<strong>Construction</strong> Law Journal (CLJ)<br />

(F<strong>in</strong>al Accepted Manuscript), Volume 28, Issue 8, November 2012, Pages 590-613<br />

and quality, the rema<strong>in</strong><strong>in</strong>g four KPIs primarily focus on the measures of work<strong>in</strong>g relationship<br />

between the employer and the contractor.<br />

Round 3: Establish<strong>in</strong>g <strong>in</strong>dividual weight<strong>in</strong>gs <strong>for</strong> the seven most important KPIs<br />

In the third round of the <strong>Delphi</strong> questionnaire, experts were requested to <strong>in</strong>dicate the level of<br />

importance (rat<strong>in</strong>g) on the top seven selected KPIs based on a 5-po<strong>in</strong>t Likert scale (i.e. 1 =<br />

least important; 2 = slightly important; 3 = important; 4 = very important; and 5 = most<br />

important) to evaluate the per<strong>for</strong>mance of TCC/GMP projects. F<strong>in</strong>ally, all the 14 panel<br />

members submitted their completed questionnaires <strong>in</strong> July 2011 pursuant to some email<br />

rem<strong>in</strong>ders.<br />

Table 5: Results of Round 3 <strong>Delphi</strong> survey<br />

Key Per<strong>for</strong>mance Indicators (KPIs) <strong>for</strong> TCC/GMP Rank Mean Correspond<strong>in</strong>g<br />

construction projects<br />

rat<strong>in</strong>g weight<strong>in</strong>g<br />

Mutual trust between project partners 1 4.71 0.180<br />

F<strong>in</strong>al out-turn cost exceed<strong>in</strong>g the f<strong>in</strong>al contract target<br />

cost or guaranteed maximum price value or not<br />

2 4.14 0.158<br />

Time per<strong>for</strong>mance 3 4.07 0.155<br />

Magnitude of disputes and conflicts 4 3.50 0.134<br />

Client’s satisfaction on the quality of completed work 4 3.50 0.134<br />

Contractor’s <strong>in</strong>volvement <strong>in</strong> project design 6 3.21 0.123<br />

Time required <strong>for</strong> the settlement of f<strong>in</strong>al project<br />

account<br />

7 3.07 0.117<br />

Number of respondents 14<br />

Kendall’s coefficient of concordance (W) 0.552<br />

Critical value of W from statistical table 0.137<br />

Degree of freedom 6<br />

Level of significance