EFECTS OF TURBINE TYPE SELECTION<br />
ON TECHNICAL AND ECONOMICAL BENEFITS<br />
OF THE NEW SHPP PROJECT<br />
Authors: Hajrudin DZAFO Dipl.-Ing. & Dzevad FAZLIC Dipl.-Ing.<br />
JP Elektroprivreda BiH d.d.- Sarajevo<br />
Bosnia <strong>and</strong> Herzegovina
Bosnian hydropower historical overview:<br />
years: 1899 – first SHPP Jajce ( 8 x 1,0 MW)<br />
to 1918 – six SHPP in operati<strong>on</strong> with 7,3 MW<br />
after 1945 – NO interest for SHPP !?<br />
from 1999. up today:<br />
NEW AGE FOR SMALL HYDRO IN BOSNIA !
Year 1899 – Bosnia & Herzegovina:<br />
the first Hydro power plant Jajce ( 8 x 1,0 MW)
IS IT BOSNIAN PYRAMIDE !??
Year 2008: Bosnia & Herzegovina:<br />
rivers <strong>and</strong> streamflows
FEDERATION OF BOSNIA & HERZEGOVINA: Hydropotential for new SHPP<br />
Year 2008: 15 SHPP... in operati<strong>on</strong><br />
50 SHPP... under c<strong>on</strong>tructi<strong>on</strong><br />
200 SHPP ...c<strong>on</strong>cessi<strong>on</strong> c<strong>on</strong>tracts
THE AREA OF POWER PLANT PROJECT<br />
CEMERNICA & KALJANI<br />
- East Bosnia -
SMALL HYDRO POWER PLANT<br />
CEMERNICA & KALJANI<br />
SCHEME
6.00<br />
5.00<br />
4.00<br />
3.00<br />
2.00<br />
1.00<br />
0.00<br />
Srednji protok<br />
Q BAZNO TEH:MIN,<br />
GODIŠNJA KRIVA TRAJANJA PROTOKA<br />
(m3/s)<br />
THE ANNUAL FLOW DURATION CURVE:<br />
locati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> SHPP Cemernica & SHPP Kaljani<br />
RASPOLOŢIVI PROTOK (m3/s)<br />
0 10 20 30 40 50 60 70 80 90 100<br />
TRAJANJE PROTOKA (% godišnje)
Number <str<strong>on</strong>g>of</str<strong>on</strong>g> units: ......... 1<br />
Type <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>turbine</str<strong>on</strong>g>: .......... Pelt<strong>on</strong><br />
The installed power<br />
<str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>turbine</str<strong>on</strong>g>: ................... 530 kW<br />
Annual generati<strong>on</strong>: ....... 2,1 GWh<br />
THE SHPP CEMERNICA ( 530 kW )<br />
Average annual flow ....Qmean = 0,370 m3/s<br />
The installed flow ....Qi = 0,500 m3/s<br />
Pressure pipeline length / diameter:<br />
d = 1481,00 m / 600/500 mm<br />
Gross head / Net head: 129,61 m / 120,16 m
THE SHPP KALJANI<br />
Two Francis Units versus Two Cross-flow Units<br />
Criteria (No.1)…..Annual generati<strong>on</strong>:<br />
VS<br />
Variant I: 2 x Francis unit ….... Hn = 36,5 m; Qi = 2 x 2,0 m3/s<br />
Variant II: 2 x Cross flow unit … Hn = 36,5 m; Qi = 2 x 2,0 m3/s<br />
Variant III: 1 x Cross flow unit ….. Hn=36,5m; Qi= 2,0 m3/s<br />
1 x Francis unit ……… Hn=36,5m; Qi= 2,0 m3/s (peak=89%)
THE SHPP KALJANI<br />
Two Francis Units versus Two Cross-flow Units<br />
Criteria (No.1)…..Annual generati<strong>on</strong>:<br />
Variant I: 2 x Francis unit ….... Hn = 36,5 m; Qi = 2 x 2,0 m3/s<br />
Annual generati<strong>on</strong> (GWh)<br />
teh.min.(%Qi) 40% 50% 60%<br />
peak (%)<br />
90,5 4,67 4,64 4,00<br />
89,0 4,62 5,56 3,95<br />
87,0 4,52 4,46 3,85
THE SHPP KALJANI<br />
Two Francis Units versus Two Cross-flow Units<br />
Criteria (No.1)…..Annual generati<strong>on</strong>:<br />
Variant II: 2 x Cross flow unit … Hn = 36,5 m; Qi = 2 x 2,0 m3/s<br />
Flow rate 100% 90% 60% 30% 17%<br />
Output kW 610 549 366 183 101<br />
Flow rate l/s 2000 1800 1200 600 340<br />
Efficiency (%) ( ή ) 84 84 84 83 81<br />
Annual generati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> Variant II: ....... 4,68 GWh
THE SHPP KALJANI<br />
Two Francis Units versus Two Cross-flow Units<br />
Criteria (No.1)…..Annual generati<strong>on</strong>:<br />
Variant III: 1 x Cross flow unit ….. Hn=36,5m; Qi= 2,0 m3/s<br />
1 x Francis unit ……… Hn=36,5m; Qi= 2,0 m3/s (peak=89%)<br />
Annual generati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> Variant III: ....... Francis unit:........ 2,95 GWh<br />
........ Cross flow unit:.. 1,87 GWh<br />
Total:__________ 4,82 GWh<br />
Criteria (No.2)…..Governing system – c<strong>on</strong>trol equipment:<br />
It is complicated c<strong>on</strong>nect equipment <str<strong>on</strong>g>of</str<strong>on</strong>g> different suppliers,<br />
also incompatible auxiliary governing systems.<br />
From that reas<strong>on</strong>s, we compare <strong>and</strong> not accepted variant III.
THE SHPP KALJANI<br />
Selected soluti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> hydroelectric generating units<br />
for SHPP Kaljani <strong>and</strong> SHPP Cemernica:<br />
SHPP Cemernica:.......<strong>on</strong>e Pelt<strong>on</strong> unit (two runners with four nozzles)...530 kW<br />
SHPP Kaljani: ..............two cross flow <str<strong>on</strong>g>turbine</str<strong>on</strong>g>s ..................................2 x 630 kW<br />
with these hydraulic characteristics for <strong>on</strong>e <str<strong>on</strong>g>turbine</str<strong>on</strong>g>:<br />
Gross head .......... Hb = 39,50 m<br />
Net head .............. Hnet = 37,00 m<br />
Hydraulic losses ... ∑t = 2,50 m<br />
Flow rates: ... maximum flow rate at Hnet ... Qmax = 2.000 l/s<br />
minimum flow rate at Hnet Qmin = 340 l/s<br />
Guaranteed performance based <strong>on</strong> the hydraulic data in full regulati<strong>on</strong>:<br />
Flow rate 100% 90% 60% 30% 17%<br />
Output kW 630 567 378 189 107<br />
Flow rate l/s 2000 1800 1200 600 340<br />
Efficiency (%) ( ή ) 87 87 87 87 85
THE SHPP KALJANI ( 2 x 580 kW Generator output)
THE SHPP CEMERNICA & SHPP KALJANI COMMON POWERHOUSE<br />
(1 PELTON + 2 CROSFLOW = 3 UNITS )
THE SHPP CEMERNICA & SHPP KALJANI COMMON POWERHOUSE<br />
(1 PELTON + 2 CROSFLOW = 3 UNITS )<br />
THE POWERHOUSE<br />
UNDER CONTRUCTION,<br />
May 2008.
CONCLUSION<br />
The main characteristic <str<strong>on</strong>g>of</str<strong>on</strong>g> this design soluti<strong>on</strong><br />
is the joint powerhouse for both power plants.<br />
From tender request for two Francis <str<strong>on</strong>g>turbine</str<strong>on</strong>g>, to final<br />
decisi<strong>on</strong> for choosing this <str<strong>on</strong>g>turbine</str<strong>on</strong>g> <str<strong>on</strong>g>type</str<strong>on</strong>g>, with <strong>technical</strong> <strong>and</strong><br />
ec<strong>on</strong>omical str<strong>on</strong>g reas<strong>on</strong>s, processing explained.<br />
Turbine-generator unit <str<strong>on</strong>g>selecti<strong>on</strong></str<strong>on</strong>g> for the new small<br />
hydropower plant is a very sensitive phase <str<strong>on</strong>g>of</str<strong>on</strong>g> the project<br />
development, needs more criteria involved in process <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
designing.<br />
Most important criteria are <strong>technical</strong> availability operati<strong>on</strong><br />
all equipment during annual period with highest number<br />
<str<strong>on</strong>g>of</str<strong>on</strong>g> working hours, which means highest total income for<br />
owners <strong>and</strong> investors <str<strong>on</strong>g>of</str<strong>on</strong>g> the small hydropower projects.
Hajrudin DZAFO Dipl.-Ing. Dzevad FAZLIC Dipl.-Ing.<br />
E-mail: h.dzafo@elektroprivreda.ba dz.fazlic@elektroprivreda.ba<br />
Bosnia <strong>and</strong> Herzegovina<br />
THANK YOU FOR ATENTION !