14.08.2013 Views

Improving Equipment Availability and Reliability Using the ... - OSIsoft

Improving Equipment Availability and Reliability Using the ... - OSIsoft

Improving Equipment Availability and Reliability Using the ... - OSIsoft

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Overview of Kotputli Cement Works<br />

MTPD Year Status<br />

10,000 2009 Greenfield plant.<br />

PI SYSTEM<br />

INSTALLED IN THE<br />

2011 JAN.<br />

We are committed to Green, Clean <strong>and</strong> Safe environment.<br />

© Copyright 2011 <strong>OSIsoft</strong>, LLC 34

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!