09.11.2013 Views

Train drivers manual - German Railroads

Train drivers manual - German Railroads

Train drivers manual - German Railroads

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

V O L U M E 2<br />

PC CD-ROM<br />

Fast railcars on<br />

the runway<br />

Munster – Osnabruck – Bremen<br />

<strong>Train</strong> <strong>drivers</strong> <strong>manual</strong>


67,6 - Münster<br />

73,4 - Sudmühle<br />

120,0 m<br />

100,0 m<br />

80,0 m<br />

60,0 m<br />

40,0 m<br />

20,0 m<br />

0,0 m<br />

78,8 - Westbevern<br />

54,3<br />

54,3<br />

86,8 - Brock-Ostbevern<br />

93,1 - Kattenvenne<br />

54,3<br />

54,3<br />

100,6 - Lengerich<br />

105,9 - Natrup-Hagen<br />

90,7<br />

57,0<br />

Osnabruck<br />

Munster<br />

111,8 - Hasbergen<br />

120,6 - Osnabrück<br />

132,4 - Vehrte<br />

139,0 - Osterkappeln<br />

148,2 - Bohmte<br />

159,6 - Lemförde<br />

165,4 - Lembruch<br />

178,0 - Diepholz<br />

186,1 - Drebber<br />

193,1 - Barnstorf<br />

198,9 - Drentwede<br />

207,4 - Twistringen<br />

217,0 - Bassum<br />

Elevation profile Munster – Bremen<br />

101,5<br />

81,9<br />

78,3<br />

75,3<br />

69,8<br />

47,9<br />

43,9<br />

40,2<br />

35,0 37,4 50,6<br />

40,2<br />

221,8 - Bramstedt<br />

50,6<br />

49,6<br />

40,3<br />

226,8 - Syke<br />

230,1 - Barrien<br />

236 - Kirchweyhe<br />

49,6<br />

239,9 - Abz Dreye<br />

16,0<br />

10,8<br />

243,6 - Br-Hemelingen<br />

251,0 - Bremen<br />

10,8<br />

10,8<br />

11,5<br />

Route layout<br />

Bremen<br />

Bremen-Hemelingen<br />

Abzw. Dreye<br />

Kirchweyhe<br />

Syke<br />

Bramstedt<br />

Bassum<br />

Twistringen<br />

Osterkappeln<br />

Vehrte<br />

Bohmte<br />

Lembruch<br />

Lemförde<br />

Drebber<br />

Diepholz<br />

Barnstorf<br />

Drentwede<br />

Central station Bremen<br />

Hasbergen<br />

Natrup-Hagen<br />

Lengerich<br />

Kattenvenne<br />

Central station Munster<br />

Brock-Ostbevern<br />

Sudmühle<br />

Westbevern<br />

Central station Osnabruck


Signal Chart<br />

Signal Chart<br />

Signal Chart<br />

Main signals indicate if the oncoming<br />

part of the track is to be<br />

driven on or not.<br />

Repeater signals indicate the status<br />

of the oncoming main signal.<br />

Speed signals refer to reduced<br />

speed zones.<br />

Hp 0 (semaphore)<br />

Main signal “Stop”.<br />

Stop in front of<br />

the signal. While<br />

switching, permission<br />

to pass can<br />

be asked using the<br />

Tab key.<br />

Hp 1 (semaphore)<br />

Main signal “Clear”.<br />

Passing allowed<br />

within the speed<br />

limit as given in<br />

the speed <strong>manual</strong>.<br />

Hp 0 (light)<br />

Main signal<br />

“Stop”.<br />

Stop in front of<br />

the signal. While<br />

switching, permission<br />

to pass can<br />

be asked using the<br />

Tab key.<br />

Hp 1 (light)<br />

Main signal “Clear”.<br />

Passing allowed within the<br />

speed limit as given in the<br />

speed <strong>manual</strong>.<br />

The tracks switch area:<br />

The tracks switch area is restricted:<br />

The start lies at the signal wherefrom<br />

driving is allowed.<br />

The end lies:<br />

1: at approaching an entry signal<br />

or repeater signal to the main signal<br />

or at a little ahead of a regular<br />

halting point of the train.<br />

2: at approaching an exit signal<br />

behind the last switch of the track.<br />

3: at junction and connection<br />

points with a main signal behind<br />

the last switch in the track.<br />

4: in <strong>Train</strong> Simulator, if single<br />

track area, behind the entry signal<br />

on the opposite side.<br />

Form or semaphore<br />

main signal (Form-<br />

Hauptsignal)<br />

Repeater light<br />

signal (Licht-<br />

Vorsignal)<br />

Main light signal ahead of Munster<br />

central station (Licht-Hauptsignale vor<br />

Muenster Hbf)<br />

Hp 2 (semaphore)<br />

Main signal “reduced<br />

speed”.<br />

Passing is allowed at<br />

no more than 40 km/h.<br />

This reduction applies<br />

to the oncoming track<br />

switch area.<br />

Vr 1 (semaphore)<br />

Repeater signal<br />

“Await clear”.<br />

Await at the next<br />

main signal an all<br />

clear.<br />

Vr 0 (semaphore)<br />

Repeater signal “await<br />

stop”. Await to stop at the<br />

next main signal.<br />

Vr 2 (semaphore)<br />

Repeater signal “Await<br />

reduced speed zone”<br />

Await a reduced speed<br />

zone at the next main<br />

signal.<br />

Hp 2 (light)<br />

Main signal<br />

“reduced speed”.<br />

Passing is allowed<br />

at no more than<br />

40 km/h. This<br />

reduction applies<br />

to the oncoming<br />

track switch area.<br />

Vr 1 (light)<br />

Repeater signal<br />

“Await clear”.<br />

Await at the next<br />

main signal an all<br />

clear.<br />

(The white light indicates<br />

this is a restated<br />

repeater signal)<br />

Vr 0 (light)<br />

Repeater signal “await<br />

stop”<br />

Await to stop at the<br />

next main signal.<br />

(The white light indicates<br />

this is a restated<br />

repeater signal)<br />

Vr 2 (light)<br />

Repeater signal “Await<br />

reduced speed zone”<br />

Await a reduced speed<br />

zone at the next main<br />

signal.<br />

(The white light indicates<br />

this is a restated repeater<br />

signal)


Signal Chart<br />

Signal Chart<br />

Signal Chart<br />

Ne 3<br />

Approach markers.<br />

Expect a repeater<br />

signal.<br />

Sh1<br />

End of passing<br />

prohibition!<br />

Continue at<br />

switching speed of<br />

25 km/h.<br />

Bu 2<br />

Diamond sign<br />

Await a railroad crossing<br />

signal.<br />

Ne 5<br />

Halt sign. Marks the halting<br />

point for trains that<br />

have a scheduled stop.<br />

Ra 10<br />

Halt sign.<br />

No switching beyond<br />

this point.<br />

Lf 1<br />

Reduced speed zone<br />

Await an oncoming<br />

reduced speed zone.<br />

Do not exceed speed<br />

limit.<br />

Sh 0<br />

Stop! No passing!<br />

Use the TAB key<br />

for permission to<br />

pass.<br />

Bu 1<br />

Railroad crossing signal.<br />

(White flashing light)<br />

permission to pass the<br />

railroad crossing.<br />

Wn 1<br />

Switch lanterns show<br />

the status of a switch.<br />

Track is in line.<br />

Wn 2a<br />

Track is branching off.<br />

(facing the “forks” of<br />

the switch)<br />

Lf 2<br />

Start sign. Marks the start<br />

of the temporary reduced<br />

speed zone.<br />

Lf 3<br />

End sign. Marks the end<br />

of thet emporary reduced<br />

speed zone.<br />

Bu 4<br />

Whistle board.<br />

Whistle for about<br />

3 seconds.<br />

If ignored the<br />

activity will end.<br />

Bu 4<br />

When trains have a<br />

planned stop between<br />

a whistle sign and railroad<br />

crossing, the<br />

whistle sign is repeated<br />

after the halting point.<br />

The whistle sign<br />

applies only for trains<br />

not stopping before the<br />

crossing.<br />

Wn 2b<br />

Track is branching<br />

off.<br />

(facing the “heart”<br />

of the switch)<br />

Ra 11<br />

Waiting sign.<br />

Await orders from the<br />

supervisor.<br />

Lf 4<br />

Speed sign.<br />

A permanent reduced<br />

speed zone follows.<br />

Do not exceed the<br />

given limit.<br />

Lf 5<br />

Start sign.<br />

The given speed on the<br />

speed sign (Lf 4) must<br />

be reached.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!