Dredge Management Guidelines - the BIEAP and FREMP Website
Dredge Management Guidelines - the BIEAP and FREMP Website
Dredge Management Guidelines - the BIEAP and FREMP Website
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
3<br />
4<br />
6<br />
9<br />
9<br />
9<br />
10<br />
10<br />
11<br />
11<br />
11<br />
15<br />
15<br />
16<br />
16<br />
16<br />
19<br />
19<br />
20<br />
21<br />
21<br />
25<br />
27<br />
37<br />
41<br />
43<br />
45<br />
47<br />
53<br />
55<br />
57<br />
59<br />
61<br />
63<br />
Table of Contents<br />
Glossary<br />
Acronyms<br />
Part 1: Introduction<br />
The Fraser River<br />
The Fraser River Estuary <strong>Management</strong> Program <strong>and</strong> <strong>the</strong> Estuary <strong>Management</strong> Plan<br />
The Rise of Dredging as an issue<br />
Guiding Principles for Dredging Task Group<br />
Task Group conclusions<br />
Purpose of this document<br />
Structure of this document<br />
How this document will affect dredging projects<br />
Part 2: The Fraser River Sediment Budget <strong>and</strong> S<strong>and</strong> Registry<br />
What is a Sediment Budget?<br />
The area <strong>the</strong> Budget covers<br />
How <strong>the</strong> Budget is determined<br />
What is <strong>the</strong> S<strong>and</strong> Registry <strong>and</strong> what is its role?<br />
What <strong>the</strong> Registry Contains<br />
Part 3: The Application Process<br />
Dredging <strong>and</strong> Project Review in <strong>the</strong> Estuary<br />
Overview<br />
Project Review Process for Dredging<br />
Engaging in <strong>the</strong> Project Review Process<br />
Application requirements<br />
Appendices<br />
Map 1 Agency Jurisdictions<br />
Map 2 to 6 Deep Sea Navigation Channel Maps<br />
Appendix 1 Project Review in <strong>the</strong> Fraser River Estuary<br />
Appendix 2 Environmental Dredging <strong>Guidelines</strong> for <strong>the</strong> Lower Fraser<br />
Appendix 3 Fraser River Port Authority Transfer Pit Operating <strong>Guidelines</strong><br />
Appendix 4 Upl<strong>and</strong> Disposal Requirements<br />
Appendix 5 Interim Contaminant Testing <strong>Guidelines</strong> For Ocean Disposal, Pacific <strong>and</strong> Yukon Region<br />
Appendix 6 Fraser River Hydrographic Survey <strong>Guidelines</strong><br />
Appendix 7 Fraser River Hydraulic Study Requirements<br />
Appendix 8 Future Habitat Inventory Requirements<br />
Appendix 9 Particle Size Analysis <strong>Guidelines</strong><br />
Appendix 10 <strong>Dredge</strong> <strong>Management</strong> Advisory Committee Terms of Reference<br />
Appendix 11 Dredging Application Form