Lake Nganoke<br />

9. Executive summary<br />

This is a further updated report for Lake Nganoke for the year 2007/08. It is a<br />

follow on report from the report prepared in 2006/07.<br />

Predator control was carried out for only six months of the year. Other work<br />

activities and the owners request not to service the equipment during the<br />

months of May and June were the main reasons for this operation not receiving<br />

the full 12 monthly maintenance rounds.<br />

10. Recommendations<br />

• Continue to carry on with integrated predator control at Lake Nganoke and<br />

service the sites on a monthly basis or as time permits.<br />

11. Objective<br />

• To reduce predator populations to a level that improves and enhances the<br />

management areas biodiversity values.<br />

12. Operational area<br />

The operational area remains unchanged and still covers the same six hectares<br />

of Lake Nganoke and the adjacent Turanganui wetland.<br />

12.1 Traps and bait stations<br />

Fenn traps and Sentry bait stations continue to be used at Lake Nganoke, but<br />

many were changed during the year as they had exceeded their use-by dates.<br />

Prolonged submerged periods at times of high water had rusted some Fenns,<br />

making then unsuitable for continued use. Bait stations were breaking down<br />

due to over exposure to the suns ultra violet rays.<br />

There are still 16 control sites in place around both wetland areas.<br />

13. Operational results<br />

Operational results are listed on a monthly basis as follows and are valid until<br />

the end of June 2008.<br />

Month Rat Hedgehog Cat Mice<br />

July 0 12 2 0<br />

August 0 4 1 0<br />

November 1 11 0 1<br />

January 2 15 1 0<br />

March 3 8 2 0<br />

April 0 2 1 0<br />

Total 6 52 7 1<br />

Total amount of Pestoff used was 4kg.<br />

WGN_DOCS-#609098-V1 PAGE 11 OF 44