9.2.3. <strong>Fatra</strong> – Uzin system<br />
This floor system includes the following components:<br />
• Dynamik floor covering<br />
• Cu strip<br />
• Uzin KE2000 SL conductive adhesive<br />
• Uzin-PE260L conductive base coat<br />
• Uzin-NC150 levelling compound<br />
• Bonding primer depending on the base type<br />
9.2.3.1. Installing the conductive mesh<br />
Use a foam plastic roller or a brush to apply a uniform layer of the conductive coat onto the base with the self-levelling<br />
compound. Allow the coat a minimum of 12 hours to dry. Arrange the conductive mesh onto the dry base so that no point of the<br />
floor covering is more than 15 m from the Cu strip. In smaller rooms, install only one grounding end of the Cu strip. The<br />
minimum length of the Cu strip that must be installed into the <strong>Fatra</strong> – Uzin floor system is 1 m.<br />
Grounding<br />
Cu strip<br />
30 m 30 m Approx. 300 mm<br />
Use a brush to apply a thin, approximately 3 cm wide layer of the conductive dispersion adhesive into which the Cu strip will be<br />
pressed. All intersections must be soldered in accordance with section 9.1.1.1. Loose ends of the copper strip fitted with a<br />
disconnectable terminal to check electrical resistance must be connected to the main protective terminal in accordance with the<br />
CSN 33 2000-5-54 standard (Grounding and protective conductors). Once the Cu conductive mesh is installed, measure its<br />
resistance R. The remaining steps are identical to those described in sections 8.4 to 8.9.<br />
9.2.4. <strong>Fatra</strong> – Schönox system<br />
This floor system includes the following components:<br />
• Dynamik floor covering<br />
• Cu strip<br />
• Schönox Combileit conductive adhesive<br />
• Schönox SuperPlan self-levelling compound<br />
9.2.4.1. Installing the conductive mesh<br />
Approx. 300 mm<br />
Use a foam plastic roller or a brush to apply a uniform layer of the conductive coat onto the base with the self-levelling<br />
compound. Allow the coat a minimum of 12 hours to dry. Arrange the conductive mesh onto the dry base so that no point of the<br />
floor covering is more than 15 m from the Cu strip. In smaller rooms, install only one grounding end of the Cu strip. The<br />
minimum length of the Cu strip that must be installed into the <strong>Fatra</strong> – Schönox floor system is 1 m.<br />
Use a brush to apply a thin, approximately 3 cm wide layer of the conductive dispersion adhesive into which the Cu strip will be<br />
pressed. All intersections must be soldered. Loose ends of the copper strip fitted with a disconnectable terminal to check<br />
electrical resistance must be connected to the main protective terminal in accordance with the CSN 33 2000-5-54 standard<br />
(Grounding and protective conductors). Once the Cu conductive mesh is installed, measure its resistance R. The remaining<br />
steps are identical to those described in sections 8.4 to 8.9.