First progress report on a multi-channel magnetic drum inner ...
First progress report on a multi-channel magnetic drum inner ...
First progress report on a multi-channel magnetic drum inner ...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
VIII-5<br />
yet every possibility of reducing complicati<strong>on</strong> should be explored^ and<br />
in particular with parallel operati<strong>on</strong> at ,01 sec<strong>on</strong>d cyclic rate, pulsers<br />
c<strong>on</strong>sisting of a single gas thyratr<strong>on</strong> are distinctly possible and could<br />
de i<strong>on</strong>ize readily in a millisec<strong>on</strong>d so as to be ready for the next<br />
occasi<strong>on</strong>. These tubes could not be used for the sequence of 40 possible<br />
pulses spaced 10 irlcroseccnds apart as required by the series arrange-<br />
ment; in fact, this system calls for quite refined design in hard-tube<br />
blocking oscillator techniques.<br />
10) There is also the gating problem in the series system; in<br />
each <strong>channel</strong> a gate must be supplied capable of handling the full<br />
recording current of 10 amp. without attriti<strong>on</strong>, and also of handling<br />
the low voltage level of the amplifier innut without introducing<br />
noise. This is no easy set of specificati<strong>on</strong>s to meet, especially if<br />
strictly loyal to vacuum tube techniques. Within the realm of possibili-<br />
ties are high speed electro<strong>magnetic</strong> relays, which can easily be obtained<br />
and will operats in time intervals of 1 millisec<strong>on</strong>d or less; also surface-<br />
layer rectifier arrangements merit some c<strong>on</strong>siderati<strong>on</strong>.<br />
11) .'/hile no insuperable, or even very severe problems are presented<br />
by these alternatives it is nevertheless quite clear that alternatives<br />
exist involving c<strong>on</strong>siderable numbers of circuit elements, and that some<br />
thought should be devoted to this problem before proceeding • No<br />
delay is expected in realizing suitable means, and the project is at the<br />
closing date of this <str<strong>on</strong>g>report</str<strong>on</strong>g> less than four m<strong>on</strong>ths old, so that decisi<strong>on</strong>