Arrange the conductive mesh onto the dry base so that no point of the floor covering is more than 7.5 m from the Cu strip. In<br />

smaller rooms, install only one grounding end of the Cu strip. The minimum length of the Cu strip that must be installed into the<br />

<strong>Fatra</strong> – Mapei floor system is 1 m.<br />

Use a brush to apply a thin, approximately 3 cm wide layer of the conductive dispersion adhesive into which the Cu strip will be<br />

pressed. All intersections must be soldered in accordance with section 9.1.1.1. Loose ends of the copper strip fitted with a<br />

disconnectable terminal to check electrical resistance must be connected to the main protective terminal in accordance with the<br />

CSN 33 2000-5-54 standard (Grounding and protective conductors). Once the Cu conductive mesh is installed, measure its<br />

resistance R. The remaining steps are identical to those described in sections 8.4 to 8.9.<br />

9.1.3. <strong>Fatra</strong> – Uzin system<br />

This floor system includes the following components:<br />

• Elektrostatik floor covering<br />

• Cu strip<br />

• Uzin KE2000 SL conductive adhesive<br />

• Uzin-PE260L conductive base coat<br />

• Uzin-NC150 levelling compound<br />

• Bonding primer depending on the base type<br />

9.1.3.1. Installing the conductive mesh<br />

Use a foam plastic roller or a brush to apply a uniform layer of the conductive coat onto the base with the self-levelling<br />

compound. Allow the coat a minimum of 12 hours to dry. Arrange the conductive mesh onto the dry base so that no point of the<br />

floor covering is more than 15 m from the Cu strip. In smaller rooms, install only one grounding end of the Cu strip. The<br />

minimum length of the Cu strip that must be installed into the <strong>Fatra</strong> – Uzin floor system is 1 m.<br />

Use a brush to apply a thin, approximately 3 cm wide layer of the conductive dispersion adhesive into which the Cu strip will be<br />

pressed. All intersections must be soldered in accordance with section 9.1.1.1.<br />

Grounding<br />

Cu strip<br />

30 m 30 m Approx. 300 mm<br />

Loose ends of the copper strip fitted with a disconnectable terminal to check electrical resistance must be connected to the main<br />

protective terminal in accordance with the CSN 33 2000-5-54 standard (Grounding and protective conductors). Once the Cu<br />

conductive mesh is installed, measure its resistance R. The remaining steps are identical to those described in sections 8.4 to<br />

8.9.<br />

9.1.4. <strong>Fatra</strong> – Schönox system<br />

This floor system includes the following components:<br />

• Elektrostatik floor covering<br />

• Cu strip<br />

• Schönox Combileit conductive adhesive<br />

• Schönox SuperPlan self-levelling compound<br />

9.1.4.1. Installing the conductive mesh<br />

Approx. 300 mm<br />

Use a foam plastic roller or a brush to apply a uniform layer of the conductive coat onto the base with the self-levelling<br />

compound. Allow the coat a minimum of 12 hours to dry. Arrange the conductive mesh onto the dry base so that no point of the