12.11.2013 Views

19 MB PDF - GlobalSecurity.org

19 MB PDF - GlobalSecurity.org

19 MB PDF - GlobalSecurity.org

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

AIR FORCE PROGRAMS<br />

Force as not pertinent to technical development of the Phase 3 missile. A fourth shot was successfully conducted.<br />

DOT&E continues to monitor progress towards accreditation of the model and readiness for operational testing. The<br />

limited number of planned live shots places a strong reliance on modeling and simulation to confirm the full weapons<br />

employment envelope and operational effectiveness of the Phase 3 P 3 I AMRAAM missile. The modeling and simulation<br />

suite has not yet been delivered to the government <strong>org</strong>anizations that must understand and validate it. If this situation is<br />

not corrected, completion of operational testing on schedule is in jeopardy. Additional live test shots will have to be<br />

added to the planned operational test to ensure an adequate effectiveness evaluation in the event that the modeling and<br />

simulation suite cannot be validated.<br />

226

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!