05.08.2013 Views

Basic Aviation Risk Standard Resource Sector - Flight Safety ...

Basic Aviation Risk Standard Resource Sector - Flight Safety ...

Basic Aviation Risk Standard Resource Sector - Flight Safety ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Appendix 4:<br />

Threat 14.0: Inadvertent Load Release –<br />

External Load Operations<br />

The load is inadvertently released in flight, falls to the ground and causes an accident<br />

Control 14.1: Manual and Electrical<br />

Release Mechanisms<br />

26<br />

Threat Controls<br />

Threat 14.0:<br />

Inadvertent<br />

Load Release<br />

The aircraft is to have serviceable cockpit manual and electric<br />

release mechanisms and an external manual release at the hook.<br />

Control 14.2: <strong>Standard</strong>ised Controls<br />

When practical, for aircraft of the same or similar type,<br />

the aircraft operator is to standardise the electrical load<br />

release switches, particularly when located on the cyclic and<br />

collective controls.<br />

Manual and Electrical<br />

Release Mechanism<br />

<strong>Standard</strong>ised Controls<br />

Guarded Release Switch<br />

Control 14.3: Guarded Release Switch<br />

When possible for the type, all electrical release switches shall<br />

be guarded to prevent inadvertent activation.<br />

Control 14.4: Load Construction<br />

The aircraft operator is to ensure that all loads are rigged by<br />

appropriately qualified personnel.<br />

Load Construction<br />

<strong>Flight</strong> SaFety Foundation BaSic aviation RiSk StandaRd – <strong>Resource</strong> <strong>Sector</strong> © version 3

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!