsuitable ground conditions for<br />

road construction due to season<br />

climatic conditions. BMP 14.6<br />

__________ __________<br />

Contractor COR<br />

Additional comments:<br />

Unstable slopes due to saturated<br />

Soils. BMP 14.6<br />

__________ __________<br />

Contractor COR<br />

Additional comments:<br />

Road fill placed over snow.<br />

BMP 14.6<br />

_________ __________<br />

Contractor COR<br />

Additional comments:<br />

FSH 2509.22 – SOIL AND WATER CONSERVATION HANDBOOK<br />

CHAPTER 10 – WATER QUALITY MANAGEMENT FOR<br />

NATIONAL FOREST SYSTEM LANDS IN ALASKA<br />

14.5 – Exhibit 01<br />

______________________ Ranger District<br />

ROAD CONSTRUCTION EROSION CONTROL PLAN<br />

Mitigation Measures<br />

Install culvert<br />

Adjust size of area in relationship to seasonal climatic<br />

conditions, or as directed by the Engineer. Seed and<br />

fertilize at prescribed frequencies.<br />

Normal Season<br />

Max. Bared Area ____ LF – Pioneered Roadway<br />

Max. Bared Area ____ LF – Cutslopes & Sidecast Ex.<br />

Frequency: ____ Days max. between seeding finished slopes<br />

& bared areas<br />

Outside Normal Season<br />

Max. Bared Area ____ LF – Pioneered Roadway<br />

Max. Bared Area ____ LF – Cutslopes & Sidecast Ex.<br />

Frequency: ____ Days max. between seeding finished slopes<br />

& bared areas<br />

Shut down operation or a portion of the operation as directed by<br />

the Engineer<br />

Limit blasting during this condition.<br />

Controlled Blasting<br />

Sta. ______ to Sta. ______ Sta. ______ to Sta. ______<br />

Sta. ______ to Sta. ______ Sta. ______ to Sta. ______<br />

Sta. ______ to Sta. ______ Sta. ______ to Sta. ______<br />

Timing<br />

As identified<br />

2509.22_10<br />

Page 65 of 117<br />

During normal<br />

operating season as<br />

directed. Outside<br />

normal operating<br />

season per ________<br />

Implemented/<br />

Date if<br />

Appropriate<br />

________<br />

________<br />

As identified. ________<br />

In accordance with<br />

__________<br />

Embankment construction on snow prohibited. In accordance with<br />

Specification 203.<br />

________<br />

________