Existing TECO plant efficiency<br />

= 40%<br />

o 16 MW onsite generation<br />

o 80,000 tons chilled water<br />

o 750,000 lbs/hr steam packaged<br />

boilers<br />

--------------------------<br />

Post-CHP TECO plant<br />

efficiency = 80%<br />

o 100 MW CHP Plant<br />

o 152,000 ton-hrs chilled water storage<br />

tank (16,000 tons)<br />

o 540,000 lbs/hr heat recovery steam<br />

generator<br />

o Displaced load and duty on existing<br />

boilers 38