Government <strong>of</strong> <strong>India</strong><br />
Office <strong>of</strong> the Dy. Superintending Horticulturist<br />
<strong>Archaeological</strong> <strong>Survey</strong> <strong>of</strong> <strong>India</strong><br />
Horticulture Division No.-II<br />
Safdarjung Tomb<br />
New Delhi<br />
Dated the………<br />
NOTICE INVITING TENDER<br />
Sealed tenders are invited, on behalf <strong>of</strong> the President <strong>of</strong> <strong>India</strong>, by the<br />
Dy. Superintending Horticulturist, <strong>Archaeological</strong> <strong>Survey</strong> <strong>of</strong> <strong>India</strong>, Horticulture Division No.-II,<br />
Safdarjung Tomb, New Delhi from experienced, registered and eligible contractors <strong>of</strong><br />
CPWD/PWD/MES/Railways/ P & T Department / A.S.I. for the under mentioned work. The<br />
tenders will be received on 28/06/2010 up to 3.00 P.M. and will be opened on the same day<br />
at 3.30 P.M. in the presence <strong>of</strong> contractors or authorized representatives who chose to<br />
remain present.<br />
S.No. Name <strong>of</strong> Work Estimated Cost Earnest Tender<br />
Money Cost<br />
1. Annual Maintenance & upkeep <strong>of</strong><br />
garden at Outer area <strong>of</strong> Safdarjung<br />
Tomb, New Delhi for the year 2010-11<br />
Rs.1,42,609/- Rs.2,855/- Rs.500/-<br />
The tender form bearing details <strong>of</strong> materials can be had in this <strong>of</strong>fice on all<br />
working days up to 5.00 P.M. on payment <strong>of</strong> Rs.500/- in cash. The Tender Form & Tender<br />
Document can also be downloaded from the website <strong>of</strong> <strong>Archaeological</strong> <strong>Survey</strong> <strong>of</strong> <strong>India</strong><br />
www.asi.nic.in and must be accompanied by Bank Draft for Rs.500/- towards tender cost<br />
(Non-refundable) and another Bank Draft for the earnest money drawn only from Scheduled<br />
Bank in favour <strong>of</strong> ‘Deputy Superintending Horticulturist, <strong>Archaeological</strong> <strong>Survey</strong> <strong>of</strong> <strong>India</strong>,<br />
Horticulture Division No.-II, Safdarjung Tomb, New Delhi.’ Both drafts should be submitted<br />
along with tender document and following attested documents before or on the notified date.<br />
If the Bank draft for Rs.500/- as cost <strong>of</strong> Tender documents, bank draft for required earnest<br />
money and required following attested documents are not found attached with the tender<br />
document at the time <strong>of</strong> opening <strong>of</strong> tender, the tender document will be rejected outrightly.<br />
The tenderer must submit the attested copies <strong>of</strong> the following documents along<br />
with the application for obtaining the tender documents or at the time <strong>of</strong> submission <strong>of</strong> tender<br />
document, if downloaded from the website <strong>of</strong> A.S.I.:-<br />
1. Pro<strong>of</strong> <strong>of</strong> T.I.N. number.<br />
2. Pro<strong>of</strong> <strong>of</strong> Income Tax return for last three years.<br />
3. Works experience as contractor at par <strong>of</strong> estimated cost or more for the last three<br />
years with the CPWD/PWD/MES/Railways/P & T Department/ASI.<br />
4. Pro<strong>of</strong> <strong>of</strong> Registration in any Government Department.<br />
5. Demand Draft for the earnest money drawn only from Scheduled Bank in favour <strong>of</strong><br />
‘Deputy Superintending Horticulturist, <strong>Archaeological</strong> <strong>Survey</strong> <strong>of</strong> <strong>India</strong>, Horticulture<br />
Division No.-II, Safdarjung Tomb, New Delhi.’<br />
Note:-<br />
1. Last date <strong>of</strong> receipt <strong>of</strong> application form for tenders : 24/06/2010<br />
2. Last date <strong>of</strong> issue <strong>of</strong> tender form. : 25/06/2010<br />
3. The work has to be commenced immediately on award <strong>of</strong> work and complete within<br />
the stipulated time.<br />
Dy. Superintending Horticulturist
dk;kZy; mi v/kh{k.k m|kufon~]<br />
Hkkjrh; iqjkrRo losZ{k.k]<br />
m|kue.My f}rh;]<br />
lQnjtax enzlk]<br />
ubZ fnYyh& 110003<br />
&%fufonk lwpuk%&<br />
Hkkjr ds jk’Vª~zifr dh vksj ls mi&v/kh{k.k m|kufon~] Hkkjrh; iqjkrRo losZ{k.k] m|ku<br />
e.My& f}rh;]lQnjtax enzlk] ubZ fnYyh ds }kjk v/kksfyf[kr dk;Z gsrq dsUnzh; yksd fuekZ.k<br />
foHkkx @ yksd fuekZ.k foHkkx@ lsuk vfHk;kaf=fd lsok @ jsyos @ Mkd ,ao rkj foHkkx @<br />
Hkkjrh; iqjkrRo losZ{k.k ds vf/kd`r @vuqHkoh @ iathd`r rFkk ;ksX; Bsdsnkjksa ls fu/kkZfjr izi= ij<br />
eqgjcUn fufonk;sa vkeaf=r dh tkrh gSa A fufonk;sa fnukad 28/06/2010 ds vijkUg rhu cts rd<br />
izkIr dh tk;saxh ,ao mlh fnu 03-30 cts mifLFkr Bsdsnkjksa @ muds vf/kd`r izfrfuf/k;ksa ds le{k<br />
tks mifLFkr jguk pkgsa] [kksyh tk;saxh A dk;Z ds fooj.k laca/kh foLr`r tkudkjh rFkk fufonk izi=<br />
bl dk;kZy; ls fdlh Hkh dk;Z fnol esa lk;Wa 05-00 cts rd :0 500@& vizfrns; dk uxn<br />
Hkqxrku djds ,oa /kjksgj jkf”k ds MªkV ds lkFk yxkdj izkIr dh tk ldrh gSa ;k Hkkjrh;<br />
iqjkrRo losZ{k.k dh osc lkbZV www.asi.nic.in ls MkmuyksM dh tk ldrh gS ,oa eksgjcUn fufonk<br />
dk;kZy; esa Mkyrs le; fufonk izi= dk ewY; #0 500@& dk fMek.M MªkV tks fd ^mi&v/kh{k.k<br />
m|kufon~] Hkkjrh; iqjkrRo losZ{k.k] m|ku e.My& f}rh;]lQnjtax enzlk] ubZ fnYyh^ ds i{k esas<br />
ns; gks] lyaxu djuk gksxk vU;Fkk blds vHkko esa fufonk vekU; gksxh A<br />
Dze<br />
la0<br />
dk;Z dk fooj.k vuqekfur ykxr<br />
#0<br />
1 lQnjtax dk enzlk] ubZ fnYyh ds ckgjh {ks= ds<br />
m|ku dk okf’kZd j[k j[kko A<br />
/kjksgj<br />
jkf”k<br />
#0<br />
fufonk izi=<br />
dh jkf”k<br />
1]42]609@& 2]855@& #0500@&<br />
fufonk izi= ds lkFk dsoy vuqlwfpr cSad }kjk tkjh fMek.M MªkV ds :i esa /kjksgj<br />
jkf”k tks fd ^mi&v/kh{k.k m|kufon~] Hkkjrh; iqjkrRo losZ{k.k] m|ku e.My& f}rh;]lQnjtax<br />
enzlk] ubZ fnYyh^ ds i{k esas ns; gks] lyaxu djuh gksxh A fufonkdkj dks fufonk izi= tkjh djus<br />
gsrq fuEufyf[kr nLrkostksa dh lR;kfir izfrfyih vko”;d :i esa izLrqr djus gksaxs A<br />
1 T.I.N. la[;k lEcU/kh izek.k i= A<br />
2 fiNys rhu o’kZ dh vk;dj fooj.kh dh lR;kfir izfrfyih A<br />
3 okafNr lhek ;k xr rhu o’kksZa ls vf/kd v<strong>of</strong>/k dk dsUnzh; yksd fuekZ.k foHkkx @ yksd<br />
fuekZ.k foHkkx@ lsuk vfHk;kaf=fd lsok @ jsyos @ Mkd ,ao rkj foHkkx @ Hkkjrh; iqjkrRo<br />
losZ{k.k esa Bsdsnkj dk dk;Z vuqHko laca/kh izek.k i= A<br />
4 lEcfU/kr ljdkjh foHkkx esa iath;u lEcU/kh izek.k i= A<br />
5 fufonk izi= ds lkFk dsoy vuqlwfpr cSad }kjk tkjh fMek.M MªkV ds :i esa /kjksgj jkf”k<br />
tks fd ^mi&v/kh{k.k m|kufon~] Hkkjrh; iqjkrRo losZ{k.k] m|ku e.My& f}rh;]lQnjtax<br />
enzlk] ubZ fnYyh^ ds i{k esas ns; gks A<br />
fVIi.kh%&<br />
1 fufonk [kksyrs le; ;fn mijksDr izi=ksa dh lR;kfir izfrfyih] /kjksgj jkf”k dk vuqlwfpr<br />
cSad }kjk tkjh fMek.M MªkV rFkk fufonk izi= dk ewY; #0 500@& dk fMek.M MªkV ¼;fn<br />
fufonk izi= Hkkjrh; iqjkrRo losZ{k.k dh osc lkbZV www.asi.nic.in ls MkmuyksM dh xbZ gS ½<br />
fufonk izi= ds lkFk ugha ik;s x, rks fufonk izi= vekU; gksxk A<br />
2 fufonk izi= tkjh djus gsrq izkFkuk i= nsus dh vfUre frfFk%&24@06@2010<br />
3 fufonk izi= tkjh djus dh vfUre frfFk%&25@06@2010
4 dk;kZns”k fuxZr gksus ds rqjUr ckn dk;Z izkjEHk djuk gksxk rFkk fu/kkZfjr le;k<strong>of</strong>/k esa iw.kZ<br />
djuk gksxk A<br />
mi&v/kh{k.k m|kufon~
<strong>GOVERNMENT</strong> <strong>OF</strong> <strong>INDIA</strong><br />
ARCHAEOLOGICAL SURVEY <strong>OF</strong> <strong>INDIA</strong><br />
TENDER DOCUMENT<br />
State – New Delhi Division- No. II , New Delhi<br />
Branch- Horticulture Sub-Division- Safdarjung Tomb<br />
Percentage Rate Tender / Item rate &contract for the Work <strong>of</strong> “Annual Maintenance<br />
& upkeep <strong>of</strong> garden at Outer area <strong>of</strong> Safdarjung Tomb, New Delhi for the year 2010-<br />
11”.<br />
Tender for the work or Supply <strong>of</strong> Material as given in schedule<br />
To be submitted by 03.00 P.M. hours on 28/06/2010<br />
(Time) (Dated)<br />
To be opened in the presence <strong>of</strong> tenderers who may be present at 03:30 p.m. hours<br />
on 28/06/2010 in the <strong>of</strong>fice <strong>of</strong> Dy. Superintending Horticulturist, <strong>Archaeological</strong><br />
<strong>Survey</strong> <strong>of</strong> <strong>India</strong>, Horticulture Division No.-II, Safdarjung Tomb, New Delhi.<br />
…………………………………………………………………………………………<br />
Issued to: ………………………………………………………………………………<br />
……………………………………………………………………………….<br />
(Contractor)<br />
Signature <strong>of</strong> the <strong>of</strong>ficer issuing the documents………..<br />
Designation …………………………………………….<br />
Date <strong>of</strong> issue……………………………………………
SCHEDULE <strong>OF</strong> QUANTITY<br />
STATE:- Delhi<br />
BRANCH:- HORTICULTURE, ARCHAEOLOGICAL SURVEY <strong>OF</strong> <strong>INDIA</strong><br />
NAME <strong>OF</strong> WORK:- Annual Maintenance & upkeep <strong>of</strong> garden at Outer area <strong>of</strong><br />
Safdarjung Tomb, New Delhi for the year 2010-11(For 09<br />
months from July 2010 to March 2011).<br />
Item<br />
No.<br />
Name <strong>of</strong> work Quantity Rate Unit<br />
Per<br />
1. Complete maintenance <strong>of</strong> lawns<br />
(intensive), flowerbeds, hedges<br />
and standing trees & plants as per<br />
specifications, attached conditions<br />
and periodic directions <strong>of</strong><br />
competent authorities.<br />
Amount in Words: Rs.<br />
3.0 Acre Per<br />
acre<br />
per<br />
month<br />
Amount<br />
(In Rs.)<br />
Contractor<br />
NOTE :- 1. THE RATES SHOULD BE MENTIONED IN FIGURES AS WELL AS<br />
WORDS.<br />
2. OVERALL TENDERED RATES WILL BE CONSIDERED.<br />
3. Man power deployment for Garden Maintenance as per norms<br />
= 01 Man / per Acre<br />
Dy. Superintending Horticulturist
<strong>GOVERNMENT</strong> <strong>OF</strong> <strong>INDIA</strong><br />
ARCHAEOLOGICAL SURVEY <strong>OF</strong> <strong>INDIA</strong><br />
State – New Delhi Division- No. II, New Delhi<br />
Branch- Horticulture Sub-Division- Safdarjung Tomb<br />
ITEM RATE TENDER & CONTRACT FOR WORK<br />
(<strong>Archaeological</strong> Works Code, Paragraph 13.4.3)<br />
General rules and directions<br />
Note:- In case any discrepancy is between the Hindi and the English version <strong>of</strong> the<br />
documents, the English version shall be final & binding.<br />
1. All the proposed for execution by contract notified in the form <strong>of</strong> invitation<br />
<strong>of</strong> tender posted in the public places and signed by the Circle / Branch<br />
Officer. This form will state the work to be carried out as well as the date<br />
for submitting and opening tenders and the time allowed for carrying out<br />
the work, also the amount <strong>of</strong> the earnest money to be deposited with the<br />
tender and the percentage <strong>of</strong> security deposited by the successful<br />
tenderer and the percentage, if any to be deducted from the bill. Copies <strong>of</strong><br />
the specification, designs and drawing and any other document required in<br />
the connection with the work signed for the purpose <strong>of</strong> identification by the<br />
circle / Branch <strong>of</strong>ficer shall also be open for inspection by the contractor at<br />
the <strong>of</strong>fice <strong>of</strong> the circle / Branch during <strong>of</strong>fice hours.<br />
2. In event <strong>of</strong> tender being submitted by a firm, it must be signed separately<br />
by each member there <strong>of</strong> or in the event <strong>of</strong> absence <strong>of</strong> any partner, it must<br />
be signed on the behalf by a person holding the power <strong>of</strong> attorney<br />
authorising him to do so, such power <strong>of</strong> attorney should be produced with<br />
the tender and it must be disclose that is duly registered under the <strong>India</strong>n<br />
Partnership Act.<br />
3. Receipt for the payment made on the account <strong>of</strong> work, when executed by the<br />
firm, must also be signed by the several Partners, except where the<br />
contractors have described in their tender as a firm, in which case the<br />
must be signed in the name <strong>of</strong> the firm by one the partner or be some<br />
other person having authority to give effectual receipts for the firm.<br />
4. Any person, who submits the tender, shall fill up the usual printed form,<br />
stating at what rate he is willing to undertake each item <strong>of</strong> work. Tenders,<br />
which propose any alteration in the work specified in the said form <strong>of</strong><br />
invitation <strong>of</strong> tender or which contains any other condition <strong>of</strong> any sort, will<br />
liable to rejection. No single tender shall include more than one work but<br />
contractor who wish to tender for two or more work shall submit a separate<br />
tender for each work. They shall have the name and number <strong>of</strong> the work to<br />
which they refer, written outside the envelope.<br />
A. The rate (s) /or amount (s) must be quoted in decimal coinage.
5. The Circle / Branch <strong>of</strong>ficer or his duly authorised assistant will open<br />
tenders in the presence <strong>of</strong> any intending contractors who may be present<br />
at the time and will enter the amount <strong>of</strong> the several tenders in a<br />
comparative statement in a suitable form. In the event <strong>of</strong> a tender being<br />
accepted, a receipt for the earnest money forwarded therewith shall there<br />
upon for the purpose <strong>of</strong> identification sign. Copies <strong>of</strong> the specifications and<br />
other documents mentioned in rule. In event <strong>of</strong> being tender being<br />
rejected, the earnest money appended with such unaccepted tender shall<br />
thereupon be returned to the contractor remitting the same.<br />
6. The <strong>of</strong>ficer inviting tenders shall have the right <strong>of</strong> rejecting all or any <strong>of</strong> the<br />
tenders and will not be bound to accept the lowest tender.<br />
7. The receipts <strong>of</strong> the accountant or a clerk for any money paid by contractor<br />
will not be considered as an acknowledgement <strong>of</strong> payment to the Circle /<br />
Branch <strong>of</strong>ficer and the contractor shall be responsible for seeing that he<br />
procures a receipt signed by the Circle /Branch <strong>of</strong>ficer or a duly authorised<br />
Cashier or the Drawing & Disbursing <strong>of</strong>ficer.<br />
8. The memorandum <strong>of</strong> work tendered for and the schedule <strong>of</strong> material to be<br />
supplied by the <strong>Archaeological</strong> <strong>Survey</strong> <strong>of</strong> <strong>India</strong> and their issue rates, shall<br />
be filled in and completed in the <strong>of</strong>fice <strong>of</strong> the Circle /Branch <strong>of</strong>ficer before<br />
the tender form is issued to an intending tenderer, without having been so<br />
filled in and not complete form, he shall request the <strong>of</strong>fice to have this<br />
done before he completes and delivers his tender.<br />
9. The tenderer shall sign a declaration under the <strong>of</strong>ficial Secret Act to maintain<br />
secrecy <strong>of</strong> the tender document, drawing or other records connected with<br />
the work given to them. The unsuccessful tenderer shall return all drawing<br />
given to them.<br />
DECLARATION<br />
I/We here by declare that I/We treat the tender documents, drawing and other<br />
records connected with the work as secret/confidential documents and shall not<br />
communicate information derived there from to any person other than a person to<br />
whom I/We am/ are authorised to communicate the same or use the information in<br />
any manner prejudicial to the safety <strong>of</strong> the state.<br />
CONTRACTOR<br />
I/We hereby tender for execution for the President <strong>of</strong> <strong>India</strong> <strong>of</strong> the work specified in<br />
the underwritten memorandum with in time specified therein and in accordance with<br />
and in all respects with specifications, designs, drawing and instructions in writing<br />
referred to in rule I there<strong>of</strong> and in clause II <strong>of</strong> the conditions <strong>of</strong> the contract and with<br />
such material as are provided for, by and in all respects in accordance with, such<br />
conditions so far as applicable.
(a) General Description -<br />
(b) Estimated Cost :- Rs.1,42,609.00<br />
(c) Earnest Money:- Rs. 2,855.00<br />
MEMORANDUM<br />
(d) Security Deposit:- Rs …………………………………<br />
(I) In case <strong>of</strong> works costing up to Rs. 1 lakh, 10% <strong>of</strong> the estimated cost <strong>of</strong> the work<br />
put to tender .<br />
(II) In case <strong>of</strong> works costing more than Rs. 1 lakh, and up to 2 lakh 10% <strong>of</strong> the first<br />
1lakh 7.5 % on the balance and<br />
(III) In case <strong>of</strong> works costing more than Rs. 2 lakh 10%on the first Rs. 1 lakh 7.5%<br />
on the next 1 lakh and 5% on the balance, subject to a maximum <strong>of</strong> Rs. 1 lakh<br />
only.<br />
The security deposit will be collected by deductions from the running bills <strong>of</strong> the<br />
Contractors at the rate mentioned above and the earnest, if deposited in cash at the<br />
time <strong>of</strong> tender as a part <strong>of</strong> security deposit.<br />
FORMS <strong>OF</strong> SECURITY<br />
1. Cash<br />
2. Promissory notes and stock certificates <strong>of</strong> Central Government or state<br />
Government.<br />
3. Post <strong>of</strong>fice cash certificates, National saving certificates, Treasury saving<br />
Certificates and National Plan Saving Certificates.<br />
4. Post Office Saving Bank Pass books.<br />
5. Municipal debenture or Port Trust Bounds.<br />
6. Deposit Receipts <strong>of</strong> Public Sector Recognised Banks (approved by<br />
Government for the purpose.<br />
(e) Time allowed for the work will be reckoned from the 15 th day after the date<br />
<strong>of</strong> written order for completion within ……………………. Month.<br />
Should this tender be accepted in whole or in part, I/ We hereby agree (i)<br />
to abided by and fulfil all terms and provisions <strong>of</strong> the conditions annexed hereto<br />
and all terms and provisions contained in notice inviting tenders so far as<br />
applicable and / or in default there <strong>of</strong> forfeit and pay to the President <strong>of</strong> <strong>India</strong> or<br />
his successors, in <strong>of</strong>ficer the sum <strong>of</strong> money mentioned in the said contentions. A<br />
sum <strong>of</strong> Rs………. … is hereby forwarded in cash / Treasury challan / deposit at<br />
call Receipt <strong>of</strong> a public sector Bank ( scheduled Bank guaranteed by through<br />
Reserve Bank <strong>of</strong> <strong>India</strong> ) as earnest money. I/We fail to commence the work<br />
specified in the above memorandum , I / We agree that the said President or
successor in <strong>of</strong>fice shall with prejudice to any other or remedy, by that liberty to<br />
forfeit the said earnest money absolutely, otherwise the said earnest money shall<br />
be retained by him towards Security Deposits mentioned against clauses <strong>of</strong> the<br />
above mentioned memorandum (ii) to execute all the works referred to in the<br />
tender tainted or referred to therein and to carry out such deviations as may be<br />
ordered. Up a maximum <strong>of</strong> ……………………..percentage at rate quoted in the<br />
tender documents and those in excess <strong>of</strong> that limit at the rates to be determined<br />
in accordance with provisions contained in clause 12 A <strong>of</strong> the tender.<br />
Witness:-<br />
Occupation:-<br />
The above tender is hereby accepted by me<br />
on behalf <strong>of</strong> the President <strong>of</strong> <strong>India</strong>.<br />
Dated the ……………………………day <strong>of</strong> 200<br />
Signature <strong>of</strong> witness <strong>of</strong> contractor‘s signature<br />
Signature <strong>of</strong> the <strong>of</strong>ficer by whom accepted.<br />
Signature<br />
(Contractor)
TERMS AND CONDITIONS<br />
1. The work/ supply shall be carried out by the contractor/ firm strictly and in<br />
accordance with A.S.I specifications as amended from time to time. At<br />
present norms for maintenance <strong>of</strong> Garden include one Man / Acre and for<br />
Woodland it is ½ Man / Acre.<br />
2. The rates given for the works should be inclusive <strong>of</strong> all taxes, leads and<br />
lifts etc. Nothing extra shall be paid over the rates quoted by the<br />
contractor/ firm.<br />
3. In case the material is not as per specifications, the same shall be<br />
replaced by the contractor/ firm. The Department shall not be responsible<br />
for any theft or loss. If required, Department/ Govt. can remove the<br />
material at the risk and cost <strong>of</strong> the contractor / firm.<br />
4. No payment shall be made to the contractor / firm if the materials are<br />
damaged due to natural calamities before measurement.<br />
5. The competent authority reserves the right to accept or reject any or all the<br />
tenders without assigning any reason.<br />
6. Water charges @ 1% will be recovered from the contractor’s bill, wherever<br />
applicable.<br />
7. The tender must accompany the Earnest money <strong>of</strong> Rs………… in the form<br />
<strong>of</strong> bank draft <strong>of</strong> nationalized bank in favour <strong>of</strong> Dy. Suptdg. Horticulturist,<br />
A.S.I., H.D-II, Safdarjung Tomb, New Delhi. Cheque will not be accepted.<br />
Earnest money will be refundable after successful completion <strong>of</strong> work.<br />
8. It shall be the responsibility <strong>of</strong> the contractor / firm to ensure that no<br />
damage is caused to Govt. property at the site by his/ their vehicle or<br />
labour party. Cost <strong>of</strong> such damages, if any, will be assessed at the<br />
discretion <strong>of</strong> the Dy. Suptdg. Horticulturist and the same will have to be<br />
made good by the contractor / firm.<br />
9. The tender submitted on behalf <strong>of</strong> a firm shall be signed by all the partners<br />
<strong>of</strong> the firm or by a partner who is duly authorised on behalf <strong>of</strong> the firm to<br />
enter into contract. Otherwise the tender is liable to be rejected.<br />
10. The contractors / firm shall not sublet any portion <strong>of</strong> contract. Failing which<br />
the undersigned shall serve a notice, rescinding the contract, where upon<br />
the Earnest Money and Security Money shall be forfeited.<br />
11. Time shall be considered as the essence <strong>of</strong> the Contract. The entire work<br />
must be completed during 2009-10 from the date <strong>of</strong> award letter, failing<br />
which the remaining work can be reallotted to another contractor / firm at<br />
the risk and cost <strong>of</strong> the contractor / firm with due notice to the contractor /<br />
firm.<br />
12. The Contract/ agreement can be terminated at any time after serving one<br />
month notice due to Non-Availability <strong>of</strong> Funds or technical reasons or<br />
financial complications. In these circumstances no claim shall be made.<br />
Dept./ Govt. shall not pay any compensation on this account.<br />
13. The contractor / firm should comply the requirement <strong>of</strong> labour / child labour<br />
Act and they will be responsible for violation, if any.<br />
14. The contractor should maintain attendance and other records <strong>of</strong> the<br />
manpower engaged by him required under law and must observe all the<br />
formalities under the Labour act.<br />
15. Security Money will be deposited in advance by the contractor / firm whose<br />
tender is accepted by the competent authority.<br />
16. The running payment will be made as per rules <strong>of</strong> A.S.I.<br />
Contd……P/2
- 2 -<br />
17. Error / omission if any shall be rectifiable with no claim.<br />
18. No claim whatsoever on account <strong>of</strong> fluctuations in prices will be<br />
entertained.<br />
19. In the event <strong>of</strong> the Site-in-charge being <strong>of</strong> the opinion that the Contractor is<br />
not employing on the works a sufficient number <strong>of</strong> staff and workmen as is<br />
necessary for the proper completion <strong>of</strong> the works within the time<br />
prescribed, the Contractor shall forthwith on receiving intimation to this<br />
effect take additional staff and labour (at his own expense) specified by the<br />
site-in-charge / Dy. S.H. within seven days <strong>of</strong> being so required and failure<br />
on the part <strong>of</strong> the contractor to comply with such instruction will entitle the<br />
company to rescind the contract under clause <strong>of</strong> these conditions.<br />
20. The Competent Authority reserves the right to increase or decrease upto 30%<br />
<strong>of</strong> the quantity <strong>of</strong> material/work at any time during the execution <strong>of</strong> work<br />
and before completion <strong>of</strong> work according to the requirement <strong>of</strong> the site and<br />
no claim whatsoever on this account shall be entertained.<br />
21.All gold, silver, oil and other materials or any antiques and other similar things,<br />
which may be found, in or upon the site shall be the property <strong>of</strong> the<br />
<strong>Archaeological</strong> <strong>Survey</strong> <strong>of</strong> <strong>India</strong>. Contractor / firm shall deliver the same to<br />
such persons as the Department may from time to time appoint to receive<br />
the same.<br />
22.The contractor / firm shall not be entitled to any compensation whatsoever on<br />
account <strong>of</strong> any delay or default in the supply <strong>of</strong> materials mentioned in the<br />
schedule.<br />
23. The contractor shall arrange at his own expenses for clear drinking water,<br />
housing, medical facilities necessary for the welfare <strong>of</strong> the labours<br />
employed at his work.<br />
24.Any material left on the site <strong>of</strong> work after one month from the date <strong>of</strong><br />
completion <strong>of</strong> the work shall become the property <strong>of</strong> the Govt. and no<br />
payment shall be made for it.<br />
25. The Department reserve the option to take away any item <strong>of</strong> the work or part<br />
there<strong>of</strong> any time during the currency <strong>of</strong> the contract and reallot it to<br />
another agency with due notice to the contractor / firm without liability or<br />
compensation.<br />
26. The Earnest Money and Security deposit <strong>of</strong> the successful contractor / firm<br />
will be forfeited, if he fails to comply with any <strong>of</strong> the conditions <strong>of</strong> the<br />
contract and work shall be carried out at risk and cost <strong>of</strong> the contractor /<br />
firm.<br />
27.Overall rates shall be considered for approval <strong>of</strong> tender.<br />
28.Value <strong>of</strong> item if above Rs. 50,000/- may be test checked by the Chief<br />
Horticulturist or his representative.<br />
29. The contractor will get themselves Registered with the PF & ESI<br />
Authorities and submit a pro<strong>of</strong> to this effect with the <strong>Archaeological</strong> <strong>Survey</strong><br />
<strong>of</strong> <strong>India</strong> for the regular employees on the roll <strong>of</strong> contractor.<br />
30. The Grass in lawns shall regularly moved with lawn mowers provided by<br />
the A.S.I. The thickness <strong>of</strong> the grass shall not be allowed to increase<br />
beyond 60 mm. the minimum thickness <strong>of</strong> grass shall be maintained as 50<br />
mm. The thickness shall be measured from top <strong>of</strong> the soil surface. The<br />
grass shall also be kept free from all kinds <strong>of</strong> weeds.<br />
31.Payment will be made as per actual measurement.<br />
32.The Department will provide required material, machinery and tools.<br />
Contd……P/3
- 3 –<br />
33.The lawns shall be kept constantly rolled to give cushioning effect to the<br />
grass. The manuring <strong>of</strong> the lawn shall be done preferably in the months <strong>of</strong><br />
DECEMBER & JANUARY or as directed by the site-in-charge.<br />
(Manure/sludge/good earth/urea etc. wherever needed will be provided<br />
departmentally).<br />
34. As per clause 19-D <strong>of</strong> the agreement, it is obligatory on part <strong>of</strong> the<br />
contractor to provide following information / statement by 4 th and 19 th <strong>of</strong><br />
every month to the Garden in-charge in respect <strong>of</strong> IInd half <strong>of</strong> the<br />
preceding month and IInd half <strong>of</strong> current month respectively<br />
a). No. <strong>of</strong> the labour employed by him on the work.<br />
b). Their working hours<br />
c) The wages paid to them.<br />
d). The accidents that occurred during the said fortnight showing the<br />
circumstances under which that happened and the extent <strong>of</strong> damage<br />
and injury caused.<br />
e). The number <strong>of</strong> female workers who have been allowed maternity<br />
benefit according to clause 19-F and the amount paid to them.<br />
Failing which the contractor shall be liable to pay to govt. a sum not<br />
exceeding Rs.200/- for each default or materially incorrect statement. The<br />
decision <strong>of</strong> the Divisional <strong>of</strong>ficer shall be final in deducting from any bill<br />
due to the contractor the amount levied as fine and be binding on the<br />
contractor.<br />
35. In case, any laxity <strong>of</strong> garden maintenance is noticed at any time during<br />
the contract period, such works shall be carried out departmentally<br />
to the extent <strong>of</strong> recouping to the desired levels and costs will be<br />
recovered from the contractor.<br />
36.The contractor shall submit a pro<strong>of</strong> in support <strong>of</strong> engaged labour having<br />
applied for police verification to ensure safety & security <strong>of</strong> the<br />
monuments.<br />
37. The responsibility for providing any accommodation, feeding and sanitary<br />
necessities for the workmen employed by the Contractor shall be<br />
exclusively that <strong>of</strong> the contractor and such facilities can be provided<br />
outside the Site provided by the <strong>Archaeological</strong> <strong>Survey</strong> <strong>of</strong> <strong>India</strong>.<br />
38. The Contractor shall not allow his workmen to put up any unauthorized<br />
hutment, canteens or tea shops etc. on the <strong>Archaeological</strong> <strong>Survey</strong> <strong>of</strong><br />
<strong>India</strong>’s property.<br />
39.The seasonal flower beds and Rose beds should be kept maintained including<br />
preparation, manuring, watering, hoeing, etc. as per directions <strong>of</strong> the sitein-charge<br />
/ Dy. Superintending Horticulturist.<br />
40.Minimum one supervisor is to be engaged for 18 nos. <strong>of</strong> staff. The contractor<br />
must engage one full time, experienced supervisor who preferably should<br />
be an experienced agriculture graduate or retired<br />
Contd……P/4
- 4 –<br />
Chaudhary (garden supervisor) on C.P.W.D., M.C.D., N.D.M.C., D.D.A. or<br />
other Govt. Deptt. Undertaking or firm <strong>of</strong> repute and with knowledge <strong>of</strong> the<br />
subject and he should be literate enough to maintain the required records.<br />
41. If any litigation arises through labour court or labour commissioner & any<br />
other court etc. on account <strong>of</strong> litigation through labourers engaged by him,<br />
the contractor will be fully responsible. Moreover, if claim arises out <strong>of</strong> any<br />
litigation, the contractor will be responsible for payment <strong>of</strong> such claim.<br />
Accepted<br />
(Signature <strong>of</strong> Contractor) Dy. SUPTDG. HORTICULTURIST