MINUTES OF MEETING<br />
ITEM ACTIONS<br />
1.0 Welcome<br />
MO opened the meeting and welcomed new members (Pr<strong>of</strong>essor Tim Lenton,<br />
Grace Hopper and Sophie Chung-Pan-Lan). MO expressed thanks to both Paul<br />
Adams and Stewart Barr’s for their contribution to the group.<br />
JS requested that agenda and papers continue to be shown electronically.<br />
2.0 Minutes <strong>of</strong> last meeting: Matters Arising<br />
The minutes <strong>of</strong> the last meeting were agreed and the following updates were<br />
also provided:<br />
• GW reported that EDS are currently carrying out a feasibility study<br />
regarding the use <strong>of</strong> kitchen oil in the Streatham Farm boiler.<br />
• KG to liaise with Iain Park regarding the continued use <strong>of</strong> footpath<br />
lighting in the plantation area.<br />
3.0 Sustainability Plan 2011/<strong>2012</strong><br />
KGa reported that over 80% <strong>of</strong> the plan has been completed in full. Achieving<br />
ISO14001 certification had made a particularly important contribution to further<br />
improving the <strong>University</strong>’s environmental performance.<br />
The Items allocated Red status on the Sustainability Plan were discussed:<br />
• Item 2.4 (Skip Management) in the plan will be addressed now the new<br />
permanent Waste and Recycling Supervisor is in post.<br />
• Item 3.5 (Sustainability Resources for Students) was not complete as<br />
resources were diverted to the Grand Challenges project. This was<br />
viewed as a good use <strong>of</strong> resources given the positive sustainability<br />
impact <strong>of</strong> the initiative. It was requested that a footnote describing the<br />
Grand challenges project be included in the final 2011/12 plan.<br />
• Item 5.2 (Car sharing) will have its first phase launched on 1 st October<br />
<strong>2012</strong>. Post meeting note: The programme will be launched on 1 st<br />
November.<br />
4.0 Sustainability Plan <strong>2012</strong>/13<br />
MO invited the group to comment on content and discuss the plan for the coming<br />
year.<br />
PL requested that more detail be provided regarding the relative importance <strong>of</strong><br />
each action and noted it would be helpful to include further narrative within the<br />
criteria.<br />
KG stated that Item 1.3 (Achieving ISO14001) would need to change in <strong>2012</strong>/13<br />
as recent environmental audits had highlighted areas requiring action across<br />
colleges. The present action would only target a single college / service.<br />
5.0 Energy and Water Performance Report (SAG <strong>2012</strong>/13/01)<br />
GW presented the Energy and Water Performance Report. It was highlighted<br />
that carbon dioxide (CO2) emissions are below target and GW is confident that<br />
the Staff Bonus criteria will be triggered.<br />
LK<br />
PM<br />
KG<br />
KG<br />
KG<br />
KG