leesadvies PS1 :<br />

• B3-106 A new solution for space saving of substations in<br />

Tehran Regional Electric Company<br />

– Special reporter Question 1.6:<br />

– However are there examples of projects, where such a solution does not work?<br />

– What about the cost-effectiveness of integration of substations and lines into the<br />

geographic service area?<br />

– Are these applications with reduced footprint also of interest, even if there is<br />

enough space available?<br />

• B3-107 The challenge for busbar disconnectors of gas<br />

insulated switchgear (GIS) in a 4<strong>20</strong>kV mixed technology<br />

(Hybrid) substation<br />

– Special reporter Question 1.7:<br />

– Are there already experiences with such mixed solution installations in this<br />

regard?<br />

– What have manufacturers done or plan to solve these problems?<br />

– Are there other problems to be expected, if AIS equipment and MTS equipment<br />

are mixed within a common substation?<br />