Item.<br />
No.<br />
<strong>CIDCO</strong> <strong>OF</strong> MAHARASHTRA LIMITED.<br />
C.A.NO. 01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010-11<br />
Sl.Pg.No. 203<br />
Name of Work : Extension of Bridge CD-10 on 32 m wide Pandav Marg across<br />
the 45 m wide Diversion Channel at Kharghar.<br />
C.A. No. : 01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010-11<br />
<strong>SCHEDULE</strong> <strong>“A”</strong><br />
<strong>BILL</strong> <strong>OF</strong> <strong>QUANTITIES</strong><br />
Description Qty. Rate Unit Amount<br />
1 Excavation for foundation to any<br />
depth in all types of earth, soils of<br />
all types such as sand, gravel,<br />
slush, soft murum, hard murum<br />
with or without boulders including<br />
shoring and strutting wherever<br />
necessary, disposing off the surplus<br />
materials within 50m beyond the work<br />
site, with all lifts, stacking and<br />
spreading as directed, heavy<br />
dewatering by pump or manually,<br />
preparing the bed for foundation and<br />
necessary backfilling .... etc. complete.<br />
NOTE-<br />
All payment towards the royalty, fees,<br />
taxes etc should be borne by the<br />
contractor.<br />
2 Excavation for foundation to any<br />
depth in soft rock including shoring<br />
and strutting wherever necessary,<br />
disposing off the surplus materials<br />
within 50m, beyond the work site, with<br />
2610.00 135.00 Cum 352350.00<br />
210.00 267.30 Cum 56133.00
Item.<br />
No.<br />
<strong>CIDCO</strong> <strong>OF</strong> MAHARASHTRA LIMITED.<br />
C.A.NO. 01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010-11<br />
Sl.Pg.No. 204<br />
Description Qty. Rate Unit Amount<br />
all lifts, stacking and spreading as<br />
directed, heavy dewatering by pump<br />
or manually, preparing bed for<br />
foundation and necessary backfilling<br />
......etc. complete.<br />
NOTE-<br />
All payment towards the royalty, fees,<br />
taxes etc should be borne by the<br />
contractor.<br />
3 Excavation for foundation in hard<br />
rock upto any depth with all lifts by<br />
chiseling manually or by mechanical<br />
means such as hydraulic rock driller<br />
including wedging, line drilling,<br />
trimming and levelling the bed,<br />
removing the excavated materials upto<br />
a distance of 50m beyond the work<br />
site with all lifts, stacking the<br />
serviceable materials in measurable<br />
heaps as directed, heavy dewatering<br />
by pump or manually, preparing bed<br />
for foundation and necessary back<br />
filling .............etc. complete.<br />
NOTE-<br />
All payment towards the royalty, fees,<br />
taxes etc should be borne by the<br />
contractor.<br />
1995.00 588.30 Cum 1173658.50
Item.<br />
No.<br />
<strong>CIDCO</strong> <strong>OF</strong> MAHARASHTRA LIMITED.<br />
C.A.NO. 01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010-11<br />
Sl.Pg.No. 205<br />
Description Qty. Rate Unit Amount<br />
4a Providing and laying dry trap metal<br />
soling 150mm to 230 mm thick<br />
including hand packing with metal,<br />
rubble chips, application of required<br />
murum/stone dust blindage and<br />
compaction watering with all leads<br />
and lifts, heavy dewatering by pump<br />
or manually, preparing bed for<br />
foundation and necessary backfilling<br />
...... etc. complete.<br />
NOTE-<br />
All payment towards the royalty, fees,<br />
taxes etc should be borne by the<br />
contractor.<br />
4b Providing trap rubble filling behind<br />
the walls / abutments / returns<br />
including filling voids with gravel,<br />
hand packing and compacting the<br />
rubble etc. complete. as per<br />
Appendix-6 of IRC 78 /2000 (latest<br />
version MORTH specification) and<br />
heavy dewatering by pump or<br />
manually, preparing bed for<br />
foundation and necessary backfilling<br />
............. etc. complete.<br />
NOTE-<br />
All payment towards the royalty, fees,<br />
taxes etc should be borne by the<br />
contractor.<br />
350.00 427.00 Cum 149450.00<br />
140.00 330.00 Cum 46200.00
Item.<br />
No.<br />
<strong>CIDCO</strong> <strong>OF</strong> MAHARASHTRA LIMITED.<br />
C.A.NO. 01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010-11<br />
Sl.Pg.No. 206<br />
Description Qty. Rate Unit Amount<br />
5a Providing and laying Ready mix<br />
cement concrete (RMC) of M20<br />
grade using design mix with minimum<br />
cement content 310 kg/m3 and<br />
maximum water cement ratio 0.45<br />
using nominal maximum size of<br />
“20mm and down” trap metal for<br />
foundation and bedding with all<br />
labours, materials, plant &<br />
equipments, shuttering, form work,<br />
staging, including transporting for all<br />
leads and all lifts, placing, vibrating<br />
with mechanical vibrator, pumping of<br />
concrete of any distance to required<br />
location, finishing, curing, as per<br />
IRC/2000 specification (MORTH) and<br />
heavy dewatering by pump or<br />
manually ............. etc. complete.<br />
NOTE-<br />
All payment towards the royalty, fees,<br />
taxes etc should be borne by the<br />
contractor.<br />
5b Providing and laying Ready mix<br />
cement concrete (RMC) of M20<br />
grade using design mix with minimum<br />
cement content 310 kg/m3 and<br />
maximum water cement ratio 0.45<br />
using nominal maximum size of<br />
492.00 4663.00 Cum 2294196.00<br />
427.00 4064.30 Cum 1735456.10
Item.<br />
No.<br />
<strong>CIDCO</strong> <strong>OF</strong> MAHARASHTRA LIMITED.<br />
C.A.NO. 01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010-11<br />
Sl.Pg.No. 207<br />
Description Qty. Rate Unit Amount<br />
aggregate should be “20 mm and<br />
down” trap metal and plums about 15<br />
% of trap/granite/quartzite/gneiss<br />
stones for bedding with all labours,<br />
materials, plant & equipments,<br />
shuttering, form work, staging,<br />
including transporting for all leads<br />
and all lifts, placing, vibrating with<br />
mechanical vibrator, pumping of<br />
concrete of any distance to required<br />
location, finishing and curing, as per<br />
IRC/2000 specification (MORTH) and<br />
heavy dewatering by pump or<br />
manually, ............. etc. complete.<br />
NOTE-<br />
All payment towards the royalty, fees,<br />
taxes etc should be borne by the<br />
contractor.<br />
6 Providing and laying Ready mix<br />
cement concrete (RMC) of M30<br />
grade using design mix with minimum<br />
cement content 310 kg/m3 and<br />
maximum water cement ratio 0.45<br />
using nominal maximum size of "20<br />
mm and down" trap metal for PCC<br />
Abutments foundation, PCC<br />
Abutment foundation, PCC Riding<br />
return, Bedding walls of<br />
foundations with all labours,<br />
640.00 5191.00 Cum 3322240.00
Item.<br />
No.<br />
<strong>CIDCO</strong> <strong>OF</strong> MAHARASHTRA LIMITED.<br />
C.A.NO. 01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010-11<br />
Sl.Pg.No. 208<br />
Description Qty. Rate Unit Amount<br />
materials, plant & equipments,<br />
shuttering, form work, staging,<br />
including transporting for all leads<br />
and all lifts, placing, vibrating with<br />
mechanical vibrator, pumping of<br />
concrete of any distance to required<br />
location, finishing, curing, as per<br />
IRC/2000 specification (MORTH) and<br />
heavy dewatering by pump or<br />
manually ............. etc. complete.<br />
NOTE-<br />
All payment towards the royalty, fees,<br />
taxes etc should be borne by the<br />
contractor.<br />
7 Providing and laying Ready mix<br />
cement concrete (RMC) of M35<br />
grade using design mix with minimum<br />
cement content 400 kg/m3 and<br />
maximum water cement ratio 0.40<br />
using nominal maximum size of "20<br />
mm and down" trap metal for "v"<br />
haunch footing, pier, pier caps,<br />
dirt walls, abutment caps, kerbs,<br />
RCC work, return wall, raft<br />
foundations, etc. as per detailed<br />
drawing or as directed by Engineer,<br />
with all labours, materials, plant &<br />
equipments, shuttering, form work,<br />
staging, including transporting for all<br />
135.00 6094.75 Cum 822791.25
Item.<br />
No.<br />
<strong>CIDCO</strong> <strong>OF</strong> MAHARASHTRA LIMITED.<br />
C.A.NO. 01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010-11<br />
Sl.Pg.No. 209<br />
Description Qty. Rate Unit Amount<br />
leads and all lifts, placing, vibrating<br />
with mechanical vibrator, pumping of<br />
concrete of any distance to required<br />
location, finishing, curing as per<br />
IRC/2000 specification (MORTH) and<br />
heavy dewatering by pump or<br />
manually ……….. etc. complete.<br />
NOTE-<br />
All payment towards the royalty, fees,<br />
taxes etc should be borne by the<br />
contractor.<br />
8 Providing and laying Ready mix<br />
cement concrete (RMC) of M35<br />
grade using design mix with minimum<br />
cement content 400 kg/m3 and<br />
maximum water cement ratio 0.40<br />
using nominal maximum size of "20<br />
mm and down" trap metal for RCC<br />
circular column, RCC solid pier,<br />
vertical post of railing, RCC<br />
column of any shape including<br />
provision of "v" shaped false joints to<br />
form suitable panels on the faces to<br />
approved design as per detailed<br />
drawing or as directed by Engineer,<br />
with all labours, materials, plant &<br />
equipments, shuttering, form work,<br />
staging, including transporting for all<br />
leads and all lifts, placing, vibrating<br />
115.00 7841.75 Cum 901801.25
Item.<br />
No.<br />
<strong>CIDCO</strong> <strong>OF</strong> MAHARASHTRA LIMITED.<br />
C.A.NO. 01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010-11<br />
Sl.Pg.No. 210<br />
Description Qty. Rate Unit Amount<br />
with mechanical vibrator, pumping of<br />
concrete of any distance to required<br />
location, finishing, curing, as per<br />
IRC/2000 specification (MORTH) and<br />
heavy dewatering by pump or<br />
manually ……….. etc. complete.<br />
NOTE-<br />
All payment towards the royalty, fees,<br />
taxes etc should be borne by the<br />
contractor.<br />
9 Providing and laying Ready mix<br />
cement concrete (RMC) of M35<br />
grade using design mix with minimum<br />
cement content 400 kg/m3 and<br />
maximum water cement ratio 0.40<br />
using nominal maximum size of "20<br />
mm and down" trap metal for RCC<br />
caps over the piers and<br />
abutment cap of any shape<br />
including provision of "v" shaped false<br />
joints to form suitable panels on the<br />
faces to approved design etc.as per<br />
detailed drawing or as directed by<br />
Engineer, with all labours, materials,<br />
plant & equipments, shuttering, form<br />
work, staging, including transporting<br />
for all leads and all lifts, placing,<br />
vibrating with mechanical vibrator,<br />
pumping of concrete of any distance<br />
70.00 5251.75 Cum 367622.50
Item.<br />
No.<br />
<strong>CIDCO</strong> <strong>OF</strong> MAHARASHTRA LIMITED.<br />
C.A.NO. 01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010-11<br />
Sl.Pg.No. 211<br />
Description Qty. Rate Unit Amount<br />
to required location, finishing, curing,<br />
as per IRC/2000 specification<br />
(MORTH) etc. complete.<br />
NOTE-<br />
All payment towards the royalty, fees,<br />
taxes etc should be borne by the<br />
contractor.<br />
10 Providing and laying Ready mix<br />
cement concrete (RMC) of M35<br />
grade using design mix with minimum<br />
cement content 400 kg/m3 and<br />
maximum water cement ratio 0.40<br />
using nominal maximum size of "20<br />
mm and down" trap metal for RCC<br />
work like RCC Parapets / dirt /<br />
ballast walls, RCC kerbs, bearing<br />
beams, railing post as per detailed<br />
drawing or as directed by Engineer,<br />
with all labours, materials, plant &<br />
equipments, shuttering, form work,<br />
staging, including transporting for all<br />
leads and all lifts, placing, vibrating<br />
with mechanical vibrator, pumping of<br />
concrete of any distance to required<br />
location, finishing, curing, as per<br />
IRC/2000 specification (MORTH)<br />
……….. etc. complete.<br />
115.00 6756.75 Cum 777026.25
Item.<br />
No.<br />
<strong>CIDCO</strong> <strong>OF</strong> MAHARASHTRA LIMITED.<br />
C.A.NO. 01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010-11<br />
Sl.Pg.No. 212<br />
Description Qty. Rate Unit Amount<br />
NOTE-<br />
All payment towards the royalty, fees,<br />
taxes etc should be borne by the<br />
contractor.<br />
11 Providing and laying Ready mix<br />
cement concrete (RMC) of M35<br />
grade using design mix with minimum<br />
cement content 400 kg/m3 and<br />
maximum water cement ratio 0.40<br />
using nominal maximum size of "20<br />
mm and down" trap metal for RCC<br />
work like RCC slab deck, RCC<br />
approaches Main/cross girder<br />
diaphrams, solid slab,/ T- beam<br />
& bearing beams, any shape<br />
and size and slab / Box girder<br />
and cantilever as per detailed<br />
drawing or as directed by Engineer,<br />
with all labours, materials, plant &<br />
equipments, shuttering, form work,<br />
staging, including transporting for all<br />
leads and all lifts, placing, vibrating<br />
with mechanical vibrator, pumping of<br />
concrete of any distance to required<br />
location, finishing and curing, as per<br />
IRC/2000 specification (MORTH)<br />
……….. etc. complete.<br />
590.00 7659.75 Cum 4519252.50
Item.<br />
No.<br />
<strong>CIDCO</strong> <strong>OF</strong> MAHARASHTRA LIMITED.<br />
C.A.NO. 01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010-11<br />
Sl.Pg.No. 213<br />
NOTE –<br />
Description Qty. Rate Unit Amount<br />
(i) Contractor shall carry out non<br />
destructive test as and when<br />
directed by the Engineer without<br />
any extra cost to <strong>CIDCO</strong> <strong>Ltd</strong>.<br />
(ii) All payments towards the<br />
royalty, fees, taxes etc. should<br />
be borne by the contractor.<br />
12 Providing and fixing precast factory<br />
made RCC slab covers of 100 mm<br />
thickness in M-35 grade of concrete<br />
using design mix with minimum<br />
cement content as per MORTH<br />
specifications (latest version) and as<br />
per detailed design and drawings or<br />
as directed with fixing of 3 mm thick<br />
M.S.plate around the slab for<br />
inspection opening with top embossed<br />
with name "<strong>CIDCO</strong> <strong>Ltd</strong>" and back side<br />
with manufacturers name, logo and<br />
contractors name including<br />
"Compaction, curing and finishing<br />
uneven and honey combed surface<br />
with cement mortar 1:3 of sufficient<br />
minimum thickness to give a smooth<br />
and even surface, reinforcement @<br />
100 Kg. per cum" etc. complete.<br />
NOTE –<br />
The cost also includes all type of taxes.<br />
365.00 2581.15 Sqm. 942119.75
Item.<br />
No.<br />
<strong>CIDCO</strong> <strong>OF</strong> MAHARASHTRA LIMITED.<br />
C.A.NO. 01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010-11<br />
Sl.Pg.No. 214<br />
Description Qty. Rate Unit Amount<br />
13 Providing and fixing 110 mm dia<br />
HDPE pipes of approved brand for<br />
weep holes, staggered as per drawing<br />
or as directed by Engineer etc.<br />
complete.<br />
NOTE –<br />
The cost also includes all type of taxes.<br />
14a Providing and fixing galvanized iron<br />
150 mm diameter water spout<br />
including whole assembly and fittings<br />
as per the drawing and technical<br />
specification or as directed, etc…..<br />
complete.<br />
NOTE –<br />
The cost also includes all type of taxes.<br />
14b Providing and fixing 50 mm diameter<br />
PVC pipe of approved make with<br />
required length including whole<br />
assembly and fittings as per the<br />
drawing and technical specification or<br />
as directed, etc …complete.<br />
NOTE –<br />
The cost also includes all type of taxes.<br />
650.00 85.00 Rmt 55250.00<br />
25.00 903.00 No. 22575.00<br />
138.00 81.00 Rmt 11178.00
Item.<br />
No.<br />
<strong>CIDCO</strong> <strong>OF</strong> MAHARASHTRA LIMITED.<br />
C.A.NO. 01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010-11<br />
Sl.Pg.No. 215<br />
Description Qty. Rate Unit Amount<br />
15 Providing and placing, fixing TMT bar<br />
reinforcement of various diameters<br />
Fe 415, confirming to IS:1786-1985<br />
(latest version) of approved make in<br />
all RCC item of substructure and<br />
superstructures, Footing foundation,<br />
circular columns, piers of any shape,<br />
dirt walls, abutment reinforcements,<br />
Pier caps, slabs, T beams and slabs,<br />
balanced beams, RCC walls,<br />
approach slabs, RCC railing, RCC<br />
chairs with footing, solid slabs,solid<br />
piers, fothpath RCC beams, RCC<br />
precast items, all stirrups of any size<br />
and shape, supporting bars, extra<br />
bars, cantilever slabs, RCC kerbs,<br />
main and cross girders, diaphragms,<br />
ballast walls, RCC parapets, RCC<br />
walls, Raft slabs, bearing beams<br />
including "V" haunches, Box returns,<br />
canopies, staircases, newels, chajjas,<br />
lintels, pardies, coping, fins, arches,<br />
including binding wires, all type of<br />
irregular shape and size of RCC works<br />
as per detailed designs, drawings and<br />
schedules, including cutting, bending,<br />
hooking the bars, binding with wires<br />
or tack welding and supporting as<br />
required completed or as directed by<br />
Engineer etc. complete.<br />
248.00 45693.00 MT 11331864.00
Item.<br />
No.<br />
<strong>CIDCO</strong> <strong>OF</strong> MAHARASHTRA LIMITED.<br />
C.A.NO. 01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010-11<br />
Sl.Pg.No. 216<br />
NOTE :-<br />
Description Qty. Rate Unit Amount<br />
The quantity to be measured and paid<br />
for this item shall not include wastage<br />
in cutting. Actually installed and<br />
placed in position steel shall be paid.<br />
The cost also includes all types of<br />
taxes.<br />
16 Providing and applying anticorrisive<br />
treatment TMT steel<br />
reinforcement as per cement<br />
polymer composite coating (CPCC)<br />
method developed by CECRI including<br />
cleaning the bar by means of any<br />
established mechanical or manual<br />
method for removing the rust and<br />
deleterious matter, applying rapid<br />
setting primer and cement polymer<br />
sealing coat of approved and licensed<br />
by CECRI including redoing the<br />
process if damaged occur during<br />
handling, stacking etc. complete as<br />
directed by the Engineer in charge.<br />
NOTE –<br />
The cost also includes all type of taxes.<br />
248.00 6135.00 MT 1521480.00
Item.<br />
No.<br />
<strong>CIDCO</strong> <strong>OF</strong> MAHARASHTRA LIMITED.<br />
C.A.NO. 01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010-11<br />
Sl.Pg.No. 217<br />
Description Qty. Rate Unit Amount<br />
17 Providing and applying approved<br />
quality coal tar epoxy paint in three<br />
coats for all external surface of RCC<br />
members below the HFL/free board,<br />
well, pier, girders abutment, and caps,<br />
return walls, columns, dirt walls,<br />
substructure, exposed surface of<br />
existing precast bridge, including<br />
existing and old/new RCC cleaning<br />
surfaces by sand blasting ,brushing,<br />
cost of all materials, labour,<br />
machinery, equipment, scaffolding<br />
required height with all leads & all lifts<br />
etc. complete as directed by Engineer.<br />
NOTE –<br />
The cost also includes all type of taxes.<br />
18 Providing and applying Polymer<br />
Polysafe E.C. (P.No.567) synthetic<br />
elastomeric coating cum paint,<br />
ready to use for bridge structure in<br />
saline as to avoid salt penetration<br />
from marine environment & U.V<br />
effects of sunrays, fungus<br />
developments and to protect the<br />
reinforcement from marine<br />
atmosphere effects in three coats<br />
including scaffolding, sand blasting,<br />
cleaning the surface of concrete,<br />
brushing steel reinforcement and<br />
applying polymer coating with Primer,<br />
985.00 225.00 Sqm 221625.00<br />
3340.00 457.00 Sqm 1526380.00
Item.<br />
No.<br />
<strong>CIDCO</strong> <strong>OF</strong> MAHARASHTRA LIMITED.<br />
C.A.NO. 01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010-11<br />
Sl.Pg.No. 218<br />
Description Qty. Rate Unit Amount<br />
First coat and Second coat at an<br />
interval of 24 hours of approved<br />
shade and colour. But not to applied<br />
on oil, Grease, Tar & Moisture of<br />
surface as per detailed specifications<br />
and as directed by the Engineer.<br />
NOTE –<br />
The cost also includes all type of taxes.<br />
19a Providing expansion joints in RCC<br />
walls/slab of approach slabs<br />
structure (interior side) with plain<br />
premoulded filler 25 mm thick,<br />
including fixing T.W. battens both<br />
faces and complete as per detailed<br />
design and drawings or as directed by<br />
Engineer.<br />
NOTE –<br />
The cost also includes all type of taxes.<br />
19b Providing expansion joints in<br />
R.C.C. RCC walls/slab of<br />
approach slabs structure<br />
(exterior side) with plain<br />
premoulded filler 25 mm thick and 3<br />
mm thick aluminium plate, hold fast,<br />
fixing T.W. battens on internal face,<br />
finishing etc. complete as directed as<br />
per detailed design and drawings or<br />
as directed by Engineer.<br />
NOTE –<br />
The cost also includes all type of taxes.<br />
150.00 1502.00 Sqm 225300.00<br />
45.00 2072.00 sq.m 93240.00
Item.<br />
No.<br />
<strong>CIDCO</strong> <strong>OF</strong> MAHARASHTRA LIMITED.<br />
C.A.NO. 01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010-11<br />
Sl.Pg.No. 219<br />
Description Qty. Rate Unit Amount<br />
20 Providing welded joints for Mild /<br />
TMT steel reinforcement bars as<br />
per MORTH specification (latest<br />
version) etc complete.<br />
(a) upto 25 mm dia 0.00 169.00 No 0.00<br />
(b) above 25 mm dia 0.00 216.00 No 0.00<br />
21 Disposal of excavated material<br />
upto 0.5 km lead including loading,<br />
unloading, transporting by mechanical<br />
or other means, stacking, spreading,<br />
levelling as directed by Engineer etc.<br />
complete.<br />
22 Carrying out plate load test to<br />
determine safe bearing capacity of soil<br />
/ strata as per IS Code No. 1888.<br />
The test shall be conducted on square<br />
plates of size 600 mm x 600 mm. &<br />
25 mm thick . Vertical movement shall<br />
be measured by three dial gauges<br />
preferably four dial gauges at 90<br />
degree. The loads shall be measured<br />
using 15 MT capacity proving ring /<br />
hydraulic jack and pressure gauge<br />
duly calibrated from time to time<br />
including the necessary shifting<br />
arrangements for carrying out the test<br />
and providing results and graphs as<br />
per IS specifications item including<br />
transportation and shifting and<br />
installation of entire test work as<br />
2740.00 50.35 Cum 137959.00<br />
2.00 11450.00 No. 22900.00
Item.<br />
No.<br />
<strong>CIDCO</strong> <strong>OF</strong> MAHARASHTRA LIMITED.<br />
C.A.NO. 01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010-11<br />
Sl.Pg.No. 220<br />
Description Qty. Rate Unit Amount<br />
directed, etc complete. The tests results<br />
shall be submitted in a report form<br />
with observation sheets, graphs,<br />
tabular form & inferences, if any.<br />
23a Providing earthwork in<br />
embankment with approved<br />
materials obtained from Contractors<br />
own source including all leads and<br />
lifts, laying in layers of 20 to 30cms in<br />
thickness, breaking clods, dressing to<br />
the required lines, curves, grades, and<br />
section with watering and compacting<br />
with vibratory power rollers etc.<br />
Complete.<br />
NOTE -<br />
i. All payments towards the<br />
royalty, fees, taxes etc. shall be<br />
borne by the contractor.<br />
ii. The Environmental cess shall be<br />
recovered at Rs.1/m3 of gross<br />
volume computed without<br />
deductions as mentioned for<br />
the Interim Payment Certificate<br />
or Final Payment Certificate.<br />
iii. P.D. Tests shall be carried out<br />
@ one test comprising of 3<br />
specimens average result per<br />
1000 m2 area.<br />
3480.00 386.70 Cum 1345716.00
Item.<br />
No.<br />
<strong>CIDCO</strong> <strong>OF</strong> MAHARASHTRA LIMITED.<br />
C.A.NO. 01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010-11<br />
Sl.Pg.No. 221<br />
Description Qty. Rate Unit Amount<br />
iv. Compaction upto 95%<br />
Modified P.D. and the<br />
laboratory soil dry density shall<br />
be not less than 1.60 g/cc. at<br />
Optimum moisture content.<br />
v. The gross volume of the<br />
embankment shall reduced by<br />
5% for Interim Payment<br />
Certificate or Final Payment<br />
Certificate<br />
23b Providing earthwork in<br />
embankment with approved<br />
materials obtained from Contractors<br />
own source including all leads and<br />
lifts, laying in layers of 20 to 30cms in<br />
thickness, breaking clods, dressing to<br />
the required lines, curves, grades, and<br />
section with watering and compacting<br />
with vibratory power rollers etc.<br />
Complete.<br />
NOTES:-<br />
i. All payments towards the<br />
royalty, fees, taxes etc. shall be<br />
borne by the contractor.<br />
ii. The Environmental cess shall be<br />
recovered at Rs.1/m3 of gross<br />
volume computed without<br />
deductions as mentioned for<br />
the interim payment certificate<br />
or Final payment certificate<br />
65.00 387.00 Cum 25155.00
Item.<br />
No.<br />
<strong>CIDCO</strong> <strong>OF</strong> MAHARASHTRA LIMITED.<br />
C.A.NO. 01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010-11<br />
Sl.Pg.No. 222<br />
Description Qty. Rate Unit Amount<br />
iii. P.D. Tests shall be carried out<br />
@ one test comprising of 3<br />
specimens average result per<br />
1000 m2 area.<br />
iv. Compaction upto 97%<br />
Modified P.D. and the<br />
laboratory soil dry density shall<br />
be not less than 1.75 g/cc. at<br />
Optimum moisture content.<br />
v. The gross volume of the<br />
embankment shall reduced by<br />
5% for interim payment<br />
certificate and 1% for Final<br />
payment certificate.<br />
23c Providing earthwork in embankment<br />
with approved materials obtained<br />
from the road cutting with a lead<br />
of 1.00 KM including all lifts, laying in<br />
layers of 20 to 30 cms in thickness,<br />
breaking clods, dressing to the<br />
required lines, curves, grades, and<br />
section with watering and compacting<br />
with vibratory power rollers etc.<br />
Complete.<br />
NOTES -<br />
i. All payments towards the<br />
royalty, fees, taxes etc. shall be<br />
borne by the contractor.<br />
45.00 179.70 Cum 8086.50
Item.<br />
No.<br />
<strong>CIDCO</strong> <strong>OF</strong> MAHARASHTRA LIMITED.<br />
C.A.NO. 01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010-11<br />
Sl.Pg.No. 223<br />
Description Qty. Rate Unit Amount<br />
ii. The Environmental cess shall be<br />
recovered at Rs.1/m3 of gross<br />
volume computed without<br />
deductions as mentioned for<br />
the Interim Payment Certificate<br />
or Final Payment Certificate.<br />
iii. P.D. Tests shall be carried out<br />
@ one test comprising of 3<br />
specimens average result per<br />
1000 m2 area.<br />
iv. Compaction upto 95%<br />
Modified P.D. and the<br />
laboratory soil dry density shall<br />
be not less than 1.6 g/cc. at<br />
Optimum moisture content.<br />
v. The gross volume of the<br />
embankment shall reduced by<br />
5% for Interim Payment<br />
Certificate and 1% for Final<br />
Payment Certificate.<br />
23d Providing earthwork in embankment<br />
with approved materials obtained<br />
from the road cutting with a lead<br />
of 1.00 KM including all lifts, laying in<br />
layers of 20 to 30 cms in thickness,<br />
breaking clods, dressing to the<br />
required lines, curves, grades, and<br />
65.00 180.10 Cum 11706.50
Item.<br />
No.<br />
<strong>CIDCO</strong> <strong>OF</strong> MAHARASHTRA LIMITED.<br />
C.A.NO. 01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010-11<br />
Sl.Pg.No. 224<br />
Description Qty. Rate Unit Amount<br />
section with watering and compacting<br />
with vibratory power rollers etc.<br />
Complete.<br />
NOTES-<br />
(i) All payments towards the<br />
royalty, fees, taxes etc. shall be<br />
borne by the contractor.<br />
(ii) The Environmental cess shall be<br />
recovered at Rs.1/m3 of gross<br />
volume computed without<br />
deductions as mentioned for<br />
the interim payment certificate<br />
or Final payment certificate<br />
(iii) P.D. Tests shall be carried out<br />
@ one test comprising of 3<br />
specimens average result per<br />
1000 m2 area.<br />
(iv) Compaction upto 97%<br />
Modified P.D. and the<br />
laboratory soil dry density shall<br />
be not less than 1.75 g/cc. at<br />
Optimum moisture content.<br />
(v) The gross volume of the<br />
embankment shall reduced by<br />
5% for Interim Payment<br />
Certificate and 1% for Final<br />
Payment Certificate.
Item.<br />
No.<br />
<strong>CIDCO</strong> <strong>OF</strong> MAHARASHTRA LIMITED.<br />
C.A.NO. 01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010-11<br />
Sl.Pg.No. 225<br />
Description Qty. Rate Unit Amount<br />
24 Demarcation of the Road /<br />
channel / bridge alignment by<br />
traversing along the existing /<br />
proposed route with one second<br />
theodolite. Taking angles & distance<br />
at turning points including transfer of<br />
Co-ordinate from known point to<br />
survey area and as directed by<br />
Engineer & providing 5 Nos. colour<br />
paper prints with drawing in soft copy<br />
format.<br />
25a Providing & placing in position Plastic<br />
cover blocks of required size at 1.5<br />
mtr. centre to centre near the edge of<br />
each site and at centre when the width<br />
is more than 75 cm to reinforcement<br />
to give a clean cover of 40 mm to 65<br />
mm from all sides as per I.S. 456-<br />
2000 and MORTH specifications<br />
(latest version) in RCC columns & pier<br />
& footing, wall, raft, chairs, thurst<br />
blocks.<br />
NOTE -<br />
The cost also includes all type of taxes.<br />
25b Providing & placing in position Plastic<br />
cover blocks of required size at 90<br />
cm centre to centre to each main<br />
bottom bars and to stirrups at sides to<br />
1.00 8515.00 km 8515.00<br />
15.00 44.00 Cum 660.00<br />
0.00 47.00 Cum 0.00
Item.<br />
No.<br />
<strong>CIDCO</strong> <strong>OF</strong> MAHARASHTRA LIMITED.<br />
C.A.NO. 01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010-11<br />
Sl.Pg.No. 226<br />
Description Qty. Rate Unit Amount<br />
give required clear cover from all<br />
sides as per I.S. 456-2000 and<br />
MORTH specifications (latest version)<br />
in R.C.C. beams.<br />
NOTE -<br />
The cost also includes all type of taxes.<br />
25c Providing & placing plastic cover<br />
block of required size at the rate of<br />
27 Nos. per 10 square metre to<br />
reinforcement to give a clear cover as<br />
per I.S.456-2000 and MORTH<br />
specifications (latest version) in R.C.C.<br />
slabs.<br />
NOTE -<br />
The cost also includes all type of taxes.<br />
26 Providing and laying dry stone<br />
pitching 230 mm thick with pin<br />
header per sq.m or as directed, in<br />
staggered type and pointing in cement<br />
mortar 1:3 as specified and as per<br />
drawing and as directed by Engineer<br />
with all leads and lifts etc. complete.<br />
NOTE-<br />
All payment towards the royalty, fees,<br />
taxes etc should be borne by the<br />
contractor.<br />
25.00 36.00 Cum 900.00<br />
995.00 152.00 sqm 151240.00
Item.<br />
No.<br />
<strong>CIDCO</strong> <strong>OF</strong> MAHARASHTRA LIMITED.<br />
C.A.NO. 01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010-11<br />
Sl.Pg.No. 227<br />
Description Qty. Rate Unit Amount<br />
27 Dismantling carefully breaking<br />
concrete by chiseling, wedging of the<br />
existing RCC concrete railing parapet,<br />
existing pipes, dead pipes, encasing,<br />
foundations, small structure as<br />
directed, including cutting of steel and<br />
stacking the materials neatly within 50<br />
meter lead, removing concrete stuff<br />
etc complete.<br />
28 Providing and fixing precast RCC<br />
Railing with cast in situ precast<br />
panels/members in M-35 grade of<br />
concrete using design mix with<br />
minimum cement content as per IRC<br />
2000 specification - MORTH, as per<br />
detailed design and drawings in<br />
railing length or as directed including<br />
compaction, curing and finishing<br />
uneven and honey combed surface<br />
with cement mortar 1:3 of sufficient<br />
minimum thickness to give a smooth<br />
and even surface. The cost also<br />
includes all types of taxes, sales tax,<br />
cess levied by local authority etc.<br />
complete.<br />
25.00 316.00 Cum 7900.00<br />
120.88 1367.95 Rmt 165357.80
Item.<br />
No.<br />
<strong>CIDCO</strong> <strong>OF</strong> MAHARASHTRA LIMITED.<br />
C.A.NO. 01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010-11<br />
Sl.Pg.No. 228<br />
Description Qty. Rate Unit Amount<br />
29 Providing, fabricating MS plate of<br />
various sizes, angles, bolt of required<br />
diameter structural steel work for<br />
expansion joint for deck slab and<br />
bridge items as per detailed design<br />
and drawing or as directed, for RCC<br />
work as per detailed design and<br />
drawings as per MORTH specifications<br />
(latest version) or as directed including<br />
cutting, fabricating, brackets for<br />
cables, channels, hoisting, erecting,<br />
fixing in position making welding<br />
connections with connecting plates<br />
and braces etc. and including one<br />
coat of anti-corrosive paint and over it<br />
two coat of paintings of approved<br />
quality and shade, payment for MS<br />
plate will be made for the actual<br />
weight basis including required<br />
machineries, all materials, labour The<br />
cost also includes all types of taxes,<br />
sales tax, cess levied by local authority<br />
etc. complete.<br />
30 Providing flush grooved pointing<br />
with cement mortor 1:3 to stone<br />
masonry / pitching including<br />
scaffolding and curing as per MORTH<br />
specifications (Latest version), etc<br />
complete.<br />
4.25 48885.00 MT 207761.25<br />
1028.14 51.00 Sqm 52435.14
Item.<br />
No.<br />
<strong>CIDCO</strong> <strong>OF</strong> MAHARASHTRA LIMITED.<br />
C.A.NO. 01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010-11<br />
Sl.Pg.No. 229<br />
NOTE -<br />
Description Qty. Rate Unit Amount<br />
All payment towards the royalty, fees,<br />
taxes etc should be borne by the<br />
contractor.<br />
31 Providing and fixing in position tar<br />
paper bearing as per detailed<br />
drawings as per MORTH specification<br />
(latest version) and as directed by<br />
Engineer, etc complete.<br />
NOTE -<br />
The cost also includes all type of taxes.<br />
32 Providing vent hole in the<br />
abutments as per detail design and<br />
drawings, as per MORTH<br />
specifications (latest version) or in slab<br />
and wearing course with iron grill at<br />
the top and galvanised iron pipe at<br />
bottom as per drawing or as directed,<br />
etc.<br />
NOTE -<br />
The cost also includes all type of taxes.<br />
33a Providing and constructing BB<br />
masonry (IInd sort) circular/<br />
concentric conical manhole with<br />
1.83 m dia at bottom and 0.53 m.<br />
Dia. at top with 230 mm thick brick<br />
masonry (IInd sort) in C.M. 1:3 and<br />
185.00 52.00 Sqm 9620.00<br />
20.00 305.00 No. 6100.00<br />
3.00 23721.80 No 71165.40
Item.<br />
No.<br />
<strong>CIDCO</strong> <strong>OF</strong> MAHARASHTRA LIMITED.<br />
C.A.NO. 01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010-11<br />
Sl.Pg.No. 230<br />
Description Qty. Rate Unit Amount<br />
20 mm thick smooth cement plaster in<br />
C.M. 1:2 from inside and outside,<br />
including curing providing and fixing<br />
copolymer, polypropylene, steel<br />
reinforcement PVC heavy duty step/<br />
footrest of approved make conforming<br />
to an ASTM D-4101 specification<br />
including providing foundation<br />
concrete in M-15 and 300 mm thick<br />
with benching and channelling,<br />
supplying and fixing RCC factory<br />
made steel fibre reinforced (SFRC)<br />
heavy duty manhole cover and frame<br />
with steel bearing of cover into the<br />
frame including shoring strutting etc.<br />
complete. As per design and drawing<br />
circulated by SE (ENV) in 2003<br />
including heavy dewatering by pump<br />
till the completion of work. (Depth<br />
upto 2.28 m. from top of frame to<br />
invert level of pipe)<br />
NOTE :<br />
(i) The contractor has to make his<br />
own arrangement for testing the<br />
manhole.<br />
(ii) All payment towards the royalty,<br />
fees, taxes etc should be borne<br />
by the contractor.
Item.<br />
No.<br />
<strong>CIDCO</strong> <strong>OF</strong> MAHARASHTRA LIMITED.<br />
C.A.NO. 01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010-11<br />
Sl.Pg.No. 231<br />
Description Qty. Rate Unit Amount<br />
33b For additional extra meter depth<br />
beyond 2.28 m. & upto 4.00 m of<br />
above item No.33a.<br />
NOTE :<br />
(i) The contractor has to make his<br />
own arrangement for testing the<br />
manhole.<br />
(ii) All payment towards royalty,<br />
fees, taxes etc should be borne<br />
by the contractor.<br />
34 Providing & laying granular sub-<br />
base (GSB) as per clause 401 of<br />
M.O.R.T.&H (2001) specifications of<br />
specified grading (Table 400-1 or<br />
400-2) in specified thickness in layers.<br />
The item to include premixing the<br />
materials in plant, transportation to<br />
site, spreading in uniform layers with<br />
motor grader on a prepared<br />
subgrade, compacting with vibratory<br />
rollers till 98% of the maximum dry<br />
density (IS 2720 part-8) is achieved<br />
etc. Complete. The rate includes for<br />
tests on completion of each GSB layer.<br />
The strength of each GSB layer shall<br />
be evaluated by conducting CBR (IS<br />
9.00 10682.80 Rmt 96145.20
Item.<br />
No.<br />
<strong>CIDCO</strong> <strong>OF</strong> MAHARASHTRA LIMITED.<br />
C.A.NO. 01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010-11<br />
Sl.Pg.No. 232<br />
Description Qty. Rate Unit Amount<br />
2720 Part 16 & 31) or Plate load test<br />
using 750mm dia. Plate, (IS 9214) for<br />
obtaining equivalent CBR value @ one<br />
test per 3000 m2 compacted surface<br />
area as per the Grading. The item<br />
includes for all necessary material,<br />
labour, diversions, taxes, royalty, cess<br />
etc complete.<br />
a) For Grading-I of close-graded<br />
GSB material with minimum<br />
CBR value of 30% to be<br />
obtained on top of the<br />
compacted layer.<br />
(Upper sub-base)<br />
b) For Grading-II of close-<br />
graded GSB material with<br />
minimum CBR value of 25% to<br />
be obtained on top of the<br />
compacted layer.<br />
(Intermediate sub-base)<br />
c) For Grading-III of close-<br />
graded GSB material with<br />
minimum CBR value of 20% to<br />
be obtained on top of the<br />
compacted layer.<br />
(Lower sub-base).<br />
156.00 727.95 cu.m 113560.20<br />
156.00 685.45 cu. m 106930.20<br />
0.00 644.00 cu. m 0.00
Item.<br />
No.<br />
<strong>CIDCO</strong> <strong>OF</strong> MAHARASHTRA LIMITED.<br />
C.A.NO. 01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010-11<br />
Sl.Pg.No. 233<br />
Description Qty. Rate Unit Amount<br />
35 Providing & laying granular base of<br />
Wet mix macadam (WMM) as per<br />
clause 406 of M.O.R.T.&H (2001)<br />
specifications of specified grading<br />
(Table 400-11) in specified thickness<br />
in layers. The item to include<br />
premixing the materials in plant,<br />
transportation to site, spreading in<br />
uniform layers with paver on a<br />
prepared sub-base, compacting with<br />
vibratory rollers till 98% of the<br />
maximum dry density (IS 2720 Part-8)<br />
is achieved etc complete. The rate<br />
includes for tests on completion of<br />
each WMM layer. The strength of each<br />
WMM layer shall be evaluated by<br />
Plate load test with 750 mm dia plate.<br />
(IS 9214) for obtaining equivalent CBR<br />
value @ one test per 3000 m2<br />
compacted surface area as per the<br />
Grading. The item includes for all<br />
necessary material, labour, diversions,<br />
taxes, royalty, cess etc complete.<br />
36 To carry out plate load test to<br />
determine modulus of sub-grade<br />
reaction (K-value) of unbound / semi-<br />
bound macadam (GSB, WMM, BBM)<br />
in field as per IS Code No. 9214-<br />
1979. The item includes to conduct<br />
one test per location. The test shall be<br />
182.00 1047.10 Cum 190572.20<br />
2.00 7575.00 No. 15150.00
Item.<br />
No.<br />
<strong>CIDCO</strong> <strong>OF</strong> MAHARASHTRA LIMITED.<br />
C.A.NO. 01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010-11<br />
Sl.Pg.No. 234<br />
Description Qty. Rate Unit Amount<br />
conducted on 75cm. dia & 25mm<br />
thick plate with stiffening plates of<br />
smaller size of 60, 45 & 30 cm. dia<br />
and 25mm thick each shall be used.<br />
Vertical movement shall be measured<br />
by three dial gauges placed at 120 0<br />
preferably 4 dial gauges placed at<br />
90 0 . The load shall be measured using<br />
15 MT capacity proving ring /<br />
hydraulic jack with pressure gauge<br />
duly calibrated from time to time. The<br />
test results shall be submitted in a<br />
report form with observation sheets,<br />
graphs, tabular form & inferences if<br />
any.<br />
37 Providing and applying bituminous<br />
tack coat of approved type and<br />
grade by a self propelled or towed<br />
bitumen pressure sprayer as per<br />
Specifications for road and bridge<br />
works (M.O.R.T.& H., 2001). The item<br />
includes for preparation of the base,<br />
application of the tack coat, relevant<br />
tests for quality control as enumerated<br />
in table 900-4, diversion of traffic, etc.<br />
complete. (Using 60 / 70 grade<br />
bitumen). The rate shall include for all<br />
labour, materials, machinery,<br />
transportation, taxes etc. complete.
Item.<br />
No.<br />
<strong>CIDCO</strong> <strong>OF</strong> MAHARASHTRA LIMITED.<br />
C.A.NO. 01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010-11<br />
Sl.Pg.No. 235<br />
Description Qty. Rate Unit Amount<br />
a) At an application rate of<br />
@50 kg/ 100 m2 Over B.T.<br />
surface.<br />
b) At an application rate of<br />
@100 kg/ 100 m2 Over<br />
W.B.M. surface.<br />
38 Providing and constructing<br />
Bituminous Bound Macadam<br />
(BBM) surface 75 mm thickness<br />
including supplying all materials<br />
including metal, bitumen etc.<br />
spreading 40 mm hand broken trap<br />
metal 9 cum per 100 m2 and 20 mm<br />
trap metal at the rate of 1.5 cum/100<br />
sqm., heating and spreading bitumen<br />
(excluding tack coat) at 250 kg./100<br />
m2, spreading 12 mm size key<br />
aggregate at the rate of 1.8 cum/100<br />
sqm and compaction with vibratory<br />
roller complete. Grade of bitumen<br />
shall be 60/70. The rate is inclusive of<br />
royalty and all type of taxes.<br />
NOTE -<br />
Item also includes cleaning the road<br />
surface with wire brush/brooms and<br />
make it free from dust and water<br />
before applying/spreading tack coat.<br />
The tack coat shall be paid separately.<br />
2260.00 19.15 Sqm 43279.00<br />
1040.00 35.25 Sqm 36660.00<br />
1040.00 168.60 Sqm 175344.00
Item.<br />
No.<br />
<strong>CIDCO</strong> <strong>OF</strong> MAHARASHTRA LIMITED.<br />
C.A.NO. 01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010-11<br />
Sl.Pg.No. 236<br />
Description Qty. Rate Unit Amount<br />
39 Providing and laying hot mix hot<br />
laid Dense Graded Bituminous<br />
Macadam (DBM) of required<br />
thickness with minimum 4.5% bitumen<br />
by weight of total mix/ depending on<br />
job mix formula & as per clause 507<br />
of MORTH (2001) specification for<br />
road & bridges including diversion of<br />
traffic, supply of all materials, heating<br />
bitumen and chips, mixing bitumen<br />
and chips with necessary filler material<br />
in batch type or continuous type or<br />
drum mix type hot mix plant, laying<br />
dense bituminous macadam by paver<br />
finisher including compaction with<br />
vibratory roller etc. complete<br />
(excluding tack coat). The grade of<br />
bitumen shall be 60/70. The rate is<br />
inclusive of royalty and all types of<br />
taxes.<br />
40 Providing and laying hot mix hot laid<br />
Asphaltic Concrete / bituminous<br />
concrete (AC/BC) with bitumen<br />
minimum 5% by weight of total mix as<br />
per job mix formula as per clause 509<br />
of MORTH (2001) specification for<br />
road & bridges including supplying all<br />
materials, heating bitumen and chips<br />
110.00 4860.25 Cum 534627.50<br />
70.00 5589.80 Cum 391286.00
Item.<br />
No.<br />
<strong>CIDCO</strong> <strong>OF</strong> MAHARASHTRA LIMITED.<br />
C.A.NO. 01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010-11<br />
Sl.Pg.No. 237<br />
Description Qty. Rate Unit Amount<br />
with necessary filler material mixing<br />
bitumen and chips in hot mix plant<br />
laying asphaltic concrete with sensor<br />
paver finisher including compaction<br />
with vibratory roller etc. complete<br />
(excluding tack coat). The grade of<br />
bitumen shall be 60/70. The rate is<br />
inclusive of royalty and all types of<br />
taxes.<br />
41a Providing lowering, laying and jointing<br />
RCC, S/S pipes manufactured as per<br />
IS:458 ( latest version ) having ISI of<br />
450 dia NP3 class with rubber ring<br />
joints as directed in proper grade<br />
including cost of materials, rubber<br />
rings, all taxes (central and local)<br />
transportation, loading and unloading<br />
and hydraulic testing as per I.S. 458<br />
(latest version) including necessary<br />
heavy dewatering by all means etc.<br />
complete.<br />
NOTE :<br />
(i) The contractor has to make his<br />
own arrangement for testing the<br />
pipeline as per I.S. standard.<br />
(ii) The cost also includes all type<br />
of taxes.<br />
61.00 1971.00 Rmt 120231.00
Item.<br />
No.<br />
<strong>CIDCO</strong> <strong>OF</strong> MAHARASHTRA LIMITED.<br />
C.A.NO. 01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010-11<br />
Sl.Pg.No. 238<br />
Description Qty. Rate Unit Amount<br />
41b Providing lowering, laying and jointing<br />
RCC, S/S pipes manufactured as per<br />
IS:458 (latest version) having ISI of<br />
700 dia NP3 class with rubber ring<br />
joints as directed in proper grade<br />
including cost of materials, rubber<br />
rings, all taxes (central and local)<br />
transportation, loading and unloading<br />
and hydraulic testing as per I.S. 458<br />
(latest version) including necessary<br />
heavy dewatering by all means etc.<br />
complete.<br />
NOTE -<br />
(i) The contractor has to make his<br />
own arrangement for testing the<br />
pipeline as per I.S. standard.<br />
(ii) The cost also includes all type<br />
of taxes.<br />
41c Providing D.I.K-9 grade 450 mm<br />
Dia pipes of approved make with<br />
internal cement mortar lining<br />
including all taxes, insurance, railway<br />
freight, unloading from railway<br />
wagon, loading into truck, transport to<br />
departmental stores/site, unloading,<br />
stacking, etc. complete (IS: 8329-<br />
2000 Latest Version) and Lowering<br />
0.00 3775.00 Rmt 0.00<br />
55.00 5462.00 Rmt 300410.00
Item.<br />
No.<br />
<strong>CIDCO</strong> <strong>OF</strong> MAHARASHTRA LIMITED.<br />
C.A.NO. 01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010-11<br />
Sl.Pg.No. 239<br />
Description Qty. Rate Unit Amount<br />
laying and jointing with SBR rubber<br />
gaskets and CI/MS/DI specials of<br />
required diameter in proper position,<br />
grade and alignment as directed by<br />
Engineer including conveyance of<br />
material from stores to site of work,<br />
including cost of jointing materials<br />
and rubber rings labour, giving<br />
hydraulic testing etc. complete.<br />
NOTE -<br />
(i) only SBR Rubber gaskets to be<br />
used<br />
(ii) The cost also includes all type<br />
of taxes.<br />
41d Providing D.I.K-9 grade 700 mm<br />
Dia pipes of approved make with<br />
internal cement mortar lining<br />
including all taxes, insurance, railway<br />
freight, unloading from railway<br />
wagon, loading into truck, transport to<br />
departmental stores/site, unloading,<br />
stacking, etc. complete (IS: 8329-<br />
2000 Latest Version) and Lowering<br />
laying and jointing with SBR rubber<br />
gaskets and CI/MS/DI specials of<br />
required diameter in proper position,<br />
0.00 10807.00 Rmt 0.00
Item.<br />
No.<br />
<strong>CIDCO</strong> <strong>OF</strong> MAHARASHTRA LIMITED.<br />
C.A.NO. 01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010-11<br />
Sl.Pg.No. 240<br />
Description Qty. Rate Unit Amount<br />
grade and alignment as directed by<br />
Engineer including conveyance of<br />
material from stores to site of work,<br />
including cost of jointing materials<br />
and rubber rings labour, giving<br />
hydraulic testing etc. complete.<br />
NOTE -<br />
(i) only SBR Rubber gaskets to be<br />
used<br />
(ii) The cost also includes all type<br />
of taxes.<br />
41e Providing D.I.K-9 grade 100 mm<br />
Dia pipes of approved make with<br />
internal cement mortar lining<br />
including all taxes, insurance, railway<br />
freight, unloading from railway<br />
wagon, loading into truck, transport to<br />
departmental stores/site, unloading,<br />
stacking, etc. complete (IS: 8329-<br />
2000 Latest Version) and Lowering<br />
laying and jointing with SBR rubber<br />
gaskets and CI/MS/DI specials of<br />
required diameter in proper position,<br />
grade and alignment as directed by<br />
Engineer including conveyance of<br />
material from stores to site of work,<br />
including cost of jointing materials<br />
and rubber rings labour, giving<br />
hydraulic testing etc. complete.<br />
71.00 1014.00 Rmt 71994.00
Item.<br />
No.<br />
<strong>CIDCO</strong> <strong>OF</strong> MAHARASHTRA LIMITED.<br />
C.A.NO. 01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010-11<br />
Sl.Pg.No. 241<br />
Description Qty. Rate Unit Amount<br />
NOTE :<br />
(i) only SBR Rubber gaskets to be<br />
used<br />
(ii) The cost also includes all type<br />
of taxes.<br />
41f Removing, Lowering laying and<br />
jointing of the existing D.I.K-9 grade<br />
100 mm Dia pipes of approved<br />
make with SBR rubber gaskets and<br />
CI/MS/DI specials of required<br />
diameter in proper position, grade<br />
and alignment as directed by Engineer<br />
including conveyance of material from<br />
site to site of work, including cost of<br />
jointing materials and rubber rings<br />
labour, giving hydraulic testing etc.<br />
complete.<br />
NOTE :<br />
(i) only SBR Rubber gaskets to be<br />
used<br />
(ii) The cost also includes all type<br />
of taxes.<br />
42 Cutting and champhering of DI<br />
pipes of 100 mm diameter including<br />
cost of all materials and labour<br />
involved, etc. complete as directed by<br />
Engineer.<br />
15.00 54.00 Rmt 810.00<br />
10.00 32.00 per<br />
one<br />
Cut<br />
320.00
Item.<br />
No.<br />
<strong>CIDCO</strong> <strong>OF</strong> MAHARASHTRA LIMITED.<br />
C.A.NO. 01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010-11<br />
Sl.Pg.No. 242<br />
Description Qty. Rate Unit Amount<br />
43 Providing and Supplying ISI standard<br />
D.I. specials & fitting with<br />
arrangement for sealing rubber gasket<br />
of S.B.R, complete with cast iron collar<br />
gland and mild steel nut bolt's coated<br />
or otherwise protected from rusting<br />
and suitable for D.I. Pipes including<br />
cost of all labours, materials,<br />
transportation upto Depart-mental<br />
store/site loading and unloading<br />
including all taxes etc.<br />
(a) 80 mm dia. to 300 mm dia 120.00 91.00 kg 10920.00<br />
(b) 350 mm dia. & above 1840.00 110.00 kg 202400.00<br />
44 Providing Second class Burnt Brick<br />
masonry with conventional / IS type<br />
bricks in cement mortar 1:6 in<br />
foundation and plinth of inner walls &<br />
external walls, including bailing out<br />
water manually, striking joints on<br />
unexposed faces, racking out joints on<br />
exposed faces and curing complete.<br />
NOTE:<br />
All payment towards royalty, fees,<br />
taxes etc should be borne by the<br />
contractor.<br />
15.00 2981.00 Cum 44715.00
Item.<br />
No.<br />
<strong>CIDCO</strong> <strong>OF</strong> MAHARASHTRA LIMITED.<br />
C.A.NO. 01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010-11<br />
Sl.Pg.No. 243<br />
Description Qty. Rate Unit Amount<br />
45 Providing cement plaster 12mm<br />
thick in a single coat in cement<br />
mortar 1:3 without neeru finish to<br />
concrete or brick surface in all<br />
positions including racking out joints,<br />
scaffolding and curing complete.<br />
NOTE:<br />
All payment towards royalty, fees,<br />
taxes etc should be borne by the<br />
contractor.<br />
46 Providing & fixing parabolic shape<br />
PCC precast-factory made M25<br />
Grade kerb stone using design mix<br />
with minimum cement content as per<br />
IS 456 of size 500/200/850 mm as<br />
per detailed design and drawing<br />
including excavation, fixing in PCC of<br />
M-15 grade 250 mm thick including<br />
side concreting, filling joints in cement<br />
mortar (1:3) disposal of excavated<br />
material, including painting in two<br />
coats of oil paints and one coat of<br />
primer to exposed faces,<br />
transportation to site, labour, etc.<br />
complete. The rate inclusive of all<br />
type of taxes.<br />
25.00 102.00 Sqm 2550.00<br />
50.00 980.60 Rmt 49029.80
Item.<br />
No.<br />
<strong>CIDCO</strong> <strong>OF</strong> MAHARASHTRA LIMITED.<br />
C.A.NO. 01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010-11<br />
Sl.Pg.No. 244<br />
Description Qty. Rate Unit Amount<br />
47 Dewatering the excavated<br />
trenches and pools of water<br />
within project area by using pumps<br />
and other devices, including disposing<br />
of the water to a safe distance as<br />
directed By using 10 to 19 H.P.<br />
Pumps.<br />
1.00 77.00 Hr 77.00<br />
TOTAL COST PUT TO TENDER (A) Rs. 37209377.49<br />
Add/Subtract (+/-) ______% quoted by the Contractor to<br />
reflect the Total Cost (B) Rs.<br />
GRAND TOTAL (A+B) Rs.<br />
(Rupees ________________________________________________________________<br />
__________________________________________________________________) only.<br />
NOTES :<br />
1) It is compulsory to fill the amount both in words and figures or else the tender is<br />
liable to be rejected.<br />
2) This is to confirm that I have read carefully instruction No. 11.2 Sl.Pg.<br />
No.16 of the Tender and I understand that my tender is liable to be rejected if I<br />
fail to submit the offer in accordance with the various provisions and do not<br />
comply with the stipulations.<br />
3) I, understand that my tender is liable to be rejected if I fail to fill the amount both<br />