EFECTS OF TURBINE TYPE SELECTION<br />

ON TECHNICAL AND ECONOMICAL BENEFITS<br />

OF THE NEW SHPP PROJECT<br />

Authors: Hajrudin DZAFO Dipl.-Ing. & Dzevad FAZLIC Dipl.-Ing.<br />

JP Elektroprivreda BiH d.d.- Sarajevo<br />

Bosnia <strong>and</strong> Herzegovina


Bosnian hydropower historical overview:<br />

years: 1899 – first SHPP Jajce ( 8 x 1,0 MW)<br />

to 1918 – six SHPP in operati<strong>on</strong> with 7,3 MW<br />

after 1945 – NO interest for SHPP !?<br />

from 1999. up today:<br />

NEW AGE FOR SMALL HYDRO IN BOSNIA !


Year 1899 – Bosnia & Herzegovina:<br />

the first Hydro power plant Jajce ( 8 x 1,0 MW)


IS IT BOSNIAN PYRAMIDE !??


Year 2008: Bosnia & Herzegovina:<br />

rivers <strong>and</strong> streamflows


FEDERATION OF BOSNIA & HERZEGOVINA: Hydropotential for new SHPP<br />

Year 2008: 15 SHPP... in operati<strong>on</strong><br />

50 SHPP... under c<strong>on</strong>tructi<strong>on</strong><br />

200 SHPP ...c<strong>on</strong>cessi<strong>on</strong> c<strong>on</strong>tracts


THE AREA OF POWER PLANT PROJECT<br />

CEMERNICA & KALJANI<br />

- East Bosnia -


SMALL HYDRO POWER PLANT<br />

CEMERNICA & KALJANI<br />

SCHEME


6.00<br />

5.00<br />

4.00<br />

3.00<br />

2.00<br />

1.00<br />

0.00<br />

Srednji protok<br />

Q BAZNO TEH:MIN,<br />

GODIŠNJA KRIVA TRAJANJA PROTOKA<br />

(m3/s)<br />

THE ANNUAL FLOW DURATION CURVE:<br />

locati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> SHPP Cemernica & SHPP Kaljani<br />

RASPOLOŢIVI PROTOK (m3/s)<br />

0 10 20 30 40 50 60 70 80 90 100<br />

TRAJANJE PROTOKA (% godišnje)


Number <str<strong>on</strong>g>of</str<strong>on</strong>g> units: ......... 1<br />

Type <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>turbine</str<strong>on</strong>g>: .......... Pelt<strong>on</strong><br />

The installed power<br />

<str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>turbine</str<strong>on</strong>g>: ................... 530 kW<br />

Annual generati<strong>on</strong>: ....... 2,1 GWh<br />

THE SHPP CEMERNICA ( 530 kW )<br />

Average annual flow ....Qmean = 0,370 m3/s<br />

The installed flow ....Qi = 0,500 m3/s<br />

Pressure pipeline length / diameter:<br />

d = 1481,00 m / 600/500 mm<br />

Gross head / Net head: 129,61 m / 120,16 m


THE SHPP KALJANI<br />

Two Francis Units versus Two Cross-flow Units<br />

Criteria (No.1)…..Annual generati<strong>on</strong>:<br />

VS<br />

Variant I: 2 x Francis unit ….... Hn = 36,5 m; Qi = 2 x 2,0 m3/s<br />

Variant II: 2 x Cross flow unit … Hn = 36,5 m; Qi = 2 x 2,0 m3/s<br />

Variant III: 1 x Cross flow unit ….. Hn=36,5m; Qi= 2,0 m3/s<br />

1 x Francis unit ……… Hn=36,5m; Qi= 2,0 m3/s (peak=89%)


THE SHPP KALJANI<br />

Two Francis Units versus Two Cross-flow Units<br />

Criteria (No.1)…..Annual generati<strong>on</strong>:<br />

Variant I: 2 x Francis unit ….... Hn = 36,5 m; Qi = 2 x 2,0 m3/s<br />

Annual generati<strong>on</strong> (GWh)<br />

teh.min.(%Qi) 40% 50% 60%<br />

peak (%)<br />

90,5 4,67 4,64 4,00<br />

89,0 4,62 5,56 3,95<br />

87,0 4,52 4,46 3,85


THE SHPP KALJANI<br />

Two Francis Units versus Two Cross-flow Units<br />

Criteria (No.1)…..Annual generati<strong>on</strong>:<br />

Variant II: 2 x Cross flow unit … Hn = 36,5 m; Qi = 2 x 2,0 m3/s<br />

Flow rate 100% 90% 60% 30% 17%<br />

Output kW 610 549 366 183 101<br />

Flow rate l/s 2000 1800 1200 600 340<br />

Efficiency (%) ( ή ) 84 84 84 83 81<br />

Annual generati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> Variant II: ....... 4,68 GWh


THE SHPP KALJANI<br />

Two Francis Units versus Two Cross-flow Units<br />

Criteria (No.1)…..Annual generati<strong>on</strong>:<br />

Variant III: 1 x Cross flow unit ….. Hn=36,5m; Qi= 2,0 m3/s<br />

1 x Francis unit ……… Hn=36,5m; Qi= 2,0 m3/s (peak=89%)<br />

Annual generati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> Variant III: ....... Francis unit:........ 2,95 GWh<br />

........ Cross flow unit:.. 1,87 GWh<br />

Total:__________ 4,82 GWh<br />

Criteria (No.2)…..Governing system – c<strong>on</strong>trol equipment:<br />

It is complicated c<strong>on</strong>nect equipment <str<strong>on</strong>g>of</str<strong>on</strong>g> different suppliers,<br />

also incompatible auxiliary governing systems.<br />

From that reas<strong>on</strong>s, we compare <strong>and</strong> not accepted variant III.


THE SHPP KALJANI<br />

Selected soluti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> hydroelectric generating units<br />

for SHPP Kaljani <strong>and</strong> SHPP Cemernica:<br />

SHPP Cemernica:.......<strong>on</strong>e Pelt<strong>on</strong> unit (two runners with four nozzles)...530 kW<br />

SHPP Kaljani: ..............two cross flow <str<strong>on</strong>g>turbine</str<strong>on</strong>g>s ..................................2 x 630 kW<br />

with these hydraulic characteristics for <strong>on</strong>e <str<strong>on</strong>g>turbine</str<strong>on</strong>g>:<br />

Gross head .......... Hb = 39,50 m<br />

Net head .............. Hnet = 37,00 m<br />

Hydraulic losses ... ∑t = 2,50 m<br />

Flow rates: ... maximum flow rate at Hnet ... Qmax = 2.000 l/s<br />

minimum flow rate at Hnet Qmin = 340 l/s<br />

Guaranteed performance based <strong>on</strong> the hydraulic data in full regulati<strong>on</strong>:<br />

Flow rate 100% 90% 60% 30% 17%<br />

Output kW 630 567 378 189 107<br />

Flow rate l/s 2000 1800 1200 600 340<br />

Efficiency (%) ( ή ) 87 87 87 87 85


THE SHPP KALJANI ( 2 x 580 kW Generator output)


THE SHPP CEMERNICA & SHPP KALJANI COMMON POWERHOUSE<br />

(1 PELTON + 2 CROSFLOW = 3 UNITS )


THE SHPP CEMERNICA & SHPP KALJANI COMMON POWERHOUSE<br />

(1 PELTON + 2 CROSFLOW = 3 UNITS )<br />

THE POWERHOUSE<br />

UNDER CONTRUCTION,<br />

May 2008.


CONCLUSION<br />

The main characteristic <str<strong>on</strong>g>of</str<strong>on</strong>g> this design soluti<strong>on</strong><br />

is the joint powerhouse for both power plants.<br />

From tender request for two Francis <str<strong>on</strong>g>turbine</str<strong>on</strong>g>, to final<br />

decisi<strong>on</strong> for choosing this <str<strong>on</strong>g>turbine</str<strong>on</strong>g> <str<strong>on</strong>g>type</str<strong>on</strong>g>, with <strong>technical</strong> <strong>and</strong><br />

ec<strong>on</strong>omical str<strong>on</strong>g reas<strong>on</strong>s, processing explained.<br />

Turbine-generator unit <str<strong>on</strong>g>selecti<strong>on</strong></str<strong>on</strong>g> for the new small<br />

hydropower plant is a very sensitive phase <str<strong>on</strong>g>of</str<strong>on</strong>g> the project<br />

development, needs more criteria involved in process <str<strong>on</strong>g>of</str<strong>on</strong>g><br />

designing.<br />

Most important criteria are <strong>technical</strong> availability operati<strong>on</strong><br />

all equipment during annual period with highest number<br />

<str<strong>on</strong>g>of</str<strong>on</strong>g> working hours, which means highest total income for<br />

owners <strong>and</strong> investors <str<strong>on</strong>g>of</str<strong>on</strong>g> the small hydropower projects.


Hajrudin DZAFO Dipl.-Ing. Dzevad FAZLIC Dipl.-Ing.<br />

E-mail: h.dzafo@elektroprivreda.ba dz.fazlic@elektroprivreda.ba<br />

Bosnia <strong>and</strong> Herzegovina<br />

THANK YOU FOR ATENTION !

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!