Dazu - Chongqing<br />

© DHV, all rights reserved<br />

Confidential © RoyalHaskoningDHV, all rights reserved 5


Carrousel: more than 1,500 references<br />

60 in China<br />

Saudi Arabia USA BASF, 10,000,000 pe<br />

China<br />

© DHV, all rights reserved<br />

Confidential © RoyalHaskoningDHV, all rights reserved 7


Principle of Nereda ®<br />

Activated sludge Aerobic granular biomass<br />

Anaerobic<br />

Anoxic<br />

Aerobic<br />

Courtesy Delft University of Technology<br />

© DHV, all rights reserved<br />

Confidential © RoyalHaskoningDHV, all rights reserved 15


Hydraulic design (1/2)<br />

§ Influent feeding<br />

§ Goals<br />

§ Minimize short-circuiting<br />

§ Maximize Exchange Ratio<br />

§ Design<br />

§ Uniform piping layout at the<br />

bottom of the reactors<br />

§ Orifice number and sizing<br />

allowing even effluent<br />

distribution<br />

1. FEED / DISCHARGE<br />

© DHV, all rights reserved<br />

Confidential © RoyalHaskoningDHV, all rights reserved 17


Key topics Nereda<br />

§ 75% smaller footprint:<br />

• high biomass concentration<br />

• no selectors, no anaerobic tanks, no clarifiers<br />

Nereda<br />

activated sludge with bio-P<br />

Area Requirement (m 2 )<br />

§ >30-50% energy savings:<br />

• less rotary equipment<br />

• efficient aeration<br />

© DHV, all rights reserved<br />

Confidential © RoyalHaskoningDHV, all rights reserved 20


Replacement STP Epe<br />

Old STP (1960 till 2011)<br />

Activated sludge<br />

33,000 p.e.<br />

600 m 3 /h<br />

Partial N-removal<br />

Chemical P-removal<br />

New situation (start-up 2011)<br />

Aerobic granular sludge<br />

59,000 p.e.<br />

1,500 m 3 /h<br />

Full N-removal<br />

Biological P-removal<br />

© DHV, all rights reserved<br />

Confidential © RoyalHaskoningDHV, all rights reserved 23


Construction<br />

© DHV, all rights reserved<br />

Confidential © DHV, all rights © reserved RoyalHaskoningDHV, all rights reserved 25


© DHV, all rights reserved<br />

Confidential © RoyalHaskoningDHV, all rights reserved 26


Epe<br />

inlet works<br />

pretreatment<br />

discharge sand filter<br />

© DHV, all rights reserved<br />

Confidential © RoyalHaskoningDHV, all rights reserved 27


Nereda ® cycle<br />

Nereda cycle Process Biology Design criteria<br />

1. Anaerobic feed<br />

and effluent<br />

discharge<br />

2. Aeration<br />

3. Settling<br />

1. FEED / DISCHARGE<br />

Wastewater feed through the<br />

granular sludge bed and treated<br />

effluent displacement/discharge<br />

Aeration in complete mixed<br />

conditions<br />

Granular sludge settling retrieval<br />

and selection<br />

• P release<br />

• COD removal<br />

2. AERATION<br />

Excess sludge buffering<br />

• P uptake<br />

• COD removal<br />

• Nitrification<br />

• Simultaneous denitrification<br />

• Polishing post-denitrification<br />

3.SETTLING<br />

• Phase duration (min)<br />

• Reactor depth (m)<br />

• Surface load (m/h)<br />

• Exchange ratio (%)<br />

• Sludge load (kgCOD/kgMLSS/d)<br />

• Phase duration (min)<br />

• Selection pressure (m/h)<br />

• Phase duration (m)<br />

© DHV, all rights reserved<br />

Confidential © RoyalHaskoningDHV, all rights reserved 28


Epe STP<br />

© DHV, all rights reserved<br />

Confidential © RoyalHaskoningDHV, all rights reserved 29


Parameter<br />

Epe performance<br />

Influent<br />

mg/l<br />

Performance verification campaign<br />

March - November 2012<br />

(flow proportional)<br />

Effluent<br />

mg/l<br />

Removal<br />

COD 879 27 96.9%<br />

BOD 333 < 2 > 99.4%<br />

N Kj 77 1.4 98.1%<br />

NH 4 -N 54 0.1 99.8%<br />

N total 94.7%<br />

P ortho 5.8 0.26 * ) 95.6%<br />

P total 9.3 0.3 97.2%<br />

Suspended Solids 341 98.5%<br />

* ) < 0.02 mg P/l during second verification campaign<br />

© DHV, all rights reserved<br />

Confidential © DHV, all rights © reserved RoyalHaskoningDHV, all rights reserved 31


Investments Epe<br />

(data courtesy Water Board Veluwe)<br />

§ Total investment<br />

incl. 19% VAT, internal costs<br />

and fall-back facility preparation<br />

§ Contract RHDHV<br />

§ Price level next best:<br />

€ 18.7 million<br />

€ 15 million<br />

€ 22 million<br />

Note: investment costs includes additional equipment for first-full-scale<br />

design risk mitigation and fall-back preparations.<br />

© DHV, all rights reserved<br />

Confidential © RoyalHaskoningDHV, all rights reserved 33


History<br />

© DHV, all rights reserved<br />

Confidential © RoyalHaskoningDHV, all rights reserved 35


Nereda Epe showed sustainability<br />

© DHV, all rights reserved<br />

Confidential © RoyalHaskoningDHV, all rights reserved 36


STP Garmerwolde<br />

§ 150.000 pe extension<br />

§ 4,200 m 3 /h<br />

§ 2 x 10,000 m 3 Nereda<br />

§ N total =7 mg/l; P total =1 mg/l<br />

§ No post treatment<br />

© DHV, all rights reserved<br />

Confidential © RoyalHaskoningDHV, all rights reserved 37


STP Dinxperlo<br />

© DHV, all rights reserved<br />

Confidential © RoyalHaskoningDHV, all rights reserved 38


STP Vroomshoop<br />

(hybrid)<br />

© DHV, all rights reserved<br />

Confidential © RoyalHaskoningDHV, all rights reserved 39


Current status of the technology<br />

Installed base: The Netherlands – Portugal – South Africa<br />

Cheese speciality industry<br />

Convenient food industry<br />

Edible oil industry (SBR retrofit)<br />

Convenient food industry<br />

STP Epe | 59.000 pe | 1.500 m3/h<br />

STP Vroomshoop | 25.000 pe | 1.265 m3/h (construction)<br />

STP Dinxperlo | 15.730 pe (construction)<br />

STP Lisbon | 3 MLD (semi full-scale retrofit demo)<br />

STP Gansbaai | 63.000 pe | 5 MLD<br />

STP Stellenbosch | 40.000 pe | 5 MLD (construction)<br />

STP Garmerwolde | 150.000 pe | 4.200 m3/h (construction)<br />

STP Utrecht | 530.000 pe | 15.000 m3/h (demo contracted)<br />

Pipeline: approx. 20, inclusive larger scale<br />

further international roll-out to e.g. Australia, Brazil, India,<br />

Japan, Middle-East, Poland, UK and USA<br />

© DHV, all rights reserved<br />

Confidential © RoyalHaskoningDHV, all rights reserved 41


Why Nereda is often the best choice<br />

§ Lowest construction costs<br />

§ Lowest operation costs<br />

§ Easy and reliable operation<br />

§ Lowest energy consumption<br />

§ Best environmental profile<br />

§ No chemicals for nutrient removal<br />

§ Minimal waste production<br />

§ Most modern technology<br />

§ Reuse of existing tanks often possible<br />

§ Future proof<br />

• Easy to adopt to tougher standards<br />

• Harvest bioplastics<br />

© DHV, all rights reserved<br />

Confidential © RoyalHaskoningDHV, all rights reserved 42


More information<br />

Web:<br />

www.nereda.net<br />

E-mail:<br />

Nereda@RHDHV.com<br />

© DHV, all rights reserved<br />

Confidential © RoyalHaskoningDHV, all rights reserved 43


Nereda – Energy, Soil and<br />

Materials Factory??<br />

© DHV, all rights reserved<br />

Confidential © RoyalHaskoningDHV, all rights reserved 44


Reusable<br />

effluent<br />

Future scenario 1<br />

Water, energy and P-recovery is possible<br />

Heat/electricity<br />

1. FEED / DISCHARGE<br />

Phosphorus<br />

2. AERATION<br />

Excess sludge<br />

buffering<br />

Struvite<br />

3.SETTLING<br />

Crystalactor<br />

© DHV, all rights reserved<br />

Confidential © RoyalHaskoningDHV, all rights reserved 45


Nereda – Future Scenario2<br />

Treat<br />

wastewater<br />

Extra cellular<br />

polysaccharides<br />

Extra cellular<br />

proteins<br />

Bacterial<br />

alginate<br />

© DHV, all rights reserved<br />

Confidential © RoyalHaskoningDHV, all rights reserved 46<br />

.<br />

.


• Food industry: food additives in ice-cream, jellies, beer, etc.<br />

• Textile printing<br />

• Medical purpose<br />

© DHV, all rights reserved<br />

Confidential © RoyalHaskoningDHV, all rights reserved 47


© DHV, all rights reserved<br />

Confidential © RoyalHaskoningDHV, all rights reserved 48


0, 1 ug/L, 10ug/L, 100 ug/L, 1mg/L,10 mg/L<br />

© DHV, all rights reserved<br />

Confidential © RoyalHaskoningDHV, all rights reserved 49


§ Will extracellular polysaccharides in aerobic<br />

granules change our future?<br />

© DHV, all rights reserved<br />

Confidential © RoyalHaskoningDHV, all rights reserved 50


© DHV, all rights reserved<br />

Confidential © RoyalHaskoningDHV, all rights reserved 51

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!