R02. Geotechnical Solutions for Soil Improvement, Rapid<br />

Embankment Construction and Stabilization <strong>of</strong> Pavement<br />

Working Platform<br />

Advertised on March 2007 – under contract negotiations<br />

• Objective: To develop alternative methods to facilitate<br />

rapid roadway and embankment construction with<br />

improved long-term performance. The project will focus<br />

on three elements:<br />

– Construction <strong>of</strong> new embankments and roadways over unstable<br />

soils<br />

– Rapid widening <strong>of</strong> existing embankments and roadways<br />

– Stabilization <strong>of</strong> the pavement working platform.<br />

• Budget: $3,000,000<br />

• Duration: 4 years