MODEL ESTIMATE<br />

Name <strong>of</strong> Work : Construction <strong>of</strong> Earthen Bund in Arable Land<br />

Length = 1.00M<br />

Top Width = 0.60 M<br />

Bottom Width = 2.40 M<br />

Height <strong>of</strong> Bund = 0.60 M<br />

Side slope U/s D/s = 1.5:1<br />

Cross Section <strong>of</strong> Bund = 0.90 sqm<br />

S.No. Item Qty. Rate Amount<br />

1 Dag belling 5 to 7 cm deep 2x1.00=2.00m 2.00 0.44*135 /Rmt 1.98<br />

2 Jungle clearance ordinary 1.00x6.00=6.00sqm 6.00 1.40 s/qm 8.40<br />

3 Earth work for Bund/Embankment in dry or moist 0.90 85.00 /Cum 76.50<br />

Soil C/C Laying layers <strong>of</strong> 15 cms breaking <strong>of</strong><br />

clods, sorting <strong>of</strong> grassp bebbles etc. & dressing<br />

in required pr<strong>of</strong>ile when compacted manually<br />

or by plain roller with in initial lead <strong>of</strong> 50 mtr &<br />

lift 1.5 M for Hard Soil.<br />

4 Sowing <strong>of</strong> castor seed by notching or dibbling 2.00 0.59 M 1.18<br />

on the bund at spacing <strong>of</strong> 0.50 M.<br />

5 Cost <strong>of</strong> Seed Dhaman/stylo hemeta & Castor L.S. 0.55<br />

TOTAL 88.61<br />

Add 3% Contengency 2.66<br />

60<br />

Rs. 91.27<br />

Say 91/-Per<br />

Rmt