Vernal Pool Restoration - American Society of Landscape Architects
Vernal Pool Restoration - American Society of Landscape Architects
Vernal Pool Restoration - American Society of Landscape Architects
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Case<br />
No. 038<br />
The regu ulatory envi ironment an nd regulator<br />
was suppoortive<br />
<strong>of</strong> the project.<br />
Did the client c reque est that othe er factors be b considereed,<br />
such ass<br />
energy savvings,<br />
usabble<br />
green sp pace, or pro operty value e enhancem ments? No<br />
Cost & Jobs Ana alysis<br />
Estimate ed Cost <strong>of</strong> Stormwater<br />
S r Project: $1 100,000-$5000,000<br />
(Public<br />
funding: SState)<br />
Was a green<br />
vs. gre ey cost analysis<br />
perfor rmed? No<br />
Cost imp pact <strong>of</strong> cons serving gre een/open sp pace to the ooverall<br />
costs<br />
<strong>of</strong> the sitte<br />
design/d developmen nt project: Surprisingly,<br />
S<br />
natives are more cost eeffective<br />
thann<br />
exotics even<br />
with a pro oject as com mplex as the <strong>Vernal</strong> <strong>Pool</strong>s<br />
on Interstaate<br />
80. Beccause<br />
nativees<br />
are adapteed<br />
to<br />
the local environmen nt, their cost t, energy inp puts and envvironmental<br />
iimpact<br />
are rreduced<br />
bothh<br />
short term m and long term. t Althou ugh a grassland<br />
ecosysttem,<br />
vernal ppool<br />
speciess<br />
are low<br />
growing and a don't ne eed mowing. . The casca ading drainagge<br />
system shown<br />
in the LAM article for<br />
the pools s serve to slo ow and store e stormwater<br />
without thee<br />
need for neew<br />
drainagee<br />
systems noor<br />
irrigation.<br />
Exotics do o not slow or r store storm mwater and, tthey<br />
requiree<br />
massive ammounts<br />
<strong>of</strong><br />
irrigation.<br />
In addition n, exotics typ pically requir re fertilizer, hherbicides<br />
aand<br />
landscappe<br />
managemment<br />
such as pruning p and disease con ntrol. The California C nattives<br />
<strong>of</strong> these<br />
vernal poools<br />
require no<br />
environm mental or ma aintenance in nput.<br />
Cost imp pact <strong>of</strong> cons serving gre een/open sp pace for stoormwater<br />
maanagementt<br />
over<br />
tradition nal site design/site<br />
dev velopment approaches<br />
a<br />
(grey infrastructure)?<br />
? Significanttly<br />
reduced costs (10% or greater savings).<br />
Number <strong>of</strong> jobs cre eated: 5<br />
Job hours<br />
devoted to project:<br />
Planning P and Design: 300 0<br />
Construction:<br />
C : 600<br />
Annual A Maint tenance: 0<br />
Other: O 9,000 (research an nd education n)<br />
Perform mance Me easures<br />
Stormwa ater reduction<br />
perform mance analy ysis:<br />
20%<br />
Commun nity & economic<br />
benef fits that hav ve resulted from the prroject:<br />
<strong>Restoration</strong> R te echniques now n applied state-wide s<br />
Pagg<br />
e | 2