NOTICE TO PROSPECTIVE BIDDERS - COTA
NOTICE TO PROSPECTIVE BIDDERS - COTA
NOTICE TO PROSPECTIVE BIDDERS - COTA
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
25.<br />
26.<br />
Warranties<br />
Inspection<br />
25.1 Performance Warranty<br />
Contractor warrants that the Refrigerant Reclaim System will perform in<br />
accordance with the performance requirements set forth in the specifications<br />
and that the Refrigerant Reclaim System has been designed so as to conform<br />
to the specifications. Contractor further warrants that the Refrigerant Reclaim<br />
System will be merchantable, of good material and workmanship, free from<br />
defects and will be fit and sufficient for the purpose intended.<br />
25.2 Parts and Labor Warranty<br />
Parts and labor for the entire Refrigerant Reclaim System shall be warranted<br />
for a minimum of twelve (12) months from the date of acceptance by <strong>COTA</strong><br />
for parts and labor acceptance by <strong>COTA</strong> shall be upon inspection and<br />
confirmation that the equipment meets contract specifications, and shall be<br />
completed within three (3) working days after delivery.<br />
Materials or equipment purchased are subject to inspection and approval at <strong>COTA</strong>’s destination.<br />
<strong>COTA</strong> reserves the right to reject and refuse acceptance of items which are not in accordance<br />
with the instructions, specifications, drawings or a part of the contractor’s warranty (express or<br />
implied). Rejected materials or equipment shall be removed by, or at the expense of the<br />
contractor promptly after rejection.<br />
27.<br />
Price Warranty<br />
Contractor warrants that the prices for the goods sold to <strong>COTA</strong> under this Agreement are not less<br />
favorable than those currently extended to any other customer for the same or like items in equal<br />
or less quantities. In the event Contractor reduces its price for such goods during the term of this<br />
Agreement, Contractor agrees to reduce the prices hereof accordingly.<br />
28.<br />
Notification of Material Changes in Business<br />
Contractor agrees that if it experiences any material changes in its business including, without<br />
limitation, a reorganization, refinancing, restructuring, leveraged buyout, bankruptcy, loss of key<br />
personnel, etc., it agrees to immediately notify <strong>COTA</strong>'s Director of Supply Management of the<br />
changes. Contractor also agrees to immediately notify the Director of Supply Management of<br />
any condition which may jeopardize the scheduled delivery or fulfillment of Contractor's<br />
contractual obligations to <strong>COTA</strong>.<br />
2-8