• BOF modernization to produce the liquid steel volume<br />
required to meet our production targets.<br />
• Calcination Plant No.8 construction to supply calcine<br />
needed to reach our production output targets.<br />
• Scrap Preparation Plant construction to prepare scrap<br />
metal for use in the BOF when that modernization project<br />
is completed.<br />
• New Slab Casting Plant No.2, which has the same<br />
capacity as Slab Casting Plant No.1.<br />
• Slab Heating Furnaces No.1 and 2 construction to supply<br />
the new flat steel Hot Strip Mills with pre-heated slabs.<br />
• Hot Shearing and Slitting Lines construction to custom<br />
cut flat steel coils to the sizes required by our customers.<br />
• Steam Boilers No.6 and 7 construction to meet increased<br />
steam consumption needs as result of production output<br />
increases.<br />
• Turbo Generator modernization in the steam regulation<br />
and automation systems to reduce steam used per unit<br />
of electricity generated.<br />
• Construction and installation of a new 380 kV main<br />
transmission line from Erzin to Iskenderun (the ETL line)<br />
and accompanying Switching Plant to meet higher energy<br />
consumption needs resulting from the plant’s capacity<br />
and product portfolio expansion.<br />
• Air Separation Plant No.7 construction to meet our<br />
oxygen, nitrogen and argon consumption requirements,<br />
in line with plant expansion.<br />
New Hot Strip Mill construction at our ‹skenderun plant,<br />
the core investment in transforming the facility for<br />
manufacturing flat steel products, reached its final stage<br />
and is expected to become operational by spring of<br />
2008.<br />
Investments in Mining<br />
Steel producers with access to their own dedicated<br />
iron ore resources enjoy competitive advantage in the<br />
current market environment of ever increasing raw<br />
material costs and supply bottlenecks. Taking this fact<br />
into consideration, Erdemir Group’s mining arm obviously<br />
plays a very strategic role for sustaining our Group’s<br />
success with its 14 separate iron ore mines, producing<br />
50% of domestic iron ore output and operating the<br />
only pelletizing plant in Turkey.<br />
We plan to strengthen our backward integrated position<br />
by adding a new pelletizing plant at Hasançelebi, with<br />
2,0 million tons per annum pellet output. Engineering<br />
and design is already complete for this investment and<br />
the plant is expected to commence operation in 2010,<br />
significantly reducing both our risk to external supply<br />
shocks and our raw material costs.<br />
Investments at Romania Plant<br />
Brand new Continuous Annealing Furnace No.2 and<br />
Slitting Line were installed and commenced operations<br />
at our plant in Romania during 2007.<br />
Investments at K›r›kkale Plant<br />
A wide range of modernization projects were undertaken<br />
at our pipe manufacturing facility at K›r›kkale during<br />
2007.<br />