15.08.2013 Views

CHP Feasibility Study - Houston Advanced Research Center

CHP Feasibility Study - Houston Advanced Research Center

CHP Feasibility Study - Houston Advanced Research Center

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Detailed Analysis : Case <strong>Study</strong><br />

• Texas Capital Complex : Austin, Texas<br />

– 25 Buildings<br />

– 4.8 million existing sq ft + 7 million potential new<br />

construction space<br />

– Mostly office space; new construction : mixed use<br />

– Existing Central Plant ( some aging chillers & boilers)<br />

• Chilled water and steam distribution<br />

• GC RAC conducted detailed feasibility study<br />

– Phase 1 : Highest Efficiency Option<br />

– Phase 2 : Highest Reliability Option<br />

15

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!