23.10.2013 Views

World Bank Project Appraisal Document - GAFSP

World Bank Project Appraisal Document - GAFSP

World Bank Project Appraisal Document - GAFSP

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Annex 1: Results Framework and Monitoring<br />

TAJIKISTAN: SECOND PUBLIC EMPLOYMENT FOR SUSTAINABLE AGRICULTURE AND WATER MANAGEMENT<br />

PROJECT<br />

Results Framework<br />

<strong>Project</strong> Development Objective: The project development objectives are to (i) provide employment to food-insecure people through the rehabilitation of irrigation and drainage infrastructure,<br />

(ii) increase crop production in response to improved irrigation and drainage infrastructure, and (iii) support the development of improved policies and institutions for water resource management<br />

as a means to improve food availability and food access for low-income people in poor rural areas supported by the project.<br />

PDO level results<br />

indicators Core<br />

Indicator One: Direct<br />

project beneficiaries,<br />

disaggregated by gender<br />

Indicator Two: Persondays<br />

worked, disaggregated<br />

by gender, vulnerable group<br />

Indicator Three: Increase<br />

in cereal, food and fodder<br />

crop yield on rehabilitated<br />

irrigated land<br />

Indicator Four:<br />

Operational water user<br />

associations created and/or<br />

strengthened (number)<br />

Indicator Five: National<br />

IWRM strategy prepared<br />

and agreed with MAWRM<br />

Indicator Six: The<br />

Kafernigan River Basin<br />

Plan prepared and agreed<br />

with the MAWRM<br />

X<br />

X<br />

Unit of measure Baseline<br />

No. benefic.<br />

- % women<br />

No. person-days<br />

- # women<br />

- # severely foodinsecure<br />

% change<br />

Number<br />

- WUAs created<br />

- WUAs<br />

strengthened<br />

Zero<br />

Zero<br />

N/A<br />

Zero<br />

Yes/No No<br />

Cumulative target values** Frequency<br />

YR 1 YR 2 YR3 YR 4 YR 5<br />

221,000<br />

-10<br />

120,000<br />

- 18,000<br />

- 24,000<br />

No<br />

changes<br />

are<br />

expected<br />

17<br />

-0<br />

-17<br />

Work in<br />

progress<br />

513,974<br />

-10<br />

318,960<br />

- 47,844<br />

- 63,792<br />

17<br />

714,413<br />

-10<br />

497,920<br />

- 74,688<br />

- 99,584<br />

769,064<br />

-10<br />

763,960<br />

- 114,594<br />

- 152.792<br />

- 7 -<br />

46<br />

-5<br />

-41<br />

First<br />

draft<br />

IWRM<br />

strategy<br />

prepared<br />

80<br />

-15<br />

-65<br />

Final<br />

IWRM<br />

strategy<br />

agreed<br />

with<br />

MAWRM<br />

95<br />

-20<br />

-75<br />

Final<br />

IWRM<br />

strategy<br />

agreed<br />

with<br />

MAWRM<br />

Yes/No No No No Yes Yes<br />

772,000<br />

- 10<br />

880,000<br />

- 132 000<br />

- 176 000<br />

- 20<br />

- 75<br />

10<br />

95<br />

Semiannually<br />

Semiannually<br />

At end of<br />

project;<br />

Annual trends<br />

Semiannually<br />

Yes Annually<br />

The Kafernigan<br />

River Basin Plan<br />

prepared and<br />

agreed with the<br />

MAWRM<br />

Annually<br />

Data source/<br />

methodology<br />

Monthly PMU<br />

Monitoring<br />

reports<br />

Monthly PMU<br />

monitoring<br />

reports<br />

Household<br />

survey;<br />

Secondary data<br />

(jamoat)<br />

Semiannual<br />

reports<br />

Semiannual<br />

PMU Progress<br />

Reports<br />

Semiannual<br />

PMU Progress<br />

Reports<br />

Responsibility<br />

for Data<br />

Collection<br />

PMU<br />

PMU<br />

PMU<br />

PMU<br />

PMU<br />

PMU

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!