Train drivers manual - German Railroads
Train drivers manual - German Railroads
Train drivers manual - German Railroads
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
V O L U M E 2<br />
PC CD-ROM<br />
Fast railcars on<br />
the runway<br />
Munster – Osnabruck – Bremen<br />
<strong>Train</strong> <strong>drivers</strong> <strong>manual</strong>
67,6 - Münster<br />
73,4 - Sudmühle<br />
120,0 m<br />
100,0 m<br />
80,0 m<br />
60,0 m<br />
40,0 m<br />
20,0 m<br />
0,0 m<br />
78,8 - Westbevern<br />
54,3<br />
54,3<br />
86,8 - Brock-Ostbevern<br />
93,1 - Kattenvenne<br />
54,3<br />
54,3<br />
100,6 - Lengerich<br />
105,9 - Natrup-Hagen<br />
90,7<br />
57,0<br />
Osnabruck<br />
Munster<br />
111,8 - Hasbergen<br />
120,6 - Osnabrück<br />
132,4 - Vehrte<br />
139,0 - Osterkappeln<br />
148,2 - Bohmte<br />
159,6 - Lemförde<br />
165,4 - Lembruch<br />
178,0 - Diepholz<br />
186,1 - Drebber<br />
193,1 - Barnstorf<br />
198,9 - Drentwede<br />
207,4 - Twistringen<br />
217,0 - Bassum<br />
Elevation profile Munster – Bremen<br />
101,5<br />
81,9<br />
78,3<br />
75,3<br />
69,8<br />
47,9<br />
43,9<br />
40,2<br />
35,0 37,4 50,6<br />
40,2<br />
221,8 - Bramstedt<br />
50,6<br />
49,6<br />
40,3<br />
226,8 - Syke<br />
230,1 - Barrien<br />
236 - Kirchweyhe<br />
49,6<br />
239,9 - Abz Dreye<br />
16,0<br />
10,8<br />
243,6 - Br-Hemelingen<br />
251,0 - Bremen<br />
10,8<br />
10,8<br />
11,5<br />
Route layout<br />
Bremen<br />
Bremen-Hemelingen<br />
Abzw. Dreye<br />
Kirchweyhe<br />
Syke<br />
Bramstedt<br />
Bassum<br />
Twistringen<br />
Osterkappeln<br />
Vehrte<br />
Bohmte<br />
Lembruch<br />
Lemförde<br />
Drebber<br />
Diepholz<br />
Barnstorf<br />
Drentwede<br />
Central station Bremen<br />
Hasbergen<br />
Natrup-Hagen<br />
Lengerich<br />
Kattenvenne<br />
Central station Munster<br />
Brock-Ostbevern<br />
Sudmühle<br />
Westbevern<br />
Central station Osnabruck
Signal Chart<br />
Signal Chart<br />
Signal Chart<br />
Main signals indicate if the oncoming<br />
part of the track is to be<br />
driven on or not.<br />
Repeater signals indicate the status<br />
of the oncoming main signal.<br />
Speed signals refer to reduced<br />
speed zones.<br />
Hp 0 (semaphore)<br />
Main signal “Stop”.<br />
Stop in front of<br />
the signal. While<br />
switching, permission<br />
to pass can<br />
be asked using the<br />
Tab key.<br />
Hp 1 (semaphore)<br />
Main signal “Clear”.<br />
Passing allowed<br />
within the speed<br />
limit as given in<br />
the speed <strong>manual</strong>.<br />
Hp 0 (light)<br />
Main signal<br />
“Stop”.<br />
Stop in front of<br />
the signal. While<br />
switching, permission<br />
to pass can<br />
be asked using the<br />
Tab key.<br />
Hp 1 (light)<br />
Main signal “Clear”.<br />
Passing allowed within the<br />
speed limit as given in the<br />
speed <strong>manual</strong>.<br />
The tracks switch area:<br />
The tracks switch area is restricted:<br />
The start lies at the signal wherefrom<br />
driving is allowed.<br />
The end lies:<br />
1: at approaching an entry signal<br />
or repeater signal to the main signal<br />
or at a little ahead of a regular<br />
halting point of the train.<br />
2: at approaching an exit signal<br />
behind the last switch of the track.<br />
3: at junction and connection<br />
points with a main signal behind<br />
the last switch in the track.<br />
4: in <strong>Train</strong> Simulator, if single<br />
track area, behind the entry signal<br />
on the opposite side.<br />
Form or semaphore<br />
main signal (Form-<br />
Hauptsignal)<br />
Repeater light<br />
signal (Licht-<br />
Vorsignal)<br />
Main light signal ahead of Munster<br />
central station (Licht-Hauptsignale vor<br />
Muenster Hbf)<br />
Hp 2 (semaphore)<br />
Main signal “reduced<br />
speed”.<br />
Passing is allowed at<br />
no more than 40 km/h.<br />
This reduction applies<br />
to the oncoming track<br />
switch area.<br />
Vr 1 (semaphore)<br />
Repeater signal<br />
“Await clear”.<br />
Await at the next<br />
main signal an all<br />
clear.<br />
Vr 0 (semaphore)<br />
Repeater signal “await<br />
stop”. Await to stop at the<br />
next main signal.<br />
Vr 2 (semaphore)<br />
Repeater signal “Await<br />
reduced speed zone”<br />
Await a reduced speed<br />
zone at the next main<br />
signal.<br />
Hp 2 (light)<br />
Main signal<br />
“reduced speed”.<br />
Passing is allowed<br />
at no more than<br />
40 km/h. This<br />
reduction applies<br />
to the oncoming<br />
track switch area.<br />
Vr 1 (light)<br />
Repeater signal<br />
“Await clear”.<br />
Await at the next<br />
main signal an all<br />
clear.<br />
(The white light indicates<br />
this is a restated<br />
repeater signal)<br />
Vr 0 (light)<br />
Repeater signal “await<br />
stop”<br />
Await to stop at the<br />
next main signal.<br />
(The white light indicates<br />
this is a restated<br />
repeater signal)<br />
Vr 2 (light)<br />
Repeater signal “Await<br />
reduced speed zone”<br />
Await a reduced speed<br />
zone at the next main<br />
signal.<br />
(The white light indicates<br />
this is a restated repeater<br />
signal)
Signal Chart<br />
Signal Chart<br />
Signal Chart<br />
Ne 3<br />
Approach markers.<br />
Expect a repeater<br />
signal.<br />
Sh1<br />
End of passing<br />
prohibition!<br />
Continue at<br />
switching speed of<br />
25 km/h.<br />
Bu 2<br />
Diamond sign<br />
Await a railroad crossing<br />
signal.<br />
Ne 5<br />
Halt sign. Marks the halting<br />
point for trains that<br />
have a scheduled stop.<br />
Ra 10<br />
Halt sign.<br />
No switching beyond<br />
this point.<br />
Lf 1<br />
Reduced speed zone<br />
Await an oncoming<br />
reduced speed zone.<br />
Do not exceed speed<br />
limit.<br />
Sh 0<br />
Stop! No passing!<br />
Use the TAB key<br />
for permission to<br />
pass.<br />
Bu 1<br />
Railroad crossing signal.<br />
(White flashing light)<br />
permission to pass the<br />
railroad crossing.<br />
Wn 1<br />
Switch lanterns show<br />
the status of a switch.<br />
Track is in line.<br />
Wn 2a<br />
Track is branching off.<br />
(facing the “forks” of<br />
the switch)<br />
Lf 2<br />
Start sign. Marks the start<br />
of the temporary reduced<br />
speed zone.<br />
Lf 3<br />
End sign. Marks the end<br />
of thet emporary reduced<br />
speed zone.<br />
Bu 4<br />
Whistle board.<br />
Whistle for about<br />
3 seconds.<br />
If ignored the<br />
activity will end.<br />
Bu 4<br />
When trains have a<br />
planned stop between<br />
a whistle sign and railroad<br />
crossing, the<br />
whistle sign is repeated<br />
after the halting point.<br />
The whistle sign<br />
applies only for trains<br />
not stopping before the<br />
crossing.<br />
Wn 2b<br />
Track is branching<br />
off.<br />
(facing the “heart”<br />
of the switch)<br />
Ra 11<br />
Waiting sign.<br />
Await orders from the<br />
supervisor.<br />
Lf 4<br />
Speed sign.<br />
A permanent reduced<br />
speed zone follows.<br />
Do not exceed the<br />
given limit.<br />
Lf 5<br />
Start sign.<br />
The given speed on the<br />
speed sign (Lf 4) must<br />
be reached.