Improving Equipment Availability and Reliability Using the ... - OSIsoft
Improving Equipment Availability and Reliability Using the ... - OSIsoft
Improving Equipment Availability and Reliability Using the ... - OSIsoft
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Case study # 2<br />
<strong>Equipment</strong> name:<br />
Crusher H.T. Motor( B7 )<br />
• Problem Faced<br />
• Whenever H.T. motor gets tripped on Thermal<br />
Overload , Sometimes it was found that <strong>the</strong> current<br />
value in <strong>the</strong> SCADA point trend was normal.<br />
• So it was very difficult to convince <strong>the</strong> MINES as well<br />
as PROCESS dept., that it was an actual tripping due<br />
to rise in current value above specified value.<br />
© Copyright 2011 <strong>OSIsoft</strong>, LLC<br />
13