R02. Geotechnical Solutions for Soil Improvement, Rapid<br />
Embankment Construction and Stabilization <strong>of</strong> Pavement<br />
Working Platform<br />
Advertised on March 2007 – under contract negotiations<br />
• Objective: To develop alternative methods to facilitate<br />
rapid roadway and embankment construction with<br />
improved long-term performance. The project will focus<br />
on three elements:<br />
– Construction <strong>of</strong> new embankments and roadways over unstable<br />
soils<br />
– Rapid widening <strong>of</strong> existing embankments and roadways<br />
– Stabilization <strong>of</strong> the pavement working platform.<br />
• Budget: $3,000,000<br />
• Duration: 4 years