Mechanical<br />

Buried under the stadium seating in the sports hall<br />

and the swimming pool, 49 air-handling units are<br />

served with hot and cold water from a central plant<br />

located on the other half of the site. Additionally a<br />

19km network of hot water piping was buried 25cm<br />

below the grass surface of the stadium playing field<br />

to allow year round use.<br />

Experimenting<br />

Since this project has been executed before our<br />

current digital age, all of the calculations had been<br />

done by hand. Most of the engineering was also the<br />

result of practical experiments, mostly conducted by<br />

Frei Otto himself, and based on models in varying<br />

scales.<br />

Otto started with models of the roof at a 1:125<br />

scale. He measured the mechanical forces in the<br />

individual wires of the net with gauges he had<br />

developed himself. Several fixed cameras recorded<br />

both the loaded and unloaded shape of the model<br />

for comparative measurements.<br />

As soon as these experiments offered the<br />

necessary insight in how these constructions<br />

worked and reacted, larger models were built and<br />

hand calculations were performed for verification.<br />

Therefore, architects and engineers used drawings<br />

on a 1:10 scale, resulting in 3.800 sqm of drawings.<br />

6