• BOF modernization to produce the liquid steel volume<br />

required to meet our production targets.<br />

• Calcination Plant No.8 construction to supply calcine<br />

needed to reach our production output targets.<br />

• Scrap Preparation Plant construction to prepare scrap<br />

metal for use in the BOF when that modernization project<br />

is completed.<br />

• New Slab Casting Plant No.2, which has the same<br />

capacity as Slab Casting Plant No.1.<br />

• Slab Heating Furnaces No.1 and 2 construction to supply<br />

the new flat steel Hot Strip Mills with pre-heated slabs.<br />

• Hot Shearing and Slitting Lines construction to custom<br />

cut flat steel coils to the sizes required by our customers.<br />

• Steam Boilers No.6 and 7 construction to meet increased<br />

steam consumption needs as result of production output<br />

increases.<br />

• Turbo Generator modernization in the steam regulation<br />

and automation systems to reduce steam used per unit<br />

of electricity generated.<br />

• Construction and installation of a new 380 kV main<br />

transmission line from Erzin to Iskenderun (the ETL line)<br />

and accompanying Switching Plant to meet higher energy<br />

consumption needs resulting from the plant’s capacity<br />

and product portfolio expansion.<br />

• Air Separation Plant No.7 construction to meet our<br />

oxygen, nitrogen and argon consumption requirements,<br />

in line with plant expansion.<br />

New Hot Strip Mill construction at our ‹skenderun plant,<br />

the core investment in transforming the facility for<br />

manufacturing flat steel products, reached its final stage<br />

and is expected to become operational by spring of<br />

2008.<br />

Investments in Mining<br />

Steel producers with access to their own dedicated<br />

iron ore resources enjoy competitive advantage in the<br />

current market environment of ever increasing raw<br />

material costs and supply bottlenecks. Taking this fact<br />

into consideration, Erdemir Group’s mining arm obviously<br />

plays a very strategic role for sustaining our Group’s<br />

success with its 14 separate iron ore mines, producing<br />

50% of domestic iron ore output and operating the<br />

only pelletizing plant in Turkey.<br />

We plan to strengthen our backward integrated position<br />

by adding a new pelletizing plant at Hasançelebi, with<br />

2,0 million tons per annum pellet output. Engineering<br />

and design is already complete for this investment and<br />

the plant is expected to commence operation in 2010,<br />

significantly reducing both our risk to external supply<br />

shocks and our raw material costs.<br />

Investments at Romania Plant<br />

Brand new Continuous Annealing Furnace No.2 and<br />

Slitting Line were installed and commenced operations<br />

at our plant in Romania during 2007.<br />

Investments at K›r›kkale Plant<br />

A wide range of modernization projects were undertaken<br />

at our pipe manufacturing facility at K›r›kkale during<br />

2007.<br />

40