22.10.2013 Views

Dredge Management Guidelines - the BIEAP and FREMP Website

Dredge Management Guidelines - the BIEAP and FREMP Website

Dredge Management Guidelines - the BIEAP and FREMP Website

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

In ei<strong>the</strong>r case, <strong>the</strong> proponent is responsible for:<br />

■ identifying, through <strong>the</strong> pre-application process, that a sustainable s<strong>and</strong> load is available for<br />

removal;<br />

■ demonstrating that <strong>the</strong> project meets <strong>the</strong> applicable guidelines intended to ensure mitigation of<br />

negative environmental impacts;<br />

■ ensuring that <strong>the</strong> material meets <strong>the</strong> applicable st<strong>and</strong>ards for transfer pit storage, upl<strong>and</strong> use,<br />

<strong>and</strong>/or ocean disposal as required <strong>and</strong> obtaining applicable disposal permits;<br />

■ ensuring that all necessary permits have been received prior to commencement of dredging;<br />

■ ensuring that dredging does not compromise <strong>the</strong> structural integrity of dykes, utility crossings <strong>and</strong><br />

bridge abutments; <strong>and</strong><br />

■ ensuring that municipal regulations regarding upl<strong>and</strong> disposal <strong>and</strong> return-water routing are met.<br />

A list of relevant guidelines <strong>and</strong> requirements can be found in <strong>the</strong> Appendices as follows:<br />

Map/Appendix<br />

Map 1<br />

Maps 2-6<br />

Appendix 1<br />

Appendix 2<br />

Appendix 3<br />

Appendix 4<br />

Appendix 5<br />

Appendix 6<br />

Appendix 7<br />

Appendix 8<br />

Appendix 9<br />

Appendix 10<br />

Appendix 11<br />

22 Part 3: The Application Process<br />

Title<br />

Agency Jurisdiction(s)<br />

Deep Sea Channel Navigation Maps<br />

Project Review in <strong>the</strong> Fraser River Estuary<br />

Environmental Dredging <strong>Guidelines</strong> for <strong>the</strong> Lower<br />

Fraser<br />

Transfer Pit Operating <strong>Guidelines</strong><br />

Upl<strong>and</strong> Disposal Requirements<br />

Ocean Disposal Contaminants Testing <strong>Guidelines</strong><br />

Hydrographic Survey <strong>Guidelines</strong><br />

Hydraulic Study <strong>Guidelines</strong><br />

Future Habitat Inventory Requirements<br />

Particle Size Analysis <strong>Guidelines</strong><br />

<strong>Dredge</strong> <strong>Management</strong> Advisory Committee Terms of<br />

Reference<br />

Dredging Application Form

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!