NEPTUN – Success integrated. NEPTUN
NEPTUN – Success integrated. NEPTUN
NEPTUN – Success integrated. NEPTUN
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
VA TECH HYDRO<br />
<strong>NEPTUN</strong> <strong>–</strong> <strong>Success</strong> <strong>integrated</strong>.<br />
www.vatech-hydro.com<br />
N E P T U N<br />
Automation & Control<br />
V O E S T<br />
Excitation<br />
Power Plant Management<br />
Monitoring & Diagnosis<br />
Protection<br />
Synchronization<br />
Turbine Controller
Welcome!<br />
Harnessing water to produce energy is a matter of<br />
increasing public interest. It is driven by international<br />
efforts to raise the profile of hydro-power as an alternative<br />
energy source and its potential to generate<br />
large amounts of energy in a short space of time.<br />
VA Technologie AG is an internationally active technology<br />
and service company. Its core business areas<br />
are hydro-power generation, metallurgy, energy<br />
transmission and distribution, water systems and<br />
industrial services.<br />
VA TECH HYDRO is the VA Technologie Group<br />
company responsible for hydro-power generation<br />
and is the world’s second biggest solution provider<br />
of electromechanical systems and services for hydro<br />
generation, supplying state-of-the-art “Water to Wire”<br />
products and solutions for both new and existing<br />
power plants.<br />
Using innovative concepts in the <strong>integrated</strong> automation<br />
field, the <strong>NEPTUN</strong> range improves efficiency<br />
and flexibility in hydroelectric generation assets and<br />
provides an open basis for future expansion. As a<br />
“centre of competence”, Vienna-based VA TECH SAT<br />
can provide expert support and advice in all your<br />
questions relating to <strong>NEPTUN</strong>.<br />
The following pages introduce <strong>NEPTUN</strong> and its seven<br />
subsystems of application.
VA TECH HYDRO<br />
Water to Wire<br />
VA Technologie AG is a globally active Technology<br />
and Service company. Its core activities are metallurgy,<br />
energy transmission and distribution, water systems<br />
and industrial services.<br />
VA Technologie AG was founded in 1993 as a listed<br />
corporation, and in the financial year 2000 employed<br />
a total workforce of 22,000 and posted turnover of<br />
around four billion euros. The company has now<br />
successfully launched its DRIVE programme to consolidate<br />
and foster its expertise, and going forward<br />
has chosen to focus on its core competencies of<br />
automation, services and e-business.<br />
VA TECH HYDRO is the VA Technologie AG<br />
company responsible for the key sector of power<br />
generation. It is the world’s second largest solution<br />
provider of electromechanical systems and services<br />
for hydroelectric generation. In the financial year 2000<br />
VA TECH HYDRO had a workforce of 3,000 with a<br />
turnover of around 738 million euros and a steadily<br />
growing order book.<br />
VA TECH HYDRO came into existence as a result<br />
of the consolidation of the hydro-related activities<br />
of VA TECH ELIN, TECH ESCHER WYSS and<br />
VA TECH VOEST MCE. The company is organized in<br />
four divisions: Large Hydro, Compact Hydro, Service<br />
& Rehab and Combined Cycle. VA TECH HYDRO has<br />
a total of more than 160 years’ knowledge and<br />
experience in the field of hydro-power generation<br />
and has already installed over 225,000 MW.<br />
VA TECH HYDRO provides state-of-the-art “Water<br />
to Wire” products and solutions for new and existing<br />
power plants. These total solutions cover hydraulic<br />
conception and design, electromechanical and<br />
electronic systems and power transmission and<br />
distribution.<br />
VA TECH HYDRO’s secondary technology uses<br />
innovative concepts to improve the efficiency and<br />
flexibility of hydroelectric plant and provides a sound<br />
foundation for future expansion.
<strong>NEPTUN</strong><br />
<strong>Success</strong> <strong>integrated</strong>.<br />
Harnessing water to produce energy is a matter of<br />
increasing public interest: international initiatives have<br />
raised the profile of hydro-power as an alternative<br />
energy source, and reservoir power stations offer<br />
great potential to generate large amounts of energy<br />
in a short space of time.<br />
In parallel with this, an increasingly exacting market is<br />
demanding ever-greater efficiency and flexibility, as a<br />
result of which only a prudent investment strategy will<br />
guarantee the future of hydro power. In many cases,<br />
investment in up-to-date secondary technology<br />
represents the most cost-effective strategy available<br />
to companies. This secondary technology is divided<br />
into two main categories: hardware and engineering.<br />
Historically, hardware came from a variety of disparate<br />
sources. Today, however, systems use modern,<br />
standardised microprocessor technology, the logical<br />
consequence of which is a universal, <strong>integrated</strong><br />
approach to the varied technologies existing within a<br />
system. Furthermore, by using standard components,<br />
the money spent on maintaining stocks of spare parts<br />
can be greatly reduced.<br />
The costliest tasks in the engineering field are signal<br />
conditioning and connection and integration of<br />
heterogeneous systems. Depending on the power<br />
plant, there can be hundreds of analogue and digital<br />
signals to deal with, each at a different strength and<br />
each of a different quality, most of which have to be<br />
recorded and processed manually. For this reason a<br />
central database, which would also be compatible<br />
with any future changes or expansion to the plant, is<br />
of the highest priority.<br />
So costs in both of these areas must be reduced if<br />
future investments are to be feasible and cost-effective.<br />
Result<br />
Engineering<br />
Hardware
The <strong>NEPTUN</strong> philosophy is quite simple: The more<br />
you do for your power plant, the more cost-effective<br />
and easier the process becomes. And because<br />
<strong>NEPTUN</strong> can be implemented in stages, you can go<br />
forward step by step.<br />
The seven pillars represent the seven areas of<br />
<strong>integrated</strong> secondary technology. In contrast to the<br />
traditional approach, which essentially viewed these<br />
areas in isolation (see illustration left), <strong>NEPTUN</strong>’s<br />
comprehensive, <strong>integrated</strong> approach clearly gives<br />
added value (illustration right).<br />
Company capital freed<br />
Result<br />
Savings<br />
Engineering/Hardware<br />
Engineering<br />
Hardware<br />
This means that every investment pays for itself many<br />
times over: firstly, hardware costs are lower than in<br />
conventional systems, as only a small number of<br />
standard components are needed, and secondly, any<br />
subsequent technological integration will require the<br />
integration of ever fewer signals, noticeably reducing<br />
engineering costs. Thirdly, as there will be fewer<br />
replacement parts to deal with, the cost associated<br />
with maintaining stocks of spares will also fall.<br />
<strong>Success</strong><br />
<strong>integrated</strong><br />
N E P T U N<br />
Automation & Control<br />
Excitation<br />
Power Plant Management<br />
Monitoring & Diagnosis<br />
Protection<br />
Synchronization<br />
Turbine Controller
<strong>NEPTUN</strong> <strong>–</strong> <strong>Success</strong> <strong>integrated</strong> www.sat-automation.com/neptun<br />
Excited about excitation<br />
Our reliable excitation system with its flexible digital controller<br />
is compatible with the most varied of power plant<br />
requirements.<br />
Control your equipment<br />
Our modern automation system can manage both<br />
distributed and centralised process control systems<br />
using cost-effective information technologies.<br />
Automation & Control<br />
Excitation<br />
Turbine Controller<br />
Manage your station<br />
We provide solid, wide-ranging experience and support for<br />
your comprehensive power plant solutions.<br />
Set your turbine to save!<br />
Universal turbine governors, which can be employed as<br />
conventional standard regulators or condition-based regulators,<br />
ensure the safe and optimal functioning of all types of turbine.<br />
Power Plant Management<br />
Close at the right moment<br />
The digital synchronisation system employs innovative<br />
hardware and software technology to ensure high-precision<br />
and reliable switching operations.<br />
Synchronization<br />
Making most of your power plant<br />
The user-friendly <strong>NEPTUN</strong> Monitoring and Diagnosis system<br />
will help you reduce maintenance costs and increase the<br />
efficiency of your whole facility.<br />
Monitoring & Diagnosis<br />
Protect your values<br />
We provide a range of digital self-monitoring protection<br />
products for use with generators, transformers and blocks<br />
as well as in smaller power plants.<br />
Protection
Your Center of Competence<br />
Perhaps we don’t know you personally yet.<br />
But we know your requirements.<br />
Are you looking for a team with a sense of responsibility?<br />
One that will support and guide you in your<br />
search for the right solution? Do you appreciate new<br />
and creative ideas as well as reliable experience in the<br />
field of <strong>integrated</strong> secondary technology and beyond?<br />
Do you demand attention to detail coupled with an<br />
ability to see the big picture and the objectivity to<br />
cope with global challenges? Do you appreciate<br />
smooth communication and expect an exceptional<br />
level of service? If so, then get in touch!<br />
VA TECH SAT was founded in Vienna in 1973 and is<br />
now the Centre of Competence for hydro power automation.<br />
It is your expert adviser in all questions relating<br />
to <strong>NEPTUN</strong>. As a supplier of automation systems in<br />
the field of secondary technology, VA TECH SAT has<br />
a long tradition and much experience in relation to<br />
hydroelectric generation assets.<br />
VA TECH SAT focuses internationally on the<br />
processes of power supply, transportation and water<br />
supply and wastewater disposal. VA TECH SAT also<br />
has specialised know-how in the fields of automation,<br />
control systems and project implementation.<br />
In the following pages we are going to show you just<br />
what we should get together and talk about.
Automation & Control<br />
Have you noticed something?<br />
Probably not.<br />
And quite rightly too <strong>–</strong> our modern automation<br />
systems keep a very low profile. But they do ensure<br />
that your plant operates smoothly and safely at all<br />
times.<br />
In exceptional cases they will override any affected<br />
plant component, switching it to a pre-defined and<br />
safe operating status <strong>–</strong> and they remain operable at<br />
any time, either on site or remotely.<br />
The benefits of our expertise are clear right from the<br />
beginning of a project. Naturally, our systems are<br />
easy to integrate into your plant and are divided into<br />
independent units. And all control and regulation<br />
functions are carried out close to the process.<br />
Process signals are logged and managed without<br />
multiple signal recording.<br />
Over 25 years’ experience<br />
1,000 components worldwide<br />
150 power plants automated<br />
High-performance communications concepts compatible<br />
with international standards ensure that your<br />
systems can be expanded and enlarged in the future.<br />
So after your systems have been successfully installed<br />
and commissioned, you can be secure in the knowledge<br />
that you can add further units, such as a substation,<br />
at minimal expense at any time. The <strong>integrated</strong><br />
nature of our systems means maintenance and service<br />
charges are kept to a minimum, while fewer components<br />
translate to lower spare parts costs.<br />
As you can see, our automation and control systems<br />
are kind to your nerves and save you time and a lot of<br />
money. And that you will notice.
Excitation<br />
Something to get<br />
excited about.<br />
Over 30 years’ experience<br />
1,000 exciters worldwide<br />
40,000 MW excited<br />
15,000 operational years<br />
Whether you just want to modernise your voltage<br />
regulator or use a static excitation system: our<br />
state-of-the-art excitation systems for synchronous<br />
generators make it possible for the energy generated<br />
by the turbines to be transferred to the national grid<br />
more efficiently, helping you reduce power loss.<br />
That our excitation systems are easy to integrate into<br />
your plant goes without saying. No matter which of<br />
our products you choose, you can always rely on our<br />
tried-and-tested technology.<br />
Intelligent limitation regulators make sure that all<br />
values remain within defined boundaries. In the case<br />
of static excitation, direct access to the rotor and all<br />
the benefits of an electric brake give you an excellent<br />
control dynamic at all times.<br />
<strong>NEPTUN</strong> can be expanded in stages <strong>–</strong> at minimal<br />
expense, of course. And the <strong>integrated</strong> nature of the<br />
system and the small number of spare parts required<br />
will also reduce your costs.<br />
Higher returns, less downtime and a high degree of<br />
user friendliness. One regulator, one piece of documentation,<br />
one real advance. Now that is something<br />
to get excited about.
Power Plant Management<br />
The more complex the problem,<br />
the simpler the solution<br />
<strong>Success</strong>ful management means making the right<br />
decisions, and you can only do that if you have all the<br />
data you need, linked and processed as required.<br />
So the more complex your problem, the more clearly<br />
you’ll see the advantages of our cutting-edge plant<br />
management solutions: solutions we’ll develop to<br />
incorporate various different elements of your plant’s<br />
management structure.<br />
The most important goal for us is to ensure maximum<br />
availability of your generation equipment while providing<br />
optimum support for your management team. We<br />
also strive to increase efficiency, reduce operating and<br />
maintenance costs and minimise capital tie-up.<br />
Over 30 years’ experience<br />
Over 50 power plants with<br />
control functions<br />
Parallel control of multiple<br />
regulating units<br />
If you want to combine several power plants into a<br />
single cascade, certain universally relevant questions<br />
need to be considered (maintenance cycles, contracts,<br />
official requirements, etc.). Or you can post data from<br />
your power plant on an intranet or internet site. These<br />
are just some of the many convenient options open<br />
to you.<br />
Our standardised engineering and hardware concept<br />
means that our solutions are easy to integrate into<br />
your existing power plant structure. Maintenance,<br />
service and spare parts costs can also be significantly<br />
reduced.<br />
You’ll see: if you no longer have to worry about<br />
everything yourself, we have done our job properly.
Monitoring & Diagnosis<br />
Monitoring & Diagnosis<br />
Fewer “sick-days” and increased output.<br />
Imagine that the individual components of your plant<br />
are your patients. Then imagine that there are different<br />
types of patient: some of them come for a check-up<br />
at the sign of even the most minor complaint <strong>–</strong> all they<br />
seem to do is hold up the smooth running of the plant<br />
<strong>–</strong> while others only come to you when it is almost too<br />
late.<br />
How would it be if every part of your power plant were<br />
to let you know if things weren’t going well? Or even<br />
tell you how things could work even better?<br />
Our user-friendly monitoring and diagnosis system can<br />
help you achieve just that. It reduces maintenance<br />
costs and increases the overall cost-efficiency of your<br />
plant.<br />
The system helps you recognise age-related problems<br />
and faults as well as their causes before they lead to<br />
noticeable and costly damage, and monitors turbines,<br />
shafts, bearings and generators for mechanical,<br />
dielectric or thermal problems.<br />
We use the latest hardware and software <strong>–</strong> all able to<br />
cope with future development or expansion <strong>–</strong> which<br />
will complement any existing monitoring systems and<br />
process-specific upgrades.<br />
Cost of installation and integration with your existing<br />
control system is minimal, which in turn means lower<br />
engineering and investment costs.<br />
50 units monitored worldwide<br />
3,100 MW monitored<br />
1,600,000 hours of monitoring experience<br />
Observe all relevant data in all operating conditions,<br />
analyse trends and be notified if defined limits are<br />
exceeded. That way you can be sure of your diagnosis<br />
and know that you’ve prescribed the right treatment.
Protection<br />
Have you ever heard of a VIP?<br />
For us a VIP is a “very important power plant” <strong>–</strong> and<br />
every plant we look after is a VIP. So what does that<br />
mean in practice?<br />
It’s nice to know that your generators, transformers or<br />
compact installations are well protected against electrical<br />
damage. Regardless of whether your system is wired<br />
for 15.7, 50 or 60 Hertz: our bodyguards do everything<br />
they can to make sure that you’re well protected:<br />
they’re fast, reliable and they cover your whole system.<br />
Over 30 years’ experience<br />
1,500 protection installations worldwide<br />
34,000 MVA protected digitally<br />
490 operating years’ digital protection experience<br />
Our years of experience help us choose the right<br />
strategy to give you the best protection. High quality<br />
standardised equipment reduces your hardware and<br />
engineering costs and keeps spare part stocks as<br />
low as possible.<br />
Our engineers will help you to install your protection<br />
equipment cost-effectively, or alternatively can look<br />
after the whole project for you. That way you get the<br />
best technical solution for the best possible price.<br />
And our digital protection system won’t just monitor<br />
your plant; it will also monitor itself. An <strong>integrated</strong><br />
analysis tool will help you to make improvements in<br />
your equipment and/or its usage.<br />
Interested?<br />
Hire our “bodyguards” and you too can be one of our<br />
“very important power plants”.
Synchronization<br />
Wouldn’t it be great<br />
if everything worked<br />
together in harmony?<br />
A steady hand and total concentration used to be the<br />
basic requirements for successful parallel generator<br />
switching. Nowadays all you have to do is choreograph<br />
the progress while watching everything happen<br />
on your monitor. While the almost inaudible synchronization<br />
process unfolds in the machine hall, you can<br />
relax in the knowledge that your plant’s cost-effectiveness,<br />
reliability and functional capacity have all been<br />
improved.<br />
Over 30 years’ experience<br />
500 digital synchronization<br />
devices installed<br />
1,200 MVA synchronised<br />
Our digital synchronization systems with their innovative<br />
hardware and software perform switching operations<br />
safely and precisely. All data is logged so that<br />
even difficult problems are easily resolved. That way<br />
you can spend more time fine-tuning your plant’s<br />
performance. And our reliable well-tested redundant<br />
technology will ensure that the whole process goes<br />
exactly the way you want.<br />
As you can see, our digital synchronization systems<br />
have a lot going for them and provide performance<br />
you can rely on. How’s that for harmony?
Turbine Controller<br />
Our rule:<br />
Always be flexible<br />
If you’re someone who always likes to get the right<br />
number of revs you’ve got to stay pretty flexible.<br />
Regardless of how much power you want to generate,<br />
our universal turbine controller let you use your turbines<br />
to the full.<br />
Our turbine controller, from conventional standard<br />
regulator with PID structure to condition-based regulators,<br />
guarantee safe and optimal control of all types<br />
of turbine. The modular system architecture is based<br />
on high-performance multiprocessor technology and is<br />
also extremely easy to use.<br />
Over 160 years’ experience<br />
25,000 turbines regulated worldwide<br />
225,000 MW regulated<br />
Drift-free, no-maintenance revolution logging and a<br />
servo-motor-setting go without saying, and our hardware<br />
requires only the bare minimum of space. And<br />
because the hardware is identical to other modules in<br />
the <strong>NEPTUN</strong> range, you save on hardware and<br />
engineering costs from the word go and can keep<br />
your spare parts stocks to a minimum.<br />
Regardless of whether you have Kaplan, Francis or<br />
Pelton turbines, we’ll organize it for you.
© VA TECH SAT GmbH & Co. <strong>–</strong> Wien<br />
www.sat-automation.com/neptun<br />
neptun@sat-automation.com<br />
Layout Design: Machbar | Kassel<br />
Illustration: Yasser Serdani<br />
www.machbar.com<br />
MX8-002-1.00
www.sat-automation.com/neptun<br />
Argentina<br />
VA TECH International Argentina S.A.<br />
Av. Cordoba 1561 - Piso 12<br />
1055 Buenos Aires<br />
+54/11/4815/3964 Fax /3968<br />
Australia<br />
VA TECH Australia Pty Limited<br />
Suite 5, Level 9<br />
100 Walker Street North<br />
Sydney NSW 2060<br />
+61/2/9954/0722 Fax /0782<br />
VA TECH Australia Pty Ltd<br />
16 Miles Street<br />
P.O.Box 4155<br />
Mulgrave<br />
Victoria 3170<br />
+61/3/9264-9988 Fax /9574-9556<br />
Austria<br />
VA TECH HYDRO GmbH & Co<br />
Vienna Headquaters<br />
Penzinger Straße 76<br />
P.O. Box 5<br />
A-1141 Wien<br />
+43/1/89100 Fax /8946046<br />
VA TECH HYDRO Linz Branch<br />
Lunzer Straße 64<br />
P.O. Box 28<br />
A-4031 Linz<br />
+43/732/6989-0 Fax /6980-0<br />
VA TECH SAT GmbH & Co<br />
Ruthnergasse 1<br />
A-1210 Wien<br />
+43/1/29129 Fax /2928838<br />
Bolivia<br />
VOEST-ALPINE MCE Bolivia S.R.L<br />
Pasaje Villegas 1140<br />
Sopocachi La Paz<br />
+591/2/433292<br />
Brazil<br />
VA TECH ENERG Ltda.<br />
Rua Bernardo Guimaraes<br />
2063 Lourdes<br />
30.140-082 Belo Horizonte-MG<br />
+55/31/3337-2044 Fax /3335-1127<br />
VA TECH Internacional Brasil Ltda.<br />
Rua Sao Josè, 70, 10th Floor<br />
20010-020 Rio de Janeiro-RJ<br />
+55/21/533/4331 Fax /8456<br />
Canada<br />
VA TECH ESCHER WYSS Canada<br />
A division of VA TECH Ferranti-Packard<br />
Transformers Ld.<br />
189 Dieppe Road<br />
P.O.Box 548, St. Catharines<br />
Ontario L2R 6W9<br />
+1/905/685/6551 Fax /9783<br />
VA TECH BOUVIER CANADA Inc.<br />
102 Chemin du Tremblay<br />
Boucherville<br />
P.Q. Canada J4B 6Z6<br />
+1/450/449/1228 Fax /1229<br />
Chile<br />
VOEST-ALPINE MCE Chile S.A.<br />
Luis Rodriguez V.<br />
4668 Las Condes Casilla 57<br />
Santiago de Chile<br />
+56/2/366/9022 Fax /9035<br />
China<br />
VA TECH HYDRO GmbH & Co<br />
Beijing Representative Office<br />
No. 7 Guanghua Road<br />
Hanwei Plaza 18/F3-7<br />
Chaoyang District<br />
100004 Beijing<br />
+86/10/6561/3388 Fax /4192<br />
Colombia<br />
Sulzer Columbia S.A.<br />
Carrera 7, No. 33-81<br />
CO-Bogota<br />
+57/1/5603852 Fax /3380371<br />
Czech Republic<br />
VA TECH SAT Praha spol. s r. o.<br />
Ceskobrodska 108 n.<br />
CS-13004 Praha 3<br />
+420/2/66310746 Fax /6838399<br />
Denmark<br />
VA TECH SAT A/S<br />
Slotsmarken 12<br />
DK-2970 Horsholm<br />
+45/4586/2700 Fax /4103<br />
Egypt<br />
VA TECH International GmbH<br />
Representative Office Cairo<br />
Nile Hilton - Commercial Center<br />
Tahir Square<br />
Office No. 39/40<br />
+20/2/579/6332 Fax /6331<br />
France<br />
VA TECH BOUVIER HYDRO S.A.<br />
49-51 boulevard Paul Langevin<br />
F-B.P. 7- 38601 Fontaine Cedex<br />
+33/476/859523 Fax /261620<br />
Germany<br />
VA TECH ELIN ESCHER WYSS GmbH<br />
Escher-Wyss-Straße 25<br />
D-88212 Ravensburg<br />
+49/751/83/00 Fax /2396<br />
VA TECH SAT GmbH<br />
Robert-Koch-Straße 5<br />
D-82152 Planegg<br />
+49/89/899138/0 Fax /615<br />
VA TECH SAT GmbH<br />
Funkschneise 5<br />
D-28309 Bremen<br />
+49/421/41099/0 Fax /715<br />
VA TECH SAT GmbH<br />
Ziegeleistraße 5<br />
D-99880 Waltershausen<br />
+49/3622/6506/0 Fax /815<br />
Hungary<br />
VA TECH HYDRO GmbH & Co<br />
Representative Office Budapest<br />
Buday Laszlô u. 12<br />
H-1024 Budapest<br />
+36/1/345/4539 Fax /4541<br />
India<br />
VA TECH International Private Ltd.<br />
6, Community Centre<br />
Basant Lok, Vasant Vihar<br />
New Delhi 110057<br />
+91/11/614/2287 Fax /6833<br />
CG ELIN Power Systems Ltd.<br />
D-17, MPAKVN Industrial Area<br />
Mandideep 462 046<br />
Dist. Raisen, near Bhopal (M.P.)<br />
+91/748033/714 Fax /702<br />
VA TECH ESCHER WYSS Flovel Ltd.<br />
Amar Nagar<br />
P.O. 13/1, Mathura Road<br />
IND-Faridabad/Haryana 121 003<br />
+91/129/2743/19 Fax /20<br />
Indonesia<br />
PT. VA TECH South East Asia<br />
Jl. Talang No. 3, Proklamasi<br />
RI-Jakarta 10320<br />
+62/21/390/4367 Fax /5006<br />
Iran<br />
VA TECH ELIN Tehran Branch<br />
Khaled Eslamboli Ave. 21st Street<br />
No. 9, 2nd floor<br />
Tehran 15139<br />
+98/21/871/9618 Fax /6413<br />
Technical specifications are used for purposes of product description only<br />
and are not guaranteed specifications in legal terms. Subject to modifications<br />
<strong>–</strong> also in terms of technology.<br />
Italy<br />
VA TECH ESCHER WYSS S.r.l.<br />
Via Daniele Manin 16/18<br />
I-36015 Schio (Vicenza)<br />
+39/0445/678/211 Fax /218<br />
Korea<br />
VA TECH International GmbH<br />
Korea Branch, Hong Woo Bldg.<br />
945-1, Daechi-Dong, Kangnam-Ku<br />
Seoul 135-280<br />
+82/2/5558718 Fax /5685008<br />
Malaysia<br />
ENTRUTECH Sdn. Bhd.<br />
16th Floor, Menara Haw Par<br />
Jalan Sultan Ismail<br />
50250 Kuala Lumpur<br />
+60/3/27101686 Fax /2066770<br />
VA TECH SAT Sdn. Bhd. No. 15<br />
Jalan BRP 9/1D,<br />
Perusahaan Bukit Rahman Putra,<br />
MY-47000 Sungai Buloh<br />
+6/03/65780/50 Fax /60<br />
Mexico<br />
VA TECH ESCHER WYSS S.A. de C.V.<br />
Av. Cd. Industrial No. 977<br />
Col. Cd. Industrial<br />
MEX-58200 Morelia, Mich.<br />
+52/43/432315/30 Fax /38<br />
Netherlands<br />
ELECTRON Automation B.V.<br />
Takkebijsters 17<br />
NL-4817 BL Breda<br />
+31/76/5738430 Fax /5720430<br />
Peru<br />
VA TECH ESCHER WYSS Peru, S.A.<br />
Av. Independencia 238<br />
Chosice/Moyopampa<br />
+51/1/361/0011 Fax /4154<br />
Philippines<br />
VA TECH International GmbH<br />
Regional Headquarters Manila<br />
Suite 401, Golden Rock Building<br />
Salcedo Street, Legaspi Village 168<br />
1268 Makati City<br />
+63/2/8941010 Fax /8174674<br />
Poland<br />
EPSAG sp. z o.o.<br />
ul. Mazowiecka 21<br />
PL-30-019 Krakow<br />
+48/12/6325071<br />
VA TECH HYDRO GmbH & Co<br />
Representative Office Warszawa<br />
ul. Stawki 2/intraco 6p<br />
PL-00193 Warszawa<br />
+48/22/6357023 Fax 6356987<br />
Slowakia<br />
SAT Bratislava systemy automatizacnej<br />
techniky spol. s r. o. Kominarska 1<br />
SK-831 04 Bratislava<br />
+421/7/55577/222 Fax /011<br />
South Africa<br />
VA TECH International<br />
The Ferns Office Park, VA House<br />
364 Pretoria Ave., Randburg 2194<br />
Cramerview 2060<br />
+27/11/8860900 Fax 7898608<br />
Spain<br />
VA TECH ESCHER WYSS S.L.<br />
Paseo de la Castellana, 163<br />
E-28046 Madrid<br />
+34/91/42510/00 Fax /01<br />
VA TECH International of Spain S. A.<br />
Basilica 19, 8-A<br />
E-28020 Madrid<br />
+34/91/555/1927 Fax /1399<br />
Sweden<br />
VA TECH ELIN Svenska AB<br />
P.O.Box 5223<br />
S-10245 Stockholm<br />
+46/8/6628/732 Fax /357<br />
Switzerland<br />
VA TECH HYDRO VEVEY S.A.<br />
Rue des Deux Gares 6<br />
Case postale No. 368<br />
CH-1800 Vevey<br />
+41/21/925/7700 Fax /7703<br />
VA TECH ESCHER WYSS AG<br />
Hardstraße 319<br />
CH-8023 Zürich<br />
+41/1/278/2323 Fax /2988<br />
VA TECH ESCHER WYSS AG<br />
Obernauerstraße 4<br />
CH-6010 Kriens<br />
+41/41/329/5111 Fax /5152<br />
VA TECH SAT AG<br />
Bösch 35<br />
CH-6331 Hünenberg<br />
+41/41/78582/82 Fax /72<br />
Taiwan<br />
VA TECH International GmbH<br />
Taiwan Branch<br />
9. FI.-3, No. 167 Fu Hsing<br />
North Road, Taipei<br />
+886/2/27198057 Fax /25460902<br />
Thailand<br />
VA TECH (Thailand) Co. Ltd.<br />
12/B Lake Rajada Office Complex<br />
193/44 Ratchdapisek Road<br />
Kwaeng Klongtoey, Khet Klongtoey<br />
Bangkok 10110<br />
+66/2/264035357 Fax /2640361<br />
Turkey<br />
VA TECH ELIN Elmak Electromekanik<br />
Sistemler Ticaret Limited<br />
Sirketi Billur Sok. 5/7-8<br />
TR-06700 Kavaklidere Ankara<br />
+90/312/466/3580 Fax /3611<br />
Ukraine<br />
VA TECH International GmbH<br />
Vertretung in der Ukraine<br />
Uliza Artema, 73<br />
11. Etage, Nr. 1109<br />
254655, GSP Kiew-53<br />
+38/044/2113984 Fax /2161665<br />
United States of America<br />
International Power Technology, Inc.<br />
1065 East Hillsdale Blvd.<br />
Suite 230, Foster City<br />
CA-94404, California<br />
+1/650/37290/40 Fax /49<br />
VA TECH ELIN USA Corporation<br />
Lincoln Building Suite 4519<br />
60 East 42nd Street<br />
New York, N.Y. 10165<br />
+1/212/808/4470 Fax /4473<br />
VA TECH VOEST MCE Corporation<br />
812-A West Innes Street<br />
Salisbury, NC 28144<br />
+1/704/647/9276 Fax /9277<br />
Venezuela<br />
VA TECH International de Venezuela C.A.<br />
Avenida la Estancia<br />
Torre las Mercedes, Piso 6 Chuao<br />
Caracas 1060 A<br />
+58/2/9917044 Fax /9928720<br />
Vietnam<br />
VA TECH International GmbH<br />
Representative Office Hanoi<br />
16 Nguyen Cong Tru Street<br />
Hai Ba Trung District<br />
Hanoi<br />
+84/4/97174/55 Fax /9717456<br />
VA TECH SAT GmbH & Co. - Wien<br />
MX8-002-1.00