29. Sub-component IIc: Develop and Strengthen Irrigation and Drainage Institutions (<strong>GAFSP</strong><br />
contribution of USD 2.33 million and IDA contribution USD 2.33 million). The project will assist the<br />
GoT to: (i) build independent, financially-autonomous irrigation and drainage service providers<br />
responsible for the management and maintenance of off-farm irrigation and drainage infrastructure and<br />
for water delivery to water user associations; (ii) support the transformation of existing region and<br />
district level institutions into the new institutional framework; and (iii) establish and strengthen the<br />
capacity of these institutions through provision of technical assistance, goods, works and training.<br />
30. Component III: <strong>Project</strong> Management (<strong>GAFSP</strong> financing of USD 2.01 million). A project<br />
management unit (PMU) to be managed under the <strong>World</strong> <strong>Bank</strong>-financed Ferghana Valley Water<br />
Resource Management project will be the main implementation agency. It will be responsible for:<br />
implementation and coordination, financial management and procurement, communication and<br />
awareness programs, environmental management and safeguards, and monitoring and evaluation.<br />
B. <strong>Project</strong> Financing<br />
Lending Instrument<br />
31. A USD 18.00 million equivalent IDA-funded Specific Investment Loan (SIL) and a USD 27.90<br />
million <strong>GAFSP</strong> Recipient Executed Grant are proposed. The project will be processed through IDA<br />
and <strong>GAFSP</strong> procedures.<br />
<strong>Project</strong> Cost and Financing<br />
32. The project will be financed by grants from the IDA and the Global Agriculture and Food<br />
Security Program (<strong>GAFSP</strong>) Trust fund.<br />
<strong>Project</strong> Components<br />
1. Rehabilitation of Irrigation and<br />
Drainage Infrastructure.<br />
1a: Public Works<br />
1b: Mechanized and other works<br />
1c: Emergency Flood Control<br />
2. Assistance in water resources<br />
management, including technical<br />
assistance for policy and institutional<br />
reform.<br />
2a: Country Level Reform<br />
2b: River Basin Planning<br />
2c: Develop and Strengthen I&D<br />
Institutions<br />
3. <strong>Project</strong> Implementation<br />
Total Baseline Costs<br />
Physical contingencies<br />
Price contingencies<br />
<strong>Project</strong> cost (US$<br />
equivalent)<br />
31.74<br />
8.91<br />
19.88<br />
2.95<br />
7.54<br />
2.20<br />
1.00<br />
4.34<br />
1.88<br />
41.16<br />
1.52<br />
3.22<br />
7<br />
<strong>GAFSP</strong><br />
Financing<br />
19.35<br />
8.91<br />
10.44<br />
0.00<br />
3.77<br />
1.10<br />
0.50<br />
2.17<br />
1.88<br />
25.00<br />
0.92<br />
1.98<br />
IDA Financing<br />
(US$ equivalent)<br />
12.39<br />
0.00<br />
9.44<br />
2.95<br />
3.77<br />
1.10<br />
0.50<br />
2.17<br />
0.00<br />
16.16<br />
0.60<br />
1.24<br />
% IDA-<strong>GAFSP</strong><br />
Financing<br />
100.0<br />
100.0<br />
100.0<br />
100.0<br />
100.0<br />
100.0<br />
100.0<br />
100.0<br />
100.0<br />
100.0<br />
100.0<br />
100.0<br />
100.0