Item.<br />

No.<br />

<strong>CIDCO</strong> <strong>OF</strong> MAHARASHTRA LIMITED.<br />

C.A.NO. 01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010-11<br />

Sl.Pg.No. 203<br />

Name of Work : Extension of Bridge CD-10 on 32 m wide Pandav Marg across<br />

the 45 m wide Diversion Channel at Kharghar.<br />

C.A. No. : 01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010-11<br />

<strong>SCHEDULE</strong> <strong>“A”</strong><br />

<strong>BILL</strong> <strong>OF</strong> <strong>QUANTITIES</strong><br />

Description Qty. Rate Unit Amount<br />

1 Excavation for foundation to any<br />

depth in all types of earth, soils of<br />

all types such as sand, gravel,<br />

slush, soft murum, hard murum<br />

with or without boulders including<br />

shoring and strutting wherever<br />

necessary, disposing off the surplus<br />

materials within 50m beyond the work<br />

site, with all lifts, stacking and<br />

spreading as directed, heavy<br />

dewatering by pump or manually,<br />

preparing the bed for foundation and<br />

necessary backfilling .... etc. complete.<br />

NOTE-<br />

All payment towards the royalty, fees,<br />

taxes etc should be borne by the<br />

contractor.<br />

2 Excavation for foundation to any<br />

depth in soft rock including shoring<br />

and strutting wherever necessary,<br />

disposing off the surplus materials<br />

within 50m, beyond the work site, with<br />

2610.00 135.00 Cum 352350.00<br />

210.00 267.30 Cum 56133.00


Item.<br />

No.<br />

<strong>CIDCO</strong> <strong>OF</strong> MAHARASHTRA LIMITED.<br />

C.A.NO. 01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010-11<br />

Sl.Pg.No. 204<br />

Description Qty. Rate Unit Amount<br />

all lifts, stacking and spreading as<br />

directed, heavy dewatering by pump<br />

or manually, preparing bed for<br />

foundation and necessary backfilling<br />

......etc. complete.<br />

NOTE-<br />

All payment towards the royalty, fees,<br />

taxes etc should be borne by the<br />

contractor.<br />

3 Excavation for foundation in hard<br />

rock upto any depth with all lifts by<br />

chiseling manually or by mechanical<br />

means such as hydraulic rock driller<br />

including wedging, line drilling,<br />

trimming and levelling the bed,<br />

removing the excavated materials upto<br />

a distance of 50m beyond the work<br />

site with all lifts, stacking the<br />

serviceable materials in measurable<br />

heaps as directed, heavy dewatering<br />

by pump or manually, preparing bed<br />

for foundation and necessary back<br />

filling .............etc. complete.<br />

NOTE-<br />

All payment towards the royalty, fees,<br />

taxes etc should be borne by the<br />

contractor.<br />

1995.00 588.30 Cum 1173658.50


Item.<br />

No.<br />

<strong>CIDCO</strong> <strong>OF</strong> MAHARASHTRA LIMITED.<br />

C.A.NO. 01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010-11<br />

Sl.Pg.No. 205<br />

Description Qty. Rate Unit Amount<br />

4a Providing and laying dry trap metal<br />

soling 150mm to 230 mm thick<br />

including hand packing with metal,<br />

rubble chips, application of required<br />

murum/stone dust blindage and<br />

compaction watering with all leads<br />

and lifts, heavy dewatering by pump<br />

or manually, preparing bed for<br />

foundation and necessary backfilling<br />

...... etc. complete.<br />

NOTE-<br />

All payment towards the royalty, fees,<br />

taxes etc should be borne by the<br />

contractor.<br />

4b Providing trap rubble filling behind<br />

the walls / abutments / returns<br />

including filling voids with gravel,<br />

hand packing and compacting the<br />

rubble etc. complete. as per<br />

Appendix-6 of IRC 78 /2000 (latest<br />

version MORTH specification) and<br />

heavy dewatering by pump or<br />

manually, preparing bed for<br />

foundation and necessary backfilling<br />

............. etc. complete.<br />

NOTE-<br />

All payment towards the royalty, fees,<br />

taxes etc should be borne by the<br />

contractor.<br />

350.00 427.00 Cum 149450.00<br />

140.00 330.00 Cum 46200.00


Item.<br />

No.<br />

<strong>CIDCO</strong> <strong>OF</strong> MAHARASHTRA LIMITED.<br />

C.A.NO. 01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010-11<br />

Sl.Pg.No. 206<br />

Description Qty. Rate Unit Amount<br />

5a Providing and laying Ready mix<br />

cement concrete (RMC) of M20<br />

grade using design mix with minimum<br />

cement content 310 kg/m3 and<br />

maximum water cement ratio 0.45<br />

using nominal maximum size of<br />

“20mm and down” trap metal for<br />

foundation and bedding with all<br />

labours, materials, plant &<br />

equipments, shuttering, form work,<br />

staging, including transporting for all<br />

leads and all lifts, placing, vibrating<br />

with mechanical vibrator, pumping of<br />

concrete of any distance to required<br />

location, finishing, curing, as per<br />

IRC/2000 specification (MORTH) and<br />

heavy dewatering by pump or<br />

manually ............. etc. complete.<br />

NOTE-<br />

All payment towards the royalty, fees,<br />

taxes etc should be borne by the<br />

contractor.<br />

5b Providing and laying Ready mix<br />

cement concrete (RMC) of M20<br />

grade using design mix with minimum<br />

cement content 310 kg/m3 and<br />

maximum water cement ratio 0.45<br />

using nominal maximum size of<br />

492.00 4663.00 Cum 2294196.00<br />

427.00 4064.30 Cum 1735456.10


Item.<br />

No.<br />

<strong>CIDCO</strong> <strong>OF</strong> MAHARASHTRA LIMITED.<br />

C.A.NO. 01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010-11<br />

Sl.Pg.No. 207<br />

Description Qty. Rate Unit Amount<br />

aggregate should be “20 mm and<br />

down” trap metal and plums about 15<br />

% of trap/granite/quartzite/gneiss<br />

stones for bedding with all labours,<br />

materials, plant & equipments,<br />

shuttering, form work, staging,<br />

including transporting for all leads<br />

and all lifts, placing, vibrating with<br />

mechanical vibrator, pumping of<br />

concrete of any distance to required<br />

location, finishing and curing, as per<br />

IRC/2000 specification (MORTH) and<br />

heavy dewatering by pump or<br />

manually, ............. etc. complete.<br />

NOTE-<br />

All payment towards the royalty, fees,<br />

taxes etc should be borne by the<br />

contractor.<br />

6 Providing and laying Ready mix<br />

cement concrete (RMC) of M30<br />

grade using design mix with minimum<br />

cement content 310 kg/m3 and<br />

maximum water cement ratio 0.45<br />

using nominal maximum size of "20<br />

mm and down" trap metal for PCC<br />

Abutments foundation, PCC<br />

Abutment foundation, PCC Riding<br />

return, Bedding walls of<br />

foundations with all labours,<br />

640.00 5191.00 Cum 3322240.00


Item.<br />

No.<br />

<strong>CIDCO</strong> <strong>OF</strong> MAHARASHTRA LIMITED.<br />

C.A.NO. 01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010-11<br />

Sl.Pg.No. 208<br />

Description Qty. Rate Unit Amount<br />

materials, plant & equipments,<br />

shuttering, form work, staging,<br />

including transporting for all leads<br />

and all lifts, placing, vibrating with<br />

mechanical vibrator, pumping of<br />

concrete of any distance to required<br />

location, finishing, curing, as per<br />

IRC/2000 specification (MORTH) and<br />

heavy dewatering by pump or<br />

manually ............. etc. complete.<br />

NOTE-<br />

All payment towards the royalty, fees,<br />

taxes etc should be borne by the<br />

contractor.<br />

7 Providing and laying Ready mix<br />

cement concrete (RMC) of M35<br />

grade using design mix with minimum<br />

cement content 400 kg/m3 and<br />

maximum water cement ratio 0.40<br />

using nominal maximum size of "20<br />

mm and down" trap metal for "v"<br />

haunch footing, pier, pier caps,<br />

dirt walls, abutment caps, kerbs,<br />

RCC work, return wall, raft<br />

foundations, etc. as per detailed<br />

drawing or as directed by Engineer,<br />

with all labours, materials, plant &<br />

equipments, shuttering, form work,<br />

staging, including transporting for all<br />

135.00 6094.75 Cum 822791.25


Item.<br />

No.<br />

<strong>CIDCO</strong> <strong>OF</strong> MAHARASHTRA LIMITED.<br />

C.A.NO. 01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010-11<br />

Sl.Pg.No. 209<br />

Description Qty. Rate Unit Amount<br />

leads and all lifts, placing, vibrating<br />

with mechanical vibrator, pumping of<br />

concrete of any distance to required<br />

location, finishing, curing as per<br />

IRC/2000 specification (MORTH) and<br />

heavy dewatering by pump or<br />

manually ……….. etc. complete.<br />

NOTE-<br />

All payment towards the royalty, fees,<br />

taxes etc should be borne by the<br />

contractor.<br />

8 Providing and laying Ready mix<br />

cement concrete (RMC) of M35<br />

grade using design mix with minimum<br />

cement content 400 kg/m3 and<br />

maximum water cement ratio 0.40<br />

using nominal maximum size of "20<br />

mm and down" trap metal for RCC<br />

circular column, RCC solid pier,<br />

vertical post of railing, RCC<br />

column of any shape including<br />

provision of "v" shaped false joints to<br />

form suitable panels on the faces to<br />

approved design as per detailed<br />

drawing or as directed by Engineer,<br />

with all labours, materials, plant &<br />

equipments, shuttering, form work,<br />

staging, including transporting for all<br />

leads and all lifts, placing, vibrating<br />

115.00 7841.75 Cum 901801.25


Item.<br />

No.<br />

<strong>CIDCO</strong> <strong>OF</strong> MAHARASHTRA LIMITED.<br />

C.A.NO. 01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010-11<br />

Sl.Pg.No. 210<br />

Description Qty. Rate Unit Amount<br />

with mechanical vibrator, pumping of<br />

concrete of any distance to required<br />

location, finishing, curing, as per<br />

IRC/2000 specification (MORTH) and<br />

heavy dewatering by pump or<br />

manually ……….. etc. complete.<br />

NOTE-<br />

All payment towards the royalty, fees,<br />

taxes etc should be borne by the<br />

contractor.<br />

9 Providing and laying Ready mix<br />

cement concrete (RMC) of M35<br />

grade using design mix with minimum<br />

cement content 400 kg/m3 and<br />

maximum water cement ratio 0.40<br />

using nominal maximum size of "20<br />

mm and down" trap metal for RCC<br />

caps over the piers and<br />

abutment cap of any shape<br />

including provision of "v" shaped false<br />

joints to form suitable panels on the<br />

faces to approved design etc.as per<br />

detailed drawing or as directed by<br />

Engineer, with all labours, materials,<br />

plant & equipments, shuttering, form<br />

work, staging, including transporting<br />

for all leads and all lifts, placing,<br />

vibrating with mechanical vibrator,<br />

pumping of concrete of any distance<br />

70.00 5251.75 Cum 367622.50


Item.<br />

No.<br />

<strong>CIDCO</strong> <strong>OF</strong> MAHARASHTRA LIMITED.<br />

C.A.NO. 01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010-11<br />

Sl.Pg.No. 211<br />

Description Qty. Rate Unit Amount<br />

to required location, finishing, curing,<br />

as per IRC/2000 specification<br />

(MORTH) etc. complete.<br />

NOTE-<br />

All payment towards the royalty, fees,<br />

taxes etc should be borne by the<br />

contractor.<br />

10 Providing and laying Ready mix<br />

cement concrete (RMC) of M35<br />

grade using design mix with minimum<br />

cement content 400 kg/m3 and<br />

maximum water cement ratio 0.40<br />

using nominal maximum size of "20<br />

mm and down" trap metal for RCC<br />

work like RCC Parapets / dirt /<br />

ballast walls, RCC kerbs, bearing<br />

beams, railing post as per detailed<br />

drawing or as directed by Engineer,<br />

with all labours, materials, plant &<br />

equipments, shuttering, form work,<br />

staging, including transporting for all<br />

leads and all lifts, placing, vibrating<br />

with mechanical vibrator, pumping of<br />

concrete of any distance to required<br />

location, finishing, curing, as per<br />

IRC/2000 specification (MORTH)<br />

……….. etc. complete.<br />

115.00 6756.75 Cum 777026.25


Item.<br />

No.<br />

<strong>CIDCO</strong> <strong>OF</strong> MAHARASHTRA LIMITED.<br />

C.A.NO. 01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010-11<br />

Sl.Pg.No. 212<br />

Description Qty. Rate Unit Amount<br />

NOTE-<br />

All payment towards the royalty, fees,<br />

taxes etc should be borne by the<br />

contractor.<br />

11 Providing and laying Ready mix<br />

cement concrete (RMC) of M35<br />

grade using design mix with minimum<br />

cement content 400 kg/m3 and<br />

maximum water cement ratio 0.40<br />

using nominal maximum size of "20<br />

mm and down" trap metal for RCC<br />

work like RCC slab deck, RCC<br />

approaches Main/cross girder<br />

diaphrams, solid slab,/ T- beam<br />

& bearing beams, any shape<br />

and size and slab / Box girder<br />

and cantilever as per detailed<br />

drawing or as directed by Engineer,<br />

with all labours, materials, plant &<br />

equipments, shuttering, form work,<br />

staging, including transporting for all<br />

leads and all lifts, placing, vibrating<br />

with mechanical vibrator, pumping of<br />

concrete of any distance to required<br />

location, finishing and curing, as per<br />

IRC/2000 specification (MORTH)<br />

……….. etc. complete.<br />

590.00 7659.75 Cum 4519252.50


Item.<br />

No.<br />

<strong>CIDCO</strong> <strong>OF</strong> MAHARASHTRA LIMITED.<br />

C.A.NO. 01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010-11<br />

Sl.Pg.No. 213<br />

NOTE –<br />

Description Qty. Rate Unit Amount<br />

(i) Contractor shall carry out non<br />

destructive test as and when<br />

directed by the Engineer without<br />

any extra cost to <strong>CIDCO</strong> <strong>Ltd</strong>.<br />

(ii) All payments towards the<br />

royalty, fees, taxes etc. should<br />

be borne by the contractor.<br />

12 Providing and fixing precast factory<br />

made RCC slab covers of 100 mm<br />

thickness in M-35 grade of concrete<br />

using design mix with minimum<br />

cement content as per MORTH<br />

specifications (latest version) and as<br />

per detailed design and drawings or<br />

as directed with fixing of 3 mm thick<br />

M.S.plate around the slab for<br />

inspection opening with top embossed<br />

with name "<strong>CIDCO</strong> <strong>Ltd</strong>" and back side<br />

with manufacturers name, logo and<br />

contractors name including<br />

"Compaction, curing and finishing<br />

uneven and honey combed surface<br />

with cement mortar 1:3 of sufficient<br />

minimum thickness to give a smooth<br />

and even surface, reinforcement @<br />

100 Kg. per cum" etc. complete.<br />

NOTE –<br />

The cost also includes all type of taxes.<br />

365.00 2581.15 Sqm. 942119.75


Item.<br />

No.<br />

<strong>CIDCO</strong> <strong>OF</strong> MAHARASHTRA LIMITED.<br />

C.A.NO. 01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010-11<br />

Sl.Pg.No. 214<br />

Description Qty. Rate Unit Amount<br />

13 Providing and fixing 110 mm dia<br />

HDPE pipes of approved brand for<br />

weep holes, staggered as per drawing<br />

or as directed by Engineer etc.<br />

complete.<br />

NOTE –<br />

The cost also includes all type of taxes.<br />

14a Providing and fixing galvanized iron<br />

150 mm diameter water spout<br />

including whole assembly and fittings<br />

as per the drawing and technical<br />

specification or as directed, etc…..<br />

complete.<br />

NOTE –<br />

The cost also includes all type of taxes.<br />

14b Providing and fixing 50 mm diameter<br />

PVC pipe of approved make with<br />

required length including whole<br />

assembly and fittings as per the<br />

drawing and technical specification or<br />

as directed, etc …complete.<br />

NOTE –<br />

The cost also includes all type of taxes.<br />

650.00 85.00 Rmt 55250.00<br />

25.00 903.00 No. 22575.00<br />

138.00 81.00 Rmt 11178.00


Item.<br />

No.<br />

<strong>CIDCO</strong> <strong>OF</strong> MAHARASHTRA LIMITED.<br />

C.A.NO. 01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010-11<br />

Sl.Pg.No. 215<br />

Description Qty. Rate Unit Amount<br />

15 Providing and placing, fixing TMT bar<br />

reinforcement of various diameters<br />

Fe 415, confirming to IS:1786-1985<br />

(latest version) of approved make in<br />

all RCC item of substructure and<br />

superstructures, Footing foundation,<br />

circular columns, piers of any shape,<br />

dirt walls, abutment reinforcements,<br />

Pier caps, slabs, T beams and slabs,<br />

balanced beams, RCC walls,<br />

approach slabs, RCC railing, RCC<br />

chairs with footing, solid slabs,solid<br />

piers, fothpath RCC beams, RCC<br />

precast items, all stirrups of any size<br />

and shape, supporting bars, extra<br />

bars, cantilever slabs, RCC kerbs,<br />

main and cross girders, diaphragms,<br />

ballast walls, RCC parapets, RCC<br />

walls, Raft slabs, bearing beams<br />

including "V" haunches, Box returns,<br />

canopies, staircases, newels, chajjas,<br />

lintels, pardies, coping, fins, arches,<br />

including binding wires, all type of<br />

irregular shape and size of RCC works<br />

as per detailed designs, drawings and<br />

schedules, including cutting, bending,<br />

hooking the bars, binding with wires<br />

or tack welding and supporting as<br />

required completed or as directed by<br />

Engineer etc. complete.<br />

248.00 45693.00 MT 11331864.00


Item.<br />

No.<br />

<strong>CIDCO</strong> <strong>OF</strong> MAHARASHTRA LIMITED.<br />

C.A.NO. 01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010-11<br />

Sl.Pg.No. 216<br />

NOTE :-<br />

Description Qty. Rate Unit Amount<br />

The quantity to be measured and paid<br />

for this item shall not include wastage<br />

in cutting. Actually installed and<br />

placed in position steel shall be paid.<br />

The cost also includes all types of<br />

taxes.<br />

16 Providing and applying anticorrisive<br />

treatment TMT steel<br />

reinforcement as per cement<br />

polymer composite coating (CPCC)<br />

method developed by CECRI including<br />

cleaning the bar by means of any<br />

established mechanical or manual<br />

method for removing the rust and<br />

deleterious matter, applying rapid<br />

setting primer and cement polymer<br />

sealing coat of approved and licensed<br />

by CECRI including redoing the<br />

process if damaged occur during<br />

handling, stacking etc. complete as<br />

directed by the Engineer in charge.<br />

NOTE –<br />

The cost also includes all type of taxes.<br />

248.00 6135.00 MT 1521480.00


Item.<br />

No.<br />

<strong>CIDCO</strong> <strong>OF</strong> MAHARASHTRA LIMITED.<br />

C.A.NO. 01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010-11<br />

Sl.Pg.No. 217<br />

Description Qty. Rate Unit Amount<br />

17 Providing and applying approved<br />

quality coal tar epoxy paint in three<br />

coats for all external surface of RCC<br />

members below the HFL/free board,<br />

well, pier, girders abutment, and caps,<br />

return walls, columns, dirt walls,<br />

substructure, exposed surface of<br />

existing precast bridge, including<br />

existing and old/new RCC cleaning<br />

surfaces by sand blasting ,brushing,<br />

cost of all materials, labour,<br />

machinery, equipment, scaffolding<br />

required height with all leads & all lifts<br />

etc. complete as directed by Engineer.<br />

NOTE –<br />

The cost also includes all type of taxes.<br />

18 Providing and applying Polymer<br />

Polysafe E.C. (P.No.567) synthetic<br />

elastomeric coating cum paint,<br />

ready to use for bridge structure in<br />

saline as to avoid salt penetration<br />

from marine environment & U.V<br />

effects of sunrays, fungus<br />

developments and to protect the<br />

reinforcement from marine<br />

atmosphere effects in three coats<br />

including scaffolding, sand blasting,<br />

cleaning the surface of concrete,<br />

brushing steel reinforcement and<br />

applying polymer coating with Primer,<br />

985.00 225.00 Sqm 221625.00<br />

3340.00 457.00 Sqm 1526380.00


Item.<br />

No.<br />

<strong>CIDCO</strong> <strong>OF</strong> MAHARASHTRA LIMITED.<br />

C.A.NO. 01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010-11<br />

Sl.Pg.No. 218<br />

Description Qty. Rate Unit Amount<br />

First coat and Second coat at an<br />

interval of 24 hours of approved<br />

shade and colour. But not to applied<br />

on oil, Grease, Tar & Moisture of<br />

surface as per detailed specifications<br />

and as directed by the Engineer.<br />

NOTE –<br />

The cost also includes all type of taxes.<br />

19a Providing expansion joints in RCC<br />

walls/slab of approach slabs<br />

structure (interior side) with plain<br />

premoulded filler 25 mm thick,<br />

including fixing T.W. battens both<br />

faces and complete as per detailed<br />

design and drawings or as directed by<br />

Engineer.<br />

NOTE –<br />

The cost also includes all type of taxes.<br />

19b Providing expansion joints in<br />

R.C.C. RCC walls/slab of<br />

approach slabs structure<br />

(exterior side) with plain<br />

premoulded filler 25 mm thick and 3<br />

mm thick aluminium plate, hold fast,<br />

fixing T.W. battens on internal face,<br />

finishing etc. complete as directed as<br />

per detailed design and drawings or<br />

as directed by Engineer.<br />

NOTE –<br />

The cost also includes all type of taxes.<br />

150.00 1502.00 Sqm 225300.00<br />

45.00 2072.00 sq.m 93240.00


Item.<br />

No.<br />

<strong>CIDCO</strong> <strong>OF</strong> MAHARASHTRA LIMITED.<br />

C.A.NO. 01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010-11<br />

Sl.Pg.No. 219<br />

Description Qty. Rate Unit Amount<br />

20 Providing welded joints for Mild /<br />

TMT steel reinforcement bars as<br />

per MORTH specification (latest<br />

version) etc complete.<br />

(a) upto 25 mm dia 0.00 169.00 No 0.00<br />

(b) above 25 mm dia 0.00 216.00 No 0.00<br />

21 Disposal of excavated material<br />

upto 0.5 km lead including loading,<br />

unloading, transporting by mechanical<br />

or other means, stacking, spreading,<br />

levelling as directed by Engineer etc.<br />

complete.<br />

22 Carrying out plate load test to<br />

determine safe bearing capacity of soil<br />

/ strata as per IS Code No. 1888.<br />

The test shall be conducted on square<br />

plates of size 600 mm x 600 mm. &<br />

25 mm thick . Vertical movement shall<br />

be measured by three dial gauges<br />

preferably four dial gauges at 90<br />

degree. The loads shall be measured<br />

using 15 MT capacity proving ring /<br />

hydraulic jack and pressure gauge<br />

duly calibrated from time to time<br />

including the necessary shifting<br />

arrangements for carrying out the test<br />

and providing results and graphs as<br />

per IS specifications item including<br />

transportation and shifting and<br />

installation of entire test work as<br />

2740.00 50.35 Cum 137959.00<br />

2.00 11450.00 No. 22900.00


Item.<br />

No.<br />

<strong>CIDCO</strong> <strong>OF</strong> MAHARASHTRA LIMITED.<br />

C.A.NO. 01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010-11<br />

Sl.Pg.No. 220<br />

Description Qty. Rate Unit Amount<br />

directed, etc complete. The tests results<br />

shall be submitted in a report form<br />

with observation sheets, graphs,<br />

tabular form & inferences, if any.<br />

23a Providing earthwork in<br />

embankment with approved<br />

materials obtained from Contractors<br />

own source including all leads and<br />

lifts, laying in layers of 20 to 30cms in<br />

thickness, breaking clods, dressing to<br />

the required lines, curves, grades, and<br />

section with watering and compacting<br />

with vibratory power rollers etc.<br />

Complete.<br />

NOTE -<br />

i. All payments towards the<br />

royalty, fees, taxes etc. shall be<br />

borne by the contractor.<br />

ii. The Environmental cess shall be<br />

recovered at Rs.1/m3 of gross<br />

volume computed without<br />

deductions as mentioned for<br />

the Interim Payment Certificate<br />

or Final Payment Certificate.<br />

iii. P.D. Tests shall be carried out<br />

@ one test comprising of 3<br />

specimens average result per<br />

1000 m2 area.<br />

3480.00 386.70 Cum 1345716.00


Item.<br />

No.<br />

<strong>CIDCO</strong> <strong>OF</strong> MAHARASHTRA LIMITED.<br />

C.A.NO. 01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010-11<br />

Sl.Pg.No. 221<br />

Description Qty. Rate Unit Amount<br />

iv. Compaction upto 95%<br />

Modified P.D. and the<br />

laboratory soil dry density shall<br />

be not less than 1.60 g/cc. at<br />

Optimum moisture content.<br />

v. The gross volume of the<br />

embankment shall reduced by<br />

5% for Interim Payment<br />

Certificate or Final Payment<br />

Certificate<br />

23b Providing earthwork in<br />

embankment with approved<br />

materials obtained from Contractors<br />

own source including all leads and<br />

lifts, laying in layers of 20 to 30cms in<br />

thickness, breaking clods, dressing to<br />

the required lines, curves, grades, and<br />

section with watering and compacting<br />

with vibratory power rollers etc.<br />

Complete.<br />

NOTES:-<br />

i. All payments towards the<br />

royalty, fees, taxes etc. shall be<br />

borne by the contractor.<br />

ii. The Environmental cess shall be<br />

recovered at Rs.1/m3 of gross<br />

volume computed without<br />

deductions as mentioned for<br />

the interim payment certificate<br />

or Final payment certificate<br />

65.00 387.00 Cum 25155.00


Item.<br />

No.<br />

<strong>CIDCO</strong> <strong>OF</strong> MAHARASHTRA LIMITED.<br />

C.A.NO. 01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010-11<br />

Sl.Pg.No. 222<br />

Description Qty. Rate Unit Amount<br />

iii. P.D. Tests shall be carried out<br />

@ one test comprising of 3<br />

specimens average result per<br />

1000 m2 area.<br />

iv. Compaction upto 97%<br />

Modified P.D. and the<br />

laboratory soil dry density shall<br />

be not less than 1.75 g/cc. at<br />

Optimum moisture content.<br />

v. The gross volume of the<br />

embankment shall reduced by<br />

5% for interim payment<br />

certificate and 1% for Final<br />

payment certificate.<br />

23c Providing earthwork in embankment<br />

with approved materials obtained<br />

from the road cutting with a lead<br />

of 1.00 KM including all lifts, laying in<br />

layers of 20 to 30 cms in thickness,<br />

breaking clods, dressing to the<br />

required lines, curves, grades, and<br />

section with watering and compacting<br />

with vibratory power rollers etc.<br />

Complete.<br />

NOTES -<br />

i. All payments towards the<br />

royalty, fees, taxes etc. shall be<br />

borne by the contractor.<br />

45.00 179.70 Cum 8086.50


Item.<br />

No.<br />

<strong>CIDCO</strong> <strong>OF</strong> MAHARASHTRA LIMITED.<br />

C.A.NO. 01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010-11<br />

Sl.Pg.No. 223<br />

Description Qty. Rate Unit Amount<br />

ii. The Environmental cess shall be<br />

recovered at Rs.1/m3 of gross<br />

volume computed without<br />

deductions as mentioned for<br />

the Interim Payment Certificate<br />

or Final Payment Certificate.<br />

iii. P.D. Tests shall be carried out<br />

@ one test comprising of 3<br />

specimens average result per<br />

1000 m2 area.<br />

iv. Compaction upto 95%<br />

Modified P.D. and the<br />

laboratory soil dry density shall<br />

be not less than 1.6 g/cc. at<br />

Optimum moisture content.<br />

v. The gross volume of the<br />

embankment shall reduced by<br />

5% for Interim Payment<br />

Certificate and 1% for Final<br />

Payment Certificate.<br />

23d Providing earthwork in embankment<br />

with approved materials obtained<br />

from the road cutting with a lead<br />

of 1.00 KM including all lifts, laying in<br />

layers of 20 to 30 cms in thickness,<br />

breaking clods, dressing to the<br />

required lines, curves, grades, and<br />

65.00 180.10 Cum 11706.50


Item.<br />

No.<br />

<strong>CIDCO</strong> <strong>OF</strong> MAHARASHTRA LIMITED.<br />

C.A.NO. 01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010-11<br />

Sl.Pg.No. 224<br />

Description Qty. Rate Unit Amount<br />

section with watering and compacting<br />

with vibratory power rollers etc.<br />

Complete.<br />

NOTES-<br />

(i) All payments towards the<br />

royalty, fees, taxes etc. shall be<br />

borne by the contractor.<br />

(ii) The Environmental cess shall be<br />

recovered at Rs.1/m3 of gross<br />

volume computed without<br />

deductions as mentioned for<br />

the interim payment certificate<br />

or Final payment certificate<br />

(iii) P.D. Tests shall be carried out<br />

@ one test comprising of 3<br />

specimens average result per<br />

1000 m2 area.<br />

(iv) Compaction upto 97%<br />

Modified P.D. and the<br />

laboratory soil dry density shall<br />

be not less than 1.75 g/cc. at<br />

Optimum moisture content.<br />

(v) The gross volume of the<br />

embankment shall reduced by<br />

5% for Interim Payment<br />

Certificate and 1% for Final<br />

Payment Certificate.


Item.<br />

No.<br />

<strong>CIDCO</strong> <strong>OF</strong> MAHARASHTRA LIMITED.<br />

C.A.NO. 01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010-11<br />

Sl.Pg.No. 225<br />

Description Qty. Rate Unit Amount<br />

24 Demarcation of the Road /<br />

channel / bridge alignment by<br />

traversing along the existing /<br />

proposed route with one second<br />

theodolite. Taking angles & distance<br />

at turning points including transfer of<br />

Co-ordinate from known point to<br />

survey area and as directed by<br />

Engineer & providing 5 Nos. colour<br />

paper prints with drawing in soft copy<br />

format.<br />

25a Providing & placing in position Plastic<br />

cover blocks of required size at 1.5<br />

mtr. centre to centre near the edge of<br />

each site and at centre when the width<br />

is more than 75 cm to reinforcement<br />

to give a clean cover of 40 mm to 65<br />

mm from all sides as per I.S. 456-<br />

2000 and MORTH specifications<br />

(latest version) in RCC columns & pier<br />

& footing, wall, raft, chairs, thurst<br />

blocks.<br />

NOTE -<br />

The cost also includes all type of taxes.<br />

25b Providing & placing in position Plastic<br />

cover blocks of required size at 90<br />

cm centre to centre to each main<br />

bottom bars and to stirrups at sides to<br />

1.00 8515.00 km 8515.00<br />

15.00 44.00 Cum 660.00<br />

0.00 47.00 Cum 0.00


Item.<br />

No.<br />

<strong>CIDCO</strong> <strong>OF</strong> MAHARASHTRA LIMITED.<br />

C.A.NO. 01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010-11<br />

Sl.Pg.No. 226<br />

Description Qty. Rate Unit Amount<br />

give required clear cover from all<br />

sides as per I.S. 456-2000 and<br />

MORTH specifications (latest version)<br />

in R.C.C. beams.<br />

NOTE -<br />

The cost also includes all type of taxes.<br />

25c Providing & placing plastic cover<br />

block of required size at the rate of<br />

27 Nos. per 10 square metre to<br />

reinforcement to give a clear cover as<br />

per I.S.456-2000 and MORTH<br />

specifications (latest version) in R.C.C.<br />

slabs.<br />

NOTE -<br />

The cost also includes all type of taxes.<br />

26 Providing and laying dry stone<br />

pitching 230 mm thick with pin<br />

header per sq.m or as directed, in<br />

staggered type and pointing in cement<br />

mortar 1:3 as specified and as per<br />

drawing and as directed by Engineer<br />

with all leads and lifts etc. complete.<br />

NOTE-<br />

All payment towards the royalty, fees,<br />

taxes etc should be borne by the<br />

contractor.<br />

25.00 36.00 Cum 900.00<br />

995.00 152.00 sqm 151240.00


Item.<br />

No.<br />

<strong>CIDCO</strong> <strong>OF</strong> MAHARASHTRA LIMITED.<br />

C.A.NO. 01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010-11<br />

Sl.Pg.No. 227<br />

Description Qty. Rate Unit Amount<br />

27 Dismantling carefully breaking<br />

concrete by chiseling, wedging of the<br />

existing RCC concrete railing parapet,<br />

existing pipes, dead pipes, encasing,<br />

foundations, small structure as<br />

directed, including cutting of steel and<br />

stacking the materials neatly within 50<br />

meter lead, removing concrete stuff<br />

etc complete.<br />

28 Providing and fixing precast RCC<br />

Railing with cast in situ precast<br />

panels/members in M-35 grade of<br />

concrete using design mix with<br />

minimum cement content as per IRC<br />

2000 specification - MORTH, as per<br />

detailed design and drawings in<br />

railing length or as directed including<br />

compaction, curing and finishing<br />

uneven and honey combed surface<br />

with cement mortar 1:3 of sufficient<br />

minimum thickness to give a smooth<br />

and even surface. The cost also<br />

includes all types of taxes, sales tax,<br />

cess levied by local authority etc.<br />

complete.<br />

25.00 316.00 Cum 7900.00<br />

120.88 1367.95 Rmt 165357.80


Item.<br />

No.<br />

<strong>CIDCO</strong> <strong>OF</strong> MAHARASHTRA LIMITED.<br />

C.A.NO. 01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010-11<br />

Sl.Pg.No. 228<br />

Description Qty. Rate Unit Amount<br />

29 Providing, fabricating MS plate of<br />

various sizes, angles, bolt of required<br />

diameter structural steel work for<br />

expansion joint for deck slab and<br />

bridge items as per detailed design<br />

and drawing or as directed, for RCC<br />

work as per detailed design and<br />

drawings as per MORTH specifications<br />

(latest version) or as directed including<br />

cutting, fabricating, brackets for<br />

cables, channels, hoisting, erecting,<br />

fixing in position making welding<br />

connections with connecting plates<br />

and braces etc. and including one<br />

coat of anti-corrosive paint and over it<br />

two coat of paintings of approved<br />

quality and shade, payment for MS<br />

plate will be made for the actual<br />

weight basis including required<br />

machineries, all materials, labour The<br />

cost also includes all types of taxes,<br />

sales tax, cess levied by local authority<br />

etc. complete.<br />

30 Providing flush grooved pointing<br />

with cement mortor 1:3 to stone<br />

masonry / pitching including<br />

scaffolding and curing as per MORTH<br />

specifications (Latest version), etc<br />

complete.<br />

4.25 48885.00 MT 207761.25<br />

1028.14 51.00 Sqm 52435.14


Item.<br />

No.<br />

<strong>CIDCO</strong> <strong>OF</strong> MAHARASHTRA LIMITED.<br />

C.A.NO. 01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010-11<br />

Sl.Pg.No. 229<br />

NOTE -<br />

Description Qty. Rate Unit Amount<br />

All payment towards the royalty, fees,<br />

taxes etc should be borne by the<br />

contractor.<br />

31 Providing and fixing in position tar<br />

paper bearing as per detailed<br />

drawings as per MORTH specification<br />

(latest version) and as directed by<br />

Engineer, etc complete.<br />

NOTE -<br />

The cost also includes all type of taxes.<br />

32 Providing vent hole in the<br />

abutments as per detail design and<br />

drawings, as per MORTH<br />

specifications (latest version) or in slab<br />

and wearing course with iron grill at<br />

the top and galvanised iron pipe at<br />

bottom as per drawing or as directed,<br />

etc.<br />

NOTE -<br />

The cost also includes all type of taxes.<br />

33a Providing and constructing BB<br />

masonry (IInd sort) circular/<br />

concentric conical manhole with<br />

1.83 m dia at bottom and 0.53 m.<br />

Dia. at top with 230 mm thick brick<br />

masonry (IInd sort) in C.M. 1:3 and<br />

185.00 52.00 Sqm 9620.00<br />

20.00 305.00 No. 6100.00<br />

3.00 23721.80 No 71165.40


Item.<br />

No.<br />

<strong>CIDCO</strong> <strong>OF</strong> MAHARASHTRA LIMITED.<br />

C.A.NO. 01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010-11<br />

Sl.Pg.No. 230<br />

Description Qty. Rate Unit Amount<br />

20 mm thick smooth cement plaster in<br />

C.M. 1:2 from inside and outside,<br />

including curing providing and fixing<br />

copolymer, polypropylene, steel<br />

reinforcement PVC heavy duty step/<br />

footrest of approved make conforming<br />

to an ASTM D-4101 specification<br />

including providing foundation<br />

concrete in M-15 and 300 mm thick<br />

with benching and channelling,<br />

supplying and fixing RCC factory<br />

made steel fibre reinforced (SFRC)<br />

heavy duty manhole cover and frame<br />

with steel bearing of cover into the<br />

frame including shoring strutting etc.<br />

complete. As per design and drawing<br />

circulated by SE (ENV) in 2003<br />

including heavy dewatering by pump<br />

till the completion of work. (Depth<br />

upto 2.28 m. from top of frame to<br />

invert level of pipe)<br />

NOTE :<br />

(i) The contractor has to make his<br />

own arrangement for testing the<br />

manhole.<br />

(ii) All payment towards the royalty,<br />

fees, taxes etc should be borne<br />

by the contractor.


Item.<br />

No.<br />

<strong>CIDCO</strong> <strong>OF</strong> MAHARASHTRA LIMITED.<br />

C.A.NO. 01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010-11<br />

Sl.Pg.No. 231<br />

Description Qty. Rate Unit Amount<br />

33b For additional extra meter depth<br />

beyond 2.28 m. & upto 4.00 m of<br />

above item No.33a.<br />

NOTE :<br />

(i) The contractor has to make his<br />

own arrangement for testing the<br />

manhole.<br />

(ii) All payment towards royalty,<br />

fees, taxes etc should be borne<br />

by the contractor.<br />

34 Providing & laying granular sub-<br />

base (GSB) as per clause 401 of<br />

M.O.R.T.&H (2001) specifications of<br />

specified grading (Table 400-1 or<br />

400-2) in specified thickness in layers.<br />

The item to include premixing the<br />

materials in plant, transportation to<br />

site, spreading in uniform layers with<br />

motor grader on a prepared<br />

subgrade, compacting with vibratory<br />

rollers till 98% of the maximum dry<br />

density (IS 2720 part-8) is achieved<br />

etc. Complete. The rate includes for<br />

tests on completion of each GSB layer.<br />

The strength of each GSB layer shall<br />

be evaluated by conducting CBR (IS<br />

9.00 10682.80 Rmt 96145.20


Item.<br />

No.<br />

<strong>CIDCO</strong> <strong>OF</strong> MAHARASHTRA LIMITED.<br />

C.A.NO. 01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010-11<br />

Sl.Pg.No. 232<br />

Description Qty. Rate Unit Amount<br />

2720 Part 16 & 31) or Plate load test<br />

using 750mm dia. Plate, (IS 9214) for<br />

obtaining equivalent CBR value @ one<br />

test per 3000 m2 compacted surface<br />

area as per the Grading. The item<br />

includes for all necessary material,<br />

labour, diversions, taxes, royalty, cess<br />

etc complete.<br />

a) For Grading-I of close-graded<br />

GSB material with minimum<br />

CBR value of 30% to be<br />

obtained on top of the<br />

compacted layer.<br />

(Upper sub-base)<br />

b) For Grading-II of close-<br />

graded GSB material with<br />

minimum CBR value of 25% to<br />

be obtained on top of the<br />

compacted layer.<br />

(Intermediate sub-base)<br />

c) For Grading-III of close-<br />

graded GSB material with<br />

minimum CBR value of 20% to<br />

be obtained on top of the<br />

compacted layer.<br />

(Lower sub-base).<br />

156.00 727.95 cu.m 113560.20<br />

156.00 685.45 cu. m 106930.20<br />

0.00 644.00 cu. m 0.00


Item.<br />

No.<br />

<strong>CIDCO</strong> <strong>OF</strong> MAHARASHTRA LIMITED.<br />

C.A.NO. 01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010-11<br />

Sl.Pg.No. 233<br />

Description Qty. Rate Unit Amount<br />

35 Providing & laying granular base of<br />

Wet mix macadam (WMM) as per<br />

clause 406 of M.O.R.T.&H (2001)<br />

specifications of specified grading<br />

(Table 400-11) in specified thickness<br />

in layers. The item to include<br />

premixing the materials in plant,<br />

transportation to site, spreading in<br />

uniform layers with paver on a<br />

prepared sub-base, compacting with<br />

vibratory rollers till 98% of the<br />

maximum dry density (IS 2720 Part-8)<br />

is achieved etc complete. The rate<br />

includes for tests on completion of<br />

each WMM layer. The strength of each<br />

WMM layer shall be evaluated by<br />

Plate load test with 750 mm dia plate.<br />

(IS 9214) for obtaining equivalent CBR<br />

value @ one test per 3000 m2<br />

compacted surface area as per the<br />

Grading. The item includes for all<br />

necessary material, labour, diversions,<br />

taxes, royalty, cess etc complete.<br />

36 To carry out plate load test to<br />

determine modulus of sub-grade<br />

reaction (K-value) of unbound / semi-<br />

bound macadam (GSB, WMM, BBM)<br />

in field as per IS Code No. 9214-<br />

1979. The item includes to conduct<br />

one test per location. The test shall be<br />

182.00 1047.10 Cum 190572.20<br />

2.00 7575.00 No. 15150.00


Item.<br />

No.<br />

<strong>CIDCO</strong> <strong>OF</strong> MAHARASHTRA LIMITED.<br />

C.A.NO. 01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010-11<br />

Sl.Pg.No. 234<br />

Description Qty. Rate Unit Amount<br />

conducted on 75cm. dia & 25mm<br />

thick plate with stiffening plates of<br />

smaller size of 60, 45 & 30 cm. dia<br />

and 25mm thick each shall be used.<br />

Vertical movement shall be measured<br />

by three dial gauges placed at 120 0<br />

preferably 4 dial gauges placed at<br />

90 0 . The load shall be measured using<br />

15 MT capacity proving ring /<br />

hydraulic jack with pressure gauge<br />

duly calibrated from time to time. The<br />

test results shall be submitted in a<br />

report form with observation sheets,<br />

graphs, tabular form & inferences if<br />

any.<br />

37 Providing and applying bituminous<br />

tack coat of approved type and<br />

grade by a self propelled or towed<br />

bitumen pressure sprayer as per<br />

Specifications for road and bridge<br />

works (M.O.R.T.& H., 2001). The item<br />

includes for preparation of the base,<br />

application of the tack coat, relevant<br />

tests for quality control as enumerated<br />

in table 900-4, diversion of traffic, etc.<br />

complete. (Using 60 / 70 grade<br />

bitumen). The rate shall include for all<br />

labour, materials, machinery,<br />

transportation, taxes etc. complete.


Item.<br />

No.<br />

<strong>CIDCO</strong> <strong>OF</strong> MAHARASHTRA LIMITED.<br />

C.A.NO. 01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010-11<br />

Sl.Pg.No. 235<br />

Description Qty. Rate Unit Amount<br />

a) At an application rate of<br />

@50 kg/ 100 m2 Over B.T.<br />

surface.<br />

b) At an application rate of<br />

@100 kg/ 100 m2 Over<br />

W.B.M. surface.<br />

38 Providing and constructing<br />

Bituminous Bound Macadam<br />

(BBM) surface 75 mm thickness<br />

including supplying all materials<br />

including metal, bitumen etc.<br />

spreading 40 mm hand broken trap<br />

metal 9 cum per 100 m2 and 20 mm<br />

trap metal at the rate of 1.5 cum/100<br />

sqm., heating and spreading bitumen<br />

(excluding tack coat) at 250 kg./100<br />

m2, spreading 12 mm size key<br />

aggregate at the rate of 1.8 cum/100<br />

sqm and compaction with vibratory<br />

roller complete. Grade of bitumen<br />

shall be 60/70. The rate is inclusive of<br />

royalty and all type of taxes.<br />

NOTE -<br />

Item also includes cleaning the road<br />

surface with wire brush/brooms and<br />

make it free from dust and water<br />

before applying/spreading tack coat.<br />

The tack coat shall be paid separately.<br />

2260.00 19.15 Sqm 43279.00<br />

1040.00 35.25 Sqm 36660.00<br />

1040.00 168.60 Sqm 175344.00


Item.<br />

No.<br />

<strong>CIDCO</strong> <strong>OF</strong> MAHARASHTRA LIMITED.<br />

C.A.NO. 01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010-11<br />

Sl.Pg.No. 236<br />

Description Qty. Rate Unit Amount<br />

39 Providing and laying hot mix hot<br />

laid Dense Graded Bituminous<br />

Macadam (DBM) of required<br />

thickness with minimum 4.5% bitumen<br />

by weight of total mix/ depending on<br />

job mix formula & as per clause 507<br />

of MORTH (2001) specification for<br />

road & bridges including diversion of<br />

traffic, supply of all materials, heating<br />

bitumen and chips, mixing bitumen<br />

and chips with necessary filler material<br />

in batch type or continuous type or<br />

drum mix type hot mix plant, laying<br />

dense bituminous macadam by paver<br />

finisher including compaction with<br />

vibratory roller etc. complete<br />

(excluding tack coat). The grade of<br />

bitumen shall be 60/70. The rate is<br />

inclusive of royalty and all types of<br />

taxes.<br />

40 Providing and laying hot mix hot laid<br />

Asphaltic Concrete / bituminous<br />

concrete (AC/BC) with bitumen<br />

minimum 5% by weight of total mix as<br />

per job mix formula as per clause 509<br />

of MORTH (2001) specification for<br />

road & bridges including supplying all<br />

materials, heating bitumen and chips<br />

110.00 4860.25 Cum 534627.50<br />

70.00 5589.80 Cum 391286.00


Item.<br />

No.<br />

<strong>CIDCO</strong> <strong>OF</strong> MAHARASHTRA LIMITED.<br />

C.A.NO. 01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010-11<br />

Sl.Pg.No. 237<br />

Description Qty. Rate Unit Amount<br />

with necessary filler material mixing<br />

bitumen and chips in hot mix plant<br />

laying asphaltic concrete with sensor<br />

paver finisher including compaction<br />

with vibratory roller etc. complete<br />

(excluding tack coat). The grade of<br />

bitumen shall be 60/70. The rate is<br />

inclusive of royalty and all types of<br />

taxes.<br />

41a Providing lowering, laying and jointing<br />

RCC, S/S pipes manufactured as per<br />

IS:458 ( latest version ) having ISI of<br />

450 dia NP3 class with rubber ring<br />

joints as directed in proper grade<br />

including cost of materials, rubber<br />

rings, all taxes (central and local)<br />

transportation, loading and unloading<br />

and hydraulic testing as per I.S. 458<br />

(latest version) including necessary<br />

heavy dewatering by all means etc.<br />

complete.<br />

NOTE :<br />

(i) The contractor has to make his<br />

own arrangement for testing the<br />

pipeline as per I.S. standard.<br />

(ii) The cost also includes all type<br />

of taxes.<br />

61.00 1971.00 Rmt 120231.00


Item.<br />

No.<br />

<strong>CIDCO</strong> <strong>OF</strong> MAHARASHTRA LIMITED.<br />

C.A.NO. 01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010-11<br />

Sl.Pg.No. 238<br />

Description Qty. Rate Unit Amount<br />

41b Providing lowering, laying and jointing<br />

RCC, S/S pipes manufactured as per<br />

IS:458 (latest version) having ISI of<br />

700 dia NP3 class with rubber ring<br />

joints as directed in proper grade<br />

including cost of materials, rubber<br />

rings, all taxes (central and local)<br />

transportation, loading and unloading<br />

and hydraulic testing as per I.S. 458<br />

(latest version) including necessary<br />

heavy dewatering by all means etc.<br />

complete.<br />

NOTE -<br />

(i) The contractor has to make his<br />

own arrangement for testing the<br />

pipeline as per I.S. standard.<br />

(ii) The cost also includes all type<br />

of taxes.<br />

41c Providing D.I.K-9 grade 450 mm<br />

Dia pipes of approved make with<br />

internal cement mortar lining<br />

including all taxes, insurance, railway<br />

freight, unloading from railway<br />

wagon, loading into truck, transport to<br />

departmental stores/site, unloading,<br />

stacking, etc. complete (IS: 8329-<br />

2000 Latest Version) and Lowering<br />

0.00 3775.00 Rmt 0.00<br />

55.00 5462.00 Rmt 300410.00


Item.<br />

No.<br />

<strong>CIDCO</strong> <strong>OF</strong> MAHARASHTRA LIMITED.<br />

C.A.NO. 01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010-11<br />

Sl.Pg.No. 239<br />

Description Qty. Rate Unit Amount<br />

laying and jointing with SBR rubber<br />

gaskets and CI/MS/DI specials of<br />

required diameter in proper position,<br />

grade and alignment as directed by<br />

Engineer including conveyance of<br />

material from stores to site of work,<br />

including cost of jointing materials<br />

and rubber rings labour, giving<br />

hydraulic testing etc. complete.<br />

NOTE -<br />

(i) only SBR Rubber gaskets to be<br />

used<br />

(ii) The cost also includes all type<br />

of taxes.<br />

41d Providing D.I.K-9 grade 700 mm<br />

Dia pipes of approved make with<br />

internal cement mortar lining<br />

including all taxes, insurance, railway<br />

freight, unloading from railway<br />

wagon, loading into truck, transport to<br />

departmental stores/site, unloading,<br />

stacking, etc. complete (IS: 8329-<br />

2000 Latest Version) and Lowering<br />

laying and jointing with SBR rubber<br />

gaskets and CI/MS/DI specials of<br />

required diameter in proper position,<br />

0.00 10807.00 Rmt 0.00


Item.<br />

No.<br />

<strong>CIDCO</strong> <strong>OF</strong> MAHARASHTRA LIMITED.<br />

C.A.NO. 01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010-11<br />

Sl.Pg.No. 240<br />

Description Qty. Rate Unit Amount<br />

grade and alignment as directed by<br />

Engineer including conveyance of<br />

material from stores to site of work,<br />

including cost of jointing materials<br />

and rubber rings labour, giving<br />

hydraulic testing etc. complete.<br />

NOTE -<br />

(i) only SBR Rubber gaskets to be<br />

used<br />

(ii) The cost also includes all type<br />

of taxes.<br />

41e Providing D.I.K-9 grade 100 mm<br />

Dia pipes of approved make with<br />

internal cement mortar lining<br />

including all taxes, insurance, railway<br />

freight, unloading from railway<br />

wagon, loading into truck, transport to<br />

departmental stores/site, unloading,<br />

stacking, etc. complete (IS: 8329-<br />

2000 Latest Version) and Lowering<br />

laying and jointing with SBR rubber<br />

gaskets and CI/MS/DI specials of<br />

required diameter in proper position,<br />

grade and alignment as directed by<br />

Engineer including conveyance of<br />

material from stores to site of work,<br />

including cost of jointing materials<br />

and rubber rings labour, giving<br />

hydraulic testing etc. complete.<br />

71.00 1014.00 Rmt 71994.00


Item.<br />

No.<br />

<strong>CIDCO</strong> <strong>OF</strong> MAHARASHTRA LIMITED.<br />

C.A.NO. 01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010-11<br />

Sl.Pg.No. 241<br />

Description Qty. Rate Unit Amount<br />

NOTE :<br />

(i) only SBR Rubber gaskets to be<br />

used<br />

(ii) The cost also includes all type<br />

of taxes.<br />

41f Removing, Lowering laying and<br />

jointing of the existing D.I.K-9 grade<br />

100 mm Dia pipes of approved<br />

make with SBR rubber gaskets and<br />

CI/MS/DI specials of required<br />

diameter in proper position, grade<br />

and alignment as directed by Engineer<br />

including conveyance of material from<br />

site to site of work, including cost of<br />

jointing materials and rubber rings<br />

labour, giving hydraulic testing etc.<br />

complete.<br />

NOTE :<br />

(i) only SBR Rubber gaskets to be<br />

used<br />

(ii) The cost also includes all type<br />

of taxes.<br />

42 Cutting and champhering of DI<br />

pipes of 100 mm diameter including<br />

cost of all materials and labour<br />

involved, etc. complete as directed by<br />

Engineer.<br />

15.00 54.00 Rmt 810.00<br />

10.00 32.00 per<br />

one<br />

Cut<br />

320.00


Item.<br />

No.<br />

<strong>CIDCO</strong> <strong>OF</strong> MAHARASHTRA LIMITED.<br />

C.A.NO. 01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010-11<br />

Sl.Pg.No. 242<br />

Description Qty. Rate Unit Amount<br />

43 Providing and Supplying ISI standard<br />

D.I. specials & fitting with<br />

arrangement for sealing rubber gasket<br />

of S.B.R, complete with cast iron collar<br />

gland and mild steel nut bolt's coated<br />

or otherwise protected from rusting<br />

and suitable for D.I. Pipes including<br />

cost of all labours, materials,<br />

transportation upto Depart-mental<br />

store/site loading and unloading<br />

including all taxes etc.<br />

(a) 80 mm dia. to 300 mm dia 120.00 91.00 kg 10920.00<br />

(b) 350 mm dia. & above 1840.00 110.00 kg 202400.00<br />

44 Providing Second class Burnt Brick<br />

masonry with conventional / IS type<br />

bricks in cement mortar 1:6 in<br />

foundation and plinth of inner walls &<br />

external walls, including bailing out<br />

water manually, striking joints on<br />

unexposed faces, racking out joints on<br />

exposed faces and curing complete.<br />

NOTE:<br />

All payment towards royalty, fees,<br />

taxes etc should be borne by the<br />

contractor.<br />

15.00 2981.00 Cum 44715.00


Item.<br />

No.<br />

<strong>CIDCO</strong> <strong>OF</strong> MAHARASHTRA LIMITED.<br />

C.A.NO. 01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010-11<br />

Sl.Pg.No. 243<br />

Description Qty. Rate Unit Amount<br />

45 Providing cement plaster 12mm<br />

thick in a single coat in cement<br />

mortar 1:3 without neeru finish to<br />

concrete or brick surface in all<br />

positions including racking out joints,<br />

scaffolding and curing complete.<br />

NOTE:<br />

All payment towards royalty, fees,<br />

taxes etc should be borne by the<br />

contractor.<br />

46 Providing & fixing parabolic shape<br />

PCC precast-factory made M25<br />

Grade kerb stone using design mix<br />

with minimum cement content as per<br />

IS 456 of size 500/200/850 mm as<br />

per detailed design and drawing<br />

including excavation, fixing in PCC of<br />

M-15 grade 250 mm thick including<br />

side concreting, filling joints in cement<br />

mortar (1:3) disposal of excavated<br />

material, including painting in two<br />

coats of oil paints and one coat of<br />

primer to exposed faces,<br />

transportation to site, labour, etc.<br />

complete. The rate inclusive of all<br />

type of taxes.<br />

25.00 102.00 Sqm 2550.00<br />

50.00 980.60 Rmt 49029.80


Item.<br />

No.<br />

<strong>CIDCO</strong> <strong>OF</strong> MAHARASHTRA LIMITED.<br />

C.A.NO. 01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010-11<br />

Sl.Pg.No. 244<br />

Description Qty. Rate Unit Amount<br />

47 Dewatering the excavated<br />

trenches and pools of water<br />

within project area by using pumps<br />

and other devices, including disposing<br />

of the water to a safe distance as<br />

directed By using 10 to 19 H.P.<br />

Pumps.<br />

1.00 77.00 Hr 77.00<br />

TOTAL COST PUT TO TENDER (A) Rs. 37209377.49<br />

Add/Subtract (+/-) ______% quoted by the Contractor to<br />

reflect the Total Cost (B) Rs.<br />

GRAND TOTAL (A+B) Rs.<br />

(Rupees ________________________________________________________________<br />

__________________________________________________________________) only.<br />

NOTES :<br />

1) It is compulsory to fill the amount both in words and figures or else the tender is<br />

liable to be rejected.<br />

2) This is to confirm that I have read carefully instruction No. 11.2 Sl.Pg.<br />

No.16 of the Tender and I understand that my tender is liable to be rejected if I<br />

fail to submit the offer in accordance with the various provisions and do not<br />

comply with the stipulations.<br />

3) I, understand that my tender is liable to be rejected if I fail to fill the amount both<br />

in words and figures.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!