27.08.2013 Views

25 September 2012 - University of Exeter

25 September 2012 - University of Exeter

25 September 2012 - University of Exeter

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

MINUTES OF MEETING<br />

ITEM ACTIONS<br />

1.0 Welcome<br />

MO opened the meeting and welcomed new members (Pr<strong>of</strong>essor Tim Lenton,<br />

Grace Hopper and Sophie Chung-Pan-Lan). MO expressed thanks to both Paul<br />

Adams and Stewart Barr’s for their contribution to the group.<br />

JS requested that agenda and papers continue to be shown electronically.<br />

2.0 Minutes <strong>of</strong> last meeting: Matters Arising<br />

The minutes <strong>of</strong> the last meeting were agreed and the following updates were<br />

also provided:<br />

• GW reported that EDS are currently carrying out a feasibility study<br />

regarding the use <strong>of</strong> kitchen oil in the Streatham Farm boiler.<br />

• KG to liaise with Iain Park regarding the continued use <strong>of</strong> footpath<br />

lighting in the plantation area.<br />

3.0 Sustainability Plan 2011/<strong>2012</strong><br />

KGa reported that over 80% <strong>of</strong> the plan has been completed in full. Achieving<br />

ISO14001 certification had made a particularly important contribution to further<br />

improving the <strong>University</strong>’s environmental performance.<br />

The Items allocated Red status on the Sustainability Plan were discussed:<br />

• Item 2.4 (Skip Management) in the plan will be addressed now the new<br />

permanent Waste and Recycling Supervisor is in post.<br />

• Item 3.5 (Sustainability Resources for Students) was not complete as<br />

resources were diverted to the Grand Challenges project. This was<br />

viewed as a good use <strong>of</strong> resources given the positive sustainability<br />

impact <strong>of</strong> the initiative. It was requested that a footnote describing the<br />

Grand challenges project be included in the final 2011/12 plan.<br />

• Item 5.2 (Car sharing) will have its first phase launched on 1 st October<br />

<strong>2012</strong>. Post meeting note: The programme will be launched on 1 st<br />

November.<br />

4.0 Sustainability Plan <strong>2012</strong>/13<br />

MO invited the group to comment on content and discuss the plan for the coming<br />

year.<br />

PL requested that more detail be provided regarding the relative importance <strong>of</strong><br />

each action and noted it would be helpful to include further narrative within the<br />

criteria.<br />

KG stated that Item 1.3 (Achieving ISO14001) would need to change in <strong>2012</strong>/13<br />

as recent environmental audits had highlighted areas requiring action across<br />

colleges. The present action would only target a single college / service.<br />

5.0 Energy and Water Performance Report (SAG <strong>2012</strong>/13/01)<br />

GW presented the Energy and Water Performance Report. It was highlighted<br />

that carbon dioxide (CO2) emissions are below target and GW is confident that<br />

the Staff Bonus criteria will be triggered.<br />

LK<br />

PM<br />

KG<br />

KG<br />

KG<br />

KG

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!