Voorbereidingsdagen 2004 19-20 augustus 2004 - cigre
Voorbereidingsdagen 2004 19-20 augustus 2004 - cigre
Voorbereidingsdagen 2004 19-20 augustus 2004 - cigre
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
leesadvies PS1 :<br />
• B3-106 A new solution for space saving of substations in<br />
Tehran Regional Electric Company<br />
– Special reporter Question 1.6:<br />
– However are there examples of projects, where such a solution does not work?<br />
– What about the cost-effectiveness of integration of substations and lines into the<br />
geographic service area?<br />
– Are these applications with reduced footprint also of interest, even if there is<br />
enough space available?<br />
• B3-107 The challenge for busbar disconnectors of gas<br />
insulated switchgear (GIS) in a 4<strong>20</strong>kV mixed technology<br />
(Hybrid) substation<br />
– Special reporter Question 1.7:<br />
– Are there already experiences with such mixed solution installations in this<br />
regard?<br />
– What have manufacturers done or plan to solve these problems?<br />
– Are there other problems to be expected, if AIS equipment and MTS equipment<br />
are mixed within a common substation?<br />
23