Dredge Management Guidelines - the BIEAP and FREMP Website
Dredge Management Guidelines - the BIEAP and FREMP Website
Dredge Management Guidelines - the BIEAP and FREMP Website
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
In ei<strong>the</strong>r case, <strong>the</strong> proponent is responsible for:<br />
■ identifying, through <strong>the</strong> pre-application process, that a sustainable s<strong>and</strong> load is available for<br />
removal;<br />
■ demonstrating that <strong>the</strong> project meets <strong>the</strong> applicable guidelines intended to ensure mitigation of<br />
negative environmental impacts;<br />
■ ensuring that <strong>the</strong> material meets <strong>the</strong> applicable st<strong>and</strong>ards for transfer pit storage, upl<strong>and</strong> use,<br />
<strong>and</strong>/or ocean disposal as required <strong>and</strong> obtaining applicable disposal permits;<br />
■ ensuring that all necessary permits have been received prior to commencement of dredging;<br />
■ ensuring that dredging does not compromise <strong>the</strong> structural integrity of dykes, utility crossings <strong>and</strong><br />
bridge abutments; <strong>and</strong><br />
■ ensuring that municipal regulations regarding upl<strong>and</strong> disposal <strong>and</strong> return-water routing are met.<br />
A list of relevant guidelines <strong>and</strong> requirements can be found in <strong>the</strong> Appendices as follows:<br />
Map/Appendix<br />
Map 1<br />
Maps 2-6<br />
Appendix 1<br />
Appendix 2<br />
Appendix 3<br />
Appendix 4<br />
Appendix 5<br />
Appendix 6<br />
Appendix 7<br />
Appendix 8<br />
Appendix 9<br />
Appendix 10<br />
Appendix 11<br />
22 Part 3: The Application Process<br />
Title<br />
Agency Jurisdiction(s)<br />
Deep Sea Channel Navigation Maps<br />
Project Review in <strong>the</strong> Fraser River Estuary<br />
Environmental Dredging <strong>Guidelines</strong> for <strong>the</strong> Lower<br />
Fraser<br />
Transfer Pit Operating <strong>Guidelines</strong><br />
Upl<strong>and</strong> Disposal Requirements<br />
Ocean Disposal Contaminants Testing <strong>Guidelines</strong><br />
Hydrographic Survey <strong>Guidelines</strong><br />
Hydraulic Study <strong>Guidelines</strong><br />
Future Habitat Inventory Requirements<br />
Particle Size Analysis <strong>Guidelines</strong><br />
<strong>Dredge</strong> <strong>Management</strong> Advisory Committee Terms of<br />
Reference<br />
Dredging Application Form