Sustainability Report 2011 - Balfour Beatty Rail
Sustainability Report 2011 - Balfour Beatty Rail
Sustainability Report 2011 - Balfour Beatty Rail
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Profitable markets<br />
Influencing for sustainability<br />
38<br />
The bridge<br />
of the future<br />
Keeping New Zealand<br />
Beautiful<br />
Specially designed electricity transmission towers<br />
constructed by <strong>Balfour</strong> <strong>Beatty</strong> Utility Solutions for use<br />
in environmentally sensitive areas on North Island,<br />
New Zealand.<br />
balfourbeatty.com/sustainability<br />
Blackfriars Station is the first station to span the River<br />
Thames as part of the London Thameslink upgrade.<br />
The bridge itself is fitted with 1MW of photovoltaic<br />
panels providing 50% of the station’s annual energy<br />
needs while allowing for larger trains to help cut<br />
congestion at peak times.<br />
balfourbeatty.com/sustainability<br />
<strong>Balfour</strong> <strong>Beatty</strong> <strong>Sustainability</strong> <strong>Report</strong> <strong>2011</strong>