FC-1 AND FC-2<br />

FILL ILL-UP UP AND<br />

CIRCULATING<br />

IRCULATING TOOL OOL<br />

FACTS<br />

FILL ILL-UP UP AND<br />

CEMENTING<br />

EMENTING TOOL OOL<br />

SYSTEM YSTEM


FC-1 FILL FILL-UP<br />

UP &<br />

CIRCULATING IRCULATING TOOL OOL<br />

WITH SLIDING LIDING SLEEVE LEEVE<br />

BENEFITS & FEATURES<br />

Fill-<strong>up</strong> is accomplished by pumping through the top drive. Hoses or<br />

conventional accessories are NOT required.<br />

Fill-<strong>up</strong> can be accomplished while casing is run. No shutdown is required.<br />

Circulation is accomplished by slacking down to place the FC-1 seal inside<br />

the casing.<br />

Circulation can be achieved while washing down <strong>with</strong>out accessory rig-<strong>up</strong>.<br />

The Mud Saver Valve eliminates spilling of costly drilling fluids after <strong>fill</strong> or<br />

circulation.<br />

Rig time is saved by performing both <strong>fill</strong>-<strong>up</strong> and circulation <strong>with</strong>out rigging<br />

<strong>up</strong> accessories.<br />

Safety is improved as rig hands are not near pressure lines or valves while<br />

<strong>fill</strong>ing or <strong>circulating</strong>.<br />

Operation does not require axial movement to actuate the Mud Saver valve.<br />

For more information call 1-800-833-7265 or e-mail info@frankscasing.com<br />

www.frankscasing.com<br />

Copyright ª 2003 Frank’s Casing Crew & Rental Tools, Inc., Lafayette, LA


FC-1<br />

Rigged Up<br />

FC-1 Rigged Up<br />

This drawing drawing above shows<br />

the <strong>tool</strong> connected to the top drive.<br />

Spacer joints space the <strong>tool</strong> out so<br />

that the packer c<strong>up</strong> is just above the<br />

elevator. The FC-1 has an armour<br />

flex-hose to help guide the <strong>tool</strong> into<br />

the pipe.<br />

FC-1<br />

Filling Up<br />

FC-1 Filling Up<br />

This drawing shows the elevator<br />

set on the pipe in the normal position.<br />

Notice that the packer c<strong>up</strong> is<br />

still above the collar of the pipe.<br />

This is the position used for <strong>fill</strong>ing<br />

the pipe. Filling may begin as<br />

soon as the elevator is set.<br />

For more information call 1-800-833-7265 or e-mail info@frankscasing.com<br />

www.frankscasing.com<br />

Copyright ª 2003 Frank’s Casing Crew & Rental Tools, Inc., Lafayette, LA<br />

FC-1<br />

Circulating<br />

FC-1 Circulating<br />

The drawing above depicts the FC-1<br />

ready to circualte. The elevator has<br />

been released and lowered, allowing<br />

the packer c<strong>up</strong> to enter the pipe.<br />

Once the slips are set on the<br />

elevator, circulation can begin.


Frank’s FC-1 and FC-2 offers Flexibility<br />

Fill-<strong>up</strong> and Circulating Tool<br />

- 4-1/2” to 26” <strong>fill</strong>-<strong>up</strong> and <strong>circulating</strong> capablitites, any weights and thread.<br />

- Top drive or hook rigs can be accommodated.<br />

FC-2 Fill-<strong>up</strong> and Circulating Tool<br />

- The FC-1 Tool can be used on rigs NOT equipped <strong>with</strong> at top drive drilling system<br />

through the use of an “Adapter Assembly.”<br />

Fill-<strong>up</strong> and Circulating Tool <strong>with</strong> Torque Sub Applications<br />

- 4-1/2” to 13-5/8” casing <strong>fill</strong>-<strong>up</strong> and <strong>circulating</strong> capabilities <strong>with</strong> the additional benefit<br />

of connecting the casing directly to the top drive to rotate and reciprocate the<br />

casing string.<br />

Side Port Entry Sub<br />

- For top drive rigs that can not use the kelly hose when running casing. Allows 2”<br />

mud s<strong>up</strong>ply hose to be conected to the FC-1 <strong>tool</strong> for casing <strong>fill</strong>-<strong>up</strong> and <strong>circulating</strong>.<br />

Also maybe used on Flow-back jobs, where flowing back through the top drive<br />

cause a restriction.<br />

Fill-<strong>up</strong> and Circulating Tool <strong>with</strong> Push Down Plate<br />

- 4-1/2” to 26” casing <strong>fill</strong>-<strong>up</strong> and <strong>circulating</strong> cababilities, <strong>with</strong> the added benefit of<br />

being able to apply the weight of the top drive / hook directly to the casing string.<br />

This aids in pushing the casing pass obstructions and / or dog legs.<br />

Flow Back Tool Application<br />

- 4-1/2” to 26” casing reverse flow capablities, can transfer fluid for the casing<br />

annulus back to the mud pits as the casings is lower into the hole. For tie-backs in<br />

cased hole applications.<br />

Flow Back and Circulating Applications<br />

- 4-1/2” to 26” casing reverse flow capablities and <strong>circulating</strong> conditions for well<br />

control problems on liners, and full strings <strong>with</strong> sensitive pressure gradients.<br />

Sliding Sleeve Accessory<br />

- Unique pressure bypass mandrel eliminates the possibility of pulling the seal<br />

under pressure, increases Mud Saver Valve life and circulation rates.<br />

Fill-<strong>up</strong>, Circulating, and Cementing Tool Applications<br />

- 7” to 20” <strong>fill</strong>-<strong>up</strong> and <strong>circulating</strong> during casing operations and converts to cementing<br />

operations.<br />

Tie-back Pressure Test Applications<br />

- 4-1/2” to 26” casing pressure test on tie-backs, economical on batch jobs <strong>with</strong><br />

multiple casing sizes and multiple wells.<br />

Stab-in Cementing Pack Off Tool<br />

- 9-5/8” to 26” casing <strong>fill</strong>-<strong>up</strong> and <strong>circulating</strong> on casing running operations for Tag-in<br />

jobs and then may be used to pressurize the casing annulus for setting external<br />

casing packer.<br />

For more information call 1-800-833-7265 or e-mail info@frankscasing.com<br />

www.frankscasing.com<br />

Copyright ª 2003 Frank’s Casing Crew & Rental Tools, Inc., Lafayette, LA


Figure 1<br />

Frank’s Fill-<strong>up</strong> <strong>tool</strong> dressed for a<br />

standard Fill-<strong>up</strong> <strong>tool</strong> job. Note the<br />

new equalizer sub (shown in red)<br />

which has a flow area of a full<br />

7-1/5”. Once the stand pipe is<br />

opened, this valve automatically<br />

equalizes any pressure which<br />

may be trapped under the c<strong>up</strong>.<br />

Valve open<br />

during flowback<br />

Figure 2<br />

The flowback valve placed in a<br />

short hose and attached to the<br />

bottom of a flow back <strong>tool</strong>.<br />

Because the valve opens only one<br />

way, mud flows back <strong>up</strong> inside of<br />

the casing to be retreived through<br />

the top drive and into the mud pit.<br />

In order to trap any fluid which may<br />

be flowing back, the FC-1 is<br />

dressed out long enough to stab<br />

into the casing each time.<br />

Valve closed<br />

during circulation<br />

For more information call 1-800-833-7265 or e-mail info@frankscasing.com<br />

www.frankscasing.com<br />

Copyright ª 2003 Frank’s Casing Crew & Rental Tools, Inc., Lafayette, LA<br />

Figure 3<br />

Once the <strong>tool</strong> is picked <strong>up</strong> out of<br />

the casing, the flowback valve<br />

automatically closes. When this<br />

happens, mud will not leak out of<br />

the <strong>tool</strong> or top drive. Because this<br />

is a one-way valve, circulation is<br />

possible only if the <strong>tool</strong> is dressed<br />

<strong>with</strong> a <strong>sliding</strong> <strong>sleeve</strong> as shown<br />

above. If the <strong>sliding</strong> <strong>sleeve</strong> is not in<br />

place and circulation is required,<br />

the valve must be removed.


FACTS TM FILL ILL-UP<br />

SYSTEM YSTEM<br />

& CEMENTING<br />

EMENTING TOOL OOL<br />

UP & C<br />

The FACTS TM . . .<br />

Frank’s has made cementing operations safer. Frank’s<br />

innovative FC-1 Fill-Up Tool and unique cementing<br />

adapter <strong>with</strong> remote ball dropping mechanism has<br />

been combined <strong>with</strong> a patented plug system to provide<br />

the drilling industry <strong>with</strong> a safer work environment and<br />

less rig <strong>up</strong>.<br />

The FACTS TM eliminates large cumbersome<br />

cementing heads because cementing operations can<br />

be conducted directly through the FC-1 Fill-Up Tool.<br />

FASTER . . .<br />

Installation of FACTS TM prior to casing run allows<br />

cementing operations to begin <strong>with</strong>out delay.<br />

SAFER . . .<br />

Installation is completed on the floor. Actuation of plug<br />

dropping mechanism occurs remotely.<br />

FASTER + SAFER = DECREASED DRILLING COST<br />

For more information call 1-800-833-7265 or e-mail info@frankscasing.com<br />

www.frankscasing.com<br />

Copyright ª 2003 Frank’s Casing Crew & Rental Tools, Inc., Lafayette, LA


FACTS TM Fill-<strong>up</strong> & Cementing Tool System<br />

Technical Data Sheet<br />

Pressure Rating<br />

Pressure applied to the <strong>tool</strong> from inside the casing results in a piston force<br />

acting <strong>up</strong>ward on the <strong>tool</strong> subjecting it to buckling forces. For this reason,<br />

pressure applied to the <strong>tool</strong> should not exceed the pressures listed below.<br />

FACTS TM FC Tool Pressure Rating (psi)<br />

(For Top Drive w/5ft from link ears to 4-1/2 IF Pin Shoulder)<br />

Bail Length (ft)<br />

Size <strong>up</strong> to 16 <strong>up</strong> to 22<br />

7" to 8-5/8" 5000 5000<br />

9-5/8" & 9-7/8" 5000 5000<br />

10-3/4" 5000 5000<br />

11-3/4" 5000 4400<br />

13-3/8" & 13-5/8" 5000 2500<br />

16" 3000 1700<br />

18-5/8" 2500 1300<br />

20" 2500 1100<br />

Circulation Rates<br />

Circulation Mode - During Circulation, any flow rate needed can be achieved,<br />

especially if <strong>circulating</strong> through tight zones. Typically, flow rates <strong>up</strong> to 25 bpm<br />

can be achieved for short periods of time. High rates and duration may erode<br />

mud saver valve. If <strong>circulating</strong> greater than 6 hours at 15bpm, it is recomended<br />

that the mud saver valve be removed.<br />

Cementing Mode - During cementing, flow rates of 10 bpm for <strong>up</strong> to 3 hours<br />

can be achieved. Displacement rates and times in excesss of 10 bpm for 3<br />

hors can result in a lower observed plug landing pressure.<br />

For more information call 1-800-833-7265 or e-mail info@frankscasing.com<br />

www.frankscasing.com<br />

Copyright ª 2003 Frank’s Casing Crew & Rental Tools, Inc., Lafayette, LA<br />

REVISED 6/7/04

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!