03.09.2013 Views

Voorbereidingsdagen 2004 19-20 augustus 2004 - cigre

Voorbereidingsdagen 2004 19-20 augustus 2004 - cigre

Voorbereidingsdagen 2004 19-20 augustus 2004 - cigre

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

PS1: Advances in substations<br />

technologies<br />

• Substations in case of stronger constraints with<br />

respect to footprint and environment<br />

• (severe climatic conditions and public amenity)<br />

• EHV/UHV substations<br />

• Design and construction of substations for<br />

offshore wind farms<br />

• Design of GIL for bulk power transmission<br />

7

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!