29. Sub-component IIc: Develop and Strengthen Irrigation and Drainage Institutions (<strong>GAFSP</strong><br />

contribution of USD 2.33 million and IDA contribution USD 2.33 million). The project will assist the<br />

GoT to: (i) build independent, financially-autonomous irrigation and drainage service providers<br />

responsible for the management and maintenance of off-farm irrigation and drainage infrastructure and<br />

for water delivery to water user associations; (ii) support the transformation of existing region and<br />

district level institutions into the new institutional framework; and (iii) establish and strengthen the<br />

capacity of these institutions through provision of technical assistance, goods, works and training.<br />

30. Component III: <strong>Project</strong> Management (<strong>GAFSP</strong> financing of USD 2.01 million). A project<br />

management unit (PMU) to be managed under the <strong>World</strong> <strong>Bank</strong>-financed Ferghana Valley Water<br />

Resource Management project will be the main implementation agency. It will be responsible for:<br />

implementation and coordination, financial management and procurement, communication and<br />

awareness programs, environmental management and safeguards, and monitoring and evaluation.<br />

B. <strong>Project</strong> Financing<br />

Lending Instrument<br />

31. A USD 18.00 million equivalent IDA-funded Specific Investment Loan (SIL) and a USD 27.90<br />

million <strong>GAFSP</strong> Recipient Executed Grant are proposed. The project will be processed through IDA<br />

and <strong>GAFSP</strong> procedures.<br />

<strong>Project</strong> Cost and Financing<br />

32. The project will be financed by grants from the IDA and the Global Agriculture and Food<br />

Security Program (<strong>GAFSP</strong>) Trust fund.<br />

<strong>Project</strong> Components<br />

1. Rehabilitation of Irrigation and<br />

Drainage Infrastructure.<br />

1a: Public Works<br />

1b: Mechanized and other works<br />

1c: Emergency Flood Control<br />

2. Assistance in water resources<br />

management, including technical<br />

assistance for policy and institutional<br />

reform.<br />

2a: Country Level Reform<br />

2b: River Basin Planning<br />

2c: Develop and Strengthen I&D<br />

Institutions<br />

3. <strong>Project</strong> Implementation<br />

Total Baseline Costs<br />

Physical contingencies<br />

Price contingencies<br />

<strong>Project</strong> cost (US$<br />

equivalent)<br />

31.74<br />

8.91<br />

19.88<br />

2.95<br />

7.54<br />

2.20<br />

1.00<br />

4.34<br />

1.88<br />

41.16<br />

1.52<br />

3.22<br />

7<br />

<strong>GAFSP</strong><br />

Financing<br />

19.35<br />

8.91<br />

10.44<br />

0.00<br />

3.77<br />

1.10<br />

0.50<br />

2.17<br />

1.88<br />

25.00<br />

0.92<br />

1.98<br />

IDA Financing<br />

(US$ equivalent)<br />

12.39<br />

0.00<br />

9.44<br />

2.95<br />

3.77<br />

1.10<br />

0.50<br />

2.17<br />

0.00<br />

16.16<br />

0.60<br />

1.24<br />

% IDA-<strong>GAFSP</strong><br />

Financing<br />

100.0<br />

100.0<br />

100.0<br />

100.0<br />

100.0<br />

100.0<br />

100.0<br />

100.0<br />

100.0<br />

100.0<br />

100.0<br />

100.0<br />

100.0