R-10 AMENDMENT 2509.22-2006-2<br />
EFFECTIVE DATE: 07/14/2006<br />
DURATION: This amendment is effective until superseded or removed.<br />
Water Quality Issues<br />
Insufficient ditch relief culverts.<br />
BMP 14<br />
__________ __________<br />
Contractor COR<br />
Additional comments:<br />
Excessive area laid bare and<br />
seeding/fertilizing not<br />
implemented timely. BMP 12/17,<br />
14.8 & 14.10<br />
__________ __________<br />
Contractor COR<br />
Additional comments:<br />
Unsuitable ground conditions for<br />
road construction due to season<br />
climatic conditions. BMP 14.6<br />
__________ __________<br />
Contractor COR<br />
Additional comments:<br />
Unstable slopes due to saturated<br />
Soils. BMP 14.6<br />
__________ __________<br />
Contractor COR<br />
Additional comments:<br />
Road fill placed over snow.<br />
BMP 14.6<br />
_________ __________<br />
Contractor COR<br />
Additional comments:<br />
FSH 2509.22 – SOIL AND WATER CONSERVATION HANDBOOK<br />
CHAPTER 10 – WATER QUALITY MANAGEMENT FOR<br />
NATIONAL FOREST SYSTEM LANDS IN ALASKA<br />
14.5 – Exhibit 01<br />
______________________ Ranger District<br />
ROAD CONSTRUCTION EROSION CONTROL PLAN<br />
Mitigation Measures<br />
Install culvert<br />
Adjust size of area in relationship to seasonal climatic<br />
conditions, or as directed by the Engineer. Seed and<br />
fertilize at prescribed frequencies.<br />
Normal Season<br />
Max. Bared Area ____ LF – Pioneered Roadway<br />
Max. Bared Area ____ LF – Cutslopes & Sidecast Ex.<br />
Frequency: ____ Days max. between seeding finished slopes<br />
& bared areas<br />
Outside Normal Season<br />
Max. Bared Area ____ LF – Pioneered Roadway<br />
Max. Bared Area ____ LF – Cutslopes & Sidecast Ex.<br />
Frequency: ____ Days max. between seeding finished slopes<br />
& bared areas<br />
Shut down operation or a portion of the operation as directed by<br />
the Engineer<br />
Limit blasting during this condition.<br />
Controlled Blasting<br />
Sta. ______ to Sta. ______ Sta. ______ to Sta. ______<br />
Sta. ______ to Sta. ______ Sta. ______ to Sta. ______<br />
Sta. ______ to Sta. ______ Sta. ______ to Sta. ______<br />
Timing<br />
As identified<br />
2509.22_10<br />
Page 65 of 117<br />
During normal<br />
operating season as<br />
directed. Outside<br />
normal operating<br />
season per ________<br />
Implemented/<br />
Date if<br />
Appropriate<br />
________<br />
________<br />
As identified. ________<br />
In accordance with<br />
__________<br />
Embankment construction on snow prohibited. In accordance with<br />
Specification 203.<br />
________<br />
________