24.08.2013 Views

why geyser blankets - Eskom

why geyser blankets - Eskom

why geyser blankets - Eskom

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

DSM AUDIT PROCEDURE<br />

If insulation not fastened properly - Reject<br />

If <strong>geyser</strong> not in a working condition - Reject<br />

If insulation not loosely fitted and material is<br />

compressed to less than 60% of contracted<br />

thickness - Reject<br />

If gaps in insulation are found on top of the<br />

Geyser - Reject<br />

If >15% of <strong>geyser</strong> is not covered - Reject<br />

If sides of <strong>geyser</strong> are not completely covered<br />

- Reject

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!