25.10.2013 Views

Gannawarra 2025 - Gannawarra Shire Council

Gannawarra 2025 - Gannawarra Shire Council

Gannawarra 2025 - Gannawarra Shire Council

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

8.5 Water<br />

• Water will be the defining issue for the <strong>Gannawarra</strong><br />

<strong>Shire</strong> over the next 15 years<br />

• Irrigated agriculture has been the backbone of the<br />

<strong>Gannawarra</strong> economy and is likely to remain so.<br />

However, the Murray-Darling Basin Plan will<br />

fundamentally change how irrigation works in<br />

Victoria.<br />

• Irrigated land has 20 times the productivity of dryland<br />

agriculture.<br />

• The level of Commonwealth environmental water<br />

purchase is expected to continue for 5 years.<br />

• Changes in legislation such as the potential removal of<br />

the 4% limit on water trade out of the district; plus the<br />

removal of restrictions of the 10% limit of water held<br />

by non-water users could cause further economic loss.<br />

• The impact of the Murray Darling Basin Plan (MDBP)<br />

is yet to be fully explained and understood.<br />

• Converting some farms in the area to dryland<br />

operations will be challenging because of scale, soil<br />

type and difficulties with land aggregation.<br />

<strong>Gannawarra</strong> <strong>Shire</strong> <strong>Council</strong> 2010<br />

<strong>Gannawarra</strong> <strong>2025</strong>, Strategic Community Plan 29

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!