R06. Plan for Developing High-Speed NDT Procedures<br />

for Design Evaluation and Construction Inspection<br />

On-going project - Contract with Texas A&M<br />

• Objectives:<br />

– Develop a process to identify existing or, if necessary, to develop<br />

new and quickly implementable technologies for rapid NDT <strong>of</strong> in<br />

situ conditions<br />

– Develop <strong>AASHTO</strong>-format test procedures for rapid design<br />

evaluation and construction inspection<br />

• Budget: $5,000,000 total<br />

– $350,000 (ongoing “parent” project)<br />

• Duration: 12 month (ongoing “parent” project)